TEXAS DEPARTMENT OF TRANSPORTATION
D A L L A S D I S T R I C T
0909
_123
019
Connecting You With TexasKAUFMAN COUNTY DESIGN PROJECTS2020 HIGHWAY PROJECTS:
Dallas District Office4777 E. Highway 80Mesquite, TX 75150
TxDOT graphic
CONTACT INFORMATIONLisa WalzlPublic Information Officer (214) [email protected]
SOURCE: Texas Department of Transportation.
KAUFMAN COUNTY PROJECTS IN DESIGN (WINTER Q1 2020)# CSJ Hwy Project Limits Description Letting Est. Cost
1 0095-03-085 US 80 At FM 460 Replace bridge and approaches Aug-2022 $7.8 M
2 0197-04-081 US 175 At Little Cottonwood Creek Replace bridge and approach railing Jun-2021 $0.1 M
3 2982-01-007 FM 1390 FM 148 to SH 34 Reconstruct existing pavement and add shoulders Feb-2021 $6.8 M
4 0095-04-069 US 80 At SH 205/FM 148 Intersection improvements Aug-2020 $9.3 M
5 0197-03-054 US 175 FM 148 to CR 4106 in CrandallConstruct new 2-lane frontage roads; convert existing frontage road from 2-lane 2-way to 2-lane 1-way frontage road & ramp modifications
Aug-2020 $13 M
6 0095-03-080 US 80Lawson Rd. (Dallas / Kaufman County Line) to FM 460
Reconstruct and widen 4 to 6 mainlanes and reconstruct 4 lane discontinuous frontage roads
Aug-2022 $133 M
7 2588-01-017 FM 548 Windmill Farms to Rockwall County Line Widen and Reconstruct 2 Lane Rural to 4 Lane Urban Mar-2023 $27 M
8 0751-05-001 FM 148 S of FM 3039 to US 175 Construct 0 to 2 lane rural undivided roadway Sep-2024 $28.3 M
9 0197-03-074 US 175 Dallas County Line to W of FM 1389 Ramp Modifications Oct-2020 $2.0 M
ESTIMATED TOTAL $227.3 M
WINTER • Q1 2020
NOTICE: This map was produced for internal use within the Texas Department of Transportation. Accuracy is limited to the validity of the data as of WINTER Q1 2020.
1
2
3
4
5
67
9
8
20
KAUFMAN CO.
HUNT CO.
ELLIS CO.
KAUFMAN CO.
HENDERSON CO.
KAUFMAN CO.
KAUF
MAN
CO.
KAUF
MAN
CO.
VAN
ZAND
T CO.
DALL
AS CO
.
KAUF
MAN
CO.
ROCKWALL CO.
KAUFMAN CO.
VAN
ZAND
T CO.
N
5 miles
Elmo
KAUFMAN
Crandall
Malloy Bridge
Rd.
Cedar CreekReservoir
NewTerrell CityLake
Post OakBend City
Rosser Cottonwood Grays Prairie
Oak Grove
Kemp
Scurry
Talty
Mabank
WillsPoint
Forney
Seagoville
Mesquite
DALLAS CO.
ELLIS CO.
429751
47
429
429
429
148
148
660
660
557740
548
741
987
90
90
2578
1392
205
243
243
243
198
198
274
34
34
34
34
34
175
175
175
80
80
28601390
1390
2613
3094
3396
3080
1391
1836
1895
1895
2727
2515
2965
34
34
80
80
2728
20
20
20
20
986548
740
1641
2451
148
148
2728
148
205
1836
1388
148
175
3039
2728
2932
460
Design Project Limits
TERRELL
Oak Ridge
Combine
To I-635