1st Creative Factory Production Assignment
s1190071 Soichiro Kandos1200150 Kanji Kobayashis1200215 Nobuaki Kawauchis1200225 Yuta Takahashis1200243 Takashi Norimatsu
Our team making wrecker!
What is wrecker?
-A wrecker is a truck used to move disabled, improperly parked, or otherwise indisposed motor vehicles.
Parts List
Upper Parts ->
Lower Parts->
Making Upper part 1
Assemble the small parts
Making Upper part 2
Assembly of the seat portion and a crane part.
Making Lower
Making base of truck.
Making seat and tire.
Work was hard because small parts
there were many.
Fusion!
The fusion of upper parts andlower parts.Assemble carefully as parts is not taken.
product prototype1.Carry it is necessary to know the weight of the car.
There is also need to know horsepower track
accompanied therewith.
2.Even if there is a force on the track,
there is no sense to be cut wires.
Need strength to the wire.
3.Track is no meaning if poor maintenance even carry the car.
Regular maintenance is essential.
members collaborate
Planning(Kanji Kobayashi)To determine who is responsible for which part.
I answered if others had questions.
Analysis(Nobuaki Kawauchi, Soichiro Kanda)Read the instructions and understand the assembly method.
Check whether there is a shortage of parts.
Design(Yuta Takahashi)Check read the instructions that there are no design errors.
By dividing the whole part into two, to give the two groups.
Execution(Takashi Norimatsu)Assemble the upper and lower parts. And unit the parts.
Carefully read the manual, check if there is any leakage of the parts.
Conclusion
It has facilitated real structure grasped by to use a Lego block.
Get the image of the design of the way of things.