+ All Categories
Home > Documents > Deutsch-GeorgischerWirtschaftstag 18.10.2017, · PDF fileModern CA/ULO storage Different steps...

Deutsch-GeorgischerWirtschaftstag 18.10.2017, · PDF fileModern CA/ULO storage Different steps...

Date post: 03-Feb-2018
Category:
Upload: doankhanh
View: 215 times
Download: 0 times
Share this document with a friend
20
COMPANY SECTORS SOLUTIONS PROJECT MANAGEMENT Deutsch-Georgischer Wirtschaftstag 18.10.2017, Hamburg Planning and construction of cold storages for food, especially for fruits and vegetables for Georgia Referent: Dipl.- Ing. Ingolf Mayer
Transcript

COMPANY SECTORS SOLUTIONS PROJECT MANAGEMENT

Deutsch-Georgischer Wirtschaftstag

18.10.2017, Hamburg

Planning and construction of cold storages for food, especially for fruits and

vegetables for GeorgiaReferent: Dipl.- Ing. Ingolf Mayer

COMPANY PROJECT MANAGEMENT

ABOUT US LOCATIONS REFERENCES

SECTORS SOLUTIONS

2

Moscow

Expansion of Locations

– 1998 Rep. office in Hungary

– 2000 Rep. office in Croatia

– 2006 Rep. office in Kazakhstan

– 2009 Foundation of Plawi Hellas

in Greece

– 2010 Participation in Swiss cold

storage building specialist

– 2011 Foundation of OOO Plawi -

Service (Ldt.) in Russia

– 2017 Rep. office in Iran Thessalonica

Switzerland

COMPANY SECTORS SOLUTIONS PROJECT MANAGEMENT

ABOUT US LOCATIONS REFERENCES

Company Data/Performance

3

0

10

20

30

40

50

60

2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012e

Revenues

in € mil.

0

100

200

300

1994 1996 1998 2000 2002 2004 2006 2008 2010 2012e

Employees

No.

COMPANY PROJECT MANAGEMENT

ABOUT US LOCATIONS REFERENCES

SECTORS SOLUTIONS

Extract of References in the CIS

4

OOO «РОВЕНСКИЕ САДЫ»

ТОО «Ахдария»

TOO «Vege Cool»

ЗАО «Агрофирма

им. 15 лет Октября»

Date Builder Building project

2002Farm firm "15 Let Oktyabrya", Lebedyan, Lipetsk

Region, Russia

Planning,supply and assambling of ULO cold store for 1.800 t of fruit

(Lipezk I)

2003Farm firm "15 Let Oktyabrya", Lebedyan, Lipetsk

Region, Russia

Planning,supply and assambling of ULO cold store for 2.200 t of fruit (

(Lipezk II)

2003 ОАО "Klyuchevoye", Novocherkassk, Russia Planning,supply and assambling of ULO cold store for 800 t of fruit

2004Farm firm "Agronom", Lebedyan, Lipezkaya Oblast,

Russia

Reconstruction and rebuild of ULO-cold store for 1.200 t of fruit (Lipezk

III)

2004/2005Farm firm "15 Let Oktyabrya", Lebedyan, Lipetsk

Region, Russia

Reconstruction and modernisation of storage rooms for 2.000 t (Lipezk

IV)

2005/2006ZAO "Sad Gigant Cholod“, Slawjansk-na-Kubani,

Russia

Planning,supply and assambling of ULO cold store for 10.000 t of fruit

with sorting, packing, transport

2006Farm firm "15 Let Oktyabrya", Lebedyan, Lipetsk

Region, Russia

Planning and construction of ULO cold store for 2.300 t of fruit (Lipezk

V)

2006ООО "Rovenskiye Sady", Rovno, Tulskaya Oblast´,

RussiaPlanning,supply and assambling of ULO-cold store for 1.8000 t of fruit

2006 ООО "Samararemstroy", Samara, Russia Planning,supply and assambling of ULO cold store for 500 t

2006/2007Agrofirma "Agronom", Lebedyan, , Lipetsk Region,

Russia

Planning,supply and assambling of ULO cold store for 2.200 t of fruit,

with 2 Banana ripening chambers

2007ZAO "Sad Gigant Cholod“, Slawjansk-na-Kubani,

RussiaModernisation of ULO-cold store for 2.500 t of fruit

2007 ТОО "Attis Oralagro ", Uralsk, KazakhstanPlanning,supply and assambling of ULO cold store for 4.000 t potatoes,

carrots etc. with sorting, packing , transport

2007/2008 ТОО "Akhdarya", Ust´-Kamenogorsk, Kazakhstan Planning of a logistic center for 18.000 t of fruit and vegetables

2008 „Kazakh Cool“ LTD, Almaty, Kazakhstan Planning,supply and assambling of ULO-cold-store for 2.200 t of fruit

2008/2009Agrofirma "15 Let Oktyabrya", Lebedyan, Lipetsk

Region, RussiaPlanning,supply and assambling of ULO-cold-store for 2300 t (Lipezk VI)

TOO «Kazakh Cool»

COMPANY PROJECT MANAGEMENT

ABOUT US LOCATIONS REFERENCES

SECTORS SOLUTIONS

Extract of References in the CIS

5

OOO «РОВЕНСКИЕ САДЫ»

ТОО «Ахдария»

TOO «Vege Cool »

ЗАО «Агрофирма

им. 15 лет Октября»

TOO «Kazakh Cool»

Date Builder Building projekt

2009 OOO „Kichera – 2“, Krasnodar, Russia Planning,supply and assambling of ULO-cold store for 5.000 t of fruit

2009 OOO „TILCO RUS“, Essentuki, Stavropolskiy Krai, Russia Planning,supply and assambling of ULO-cold store for 800 t

2010 OOO „Appel City“ Krasnodar, Russia Planning,supply and assambling of ULO-cold store for 5.000 t

2010Agrofirma "15 Let Oktyabrya", Lebedyan, Lipetsk Region,

Russia

Planning,supply and assambling of ULO-cold store for 5.000 t

(Lipezk VII +VIII)

2010 OOO „KB Khladokombinat“, Nalchik, KBR Russia Planning,supply and assambling of ULO-cold store for 5.000 t.

2011 OOO «Plodtorg», Tula, Russia Planning,supply and assambling of ULO cold-store for 1.800 t of fruit

2011 «Fargona Shut», Marligan, Uzbekistan Planning,supply and assambling of ULO cold-store for 1.200 t of fruit

2011 OOO «Niva», Krasnodarskiy Kraj, Russia Planning,supply and assambling of ULO cold-store for 1.150 t of fruit

2011ООО «Sady Elbrusa», Nalchik, Kabardino-Balkaria,

RussiaPlanning,supply and assambling of ULOcold-store for 5.000 t of fruit

2011 ТОО «Company LAD Alm», Almaty, Kazakhstan Project planning of hypermarket in Astana, total 10 000 м2

2011 ТОО «Vege-Cool» Almaty, KazakhstanPlanning,supply and assambling of ULO cold-store for 3.000 t of

vegetables

2012 IKAR-S, Bilasuvar, Azerbaijan Planning,supply and assambling of ULO cold-store for 770 t of fruit

2012 OOO „APP Stavropolye“, Stawropolskyi Krai, RussiaPlanning,supply and assambling of cold-store for 10.000 t of

vegetables

2013 ООО «Zolotoj Sad», Majkop, Russia Planning,supply and assambling of ULO cold-store for 5.000 t of fruit

2013ZАО «Agrofirma im. 15 years of October», Lebedjan

Region, Lipezk, Russia

Planning,supply and assambling of ULO cold-store for 2.450 t

Lipezk IX

2013/2014 OOO «Fruit Traid», Nalchik, КBR, Russia Planning,supply and assambling of ULO cold-store for 5.000 t of fruit

COMPANY PROJECT MANAGEMENT

ABOUT US LOCATIONS REFERENCES

SECTORS SOLUTIONS

Extract of References in the CIS

6

OOO «РОВЕНСКИЕ САДЫ»

ТОО «Ахдария»

TOO «Vege Cool»

ЗАО «Агрофирма

им. 15 лет Октября»

Date Builder Building project

2013/2014 ООО «Ariant», Tsheljabinsk, RussiaSupply and assambling of interior elements for the production building

of primary and deep processing of meat

2014 ООО «Fresh Fruit», Almaaty, Kasakhstan Planning, supply and assambling of ULO cold-store for 2.200 t of fruit

2014 ANIM / IKAR-S MMC, Baku, AserbajdzhanCold-store in the existing building with a total capacity of 650 t for the

storage of fruits

2015 SITABR AGRO,Dushanbe, TadjikistanPlanning, supply and assambling of ULO cold-store for

2.200 t of fruit

2015ZАО «Agrofirma im. 15 years of October»,

Lebedjan Region, Lipezk, Russia

Planning, supply and assambling of ULO cold-store for 2.450 t

(Lipezk X)

2015 ООО «Fresh Fruit», Almaaty, Kasakhstan Planning, supply and assambling of cold-store for 3.700 t

2016 „Oberon“ LTD, Bischkek / KirgistanPlanning, supply and assambling of fruit cold-store for 2.400 t in

Balikhchi, Kirgistan

2016 OOO „Chegemskie Yabloki“, Chegem, Russia Planning, supply and assambling of ULO cold-store for 6.450 t

2016OOO „Rusagroimport“, Moskow, Russia Planning, supply and assambling of ULO cold-store for fruit and

vegetables

2016OOO “Agro-Center”, Russia, Republic Adygea,

Giaginski Region, S. SergievskoePlanning, supply and assambling for ULO-could store of 2.300 t. fruit

2016 OOO „Sady Bakhchisaraya“, Russia, S. DolinnoePlanning, supply and assambling for ULO-could store of 1.000 t. fruit

2016OOO „Yuzhnye Zemli“, Krasnodar Region, Abinsk,

Russia

Planning, supply and assambling of ULO cold store for 10.000 t of

fruit

2017 OOO „Zorinskij Sad“, Kursk Region, Russia ULO cold store for 1650 t in the existing building

2017 OOO „Alexandrovo“, Krasnodar Region, Russia Supply and assambling of cooling equipment

2017 OOO „Umiks“, Republic Adygea, Russia Supply and assambling of ULO- and cooling equipment

2017 OOO „Veydelewskoe“, Belgorod Region, RussiaSupply and assambling of the cooling equipment for the cold store for

900 t

2017/2018 TOO „Baymene“, Almaaty Region, Kasakhstan Planning, supply and assambling of ULO cold-store for 5.100 t

TOO «Kazakh Cool»

INDUSTRIAL/

COMMERCIAL

BUILDINGS

TURNKEY

FACILITIES

REFRIGERATION

AND FREEZER

ROOMS

CA/ULO HYGIENIC/

CLEAN

ROOMS

WAREHOUSES/

STORAGE

HALLS

RIPENING

ROOMS

GRP GATES

COMPANY SOLUTIONS PROJECT MANAGEMENTSECTORS

Modern CA/ULO storage

Different steps of an efficient storage and

ripening regulation

Cellar / cave storage

TRADE AND

INDUSTRY

FRUIT AND

VEGETABLES

MILK AND

CHEESE

MEAT AND

SAUSAGES

FISH LOGISTICS

PROVIDERS

COMPANY PROJECT MANAGEMENTSECTORS SOLUTIONS

Harvest Situation 2016(source:National Statistics Office 2017)

8

Georgia produced in 2016

-appr.142.000 t Vegetables

-appr. 249.000 t Potatos

-appr. 186.400 t Fruits (65.000 t Apples and 11.000 t Pears)

-appr. 159.200 t Grapes

For appr.80% of the harvest are cold-stores nessesary, it means

Georgia needs for appr.550.000…600.000 t cold stores, ROI 3..4 years

Appr. 92.5 % were produced in family holdings, 7,5% in agricultural

enterprices!!!

Small family companies are not able to invest in cold -stores!!

TRADE AND

INDUSTRY

FRUIT AND

VEGETABLES

MILK AND

CHEESE

MEAT AND

SAUSAGES

FISH LOGISTICS

PROVIDERS

COMPANY PROJECT MANAGEMENTSECTORS SOLUTIONS

Suggestion

9

Decentral collection centers in several regions

- manageable investments

- flexible

- possibility for cooperative using

= private production and corporately selling/merchandising

The system of private production and corporately selling is using by

Fruit and vegetable producers in the EU succsesful since dozens of

years!! It is the only way for producers to get acceptabel prices from

the big food retailers!!

Better than big central coldstores with high investments , difficult

handling and long transport- routes from the production-places!!!

Georgia: Trading Hub on the new Silk Road

10

China´s „One Belt One Road“ initiative aims at reviving the ancient Silk Road

Best route runs via Georgia where great investments in (rail)roads and sea

routes are being made: trade volume will greatly increase

Georgia has FTAs with China and the EU and lies centrally between the two

Example Cold-Storage for 500…600 t

11

Costs:

-approx. 300.000 €

for insulation, cooling

technology, doors

-approx. 60.000 € for

ULO-technology

-approx. 250.000 €

for concrete,

steelconstruction

(local work)

Turnkey:

approx. 610.000 €

Example Cold Storage Collecting Center

12

Costs:

-approx. 40.000 € for

insulation, doors

-approx. 35.000 € for

cooling and ventilation

equipment

-approx. 40.000 € for

concrete, steel (local work)

Turnkey:

approx. 125.000 €

Cold store for vegetables

13

Example Cold-Storage for 120 t /500…600 t / 2000 t

14

We suggest to locate site for collecting cold-stores in several regions together with the Agriculture

ministery of Georgia

INDUSTRIAL/

COMMERCIAL

BUILDINGS

TURNKEY

FACILITIES

REFRIGERATION

AND FREEZER

ROOMS

CA/ULO HYGIENIC/

CLEAN

ROOMS

WAREHOUSES/

STORAGE

HALLS

RIPENING

ROOMS

GRP GATES

COMPANY PROJECT MANAGEMENTSOLUTIONSSECTORS

High humidity

Low temperatureCool

storage

Change of storage atmosphere

higher CO2 partial pressure

Lower O2 partial pressure

ethylene reduction or inhibition

CA-

storage

(ULO)(CA= Controlled Atmosphere)

additional

Storage systems Factors for reducing postharvest

losses

©Plattenhardt + Wirth

GmbH, MünchenSeite 16

RUBINETTE

BOSKOOP

BRAEBURN

JONAGOLD

PINOVA

TOPAZ

GOLDEN DEL.

GALA

FALSTAFF

IDARED

ARLET

FIESTA

ELSTAR

COX ORANGE

Temp

° CO2

%

1 2 3 4 5O2

%CO2

%

Temp.

° C

76Sep. Okt. Nov. Dez. Jan. Feb. März Apr.

MONATE8

Mai Juni Juli

9

1 - 2

1 - 2

1 - 2

1 - 2

1 - 2

1 - 2

1 - 2

1 - 2

1 - 2

3 - 4

3 - 4

2 - 3

1-2

2 - 3

3 - 4

3 - 4

3 - 4

3 - 4

3 - 4

2 - 3

2 - 3

2 - 3

2 - 3

2 - 3

< 1.5

< 1.5

< 2

< 2

1.5-2

1.2-1.8

1.5- 2

1.2-1.8

1-1.5

1-1.5

1-1.5

1-1.5

1-1.5

1-1.5

1-1.5

1-1.5

1-1.5

1-1.5

Storage conditions for apples

COMPANY SECTORS SOLUTIONS PROJECT MANAGEMENT

ABOUT US LOCATIONS REFERENCES

Plattenhardt + Wirth GmbH

17

– 1970 First “System Fruchting”

banana ripening rooms

– 1972 Revenues exceed € 2.5

million mark, 35 employees

Market leader in gastight

CA/ULO storage rooms in

Europe until today

– 1978 Foundation of the Wyhlen

branch near Freiburg

– 1991 Foundation of the

Landsberg branch near Halle

– 1992 Revenues exceed

€ 25-million mark

– 1998 Foundation of the

Munich branch

– 1965 Foundation of the Plattenhardt +

Wirth headquarters in

Meckenbeuren

– 1966 First gastight fruit store in Germany

– 1967 Production of the first adsorber using

activated carbon in Europe

– 1966 First gastight fruit store in sandwich

design in Europe

– 1981 Foundation of the Wenden branch

in Sauerland

– 1983 First complete building solutions for

stores and transshipment halls

– 1985 Set-up of a specialist door

manufacturing department in

Meckenbeuren making high-quality,

gastight doors for ULO and CA

stores

– 2000 Revenues exceed € 30-million mark

– 2002 Revenues exceed € 40-million mark;

foundation of the Bremerhaven branch

– 2008 Revenues exceed € 50-million mark; market leader

in cold storage buildings (in terms of quality and revenues)

in Germany

– 2009 Klaus and Martin Wirth become majority managing

directors; large-scale projects carried out in Russia,

the UK, Greece and Ireland

– 2012 Foundation of the Plattenhardt +

Wirth Service branch in Moscow

Development of the Flextor

innovation

1960s

1970s

1980s

1990s

2000s

2010s

Installation of a Cooling Chain: Small/Medium Size

18

COMPANY PROJECT MANAGEMENT

ABOUT US LOCATIONS REFERENCES

SECTORS SOLUTIONS

19

Activities in the CIS

– 1993 First export activities to

Eastern Europe and the CIS

– 2002 First ULO cold storage house

for 2.000t in Lipezk, Russia;

Foundation of Rep. Offices in

Krasnodar and Moscow;

Target group/Customers: first of all

fruit and vegetable producer,

wholesaler, food industry

– 2005 next step after Russian

business success: Kasachstan

– 2006 Planning and start of the

construction of the ULO complex in

Slavjansk

– 2007 Planning of 1st big logistic

center for fruits and vegetables in Ust-

Kamenogorsk (East of Kasachstan)

– 2008 Planning and construction of

the state-of-the-art ULO cold storage

house of Central Asia in the Almaty

region (inaugurated with State Secre-

tary Mrs. Katja Hessel, March 2009)

– 2010 Realization of the latest and biggest

CA storage complex (20.000t) at

„ZAO Sad Gigant“ in Slavjansk-na-Kubani

– 2010 Start of OOO PLAWI-Service,

Moscow daughter company of Munich

branch

– 2010 First vegetable storage in

Kasachstan at „Vege Cool“ in Almaty,

official inauguration with the Minister of

Agriculture of Kazakhstan

– 2011 Cooperation with centre of

innovations Sad Gigant“ in Slawjansk

– 2011 1st ULO cold storage house in

Uzbekistan

– 2012 1st fruit cold storage house in

Azerbaijdschan

– 2012 1st order from the Governmental

Agricultural program of the Russian

Federation „APP Stawropolye“

– 2014 Inauguration of Meat Processing

Plant and of slaughtering line of OOO

Agrofirma „Ariant“ Chelyabinsk, according to

last West-European standards

1990s 2000s 2010s

COMPANY PROJECT MANAGEMENT

ABOUT US LOCATIONS REFERENCES

SECTORS SOLUTIONS

20


Recommended