Performance-Based Contracting
Performance-based contractininvolves structuring all aspects of
an acquisition around the purposeof the work to be performed asopposed to either the manner by
or a broad and imprecise statement
25 Sep 2005 M Keeney 2
.
8/8/2019 Developing Performance Based Work Statements [Compatibility Mode]
3/17
What vs. How
Lower costs
Solution is the responsibility on the
25 Sep 2005 M Keeney 3
8/8/2019 Developing Performance Based Work Statements [Compatibility Mode]
4/17
A formal written description of your
minimum requirements to be performedy a con rac or
e eart o your procurement
25 Sep 2005 M Keeney 4
8/8/2019 Developing Performance Based Work Statements [Compatibility Mode]
5/17
Why is a Clear and Concise
Establishes a baseline for proposal evaluation
Reduces evaluation and negotiation time
Minimizes need for future changes
25 Sep 2005 M Keeney 5
8/8/2019 Developing Performance Based Work Statements [Compatibility Mode]
6/17
Many Documents Are BasedOn The SOW
SOW
NAFI QA REPORTINGPLAN
EVALUATION CRITERIASECTION (M)
INSTRUCTION FORPROPOSAL PREPARATION
SECTION (L)
25 Sep 2005 M Keeney 6
8/8/2019 Developing Performance Based Work Statements [Compatibility Mode]
7/17
STATEMENT OF WORKPROCESS OVERVIEW
The following is a summary of the recommended process steps forpreparing a Statement of Work SOW :
. . .,objective of your procurement)
2. List the tasks to be performed ( i.e., All performance requirements
you intend the contractor to satisfy, all requirements that the
3. Group similar and related tasks.4. Organize the tasks in logical sequence5. Identify the input ( Required resources to perform the tasks)
6. Identify the output ( Required results or deliverables )7. Identify the timeline or frequency of the deliverables (output)
8. Develop the parameters for acceptable quality and performance
25 Sep 2005 M Keeney 7
8/8/2019 Developing Performance Based Work Statements [Compatibility Mode]
8/17
Step 1
ESTABLISH A PRELIMINARY SCOPESTATEMENT THAT:
Identifies the objective or purpose of the procurement
Description of work to be performed
Define the magnitude of work to be performed
Defines the boundaries of performance andresponsibilities
25 Sep 2005 M Keeney 8
8/8/2019 Developing Performance Based Work Statements [Compatibility Mode]
9/17
Step 2
List task to be performed that will:
Accomplish the objective of the SOW
Focus of what not how the contractor will erform
25 Sep 2005 M Keeney 9
8/8/2019 Developing Performance Based Work Statements [Compatibility Mode]
10/17
Step 3
Group similar and related task
sub-tasks
through this
25 Sep 2005 M Keeney 10
8/8/2019 Developing Performance Based Work Statements [Compatibility Mode]
11/17
8/8/2019 Developing Performance Based Work Statements [Compatibility Mode]
12/17
Step 5
Identify the required resources for eachtask in ut
May be labor, equipment and material
Identify any operating restrictions or
25 Sep 2005 M Keeney 12
8/8/2019 Developing Performance Based Work Statements [Compatibility Mode]
13/17
Step 6
Identify required results and ordeliverables (output)Meetings
Reports Provides information to develop
oversight plan
Contractor responsible for the work(input to output)
25 Sep 2005 M Keeney 13
8/8/2019 Developing Performance Based Work Statements [Compatibility Mode]
14/17
Step 7
Identify the frequency and timeline ofdeliverables
Assists in
Method of surveillance
Cost estimate
25 Sep 2005 M Keeney 14
8/8/2019 Developing Performance Based Work Statements [Compatibility Mode]
15/17
Step 8
Develop performance standard or acceptancecriteria expressed in Qualit
Quantity
Time
Appearance
ou nc u e e emen s suc as a , w en,where, how many times
Should be appropriate for the contract and
Necessary Realistic
Objective and measurable
25 Sep 2005 M Keeney 15
8/8/2019 Developing Performance Based Work Statements [Compatibility Mode]
16/17
Step 9
Determine how you will monitor the deliverables Must be appropriate for the contract
Cost effective
Methods include: Random sampling
Periodic inspection
Review of progress milestons
Reports by contractor
25 Sep 2005 M Keeney 16
8/8/2019 Developing Performance Based Work Statements [Compatibility Mode]
17/17
Conclusion
Lastly, the key factor in the success ofe er ormance ase on rac s e