E 503-CCPJ-01
INDIANA DEPARTMENT OF TRANSPORTATION
STANDARD DRAWING NO.
DATECHIEF ENGINEER
DATEDESIGN STANDARDS ENGINEER
SEPTEMBER 2020
SHEET NO.
SUBJECT
INDEX
1
2
3
4
PCCP Joints Index
INDEX
PCCP JOINTS
Sawed Joints and Joint Sealant
5
D-1 Contraction Joint Details
Transverse Construction Joint Details
2. Tie-bars shall be epoxy coated.
1. Dowel bars shall be epoxy coated.
GENERAL NOTES:
Longitudinal Joint Details
03/10/20
05/08/20
Top of Pavement
1/4" ± 1/16"
SAW CUT WITH HOT POURED SEALANT
TRANSVERSE AND LONGITUDINAL
D/2
D
Tie-Bar or Dowel Bar
Bottom of Saw Cut
Saw Cut
2
TYPE OF JOINT SEALANT
DEPTH OF
SAW CUT
DEPTH OF
Longitudinal Joint
D-1 Contraction Joint
Retrofit Contraction Joint
Retrofit Pressure Relief Joint
Transverse Construction Joint
Longitudinal Construction Joint
D/3
D/3
1"
1"
1"
1"
2" (min.)
2" (min.)
Bottom of Saw Cut
Bottom of Saw Cut
Bottom of Saw Cut
Bottom of Saw Cut
3
3
E 503-CCPJ-02
INDIANA DEPARTMENT OF TRANSPORTATION
STANDARD DRAWING NO.
DATECHIEF ENGINEER
DATEDESIGN STANDARDS ENGINEER
SEPTEMBER 2020
JOINT SEALANT
AND
SAWED JOINTS
D = PCCP Thickness
Standard Drawing Series E 506-CCPP.
3 For retrofit contraction joint and pressure relief joint details, see
2 Backer rod shall not be installed.
1. Multiple passes of sealant may be required.
NOTES:
Depth of Saw CutDepth of Sealant
1/4" ± 1/16"
03/10/20
05/08/20
9"
Sawed Contraction Joint Seal
D/3
D
LONGITUDINAL SECTION THROUGH PCCP
TYPE D-1 CONTRACTION JOINT
9"
D/2
(Dowel bar diameter as shown on the plans.)
Dowel Bars at 1'-0" c/c,
PLAN
Transverse Construction Joint
Longitudinal Joint
Lane
Lane
6'-0"
D-1 Contraction Joint
Tie-Bar (typ.)
at 1'-0" (typ.)
Dowel Bar
6" (typ.)
L
D/2D
Transverse Saw Cut
PLAN HORIZONTAL SKEW
PCCP Centerline
Dowel Bar Parallel with
ELEVATION VERTICAL TILT
Face of Saw Cut
New PCCP New PCCP
New PCCP New PCCP
Horizontal Skew ± 1/4"
Vertical Tilt Tolerance ± 1/4"
L
roadway surface
of Dowel Bar parallel with
longitudinal alignment
Roadway Surface
PCCP Centerline
E 503-CCPJ-03
INDIANA DEPARTMENT OF TRANSPORTATION
STANDARD DRAWING NO.
DATECHIEF ENGINEER
DATEDESIGN STANDARDS ENGINEER
SEPTEMBER 2020
D-1 CONTRACTION JOINT DETAILS
03/10/20
05/08/20
Saw Cut
D
A
PLAN
(See table for tie-bar diameter)
Tie-Bar
2'-0"
D/2
Transverse Construction Joint
Longitudinal Joint
6" (typ.)
Tie-Bar at 1'-0" c/c (typ.)
Lane
Lane
A
6'-0"
D-1 Contraction Joint
Dowel Bar (typ.)
2'-0"
SECTION A-A
(TIE-BARS PLACED IN PLASTIC CONCRETE)
D
D/2
d
le
SECTION A-A
(RETROFITTED TIE-BARS)
Existing PCCP PCCP Patch or New Pavement
Approved Chemical Anchor SystemTie-Bar (See table for details)
Tie-Bar Size
2'-0"
1'-0"
1'-8"
TIE-BAR SIZES FOR TRANSVERSE CONSTRUCTION JOINT
Pavement Thickness, D
Less than 9"
9" through 12"
Greater than 12"
#5
#8
#10
(Retrofit)
Min. le
PCCP Patch
L
PCCP Patch
PLAN
HORIZONTAL SKEW
ELEVATION
VERTICAL TILT
D/2D
or New Pavement
or New Pavement
Face of PCCP PCCP Centerline
Vertical Tilt Tolerance ± 1"
Horizontal Skew Tolerance ± 1"PCCP centerline
of tie-bar parallel with
longitudinal alignment
L
roadway surface
of tie-bar parallel with
longitudinal alignment
Face of PCCP
Roadway Surface
or New Pavement
or New Pavement
Existing PCCP
Existing PCCP E 503-CCPJ-04
INDIANA DEPARTMENT OF TRANSPORTATION
STANDARD DRAWING NO.
DATECHIEF ENGINEER
DATEDESIGN STANDARDS ENGINEER
SEPTEMBER 2020
anchor system manufacturer's instructions.
1. Diameter of drilled hole (d) shall be in accordance with the chemical
NOTE:
JOINT DETAILS
TRANSVERSE CONSTRUCTION
2'-0"
03/10/20
05/08/20
Tie-Bar SizePavement Thickness, D
Less than 9"
9" through 12"
Greater than 12"
Spacing
#5
#6
TIE-BAR SIZES FOR LONGITUDINAL CONSTRUCTION JOINTS
3'-0" c/c
3'-0" c/c
2'-0" c/c
#7 3'-0" c/c
#6 or
for placement of adjacent lane
Tie-bar staightened and ready concealed in pavement
Tie-bar bent 60° and Single-Pass Saw Cut
Completed
Slab
30°
D
A
A
SECTION A-A
LONGITUDINAL CONSTRUCTION JOINT PLAN VIEW
(BENT TIE-BAR PLACED IN PLASTIC CONCRETE) (See table for details)
Tie-Bar
1'-6" 1'-6"
D/2
D/2
D
1'-6"1'-6"
(See table for tie-bar size)
Tie-Bar at 3'-0" c/c
Single Pass Saw Cut
LONGITUDINAL JOINT TRANSVERSE SECTION THROUGH PCCP
Tie-Bar SizePavement Thickness, D
#5
#6
TIE-BAR SIZES FOR LONGITUDINAL JOINT
Less than or equal to 9"
Greater than 9"
2'-0"
Existing PCCP
Existing PCCP
Tie-Bar (See table for details)
Approved Chemical Anchor System
d
D/2
D
LONGITUDINAL CONSTRUCTION JOINT TRANSVERSE SECTION THROUGH PCCP
(RETROFITTED TIE-BARS)
1'-0"
E 503-CCPJ-05
INDIANA DEPARTMENT OF TRANSPORTATION
STANDARD DRAWING NO.
DATECHIEF ENGINEER
DATEDESIGN STANDARDS ENGINEER
SEPTEMBER 2020
LONGITUDINAL JOINT DETAILS
2. For retrofitted tie-bar skew and tilt tolerances see 503-CCPJ-04.
anchor system manufacturer's instructions.
1. Diameter of drilled hole (d) shall be in accordance with the chemical
NOTE:
03/10/20
05/08/20