DEVELOPING AN LNG HUB IN WEST AND EAST JAVA OPPORTUNITIES AHEAD By Junaidi Elvis President - CEO PT. Nusantara Energy Plant Indonesia
Transcript
Page 1: DEVELOPING AN LNG HUB IN WEST AND EAST JAVA OPPORTUNITIES ... ENERGY PLANT... · DEVELOPING AN LNG HUB IN WEST AND EAST JAVA OPPORTUNITIES AHEAD By Junaidi Elvis President - CEO PT.

DEVELOPING AN LNG HUB IN WEST AND EAST JAVAOPPORTUNITIES AHEAD

By

Junaidi ElvisPresident - CEO

PT. Nusantara Energy Plant Indonesia

Page 2: DEVELOPING AN LNG HUB IN WEST AND EAST JAVA OPPORTUNITIES ... ENERGY PLANT... · DEVELOPING AN LNG HUB IN WEST AND EAST JAVA OPPORTUNITIES AHEAD By Junaidi Elvis President - CEO PT.

NUSANTARA ENERGY RESOURCES (PTE) LTD (called NER) is acompany established and incorporated under the law of Singapore. NER is fullysupported by VITOL who is the largest energy trading company in the world. Theprincipal activities of NER is primarily engaged in the development of energybusinesses, including investment, construction and operation of liquefied naturalgas (“LNG”) floating storage and related infrastructure.

Through its subsidiary :

PT.Nusantara Energy Plant Indonesia (NEPI)Currently engaged in a development of LNG ImportInfrastructure project in Cilegon, Banten to supply gas toindustrial customers at Krakatau Industrial Estate Cilegon andSitubondo SRI, East Java.And also to build a Mini-Refinery located in Situbondo SRI, EastJava to produce Mogas and Avtur pursuant to fulfillment of localdemands.

PT.Nusantara Power Plant Indonesia (NPPI)Interested in participation in the field of power generationthrough the IPP (Independent Power Producer) Business.Synergies through expansion to inter-related business areexpected to provide products and services that support eachother effectively and will put NPPI in a strategic position to takeadvantage and the opportunity to grow in the energy sector inindonesia.

NEPI Overview

Page 3: DEVELOPING AN LNG HUB IN WEST AND EAST JAVA OPPORTUNITIES ... ENERGY PLANT... · DEVELOPING AN LNG HUB IN WEST AND EAST JAVA OPPORTUNITIES AHEAD By Junaidi Elvis President - CEO PT.

Natural Gas Field

Trading

LNG Transportation

LNG Receiving Terminal

Mini LNG Sea Transportation

LNG Land Transportation

Transmission/Distribution

Pipeline`Gas Off-Taker/

IPP

Mini LNG Receiving Terminal

TransportProductionReceiving Terminal

Mini Transport

Mini Receiving Terminal

Distribution Off-taker

Customers

NEPI’s scope of business consists of almost all area in the LNG value chain,including construction of Gas Off-Taker in the downstream (incollaboration with NPPI). This brings advantage to create economic scaleand competitive price among the market, or even create the market itselfthrough IPP project.

NEPI Scope of Business

Liquefaction

Transmission Pipeline

Page 4: DEVELOPING AN LNG HUB IN WEST AND EAST JAVA OPPORTUNITIES ... ENERGY PLANT... · DEVELOPING AN LNG HUB IN WEST AND EAST JAVA OPPORTUNITIES AHEAD By Junaidi Elvis President - CEO PT.

Gas

Mar

ket

Bal

ance

30923533 3521

2650

1366631

190

824

1656

1442

167

346

1098 1574 23923523

32613902

49485227

56465859

0

1000

2000

3000

4000

5000

6000

7000

2013 2015 2020 2025 2030 2035

Contracted & Committed CBM YTF LNG Gas Demand

LNG

Gas

Dem

and

by

Reg

ion

1704 20402664 2950

3430 37581048

1228

13711302

12061012

456

554

750836

892 964

3,261

3,902

4,9485,227

5,646 5,859

0

1000

2000

3000

4000

5000

6000

7000

2013 2015 2020 2025 2030 2035

Java Sumatra Kalimantan

Sulawesi Timor & Papua Total

Java Island is one of the biggest gas domesticmarket (64% of national gas market total) in 2013.The significant increase of gas market mostlycomes from manufacture industries and powerplants. It is predicted that after 2020, gasdomestic market will enter into LNG era.Currently, national growth assumption is 5%.

Based on future projection of gas demand, it isexpected that the utilization of gas will increasesteadily and, most likely, there will be changes ongas provision of such demand from conventionalpipe-gas to natural gas (ex-LNG). Such changes ingas provision is almost ascertain, considering thegas reserves which deliver conventional gasthrough pipeline to the destination of demandare depleting. Therefore, the provision of the gapfrom such depletion only can be fulfilled bynatural gas (ex-LNG), which has the flexibilityadvantage on its transportation.

Gas ex LNG Market Analysis

Page 5: DEVELOPING AN LNG HUB IN WEST AND EAST JAVA OPPORTUNITIES ... ENERGY PLANT... · DEVELOPING AN LNG HUB IN WEST AND EAST JAVA OPPORTUNITIES AHEAD By Junaidi Elvis President - CEO PT.

RUPTL (Electric Power Provision Plan)2015 – 2024

• From total of 35.000 MW, it has been identified that PowerPlants with total of 13,500 MW use gas as their main fuels.

Priority Industrial Zones and Exclusive Economic Zones

Smelter

Transportation Sector: Truck Hauling, Mining, Logistic & Shipping ¹

• In long-term and medium-term development plan year 2015 –2019, the Government prioritizes Area Development throughthe development of new economic centers particularlyoutside Java Island.

• From the total of 66 smelter companies, which has appliedto the Government for licenses, 25 companies are currentlyin the final stage of construction. 4 smelter companies arecurrently submitting their request for supply of gas to theGovernment.

• The potential market of LNG in transportation sector iscurrently prioritized to heavy goods vehicle, such as miningtruck, hauling truck and logistic transportation. Moreover, insea transportation sector, there are opportunity of potentialconversion for ferries and cargo vessels.

City Distribution Line

• Besides the provision of LNG for power plants, industrialzones, smelter and transportation, LNG supply is necessaryfor city distribution line, particularly in the reliability of gassupply.

2,600 MMscfd

2,350.38 MMscfd

2,525 MMscfd

55.2 MMscfd

N/A

Description Potential Gas Demand

Market Segmentation

Market Segmentation Analysis

Page 6: DEVELOPING AN LNG HUB IN WEST AND EAST JAVA OPPORTUNITIES ... ENERGY PLANT... · DEVELOPING AN LNG HUB IN WEST AND EAST JAVA OPPORTUNITIES AHEAD By Junaidi Elvis President - CEO PT.

Donggi SenoroTangguh

Bontang

Arun

FSRU Lampung

FSRU Jakarta

FSU NEPI – Hub II

Location : SitubondoStorage Capacity : TBARegas Capacity : TBASource of Supply : Domestic &

InternationalOff-Taker : Various consumers

FSU NEPI – Hub I

Location : CilegonStorage Capacity : 160,000 M3

Regas Capacity : 2x375 mmscfdSource of Supply : Domestic &

InternationalOff-Taker : Various consumers

LNG Liquefaction and Regasification Mapping in Indonesia

Page 7: DEVELOPING AN LNG HUB IN WEST AND EAST JAVA OPPORTUNITIES ... ENERGY PLANT... · DEVELOPING AN LNG HUB IN WEST AND EAST JAVA OPPORTUNITIES AHEAD By Junaidi Elvis President - CEO PT.

CILEGON/LAMPUNG

Hub – I

5 X 80 MW(PLTGU /

CCPP)

KDL CilegonKS Industrial

INDUSTRIAL USERS

25Years

CAPACITY

GAS DESIGNATION

LIFE TIME

PARTNER/CUSTOMER

2018

TARGET START-UP

LOCATION

Gas Requirement Minimun

375 mmscfd

Pilot project of NEPI, located in Cilegon will provide Gas ex-LNG for KrakatauDaya Listrik (power plant with 5 unit steam power @80 MW per unit) and 1 unitCCPP @60 MW. Supply of LNG derived from overseas (Import LNG). Allnecessary licenses have been obtained from the Ministry of Oil and Gas and theLNG Hub-1 project is expected to operate in 2018.Commercial scheme of LNG is conducted through the Floating Storage Unit(FSU) as its storage while the regasification is processed offshore. Natural Gas(ex-LNG) will be directly delivered to KDL facilities as its fuel, while the excesscapacity (if available) will be sold by land transportation (Pipeline or Trucking)with target market of Cilegon area or by small LNG ship with target market ofall Indonesian area.

NEPI Hub I - LNG Terminal Project Development Plan - Cilegon

Page 8: DEVELOPING AN LNG HUB IN WEST AND EAST JAVA OPPORTUNITIES ... ENERGY PLANT... · DEVELOPING AN LNG HUB IN WEST AND EAST JAVA OPPORTUNITIES AHEAD By Junaidi Elvis President - CEO PT.

PT Nusantara Energy Plant Indonesia (NEPI) aims to develop a new LNG Import Terminal inCilegon, Banten region. NEPI has secured a long term lease contract with Krakatau Daya Listrik(KDL) for the land utilization in KDL area in Cilegon, paving the way forward for the developmentof the LNG Import Terminal. The key components are currently foreseen: A Floating Storage Unit (FSU) A Jetty Structure, providing the berthing facility for the FSU and LNGC’s Regasification Plant A gas pipeline with tie-in to the existing gas networks operated by KDL Optional LNG Trucking loading

NEPI Hub I - LNG Receiving Terminal Block Diagram

Page 9: DEVELOPING AN LNG HUB IN WEST AND EAST JAVA OPPORTUNITIES ... ENERGY PLANT... · DEVELOPING AN LNG HUB IN WEST AND EAST JAVA OPPORTUNITIES AHEAD By Junaidi Elvis President - CEO PT.

Floating LNG Regasification is used to meet rising Natural Gas Demand

Total global LNG regasification capacity billion cubic feet per day

Benefits of a Floating Storage Unit (FSU) Safe & efficient Flexible and Cost effective Can be implemented within a year Potential short term temporary solution while permanent on shore facilities are constructed

Page 10: DEVELOPING AN LNG HUB IN WEST AND EAST JAVA OPPORTUNITIES ... ENERGY PLANT... · DEVELOPING AN LNG HUB IN WEST AND EAST JAVA OPPORTUNITIES AHEAD By Junaidi Elvis President - CEO PT.

10

LNG from FSU is delivered to offshorereviving terminal. Afterwards, such LNG willbe regasified and the natural gas (ex-LNG)will be delivered to the offtaker, in thismatter Krakatau Daya Listrik (KDL).Company has executed the MOU with KDL toprovide ex-LNG gas in certain areas and at acertain period of time.

Additional ex-LNG Gas is delivered by pipelineto industry customers in Cilegon area. Also NEPImay deliver such gas to other areas throughtolling or swap arrangements with gasdelivered through the pipeline network in WestJava Region.

Since the regasification process is conducted onshore, LNGmay also be transferred into ISO tank and, thereafter,transported to customers, which gas infrastructure is notavailable for.

NEPI Hub I – LNG Terminal Project Development Plan - Cilegon

Page 11: DEVELOPING AN LNG HUB IN WEST AND EAST JAVA OPPORTUNITIES ... ENERGY PLANT... · DEVELOPING AN LNG HUB IN WEST AND EAST JAVA OPPORTUNITIES AHEAD By Junaidi Elvis President - CEO PT.

NEPI LNG Hub I Terminal Cilegon–General Layout

Page 12: DEVELOPING AN LNG HUB IN WEST AND EAST JAVA OPPORTUNITIES ... ENERGY PLANT... · DEVELOPING AN LNG HUB IN WEST AND EAST JAVA OPPORTUNITIES AHEAD By Junaidi Elvis President - CEO PT.

AMDALFeasibility

Study

Hydrooceanography& Metocean

Survey

Pre Construction

1

2License & Permitting

NEPI Hub I –LNG Terminal Cilegon–Forward Plan

LNG COMMERCIAL – FSU + REGAS

LNG FSU + REGAS

CONSTRUCTION

Commercial 3 OFFTAKE DISCUSSIONS

BINDING TOLLING &

FINANCE AGREEMENTS

DESIGN & BUILD/ EPC CONTRACT

Ready for Construction

2017

Special Purpose

Port (TUKS)

Current

Current

CurrentSIGN MOUs

WITH OFFTAKERS &

DEVELOP FINANCE

STRUCTURE

Page 13: DEVELOPING AN LNG HUB IN WEST AND EAST JAVA OPPORTUNITIES ... ENERGY PLANT... · DEVELOPING AN LNG HUB IN WEST AND EAST JAVA OPPORTUNITIES AHEAD By Junaidi Elvis President - CEO PT.

13

Situbondo (SEIP)

Hub - II

IPP

SRI

INDUSTRIAL USERS

25Years

CAPACITY

GAS DESIGNATION

LIFE TIME

PARTNER

2019 / 2020

TARGET START-UP

LOCATION

Gas Requirement

TBA

The Second Project of NEPI is NEPI Hub-II which will provide Natural Gas to satisfyIPP or Industrial demand.Commercial scheme of NEPI LNG Hub-II is conducted through the FloatingStorage Unit (FSU) as its storage while the regasification is processedoffshore. Natural Gas (ex-LNG) will be directly delivered to industrialfacilities as its fuel, while the excess capacity (if available) will be sold byland transportation (Pipeline or Trucking) with target market of East Javaand other area in East Indonesia by small LNG ship with target market ofEast Indonesia.

NEPI Hub II – LNG Terminal Project Development Plan - Situbondo

Page 14: DEVELOPING AN LNG HUB IN WEST AND EAST JAVA OPPORTUNITIES ... ENERGY PLANT... · DEVELOPING AN LNG HUB IN WEST AND EAST JAVA OPPORTUNITIES AHEAD By Junaidi Elvis President - CEO PT.

Block Diagram –NEPI Hub II Project Development Plan –SEIP Situbondo

Page 15: DEVELOPING AN LNG HUB IN WEST AND EAST JAVA OPPORTUNITIES ... ENERGY PLANT... · DEVELOPING AN LNG HUB IN WEST AND EAST JAVA OPPORTUNITIES AHEAD By Junaidi Elvis President - CEO PT.

AMDALFeasibility

Study

Hydrooceanography& Metocean

Survey

Pre Construction 1

2License & Permitting

NEPI Hub II –LNG Terminal Situbondo –Forward Plan

LNG COMMERCIAL – FSU + REGAS

LNG FSU + REGAS

CONSTRUCTION

Commercial 3 OFFTAKE DISCUSSIONS

BINDING TOLLING &

FINANCE AGREEMENTS

DESIGN & BUILD/ EPC CONTRACT

Ready for Construction

2019

Special Purpose

Port (TUKS)

Current

Current

CurrentSIGN MOUs

WITH OFFTAKERS &

DEVELOP FINANCE

STRUCTURE

Page 16: DEVELOPING AN LNG HUB IN WEST AND EAST JAVA OPPORTUNITIES ... ENERGY PLANT... · DEVELOPING AN LNG HUB IN WEST AND EAST JAVA OPPORTUNITIES AHEAD By Junaidi Elvis President - CEO PT.

Condensate Processing

LPG Refrigerated &

Oil Tanks

Regasification & Gas CCPP

LNG Jetty Terminal &

FSU

LPG & Oil Jetty Terminal

Master Plan – NEPI Hub II Project Development PlanSEIP Situbondo

Page 17: DEVELOPING AN LNG HUB IN WEST AND EAST JAVA OPPORTUNITIES ... ENERGY PLANT... · DEVELOPING AN LNG HUB IN WEST AND EAST JAVA OPPORTUNITIES AHEAD By Junaidi Elvis President - CEO PT.
Page 18: DEVELOPING AN LNG HUB IN WEST AND EAST JAVA OPPORTUNITIES ... ENERGY PLANT... · DEVELOPING AN LNG HUB IN WEST AND EAST JAVA OPPORTUNITIES AHEAD By Junaidi Elvis President - CEO PT.

Thank You


Recommended