Objectives
To hydraulically
design awastewatercollection system for the
NNA usingSewarCAD .
To estimate
the potentialcost of thisnetwork
To design aWDN forthe NNAusingWaterCAD
The main objectives of thisproject are:
8/10/2019 Design of a Sewer System Collection 1.2
4/26
Introduction
the traditional way to dispose of wastewater is cesspit. the solution is to design sewage
collection system .Design of water distribution network isone of the most important
infrastructure action .
8/10/2019 Design of a Sewer System Collection 1.2
5/26
Study Area
Climate
Population The reasonsfor
choosingthe NNA
Location
Study Area
A
D B
C
8/10/2019 Design of a Sewer System Collection 1.2
6/26
Study Area
Climate
Population The reasonsfor
choosingthe NNA
Location
Study Area
A
D B
C
8/10/2019 Design of a Sewer System Collection 1.2
7/26
Study Area
Climate
Population The reasonsfor
choosingthe NNA
Location
Study Area
A
D B
C
8/10/2019 Design of a Sewer System Collection 1.2
8/26
Study Area
Climate
Population The reasonsfor
choosingthe NNA
Location
Study Area
A
D B
C
8/10/2019 Design of a Sewer System Collection 1.2
9/26
Methodology:
1
Selection of the
study area
Collect thedata relatedto the study
area
Training onSewerCAD software andWaterCADsoftware
Design andanalysissewage
network &waterdistribution
2
3
4
http://g/%D8%B4%D8%B4/%D8%A8%D9%88%D8%B1%D8%A8%D9%88%D9%8A%D9%86%D8%AA%20%D8%A8%D8%B1%D8%B2%D9%86%D8%AA%D9%8A%D8%B4%D9%86/%D8%B5%D9%88%D8%B1%D8%A97.JPG8/10/2019 Design of a Sewer System Collection 1.2
10/26
Collect the data related to the study area:
Contour map.Information from Nablus Municipality aboutthe study areaCollect information from the residents of
the study area through personal interviews.AutoCAD and GIS data for the study area.
8/10/2019 Design of a Sewer System Collection 1.2
11/26
8/10/2019 Design of a Sewer System Collection 1.2
12/26
Input information to SewarCAD
Constraints information
8/10/2019 Design of a Sewer System Collection 1.2
13/26
Input information to SewarCAD
Manhole information
8/10/2019 Design of a Sewer System Collection 1.2
14/26
Input information to SewarCAD
Sewer information
8/10/2019 Design of a Sewer System Collection 1.2
15/26
Input information to SewarCAD
Outlet information
8/10/2019 Design of a Sewer System Collection 1.2
16/26
Input information to SewarCAD
select steady statecalculation type andthen press run.
8/10/2019 Design of a Sewer System Collection 1.2
17/26
Result
Diameters Velocity Cover Slope
8/10/2019 Design of a Sewer System Collection 1.2
18/26
Estimate the cost of the network
Cost of excavation = 124131.875 NIS
Cost of Sewer = 379295 NIS
Cost of manholes = 79500 NIS
Cost of covers = 68900 NIS.
Cost of basement concrete = 3205.44
Cost of base coarse = 39457.6
Cost of Asphalt = 140920 NIS
8/10/2019 Design of a Sewer System Collection 1.2
19/26
WaterCAD
Draw Network.
8/10/2019 Design of a Sewer System Collection 1.2
20/26
Input information to WaterCAD
junction information
8/10/2019 Design of a Sewer System Collection 1.2
21/26
Input information to WaterCAD
Pipe information
8/10/2019 Design of a Sewer System Collection 1.2
22/26
Input information to WaterCAD
Reservoir information
8/10/2019 Design of a Sewer System Collection 1.2
23/26
Run network
8/10/2019 Design of a Sewer System Collection 1.2
24/26
Result
Diameters
Velocity
Pressure
8/10/2019 Design of a Sewer System Collection 1.2
25/26
Result
Diameters
Velocity
Pressure
8/10/2019 Design of a Sewer System Collection 1.2
26/26
L/O/G/O
Th an k Yo u !
Working hard
Design &Analysis
Finished