Determining Plant Capacity for a Combined Cycle Power Plant Using PEPSE Justin Strupp Scientech, a business unit of Curtiss-Wright Flow Control Company 2013 Scientech Symposium – Managing Plant Assets and Performance Clearwater Beach, Florida August 6-9, 2013 Rex Featherston, Matthew Goodwin, Jason Lee, and Andre Norwood Arizona Public Service Company
Transcript
Page 1: Determining Plant Capacity for a Combined Cycle Power ......General Electric 7FA gas turbines (~150 MW each) Supplemental firing in the HRSG Alstom Power steam turbines (~200 MW each)

Determining Plant Capacity for a Combined Cycle Power Plant

Using PEPSEJustin Strupp

Scientech, a business unit of Curtiss-Wright Flow Control

Company

2013 Scientech Symposium – Managing Plant Assets and PerformanceClearwater Beach, Florida

August 6-9, 2013

Rex Featherston, Matthew Goodwin, Jason Lee, and

Andre NorwoodArizona Public Service

Company

Page 2: Determining Plant Capacity for a Combined Cycle Power ......General Electric 7FA gas turbines (~150 MW each) Supplemental firing in the HRSG Alstom Power steam turbines (~200 MW each)

Redhawk Power Station

Two 2-on-1 Combined Cycles 492 MW Net Base LoadGeneral Electric 7FA gas turbines (~150 MW

each)Supplemental firing in the HRSGAlstom Power steam turbines (~200 MW each) Located in Arlington, ArizonaBegan operating in mid-2002

Page 3: Determining Plant Capacity for a Combined Cycle Power ......General Electric 7FA gas turbines (~150 MW each) Supplemental firing in the HRSG Alstom Power steam turbines (~200 MW each)

Problem

Current Operating Assumptions (OAs)Current OA at 2-on-1 base load conditions

-20-15-10-505

101520

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

MW

Effe

ct (M

W)

Operating Assumption - RH 2-on-1 Base Load

Net Maximum Capacity = 492 MW

Page 4: Determining Plant Capacity for a Combined Cycle Power ......General Electric 7FA gas turbines (~150 MW each) Supplemental firing in the HRSG Alstom Power steam turbines (~200 MW each)

Solution Needs

Use Ambient ConditionsMonthlyAccurateDocumentedRepeatableDay-ahead and/or Real-timePerformance Monitoring

Page 5: Determining Plant Capacity for a Combined Cycle Power ......General Electric 7FA gas turbines (~150 MW each) Supplemental firing in the HRSG Alstom Power steam turbines (~200 MW each)

Background

Operating Assumptions used for dispatch– Max Output– Heat Rate

Current Performance up to date– Degradation and/or Repairs– Ambient Conditions

Page 6: Determining Plant Capacity for a Combined Cycle Power ......General Electric 7FA gas turbines (~150 MW each) Supplemental firing in the HRSG Alstom Power steam turbines (~200 MW each)

Power Correction

Power Correction Factor for Temperature and Humidity

Page 7: Determining Plant Capacity for a Combined Cycle Power ......General Electric 7FA gas turbines (~150 MW each) Supplemental firing in the HRSG Alstom Power steam turbines (~200 MW each)

Data Collection

PI Data for Ambient Conditions– Temperature– Humidity– Pressure

Collection Intervals and TimeData Collection Schemes

– Monthly Average– Peak Time Monthly Average– Conservative Monthly Outlook– Hybrid Outlook

Page 8: Determining Plant Capacity for a Combined Cycle Power ......General Electric 7FA gas turbines (~150 MW each) Supplemental firing in the HRSG Alstom Power steam turbines (~200 MW each)

Ambient Conditions

Monthly Average – average over each month at 4-hour intervals from PI. Similar to current OAs.

14.2

14.3

14.4

14.5

0

20

40

60

80

100

1 2 3 4 5 6 7 8 9 10 11 12

Pres

sure

(PSI

A)

Tem

p (°

F) a

nd H

umid

ity (%

)

Month #

Monthly Average

Temperature Humidity Pressure

Page 9: Determining Plant Capacity for a Combined Cycle Power ......General Electric 7FA gas turbines (~150 MW each) Supplemental firing in the HRSG Alstom Power steam turbines (~200 MW each)

Ambient Conditions

Peak Time Monthly Average – average over each month using data at 5 PM each day. Peak time scenario.

14.2

14.3

14.4

14.5

0

20

40

60

80

100

120

1 2 3 4 5 6 7 8 9 10 11 12

Pres

sure

(PSI

A)

Tem

p (°

F) a

nd H

umid

ity (%

)

Month #

Peak Time Monthly Average

Temperature Humidity Pressure

Page 10: Determining Plant Capacity for a Combined Cycle Power ......General Electric 7FA gas turbines (~150 MW each) Supplemental firing in the HRSG Alstom Power steam turbines (~200 MW each)

Ambient Conditions

Conservative Monthly Outlook – Peak Time Average adding (Temperature) or subtracting (humidity and pressure) the average standard deviation of the peak time condition for those months to it. Worst case scenario.

14.0

14.1

14.2

14.3

0

20

40

60

80

100

120

1 2 3 4 5 6 7 8 9 10 11 12

Pres

sure

(PSI

A)

Tem

p (°

F) a

nd H

umid

ity (%

)

Month #

Conservative Monthly Outlook

Temperature Humidity Pressure

Page 11: Determining Plant Capacity for a Combined Cycle Power ......General Electric 7FA gas turbines (~150 MW each) Supplemental firing in the HRSG Alstom Power steam turbines (~200 MW each)

Ambient Conditions

Hybrid Outlook – average of Peak Time Monthly Average and the Conservative Monthly Outlook. A different level of conservatism.

14.1

14.2

14.3

14.4

0

20

40

60

80

100

120

1 2 3 4 5 6 7 8 9 10 11 12

Pres

sure

(PSI

A)

Tem

p (°

F) a

nd H

umid

ity (%

)

Month #

Hybrid Monthly Outlook

Temperature Humidity Pressure

Page 12: Determining Plant Capacity for a Combined Cycle Power ......General Electric 7FA gas turbines (~150 MW each) Supplemental firing in the HRSG Alstom Power steam turbines (~200 MW each)

PEPSE - Modeling

Translate Heat Balance and Plant Schematics into PEPSE Components

Page 13: Determining Plant Capacity for a Combined Cycle Power ......General Electric 7FA gas turbines (~150 MW each) Supplemental firing in the HRSG Alstom Power steam turbines (~200 MW each)

PEPSE –Schematic With Components

Page 14: Determining Plant Capacity for a Combined Cycle Power ......General Electric 7FA gas turbines (~150 MW each) Supplemental firing in the HRSG Alstom Power steam turbines (~200 MW each)

Study Modeling

Tuned PEPSE model to Heat Balances Three operating modes - each month

– 2-on-1 base load– 2-on-1 with max supplemental firing– 1-on-1 base load

Ambient Conditions – monthly for each average ambient condition

Page 15: Determining Plant Capacity for a Combined Cycle Power ......General Electric 7FA gas turbines (~150 MW each) Supplemental firing in the HRSG Alstom Power steam turbines (~200 MW each)

Other Modeling Assumptions

Evaporative Cooler considerations– On above 75 °F– Off below 75 °F

Condenser PressurePump PressuresDuct Firing – Max at 1198 °FOthers

Page 16: Determining Plant Capacity for a Combined Cycle Power ......General Electric 7FA gas turbines (~150 MW each) Supplemental firing in the HRSG Alstom Power steam turbines (~200 MW each)

2-on-1 Base Load Comparison

440

450

460

470

480

490

500

510

520

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Net

Pow

er O

utpu

t (M

W)

Redhawk 2-on-1 Base Load Comparison

Original OAs Actual Max AveragePeak Average Conservative Outlook Hybrid Outlook

Page 17: Determining Plant Capacity for a Combined Cycle Power ......General Electric 7FA gas turbines (~150 MW each) Supplemental firing in the HRSG Alstom Power steam turbines (~200 MW each)

2-on-1 Max Duct Fired Comparison

460470480490500510520530540550560

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Net

Pow

er O

utpu

t (M

W)

Redhawk 2-on-1 Max Duct Fired Comparison

Original OAs Average Peak Average Conservative Outlook Hybrid Outlook

Page 18: Determining Plant Capacity for a Combined Cycle Power ......General Electric 7FA gas turbines (~150 MW each) Supplemental firing in the HRSG Alstom Power steam turbines (~200 MW each)

1-on-1 Base Load Comparison

210215220225230235240245250255260

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Net

Pow

er O

utpu

t (M

W)

Redhawk 1-on-1 Base Load Comparison

Original OAs Average Peak Average Conservative Outlook Hybrid Outlook

Page 19: Determining Plant Capacity for a Combined Cycle Power ......General Electric 7FA gas turbines (~150 MW each) Supplemental firing in the HRSG Alstom Power steam turbines (~200 MW each)

Recommended Solutions

Which to use as the new OAs for 2-on-1 Base Load, 2-on-1 Max Duct Fired, and 1-on-1 Base Load?– Average– Peak Average– Conservative Outlook– Hybrid Outlook

Page 20: Determining Plant Capacity for a Combined Cycle Power ......General Electric 7FA gas turbines (~150 MW each) Supplemental firing in the HRSG Alstom Power steam turbines (~200 MW each)

Additional Work

Next Steps?– Plant data at each Operating Mode– Marketing involvement– Implement Method(s) for OAs– Day-ahead and Real-time instead of Monthly– Performance Monitoring

What could be done for better results?– More Data– Testing– Plant Data Tunes

Page 21: Determining Plant Capacity for a Combined Cycle Power ......General Electric 7FA gas turbines (~150 MW each) Supplemental firing in the HRSG Alstom Power steam turbines (~200 MW each)

Questions?