+ All Categories
Home > Documents > Design Development Progress December 2005 NEW SOUTH COUNTY HIGH SCHOOL.

Design Development Progress December 2005 NEW SOUTH COUNTY HIGH SCHOOL.

Date post: 27-Mar-2015
Category:
Upload: danielle-carroll
View: 216 times
Download: 1 times
Share this document with a friend
Popular Tags:
16
Design Development Progress December 2005 NEW SOUTH COUNTY HIGH SCHOOL
Transcript
Page 1: Design Development Progress December 2005 NEW SOUTH COUNTY HIGH SCHOOL.

Design Development Progress

December 2005NEW

SOUTH COUNTY

HIGH SCHOOL

Page 2: Design Development Progress December 2005 NEW SOUTH COUNTY HIGH SCHOOL.

Owner Information Fulton County Schools

Opening Date August 2008

Address/ Location Hall and Jones Road

Construction Budget $ 45,081,700 (Building: $34,081,700 & Site: $11,000,000)

Sq. Ft. $ 100.00/ sq. ft.

Architectural Firm R L Brown & Associates, Inc.

Design Requirements Parking : 628 spaces

Project Description The project consists of the construction of a multi-story HS building(s), which includes, but is not limited to: site improvements; administrative offices, classrooms & labs, cafeteria & kitchen, media center, gym, art suites, performance hall, out-door classrooms, bus and parent drop-off loops, landscaping, athletic venues, such as, football stadium & practice field, baseball and softball fields, tennis courts, and parking.

F.T.E. (Number of Students) 1875 (Core capacity of 2,500 F.T.E.)

Instructional Units (IU) 97

Programmed Area 252,457 Sq. ft.

Building Grossing Factor 1.35

Building Area 340,817 Sq. ft.

Special Programs

Psycho Ed Unit (Metro Program) South Fulton Regional – Psych-Ed & Special Ed Programs

ROTC 3 - Instructors Model

Career Technology Program Family & Consumer Sciences; Business Management; Information Technology; Diversified Tech; Excel/ Career Tech; Marketing; Auto Service Tech; Visual Communication and Design

New South County High School FACT SHEETFacts

Page 3: Design Development Progress December 2005 NEW SOUTH COUNTY HIGH SCHOOL.

Location Plan

Page 4: Design Development Progress December 2005 NEW SOUTH COUNTY HIGH SCHOOL.

Vicinity Plan

Site for High School

Site for Elem. School

Page 5: Design Development Progress December 2005 NEW SOUTH COUNTY HIGH SCHOOL.

New South County High School Site PlanSite Plan

Page 6: Design Development Progress December 2005 NEW SOUTH COUNTY HIGH SCHOOL.

Student Drop-off

Page 7: Design Development Progress December 2005 NEW SOUTH COUNTY HIGH SCHOOL.

Auditorium

Page 8: Design Development Progress December 2005 NEW SOUTH COUNTY HIGH SCHOOL.

QuickTime™ and aSorenson Video decompressorare needed to see this picture.

Entry Sequence

Page 9: Design Development Progress December 2005 NEW SOUTH COUNTY HIGH SCHOOL.

Entry

Page 10: Design Development Progress December 2005 NEW SOUTH COUNTY HIGH SCHOOL.

Entry VRML

Page 11: Design Development Progress December 2005 NEW SOUTH COUNTY HIGH SCHOOL.

Gallery

Page 12: Design Development Progress December 2005 NEW SOUTH COUNTY HIGH SCHOOL.

Media Room VRML

Page 13: Design Development Progress December 2005 NEW SOUTH COUNTY HIGH SCHOOL.

Cafeteria

Page 14: Design Development Progress December 2005 NEW SOUTH COUNTY HIGH SCHOOL.

Cafeteria VRML

Page 15: Design Development Progress December 2005 NEW SOUTH COUNTY HIGH SCHOOL.

Classroom View

Page 16: Design Development Progress December 2005 NEW SOUTH COUNTY HIGH SCHOOL.

Night View


Recommended