Name of
Colony,
7/27/2019 Detailed Estimation Format
2/81
Description
Provision for CIVIL WORKSFormation of Internal Roads
Provision for LAYING OF PAVER TILES IN DRIVE WAYS
Provision for BACKUP GENERATORS
Provision for MOTORS (12X15000)
Provision for LIFTS (8X1100000)
Provision for Retaining walls along chakali kunta (100x
Provision for Avenue plantation
Provision for Septick tank
Provision for additional facilities for Senior citizens
Provision for court yard retaining wall around blocksPayment towards drawl of lots, printig letters, hire charges of car, scrolling news,postage et
Advertisement charges
HUDA & Municipal charges
Street lighting
Water proofing to lifts
Expansion joints
Lightening arrester
Fiber sheeting roofing
Provision for rock cutting on hillock
Provision for internal Sanitary @ 7.5% on civil works
Provision for internal electrification @ 10%Provision for External electrification (2 Trnsfmr, 1 ring main)
Provision for external sanitary and water supply @ 10%
Provision for vat and service tax @ 8.04%
Provision for technical personnel (2 GE,2 Diploma)(2*324+2*250)
Provision for Quality Control charges @ 1%
Provision for INSURANCE @ 0.6%
Provision for round off
GRANT TOTAL
Work : Construction of additional blcks (4 No) (Stilt+5 floors pattern) at AARAMBH to
handanagar(v), Serilingampally(m), R.R Dist.
7/27/2019 Detailed Estimation Format
3/81
Amount
230943221.64 ######1500000.00
2250000.00
1000000.00
200000.00
8800000.00
1000000.00
500000.00
2500000.00
1000000.00
500000.0045000.00
30000.00
5000000.00
600000.00
100000.00
200000.00
200000.00
200000.00
5000000.00
17320741.62
23094322.165000000.00
23094322.16
18567835.02
500000.00
2309432.216
1385659.33
1192145.2
354032679.36
n ship, Papireddy
7/27/2019 Detailed Estimation Format
4/81
Item
NoDescription
Internal Sanitary Fittings
1'A' Supply laying, jointing and testing of
101.60mm (6" dia)
Block DI 900.4 RM
Total 900.4 RM
2'B' Supply laying, jointing and testing of
150 mm (6" dia)
Block DI 1207.5 RM
Total 1207.5 RM
3'A' Supplying and fixing of 152.40mm x
101.60mm (6'x4") SWG gully trap
Block DI 341 No.s
Total 341 No.s
4Supply and fixing of 4" (101.6mm)dia SWG
bend for WC air tightEach
Block DI 165 No.s
Total 165 No.s
5
'A' Construction of 3'-0 dia clear Inspector
Chamber with 9" thick brick masonry walls in
CM (1:6) prop
Each
Block DI 228 No.s
Total 228 No.s
6'A' Supplying and fixing of 101.60mm (4" dia)
PVC pipeRM
3594 RM
Total 3594 RM
7 'B' Supplying and fixing of 101.60mm (4" dia)PVC/SWR Single Y Junction Each
Block DI 17 No.s
Total 17 No.s
8Suppy and fixing of PVC (101.6mm) 4" dia
single YEach
Block DI 731 No.s
Per TotalAmount
Name of Work : Construction of 1 Block (Stilt+5) 80 flats ( Sft) (AARAMBH - II,
Papireddy Colony, Chandanagar(v), Serilingampally(m), R.R Dist.
RateQuantity
7/27/2019 Detailed Estimation Format
5/81
Item
NoDescription
Internal Sanitary FittingsPer TotalAmountRateQuantity
Total 731 No.s
9'B' Supplying and fixing of 101.60mm (4" dia)
PVC/SWR Plug bendEach
Block DI 759 No.s
Total 759 No.s
10 'A' S & F of 101.6 PVC/SWR Vent cowls Each
Block DI 170 No.s
Total 170 No.s
11'A' Supply and fixing of 76.20mm (3" dia)
PVC/SWR pipeRM
Block DI 6777.5 RM
Total 6777.5 RM
12'A' Supplying and fixing of 3" (76.20mm dia)
PVC/SWR Nahany traps with jallyEach
Block DI 589 No.s
Total 589 No.s
13 Supply and fixing of Y junction 76.2mm dia Each
Block DI 327 No.s
Total 327 No.s
14Supply and fixing of double Y junction 76.2mm
diaEach
Block DI 17 No.s
Total 17 No.s
15'A' Supplying and fixing of 3" (76.20mm dia)
PVC/SWR Plug BendEach
Block DI 337 No.s
Total 337 No.s
16'A' Supplying and fixing of 3" (76.20mm dia)
PVC/SWR plain bendEach
Block DI 85 No.s
Total 85 No.s
17 "A" S & F of 76.20mm went coal Each
Block DI 101 No.s
7/27/2019 Detailed Estimation Format
6/81
Item
NoDescription
Internal Sanitary FittingsPer TotalAmountRateQuantity
Total 101 No.s
18'B' Supplying and fixing of European type
Hindustan neycer or parry ware WCEach
Block DI 195 No.s
Total 195 No.s
19
'A' Supplying and fixing of 558.8mm x
406.4mm indian make white glazed wash hand
basin
Each
Block DI 320 No.s
Total 320 No.s
20
'A' Making holes n masanory work and
redoing good as directed by the department EachBlock DI 610 No.s
Total 610 No.s
21 'A' Supplying and fixing of stain less steel sink Each
Block DI 80 No.s
Total 80 No.s
22'A' Internal water supply 3 layers 40mm dia
PPR pipes for portableRM
Block DI 2751.5 RM
Total 2751.5 RM
23'A' Internal water supply 3 layers 63mm dia
PPR pipes for portableRM
Block DI 564 RM
Total 564 RM
24'A' Internal water supply 3 layers 50mm dia
PPR pipes for portableRM
Block DI 194.6 RM
Total 194.6 RM
25'A' Internal water supply 3 layers 32mm dia
PPR pipes for portableRM
Block DI 700 RM
Internal Water Supply
7/27/2019 Detailed Estimation Format
7/81
Item
NoDescription
Internal Sanitary FittingsPer TotalAmountRateQuantity
Total 700 RM
26'A' Internal water supply 3 layers 25mm dia
PPR pipes for portableRM
Block DI 795 RM
Total 795 RM
27'A' Internal water supply 3 layers 20mm dia
PPR pipes for portableRM
Block DI 835 RM
Total 835 RM
28Supply and fixing of 12.7mm dia of CP long
body bibcock of Jaquare companyEach
Block DI 200 No.s
Total 200 No.s
29Supply and fixing of 12.7mm dia of CP short
body bibcock of Jaquare companyEach
Block DI 80 No.s
Total 80 No.s
30Supply and fixing of 24.4 mm dia and
609.6mm long Aluminum auodised towel rod
Each
Block DI 195 No.s
Total 195 No.s
31
Supply and fixing of Jaquare company wall
mixure of CP non telephonic shower
arrangements 15mm etc complete
Each
Block DI 195 No.s
Total 195 No.s
32
Supply and fixing of Jaquare company wall
mixure of CP fancy shower arrangements
15mm etc complete
Each
Block DI 195 No.s
Total 195 No.s
33Supply and fixing of CP soup dish heavy type
NP screws etc completeEach
Block DI 195 No.s
7/27/2019 Detailed Estimation Format
8/81
Item
NoDescription
Internal Sanitary FittingsPer TotalAmountRateQuantity
Total 195 No.s
34Supply and fixing of PVC low level sistran
parryware slim line flush tankEach
Block DI195
No.s
Total 195 No.s
35Supply and fixing of 20mm dia PPR gate
walvesEach
Block DI 195 No.s
Total 195 No.s
36Supply and fixing of 50mm dia PPR gate
walvesEach
Block DI 800 No.s
Total 800 No.s
37Supply and fixing of 40mm dia PPR gate
walvesEach
Block DI 160 No.s
Total 160 No.s
38Supply and fixing of 63mm dia PPR gate
walvesEach
Block DI 400 No.s
Total 400 No.s
39 Making holes in RCC slab Each
Block DI 195 No.s
Total 195 No.s
7/27/2019 Detailed Estimation Format
9/81
Sl.No Description Quantity Unit
1Earth work excavation by machinary and
depositing on bank with an intial lead of
10m and lift of 2m in mixture of gravel
and soft disintegrated rock like shales,ordinary gravel stoney earth and earth
mixed with fair size boulders including
shoring shuttering and bailing out of
water etc for foundations .
For block DH 2181.47 cum
For block PF 3017.40 cum
For block DI 307.08 cum
For block PSCH 2560.00 cum
8065.95 cum
2Disposal of excavated earth available at
site (using machine) to a distance of
500 Mts. and filling in Ditches, Lowlying
area and road embankment in layers not
exceeding 15cm thick, consolidatingeach deposited layer by watering and
ramming including all operational,
incidental, labour charges, hire charges
of T&P etc., complete for finished item
of work. Qty as per item 1
7758.87 cum
3 Excavation in rock by way of benching
,chiselling, wedging, and Boring in
fourndation, grade levelling including all
lead and lift charges and disposal of
rock from the site as directed by the
department.( A rate of Rs.164.90 per
Cum
For block DH 486.68 cum
For block PF 352.84 cum
For block DI 92.12 cum
For block PSCH 792.79 cum
1724.44 cum
4 Disposal of excavated surplus rock
available at site with a lead of 0.50 KM
including transporting, loading and
unloading charges etc., complete as
directed by the Engineer in charge.
2425.10 cum
5Earth work Excavation in hard rock and
boulders of more than 3 cum in size
where ever quarrying is done by
controlled blasting without stacking
For block DH 630.00 cum
For block PF 375.00 cum
For block DI cum
For block PSCH cum
1005.00 cum
6 Disposal of excavated surplus rock
available at site with a lead of 0.50 KM
including transporting, loading and
unloading charges etc., complete as
directed by the Engineer in charge.
1005.00 cum
7 Drilling of 25mm dia and 800 mm deep
in hard rock or sheet rock by pneumatic
grouting and placing of 16 mm dia Tor
steel bars and grouting holes with slurry
excluding cost of steel and its
fabrication charges but including cost
and conveyance of al
Name of Work : Construction of 4 Blocks (Stilt+5) AARAMBH-II, Papireddy Colony, Chandanagar(v), Serilingampally(m), R.R D
ABSTRACT
Nos
7/27/2019 Detailed Estimation Format
10/81
Sl.No Description Quantity UnitNos
For block PSCH 2742.00 Rmt
14089.20 Rmt
5 Providing and laying VCC M20 in
foundations, machine foundations,
footings and bases of columns and
under floors including the cost of
centering and shuttering for Column
footings levelling course
For block DH 66.37 cum
For block PF 48.11 cum
For block DI 28.57 cum
For block PSCH 91.26 cum
234.31 cum
6 Providing and laying cement concrete
1:5:10 (1 cement :5 coarse sand :10
graded stone aggregate 40 mm.
nominal size) mm. ) in basement under
floors
For block DH 100.76 cum
For block PF 72.81 cum
For block DI 133.63 cum
For block PSCH 159.05 cum
466.25 cum
7 VRCC M20 grade mix (Design Mix as
per SS) with fixed stone aggregate of20mm & 12mm size mechanically mixed
with necessary reinforcement including
cost and conveyance of all materials
and water to work site seigniorage all
operational
FOR FOOTINGSFor block DH 210.16 cum
For block PF 152.36 cum
For block DI 98.25 cum
For block PSCH 288.99 cum
749.76 cum
8 VRCC M20 grade mix (Design Mix as
per SS) with fixed stone aggregate of
20mm & 12mm size mechanically mixed
with necessary reinforcement includingcost and conveyance of all materials
and water to work site seigniorage all
operational
FOR PEDESTALS
For block DH 30.63 cum
For block PF 23.29 cum
For block DI 12.91 cum
For block PSCH 42.05 cum
108.87 cum
9 VRCC M20 grade mix (Design Mix as
per SS) with fixed stone aggregate of
20mm & 12mm size mechanically mixed
with necessary reinforcement including
cost and conveyance of all materials
and water to work site seigniorage alloperational
FOR PLINTHBEAM
For block DH 46.43 cum
For block PF 43.04 cum
For block DI 78.24 cum
For block PSCH 70.46 cum
238.18 cum
10 VRCC M20 grade mix (Design Mix as
per SS) with fixed stone aggregate of
20mm & 12mm size mechanically mixed
with necessary reinforcement including
cost and conveyance of all materials
and water to work site seigniorage all
operational
FOR COLUMNS UPTO PLINTH BEAM
For block
DH
For block
PF
For block
DI
For block
PSCH
7/27/2019 Detailed Estimation Format
11/81
Sl.No Description Quantity UnitNos
For block
DH
For block
PF
For block
DI
For block
PSCH
GROUND FLOOR 43.37 32.98 82.80 73.75 232.89 cum
FIRST FLOOR 43.37 32.98 82.80 73.75 232.90 cum
SECOND FLOOR 43.37 32.98 82.80 73.75 232.90 cum
THIRD FLOOR 43.37 32.98 82.80 73.75 232.90 cum
FOURTH FLOOR 43.37 32.98 82.80 73.75 232.90 cum
FIFTH FLOOR 43.37 32.98 82.80 73.75 232.90 cum
SIXTH FLOOR 2.03 2.70 5.40 10.13 20.25 cum
SEVENTH FLOOR 1.35 1.35 2.70 5.40 10.80 cum
11 VRCC M20 grade mix (Design Mix as
per SS) with fixed stone aggregate of
20mm & 12mm size mechanically mixed
with necessary reinforcement including
cost and conveyance of all materials
and water to work site seigniorage all
operational
ROOF BEAMS
For block
DH
For block
PF
For block
DI
For block
PSCH
GROUND FLOOR 14.29 14.63 96.96 13.10 138.98 cum
FIRST FLOOR 14.29 14.63 43.55 13.10 85.57 cum
SECOND FLOOR 14.29 14.63 43.55 13.10 85.57 cum
THIRD FLOOR 14.29 14.63 43.55 13.10 85.57 cumFOURTH FLOOR 14.29 14.63 43.55 13.10 85.57 cum
FIFTH FLOOR 14.29 14.63 43.55 13.10 85.57 cum
SIXTH FLOOR 1.74 2.11 4.67 3.07 11.59 cum
SEVENTH FLOOR 0.71 0.71 1.42 1.47 4.31 cum
12 VRCC M20 grade mix (Design Mix as
per SS) with fixed stone aggregate of
20mm & 12mm size mechanically mixed
with necessary reinforcement including
cost and conveyance of all materials
and water to work site seigniorage all
operational
ROOFSLAB
For block
DH
For block
PF
For block
DI
For block
PSCHGROUND FLOOR 123.99 88.53 94.23 185.52 492.27 cum
FIRST FLOOR 123.99 88.53 94.23 185.52 492.27 cum
SECOND FLOOR 123.99 88.53 94.23 185.52 492.27 cum
THIRD FLOOR 123.99 88.53 94.23 185.52 492.27 cum
FOURTH FLOOR 123.99 88.53 94.23 185.52 492.27 cum
FIFTH FLOOR 123.99 88.53 94.23 185.52 492.27 cum
SIXTH FLOOR 4.13 2.73 3.69 4.13 14.68 cum
SEVENTH FLOOR 0.59 0.59 1.17 0.49 2.84 cum
13 VRCC M20 grade mix (Design Mix as
per SS) with fixed stone aggregate of
20mm & 12mm size mechanically mixed
with necessary reinforcement including
cost and conveyance of all materials
and water to work site seigniorage alloperational
Lintels
For block
DH
For block
PF
For block
DI
For block
PSCH
GROUND FLOOR
FIRST FLOOR 1.80 1.40 2.44 2.81 8.45 cum
SECOND FLOOR 1.80 1.40 2.44 2.81 8.45 cum
THIRD FLOOR 1.80 1.40 2.44 2.81 8.45 cum
FOURTH FLOOR 1.80 1.40 2.44 2.81 8.45 cum
FIFTH FLOOR 1.80 1.40 2.44 2.81 8.45 cum
SIXTH FLOOR 0.00 0.00 0.00 0.00 0.00 cum
SEVENTH FLOOR 0.02 0.02 0.03 0.06 0.13 cum
14 BED BLOCKS
For block
DH
For block
PF
For block
DI
For block
PSCH
GROUND FLOOR
FIRST FLOOR 0.44 0.36 6.68 0.70 8.18 cum
7/27/2019 Detailed Estimation Format
12/81
Sl.No Description Quantity UnitNos
FIFTH FLOOR 0.44 0.36 7.12 0.70 8.62 cum
SIXTH FLOOR
SEVENTH FLOOR 0.05 0.05 0.05 0.05 0.20 cum
15 VRCC M20 grade mix (Design Mix as
per SS) with fixed stone aggregate of
20mm & 12mm size mechanically mixed
with necessary reinforcement including
cost and conveyance of all materials
and water to work site seigniorage all
operational
Chajjas
For block
DH
For block
PF
For block
DI
For block
PSCH
GROUND FLOOR
FIRST FLOOR 61.000 43.92 78.08 103.70 286.70 Sqm
SECOND FLOOR 61.000 43.92 70.76 103.70 279.38 Sqm
THIRD FLOOR 61.000 43.92 70.76 103.70 279.38 Sqm
FOURTH FLOOR 61.000 43.92 70.76 103.70 279.38 Sqm
FIFTH FLOOR 61.000 43.92 70.76 103.70 279.38 Sqm
16Racks and lofts Ground Floor FLOOR
RCC M20 grade mix (Design Mix as per
SS) with stone aggregate of 20mm and12mm size mechanically mixed etc,
necessary reinforcement including cost
and conveyance of all materials and
water to work site seignorage and all
operational, incidential labour charges
such as centering (steel Centering)
mixing concrete, laying, lift charges,
curing, etc., complete for finished item
of work as per standard specification but
excluding cost on steel reinforcement
and its fabrication charges etc complete
for finished item of work to the required
strength as directed by department for
60 mm thick to 40 mm thick at free end,
plastering 12mm thick in CM(1:4) Prop.
For all exposed faces (Bottom & Sides)
etc.
For block
DH
For block
PF
For block
DI
For block
PSCH
GROUND FLOOR
FIRST FLOOR 91.783 68.15 114.70 91.78 366.42 Sqm
SECOND FLOOR 91.783 68.15 114.70 91.78 366.42 Sqm
THIRD FLOOR 91.783 68.15 114.70 91.78 366.42 Sqm
FOURTH FLOOR 91.783 68.15 114.70 91.78 366.42 Sqm
FIFTH FLOOR 91.783 68.15 114.70 91.78 366.42 Sqm
17VRCC M20 grade mix (Design Mix as
per SS) with fixed stone aggregate of
20mm & 12mm size mechanically mixed
with necessary reinforcement including
cost and conveyance of all materials
and water to work site seigniorage all
operational
CUPBOARD SHELVES
For block DH 684.84 Sqm
For block PF 527.70 Sqm
For block DI 878.37 Sqm
For block PSCH 684.84 Sqm
2775.75 Sqm
7/27/2019 Detailed Estimation Format
13/81
Sl.No Description Quantity UnitNos
18 BRICK MASONERY in CM(1:8)prop:
With Flyash,Gypsum, stone quarry dust
and Lime soild blocks of size
290x225x140mm(made up of
Flyash,Lime and gypsum) with
compressive strength not less than 50
kg/sq.cm. Including cost and
conveyance of all materials,labour
charges,curing etc., complete for14.00
cm. Thick Main Wall.
For block
DH
For block
PF
For block
DI
For block
PSCH
FIRST FLOOR 106.82 92.05 255.48 176.52 630.86 Cum
SECOND FLOOR 106.82 92.05 255.48 176.52 630.86 Cum
THIRD FLOOR 106.82 92.05 255.48 176.52 630.86 Cum
FOURTH FLOOR 106.82 92.05 255.48 176.52 630.86 Cum
FIFTH FLOOR 106.82 92.05 255.48 176.52 630.86 Cum
SIXTH FLOOR 61.87 51.20 26.26 135.78 275.12 Cum
SEVENTH FLOOR 4.28 4.28 13.53 17.12 39.22 cum
19 GROUND FLOOR Masonary in
CM(1:8)prop: With Flyash,Gypsum,
stone quarry dust and Lime soild blocks
of size 290x225x140mm(made up of
Flyash,Lime and gypsum) with
compressive strength not less than 50
kg/sq.cm. Including cost and
conveyance of all materials,labour
charges,curing etc., complete for10.00
cm. Thick Main Wall.
For block
DH
For block
PF
For block
DI
For block
PSCH
FIRST FLOOR 70.08 52.04 219.85 130.25 472.23 Cum
SECOND FLOOR 70.08 52.04 219.85 130.25 472.22 Cum
THIRD FLOOR 70.08 52.04 219.85 130.25 472.22 Cum
FOURTH FLOOR 70.08 52.04 219.85 130.25 472.22 CumFIFTH FLOOR 70.08 52.04 219.85 130.25 472.22 Cum
SIXTH FLOOR
20Ground floor steps PCC M-20 Grade
mix with stone aggregate of 20 mm &
12mm size mechanically mixed
including cost and conveyance of all
materials and water to work site,
seignorage fee and all opertational
,incidential,labour charges such as
centering from work, steel
centering,mixing concrete, laying, lift
charges ,vibrating,curing etc complete
for finished item of work as per Standard
Specification etc complete for finished
item of work to the required strength as
directed by department forsteps.
For block
DH
For block
PF
For block
DI
For block
PSCH
GROUND FLOOR 0.68 0.68 1.35 2.7 5.40 Cum
FIRST FLOOR 0.68 0.68 1.35 2.7 5.40 Cum
SECOND FLOOR 0.68 0.68 1.35 2.7 5.40 Cum
THIRD FLOOR 0.68 0.68 1.35 2.7 5.40 Cum
FOURTH FLOOR 0.68 0.68 1.35 2.7 5.40 Cum
FIFTH FLOOR 0.68 0.68 1.35 2.7 5.40 Cum
SIXTH FLOOR 0.68 0.68 1.35 2.7 5.40 Cum
7/27/2019 Detailed Estimation Format
14/81
Sl.No Description Quantity UnitNos
21
Plastering 12mm thick in 2 coats with a
base coat of 8mm thick in CM (1:6)
prop and top coat 4mm thick in
CM(1:4)prop with dubara sponge
finishing including cost and conveyance
of all materials seignorage and water to
work site and all operational ,incidential
labour charges such as scaffolding,
mixing, motor , lift charges, curing etc.
complete for finished item of work as per
SS No. 901, 904 for internal walls
For block
DH
For block
PF
For block
DI
For block
PSCH
GROUND FLOOR 2041.72 1533.27 2946.47 3252.34 9773.80 Sqm
FIRST FLOOR 4195.63 2744.60 5649.64 5090.66 17680.53 Sqm
SECOND FLOOR 4195.63 2744.60 5649.64 5090.66 17680.53 Sqm
THIRD FLOOR 4195.63 2744.60 5649.64 5090.66 17680.53 Sqm
FOURTH FLOOR 4195.63 2744.60 5649.64 5090.66 17680.53 Sqm
FIFTH FLOOR 4195.63 2744.60 5649.64 5090.66 17680.53 Sqm
SIXTH FLOOR 463.94 383.00 383.61 923.40 2153.95 Sqm
SEVENTH FLOOR 25.09 25.09 27.88 100.37 178.44 Sqm
22 Plastering 12mm thick in 2 coats with abase coat of 8mm thick in CM (1:6)
prop and top coat 4mm thick in
CM(1:4)prop with dubara sponge
finishing including cost and conveyance
of all materials seignorage and water to
work site and all operational ,incidential
labour charges such as scaffolding,
mixing, motor , lift charges, curing etc.
complete for finished item of work as per
SS No. 901, 904 for external walls
For block
DH
For block
PF
For block
DI
For block
PSCH
FIRST FLOOR 1177.65 965.40 1691.47 2178.511 6013.04 Sqm
SECOND FLOOR 1177.65 965.40 1691.47 2178.511 6013.04 Sqm
THIRD FLOOR 1177.65 965.40 1691.47 2178.511 6013.04 Sqm
FOURTH FLOOR 1177.65 965.40 1691.47 2178.511 6013.04 Sqm
FIFTH FLOOR 1177.65 965.40 1691.47 2178.511 6013.04 Sqm
SIXTH FLOOR 437.52 361.84 363.03 994.625 2157.01 Sqm
SEVENTH FLOOR 28.48 28.48 28.48 28.48 113.90 Sqm
23 Supply and fixing of doors as per
approved drawings with 2nd class teak
wood frame of section 100mm x 65 mm
and ISI marked flush door shutter of
35mm thick single shutterwith bond
wood solid block board type Corehaving cross bands and face veneers,
hot pressed bonded with water proof
phenol formaldehyde synthetic resin
factory made conforming to IS 2202-
1991 (Part-I) with teak veneer on one
face and commercial ply on another
face (lipping) including cost and
conveyance to site of teak wood frame,
flush shutter including supply and fixing
6 Nos.MS Z hold fasts of size
300mmx40mmx5mm including
7/27/2019 Detailed Estimation Format
15/81
Sl.No Description Quantity UnitNos
cost of ISI marked fixtures of 3Nos
Brass butt hinges 150mm long, 1No.
Aluminium aldrop 300mm long, 1No.
Aluminium tower bolt of 300 mm long at
top, 1No. 150mm long Brass handle,
1No. Brass door stopper and 1No
rubber bush including cost of second
class teak wood frame, making,
finishing and fixing the fixtures to door
with required number of screws, bolt
and nuts including all labour charges for
fixing the frame in position, fixing the
shutter to the frame etc., complete for
finished item of work as per APSS 1001
& 1002 (The vertical frame of door shall
be embedded in flooring for a depth of
not less than 10 mm) of size 1.05 x 2.00
mts (3-6 x 6-6)
For block DH 50 Nos
For block PF 45 Nos
For block DI 80 Nos
For block PSCH 50 Nos
225 Nos
24 Door of size 3-0 x 6-6 Supply fixing
and filling with cement mortar (1:8) prop
of polynon frame of section 105x60 with
30mm rebate manufactured by cold
rolled forming process using cold rolled
steel coil of 1.25mm thick with bright
CRCA strips of "D" quality M.S. grade
confirming to IS 4351-1976.
For block DH 125 Nos
For block PF 90 Nos
For block DI 215 Nos
For block PSCH 125 Nos
555 Nos
25Door of size 2-6 x 6-6 Supply fixing
and filling with cement mortar (1:8) propof Mild steel hollow door frame of
section 105x60 with 30mm rebate
manufactured by cold rolled forming
process using cold rolled steel coil of
1.25mm thick with bright CRCA strips of
"D" quality M.S. grade confirming to IS
4351-1976.
For block DH 51 Nos
For block PF 46 Nos
For block DI 2 Nos
For block PSCH 51 Nos
150 Nos
Aluminium Sliding Doorof size 6-0 x
6-6 Supply fixing and filling withcement mortar (1:8) prop of Mild steel
hollow door frame of section 105x60
with 30mm rebate manufactured by
cold rolled forming process using cold
rolled steel coil of 1.25mm thick with
bright CRCA strips of "D" quality M.S.
grade confirming to IS 4351-1976.
For block DH 50 Nos
For block PF 45 Nos
For block DI 80 Nos
For block PSCH 125 Nos
300 Nos
295x6x6.5 11505 Sft
7/27/2019 Detailed Estimation Format
16/81
Sl.No Description Quantity UnitNos
26Door of size 2-6 x 6-6 Supply and
door frame made of hollow extruded
PVC section (Nandi or equivalent)
having dimensions of 40 x57mm with
the wall thickness of 2mm +/- 0.2 mm
duly reinforced with seasoned woood
plank at the hinges side the door frame
top 2 corners shall be metricut/weilded.
with door shutters made of rigid PVCextruded hollow section (Nandi
For block DH 125 Nos
For block PF 90 Nos
For block DI 165 Nos
For block PSCH 125 Nos
505 Nos
27NCL WINDOE OF SIZE 3-0 x 4-0
Providing and fixing windows made of
prepainted steel (base steel as per IS
513 of 0.60 mm thick galvonised as per
IS 277 with zinc of 150 GSM)
For block DH 200 NosFor block PF 135 Nos
For block DI 250 Nos
For block PSCH 200 Nos
785 Nos
785*.9*1.2 847.8 Nos
28 NCL WINDOE OF SIZE 3-0 x 2-6
Providing and fixing windows made of
prepainted steel (base steel as per IS
513 of 0.60 mm thick galvonised as per
IS 277 with zinc of 150 GSM)
For block DH 50 Nos
For block PF 50 Nos
For block DI 70 Nos
For block PSCH 50 Nos
220 Nos
225*.9*.75 151.88 Sqm
29 Manufacturing & supply of 2'-0" x 1"-6"
steel ventilator including cost of steel &
glass
For block DH 125 Nos
For block PF 90 Nos
For block DI 170 Nos
For block PSCH 125 Nos
510 Nos
510*.6*.45 137.7 Sqm
30 Ground floor Flooring with
Grananalothic concrete Flooring 50 mm
thick with CC 1:1:2 prop. Using 6mm to
12 mm size (SSS) grade hard granite
stone mesigne crushed metal laid
Granalothically over an existing bed ofCC 1:5:10 Prop. 10 cm thic. CC slab
laib in alternate panels of size not
exceeding 1.5X1.5m and finishing the
top surface to required smooth ness and
slopes including cost and conveyance of
all meterials and all operational
incidental and seinarage charges and
mixing concrete, laying, curing etc.
complete for finisheditemof work.(APSS
NO:701and 707 )
For block DH 1024.11 Sqm
For block PF 830.95 Sqm
For block DI 1542.27 Sqm
For block PSCH 1563.98 Sqm
4961.30 Sqm
7/27/2019 Detailed Estimation Format
17/81
Sl.No Description Quantity UnitNos
31 Flooring with CERAMIC Edge cut tiles
of Johnson with 1st quality(premium) of
approved colour over a base coat of
cement plastring in cm. ( 1:6 ) with white
cement with required colour segment to
match the shade of the colour including
cost and conyance of all meterials,
labour and all taxes etc. complete for
finished item In rooms flooring with
8.3mm thk ceramic tiles of size(400 x
400mm) with 1" thk mortar in CN(1:6)
prop
For block
DH
For block
PF
For block
DI
For block
PSCH
FIRST FLOOR 821.29 583.07 759.92 1598.48 3762.76 Sqm
SECOND FLOOR 821.29 583.07 759.92 1598.48 3762.76 Sqm
THIRD FLOOR 821.29 583.07 759.92 1598.48 3762.76 Sqm
FOURTH FLOOR 821.29 583.07 759.92 1598.48 3762.76 Sqm
FIFTH FLOOR 821.29 583.07 759.92 1598.48 3762.76 Sqm
Total 18813.82 Sqm
32Dadooing with coluru glazed tiles 6.5mm
thick of size(300 x 200 mm) 1st quality
(as per manufacturers specification ) ofapproved make ISI CM (1:5) prop with
grey cement slurry for
kitchen,bathroom,balcony & li ft cladding
Toilet dadooing
For block
DH
For block
PF
For block
DI
For block
PSCH
FIRST FLOOR 503.20 362.78 782.45 655.24 2303.67 Sqm
SECOND FLOOR 503.20 362.78 782.45 655.24 2303.67 Sqm
THIRD FLOOR 503.20 362.78 782.45 655.24 2303.67 Sqm
FOURTH FLOOR 503.20 362.78 782.45 655.24 2303.67 Sqm
FIFTH FLOOR 503.20 362.78 782.45 655.24 2303.67 Sqm
Total 11518.35 Sqm
33 Supplying and application of two coats
of ALTEK super fine , one coat ofALTEK water based coment primer and
twocoats of ALTEK flora ( plastic
emulsion paint ) to interior faces of new
walls and ceeling of approved colour as
per manufacturer's specifications
including cost and conveyance of all
matirials to site and labour charges such
as preparing the wall, applying primary
coat etc. complete for finished item of
work for INTERNAL WALLS AND
CEILING (Total 2 coats).
For block DH 23483.79 Sqm
For block PF 15639.27 Sqm
For block DI 31578.29 Sqm
For block PSCH 29629.04 Sqm100330.39 Sqm
34"B" -Supply and application of one
coats of Altek water based cement
primer and two coats of harmony
(Acrylic emulsion paint exterior grade) to
exterior faces of new walls and ceiling
of approved colour as per
manufacturer's specifications including c
For block DH 6935.79 Sqm
For block PF 5656.53 Sqm
For block DI 9625.57 Sqm
For block PSCH 12497.18 Sqm
34715.07 Sqm
7/27/2019 Detailed Estimation Format
18/81
Sl.No Description Quantity UnitNos
35 Painting to new wood work and flush
shutters with lappam finish , over a
primary coat and painting two coats of
synthetic enamel paint 1st grade of
approved brand and shade (Total 3
coats) including cost and conveyance of
all materials to site cost of primer coat
and all labour charges etc. complete
including applying sand paper on
lappam coats for neat finish including
sales & other taxes on cost of all
materials etc. complete (APSS No.1200,
1207 & 1211) in all floors.
For block DH 727.95 Sqm
For block PF 582.18 Sqm
For block DI 1583.21 Sqm
For block PSCH 727.95 Sqm
3621.28 Sqm
36 Supply and fixing of high polished Black
granite 16 to 18 mm thick (upto 2.43 Mts
length) including the rounding the
exposed edges of granite slab and
polished set over a base of 20mm thick
C.M(1:5) prop over already forKITCHEN PLATFORM
For block
DH
For block
PF
For block
DI
For block
PSCH
FIRST FLOOR 32.19 25.99 46.20 64.25 168.62 Sqm
SECOND FLOOR 32.19 25.99 46.20 64.25 168.63 Sqm
THIRD FLOOR 32.19 25.99 46.20 64.25 168.63 Sqm
FOURTH FLOOR 32.19 25.99 46.20 64.25 168.63 Sqm
FIFTH FLOOR 32.19 25.99 46.20 64.25 168.63 Sqm
37 Supplying and laying ofpolished
shabad stone of tandur blue variety of
25.40 mm thick single piece over a
base of 20 mm thick in C. M (1:8) with
neat cement joints to full depth includingcost and conveyance of all materials
and labour charges for laying, cutting
seigniorage charges etc complete for
tread and risers
For block
DH
For block
PF
For block
DI
For block
PSCH
GROUND FLOOR 19.08 19.08 19.53 76.32 134.01 Sqm
FIRST FLOOR 19.08 19.08 19.53 76.32 134.01 Sqm
SECOND FLOOR 19.08 19.08 19.53 76.32 134.01 Sqm
THIRD FLOOR 19.08 19.08 19.53 76.32 134.01 Sqm
FOURTH FLOOR 19.08 19.08 19.53 76.32 134.01 Sqm
FIFTH FLOOR 19.08 19.08 19.53 76.32 134.01 Sqm
SIXTH FLOOR 19.08 19.08 19.53 76.32 134.01 Sqm
38 Surface preparation by means ofchipping & cleaning testing for leakage
points and grouting the same with neat
cement slurry and repairing of cracks
and pot holes,if any with polymer repair
motor and applying two coats of polymer
based water proofing slurry coating.Sika
top seal 107 with coverage of 3Kg per
sq mtr for two coats and providing
cement screed of average 50mm thick
with smooth finish,and continuing the
same upto height of 300mm all along
the parapet wall and other adjoining
walls in form of vatta
SCREED CONCRETEFor block DH 986.86 Sqm
For block PF 726.00 SqmFor block DI 1503.02 Sqm
7/27/2019 Detailed Estimation Format
19/81
Sl.No Description Quantity UnitNos
39 Lift cladding with CERAMIC Edge cut
tiles of Johnson with 1st
quality(premium) of approved colour
over a base coat of cement plastering in
cm. ( 1:6 ) with white cement with
required colour segment to match the
shade of the colour including cost and
conyance of all meterials, labour and all
taxes etc. ceramic tiles of size(300 x
300mm) with 1" thk mortar in CM(1:6)
propFor block DH 31.13 Sqm
For block PF 31.13 SqmFor block DI 75.63 Sqm
For block PSCH 124.51 Sqm
262.40 Sqm
40Impervious coat 20mm thick average
over roof slab with CM(1:4) prop. Mixed
with approved water proofing compound
at the rate of 1.0 kg per bag of cement
(50 kgs) and laid when the slab is green
with thread lining at 1-6x1-6 pannelsand finished smooth with neat cement
rendering as directed including cost and
conveyance of all materials and water to
work site, seignorage fee and all
operational, incidental, labour charges
such as mixing mortar, laying, curing
etc., complete forToilets
For block
DH
For block
PF
For block
DI
For block
PSCH
7/27/2019 Detailed Estimation Format
20/81
Agmt
item
no
Description Length Breadth Depth Quantity Unit
1
Block DH 1 1 1 56.5 29.7 1.30 2181.47 cum
2
For Coloumn footings for type 1
(External) 5 11
1
1.8 1.8 1.10 196.02
For Coloumn footings for type 1
(Internal) 5 31
2.4 2.4 1.10 95.04
For Coloumn footings for type 2
(external) 5 8
1
1.8 1.8 1.10 142.56
For Coloumn footings for type 2
(Internal) 5 1
1
2.4 2.4 1.10 31.68
For Coloumn footings for staircase 2 1 1 1.8 1.8 1.10 7.13
For Coloumn footings for lift 4 1 1 1.8 1.8 1.10 14.26486.68 cum
3
1 1 1 28 15 1.50 630.00 cum
4
For block DH
External columns 101 7 7 1 1 0.8 3959.20
internal columns 20 9 9 1 1 0.8 1296.00
Net Quantity: Total 5255.20 Rmt
5
External columns 101 1 1 1.8 1.8 0.15 49.09
internal columns 20 1 1 2.4 2.4 0.15 17.28
66.37 cum
6
Type 1 Stilt floor 5 1 1 11.1 8.9 0.1 49.40
Type 2 Stilt floor 5 1 1 9.4 8.9 0.1 41.83
Corridor 1 1 1 49.5 2 0.1 9.90
for staircase 1 1 1 8.9 3.28 0.1 2.92
Deduct for beam portions (81.59+61.38) 1 1 1 142.97 0.23 0.1 -3.29
Deduct for columns 121 1 1 0.3 0.45 0.1 -1.63
for sump 2 1 1 5.14 3.38 0.15 5.21 Cum
LIFT 1 1 1 2.26 2.26 0.15 0.77
Total qty 100.76 Cum7
External columns 101 1 1 1.8 1.8 0.475 155.44
Internal columns 20 1 1 2.4 2.4 0.475 54.72
210.16 cum
8
FOR PEDESTALS
External columns 101 1 1 0.75 0.75 0.45 25.57
Internal columns 20 1 1 0.75 0.75 0.45 5.06
for sump 2 1 1 5.14 3.38 0.125 4.34
LIFT 1 1 1 2.26 2.26 0.125 0.6430.63 cum
9 FOR PLINTHBEAM
Excavation in rock by way of benching ,chiselling, wedging, and Boring in fourndation, grade levelling including all
lead and lift charges and disposal of rock from the site as directed by the department.( A rate of Rs.164.90 per Cum
VRCC M20 grade mix (Design Mix as per SS) with fixed stone aggregate of 20mm & 12mm size mechanically mixed
with necessary reinforcement including cost and conveyance of all materials and water to work site seigniorage all
operational
Name of Work : Construction of 1 Block (Stilt+5) total 50 flats, 25 flats Type - 1 (1026.55 sft) and 25 flats Type - 2 (1212.23 sft)
AARAMBH ,RGK Scheme-II, Papireddy Colony, Chandanagar(v), Serilingampally(m), R.R Dist.
Block DH
Nos
Earth work excavation and depositing on bank with an intial lead of 10m and l ift of 2m in mixture of gravel and soft
disintegrated rock like shales ,ordinary gravel stoney earth and earth mixed with fair size boulders including shoring
shuttering and bailing out of water etc for foundations .
VRCC M20 grade mix (Design Mix as per SS) with fixed stone aggregate of 20mm & 12mm size mechanically mixed
with necessary reinforcement including cost and conveyance of all materials and water to work site seigniorage all
operational for footings
Providing and laying cement concrete 1:5:10 (1 cement :5 coarse sand :10 graded stone aggregate 40 mm. nominal
size) mm. ) in basement under floors
Drilling of 25mm dia and 800 mm deep in hard rock or sheet rock by pneumatic grouting and placing of 16 mm dia Tor
steel bars and grouting holes with slurry excluding cost of steel and its fabrication charges but including cost and
conveyance of al
Earth work Excavation in hard rock and boulders of more than 3 cum in size where ever quarrying is done by controlled
blasting without stacking
Providing and laying VCC M20 in foundations, machine foundations, footings and bases of columns and under floors
including the cost of centering and shuttering forColumn footings levelling course
7/27/2019 Detailed Estimation Format
21/81
Agmt
item
no
Description Length Breadth Depth Quantity UnitNos
B2 5 3 1 2.15 0.23 0.3 2.23
B3 5 1 1 3.05 0.23 0.3 1.05
B4 5 2 1 2.790 0.23 0.3 1.93
B5 5 1 1 3.860 0.23 0.3 1.33
B6 5 1 1 4.350 0.23 0.3 1.50
B7 5 2 1 11.100 0.23 0.3 7.66
B8 5 1 1 6.630 0.23 0.3 2.29
B9 5 1 1 3.760 0.23 0.3 1.30
B10 5 1 1 6.860 0.23 0.3 2.37
B11 5 1 1 1.050 0.23 0.3 0.36
TYPE 2 0.00
B1 4 2 1 8.900 0.23 0.3 4.91
B2 4 1 1 2.990 0.23 0.3 0.83
B3 4 2 1 1.990 0.23 0.3 1.10
B4 4 1 1 2.870 0.23 0.3 0.79
B5 4 2 1 9.400 0.23 0.3 5.19
B6 4 1 1 1.470 0.23 0.3 0.41
B7 4 2 1 5.060 0.23 0.3 2.79
B8 4 1 1 3.290 0.23 0.3 0.91
45.07 cum
FOR STAIR CASE
LW 1 1 1 5.930 0.23 0.3 0.41
SW 1 2 1 3.280 0.23 0.3 0.45lift all round 1 1 1 7.200 0.23 0.3 0.50
1.36
Total qty 46.43 cum
10 Columns upto Plinth beam
External columns 101 1 1 0.3 0.45 1 13.64
Internal columns 20 1 1 0.3 0.45 1 2.70
for side walls of sump 2 1 1 17.04 0.175 2 11.93
for side walls of lift 2 1 1 9.04 0.175 1.5 4.75
16.34 cum
COLUMNS FOR GROUND FLOOR
External columns 101 1 1 0.3 0.45 2.655 36.20
Internal columns 20 1 1 0.3 0.45 2.655 7.17
Total qty 43.37 cum
First floor 43.37 cum
Second floor 43.37 cumThird floor 43.37 cum
Fourth floor 43.37 cum
Fifth floor 43.37 cum
COLUMNS FOR SIXTH FLOOR
Staircase columns 2 1 1 0.3 0.45 2.5 0.68
lift columns 4 1 1 0.3 0.45 2.5 1.35
2.03 cum
COLUMNS FOR SEVENTH FLOOR
lift columns 4 1 1 0.3 0.45 2.5 1.35
1.35 cum
11
Up to bottom of plinth beam item no
1+2+3 3298.15Deduct for useful earth qty @50% OF
item 1 -1090.73
Deduct footings qty -210.16
Deduct pedestals qty -30.63
Deduct plinth beam qty -46.43
Deduct cols up to PB qty -16.34
Total qty 1903.86 Cum
11 ROOF BEAMS
GROUND FLOOR
TYPE 1
B1 2 1 1 8.90 0.23 0.38 1.56
B2 3 1 1 2.15 0.23 0.38 0.56
B3 1 1 1 3.05 0.23 0.38 0.27
B4 2 1 1 2.79 0.23 0.38 0.49
B5 1 1 1 3.86 0.23 0.38 0.34B6 1 1 1 4.35 0.23 0.38 0.38
B7 2 1 1 11.10 0.23 0.38 1.94
B8 1 1 1 6 63 0 23 0 38 0 58
Filling in trenches, sides of foundations, basements etc., with carted earth with a lead of 12km in layers not exceeding
15cms thick consolidating each deposited layer by watering and ramming including c/c of earth, water to workspot
7/27/2019 Detailed Estimation Format
22/81
Agmt
item
no
Description Length Breadth Depth Quantity UnitNos
B11 1 1 1 1.05 0.23 0.38 0.09
TYPE 2 7.13 cum
B1 2 1 1 8.90 0.23 0.38 1.56
B2 1 1 1 2.99 0.23 0.38 0.26
B3 2 1 1 1.99 0.23 0.38 0.35
B4 1 1 1 2.87 0.23 0.38 0.25
B5 2 1 1 9.40 0.23 0.38 1.64
B6 1 1 1 1.47 0.23 0.38 0.13
B7 2 1 1 5.06 0.23 0.38 0.88
B8 1 1 1 3.29 0.23 0.38 0.29
At stair case 2 1 1 3.28 0.23 0.38 0.57
1 1 1 5.90 0.23 0.38 0.52
for lift alround 1 1 1 8.12 0.23 0.38 0.71
7.16 cum
GROUND FLOOR 14.29 cum
FIRST FLOOR 14.29 cum
SECOND FLOOR 14.29 cum
THIRD FLOOR 14.29 cum
FOURTH FLOOR 14.29 cum
FIFTH FLOOR 14.29 cum
SIXTH FLOOR
At stair case 2 1 1 3.28 0.23 0.38 0.57
2 1 1 5.90 0.23 0.38 1.03for lift alround 1 1 1 8.12 0.23 0.38 0.71
1.74 cum
SEVENTH FLOOR
for lift alround 1 1 1 8.12 0.23 0.38 0.71
11 ROOFSLAB for Ground Floor
For Type 1 5 1 1 11.10 8.9 0.115 56.80
For Type 2 5 1 1 9.40 8.9 0.115 48.10
corridor 1 1 1 49.50 2.00 0.115 11.39
waist slab 2 1 1 3.00 1.5 0.15 1.35
midlanding slab 2 1 1 1.50 3.3 0.115 1.14
top slab for sump 2 1 1 5.14 3.38 0.15 5.21
123.99 cum
ROOFSLAB for Ground Floor 123.99 cum
ROOFSLAB for First Floor 123.99 cum
ROOFSLAB for Second Floor 123.99 cumROOFSLAB for third Floor 123.99 cum
ROOFSLAB for Fourth Floor 123.99 cum
ROOFSLAB for Fifth Floor 123.99 cum
ROOFSLAB for Sixth Floor
stair case head room 1 1 1 8.90 3.28 0.115 3.36
lift room 1 1 1 2.26 2.26 0.15 0.77
4.13 cum
ROOF SLAB SEVENTH FLOOR
lift room 1 1 1 2.26 2.26 0.115 0.59
12 Lintels FIRST FLOOR
over D 10 1 1 1.37 0.15 0.1 0.21
over D1 25 1 1 1.22 0.1 0.1 0.31
over D2 35 1 1 1.07 0.1 0.1 0.37
Over sliding door 10 1 1 2.10 0.1 0.15 0.32
over W40 1 1 1.22 0.1 0.1 0.49over W! 10 1 1 0.91 0.1 0.1 0.09
over lift 1 1 1 1.07 0.15 0.1 0.02
1.80 cum
Lintels for SECOND FLOOR 1.80 cum
Lintels for THIRD FLOOR 1.80 cum
Lintels for FOURTH FLOOR 1.80 cum
Lintels for FIFTH FLOOR 1.80 cum
SEVENTH FLOOR
over lift 1 1 1 1.07 0.15 0.10 0.02 cum
Bed blocks
over D 10 2 3 0.15 0.14 0.10 0.13
over D1 25 2 3 0.15 0.10 0.10 0.23
over D2 10 2 3 0.15 0.10 0.10 0.09
0.44 cum
bed blocks for first floor 0.44 cum
bed blocks for second floor 0.44 cum
bed blocks for third floor 0.44 cum
7/27/2019 Detailed Estimation Format
23/81
Agmt
item
no
Description Length Breadth Depth Quantity UnitNos
13
Chejjas over Windows FOR FIRST
FLOOR
Chejjas over Windows W 40 1 1 1.22 0.6 48.80
Chejjas over Windows W1 10 1 1 1.22 0.6 12.20
61.00 SQM
Chejjas over Windows FOR FIRST
FLOOR 61.00 SQM
Chejjas over Windows FOR SECOND
FLOOR 61.00 SQM
Chejjas over Windows FOR THIRD
FLOOR 61.00 SQM
Chejjas over Windows FOR FOURTH
FLOOR 61.00 SQM
Chejjas over Windows FOR FIFTH
FLOOR 61.00 SQM
14
Type 1
Lofts in kitchen 5 1 1 2.53 0.45 5.69
kitchen platform two sides 5 1 1 4.08 0.65 13.26
Deduct for sink 5 1 1 0.52 0.40 -1.04
master bed 5 1 1 4.17 0.60 12.51
bed 1 5 1 1 3.20 0.60 9.60
bed2 5 1 1 2.90 0.60 8.70
48.72
Type 2
Lofts in kitchen 5 1 1 2.40 0.45 5.40
kitchen platform two sides 5 1 1 4.80 0.65 15.60
Deduct for sink 5 1 1 0.52 0.40 -1.04
master bed 5 1 1 4.00 0.60 12.00bed 1 5 1 1 3.70 0.60 11.10
43.06 Sqm
First floor 91.78 Sqm
second floor 91.78 Sqm
third floor 91.78 Sqm
fourth floor 91.78 Sqm
fifth floor 91.78 Sqm
15
VRCC M20 FOR CUPBOARD
SHELVES
Type 1
kitchen Shelves horizontal 5 1 1 2.53 0.32 4.048
kitchen Shelves horizontal 5 2 1 1.80 0.32 5.76
kitchen Shelves verticals 5 2 1 1.50 0.32 4.8Master bed horizontal 5 2 1 2.09 0.53 11.077
Master bed verticals 5 2 1 1.98 0.53 10.494
bed 1 5 2 1 2.44 0.53 12.932
bed 1 5 2 1 1.98 0.53 10.494
bed 2 5 2 1 1.87 0.53 9.911
bed 2 5 2 1 1.98 0.53 10.494
80.01 Sqm
Type 2
kitchen Shelves horizontal 5 1 1 2.40 0.32 3.84
kitchen Shelves horizontal 5 2 1 1.75 0.32 5.60
kitchen Shelves verticals 5 2 1 1.50 0.32 4.80
Master bed horizontal 5 2 1 2.00 0.53 10.60
Master bed verticals 5 2 1 1.98 0.53 10.49
bed 1 5 2 1 2.10 0.53 11.13
bed 1 5 2 1 1.98 0.53 10.4956.96 Sqm
Total Qty for
Racks and lofts Ground Floor FLOOR RCC M20 grade mix (Design Mix as per SS) with stone aggregate of 20mm and
12mm size mechanically mixed etc, necessary reinforcement including cost and conveyance of all materials and water
to work site seignorage and all operational, incidential labour charges such as centering (steel Centering) mixing
concrete, laying, lift charges, curing, etc., complete for finished item of work as per standard specification but excluding
cost on steel reinforcement and its fabrication charges etc complete for finished item of work to the required strength asdirected by department for 60 mm thick to 40 mm thick at free end, plastering 12mm thick in CM(1:4) Prop. For all
exposed faces (Bottom & Sides) etc.
7/27/2019 Detailed Estimation Format
24/81
Agmt
item
no
Description Length Breadth Depth Quantity UnitNos
Total Qty for
five floor 684.84 Sqm
16
for type 1
All around 5 1 1 39.40 0.14 2.66 73.22
Deduct for sitout and utility 5 1 1 5.40 0.14 2.66 -10.04
deduct columns 5 9 1 0.30 0.14 2.66 -5.02
deduct for door D 5 1 1 1.06 0.14 1.98 -1.47
deduct for windows w 5 5 1 0.91 0.14 1.22 -3.89
deduct for windows w1 5 1 1 0.91 0.14 0.75 -0.48
deduct for windows v 5 3 1 0.60 0.14 0.45 -0.57
deduct for lintels over doors 5 1 1 1.37 0.14 0.10 -0.10
deduct for lintels over windows 5 6 1 1.22 0.14 0.10 -0.51
deduct for exhaust fan 5 1 0.79 0.30 0.14 0.30 -0.05
for type 2All around 5 1 1 36.00 0.14 2.66 66.91
Deduct for sitout and utility 5 1 1 5.22 0.14 2.66 -9.70deduct columns 5 8 1 0.30 0.14 2.66 -4.46
deduct for door D 5 1 1 1.06 0.14 1.98 -1.47
deduct for windows w 5 3 1 0.91 0.14 1.22 -2.33
deduct for windows w1 5 1 1 0.91 0.14 0.75 -0.48
deduct for windows v 5 2 1 0.60 0.14 0.45 -0.38
deduct for lintels over doors 5 1 1 1.37 0.14 0.10 -0.10
deduct for exhaust fan 5 1 0.79 0.30 0.14 0.30 -0.05
at staircase
L/W 1 1 1 4.72 0.14 2.66 1.75
s/W 2 1 1 3.14 0.14 1.00 0.88
at lift room allaround 1 1 1 7.01 0.14 2.66 2.61
Corridor parapet wall 1 9 1.00 2.00 0.14 1.00 2.52
106.82 Cum
BM for First floor 106.82 Cum
BM for Second floor 106.82 CumBM for Third floor 106.82 Cum
BM for Fourth floor 106.82 Cum
BM for Fifth floor 106.82 Cum
BM for Sixth floor Cum
at stair case 1 1 1 16.77 0.14 2.2 5.17
Parapet wall 1 1 1 312.06 0.14 1.2 52.43
at lift room allaround 1 1 1 7.01 0.23 2.655 4.28
61.87 Cum
SEVENTH FLOOR
at lift room allaround 1 1 1 7.010 0.23 2.655 4.28
17
Type 1
Master bed room two sides 5 1 1 7.840 0.1 2.655 10.41
bed room1 two sides 5 1 1 6.140 0.1 2.655 8.15
bed room2 three sides 5 1 1 8.260 0.1 2.655 10.97
between kitchen and utility 5 1 1 2.230 0.1 2.655 2.96
toilets west side L/W 5 2 1 2.230 0.1 2.655 5.92
toilets west side S/W 5 1 1 2.250 0.1 2.655 2.99
East side toilet 5 1 1 1.315 0.1 2.655 1.75
sitout 5 1 1 1.375 0.1 2.655 1.83
deduct for door D1 5 3 1 0.900 0.1 1.98 -2.67
deduct for door D2 5 4 1 0.750 0.1 1.98 -2.97
deduct for lintels over d1 5 3 1 1.220 0.1 0.1 -0.18
deduct for lintels over d2 5 4 1 1.050 0.1 0.1 -0.21
38.93 Cum
Type 2
Master bed room two sides 5 1 1 6.800 0.1 2.655 9.03bed room1 two sides 5 1 1 6.900 0.1 2.655 9.16
between drawing and dining 5 1 1 2.700 0.1 2.655 3.58
kitchen and utility 5 1 1 2 200 0 1 2 655 2 92
GROUND FLOOR Masonary in CM(1:8)prop: With Flyash,Gypsum, stone quarry dust and Lime soild blocks of size
290x225x140mm(made up of Flyash,Lime and gypsum) with compressive strength not less than 50 kg/sq.cm. Including
cost and conveyance of all materials,labour charges,curing etc., complete for 14.00 cm. Thick Main Wall.
Masonary in CM(1:8)prop: With Flyash,Gypsum, stone quarry dust and Lime soild blocks of size 290x225x140mm(made
up of Flyash,Lime and gypsum) with compressive strength not less than 50 kg/sq.cm. Including cost and conveyance of
all materials,labour charges,curing etc., complete for 14.00 cm. Thick Main Wall.
7/27/2019 Detailed Estimation Format
25/81
Agmt
item
no
Description Length Breadth Depth Quantity UnitNos
west side toilet two sides 5 1 1 1.600 0.1 2.655 2.12
deduct for door D1 5 2 1 0.900 0.1 1.98 -1.78
deduct for door D2 5 3 1 0.750 0.1 1.98 -2.23
deduct for lintels over d1 5 2 1 1.220 0.1 0.1 -0.12
deduct for lintels over d2 5 3 1 1.050 0.1 0.1 -0.16
31.16 Cum
Total qty 70.08 Cum
BM for First floor 70.08 Cum
BM for Second floor 70.08 Cum
BM for Third floor 70.08 Cum
BM for Fourth floor 70.08 Cum
BM for Fifth floor 70.08 Cum
18
For staircase steps
Groun floor 1 0.50 20 1.50 0.30 0.15 0.675 cum
first floor 1 0.50 20 1.50 0.30 0.15 0.675 cum
second floor 1 0.50 20 1.50 0.30 0.15 0.675 cumthird floor 1 0.50 20 1.50 0.30 0.15 0.675 cum
fourth floor 1 0.50 20 1.50 0.30 0.15 0.675 cum
fifth floor 1 0.50 20 1.50 0.30 0.15 0.675 cum
sixth floor 1 0.50 20 1.50 0.30 0.15 0.675 cum
0.675 cum
19
Type 1
GROUND floor
Columns all around 5 14 1 1.50 2.655
Beams B1 to B11 two sides 5 1 1 81.59 0.76 278.775
ceiling 5 1 1 11.10 8.9 310.042
493.95
Type 2 1082.767 Sqm
Stilt floor
Columns all around 5 9 1 1.500 2.655
Beams B1 to B11 two sides 5 1 1 61.380 0.76 179.2125
ceiling 5 1 1 9.400 8.9 233.244
Corridor ceiling 1 1 1 49.50 2 418.3
staircase room bottom 1 1 1 8.90 3.28 99.00
29.19
958.9485 Sqm
FIRST FLOOR 2041.7155 Sqm
Type 1
master bed alaround 5 1.000 1.000 16.080 3.035
master bed ceiling 5 4.070 3.97 244.014
bed room 1 5 1.000 1.000 12.700 3.035 80.7895
bed room 1 ceiling 5 1.000 1.000 3.340 2.995 192.7225bed room 2 5 11.330 3.035 16.7
bed room 2 ceiling 5 2.670 2.995 171.93275
drawing alround 5 15.210 3.035 39.98325
drawing alround ceiling 5 4.430 3.175 230.81175
dining 5 16.560 3.035 70.32625
dining ceiling 5 3.075 5.205 251.298
passage between drawing and dining
two sides 5 2.000 0.895 3.035 80.026875
passage between drawing and dining
two sides ceiling 5 1.335 0.895 27.16325
kitchen 5 8.190 3.035 5.974125
kitchen ceiling 5 2.430 2.855 124.28325
sitout 5 4.450 3.035 34.68825
sitout ceiling 5 3.175 1.55 67.52875
utility three sides 5 4.580 3.035 24.60625utility ceiling 5 2.230 1.175 69.5015
west side toilets 1 5 7.060 3.035 13.10125
west side toilets 2 5 7 260 3 035 107 1355
Ground floor steps PCC M-20 Grade mix with stone aggregate of 20 mm & 12mm size mechanically mixed including
cost and conveyance of all materials and water to work site, seignorage fee and all opertational ,incidential,labour
charges such as centering from work, steel centering,mixing concrete, laying, lift charges ,vibrating,curing etc complete
for finished item of work as per Standard Specification etc complete for finished item of work to the required strength as
directed by department for steps.
Plastering 12mm thick in 2 coats with a base coat of 8mm thick in CM (1:6) prop and top coat 4mm thick in
CM(1:4)prop with dubara sponge finishing including cost and conveyance of all materials seignorage and water to work
site and all operational ,incidential labour charges such as scaffolding, mixing, motor , lift charges, curing etc. complete
for finished item of work as per SS No. 901, 904 for internal walls
7/27/2019 Detailed Estimation Format
26/81
Agmt
item
no
Description Length Breadth Depth Quantity UnitNos
east side toilets 5 7.420 3.035 15.145
east side toilets ceiling 5 2.395 1.315 112.5985
washbasin area three sides 5 2.315 3.035 15.747125
washbasin area ceiling 5 0.500 1.315 35.130125
deductions D1 5 3.000 0.910 1.98 3.2875
D2 5 4.000 0.750 1.98 27.027
29.7
Type 2 2215.37275 Sqm
master bed alaround 5 1.000 1.000 14.000 3.035
master bed ceiling 5 3.200 3.8 212.45
bed room 1 5 1.000 1.000 14.200 3.035 60.8
bed room 1 ceiling 5 1.000 1.000 3.600 3.5 215.485
drawing alround 5 16.800 3.035 63
drawing alround ceiling 5 4.900 3.5 254.94
dining 5 11.750 3.035 85.75
dining ceiling 5 3.000 4.15 178.30625
kitchen three sides 5 8.050 3.035 62.25
kitchen ceiling 5 2.300 2.95 122.15875
sitout 5 7.000 3.035 33.925
sitout ceiling 5 3.000 1.4 106.225
utility three sides 5 4.200 3.035 21
utility ceiling 5 2.200 1 63.735
west side toilets 1 5 8.400 3.035 11west side toilets cielings 5 2.600 1.6 127.47
east side toilets 5 7.400 3.035 20.8
east side toilets ceiling 5 2.200 1.5 112.295
washbasin area three sides 5 2.315 3.035 16.5
washbasin area ceiling 5 0.500 1.315 35.130125
deductions D1 5 2.000 0.910 1.98 3.2875
D2 5 3.000 0.750 1.98 18.018
staircase two sides 1 1.000 1.000 14.530 3.035 22.275
mid landing wall 3.130 1 44.09855
lift alaround 7.200 3.035 3.13
waist slab ceiling 1 1.000 1.000 5.625 3.13 21.852
corridor 1 1.000 1.000 49.500 2 5.625
corridor between lift and staircase 2.820 3.28 49.5
9.2496
1980.25578 Sqmfirst floor 4195.62853
second floor 4195.62853
third floor 4195.62853
fourth floor 4195.62853
fifth floor 4195.62853
sixth floor 4195.62853
parapet wall all round 312.060 1.2 374.472
staircase head room 17.450 2.68 46.766
staircase room ceiling 5.625 3.13 17.60625
lift room all around 7.200 3.035 21.852
lift room ceiling 1.800 1.8 3.24
463.93625 Sqm
SEVENTH FLOOR
lift room all around 7.200 3.035 21.852
lift room ceiling1.800 1.8 3.2425.092 Sqm
20
type 1
all around 5 1.000 1.000 40.000 3.15 630
corridor wall inbetween flats 5 9.000 1.000 2.000 2.14 192.6
deductions
door D 5 1.000 1.000 1.060 1.98 -10.494
W 5 5.000 1.000 0.910 1.22 -27.755
W1 5 1.000 1.000 0.910 0.75 -3.4125
V 5 3.000 1.000 0.600 0.45 -4.05
deductions for utility and sitout portion 5 1.000 1.000 5.500 2.655 -73.0125
703.876 Sqm
type 2
ll d
Plastering 12mm thick in 2 coats with a base coat of 8mm thick in CM (1:6) prop and top coat 4mm thick in
CM(1:4)prop with dubara sponge finishing including cost and conveyance of all materials seignorage and water to work
site and all operational ,incidential labour charges such as scaffolding, mixing, motor , lift charges, curing etc. complete
for finished item of work as per SS No. 901, 904 for external walls
7/27/2019 Detailed Estimation Format
27/81
Agmt
item
no
Description Length Breadth Depth Quantity UnitNos
W 5 3.000 1.000 0.910 1.22 -16.653
W1 5 1.000 1.000 0.910 0.75 -3.4125
V 5 2.000 1.000 0.600 0.45 -2.7
deductions for utility and sitout portion 5 1.000 1.000 5.300 2.655 -70.3575
473.778 Sqm
first floor 1177.654 Sqm
second floor 1177.654 Sqm
third floor 1177.654 Sqm
fourth floor 1177.654 Sqm
fifth floor 1177.654 Sqm
sixth floor
parapet wall all round 312.060 1.14 355.7484
staircase head room 18.570 2.79 51.8103
lift room all around 9.040 3.15 28.476
door decurition 0.750 1.98 1.485
437.5197 Sqm
seventh floor
lift all roujd 1 1.000 1.000 9.040 3.15 28.476 Sqm
21
10 1 5 50 nos
22
5 1 25 125nos
23
Balcony 5 10 50
for machine room 1 1 1 nos
51
24
Attached toilet 5 25 125 nos
24
at sitout 5 10 1 50 nos
25
5 40 200 Nos
26
Kitchen window 5 10 50 Nos
27
Attached toilet 5 25 125 Nos
28
Type 1 5 1 1 11.1 8.9
Type 2 5 1 1 9.4 8.9 493.95
staircase room 1 1 1 8.9 3.28 418.3
Door of size 3-0 x 6-6 Supply fixing and filling with cement mortar (1:8) prop of Mild steel hollow door frame of section
105x60 with 30mm rebate manufactured by cold rolled forming process using cold rolled steel coil of 1.25mm thick with
bright CRCA strips of "D" quality M.S. grade confirming to IS 4351-1976.
Door of size 2-6 x 6-6 Supply fixing and filling with cement mortar (1:8) prop of Mild steel hollow door frame of section
105x60 with 30mm rebate manufactured by cold rolled forming process using cold rolled steel coil of 1.25mm thick with
bright CRCA strips of "D" quality M.S. grade confirming to IS 4351-1976.
Door of size 2-6 x 6-6 Supply and door frame made of hollow extruded PVC section (Nandi or equivalent) havingdimensions of 40 x57mm with the wall thickness of 2mm +/- 0.2 mm duly reinforced with seasoned woood plank at the
hinges side the door frame top 2 corners shall be metricut/weilded. with door shutters made of rigid PVC extruded
hollow section (Nandi
NCL WINDOE OF SIZE 3-0 x 4-0 Providing and fixing windows made of prepainted steel (base steel as per IS 513 of
0.60 mm thick galvonised as per IS 277 with zinc of 150 GSM)
Sliding Doorof size 6-0 x 6-6 Supply fixing and filling with cement mortar (1:8) prop of Mild steel hollow door frame
of section 105x60 with 30mm rebate manufactured by cold rolled forming process using cold rolled steel coil of 1.25mm
thick with bright CRCA strips of "D" quality M.S. grade confirming to IS 4351-1976.
cost supply and fixing of Teak Wood Door of size 1.06 X 1.98 m including all labour charges
NCL WINDOE OF SIZE 3-0 x 2-6 Providing and fixing windows made of prepainted steel (base steel as per IS 513 of
0.60 mm thick galvonised as per IS 277 with zinc of 150 GSM)
Manufacturing & supply of 2'-0" x 1"-6" steel ventilator including cost of steel & glass
Ground floor Flooring with Grananalothic concrete Flooring 50 mm thick with CC 1:1:2 prop. Using 6mm to 12 mm size
(SSS) grade hard granite stone mesigne crushed metal laid Granalothically over an existing bed of CC 1:5:10 Prop. 10
cm thic. CC slab laib in alternate panels of size not exceeding 1.5X1.5m and finishing the top surface to required
smooth ness and slopes including cost and conveyance of all meterials and all operational incidental and seinarage
charges and mixing concrete, laying, curing etc. complete for finisheditemof work.(APSS NO:701and 707 )
7/27/2019 Detailed Estimation Format
28/81
Agmt
item
no
Description Length Breadth Depth Quantity UnitNos
1024.107 Sqm
29
Type 1First floor qty
Master bed 5 1 1 4.07 3.97 80.79
bed 1 5 1 1 2.995 3.34 50.02
bed 2 5 1 1 2.995 2.67 39.98
drawing 5 1 1 4.43 3.175 70.33
dining 5 1 1 3.075 5.2 79.95
between drawing and dining 5 1 1 0.895 1.335 5.97
kitchen 5 1 1 2.43 2.855 34.69
utility 5 1 1 2.23 1.175 13.10
sitout 5 1 1 3.175 1.55 24.61
west side toilet 1 5 1 1 2.33 1.2 13.98
west side toilet 2 5 1 1 2.33 1.3 15.15
east side toilet 5 1 1 2.395 1.3 15.57
washbasin area 5 1 1 0.5 1.3 3.25
skirting m.bed room 5 1 1 14.43 0.1 7.22
bed 1 5 1 1 11.02 0.1 5.51
bed 2 5 1 1 10.43 0.1 5.22
drawing 5 1 1 14.44 0.1 7.22
dining 5 1 1 7.96 0.1 3.98
kitchen 5 1 1 7.32 0.1 3.66
utility 5 1 1 3.83 0.1 1.92
sitout 5 1 1 4.46 0.1 2.23
484.32 Sqm
Type 2
First floor qty
Master bed 5 1 1 3.80 3.2 60.80
bed 1 5 1 1 3.6 3.5 63.00
drawing 5 1 1 4.9 3.5 85.75
dining 5 1 1 4.15 3 62.25
kitchen 5 1 1 2.95 2.3 33.93
utility 5 1 1 2.2 1 11.00sitout 5 1 1 3 1.4 21.00
west side toilet 5 1 1 2.6 1.6 20.80
east side toilet 5 1 1 2.2 1.5 16.50
washbasin area 5 1 1 0.6 1.6 4.80
skirting m.bed room 5 1 1 12.35 0.1 6.18
bed 1 5 1 1 12.55 0.1 6.28
drawing 5 1 1 14.04 0.1 7.02
dining 5 1 1 7.5 0.1 3.75
kitchen 5 1 1 7.95 0.1 3.98
utility 5 1 1 3.45 0.1 1.73
sitout 5 1 1 3.80 0.1 1.90
410.65
Total
Quantity821.29 Sqm
Second floor 821.29 SqmThird floor 821.29 Sqm
fourth floor 821.29 Sqm
fifth floor 821.29 Sqm
821.29
30
Toilet dadooing
Type 1
west side T1 allaround 5 1 1 7.06 2.1 74.13
west side T1 allaround 5 1 1 7.26 2.1 76.23
Deduct for dooor portion 5 2 1 0.75 1.98 -14.85
east side Toilet allaround 5 1 1 7.42 2.1 77.91
Deduct for dooor portion 5 1 1 0.75 1.98 -7.42
206.00
Kitchen dadooingthree sides 5 1 1 6.965 1.22 42.48
utility three sides 5 1 1 3.83 1.22 23.36
Dadooing with coluru glazed tiles 6.5mm thick of size(300 x 200 mm) 1st quality (as per manufacturers specification ) of
approved make ISI CM (1:5) prop with grey cement slurry for kitchen,bathroom,balcony & lift cladding
Flooring with CERAMIC Edge cut tiles of Johnson with 1st quality(premium) of approved colour over a base coat of
cement plastring in cm. ( 1:6 ) with white cement with required colour segment to match the shade of the colour
including cost and conyance of all meterials, labour and all taxes etc. complete for finished item In rooms flooring with
8.3mm thk ceramic tiles of size(400 x 400mm) with 1" thk mortar in CN(1:6) prop
7/27/2019 Detailed Estimation Format
29/81
Agmt
item
no
Description Length Breadth Depth Quantity UnitNos
west side toilet allaround 5 1 1 8.40 2.1 88.20
Deduct for dooor portion 5 1 1 0.75 1.98 -7.42
east side Toilet allaround 5 1 1 7.40 2.1 77.70
Deduct for dooor portion 5 1 1 0.75 1.98 -7.42
151.06
Kitchen dadooing
three sides 5 1 1 6.8 1.22 41.48
utility three sides 5 1 1 3.45 1.22 21.04
wash basin side 5 1 1 1.6 1.22 9.76
72.28
Total
Quantity503.20 Sqm
second floor 503.20 Sqm
third floor 503.20 Sqm
fourth floor 503.20 Sqm
fifthfloor 503.20 Sqm
31
Quantity same as internal ceiling andplastering
Ground floor
1st floor to 5 floor 5 4195.6285 2041.7155
6 th floor 20978.1426
463.93625
23483.7944 Sqm
32
First floor 1177.65 Sqm
Second floor 1177.65 Sqm
Third floor 1177.65 Sqm
Fourth floor 1177.65 SqmFifth floor 1177.65 Sqm
Sixth floor 437.52 Sqm6325.79 Sqm
Add for Chejjas
Chejjas over Windows
Chejjas over Windows W 40 5 2 1.220 0.46 488.00
Chejjas over Windows W1 10 5 2 1.220 0.46 122.00
610.00 SQM
Grand total 6935.79 SQM
33
main door 10 5 1.8 1.06 1.98 188.892
d1 25 5 1.8 0.91 1.98 405.405d2 10 5 1.8 0.75 1.98 133.65 SQM
727.947
34
First floor 5 1 1 4.54 0.6
TYPE 1 two sides 5 1 1 4.50 0.6 13.62
TYPE 2 two sides 10 1 1 3.94 0.1 13.5
add for Faces 10 1 1 0.75 0.15 3.94
add for verticql Faces 1.125 Sqm
First floor 32.185 Sqm
second floor 32.185 Sqm
third floor 32.185 Sqm
fourth floor 32.185 Sqmfifthfloor 32.18535
Painting to new wood work and flush shutters with lappam finish , over a primary coat and painting two coats of synthetic
enamel paint 1st grade of approved brand and shade (Total 3 coats) including cost and conveyance of all materials to
site cost of primer coat and all labour charges etc. complete including applying sand paper on lappam coats for neat
finish including sales & other taxes on cost of all materials etc. complete (APSS No.1200, 1207 & 1211) in all floors.
Supply and fixing of high polished Black granite 16 to 18 mm thick (upto 2.43 Mts length) including the rounding the
exposed edges of granite slab and polished set over a base of 20mm thick C.M(1:5) prop over already for KITCHEN
PLATFORM
Supplying and laying of polished shabad stone of tandur blue variety of 25.40 mm thick single piece over a base of 20
mm thick in C. M (1:8) with neat cement joints to full depth including cost and conveyance of all materials and labour
Supplying and application of two coats of ALTEK super fine , one coat of ALTEK water based coment primer and
twocoats of ALTEK flora ( plastic emulsion paint ) to interior faces of new walls and ceeling of approved colour as per
manufacturer's specifications including cost and conveyance of all matirials to site and labour charges such as
preparing the wall, applying primary coat etc. complete for finished item of work for INTERNAL WALLS AND CEILING
(Total 2 coats).
"B" -Supply and application of one coats of Altek water based cement primer and two coats of harmony (Acrylic
emulsion paint exterior grade) to exterior faces of new walls and ceiling of approved colour as per manufacturer's
specifications including c
7/27/2019 Detailed Estimation Format
30/81
Agmt
item
no
Description Length Breadth Depth Quantity UnitNos
Ground floor treads 2 10 1 1.5 0.30
Raisers 2 10 1 1.5 0.15 9
Mid landing 1 1 1 3.3 1.5 4.5
add for skirting midlanding 3 sides 1 1 1 6.3 0.10 4.95
0.63
Ground floor quantity 19.08 Sqm
first floor 19.08 Sqm
second floor 19.08 Sqm
third floor 19.08 Sqm
fourth floor 19.08 Sqm
fifthfloor 19.08 Sqm
36
Type 1 terrace 5 1 1 10.80 8.60 464.40
Type 2 terrace 5 1 1 9.10 8.60 391.30
Corridor portion 1 1 1 50.50 2.00 101.00
Staircase portion 1 1 1 8.6 3.13 26.918Lift portion 1 1 1 1.8 1.8 3.24
Total qty 986.86 Sqm37
Ground floor
Total front face up to beam 1 1 1 2.26 2.82 6.37
Deduct opening -1 1 1 0.7 2.00 -1.40
Side faces 1 2 1 0.3 2.00 1.20
Top face 1 1 1 0.7 0.30 0.21
Deduct Switch portion -1 2 1 0.28 0.08 -0.04
6.34 Sqm
First floor to fifth floor
Total front face up to beam 1 1 1 1.93 2.62 5.06
Deduct opening -1 1 1 0.71 2.00 -1.42Side faces 1 2 1 0.29 2.00 1.16
Top face 1 1 1 0.71 0.29 0.21
Deduct Switch portion -1 2 1 0.28 0.08 -0.04
For Each floor 4.96 Sqm
For Five floors 24.79 Sqm
Total for GF+5floors 31.13 Sqm
38
For type 1 W/SToilet 1 5 1 1 2.33 1.30 15.15
Impervious coat 20mm thick average over roof slab with CM(1:4) prop. Mixed with approved water proofing compound
at the rate of 1.0 kg per bag of cement (50 kgs) and laid when the slab is green with thread lining at 1-6x1-6 pannels
and finished smooth with neat cement rendering as directed including cost and conveyance of all materials and water to
work site, seignorage fee and all operational, incidental, labour charges such as mixing mortar, laying, curing etc.,
complete for Toilets
Lift cladding with CERAMIC Edge cut tiles of Johnson with 1st quality(premium) of approved colour over a base coat of
cement plastering in cm. ( 1:6 ) with white cement with required colour segment to match the shade of the colour
including cost and conyance of all meterials, labour and all taxes etc. ceramic tiles of size(300 x 300mm) with 1" thk
mortar in CM(1:6) prop
Surface preparation by means of chipping & cleaning testing for leakage points and grouting the same with neat cement
slurry and repairing of cracks and pot holes,if any with polymer repair motor and applying two coats of polymer based
water proofing slurry coating.Sika top seal 107 with coverage of 3Kg per sq mtr for two coats and providing cement
screed of average 50mm thick with smooth finish,and continuing the same upto height of 300mm all along the parapet
wall and other adjoining walls in form of vatta
7/27/2019 Detailed Estimation Format
31/81
Agmt
item
no
Description Length Breadth depth Quantity Unit
1
Filling portion 1 1 1 49.00 20.00 1.20 1176.00Block area 1 1 1 59.40 31.00 1.00 1841.40
3017.40 cum
2
For Coloumn footings for type 1
(External) 5 8 1 1.80 1.80 1.10 142.56
For Coloumn footings for type 1
(Internal) 5 1 1 2.40 2.40 1.10 31.68
For Coloumn footings for type 2
(external) 4 8 1 1.80 1.80 1.10 114.05
For Coloumn footings for type 2
(Internal) 4 1 1 2.40 2.40 1.10 25.34
For Coloumn footings for staircase 4 1 1 1.80 1.80 1.10 14.26
For Coloumn footings for lift 4 1 1 1.80 1.80 1.10 14.26For Coloumn footings for corridor 3 1 1 1.80 1.80 1.10 10.69
Net Qty earth work excavation 352.84 cum
3
1 1 1 30.00 5.00 2.50 375.00 cum
4
For block PF
External columns 83 7 7 1 1 0.80 3253.60
internal columns 9 9 9 1 1 0.80 583.20
Net Quantity: Total 3836.80 Rmt
5
External columns 83 1 1 1.80 1.80 0.15 40.34
internal columns 9 1 1 2.40 2.40 0.15 7.78
48.11 Cum
6
Type 1 Stilt floor 5 1 1 8.50 8.40 0.10 35.70
Type 2 Stilt floor 4 1 1 8.65 8.40 0.10 29.06
Corridor 1 1 1 52.75 2.00 0.10 10.55
Staircase portion 1 1 1 4.73 3.60 0.10 1.70
Deduct for beam portions (63.55+65.47) 1 1 1 129.02 0.23 0.10 -2.97
Deduction for Columns 1 92 1 0.30 0.45 0.10 -1.24
for sump 2 1 1 4.40 4.9 0.15 6.47 Cum
LIFT 1 1 1 2.26 2.26 0.15 0.77
Total qty 72.81 Cum
7
Footings
BLOCK No. PF
External columns 83 1 1 1.80 1.80 0.475 127.74
Internal columns 9 1 1 2.40 2.40 0.475 24.62
152.36 cum
8
Name of Work : Construction of 1 Block (Stilt+5) 5 flats Type-1 and 4 flats Type-2, total 45 flats (885.86 Sft) (PEARL -F) AARAM
block PF
Nos
Earth work excavation and depositing on bank with an intial lead of 10m and l ift of 2m in mixture of gravel and soft
disintegrated rock like shales ,ordinary gravel stoney earth and earth mixed with fair size boulders including shoring
shuttering and bailing out of water etc for foundations .
Excavation in rock by way of benching ,chiselling, wedging, and Boring in fourndation, grade levelling including all
lead and lift charges and disposal of rock from the site as directed by the department.( A rate of Rs.164.90 per Cum
Providing and laying VCC M20 in foundations, machine foundations, footings and bases of columns and under floorsincluding the cost of centering and shuttering for Column footings levelling course
VRCC M20 grade mix (Design Mix as per SS) with fixed stone aggregate of 20mm & 12mm size mechanically mixedwith necessary reinforcement including cost and conveyance of all materials and water to work site seigniorage all
operational
Providing and laying cement concrete 1:5:10 (1 cement :5 coarse sand :10 graded stone aggregate 40 mm. nominal
size) mm. ) in basement under floors
Earth work Excavation in hard rock and boulders of more than 3 cum in size where ever quarrying is done by controlled
blasting without stacking and disposal of excavated rock within a distance of 2km from work spot
VRCC M20 grade mix (Design Mix as per SS) with fixed stone aggregate of 20mm & 12mm size mechanically mixed
with necessary reinforcement including cost and conveyance of all materials and water to work site seigniorage all
operational
Drilling of 25mm dia and 800 mm deep in hard rock or sheet rock by pneumatic grouting and placing of 16 mm dia Tor
steel bars and grouting holes with slurry excluding cost of steel and its fabrication charges but including cost and
conveyance of al
7/27/2019 Detailed Estimation Format
32/81
Agmt
item
no
Description Length Breadth depth Quantity UnitNos
External columns 83 1 1 0.75 0.75 0.45 21.01
Internal columns 9 1 1 0.75 0.75 0.45 2.28
for sump 2 1 1 4.40 4.9 0.125 5.39
LIFT 1 1 1 2.26 2.26 0.125 0.64
23.29 cum
9
FOR PLINTHBEAM
TYPE 1
B1 5 2 1 8.40 0.23 0.30 5.80
B2 5 1 1 4.79 0.23 0.30 1.65
B3 5 1 1 2.79 0.23 0.30 0.96
B4 5 1 1 3.39 0.23 0.30 1.17
B5 5 1 1 1.17 0.23 0.30 0.40
B6 5 3 1 8.50 0.23 0.30 8.80
B7 5 2 1 1.79 0.23 0.30 1.24
B8 5 1 1 2.54 0.23 0.30 0.88
B9 5 1 1 2.99 0.23 0.30 1.03
21.92
TYPE 2
B1 4 2 1 8.40 0.23 0.30 4.64B2 4 1 1 1.04 0.23 0.30 0.29
B3 4 2 1 4.49 0.23 0.30 2.48
B4 4 1 1 3.09 0.23 0.30 0.85
B5 4 3 1 8.75 0.23 0.30 7.25
B6 4 2 1 1.99 0.23 0.30 1.10
B7 4 1 1 2.79 0.23 0.30 0.77
B8 4 1 1 2.54 0.23 0.30 0.70
18.07
Corridor two sides 1 1 1 14.15 0.23 0.30 0.98
corridor connecting beams 1 2 1 2.00 0.23 0.30 0.28
for stair case 3 sides 1 1 1 12.60 0.23 0.30 0.87
for stair case front side 1 1 1 6.25 0.23 0.30 0.43
lift all round 1 1 1 7.20 0.23 0.30 0.50
3.05
Total qty 43.04 cum10 Columns upto plinth beam
External columns 83 1 1 0.30 0.45 1.90 21.29
Internal columns 9 1 1 0.30 0.45 1.90 2.31
for side walls of sump 2 1 1 18.60 0.175 2.00 13.02
for side walls of lift 1 1 1 9.04 0.175 1.50 2.37
Total qty 23.60 cum
11 COLUMNS FOR GROUND FLOOR
External columns 83 1 1 0.3 0.45 2.655 29.75
Internal columns 9 1 1 0.3 0.45 2.655 3.23
Total qty 32.98 cum
First floor 32.98 cum
Second floor 32.98 cum
Third floor 32.98 cum
Fourth floor 32.98 cum
Fifth floor 32.98 cumCOLUMNS FOR SIXTH FLOOR
Staircase columns 4 1 1 0.30 0.45 2.5 1.35
lift columns 4 1 1 0.30 0.45 2.5 1.35
2.70 cum
COLUMNS FOR SEVENTH FLOOR
4 1 1 0.30 0.45 2.5 1.35
1.35
11
Up to bottom of plinth beam item no
1+2+3 3745.24
For balance portion with out filling 1 1 1 10.40 31.00 1.20 386.88
Deduct for useful earth qty @50% OF
item 1 -1508.70Deduct footings qty -152.36
Deduct pedestals qty -23.29
Deduct plinth beam qty 43 04
Filling in trenches, sides of foundations, basements etc., with carted earth with a lead of 12km in layers not exceeding
15cms thick consolidating each deposited layer by watering and ramming including c/c of earth, water to workspot
VRCC M20 grade mix (Design Mix as per SS) with fixed stone aggregate of 20mm & 12mm size mechanically mixed
with necessary reinforcement including cost and conveyance of all materials and water to work site seigniorage all
operational
7/27/2019 Detailed Estimation Format
33/81
Agmt
item
no
Description Length Breadth depth Quantity UnitNos
12 ROOF BEAMS
GROUND FLOOR
TYPE 1
B1 2 1 1 8.40 0.23 0.38 1.47
B2 1 1 1 4.79 0.23 0.38 0.42
B3 1 1 1 2.79 0.23 0.38 0.24
B4 1 1 1 3.39 0.23 0.38 0.30
B5 1 1 1 1.17 0.23 0.38 0.10
B6 3 1 1 8.50 0.23 0.38 2.23
B7 2 1 1 1.79 0.23 0.38 0.31
B8 1 1 1 2.54 0.23 0.38 0.22
B9 1 1 1 2.99 0.23 0.38 0.26
TYPE 2 5.55 cum
B1 2 1 1 8.40 0.23 0.38 1.47
B2 1 1 1 1.04 0.23 0.38 0.09
B3 2 1 1 4.49 0.23 0.38 0.78
B4 1 1 1 3.09 0.23 0.38 0.27
B5 3 1 1 8.75 0.23 0.38 2.29
B6 2 1 1 1.99 0.23 0.38 0.35
B7 1 1 1 2.79 0.23 0.38 0.24
B8 1 1 1 2.54 0.23 0.38 0.22
For stair case 2 1 1 3.30 0.23 0.38 0.58
2 1 1 4.73 0.23 0.38 0.83For lift alround 1 1 1 8.12 0.23 0.38 0.71
For Corridor two sides 1 1 1 14.15 0.23 0.38 1.24
9.07 cum
Total qty 14.63 cum
GROUND FLOOR 14.63 cum
FIRST FLOOR 14.63 cum
SECOND FLOOR 14.63 cum
THIRD FLOOR 14.63 cum
FOURTH FLOOR 14.63 cum
FIFTH FLOOR 14.63 cum
SIXTH FLOOR
For stair case 2 1 1 3.30 0.23 0.38 0.58
2 1 1 4.73 0.23 0.38 0.83
For lift alround 1 1 1 8.12 0.23 0.38 0.71
Total qty 2.11 cumSEVENTH FLOOR
For lift alround 1 1 1 8.12 0.23 0.38 0.71
13 ROOFSLAB for Ground Floor
For Type 1 5 1 1 8.40 8.5 0.115 41.06
For Type 2 4 1 1 8.40 8.65 0.115 33.42
corridor 1 1 1 52.75 2.00 0.115 12.13
waist slab 2 1 1 3.00 1.50 0.15 1.35
midlanding slab 1 1 1 1.50 3.30 0.115 0.57
top slab for sump 2 1 1 4.90 4.4 0.15 6.47
Total qty 95.00 cum
ROOFSLAB for Ground Floor 88.53 cum
ROOFSLAB for First Floor 88.53 cum
ROOFSLAB for Second Floor 88.53 cum
ROOFSLAB for third Floor 88.53 cum
ROOFSLAB for Fourth Floor 88.53cum
ROOFSLAB for Fifth Floor 88.53 cum
ROOFSLAB for Sixth Floor cum
stair case head room 1 1 1 4.73 3.6 0.115 1.96
lift room 1 1 1 2.26 2.26 0.15 0.77
Total qty 2.73 cum
ROOF SLAB FOR SEVETH FLOOR
lift room 1 1 1 2.26 2.26 0.115 0.59
14 Lintels for FIRST FLOOR
over D 9 1 1 1.37 0.15 0.10 0.18
over D1 18 1 1 1.22 0.10 0.10 0.22
over D2 27 1 1 1.07 0.10 0.10 0.29
Over sliding door 9 1 1 2.10 0.10 0.15 0.28
over W 27 1 1 1.22 0.10 0.10 0.33
over W! 9 1 1 0.91 0.10 0.10 0.08
over lift 1 1 1 1.07 0.15 0.10 0.02
Total qty 1.40 cum
Lintels for SECOND FLOOR 1.40 cum
7/27/2019 Detailed Estimation Format
34/81
Agmt
item
no
Description Length Breadth depth Quantity UnitNos
LINTELS FOR SEVENTH FLOOR
over lift 1 1 1 1.07 0.15 0.10 0.02 cum
For BEDBLOCKS
For D 9 2 3 0.15 0.14 0.10 0.11
For D1 18 2 3 0.15 0.10 0.10 0.16
For D2 9 2 3 0.15 0.10 0.10 0.08
0.36 cum
15 Chejjas over Windows FOR FF
Chejjas over Windows W 27 1 1 1.22 0.46 32.94
Chejjas over Windows W1 9 1 1 1.22 0.46 10.98
Total qty 43.92 SQM
Chejjas over Windows FOR SECOND
FLOOR 43.92 SQM
Chejjas over Windows FOR THIRD
FLOOR 43.92 SQM
Chejjas over Windows FOR FOURTH
FLOOR 43.92 SQM
Chejjas over Windows FOR FIFTH
FLOOR 43.92 SQM
16
Type 1
Lofts in kitchen 5 1 1 2.20 0.45 4.95
kitchen platform two sides 5 1 1 4.25 0.65 13.81
Deduct for sink 5 1 1 0.52 0.40 -1.04
master bed 5 1 1 3.40 0.60 10.20
bed 1 5 1 1 3.20 0.60 9.60
37.52
Type 2
Lofts in kitchen 4 1 1 2.55 0.45 4.59
kitchen platform two sides 4 1 1 4.15 0.65 10.79
Deduct for sink 4 1 1 0.52 0.40 -0.83
master bed 4 1 1 3.50 0.60 8.40bed 1 4 1 1 3.20 0.60 7.68
30.63 Sqm
First floor 68.15 Sqm
second floor 68.15 Sqm
third floor 68.15 Sqm
fourth floor 68.15 Sqm
fifth floor 68.15 Sqm
17
VRCC M20 FOR CUPBOARD
SHELVES
Type 1
kitchen Shelves horizontal 5 1 1 2.20 0.32 3.52
kitchen Shelves horizontal 5 2 1 1.55 0.32 4.96
kitchen Shelves verticals 5 2 1 1.50 0.32 4.80
Master bed horizontal 5 2 2 1.28 0.53 13.57Master bed verticals 5 2 1 1.98 0.53 10.49
bed 1 5 2 1 2.05 0.53 10.87
bed 1 5 2 1 1.98 0.53 10.49
58.70 Sqm
Type 2
kitchen Shelves horizontal 4 1 1 2.40 0.32 3.07
kitchen Shelves horizontal 4 2 1 1.75 0.32 4.48
kitchen Shelves verticals 4 2 1 1.50 0.32 3.84
Master bed horizontal 4 2 1 2.00 0.53 8.48
Master bed verticals 4 2 1 1.98 0.53 8.40
bed 1 4 2 2 1.20 0.53 10.18
bed 1 4 2 1 1.98 0.53 8.40
46.84 Sqm
Total Qty forfirst floor 105.54 Sqm
Total Qty for
Racks and lofts Ground Floor FLOOR RCC M20 grade mix (Design Mix as per SS) with stone aggregate of 20mm and
12mm size mechanically mixed etc, necessary reinforcement including cost and conveyance of all materials and water
to work site seignorage and all operational, incidential labour charges such as centering (steel Centering) mixing
concrete, laying, lift charges, curing, etc., complete for finished item of work as per standard specification but excludingcost on steel reinforcement and its fabrication charges etc complete for finished item of work to the required strength as
directed by department for 60 mm thick to 40 mm thick at free end, plastering 12mm thick in CM(1:4) Prop. For all
exposed faces (Bottom & Sides) etc.
7/27/2019 Detailed Estimation Format
35/81
Agmt
item
no
Description Length Breadth depth Quantity UnitNos
RCC Columns for tank 2 4 1 0.30 0.45 1.20 1.30 Cum
RCC beams over all 2 1 1 14.80 0.23 0.38 2.59 Cum
RCC bottom slab 2 1 1 4.66 4.26 0.15 5.96 Cum
RCC Top slab 2 1 1 4.06 3.66 0.125 3.71 Cum
RCC Side walls 2 1 1 15.44 0.175 2.00 10.81 Cum
24.36 Cum
19 Sump at Ground floor
RCC Columns for tank 2 4 1 0.30 0.45 1.20 1.30 Cum
CC 1:5:10 2 1 1 5.03 4.17 0.15 6.29 Cum
RCC bottom slab 2 1 1 5.03 4.17 0.15 6.29 Cum
RCC Top slab 2 1 1 5.03 4.17 0.15 6.29 Cum
RCC Side walls allaround 2 1 1 17.48 0.23 1.80 14.47 Cum
34.65 Cum
20
for type 1
All around 5 1 1 33.20 0.14 2.655 61.70
Deduct for sitout and utility 5 1 1 4.80 0.14 2.655 -8.92
deduct columns 5 8 1 0.30 0.14 2.655 -4.46
deduct for door D 5 1 1 1.06 0.14 1.98 -1.47deduct for windows w 5 3 1 0.91 0.14 1.22 -2.33
deduct for windows w1 5 1 1 0.91 0.14 0.75 -0.48
deduct for windows v 5 2 1 0.60 0.14 0.45 -0.38
deduct for lintels over doors 5 1 1 1.37 0.14 0.1 -0.10
deduct for lintels over windows 5 4 1 1.22 0.14 0.1 -0.34
deduct for exhaust fan 5 1 0.79 0.30 0.14 0.3 -0.05
for type 2
All around 4 1 1 36.00 0.14 2.655 53.52
Deduct for sitout and utility 4 1 1 5.22 0.14 2.655 -7.76
deduct columns 4 8 1 0.30 0.14 2.655 -3.57
deduct for door D 4 1 1 1.06 0.14 1.98 -1.18
deduct for windows w 4 3 1 0.91 0.14 1.22 -1.87
deduct for windows w1 4 1 1 0.91 0.14 0.75 -0.38
deduct for windows v 4 2 1 0.60 0.14 0.45 -0.30
deduct for lintels over doors 4 1 1 1.37 0.14 0.1 -0.08deduct for exhaust fan 4 1 0.79 0.30 0.14 0.3 -0.04
For staircase
L/W 1 2 1 4.72 0.14 2.655 3.51
s/W 1 1 1 3.30 0.14 1.000 0.46
lift room allaround 1 1 1 7.01 0.14 2.655 2.61
Corridor parapet wall 1 7 1 2.00 0.14 1.000 1.96
Corridor parapet wall 1 1 1 14.15 0.14 1.000 1.98 Cum
Total qty 92.05 cum
BM for First floor 92.05 Cum
BM for Second floor 92.05 Cum
BM for Third floor 92.05 Cum
BM for Fourth floor 92.05 Cum
BM for Fifth floor 92.05 Cum
BM for Sixth floor
Stair case 3sides 1 1 1 13.06 0.14 2.2 4.02Parapet wall 1 1 1 255.35 0.14 1.2 42.90
at lift room allaround 1 1 1 7.01 0.23 2.655 4.28
Total qty 51.20 Cum
BM FOR SEVENTH FLOOR
at lift room allaround 1 1 1 7.01 0.23 2.655 4.28
21
Type 1
Master bed room two sides 5 1 1 6.30 0.1 2.655 8.36
bed room1 two sides 5 1 1 6.60 0.1 2.655 8.76
between kitchen and utility 5 1 1 2.00 0.1 2.655 2.66
Toilets North side 2 sides 5 1 1 3.10 0.1 2.655 4.12South side toilet 2 sides 5 1 1 4.10 0.1 2.655 5.44
sitout 2 sides 5 1 1 2.40 0.1 2.655 3.19
Wash area side 5 1 1 0 40 0 1 2 655 0 53
Masonary in CM(1:8)prop: With Flyash,Gypsum, stone quarry dust and Lime soild blocks of size
290x225x140mm(made up of Flyash,Lime and gypsum) with compressive strength not less than 50 kg/sq.cm. Including
cost and conveyance of all materials,labour charges,curing etc., complete for 14.00 cm. Thick Main Wall.
Masonary in CM(1:8)prop: With Flyash,Gypsum, stone quarry dust and Lime soild blocks of size 290x225x140mm(made
up of Flyash,Lime and gypsum) with compressive strength not less than 50 kg/sq.cm. Including cost and conveyance of
all materials,labour charges,curing etc., complete for 14.00 cm. Thick Main Wall.
7/27/2019 Detailed Estimation Format
36/81
Agmt
item
no
Description Length Breadth depth Quantity UnitNos
deduct for lintels over d1 5 2 1 1.22 0.1 0.1 -0.12
deduct for lintels over d2 5 3 1 1.05 0.1 0.1 -0.16
28.77 Cum
Type 2
Master bed room two sides 4 1 1 6.50 0.1 2.655 6.90
bed room1 two sides 4 1 1 6.40 0.1 2.655 6.80
between drawing and dining 4 1 1 0.35 0.1 2.655 0.37
between kitchen and utility 4 1 1 2.20 0.1 2.655 2.34
sitout two sides 4 1 1 2.40 0.1