1
The Gas Technology Centre NTNU-SINTEF has the pleasure to invite you to a free Technical seminar 5 november 12.15 - 13.00, Electrical Engineering EL6 Julio González Díaz, University of Santiago de Compostela Design of access tariffs to the natural gas transmission networks in the European Union The EU, through its 3rd Energy Package, recommends that the access tariffs to the different gas networks are computed following entry-exit methodologies. One of the main goals is to get harmonized transmission tariff structures in the EU that are cost reflective and facilitate gas trade, fostering competition without discriminating third party access to the networks. 150 150 Santander A Coruña Red Básica de gas natural E 2011 PLANTA DE BILBAO AASS GAVIOTA 20” 1.546 8” Ferrol Avilés Gijón Luarca 20” PLANTA DE MUGARDOS 150 150 800 238 C.I. IRÚN (ampliación 2015) 150 150 413 PLANTA DEL MUSEL 200 150 800 Llanera 26As Pontes Categoría Planificación A Oviedo Santander A Coruña León Pontevedra Bilbao Lugo Enero 2011 Pamplona S. Sebastián Vitoria Navarra AASS SERRABLO H 20” 12” 16” Ponferrada 8” 26” 30” 26” 10” Larrau 14” Villalba Vigo Guitiriz Santiago Caldas de Reis Astorga Vill ñ Langreo Reinosa Castro U. Miranda Arrigorriaga Vergara Irún Estella Viana Lesaka Sangüesa 16” 8” 12” 20” 20” C.I. LARRAU (ampliación 2013) 1626” 820 12” Treto 283 30” Lemona Llanera 26 Abegondo Ribadeo Villafranca del Bierzo Bermeo 26” Villapresente 26” 26” Viella La Junquera Andorra la Vella 26Palencia Valladolid Burgos Zamora Ourense Zaragoza Soria Huesca Lérida Barcelona PLANTA DE BARCELONA Villar de Arnedo Haro Aranda 20” 20” 20” 20” 12” 12” 8” 6” 20” 26” 26” 12” 24” 30” Monzón Manresa 12” 10” Montmeló Mataró Gerona 20” 20” 20” Alfarrás Vigo Tuy Villamañan Benavente Lerma Toro Tordesillas Cuellar Tudela 4” 6” 12” 10” Castelnou Zuera Logroño Braga O t 26” 26” Villamayor 1.950 Olmedo Medina del 20” 16 12” 12” 20” 6” Almazán Turégan Caspe Agreda Calatayud 10” 12” Ejea 30” Reus Figueras 36” Viella 30” Martorell 36” 26 26” 150 150 150 150 80 80 Salamanca Segovia Madrid Tarragona Algete Guadalajara Getafe Alcalá 26” 16” 26” 24” 8” Bañeras Tortosa Alcora 12” 4” Guarda Viseu Oporto 30” Teruel 20” 12” Campo 1228” 20” Ávila AASS DE Villalba 16” 12” o Alcañiz Caspe Castor 26” 20Otero de Herreros. 12” Arévalo Reus 30” 26” Yela 26” 40” Tivissa Zarza de Tajo n.d.” Calamocha 150 Cuenca Cáceres Toledo Talavera Castellón Valencia Ciudad Real Tarancón 26” 26” 20” Plasencia 10” 8” Segorbe Sagunto Paterna Lliria Cheste 6” Carlet Portalegre Campomaior Leiria 12” 12 28” 28” PLANTA DE SAGUNTO CARRIZO 32” Alcázar de San Juan Aranjuez 1.000 150 150 20 36” Don Benito 12” Onda Miajadas Zarza de Tajo 150 150 Córdoba Badajoz Almendralejo Alicante Murcia Ciudad Real Caudete Albacete PLANTA DE CARTAGENA 32” 28” Puertollano 26” 30” Mérida Linares 1212” 10” Carlet Denia Agullent Elche Lisboa Sines 32” 24” Jerez de los Caballeros 120 P. Génave 6” 32” 120 Chinchilla PLANTA DE GRAN CANARIA Úbeda Villafranca de los barros 16” Villarrobledo 20” Villanueva de la Serena 127 105 55 100 60 Jaén MARISMAS PALANCARES Granada Málaga Huelva Sevilla Jerez Puente Genil 48” Murcia Cartagena Lorca PLANTA DE CARTAGENA 20” 26” Osuna 16” 10” 12 8” 20” 10” 8” 10” 10” 10” 10” 20” 16” PLANTA DE SINES 1.350 1.350 Almería 900 30” 30” Totana Almacenamiento subterráneo ( en Mm 3 (n) gas) Almacenamiento subterráneo (en proyec./const.) Fuente- Álamo 150 150 150 150 Planta de regasificación (en miles de m 3 de gnl) Pl t d ifi PLANTA DE TENERIFE 150 150 150 150 150 Úbeda 8” Almonte 42” Baeza Mancha Real Espera Guadix 16” Ad El Ruedo Las Barreras PLANTA DE HUELVA POSEIDON Málaga Cádiz Algeciras Jerez Estepona Motril C.I. MARRUECOS 16” 10” 16” Mijas Capacidad de extracción (en miles m 3 (n)/h de gas) Estación de compresión Estación de compresión (en proyec./const.) Gasoducto de transporte (en construcción) (fecha de puesta en marcha más allá de 2014 o no definida) Planta de regasificacn (en proyecto o en construcción) Capacidad de regasificación (miles de m 3 (n)/h) Capacidad de regasificación (en proyec./const.) Yacimiento Conexión internacional ( en miles m 3 (n)/h ) 12” 16” Nerja Adra 20” C.I. ALMERÍA (Operativa hacia Febrero 2011) One theoretical advantage of entry-exit tariffs is that they can provide locational signals both for efficient gas injections and off-takes and for potential network expansions. This talk will give an overview of the main methodologies that are currently being discussed in different regulatory bodies within the EU, highlighting some relevant properties and connections. General representation of the Spanish gas network Gas technology for future generations To receive a free lunch, please register no later than 09:00 on 4 November at www.sintef.no/gass
Transcript
Page 1: Design of access tariffs to the natural gas transmission networks … · 2014. 11. 17. · The Gas Technology Centre NTNU-SINTEF has the pleasure to invite you to a free Technical

The Gas Technology Centre NTNU-SINTEF has the pleasure to invite you to a free

Technical seminar 5 november 12.15 - 13.00, Electrical Engineering EL6

Julio González Díaz, University of Santiago de Compostela

Design of access tariffs to the natural gas transmission networks in the European Union

The EU, through its 3rd Energy Package, recommends that the access tariffs to the different gas networks are computed following entry-exit methodologies. One of the main goals is to get harmonized transmission tariff structures in the EU that are cost reflective and facilitate gas trade, fostering competition without discriminating third party access to the networks.

150150

SantanderA Coruña

Red Básica de gas natural

E 2011

PLANTA DE BILBAOAASS GAVIOTA

20”1.546

8”

FerrolAvilés

GijónLuarca

20”

PLANTA DE MUGARDOS

150 150800 238 C.I. IRÚN (ampliación 2015)

150150

413

PLANTA DEL MUSEL

200 150

800

Llanera 26”As Pontes

Categoría Planificación AOviedo

SantanderA Coruña

LeónPontevedra

Bilbao

Lugo

Enero 2011

Pamplona

S. Sebastián

Vitoria Navarra AASS SERRABLO

H

20”

12”

16”

Ponferrada8”

26”30”

26”

10”

Larrau

14” Villalba

Vigo

Guitiriz

Santiago

Caldas de Reis

AstorgaVill ñ

Langreo

Reinosa

Castro U.

Miranda

Arrigorriaga

Vergara

Irún

EstellaViana

Lesaka

Sangüesa

16”

8”

12”

20”

20”C.I. LARRAU (ampliación 2013)

16”

26”

820

12”

Treto

283

30”Lemona

Llanera 26Abegondo

Ribadeo

Villafranca del Bierzo

Bermeo

26”

Villapresente 26” 26”

Viella

La JunqueraAndorra la Vella

26”

Palencia

Valladolid

Burgos

Zamora

Ourense

ZaragozaSoria

Huesca

Lérida BarcelonaPLANTA DE BARCELONA

Villar de Arnedo

Haro

Aranda

20”

20”

20”

20”

12”

12”

8”

6”20”

26”

26”

12”

24”

30” Monzón

Manresa

12”

10” Montmeló

Mataró

Gerona

20”

20”20”

Alfarrás

Vigo

Tuy

Villamañan

BenaventeLerma

Toro

Tordesillas Cuellar

Tudela

4”6”

12”10”

Castelnou

Zuera

Logroño

Braga

O t 26”

26”

Villamayor

1.950Olmedo

Medina del

20”

16

12”

12”

20”6”

AlmazánTurégan

Caspe

Agreda

Calatayud

10”

12”Ejea

30”Reus

Figueras

36”

Viella

30”

Martorell

36”

26

26”

150 15015015080 80Salamanca Segovia

Madrid

Tarragona

Algete Guadalajara

Getafe

Alcalá

26”16”

26”

24”8” Bañeras

Tortosa

Alcora 12”

4”

GuardaViseu

Oporto

30” Teruel

20”

12”

Campo

12”

28”

20”Ávila

AASS DE

Villalba

16”

12”oAlcañiz

Caspe

Castor

26”

20”

Otero de Herreros.12”

ArévaloReus

30”

26”Yela 26”

40”

Tivissa

Zarza de Tajo

n.d.”

Calamocha

150150Cuenca

CáceresToledoTalavera

Castellón

Valencia

Ciudad Real

Tarancón

26” 26”

20”

Plasencia10”

8”

Segorbe

SaguntoPaterna

Lliria

Cheste

6”Carlet

PortalegreCampomaior

Leiria

12”12

28”28” PLANTA

DE SAGUNTO

SSCARRIZO

32”Alcázar de San Juan

Aranjuez 1.000

150150

20

36”Don Benito

12”

Onda

Miajadas

Zarza de Tajo

150

150

Córdoba

Badajoz Almendralejo

Alicante

Murcia

Ciudad Real

CaudeteAlbacete

PLANTA DE CARTAGENA

32”

28” Puertollano

26”

30”

Mérida

Linares12”

12”

10”

Carlet

DeniaAgullent

Elche

Lisboa

Sines

32”

24”

Jerez de los Caballeros

120P. Génave

6”

32”

120

Chinchilla

PLANTA DE GRAN CANARIA

Úbeda

Villafranca de los barros

16”

Villarrobledo20”Villanueva de

la Serena

12710555

10060

Jaén

MARISMAS

PALANCARES

Granada

Málaga

Huelva Sevilla

Jerez

Puente Genil48”

Murcia

CartagenaLorca

PLANTA DE CARTAGENA

20”

26”

Osuna

16”

10”

12

8”

20”

10”

8”

10”

10”

10”10”

20”

16”

PLANTA DE SINES

1.350

1.350

Almería

900 30”

30”

Totana

Almacenamiento subterráneo ( en Mm3(n) gas)

Almacenamiento subterráneo (en proyec./const.)

Fuente-Álamo

150

150150150Planta de regasificación (en miles de m3 de gnl)

Pl t d ifi ió

PLANTA DE TENERIFE

150 150150150

150

Úbeda8”

Almonte42”

BaezaMancha Real

Espera

Guadix

16”

Ad

El Ruedo

Las Barreras

PLANTA DE HUELVA POSEIDONMálaga

Cádiz

Algeciras

Jerez

Estepona

Motril

C.I. MARRUECOS

16”

10”

16”

Mijas

Capacidad de extracción (en miles m3(n)/h de gas)

Estación de compresiónEstación de compresión (en proyec./const.)

Gasoducto de transporte (en construcción)(fecha de puesta en marcha más allá de 2014 o no definida)

Planta de regasificación(en proyecto o en construcción)

Capacidad de regasificación (miles de m3(n)/h)

Capacidad de regasificación (en proyec./const.)

YacimientoConexión internacional ( en miles m3(n)/h )

12”

16”

Nerja Adra 20”

C.I. ALMERÍA (Operativa hacia Febrero 2011)

One theoretical advantage of entry-exit tariffs is that they can provide locational signals both for efficient gas injections and off-takes and for potential network expansions.

This talk will give an overview of the main methodologies that are currently being discussed in different regulatory bodies within the EU, highlighting some relevant properties and connections.

General representation of the Spanish gas network

Gas technology for future generations

To receive a free lunch, please register no later than 09:00 on 4 November at www.sintef.no/gass