+ All Categories
Home > Documents > Detailed FRA/FCA Map centred on Belper Meadows, Belper...

Detailed FRA/FCA Map centred on Belper Meadows, Belper...

Date post: 21-Jul-2018
Category:
Upload: hoangnhi
View: 217 times
Download: 0 times
Share this document with a friend
10
Scale 1:10,000 Legend Detailed FRA/FCA Map centred on Belper Meadows, Belper - created 16 January 2014 Ref: [E6985] © Environment Agency copyright and / or database rights 2014. All rights reserved. © Crown Copyright and database right. All rights reserved. Environment Agency, 100024198, 2014. Contact Us: National Customer Contact Centre, PO Box 544, Rotherham, S60 1BY. Tel: 03708 506 506 (Mon-Fri 8-6). Email: [email protected] 1% (1 in 100 year) floodplain 1% (1 in 100 year) floodplain 1% (1 in 100 year) floodplain 1% (1 in 100 year) floodplain 1% (1 in 100 year) floodplain 1% (1 in 100 year) floodplain 1% (1 in 100 year) floodplain 1% (1 in 100 year) floodplain 1% (1 in 100 year) floodplain 0.1% (1 in 1000 year) floodplain 0.1% (1 in 1000 year) floodplain 0.1% (1 in 1000 year) floodplain 0.1% (1 in 1000 year) floodplain 0.1% (1 in 1000 year) floodplain 0.1% (1 in 1000 year) floodplain 0.1% (1 in 1000 year) floodplain 0.1% (1 in 1000 year) floodplain 0.1% (1 in 1000 year) floodplain Main River Main River Main River Main River Main River Main River Main River Main River Main River Bank Top ePlanning Tool Bank Top ePlanning Tool Bank Top ePlanning Tool Bank Top ePlanning Tool Bank Top ePlanning Tool Bank Top ePlanning Tool Bank Top ePlanning Tool Bank Top ePlanning Tool Bank Top ePlanning Tool A Strategic Flood Risk Assessment may be A Strategic Flood Risk Assessment may be A Strategic Flood Risk Assessment may be A Strategic Flood Risk Assessment may be A Strategic Flood Risk Assessment may be A Strategic Flood Risk Assessment may be A Strategic Flood Risk Assessment may be A Strategic Flood Risk Assessment may be A Strategic Flood Risk Assessment may be available, providing further information for available, providing further information for available, providing further information for available, providing further information for available, providing further information for available, providing further information for available, providing further information for available, providing further information for available, providing further information for this site. Please contact your Local Planning this site. Please contact your Local Planning this site. Please contact your Local Planning this site. Please contact your Local Planning this site. Please contact your Local Planning this site. Please contact your Local Planning this site. Please contact your Local Planning this site. Please contact your Local Planning this site. Please contact your Local Planning Authority to access this information as it will Authority to access this information as it will Authority to access this information as it will Authority to access this information as it will Authority to access this information as it will Authority to access this information as it will Authority to access this information as it will Authority to access this information as it will Authority to access this information as it will need to be considered within any Flood Risk need to be considered within any Flood Risk need to be considered within any Flood Risk need to be considered within any Flood Risk need to be considered within any Flood Risk need to be considered within any Flood Risk need to be considered within any Flood Risk need to be considered within any Flood Risk need to be considered within any Flood Risk Assessment submission. Assessment submission. Assessment submission. Assessment submission. Assessment submission. Assessment submission. Assessment submission. Assessment submission. Assessment submission.
Transcript
Page 1: Detailed FRA/FCA Map centred on Belper Meadows, Belper ...docs.ambervalley.gov.uk/Planning/StreamDocPage/obj.pdf?DocNo=... · Email: enquiries@environment-agency.gov.uk 1% (1 in 100

Scale 1:10,000

Legend

Detailed FRA/FCA Map centred on Belper Meadows, Belper - created 16 January 2014 Ref: [E6985]

© Environment Agency copyright and / or database rights 2014. All rights reserved. © Crown Copyright and database right. All rights reserved. Environment Agency, 100024198, 2014.

Contact Us: National Customer Contact Centre, PO Box 544, Rotherham, S60 1BY. Tel: 03708 506 506 (Mon-Fri 8-6). Email: [email protected]

1% (1 in 100 year) floodplain1% (1 in 100 year) floodplain1% (1 in 100 year) floodplain1% (1 in 100 year) floodplain1% (1 in 100 year) floodplain1% (1 in 100 year) floodplain1% (1 in 100 year) floodplain1% (1 in 100 year) floodplain1% (1 in 100 year) floodplain

0.1% (1 in 1000 year) floodplain0.1% (1 in 1000 year) floodplain0.1% (1 in 1000 year) floodplain0.1% (1 in 1000 year) floodplain0.1% (1 in 1000 year) floodplain0.1% (1 in 1000 year) floodplain0.1% (1 in 1000 year) floodplain0.1% (1 in 1000 year) floodplain0.1% (1 in 1000 year) floodplain

Main RiverMain RiverMain RiverMain RiverMain RiverMain RiverMain RiverMain RiverMain River

Bank Top ePlanning ToolBank Top ePlanning ToolBank Top ePlanning ToolBank Top ePlanning ToolBank Top ePlanning ToolBank Top ePlanning ToolBank Top ePlanning ToolBank Top ePlanning ToolBank Top ePlanning Tool

A Strategic Flood Risk Assessment may be A Strategic Flood Risk Assessment may be A Strategic Flood Risk Assessment may be A Strategic Flood Risk Assessment may be A Strategic Flood Risk Assessment may be A Strategic Flood Risk Assessment may be A Strategic Flood Risk Assessment may be A Strategic Flood Risk Assessment may be A Strategic Flood Risk Assessment may be available, providing further information for available, providing further information for available, providing further information for available, providing further information for available, providing further information for available, providing further information for available, providing further information for available, providing further information for available, providing further information for this site. Please contact your Local Planning this site. Please contact your Local Planning this site. Please contact your Local Planning this site. Please contact your Local Planning this site. Please contact your Local Planning this site. Please contact your Local Planning this site. Please contact your Local Planning this site. Please contact your Local Planning this site. Please contact your Local Planning Authority to access this information as it will Authority to access this information as it will Authority to access this information as it will Authority to access this information as it will Authority to access this information as it will Authority to access this information as it will Authority to access this information as it will Authority to access this information as it will Authority to access this information as it will need to be considered within any Flood Risk need to be considered within any Flood Risk need to be considered within any Flood Risk need to be considered within any Flood Risk need to be considered within any Flood Risk need to be considered within any Flood Risk need to be considered within any Flood Risk need to be considered within any Flood Risk need to be considered within any Flood Risk Assessment submission.Assessment submission.Assessment submission.Assessment submission.Assessment submission.Assessment submission.Assessment submission.Assessment submission.Assessment submission.

Page 2: Detailed FRA/FCA Map centred on Belper Meadows, Belper ...docs.ambervalley.gov.uk/Planning/StreamDocPage/obj.pdf?DocNo=... · Email: enquiries@environment-agency.gov.uk 1% (1 in 100

DE093I6DE093I6DE093I6DE093I6DE093I6DE093I6DE093I6DE093I6DE093I6

DE093DE093DE093DE093DE093DE093DE093DE093DE093

DE094DE094DE094DE094DE094DE094DE094DE094DE094

BM-00000BM-00000BM-00000BM-00000BM-00000BM-00000BM-00000BM-00000BM-00000BM-00167BM-00167BM-00167BM-00167BM-00167BM-00167BM-00167BM-00167BM-00167

Scale 1:5,000

Legend

Modelled Extents Map centred on Belper Meadows, Belper - created 16 January 2014 Ref: [E6985]

© Environment Agency copyright and / or database rights 2014. All rights reserved. © Crown Copyright and database right. All rights reserved. Environment Agency, 100024198, 2014.

Contact Us: National Customer Contact Centre, PO Box 544, Rotherham, S60 1BY. Tel: 03708 506 506 (Mon-Fri 8-6). Email: [email protected]

Source: Matlock and Belper SFRM,Source: Matlock and Belper SFRM,Source: Matlock and Belper SFRM,Source: Matlock and Belper SFRM,Source: Matlock and Belper SFRM,Source: Matlock and Belper SFRM,Source: Matlock and Belper SFRM,Source: Matlock and Belper SFRM,Source: Matlock and Belper SFRM,Capita Symonds, March 2011Capita Symonds, March 2011Capita Symonds, March 2011Capita Symonds, March 2011Capita Symonds, March 2011Capita Symonds, March 2011Capita Symonds, March 2011Capita Symonds, March 2011Capita Symonds, March 2011

Modelled Node Location and ReferenceModelled Node Location and ReferenceModelled Node Location and ReferenceModelled Node Location and ReferenceModelled Node Location and ReferenceModelled Node Location and ReferenceModelled Node Location and ReferenceModelled Node Location and ReferenceModelled Node Location and Reference

1 in 50 year Modelled Extent1 in 50 year Modelled Extent1 in 50 year Modelled Extent1 in 50 year Modelled Extent1 in 50 year Modelled Extent1 in 50 year Modelled Extent1 in 50 year Modelled Extent1 in 50 year Modelled Extent1 in 50 year Modelled Extent

1 in 75 year Modelled Extent1 in 75 year Modelled Extent1 in 75 year Modelled Extent1 in 75 year Modelled Extent1 in 75 year Modelled Extent1 in 75 year Modelled Extent1 in 75 year Modelled Extent1 in 75 year Modelled Extent1 in 75 year Modelled Extent

1 in 100 year Modelled Extent1 in 100 year Modelled Extent1 in 100 year Modelled Extent1 in 100 year Modelled Extent1 in 100 year Modelled Extent1 in 100 year Modelled Extent1 in 100 year Modelled Extent1 in 100 year Modelled Extent1 in 100 year Modelled Extent

1 in 200 year Modelled Extent1 in 200 year Modelled Extent1 in 200 year Modelled Extent1 in 200 year Modelled Extent1 in 200 year Modelled Extent1 in 200 year Modelled Extent1 in 200 year Modelled Extent1 in 200 year Modelled Extent1 in 200 year Modelled Extent

A Strategic Flood Risk Assessment may be A Strategic Flood Risk Assessment may be A Strategic Flood Risk Assessment may be A Strategic Flood Risk Assessment may be A Strategic Flood Risk Assessment may be A Strategic Flood Risk Assessment may be A Strategic Flood Risk Assessment may be A Strategic Flood Risk Assessment may be A Strategic Flood Risk Assessment may be available, providing further information for available, providing further information for available, providing further information for available, providing further information for available, providing further information for available, providing further information for available, providing further information for available, providing further information for available, providing further information for this site. Please contact your Local Planning this site. Please contact your Local Planning this site. Please contact your Local Planning this site. Please contact your Local Planning this site. Please contact your Local Planning this site. Please contact your Local Planning this site. Please contact your Local Planning this site. Please contact your Local Planning this site. Please contact your Local Planning Authority to access this information as it will Authority to access this information as it will Authority to access this information as it will Authority to access this information as it will Authority to access this information as it will Authority to access this information as it will Authority to access this information as it will Authority to access this information as it will Authority to access this information as it will need to be considered within any Flood Risk need to be considered within any Flood Risk need to be considered within any Flood Risk need to be considered within any Flood Risk need to be considered within any Flood Risk need to be considered within any Flood Risk need to be considered within any Flood Risk need to be considered within any Flood Risk need to be considered within any Flood Risk Assessment submission.Assessment submission.Assessment submission.Assessment submission.Assessment submission.Assessment submission.Assessment submission.Assessment submission.Assessment submission.

Page 3: Detailed FRA/FCA Map centred on Belper Meadows, Belper ...docs.ambervalley.gov.uk/Planning/StreamDocPage/obj.pdf?DocNo=... · Email: enquiries@environment-agency.gov.uk 1% (1 in 100

E6985 The following information, including the modelled extents mapping, has been produced including the effect of any local

defences.

Node point reference Location

2% (1 in 50 year) modelled level (mAOD)

1.33% (1 in 75 year) modelled level (mAOD)

1% (1 in 100 year) modelled level (mAOD)

DE094 SK 34378 48091 62.79 62.85 62.88 BM-00167 SK 34456 47981 62.37 62.44 62.47 BM-00000 SK 34293 47998 62.37 62.44 62.48 DE093I6 SK 34251 47815 62.26 62.34 62.39 DE093 SK 34187 47655 62.23 62.31 62.36 Source: Matlock and Belper SFRM, Capita Symonds, March 2011 (Environment Agency 2013 update)

Node point reference Location

0.5% (1 in 200 year) modelled level (mAOD)

1% + 20% flow (1 in 100 year plus climate change) modelled level (mAOD)

DE094 SK 34378 48091 63.20 63.31 BM-00167 SK 34456 47981 62.82 62.94 BM-00000 SK 34293 47998 62.82 62.95 DE093I6 SK 34251 47815 62.78 62.91 DE093 SK 34187 47655 62.76 62.90 Source: Matlock and Belper SFRM, Capita Symonds, March 2011 (Environment Agency 2013 update)

Page 4: Detailed FRA/FCA Map centred on Belper Meadows, Belper ...docs.ambervalley.gov.uk/Planning/StreamDocPage/obj.pdf?DocNo=... · Email: enquiries@environment-agency.gov.uk 1% (1 in 100

E6985 Historic Information Map Reference

Flood Event Code Name Start Date End Date Source of Flooding

Cause of Flooding

1947 03412FEG011947 Derwent 1947 January 1947 January 1947 main river channel capacity exceeded

1960 EA034_FEG_4080_DEC1960 Derwent Belper Dec 1960

01/12/1960 31/12/1960 main river channel capacity exceeded

1965 EA034_FEG_4080_DEC1965 EA034_FEG_4080_1965

Derwent December 1965 1965 Derwent, Duffield, & Milford

December 1965

December 1965

main river channel capacity exceeded

E6985 Defence Information There are no Environment Agency maintained raised defences in the area.

Page 5: Detailed FRA/FCA Map centred on Belper Meadows, Belper ...docs.ambervalley.gov.uk/Planning/StreamDocPage/obj.pdf?DocNo=... · Email: enquiries@environment-agency.gov.uk 1% (1 in 100

Sports Pavilion, Belper Meadows, Belper, Derbyshire

Flood Risk Assessment – February 2014

DW146-FRA-01 PAGE 23

Appendix 4 – Flood Resilient Construction

Water Entry Strategy

The following recommendations are based on the Department for Communities and Local Government

document ‘Improving the Flood Performance of New Buildings’. The development will not be subject to

flooding however that the existing building and proposed extension will have less than the recommended

600mm freeboard over flood levels and has therefore been assessed for flood resilient construction.

Considering the proposed floor level of 61.43m against the maximum flood level of 62.91m indicates that a

water entry strategy is appropriate.

Foundations (Relating to new foundations only)

Durable materials should be utilized that will not be affected by water and construction methods and materials

should be used that promote easy draining and drying.

The traditional concrete trench fill foundations proposed are not porous and are considered appropriate as they

will not create a path for flood waters to infiltrate the cavity walls.

Floors (Relating to new floors only)

The following will need to be considered in the design of the proposed ground floor:

A ground supported floor is proposed and is the preferred option from a flood resilience perspective.

Considering the small size of the floor and low level of the anticipated design flood (150mm below finished

floor level) the floor slab is not considered to be at risk of cracking from uplift pressure.

Hardcore and blinding: good compaction should be achieved to reduce the risk of settlement and possible

cracking as a result.

Damp Proof Membranes will be included in the design to minimise the passage of water through ground

floors. The impermeable polythene membrane will be at least 1200 gauge to minimise ripping. To join

membrane sections overlaps of 300mm or taping with mastic tape with an overlap of 50mm minimum should

be used. Care should be taken not to stretch the membrane in order to retain a waterproof layer.

Floor insulation should be of the closed-cell type to reduce the impact of flood water.

Concrete screeds above polystyrene or polyurethane insulation should be avoided as they hinder drying of the

insulation material due to their impermeabilty.

Suitable materials for skirting boards below the predicted 100 year plus climate change flood level include

ceramic tiles and PVC.

Under floor services using ferrous materials are to be avoided.

Walls (Relating to new walls only)

The following will need to be considered in the design of the building walls:

Use good quality facing bricks for the external face of cavity walls. Do not use soft bricks, such as handmade

clay bricks, which can easily crumble when subjected to water.

Ensure mortar joints are thoroughly filled to reduce the risk of water penetration

Concrete blocks are recommended for the inner leaf. The ‘Aircrete’ blocks proposed have poor drying

characteristics but offer greater impermeability for the water exclusion strategy and are therefore

recommended.

Cavity insulation should incorporate rigid closed cell materials as these retain integrity and have low moisture

take-up. Other common materials, such as mineral fibre, are not recommended as they will hold moisture for

several months after exposure to flood waters which will slow down the wall drying process. Blown-in

insulation can slump due to excessive moisture uptake, and some types can retain high levels of moisture for

long periods of time and are therefore also not recommended.

Above predicted flood level (plus 50mm freeboard) the use of plasterboard or internal cement renders is

appropriate.

Page 6: Detailed FRA/FCA Map centred on Belper Meadows, Belper ...docs.ambervalley.gov.uk/Planning/StreamDocPage/obj.pdf?DocNo=... · Email: enquiries@environment-agency.gov.uk 1% (1 in 100

Sports Pavilion, Belper Meadows, Belper, Derbyshire

Flood Risk Assessment – February 2014

DW146-FRA-01 PAGE 24

Fittings

Considering the very low anticipated instance of flooding to the property, a sacrificial approach is

recommended whereby fittings are designed to be replaced after a flood, Avoid wood fibre based carcases and

use easily removable solid wood doors and drawers.

Place fittings (e.g. electrical appliances, gas oven) as high as practical above floor level to minimise the risk of

being affected by flood water.

Services

Closed cell insulation will be used for pipes which are below the predicted flood level.

Water, electricity and gas meters will be located above predicted flood level.

Electrical sockets will be installed 300mm minimum above flood level for ground floors to minimise damage

to electrical services and allow speedy re-occupation.

Electric ring mains will be installed 300mm minimum above the predicted flood level.

Boiler units and ancillary devices will be installed above predicted flood level and preferably on the first floor

of two-storey properties.

Underfloor heating should be avoided on ground floors and controls such as thermostats should be placed

above flood level.

Wiring for telecommunications equipment and televisions should be protected by suitable insulation in the

distribution ducts to prevent damage. Any proposed design solution for flood insulation on all potentially

vulnerable wiring should be discussed with relevant service providers.

Page 7: Detailed FRA/FCA Map centred on Belper Meadows, Belper ...docs.ambervalley.gov.uk/Planning/StreamDocPage/obj.pdf?DocNo=... · Email: enquiries@environment-agency.gov.uk 1% (1 in 100

Sports Pavilion, Belper Meadows, Belper, Derbyshire

Flood Risk Assessment – February 2014

DW146-FRA-01 PAGE 25

Appendix 5 – Drawings

Page 8: Detailed FRA/FCA Map centred on Belper Meadows, Belper ...docs.ambervalley.gov.uk/Planning/StreamDocPage/obj.pdf?DocNo=... · Email: enquiries@environment-agency.gov.uk 1% (1 in 100

WATERCOURSES

66.63 SPOT LEVELS

EXISTING COMBINED SEWERS

LEGEND

CRICKET NETS

NODE:-MODELLED FLOOD LEVELS50 YEAR100 YEAR100 YEAR +CC

DE093

62.2362.3662.90

OVERLAND FLOOD FLOW ROUTE

EXISTING SURFACE WATER SEWERS

A6 BR

IDG

E STREET

RIVE

R D

ERW

ENT

Gy

Gy

Gy

Gy

Gy

Gy

Gy

Gy

Gy

Gy

Gy

Gy

Gy

Gy

Gy

Gy

IC

Re

Re

Re

DP

Post

Post

Post

Post

Post

Post

Post

Post

Post

Post

Post

Post

PostPost

Post

Post

Post

Post

Post

Fl

Fl

Fl

Fl

Fl

Fl

Fl

Fl

Fl

Fl

Fl

Fl

Fl

Fl

Fl

Fl

Sp

Tp

Tp

PInv

WL

THL

THL

THL

THL

Boll

Boll

BollBoll

BollBoll

BollBoll

Boll

Boll

Boll

Boll

Boll

BollBollBoll

BollBoll

BollBoll

Boll

Boll

Boll

Boll

BollBollBoll

Stmp

Stmp

Stmp

Sap

E:

E:

E:

E:

E:

E:

E:

E:

E:

R:

R:

R:

R:

R:

R:

R:

R:

R:

Bush

MR161.535

MR2

MR3

MR4

MR5

MR6

MR7

MR8 MR9

347620N 347620N

347640N 347640N

347660N 347660N

347680N 347680N

347700N 347700N

347720N 347720N

347740N 347740N

347760N 347760N

347780N 347780N

347800N 347800N

347820N 347820N

347840N 347840N

347860N 347860N

347880N 347880N

347900N 347900N

347920N 347920N

347940N 347940N

347960N 347960N

347980N 347980N434260E

434280E

434300E

434320E

434340E

434360E

434380E

434400E

434420E

434440E

434460E

434480E

434500E

434520E

434540E

434560E

434580E

434600E

434620E

434640E

434660E

61.33

61.18

61.36

61.18

61.16

61.03

60.90

60.61

60.69

60.97

60.97

60.79

61.02

60.83

60.71

60.70

60.65

60.58

60.49

60.5

1

60.43

60.4

2

60.4

5

60.4

3

60.4

5

60.47

60.46

60.51

60.52

60.55

60.58

60.51

60.58

60.6

5

60.50

60.46

60.45

60.51

60.46

60.57

60.58

60.50

60.49

60.53

60.6260.64

60.73

60.89

61.03

60.92

60.84

60.4

5

60.4

8

60.4

3

60.4

4

60.40

60.50

60.42

60.29

60.22

60.23

60.41

60.29

60.27

60.30

60.41

60.39

60.40

60.31

60.30

60.40

60.3

3 60.33

60.32

60.33

60.37

60.50

60.6

3

60.95

61.01

61.03 61.13

61.1

561

.18

61.1

5

61.08

61.04

61.01

60.82

60.69

60.32

60.53

60.47

60.50

60.59

60.51

60.2

1

60.28

60.42

60.42

60.40

60.41

60.29

60.32 60.34

60.86

60.88

60.45

60.6160.83

60.6

0

66.78

64.03

63.60

65.74

60.53

60.60

60.70

60.84

60.9

1

61.05

60.90

60.74

60.93

60.90

60.64

60.65

60.82

60.76

60.57

60.60

60.52

60.58

60.60

60.71

60.79

60.88

60.8

4

60.73

60.70

60.64

60.54

60.49

60.43

60.37

60.41

60.31

60.73

60.86

60.91

60.98

61.14

61.10

58.22

58.3959.31

60.8

160

.65

60.9

5

60.9

6

60.9

7 61.0

0

60.6

2

60.6

5

61.0

761

.09

61.0

1 61.0

1

60.6

3

60.43

60.6

2

61.1

3

61.0

8

61.2

861

.28 60

.54

60.5

8

61.2

6

61.2

9

61.0

4

60.97

61.12

60.66

60.53

60.50

61.0860.87

60.7860.85

60.35

60.37

60.82

60.69

60.70

60.70

60.25

60.2360.30

60.77

60.53

60.70

60.58

60.57

60.2

2

60.2

3

60.2

4

60.2

4

60.29

60.29

60.35

60.39

60.44

60.50

60.72

60.5

5

60.5

4

60.5

5

60.5

5

60.5

6

60.5

6

60.50

60.48

60.43

60.37

60.32

60.29

60.13

60.24

60.20

60.21

60.2

4

60.21

60.23

60.2

4

60.23

60.22

60.2

5

60.22

60.2

4

60.21

60.2

5

60.2

5

60.17

60.2

5

60.2

3

60.24

60.2

6

60.20

60.2

4

60.2

5

60.2

3

60.2

5

60.2

560

.24

60.2

4

60.25

60.31

60.36

60.43

60.49

60.54

60.5

5

60.5

4

60.5

5

60.5

5

60.5

5

60.5

5

60.5

5

60.55

60.49

60.43

60.37

60.31

60.2

4

60.2

4

60.2

5

60.2

4

60.2

4

60.2

4

60.2

4

60.24

60.30

60.38

60.45

60.51

60.5

1

60.5

1

60.5

1

60.5

1

60.5

1

60.5

1

60.5

1

60.51

60.46

60.37

60.30

60.24

60.2

4

60.2

4

60.2

4

60.29

60.30

60.2860.3160.37

60.36

60.41

60.44

60.43

60.45

60.43

60.37

60.31

60.28

60.30

60.29

60.31

60.36

60.37

60.4260.44

60.43

60.46

60.36

60.38

60.3

8

60.4

3

60.4

6

60.2

6

60.2

5

60.2

560

.23

60.32

60.35

60.49

60.5

2

60.60

60.5

2

60.6

5 60.3

5

60.4

160.7

1

60.4

7

60.3

5

60.4

4

60.4

1

60.3

5

60.3

3

60.46

60.3

760.3

9

60.54

60.50

60.58

60.50

60.45

60.48

60.55

61.14

61.22

61.93

63.42

63.93

62.79

63.70

64.15

63.48

62.87

61.50

60.91

61.86

62.09

62.66

62.35

60.85

60.38

60.6160.80

60.57

60.51

60.53

60.47

60.42

60.39

60.27

60.31

60.2

1

60.2

3

60.2

9

60.3

9

60.4

1

60.4

7

60.6

6

60.68

75.29

71.75

71.66

75.19

70.23

68.37

67.86

69.91

65.97

65.94

66.0

266

.05

66.1

766

.20

66.2

066

.31

66.3

166

.06

66.25

66.00

66.05

65.9065.66

65.1664.72

65.31

65.2565.14

65.26

65.2

5

64.50

64.72

64.70

65.14

61.01

61.55

61.84

62.20

62.6264.17

64.14 65.24

65.35

66.08

66.04

70.89

71.98

65.27

64.13

63.66

63.66

65.30

65.3164.46

65.18

65.04

63.67

63.26

62.54

62.30

62.33

62.23

62.25

62.53

62.88

63.23

63.21

63.70

63.70

63.72

65.3

165

.77

65.79

66.25

66.54

66.26

66.65

66.51

66.35

66.05

65.73

65.92

65.60

65.96

66.26 66.52

66.37

66.38

65.98

66.49

65.8265.52

65.24

65.38

66.27

66.34 66.40

66.2866.27

66.30

66.30

66.19

66.24

65.66

65.67

65.76

65.5965.54

65.62

66.32

65.83

66.3

0

66.16

65.71

65.75

66.2

1

66.35

66.31

66.40

66.54

66.4366.36

66.56

66.56

66.6066.56

66.44

66.43

66.72

66.84

66.66

66.74

66.67

66.94

66.69

66.65

66.99

66.54

66.80

72.32

77.21

71.2869.67

61.18

61.18

60.80

66.02

60.77

60.71

60.24

60.5

4

65.2

6

65.69

62.92

62.54

G=3.2mTCL=79.89

D

G=0.3m

Con

tain

er

Tank

Security Fence 2m high

Cover

Tarmac

Pane

l Fen

ce1.

6m h

igh

P\Rail Fence1.25m high

G=MG

TCL=67.43

Duct

Dug

out

Goals

G=MG

TCL=69.12

C r

i c k

e t

N e

t s

Security Fence1.9m high

Panel Fence

1.25m high

G=1.6mTCL=77.98

Security Fence

2.5m high

Panel Fence1.2m high

Bench

P\R

ail Fence1.2m

high

S w i n g s

Wall1.1m high

Track

Track

G=MG

G=MG

P\Rail Fence1.2m high

1.8

Wall 1.9m high

Track

Track

Panel Fence1.7m high

Panel Fence1.7m high

0.3Ø

P\Rail Fence1.25m high

P\R

ail F

ence

1.05

m h

igh

P\R

ail F

ence

1.05

m h

igh

P\R

ail F

ence

1.05

m h

igh

P\Rail Fence1.05m high

P\Rail Fence1.05m high

OverheadCable Level=67.14

OverheadCable Level=67.58

Ove

rhea

dC

able

Lev

el=

67.0

4

G=0.5mTCL=66.93

G=1.1mTCL=72.14

G=2.4mTCL=67.75

G=2.4mTCL=69.41

G=1.3mTCL=68.76

G=MG

SyntheticSurface

C a b i n

Path

Shelter

SyntheticSurface

SyntheticSurface

SyntheticSurface

IC

Concrete

Con

cret

e

SyntheticSurface

P\Rail Fence1.25m high

IC

IC

IC

IC

IC

ControlBox

Sign

G=2.2mTCL=71.10

Grass

Grass

Secu

rity

Fenc

e 2.

8m h

igh

Tarmac

TennisCourt

TennisCourt

Net

SyntheticSurface

SyntheticSurface

Secu

rity

Fenc

e 3.

0m h

igh

IC

IC

IC

Dug

out

IC

IC

IC

SyntheticSurface

SyntheticSurface

SyntheticSurface

SyntheticSurface

Goals

B r i c k P a v e d

B r i

c k

P a

v e

d

B r i

c k

P a

v e

d

B r i c k P a v e d

B r i

c k

P a

v e

d

Rai

lings

1m

hig

h

Rai

lings

1m

hig

h

Security Fence 3.0m high

Secu

rity

Fenc

e 3.

0m h

igh

Secu

rity

Fenc

e 3.

0m h

igh

Security Fence 3.0m high

Secu

rity

Fenc

e 3.

0m h

igh

S a f e t y N e t

G=2.0mTCL=73.85

Security Fence1.9m high

Security Fence2.5m high

Secu

rity

Fenc

e1.

9m h

igh

C r

i c k

e t

N e

t s

G=2.0mTCL=71.88

Bench

Bench

G=1.8mTCL=71.37

G=1.6mTCL=71.99

G=1.6mTCL=74.03

Panel Fence1.2m high

Panel Fence1.2m high

Panel Fence1.2m high

Security Fence2.5m high

Security Fence2.5m high

Security Fence

2.4m high

Security Fence

2.4m high

Hedge1.2m high

P\R

ail F

ence

1.2m

hig

h

Hedge1.2m high

G=0.7mTCL=71.71

G=1.8mTCL=76.50

G=MG

G=0.9mTCL=75.90

G=0.9mTCL=77.68

G=1.4mTCL=77.41

G=1.0mTCL=77.45

G=0.4m G=

MG G=MG

G=0.3m

G=0.8mTCL=77.01

G=0.6m

G=1.0mTCL=77.97

G=1.0mTCL=78.48

G=0.8mTCL=78.48

G=0.9mTCL=76.89

G=1.0mTCL=73.77

Ram

p

Toilets

G=MG

TCL=73.30

G=MG

TCL=76.82

G=0.6mTCL=70.71

G=MG

TCL=65.79

G=2.4mTCL=74.32

Railings0.9m high

TrackTrack

Tarmac

Wall

1.3m high

Wall

1.75m high

Wall

2.3m high

G r a s s

D e n s eW o o d l a n d

D e n s eW o o d l a n d

D e n s eW o o d l a n d

D e n s eW o o d l a n d

D e n s eW o o d l a n d

Car - Parking

G=MG

G=MG

G=0.9m

G=MG

G=MG

G=1.6m

G=2.0m

G=MG

P\Rail Fence

1.2m high

G=MG

G=MG

G=MG

G=0.9m

G=1.4m

G=0.4m

G=MG

G=0.4m

G=MG

G=MG

G=1.0m

G=1.6m

G=MG

G=1.0m

G=1.2mTCL=81.52

G=MG

TCL=82.87

Steps

Tarmac

Bushes

Bushes

Bushes

G=1.2mTCL=82.19

G=1.0mTCL=79.43

G=1.0mTCL=78.38

G=MG

TCL=83.15

G r a s s

G r a s sG r a s s

G=1.0mTCL=80.70

G=1.4m

G=MG

TCL=78.07

G=0.8m

G=MG

G=MG

G=1.0m

G=MG

G=2.0m

G=1.8mTCL=81.72

G=1.2m

G=MG

G=1.5mTCL=86.91

G=MG

G=MG

G=MG

G=1.5m

G r a s s

G r a s s

Path

G=MG

G=0.4m

G=0.3m

G=2.4mTCL=83.39

G=1.0mTCL=80.32

Canopy

G=1.0mTCL=68.22

G r a s s

G r a s s

IC

G=2.8mTCL=85.40

IC

G=1.0m

G=MG

63.94

63.6

063

.60

63.37

63.4763.27

63.21

63.13

63.04

63.5

5

63.4863.16

63.14

62.92

62.87

62.67

62.52

62.49

62.4862.52

62.5

9

62.6262.66

62.63

62.6062.42

62.40

62.55

62.84

62.85

63.06 63.39

63.21

63.02

63.10

63.48

63.42

63.10

63.02

62.96

63.24

63.41

63.33

63.26

63.20

63.23

63.12

63.22

63.06

62.92

62.84

62.84

62.88

62.91

62.69

62.65

62.7

0

62.6

6

62.68

62.82

62.96

63.08

63.13

63.2063.36

63.4

6

63.3

8

63.4

7

63.29

63.36

63.3

7

63.3

8

63.3

9

63.40

63.5

1

63.5

1

63.4

9

63.3

9

63.42

63.33

63.4

1

63.4

7

63.5

7

63.5

2

63.4

8

63.44

63.3

7

63.29

63.25

63.33

63.3

3

63.3

1

63.1

563

.24

63.2

6

63.12

63.24

63.27

63.27

63.3

5

63.4

1

63.42

63.4

963

.59

63.7

063.69

63.5

2

63.38

63.35

63.2

6

63.23

63.2

4

63.27

63.53

63.50

63.42

63.34

63.52

63.46

63.33

63.23

63.20

63.24

63.27

63.24

63.26

63.48

63.77

63.77

63.44

63.6

4

63.30

63.26

63.07

63.02

62.95

62.8262.79

62.68

62.46

62.34

62.33

62.32

62.33

62.45

62.55

62.56

62.50

62.50

62.5662.62

62.74

62.69

62.86

62.8362.87

63.31

63.41

63.19

63.34

63.53

63.5

9

63.8

1

63.15

63.1

5

63.07

62.99

63.07

63.12

62.89

62.86

62.80

62.7162.64

62.58

62.53

62.55

62.55

62.53

62.51

62.48

62.41

62.56

62.57

62.58

62.49

62.35

62.31

62.23

62.36

62.32

62.58

62.29

62.26

62.3262.24

62.25

62.14

62.25

62.11

62.1462.03

61.95

61.88

61.9061.90

62.36

62.26

62.32

62.50

62.08

62.76

62.56

62.45

62.44

62.44

62.40

61.84

61.83

61.82

61.92

61.7161.76

61.72

61.82

61.91

61.84

62.0662.55

61.24

61.2761.28

61.26

61.38

61.41

61.34

61.2761.28

61.14

61.16

61.12

61.18

61.59

61.09

61.06

61.14

61.07

61.12

61.11

61.0661.04

61.09

61.1661.20

61.05

60.95

61.13

61.17

61.2161.23

61.17

61.17

61.59

61.69

61.5461.24

61.46

60.46

60.65

60.80

60.81

60.76

60.65

60.34

60.46

61.46

61.51

61.60

61.1661.14

61.60

60.67

60.73

61.01

61.11 60.87

60.8961.10

61.17

60.91

60.88

61.2261.18

60.80

60.70

61.01

61.2

4

60.43

60.45

60.90

60.89

60.98

60.95

60.84

60.95

60.93

60.93

60.83

60.58

60.73

60.88

61.06

61.04

61.0

1

60.8

8

60.9

1

61.0

0

61.0

7

61.1

5

61.2

0

61.30

62.18

62.0

4

62.0

3

62.5

6

62.2

1

61.69

61.16

61.18

61.80

61.61

65.15

64.45

64.27

65.69

65.58 65.72

65.92

65.93

66.00

66.07

66.19

66.27

66.24

66.02

65.97

65.82

66.45

66.37

66.1

666

.27

66.1566.16

66.23

66.19

66.18

66.39

66.36

66.1966.34

66.28

66.27

66.37

66.37

66.38

66.42

66.43

66.54

66.27

66.27

66.1666.19

63.75

63.62

63.73

63.42

62.9463.0

3

63.10

63.15

63.32

62.58

62.45

62.45

62.44

62.45

62.66

62.65

62.63

62.60

62.53

63.03

62.97

62.77

62.66

62.62

62.69

62.68

63.72

63.72

63.51

63.56

63.48

63.25

63.17

63.09

63.02

62.72

62.73

62.75

62.89

63.03

63.15

63.19

62.81

62.93

66.10

66.18

66.26

66.37

66.53

66.48

66.47

66.30

65.89

62.21

61.99

61.92 62.14 62.34 62.70

62.69

62.4362.3162.17

63.03

62.94

63.23

63.14

63.0862.6462.1761.9761.9061.66

61.83

61.69

61.65

61.79

61.77

61.49

61.50

61.51

61.59

62.1961.9961.89

61.6961.70

61.41

61.43

61.49

61.46

61.3

9

61.31

61.40

61.2

9

61.2

0

61.14

61.18

61.21

61.2

2

61.2

3

61.2

8

61.2

5

61.28

61.30

61.43

61.3

7

61.48

61.4

1

61.3

5

61.1

7

61.3

2

61.34

61.23

61.29

61.27

61.2

5

61.0

9

61.23

60.52

60.52

60.59

60.66

60.58

60.5

1

60.4

7

60.66

60.93

60.95

60.62

60.4

1

60.53

60.54

60.63

60.7960.80

60.73

60.5

2

60.4

9

60.51

60.4

1

60.4

1

60.50

60.47

60.46

60.41

60.52

60.53

60.47

60.5

5

60.56

60.55

60.56

60.51

60.53

60.54

60.54

60.55

60.51

60.56

60.58

60.56

60.56

60.54

60.52

60.51

60.51

60.48

60.50

60.5260.51

60.56

60.55

60.53

60.53

60.54

60.54

60.56

61.2

7

61.1

9

60.96

60.97

61.0360.86

61.23

61.3

7

60.98

63.41

62.35

61.30

61.0461.10

61.84

62.97

64.30

64.1465.29

63.75

63.62

62.93

62.92

62.55

62.84

63.22

64.52

65.30

65.2

6

65.23

65.2

3

65.27

65.07

64.53

64.16

64.13

64.1

7

64.1

664.13

64.1

4

63.89

64.12 64.18

63.9

3

63.8

7

63.5

9

63.5

2

60.48

60.83

62.8

8

62.98

63.47

64.76

63.98

60.45

60.50

60.46

60.45

60.53

60.54

60.59

60.59

60.46

60.4

0

60.3

8

60.54

60.54

60.5860.60

60.53

60.5560.45

60.44

60.36

60.66

60.71

60.71

60.68

60.30

60.33

60.34

60.29

60.41

60.64

61.36

60.68

60.62

60.45

60.34

60.31

60.35

60.27

60.29

60.30

60.32

60.35

60.40

60.47

60.54

60.94

62.18

63.93

62.13

60.87

60.49

60.40

60.39

60.36

60.25

60.26

60.25

60.28

60.37

60.42

60.40

60.43

60.73

62.52

63.95

62.03

60.60

60.52

60.32

60.35

60.30

60.26

60.23

60.18

60.30

60.30

60.37

60.34

60.57

60.66

61.98

61.98

60.81

60.37

60.30

60.38

60.30

60.15

60.20

60.40

60.39

60.33

60.35

60.58

65.33

65.72

66.2

865.79

65.72 65.72

65.8

4

65.92

65.72

65.37

64.88

64.79

64.96

65.2865.42

65.60

65.2

7

65.28 65.5465.28

65.50

65.81

65.8

2 65.8

3

65.84

65.74

65.67

65.48

65.25

65.22

65.24

65.26

64.85

64.18 64.17

65.2464.72

65.73

65.82

65.1

9

61.50

61.51

61.69

61.91

61.55

61.56

61.48

61.59

61.54

61.68

61.04

61.08

61.15

61.5

9

61.1

6

61.2

4

61.6

9

61.39

61.38

61.22

61.14

61.03

61.10

60.88

60.99

61.00

61.05

60.91

60.95

60.86

61.32

61.32

61.20

61.01

61.02

61.00

61.11

61.2

6

61.2

0

61.00

60.88

60.97

61.03

60.92

61.80

60.20

65.26

61.1

5

61.1

9

61.1

0

60.9

5

60.8

9

60.85

61.05

60.63

ARISTOCMILL

A6(T) NORTH

TOW

ARDS MATLO

CK

60.3060.45

60.3260.49 63

.15

62.71

62.93

63.81

65.83 65.85

65.89

65.93

65.89

66.15

66.3

8

66.30

66.19

66.2

1

60.41

60.47

66.34

60.42

61.02

Fence ht 1.2

Dense Vegetation

G r a s s

Dense Vegetation

Dense Vegetation

L i b r a r y

D e n s eW o o d l a n d

D e n s eW o o d l a n d

D e n s eW o o d l a n d

D e n s eW o o d l a n d

O u t f a l l

NODE:-MODELLED FLOOD LEVELS10 YEAR20 YEAR50 YEAR100 YEAR100 YEAR +CC

DE093I6

61.4361.7662.2662.3962.91

NODE:-MODELLED FLOOD LEVELS50 YEAR100 YEAR100 YEAR +CC

BM-00000

62.3762.4862.95

NODE:-MODELLED FLOOD LEVELS50 YEAR100 YEAR100 YEAR +CC

BM-00167

62.3762.4762.94

RIV

ER D

ERW

ENT

MILL FLEAM

BRIDG

E FOO

T

DEVELOPMENTSITE BOUNDARY

CRICKET PITCH

FOOTBALL GROUND

BOWLINGGREEN

TENNISCOURTS

TENNISCOURTS

TENNISCOURT

CAR PARK

PROPOSED SPORTS PAVILLIONFFL 61.43

SITE ACCESS/EGRESS ANDEVACUATION ROUTE TOHIGHER GROUND ABOVEDESIGN FLOOD LEVEL

SOCIAL CLUB

FOOTBALL STANDS

FLOOD PLAIN

FLOOD PLAIN

EAST MILLCOMPLEX

APPROXIMATE LINE OF

CULVERTED SECTION OF

THE MILL FLEAM

THE SITE OPPERATORSREPORT THAT THE MECHANISMFOR FLOODING IS WATERBACKING UP FROMDOWNSTREAM AND THROUGHTHE CRICKET PITCH

LINE OF SURFACE WATER DRAIN APPROXIMATE ONLYSITE OPPERATORS REPORT MINOR FLOODING FROM THISDRAIN DURRING TIMES OF HIGH INTENSITY RAINFALL, BUT

FLOODING IS LOCAL TO THE MANHOLES ONLY

MAXIMUM EXTENT OF 100YEAR PLUS CLIMATECHANGE FLOOD 62.91m AOD

Project Ref.

CheckedDrawn

Cad Ref

Drawing No.

Date

Rev.

Scale

Title

Project

Client

Rev Details InitialsDate

SITE LOCATION ANDFLOOD ROUTING PLAN

001

1:1000

SMRS RRS

PARAMETER TRADING &MAINTENANCE LTD.

M

T

P

NOTE; DO NOT SCALE FROM THIS DRAWING, USE FIGURED DIMENSIONS ONLYCOPYRIGHT: THIS DRAWING AND ANY DESIGN THEREINIS THE COPYRIGHT OF PARAMETER TRADING ANDMAINTENANCE LTD. AND MUST NOT BE REPRODUCEDOR UTILISED WITHOUT THEIR WRITTEN CONSENT.

NOTES:

1. DO NOT SCALE FROM THIS DRAWING, USE FIGURED DIMENSIONSONLY. LAYOUT IS MADE UP FROM ORDNANCE SURVEY PLANS, NOLIABILITY IS OFFERED OR ACCEPTED AS TO IT'S COMPLETENESS ORACCURACY.

2. THIS PLAN IS FOR THE PURPOSE OF IDENTIFYING FEATURESRELEVANT TO THE ASSOCIATED FLOOD RISK ASSESSMENT FORBELPER MEADOWS SPORTS CLUB, BELPER.

3. LEVELS REDUCED FROM ORDNANCE SURVEY DATUM.

A

EastfieldChatsworth Road

RowsleyMatlock

DerbyshireDE4 2EH

Tel 01629 734427Mobile 07990 640523

Email [email protected]

FLOOD RISK ASSESSMENTBELPER MEADOWS

BELPER

PTM/DW146

DW146-001

04/02/14

BELPER MEADOWS SPORTS CLUB

A Updated for Environment Agency comments,additional flood information added and FFL revised

SMRS22 Oct 2014

Page 9: Detailed FRA/FCA Map centred on Belper Meadows, Belper ...docs.ambervalley.gov.uk/Planning/StreamDocPage/obj.pdf?DocNo=... · Email: enquiries@environment-agency.gov.uk 1% (1 in 100

Gy

Gy

Gy

Gy

Gy

Gy

Gy

Gy

Gy

Gy

Gy

Gy

Gy

Gy

Gy

Gy

IC

Re

Re

Re

DP

Post

Post

Post

Post

Post

Post

Post

Post

PostPost

PostPost

Post

Post

Post

Fl

Fl

Fl

Fl

Fl

Fl

Fl

Fl

Fl

Fl

Fl

Fl

Fl

Sp

Tp

Tp

THL

THL

THL

THL

Boll

Boll

BollBoll

BollBoll

BollBoll

Boll

Boll

Boll

Boll

Boll

BollBollBoll

BollBoll

BollBollBoll

Boll

Boll

Boll

BollBollBoll

Sap

E:

E:

E:

E:

E:

E:

E:

E:

E:

R:

R:

R:

R:

R:

R:

R:

R:

R:

Bush

MR2

MR3

MR4

MR5

MR6

MR7

MR8 MR9

61.33

61.18

61.36

61.18

61.16

61.03

60.90

60.61

60.69

60.97

60.97

60.79

61.02

60.83

60.71

60.70

60.65

60.58

60.49

60.5

1

60.43

60.4

2

60.4

5

60.4

3

60.4

5

60.47

60.46

60.51

60.52

60.55

60.58

60.51

60.58

60.6

5

60.50

60.46

60.45

60.51

60.46

60.57

60.58

60.50

60.49

60.53

60.6260.64

60.73

60.89

61.03

60.92

60.84

60.4

5

60.4

8

60.4

3

60.4

4

60.40

60.50

60.42

60.29

60.22

60.23

60.41

60.29

60.27

60.30

60.41

60.39

60.40

60.31

60.30

60.40

60.3

3 60.3360.32

60.33

60.37

60.50

60.6

3

60.95

61.01

61.03 61.13

61.1

561

.18

61.1

5

61.08

61.04

61.0160.69

60.32

60.53

60.51

60.2

1

60.28

60.42

60.42

60.40

60.41

60.29

60.32 60.34

60.86

60.88

60.45

60.6160.83

60.6

0

66.78

64.03

63.60

65.74

60.60

60.52

60.43

60.37

60.41

60.31

60.73

60.86

60.70

60.70

60.25

60.2360.30

60.77

60.53

60.70

60.58

60.57

60.2

2

60.2

3

60.2

4

60.2

4

60.29

60.29

60.35

60.43

60.37

60.32

60.29

60.13

60.24

60.20

60.21

60.2

4

60.21

60.23

60.2

4

60.23

60.22

60.2

560.22

60.2

4

60.21

60.2

5

60.2

5

60.17

60.2

5

60.2

3

60.24

60.2

6

60.20

60.2

4

60.2

5

60.2

3

60.2

5

60.2

560

.24

60.2

4

60.25

60.31

60.43

60.37

60.31

60.2

4

60.2

4

60.2

5

60.2

4

60.2

4

60.2

4

60.2

4

60.24

60.30

60.46

60.37

60.30

60.24

60.2

4

60.2

4

60.2

4

60.29

60.30

60.2860.3160.37

60.36

60.41

60.37

60.31

60.28

60.30

60.29

60.31

60.36

60.3860

.38

60.4

3

60.4

6

60.2

6

60.2

5

60.2

560

.23

60.32

60.35

60.49

60.5

2

60.60

60.5

2

60.6

5 60.3

5

60.4

160.7

1

60.4

7

60.3

5

60.4

4

60.4

1

60.3

5

60.3

3

60.46

60.3

760.3

9

60.54

60.50

60.58

60.50

60.45

60.48

60.55

61.14

61.22

61.93

63.42

60.2

3

60.2

9

60.3

9

60.4

1

60.4

7

60.6

6

60.68

75.29

71.75

71.66

75.19

70.23

68.37

67.86

69.91

65.97

65.94

66.0

266

.05

66.1

766

.20

66.2

066

.31

65.2

5

64.50

64.72

64.70

65.14

61.01

61.55

61.84

62.20

62.6264.17

64.14 65.24

65.35

66.08

66.04

70.89

71.98

65.27

64.13

63.66

63.66

65.30

65.3164.46

65.18

65.04

63.67

63.26

62.54

62.30

62.33

62.23

62.25

62.53

62.88

63.23

63.21

63.70

63.70

63.72

65.3

165

.77

65.79

66.25

66.54

66.26

66.65

66.51

66.35

66.05

65.73

65.92

65.60

65.96

66.26 66.52

66.37

66.3865.98

66.49

65.8265.52

65.24

65.38

66.27

66.34 66.40

66.2866.27

66.30

66.30

66.19

66.24

65.66

65.67

65.76

65.5965.54

65.62

66.32

65.83

66.3

0

66.16

65.71

65.75

66.2

1

66.35

66.31

66.40

66.54

66.4366.36

66.56

66.56

66.6066.56

66.44

66.43

66.72

66.84

66.66

66.74

66.67

66.94

66.69

66.65

66.99

66.54

66.80

72.32

77.21

71.2869.67

61.18

61.18

60.80

66.02

60.77

60.71

60.24

65.2

6

65.69

62.92

62.54

G=3.2mTCL=79.89

D

G=0.3m

Con

tain

er

Tank

Security Fence 2m high

Cover

Tarmac

Pane

l Fen

ce1.

6m h

igh

Duct

Goals

G=MG

TCL=69.12

C r

i c k

e t

N e

t s

Security Fence1.9m high

Panel Fence

1.25m high

Bench

P\R

ail Fence1.2m

high

Wall1.1m high

Track

Track

G=MG

G=MG

P\Rail Fence1.2m high

1.8

Wall 1.9m high

Track

Panel Fence1.7m high

OverheadCable Level=67.14

OverheadCable Level=67.58

Ove

rhea

dC

able

Lev

el=

67.0

4

G=0.5mTCL=66.93

G=1.1mTCL=72.14

G=2.4mTCL=67.75

G=2.4mTCL=69.41

G=1.3mTCL=68.76

G=MG

SyntheticSurface

C a b i n

Path

Shelter

SyntheticSurface

SyntheticSurface

SyntheticSurface

IC

Concrete

Con

cret

e

SyntheticSurface

P\Rail Fence1.25m high

IC

IC

IC

IC

IC

ControlBox

Sign

G=2.2mTCL=71.10

Grass

Grass

Secu

rity

Fenc

e 2.

8m h

igh

Tarmac

TennisCourt

TennisCourt

Net

SyntheticSurface

SyntheticSurface

Secu

rity

Fenc

e 3.

0m h

igh

IC

SyntheticSurface

SyntheticSurface

SyntheticSurface

B r i

c k

P a

v e

d

B r i c k P a v e d

Rai

lings

1m

hig

h

Rai

lings

1m

hig

h

Security Fence 3.0m high

Secu

rity

Fenc

e 3.

0m h

igh

Secu

rity

Fenc

e 3.

0m h

igh

S a f e t y N e t

G=2.0mTCL=73.85

Security Fence1.9m high

Security Fence2.5m high

Secu

rity

Fenc

e1.

9m h

igh

C r

i c k

e t

N e

t s

G=2.0mTCL=71.88

Bench

Bench

G=1.8mTCL=71.37

G=1.6mTCL=71.99

G=

Panel Fence1.2m high

Panel Fence1.2m high

Panel Fence1.2m high

Hedge1.2m high

P\R

ail F

ence

1.2m

hig

h

G=0.9mTCL=76.89

G=1.0mTCL=73.77

Ram

p

Toilets

G=MG

TCL=73.30

G=MG

TCL=76.82

G=0.6mTCL=70.71

G=MG

TCL=65.79

G=2.4mTCL=74.32

Railings0.9m high

TrackTrack

Tarmac

Wall

1.3m high

Wall

1.75m high

Wall

2.3m high

G r a s s

D e n s eW o o d l a n d

D e n s eW o o d l a n d

D e n s eW o o d l a n d

D e n s eW o o d l a n d

D e n s eW o o d l a n d

Car - Parking

G=MG

G=MG

G=0.9m

G=MG

G=MG

G=1.6m

G=2.0m

G=MG

P\Rail Fence1.2m high

G=MG

G=MG

G=MG

G=0.9m

G=1.4m

G=0.4m

G=MG

G=0.4m

G=MG

G=MG

G=1.0m

G=1.6m

G=MG

G=1.0m

G=1.2mTCL=81.52

G=MG

TCL=82.87

Steps

Tarmac

Bushes

Bushes

Bushes

G=1.2mTCL=82.19

G=1.0mTCL=79.43

G=1.0mTCL=78.38

G=MG

TCL=83.15

G r a s s

G r a s sG r a s s

G=1.0mTCL=80.70

G=1.4m

G=MG

TCL=78.07

G=0.8m

G=MG

G=MG

G=1.0m

G=MG

G=2.0m

G=1.8mTCL=81.72

G=1.2m

G=MG

G=1.5mTCL=86.91

G=MG

G=MG

G=MG

G=1.5m

G r a s s

G r a s s

Path

G=MG

G=0.4m

G=0.3m

G=2.4mTCL=83.39

G=1.0mTCL=80.32

Canopy

G=1.0mTCL=68.22

G r a s s

G r a s s

IC

G=2.8mTCL=85.40

IC

G=1.0m

G=MG

61.24

61.2761.28

61.26

61.38

61.41

61.34

61.2761.28

61.14

61.16

61.12

61.18

61.59

61.09

61.06

61.14

61.07

61.12

61.11

61.0661.04

61.09

61.1661.20

61.05

60.95

61.13

61.17

61.2161.23

61.17

61.17

61.59

61.69

61.5461.24

61.46

60.46

60.65

60.80

60.81

60.76

60.65

60.34

60.46

61.46

61.51

61.60

61.1661.14

61.60

60.67

60.73

61.01

61.11 60.87

60.8961.10

61.17

60.91

60.88

61.2261.18

60.80

60.70

61.01

61.2

4

60.43

60.45

60.90

60.89

60.98

60.95

60.84

60.95

60.93

60.93

60.83

60.58

60.73

60.88

61.06

61.04

61.0

1

60.8

8

60.9

1

61.0

0

61.0

7

61.1

5

61.2

0

61.30

62.18

62.0

4

62.0

3

62.5

6

62.2

1

61.69

61.16

61.18

61.80

61.61

61.14

61.18

61.21

61.2

2

61.2

3

61.2

861

.17

61.3

2

61.34

61.23

61.29

61.27

61.2

5

61.0

9

61.23

60.52

60.52

60.59

60.66

60.58

60.5

1

60.4

7

60.66

60.93

60.95

60.62

60.4

1

60.53

60.54

60.63

60.7960.80

60.73

60.5

2

60.4

9

60.51

60.4

1

60.4

1

60.50

60.47

60.46

60.41

60.52

60.53

60.47

60.5

5

60.56

60.55

60.56

60.51

60.53

60.54

60.54

60.55

60.51

60.56

60.58

60.56

60.56

60.54

60.52

60.51

60.51

60.48

60.50

60.5260.51

60.56

60.55

60.53

60.53

60.54

60.54

60.56

61.2

7

61.1

9

60.96

60.97

61.0360.86

61.23

61.3

7

60.98

63.41

62.35

61.30

61.0461.10

61.84

62.97

64.30

64.1465.29

63.75

63.62

62.93

62.92

62.55

62.84

63.22

64.52

65.30

65.2

665.23

65.2

3

65.27

65.07

64.53

64.16

64.13

64.1

7

64.1

6

64.13

64.1

4

63.89

64.12 64.1863.47

60.45

60.50

60.46

60.45

60.53

60.54

60.59

60.59

60.46

60.4

0

60.3

8

60.54

60.54

60.5860.60

60.53

60.5560.45

60.44

60.36

60.66

60.71

60.71

60.68

60.30

60.33

60.34

60.29

60.41

60.64

61.36

60.68

60.62

60.45

60.34

60.31

60.35

60.27

60.29

60.30

60.32

60.35

60.40

60.47

60.54

60.94

62.18

63.93

62.13

60.87

60.49

60.40

60.39

60.36

60.25

60.26

60.25

60.28

60.37

60.42

60.40

60.43

60.73

62.52

63.95

62.03

60.60

60.52

60.32

60.35

60.30

60.26

60.23

60.18

60.30

60.30

60.37

60.3460.15

65.33

65.72

65.72 65.72

65.8

4

65.92

65.72

65.37

64.88

64.79

64.96

65.2865.42

65.60

65.2

7

65.28 65.5465.28

65.50

65.81

65.8

2 65.8

3

65.84

65.74

65.67

65.48

65.25

65.22

65.24

65.1

9

61.04

61.08

61.15

61.03

61.10

60.88

60.99

61.00

61.05

60.91

60.95

60.86

60.88

60.97

65.26

60.9

5

60.8

9

60.85

61.05

60.63

L i b r a r y

D e n s eW o o d l a n d

D e n s eW o o d l a n d

D e n s eW o o d l a n d

D e n s eW o o d l a n d

PROPOSED SPORTS PAVILLIONFFL 61.43

EXISTING SPORTS PAVILLIONAND CHANGING ROOMS

REMOVED AS PART OF WORKS

CAR PARK

CAR PARK

CAR PARK

CAR PARK

SITE BOUNDARY

SITE BOUNDARY

SITE ACCESS/EGRESS ANDEVACUATION ROUTE TOHIGHER GROUND ABOVEDESIGN FLOOD LEVEL

PROPOSED SPORTS PAVILLION TOHAVE A GREEN ROOF TO PROVIDE

THE SUSTAINABLE DRAINAGEREQUIREMENTS FOR THE SITE

MAXIMUM EXTENT OF 100 YEAR PLUSCLIMATE CHANGE FLOOD 62.91m AOD

Project Ref.

CheckedDrawn

Cad Ref

Drawing No.

Date

Rev.

Scale

Title

Project

Client

Rev Details InitialsDate

SITE LEVEL PLAN

002

1:500

SMRS RRS

PARAMETER TRADING &MAINTENANCE LTD.

M

T

P

NOTE; DO NOT SCALE FROM THIS DRAWING, USE FIGURED DIMENSIONS ONLYCOPYRIGHT: THIS DRAWING AND ANY DESIGN THEREINIS THE COPYRIGHT OF PARAMETER TRADING ANDMAINTENANCE LTD. AND MUST NOT BE REPRODUCEDOR UTILISED WITHOUT THEIR WRITTEN CONSENT.

EastfieldChatsworth Road

RowsleyMatlock

DerbyshireDE4 2EH

Tel 01629 734427Mobile 07990 640523

Email [email protected]

A

FLOOD RISK ASSESSMENTBELPER MEADOWS

BELPER

PTM/DW146

DW146-001

04/02/14

BELPER MEADOWS SPORTS CLUB

NOTES:

1. DO NOT SCALE FROM THIS DRAWING, USE FIGURED DIMENSIONSONLY. LAYOUT IS MADE UP FROM ORDNANCE SURVEY PLANS, NOLIABILITY IS OFFERED OR ACCEPTED AS TO IT'S COMPLETENESS ORACCURACY.

2. THIS PLAN IS FOR THE PURPOSE OF IDENTIFYING FEATURESRELEVANT TO THE ASSOCIATED FLOOD RISK ASSESSMENT FORBELPER MEADOWS SPORTS CLUB, BELPER.

3. LEVELS REDUCED FROM ORDNANCE SURVEY DATUM.

A Updated for Environment Agency comments,additional flood information added and FFL revised

SMRS22 Oct 2014

Page 10: Detailed FRA/FCA Map centred on Belper Meadows, Belper ...docs.ambervalley.gov.uk/Planning/StreamDocPage/obj.pdf?DocNo=... · Email: enquiries@environment-agency.gov.uk 1% (1 in 100

Gy

Gy

Gy

Gy

Gy

Gy

Gy

Gy

Gy

Gy

Gy

Gy

Gy

Gy

Gy

Gy

IC

Re

Re

Re

DP

Post

Post

Post

Post

Post

Post

Post

Post

PostPost

PostPost

Post

Post

Post

Fl

Fl

Fl

Fl

Fl

Fl

Fl

Fl

Fl

Fl

Fl

Fl

Fl

Sp

Tp

Tp

THL

THL

THL

THL

Boll

Boll

BollBoll

BollBoll

BollBoll

Boll

Boll

Boll

Boll

Boll

BollBollBoll

BollBoll

BollBollBoll

Boll

Boll

Boll

BollBollBoll

Sap

E:

E:

E:

E:

E:

E:

E:

E:

E:

R:

R:

R:

R:

R:

R:

R:

R:

R:

Bush

MR2

MR3

MR4

MR5

MR6

MR7

MR8 MR9

61.33

61.18

61.36

61.18

61.16

61.03

60.90

60.61

60.69

60.97

60.97

60.79

61.02

60.83

60.71

60.70

60.65

60.58

60.49

60.5

1

60.43

60.4

2

60.4

5

60.4

3

60.4

5

60.47

60.46

60.51

60.52

60.55

60.58

60.51

60.58

60.6

5

60.50

60.46

60.45

60.51

60.46

60.57

60.58

60.50

60.49

60.53

60.6260.64

60.73

60.89

61.03

60.92

60.84

60.4

5

60.4

8

60.4

3

60.4

4

60.40

60.50

60.42

60.29

60.22

60.23

60.41

60.29

60.27

60.30

60.41

60.39

60.40

60.31

60.30

60.40

60.3

3 60.3360.32

60.33

60.37

60.50

60.6

3

60.95

61.01

61.03 61.13

61.1

561

.18

61.1

5

61.08

61.04

61.0160.69

60.32

60.53

60.51

60.2

1

60.28

60.42

60.42

60.40

60.41

60.29

60.32 60.34

60.86

60.88

60.45

60.6160.83

60.6

0

66.78

64.03

63.60

65.74

60.60

60.52

60.43

60.37

60.41

60.31

60.73

60.86

60.70

60.70

60.25

60.2360.30

60.77

60.53

60.70

60.58

60.57

60.2

2

60.2

3

60.2

4

60.2

4

60.29

60.29

60.35

60.43

60.37

60.32

60.29

60.13

60.24

60.20

60.21

60.2

4

60.21

60.23

60.2

4

60.23

60.22

60.2

560.22

60.2

4

60.21

60.2

5

60.2

5

60.17

60.2

5

60.2

3

60.24

60.2

6

60.20

60.2

4

60.2

5

60.2

3

60.2

5

60.2

560

.24

60.2

4

60.25

60.31

60.43

60.37

60.31

60.2

4

60.2

4

60.2

5

60.2

4

60.2

4

60.2

4

60.2

4

60.24

60.30

60.46

60.37

60.30

60.24

60.2

4

60.2

4

60.2

4

60.29

60.30

60.2860.3160.37

60.36

60.41

60.37

60.31

60.28

60.30

60.29

60.31

60.36

60.3860

.38

60.4

3

60.4

6

60.2

6

60.2

5

60.2

560

.23

60.32

60.35

60.49

60.5

2

60.60

60.5

2

60.6

5 60.3

5

60.4

160.7

1

60.4

7

60.3

5

60.4

4

60.4

1

60.3

5

60.3

3

60.46

60.3

760.3

9

60.54

60.50

60.58

60.50

60.45

60.48

60.55

61.14

61.22

61.93

63.42

60.2

3

60.2

9

60.3

9

60.4

1

60.4

7

60.6

6

60.68

75.29

71.75

71.66

75.19

70.23

68.37

67.86

69.91

65.97

65.94

66.0

266

.05

66.1

766

.20

66.2

066

.31

65.2

5

64.50

64.72

64.70

65.14

61.01

61.55

61.84

62.20

62.6264.17

64.14 65.24

65.35

66.08

66.04

70.89

71.98

65.27

64.13

63.66

63.66

65.30

65.3164.46

65.18

65.04

63.67

63.26

62.54

62.30

62.33

62.23

62.25

62.53

62.88

63.23

63.21

63.70

63.70

63.72

65.3

165

.77

65.79

66.25

66.54

66.26

66.65

66.51

66.35

66.05

65.73

65.92

65.60

65.96

66.26 66.52

66.37

66.3865.98

66.49

65.8265.52

65.24

65.38

66.27

66.34 66.40

66.2866.27

66.30

66.30

66.19

66.24

65.66

65.67

65.76

65.5965.54

65.62

66.32

65.83

66.3

0

66.16

65.71

65.75

66.2

1

66.35

66.31

66.40

66.54

66.4366.36

66.56

66.56

66.6066.56

66.44

66.43

66.72

66.84

66.66

66.74

66.67

66.94

66.69

66.65

66.99

66.54

66.80

72.32

77.21

71.2869.67

61.18

61.18

60.80

66.02

60.77

60.71

60.24

65.2

6

65.69

62.92

62.54

G=3.2mTCL=79.89

D

G=0.3m

Con

tain

er

Tank

Security Fence 2m high

Cover

Tarmac

Pane

l Fen

ce1.

6m h

igh

Duct

Goals

G=MG

TCL=69.12

C r

i c k

e t

N e

t s

Security Fence1.9m high

Panel Fence

1.25m high

Bench

P\R

ail Fence1.2m

high

Wall1.1m high

Track

Track

G=MG

G=MG

P\Rail Fence1.2m high

1.8

Wall 1.9m high

Track

Panel Fence1.7m high

OverheadCable Level=67.14

OverheadCable Level=67.58

Ove

rhea

dC

able

Lev

el=

67.0

4

G=0.5mTCL=66.93

G=1.1mTCL=72.14

G=2.4mTCL=67.75

G=2.4mTCL=69.41

G=1.3mTCL=68.76

G=MG

SyntheticSurface

C a b i n

Path

Shelter

SyntheticSurface

SyntheticSurface

SyntheticSurface

IC

Concrete

Con

cret

e

SyntheticSurface

P\Rail Fence1.25m high

IC

IC

IC

IC

IC

ControlBox

Sign

G=2.2mTCL=71.10

Grass

Grass

Secu

rity

Fenc

e 2.

8m h

igh

Tarmac

TennisCourt

TennisCourt

Net

SyntheticSurface

SyntheticSurface

Secu

rity

Fenc

e 3.

0m h

igh

IC

SyntheticSurface

SyntheticSurface

SyntheticSurface

B r i

c k

P a

v e

d

B r i c k P a v e d

Rai

lings

1m

hig

h

Rai

lings

1m

hig

h

Security Fence 3.0m high

Secu

rity

Fenc

e 3.

0m h

igh

Secu

rity

Fenc

e 3.

0m h

igh

S a f e t y N e t

G=2.0mTCL=73.85

Security Fence1.9m high

Security Fence2.5m high

Secu

rity

Fenc

e1.

9m h

igh

C r

i c k

e t

N e

t s

G=2.0mTCL=71.88

Bench

Bench

G=1.8mTCL=71.37

G=1.6mTCL=71.99

G=

Panel Fence1.2m high

Panel Fence1.2m high

Panel Fence1.2m high

Hedge1.2m high

P\R

ail F

ence

1.2m

hig

h

G=0.9mTCL=76.89

G=1.0mTCL=73.77

Ram

p

Toilets

G=MG

TCL=73.30

G=MG

TCL=76.82

G=0.6mTCL=70.71

G=MG

TCL=65.79

G=2.4mTCL=74.32

Railings0.9m high

TrackTrack

Tarmac

Wall

1.3m high

Wall

1.75m high

Wall

2.3m high

G r a s s

D e n s eW o o d l a n d

D e n s eW o o d l a n d

D e n s eW o o d l a n d

D e n s eW o o d l a n d

D e n s eW o o d l a n d

Car - Parking

G=MG

G=MG

G=0.9m

G=MG

G=MG

G=1.6m

G=2.0m

G=MG

P\Rail Fence1.2m high

G=MG

G=MG

G=MG

G=0.9m

G=1.4m

G=0.4m

G=MG

G=0.4m

G=MG

G=MG

G=1.0m

G=1.6m

G=MG

G=1.0m

G=1.2mTCL=81.52

G=MG

TCL=82.87

Steps

Tarmac

Bushes

Bushes

Bushes

G=1.2mTCL=82.19

G=1.0mTCL=79.43

G=1.0mTCL=78.38

G=MG

TCL=83.15

G r a s s

G r a s sG r a s s

G=1.0mTCL=80.70

G=1.4m

G=MG

TCL=78.07

G=0.8m

G=MG

G=MG

G=1.0m

G=MG

G=2.0m

G=1.8mTCL=81.72

G=1.2m

G=MG

G=1.5mTCL=86.91

G=MG

G=MG

G=MG

G=1.5m

G r a s s

G r a s s

Path

G=MG

G=0.4m

G=0.3m

G=2.4mTCL=83.39

G=1.0mTCL=80.32

Canopy

G=1.0mTCL=68.22

G r a s s

G r a s s

IC

G=2.8mTCL=85.40

IC

G=1.0m

G=MG

61.24

61.2761.28

61.26

61.38

61.41

61.34

61.2761.28

61.14

61.16

61.12

61.18

61.59

61.09

61.06

61.14

61.07

61.12

61.11

61.0661.04

61.09

61.1661.20

61.05

60.95

61.13

61.17

61.2161.23

61.17

61.17

61.59

61.69

61.5461.24

61.46

60.46

60.65

60.80

60.81

60.76

60.65

60.34

60.46

61.46

61.51

61.60

61.1661.14

61.60

60.67

60.73

61.01

61.11 60.87

60.8961.10

61.17

60.91

60.88

61.2261.18

60.80

60.70

61.01

61.2

4

60.43

60.45

60.90

60.89

60.98

60.95

60.84

60.95

60.93

60.93

60.83

60.58

60.73

60.88

61.06

61.04

61.0

1

60.8

8

60.9

1

61.0

0

61.0

7

61.1

5

61.2

0

61.30

62.18

62.0

4

62.0

3

62.5

6

62.2

1

61.69

61.16

61.18

61.80

61.61

61.14

61.18

61.21

61.2

2

61.2

3

61.2

861

.17

61.3

2

61.34

61.23

61.29

61.27

61.2

5

61.0

9

61.23

60.52

60.52

60.59

60.66

60.58

60.5

1

60.4

7

60.66

60.93

60.95

60.62

60.4

1

60.53

60.54

60.63

60.7960.80

60.73

60.5

2

60.4

9

60.51

60.4

1

60.4

1

60.50

60.47

60.46

60.41

60.52

60.53

60.47

60.5

5

60.56

60.55

60.56

60.51

60.53

60.54

60.54

60.55

60.51

60.56

60.58

60.56

60.56

60.54

60.52

60.51

60.51

60.48

60.50

60.5260.51

60.56

60.55

60.53

60.53

60.54

60.54

60.56

61.2

7

61.1

9

60.96

60.97

61.0360.86

61.23

61.3

7

60.98

63.41

62.35

61.30

61.0461.10

61.84

62.97

64.30

64.1465.29

63.75

63.62

62.93

62.92

62.55

62.84

63.22

64.52

65.30

65.2

665.23

65.2

3

65.27

65.07

64.53

64.16

64.13

64.1

7

64.1

6

64.13

64.1

4

63.89

64.12 64.1863.47

60.45

60.50

60.46

60.45

60.53

60.54

60.59

60.59

60.46

60.4

0

60.3

8

60.54

60.54

60.5860.60

60.53

60.5560.45

60.44

60.36

60.66

60.71

60.71

60.68

60.30

60.33

60.34

60.29

60.41

60.64

61.36

60.68

60.62

60.45

60.34

60.31

60.35

60.27

60.29

60.30

60.32

60.35

60.40

60.47

60.54

60.94

62.18

63.93

62.13

60.87

60.49

60.40

60.39

60.36

60.25

60.26

60.25

60.28

60.37

60.42

60.40

60.43

60.73

62.52

63.95

62.03

60.60

60.52

60.32

60.35

60.30

60.26

60.23

60.18

60.30

60.30

60.37

60.3460.15

65.33

65.72

65.72 65.72

65.8

4

65.92

65.72

65.37

64.88

64.79

64.96

65.2865.42

65.60

65.2

7

65.28 65.5465.28

65.50

65.81

65.8

2 65.8

3

65.84

65.74

65.67

65.48

65.25

65.22

65.24

65.1

9

61.04

61.08

61.15

61.03

61.10

60.88

60.99

61.00

61.05

60.91

60.95

60.86

60.88

60.97

65.26

60.9

5

60.8

9

60.85

61.05

60.63

L i b r a r y

D e n s eW o o d l a n d

D e n s eW o o d l a n d

D e n s eW o o d l a n d

D e n s eW o o d l a n d

LOSS OF FLOODPLAIN OVER ALLBANDS 60.5-62.9m = 308m² (EQUATING

TO THE BUILDING FOOTPRINT)

161m² OF FLOODPLAINCOMPENSATION PROVIDEDOVER ALL LEVEL BANDS BY

REMOVAL OF EXISTINGBUILDING FROM SITE AND

REINSTATING GROUND TO ALEVEL OF 60.5m

BAND 60.5-60.8mMAXIMUM FINISHED LEVEL 60.5mTOTAL REPLACEMENT AREA = 308m²

BAND 60.8-61.1mMAXIMUM FINISHED LEVEL 60.8mTOTAL REPLACEMENT AREA = 441m²

BAND 61.1-61.4mMAXIMUM FINISHED LEVEL 61.1mTOTAL REPLACEMENT AREA = 320m²

FLOODPLAIN COMPENSATION AREAS

BAND 61.4-61.7mMAXIMUM FINISHED LEVEL 61.4mTOTAL REPLACEMENT AREA = 308m²

BAND 61.7.62.0mMAXIMUM FINISHED LEVEL 61.7mTOTAL REPLACEMENT AREA = 308m²

BAND 62.0-62.3mMAXIMUM FINISHED LEVEL 62.0mTOTAL REPLACEMENT AREA = 308m²

BAND 62.3-62.6mMAXIMUM FINISHED LEVEL 62.3mTOTAL REPLACEMENT AREA = 308m²

BAND 62.6-62.9mMAXIMUM FINISHED LEVEL 62.6mTOTAL REPLACEMENT AREA = 308m²

162m² OF FLOODPLAIN COMPENSATIONVOLUME WITHIN THE BANDING 60.8-61.1m AODGENERATED DURING THECONSTRUCTION/SITE LEVELING WORKS FORTHE CAR PARK EXTENSION

147m² OF FLOODPLAIN COMPENSATION VOLUMEWITHIN ALL BANDINGS 61.1-62.9m AOD GENERATED

BY REDUCTION OF HIGHER GROUND LEVELS

GROUND LEVELS REDUCED TO ALLOW FLOODWATERS TO WASH INTO AND OUT OF THE

FLOODPLAIN COMPENSATION AREAS.LEVELS REDUCED TO 60.5m AOD

147m² OF FLOODPLAIN COMPENSATION VOLUMEWITHIN THE BANDING 60.5-60.8m AOD GENERATED

BY REDUCTION OF HIGHER GROUND LEVELS

66m² OF FLOODPLAIN COMPENSATION VOLUMEWITHIN THE BANDING 60.8-61.1m AOD AND 12m² OFFLOODPLAIN COMPENSATION VOLUME WITHIN THEBANDING 61.1-61.4m AOD GENERATED DURING THECONSTRUCTION/SITE LEVELING WORKS FOR THECAR PARK EXTENSION

52m² OF FLOODPLAIN COMPENSATION VOLUMEWITHIN THE BANDING 60.8-61.1m AOD GENERATED

BY REDUCTION OF HIGHER GROUND LEVELS

MAXIMUM EXTENT OF 100 YEAR PLUSCLIMATE CHANGE FLOOD 62.91m AOD

GROUND LEVELS REDUCED FOR THE CARPARK EXTENSION TO ALLOW FLOOD WATERSTO WASH INTO AND OUT OF THE FLOODPLAINCOMPENSATION AREAS.LEVELS REDUCED TO 60.8m AOD

Project Ref.

CheckedDrawn

Cad Ref

Drawing No.

Date

Rev.

Scale

Title

Project

Client

Rev Details InitialsDate

FLOODPLAIN COMPENSATIONPLAN

003

1:500

SMRS RRS

PARAMETER TRADING &MAINTENANCE LTD.

M

T

P

NOTE; DO NOT SCALE FROM THIS DRAWING, USE FIGURED DIMENSIONS ONLYCOPYRIGHT: THIS DRAWING AND ANY DESIGN THEREINIS THE COPYRIGHT OF PARAMETER TRADING ANDMAINTENANCE LTD. AND MUST NOT BE REPRODUCEDOR UTILISED WITHOUT THEIR WRITTEN CONSENT.

EastfieldChatsworth Road

RowsleyMatlock

DerbyshireDE4 2EH

Tel 01629 734427Mobile 07990 640523

Email [email protected]

A

FLOOD RISK ASSESSMENTBELPER MEADOWS

BELPER

PTM/DW146

DW146-001

04/02/14

BELPER MEADOWS SPORTS CLUB

NOTES:

1. DO NOT SCALE FROM THIS DRAWING, USE FIGURED DIMENSIONSONLY. LAYOUT IS MADE UP FROM ORDNANCE SURVEY PLANS, NOLIABILITY IS OFFERED OR ACCEPTED AS TO IT'S COMPLETENESS ORACCURACY.

2. THIS PLAN IS FOR THE PURPOSE OF IDENTIFYING FEATURESRELEVANT TO THE ASSOCIATED FLOOD RISK ASSESSMENT FORBELPER MEADOWS SPORTS CLUB, BELPER.

3. LEVELS REDUCED FROM ORDNANCE SURVEY DATUM.

4. FLOODPLAIN COMPENSATION VOLUMES HAVE BEEN OFFEREDON A LEVEL AND VOLUME BASIS WHEREBY THE VOLUMES OFCOMPENSATION FLOODPLAIN HAVE BEEN PROVIDED ON THE SAMELEVEL ABOVE ORDNANCE DATUM AS VOLUMES LOST. OVERALLTERE IS A MODEST INCREASE IN COMPENSATION VOLUMEPROVIDED TO OFFER BETTERMENT AGAINST THE EXISTINGSITUATION

A Updated for Environment Agency comments and floodcompensation scheme amended for revised layout

SMRS22 Oct 2014


Recommended