+ All Categories
Home > Documents > DEVELOPMENT CONTRIBUTIONS PLAN - Amazon Web Services · 2016-08-08 · PART FIVE . Part 5 provides...

DEVELOPMENT CONTRIBUTIONS PLAN - Amazon Web Services · 2016-08-08 · PART FIVE . Part 5 provides...

Date post: 09-Jul-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
11
SNEYDES PARADE PRINCES FREEWAY PRINCES FREEWAY Hospital University of Melbourne Proposed State Primary School (P-6) Suzanne Cory School Wyndh Sporti Compl Victoria University HOPPERS LANE HOPPERS LANE PRINCES HIGHWAY Heritage Area East Werribee Town Centre Loca Town Centr Local Town Centre DUNNINGS ROAD LAKESIDE AVENUE EAST WERRIBEE EMPLOYMENT PRECINCT DEVELOPMENT CONTRIBUTIONS PLAN NOVEMBER 2012 | Draft for Consultation
Transcript
Page 1: DEVELOPMENT CONTRIBUTIONS PLAN - Amazon Web Services · 2016-08-08 · PART FIVE . Part 5 provides further information on projects, including cost estimate breakdowns. PART FOUR Part

SNEYDES PARADE

PRINCES FREEWAY

PRINCES FREEWAY

MAL

TBY

BYPA

SS

MAL

TBY

BYPA

SS

MercyHospital

Universityof Melbourne

ProposedState PrimarySchool(P-6)

ProposedState School(P-9)

PotentialNon-Gov.PrimarySchool

SuzanneCory School

WERRIBEECITYCENTRE

HoppersCrossing

WERRIBEE PLAZA

MelbourneWaterPumpingStation

WyndhamSportingComplex

VictoriaUniversity

SNEYDES ROAD

SNEYDES ROAD

WATTLE AVENUE

DUNNINGS ROAD

DER

RIM

UT

ROAD

MO

RRIS

RO

AD

HEATHS ROAD

HO

PPERS LAN

E

HO

PPERS LAN

E

HACKETTS RO

AD

PRINCES HIGHWAY

HeritageAreaEast WerribeeTown Centre

LocalTown

Centre

LocalTown

Centre

Hoppers CrossingTown CentreTransition

LocalTown

Centre

POINT COOKWEST PSP

DUNNINGS ROAD

LAKESIDE AVENUE

precinct areaurban growth boundarytown centre

commercial precincthealth and learning precinctinterchange business precinctenterprise precinctmedium/high density residential

conventional density residentialschool

community facilitiesopen space (see details plan 7)heritage

permanent waterfreeway & interchangeprimary arterial roadsecondary arterial road boulevard connector streetconnector streetaccess street (indicative location)reserve for potential future grade separation of arterial road

rail line & stationproposed stationshared pedestrian/cycle bridgeeasement

utilities

future urban structure1:15,000 @ A3

800600

400200

0

1,000

V121123 EAST WERRIBEE EMPLOYMENT PRECINCT

DEVELOPMENT CONTRIBUTIONS PLANNOVEMBER 2012 | Draft for Consultation

Page 2: DEVELOPMENT CONTRIBUTIONS PLAN - Amazon Web Services · 2016-08-08 · PART FIVE . Part 5 provides further information on projects, including cost estimate breakdowns. PART FOUR Part

Please Note:

All identified projects have been included in this draft DCP. Where

detailed cost estimates are not yet available, construction cost

estimates are based on recent projects of a similar nature. Some

amounts will be adjusted on the basis of finalised cost estimates and

feedback from agencies.

Page 3: DEVELOPMENT CONTRIBUTIONS PLAN - Amazon Web Services · 2016-08-08 · PART FIVE . Part 5 provides further information on projects, including cost estimate breakdowns. PART FOUR Part

Contents

1. Introduction .............................................................................................................................. 1

1.1. Report Structure ................................................................................................................ 1

1.2. Strategic Basis .................................................................................................................... 2

1.3. Planning and Environment Act 1987 ................................................................................... 2

1.4. Strategic Planning for East Werribee Employment Precinct ................................................ 4

1.5. East Werribee Employment Precinct Structure Plan ........................................................... 4

1.6. The Area to Which the Development Contributions Plan Applies ........................................ 6

2. Infrastructure Project Justification ............................................................................................. 7

2.1. Items Not Included in the Development Contributions Plan ............................................... 7

2.2. Infrastructure Projects ..................................................................................................... 10

2.2.1. Transport Projects .................................................................................................... 10

2.2.2. Recreation & Community Centre Projects ................................................................. 17

2.3. Project Timing .................................................................................................................. 17

2.4. Distinction between Development and Community Infrastructure ................................... 17

3. Calculation of Contributions .................................................................................................... 19

3.1. Calculation of Net Developable Area and Demand Units .................................................. 19

3.1.1. Net Developable Area ............................................................................................... 19

3.1.2. Land Budget and Demand Units................................................................................ 21

3.2. Calculations of Contributions Charges .............................................................................. 21

3.2.1. Calculation of Costs .................................................................................................. 21

3.2.2. Road Construction and Intersection Works ............................................................... 21

3.2.3. Interim and Temporary works .................................................................................. 22

3.2.4. Valuation of Land ..................................................................................................... 22

3.3. Cost Apportionment ......................................................................................................... 22

3.3.1. Main Catchment Areas ............................................................................................. 23

3.3.2. Charge Areas ............................................................................................................ 23

3.3.3. Non-Government Schools ......................................................................................... 23

3.3.4. Total Contributions Payable by MCA and Development Type .................................... 23

3.3.5. Schedule of Costs ..................................................................................................... 24

3.3.6. Summary of Charges per Hectare ............................................................................. 24

4. Development Contributions Plan Administration ..................................................................... 34

Page 4: DEVELOPMENT CONTRIBUTIONS PLAN - Amazon Web Services · 2016-08-08 · PART FIVE . Part 5 provides further information on projects, including cost estimate breakdowns. PART FOUR Part

4.1. Payment of Contribution Levies and Payment Timing ....................................................... 34

4.1.1. Development Infrastructure ..................................................................................... 34

4.1.2. Community Infrastructure Levy ................................................................................ 35

4.1.3. Works in Kind ........................................................................................................... 35

4.1.4. Credit for Over Provision .......................................................................................... 36

4.1.5. Non Government Schools ......................................................................................... 36

4.2. Funds Administration ....................................................................................................... 37

4.3. Construction and Land Value Costs Indexation ................................................................. 37

4.4. Development Contributions Plan Review Period ............................................................... 38

4.5. Collecting Agency (Agency Responsible for Collecting Infrastructure Levy) ....................... 38

4.6. Development Agency (Agency Responsible for Works) ..................................................... 38

5. Implementation Strategy ......................................................................................................... 39

5.1. Rationale for the Implementation Strategy....................................................................... 39

5.2. Implementation Mechanism ............................................................................................ 39

6. Other Information ................................................................................................................... 40

6.1. Acronyms ......................................................................................................................... 40

6.2. Glossary ........................................................................................................................... 41

7. Appendices .............................................................................................................................. 45

7.1. Appendix 1 – Property Specific Land Budget ..................................................................... 45

7.2. Appendix 2 – Road Project Cost Sheets............................................................................. 47

7.3. Appendix 3 – Indicative Intersection Designs .................................................................... 48

Page 5: DEVELOPMENT CONTRIBUTIONS PLAN - Amazon Web Services · 2016-08-08 · PART FIVE . Part 5 provides further information on projects, including cost estimate breakdowns. PART FOUR Part

List of Plans

Plan 1 Development Contributions Plan Area

Plan 2 Charge Areas

Plan 3 Road Projects

Plan 4 Intersection Projects

Plan 5 Shared Trail, Bridge & Stormwater Management Projects

List of Tables

Table 1 Charge Areas ......................................................................................................................... 6

Table 2 Road Projects ...................................................................................................................... 10

Table 3 Intersection Projects ........................................................................................................... 13

Table 4 Shared Trail Projects............................................................................................................ 15

Table 5 Bridge & Culvert Projects..................................................................................................... 15

Table 6 Stormwater Management Projects ...................................................................................... 16

Table 7 Community Infrastructure Levy Projects .............................................................................. 18

Table 8 Summary Land Use Budget .................................................................................................. 20

Table 9 Calculation of Costs ............................................................................................................. 25

Table 10 Summary of Charges ......................................................................................................... 31

Page 6: DEVELOPMENT CONTRIBUTIONS PLAN - Amazon Web Services · 2016-08-08 · PART FIVE . Part 5 provides further information on projects, including cost estimate breakdowns. PART FOUR Part

East Werribee Employment Precinct Development Contributions Plan - Draft for Exhibition Nov 2012 Page 1

1. Introduction

The East Werribee Employment Precinct Development Contributions Plan (the ‘DCP’) has been

prepared by the Growth Areas Authority with the assistance of the Wyndham City Council, service

authorities and major stakeholders.

The East Werribee Employment Precinct DCP:

Outlines projects required to ensure that future workers, visitors and residents in the area

can be provided with timely access to infrastructure and services necessary to support a

quality and affordable lifestyle.

Establishes a framework for development proponents to make a financial contribution

towards the cost of the identified infrastructure projects. It ensures that the cost of

providing new infrastructure and services is shared equitably between various development

proponents and the wider community.

Provides the details of the calculation of financial contributions that must be made by future

developments towards the nominated projects. In this way, it provides developers,

investors and local communities with certainty about development contributions

requirements and how these will be administered.

1.1. Report Structure

This document comprises five parts:

PART FIVE

Part 5 provides further information on projects, including cost estimate breakdowns.

PART FOUR

Part 4 provides other supporting information.

PART THREE

Part 3 focuses on administration and implementation of the Development Contributions Plan

PART TWO

Part 2 sets out how the development contributions are calculated and costs apportioned.

PART ONE Part 1 clearly explains the strategic basis for the Development Contributions Plan, which includes

information about the East Werribee Employment Precinct Structure Plan and justification for the various infrastructure projects included in the Development Contributions Plan.

Page 7: DEVELOPMENT CONTRIBUTIONS PLAN - Amazon Web Services · 2016-08-08 · PART FIVE . Part 5 provides further information on projects, including cost estimate breakdowns. PART FOUR Part

East Werribee Employment Precinct Development Contributions Plan - Draft for Exhibition Nov 2012 Page 2

1.2. Strategic Basis

The strategic basis for the DCP is established by the State and Local Planning Policy Framework of

the Wyndham Planning Scheme. Key documents are:

the Growth Corridor Plans

the Municipal Strategic Statement

the East Werribee Employment Precinct Structure Plan

the Point Cook West Precinct Structure Plan

the Point Cook West Development Contributions Plan

the Precinct Structure Plan supporting documents.

These documents set out a broad, long term vision for the sustainable development of the East

Werribee Employment Precinct DCP area and its surrounds.

The Growth Area Framework Plans (which are incorporated into the Victoria Planning Provisions)

and the published Growth Corridor Plans illustrate the planned extent of residential, employment

and other development as well as the location of larger activity centres for each growth area. They

also include key elements of infrastructure and services such as the regional open space network,

the location of public transport networks, freeways and arterial roads.

1.3. Planning and Environment Act 1987

This DCP has been prepared in accordance with Part 3B of the Planning and Environment Act 1987

(the Act) as well as other relevant legislation and has been developed in line with the State and Local

Planning Policy Framework of the Wyndham Planning Scheme. This DCP is consistent with the

Minister for Planning’s Direction on Development Contributions made under section 46M(1) of the

Act and has had regard to the Victorian Government’s Development Contributions Guidelines (the

‘DCP Guidelines’).

The DCP provides for the charging of a Development Infrastructure Levy pursuant to section 46J(a)

of the Act towards works, services and facilities. It also provides for the charging of a Community

Infrastructure Levy pursuant to section 46J(b) of the Act as some items are classified as community

infrastructure by reference to the Act, the Minister’s Direction on Development Contributions and

the DCP guidelines.

This DCP forms part of the Wyndham Planning Scheme pursuant to section 46I of the Act and is an

incorporated document under Clause 81 of the Wyndham Planning Scheme.

The DCP is implemented in the Wyndham Planning Scheme through Schedule 12 to the

Development Contributions Plan Overlay which applies to the area shown in Plan 1.

Page 8: DEVELOPMENT CONTRIBUTIONS PLAN - Amazon Web Services · 2016-08-08 · PART FIVE . Part 5 provides further information on projects, including cost estimate breakdowns. PART FOUR Part

SNEYDES PARADE

PRINCES FREEWAY

PRINCES FREEWAY

MAL

TBY

BYPA

SS

MAL

TBY

BYPA

SS

MercyHospital

Universityof

Melbourne

ProposedState

PrimarySchool

(P-6)

ProposedState

School(P-9)

PotentialNon-Gov.PrimarySchool

SuzanneCory School

WERRIBEECITY

CENTRE

HoppersCrossing

WERRIBEE PLAZA

MelbourneWater

PumpingStation

WyndhamSportingComplex

VictoriaUniversity

SNEYDES ROADSNEYDES ROAD

WATTLE AVENUE

DUNNINGS ROAD

DER

RIM

UT

ROAD

MO

RRIS

RO

AD

HEATHS ROAD

HO

PPERS LAN

EH

OPPERS LA

NE

HACKETTS RO

AD

PRINCES HIGHWAY

HeritageArea East Werribee

Town Centre

LocalTown

Centre

LocalTown

Centre

Hoppers CrossingTown Centre

Transition

LocalTown

Centre

POINT COOKWEST PSP

DUNNINGS ROAD

LAKESIDE AVENUE

precinct area

urban growth boundary

town centre

commercial precinct

health and learning precinct

interchange business precinct

enterprise precinct

medium/high density residential

conventional density residential

school

community facilities

open space (see details plan 7)

heritage

permanent water

freeway & interchange

primary arterial road

secondary arterial road

boulevard connector street

connector street

access street (indicative location)

reserve for potential future grade separation of arterial road

rail line & station

proposed station

shared pedestrian/cycle bridge

easement

utilities

future urban structure1:15,000 @ A3

8006004002000 1,000

V121123

plan 1

Page 9: DEVELOPMENT CONTRIBUTIONS PLAN - Amazon Web Services · 2016-08-08 · PART FIVE . Part 5 provides further information on projects, including cost estimate breakdowns. PART FOUR Part

East Werribee Employment Precinct Development Contributions Plan - Draft for Exhibition Nov 2012 Page 4

1.4. Strategic Planning for East Werribee Employment Precinct

The East Werribee Employment Precinct is located to the east of the Werribee City Centre. The East

Werribee Precinct Structure Plan area is expected to provide opportunities for approximately 51,000

new jobs and 7,000 new dwellings.

The East Werribee Employment Precinct Structure Plan establishes the future urban structure of the

new employment and residential community which includes a range of networks including transport,

town centres, a diverse range of places for employment and residential neighbourhoods.

The need for the infrastructure has been determined according to the anticipated development

scenario for East Werribee as described in the East Werribee Employment Precinct Structure Plan.

The Development Contributions Plan has a strong relationship to the East Werribee Precinct

Structure Plan, as the East Werribee Precinct Structure Plan provides the rationale and justification

for infrastructure items that have been included within the Development Contributions Plan.

Accordingly, the Development Contributions Plan is an implementation based planning tool which

identifies the infrastructure items required by the new community and apportions the cost of this

infrastructure in an equitable manner across the plan area.

1.5. East Werribee Employment Precinct Structure Plan

The East Werribee Employment PSP sets out the vision for how land should be developed, illustrates

the future urban structure and describes the objectives to be achieved by the future development.

The PSP also outlines projects required to ensure that future workers, visitors and residents within

the area are provided with timely access to services and transport infrastructure necessary to

support a quality business environment and affordable lifestyle.

The PSP enables urban development and the future urban structure of the new community is

depicted through a number of networks, including employment, housing, transport, open space,

stormwater management, town centres and social infrastructure.

Page 10: DEVELOPMENT CONTRIBUTIONS PLAN - Amazon Web Services · 2016-08-08 · PART FIVE . Part 5 provides further information on projects, including cost estimate breakdowns. PART FOUR Part

SNEYDES PARADE

PRINCES FREEWAY

PRINCES FREEWAY

MAL

TBY

BYPA

SS

MAL

TBY

BYPA

SS

MercyHospital

Universityof

Melbourne

ProposedState

PrimarySchool

(P-6)

ProposedState

School(P-9)

PotentialNon-Gov.PrimarySchool

SuzanneCory School

WERRIBEECITY

CENTRE

HoppersCrossing

WERRIBEE PLAZA

MelbourneWater

PumpingStation

WyndhamSportingComplex

VictoriaUniversity

SNEYDES ROADSNEYDES ROAD

WATTLE AVENUE

DUNNINGS ROAD

DER

RIM

UT

ROAD

MO

RRIS

RO

AD

HEATHS ROAD

HO

PPERS LAN

EH

OPPERS LA

NE

HACKETTS RO

AD

PRINCES HIGHWAY

HeritageArea East Werribee

Town Centre

LocalTown

Centre

LocalTown

Centre

Hoppers CrossingTown Centre

Transition

LocalTown

Centre

POINT COOKWEST PSP

DUNNINGS ROAD

LAKESIDE AVENUE

charge areasplan 2

1:15,000 @ A3

8006004002000 1,000

V121123

area where DCP is not payable

44

55 55

11

33

22

Page 11: DEVELOPMENT CONTRIBUTIONS PLAN - Amazon Web Services · 2016-08-08 · PART FIVE . Part 5 provides further information on projects, including cost estimate breakdowns. PART FOUR Part

East Werribee Employment Precinct Development Contributions Plan - Draft for Exhibition Nov 2012 Page 6

1.6. The Area to Which the Development Contributions Plan Applies

In accordance with section 46K(1)(a) of the Planning and Environment Act 1987 the East Werribee

Employment Precinct DCP applies to land shown in Plan 1. The area is also shown on Development

Contributions Plan Overlay Schedule 12 in the Wyndham Planning Scheme.

The East Werribee Employment Precinct DCP applies to approximately 775 hectares of land which is

divided into five charge areas as shown in Plan 2.

Table 1 Charge Areas

Charge Area Description Net Developable Area (ha)

1 Town Centre & Surrounds 106.7

2 Health and Learning 69.0

3 Enterprise & Interchange Business 57.5

4 Enterprise (GAIC) 53.6

5 Point Cook South West & Wattle Ave New Communities 147.2

Total

434.0

The East Werribee Employment Precinct Structure Plan clearly demonstrates that the future urban

structure has been designed as an integrated whole. The five charge areas also define the Main

Catchment Area (‘MCA’) for the various infrastructure projects. The MCA is the geographic area

from which a given item of infrastructure will draw most of its use.

These charge areas include a number of existing uses that are expected to remain in the long-term

(shown on Plan 2). Where these uses are excluded from the Net Developable Area in table 8, no

DCP contribution will be payable.

In selecting items, consideration has been given to ensure they are not already wholly funded

through another contribution mechanism, such as a mandatory infrastructure construction

requirement of the East Werribee Employment PSP, an existing local development contributions

plan, an agreement under Section 173 of the Act or as a condition on an existing planning permit.

Identified overlap in funding has been addressed, for example by adjusting other relevant

development contributions plans or other suitable means provided for in the Planning and

Environment Act.


Recommended