Development projects · Name: Construction of a section of the Vladivostok-Nakhodka highway to the...

Date post: 28-Jun-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
16
Development projects OJSC Nash Dom - Primorye CJSC Alexander House (Sand Star) CJSC Alexander House (Technopark in Troitsa Bay) DALTA-Vostok-1 LLC Sumotori Machinery Group Photo Description Name: Development of Integrated entertainment zone Primorye General developer: OJSC Nash Dom - Primorye Time frame: 20122022 Cost: USD 2,2 billion www.iezprimorye.com www.primdevelop.ru Name: Construction of Bolshoi Vladivostok (Sand Star), a new town General developer: CJSC Alexander House Time frame: 20122020 Cost: USD 28,8 billion
Transcript
Page 1: Development projects · Name: Construction of a section of the Vladivostok-Nakhodka highway to the all-inclusive Primorye Entertainment Zone, and construction of a section of highway

Development projects

OJSC Nash Dom - Primorye

CJSC Alexander House (Sand Star)

CJSC Alexander House (Technopark in Troitsa Bay)

DALTA-Vostok-1 LLC

Sumotori Machinery Group

Photo Description

Name: Development of Integrated entertainment zone Primorye

General developer: OJSC Nash Dom - Primorye

Time frame: 2012—2022

Cost: USD 2,2 billion

www.iezprimorye.com

www.primdevelop.ru

Name: Construction of Bolshoi Vladivostok (Sand Star), a new town

General developer: CJSC Alexander House

Time frame: 2012—2020

Cost: USD 28,8 billion

Page 2: Development projects · Name: Construction of a section of the Vladivostok-Nakhodka highway to the all-inclusive Primorye Entertainment Zone, and construction of a section of highway

Name: Development of Technopark in Troitsa Bay

General developer: CJSC Alexander House

Time frame: 2012—2016

Cost: USD 4,4 billion

Photo Description

Name: Construction of Solnechnaya Dolina, a new region

Page 3: Development projects · Name: Construction of a section of the Vladivostok-Nakhodka highway to the all-inclusive Primorye Entertainment Zone, and construction of a section of highway

General developer: DALTA-Vostok-1 LLC

Time frame: 2011—2018

Cost: USD 716 million

www.dalta.ru

Photo Description

Name: Constcuction of PrimRing, advanced MotorSport and Leisure Facility

General developer: Sumotori Machinery Group

Time frame: 2011—2016

Cost: USD 227 million

www.sumotori.ru

www.primring.info

Page 4: Development projects · Name: Construction of a section of the Vladivostok-Nakhodka highway to the all-inclusive Primorye Entertainment Zone, and construction of a section of highway

Industrial complex

Sollers - Far East LLC

JSC DCSS

JSC Sazykin Progress Arsenyev Aviation Company

Photo Description

Name: Development of Far East Industrial automobile technology park

Organizer: Sollers - Far East LLC

Startup date: December 29, 2009

Cost: USD 60 million

www.sollers-auto.com

Page 5: Development projects · Name: Construction of a section of the Vladivostok-Nakhodka highway to the all-inclusive Primorye Entertainment Zone, and construction of a section of highway

Photo Description

Name: Construction of Zvezda Shipbuilding Complex

Organizer: JSC DCSS

Time frame: 2012—2019

Cost: RUB 111 billion

www.dcss.ru

Page 6: Development projects · Name: Construction of a section of the Vladivostok-Nakhodka highway to the all-inclusive Primorye Entertainment Zone, and construction of a section of highway

Photo Description

Name: commercial use of KA-62 helicopters for offshore and other types of passenger

transportation

Organizer: JSC Sazykin Progress Arsenyev Aviation Company

Time frame: 2011—2014

Cost: USD 300 million

www.kamov.ru

Page 7: Development projects · Name: Construction of a section of the Vladivostok-Nakhodka highway to the all-inclusive Primorye Entertainment Zone, and construction of a section of highway

Petrogaschemicals and energy

Rosneft

JSC RAO ES of East

JSC RAO ES of East

CJSC Natsionalnaya Khimicheskaya Gruppa

OJSC Gazprom

Photo Description

Name: Construction of a petrochemical industrial complex

Organizer: Rosneft

Time frame: 2011—2017

Cost: USD 5 billion

www.rosneft.ru

Page 8: Development projects · Name: Construction of a section of the Vladivostok-Nakhodka highway to the all-inclusive Primorye Entertainment Zone, and construction of a section of highway

Description

Name: Construction of the Ussuriysk CHPP Organizer: JSC RAO ES of East Time frame: 2012—2016 Cost: to be determined

www.rao-esv.ru

Description

— Meeting the growing demand for energy and addressing the current capacity deficit in the south

of Primorskiy Territory;

— Increasing reliability and efficiency of the energy system of the south of Primorskiy Territory;

— Lifting the «high risk region» status, making sure the reliability criterion (N-1) is met.

Page 9: Development projects · Name: Construction of a section of the Vladivostok-Nakhodka highway to the all-inclusive Primorye Entertainment Zone, and construction of a section of highway

Photo Description

Name: Construction of the Vostochnaya CHPP (GTU-CHPP on the CSWB site)

Organizer: JSC RAO ES of East

Time frame: 2011—2014

Cost: USD 330 million

www.rao-esv.ru

Description

Name: Construction of gas chemicals plant Organizer: CJSC Natsionalnaya Khimicheskaya Gruppa Time frame: 2012—2017 Cost: to be determined

Page 10: Development projects · Name: Construction of a section of the Vladivostok-Nakhodka highway to the all-inclusive Primorye Entertainment Zone, and construction of a section of highway

Description

The purposes of construction are: to ensure an increasing of Gross Regional Product

of Primorskiy Territory through the issue of a gas chemistry products on domestic and foreign

markets, to achieve a geopolitical gain of the Russia’s position in the region through access

of a gas chemistry products of Asia Pacific to the different markets.

Description

Name: Construction of gas liquefaction plant

Organizer: OJSC Gazprom

www.gazprom.ru

Description

JSC Gazprom intends to build a gas liquefaction plant near Vladivostok to supply LNG for Asia-

Pacific. It’s projected production capacity will be not less than 10 mln tn/year.

Transport and Logistics

Berkut Management Company LLC Berkut Management Company LLC DALTA-Vostok-1 LLC Aqua-Resources Group CJSC Alexander House JSC United grain company, Summa Group

Description

Name: Construction of a grain and container handling complex in Slavyanka Bay Organizer: Berkut Management Company LLC Time frame: 2014—2020 Cost: USD 80 million Projekt: Construction of a grain and container handling complex in Slavyanka Bay

www.mmpt.ru

Description

The purpose of the project: to lead Russia to a new level of the grain trade on the major

international markets, to establish a foreign trade between Russia and the Asia-Pacific region

through the Far East and thus a great potential of the ports of the Far East realize. The developed

Page 11: Development projects · Name: Construction of a section of the Vladivostok-Nakhodka highway to the all-inclusive Primorye Entertainment Zone, and construction of a section of highway

project it’s a system which is intended for the reception of grain cargoes from rail transport, for

short-term storage in a warehouse, and if it’s necessary — for drying and shipping by sea.

Mechanization on the terminal will be implemented using pipelined equipment and stationary

rotary ship-loaders of conveyor type. On the territory of the complex will be located the silo-

warehouse which is the optimal storage for grain cultures.

Description

Name: Construction of a coal handling terminal in Slavyanka Organizer: Berkut Management Company LLC Time frame: 2013—2015 Cost: USD 164 million

www.mmpt.ru

Description

The purpose of the project: to build in two phases the port terminal for bulk cargo, with

productive capacity from 2.5 (on the first stage) to 8.5 million tonnes (on the second stage). The

main difference of this one terminal is that its services targeted at all coal exporters, and that

it will not monopolized by large mining companies of Russia.

Photo

Name: Construction of a section of the Vladivostok-Nakhodka highway to the all-

inclusive Primorye Entertainment Zone, and construction of a section of highway from

the international airport to Primorye Entertainment Zone.

Organizer: DALTA-Vostok-1 LLC

Time frame: 2013—2016

Cost: USD 469 million

www.dalta.ru

Page 12: Development projects · Name: Construction of a section of the Vladivostok-Nakhodka highway to the all-inclusive Primorye Entertainment Zone, and construction of a section of highway

-

Photo Description

Name: Modernization of the intermodal Astafiev Terminal (reloading of bulked cargo)

Organizer: Aqua-Resources Group

Time frame: 2012—2015

Cost: USD 72 million

www.terminal-astafyeva.ru

Page 13: Development projects · Name: Construction of a section of the Vladivostok-Nakhodka highway to the all-inclusive Primorye Entertainment Zone, and construction of a section of highway

Photo Description

Name: Development of the Troitsa International Transshipment Complex

Organizer: CJSC Alexander House

Time frame: 2012—2015

Cost: USD 937,5 million

Page 14: Development projects · Name: Construction of a section of the Vladivostok-Nakhodka highway to the all-inclusive Primorye Entertainment Zone, and construction of a section of highway

Description

Name: Far East Grain Terminal Construction Organizer: JSC United grain company, Summa Group Time frame: 2012—2017 Cost: USD 230 million

www.oaoozk.com www.summagroup.ru

Page 15: Development projects · Name: Construction of a section of the Vladivostok-Nakhodka highway to the all-inclusive Primorye Entertainment Zone, and construction of a section of highway

Description

Taking into account the increased production of Siberia and the Russian Far East and the

dynamic rate of growth of demand in the Asia Pacific markets exports of Russian origin cereals

to the area are forecasted to exceed 10 million tons per annum by 2020. The commissioning

of the Far Eastern Grain Terminal will bring much needed modern handling capability to the

Russian Far East that will facilitate the commodity flows to meet the growing demand of the

countries and markets in the region

Agricultural complex

Zelyenie Listya Group

Photo Description

Name: Development of the Zelyenie Listya innovative agricultural complex

Organizer: Zelyenie Listya Group

Time frame: 2012—2015

Cost: USD 118 million

www.zlhk.ru

Page 16: Development projects · Name: Construction of a section of the Vladivostok-Nakhodka highway to the all-inclusive Primorye Entertainment Zone, and construction of a section of highway