Sr. No. Description of Work Amount (Rs.)
1 Construction Cost
Total Rs.
Add 5% for PST
Total Bid Amount (In Figures)
Total Bid Amount (In Words)
GRAND SUMMARY
LAHORE DEVELOPMENT AUTHORITY
LDA CITY HOUSING SCHEME, FEROZPUR ROAD, LAHORE
DEVELOPMENT OF INFRASTRUCTURE IN LDA CITY, LAHORE
Construction of Bridge at Butcher Khana Distributory at Chenab Road LDA City, Lahore
Estimated Cost (Rs. - Million) = 74.917
Sr.
No.Description of Items Quantity
Unit Of
Rate
Rate
(Rs.)Amount
1
Construction of cast in place reinforced cement concrete
piles 760mm dia (30" Dia) with concrete (4000 PSI
Cylinder strength) Excluding Steel Reinforcement as per
drawings and specifications
2700.00 Rft
2
Excavation in foundation of building, bridges and other
structures, including dagbelling, dressing, refilling around
structure with excavated earth, watering and ramming
lead upto one chain (30 m) and lift upto 5 ft. (1.5 m) in
Ordinary Soil
7392.00 1000Cft
3
Cement concrete plain including placing, compacting,
finishing and curing complete (including screening and
washing of stone aggregate) Ratio 1:3:6
462.00 cft
4
Reinforced cement concrete in slab of rafts / strip
foundation, base slab of column and retaining walls; etc
and other structural members other than those not
requiring form work (i.e horizontal shuttering) complete in
All respect. 4000 psi cylindrical strength
7392.00 cft
5
Reinforced cement concrete in roof slab, beams,columns
lintels, girders and other structural members laid in situ
or precast laid in position, or prestressed members cast
in situ, complete in all respects:-4000 psi cylindrical
strength
26185.44 cft
6
Fabrication of mild steel reinforcement bar cage for
R.C.C. bored piles, including cutting, bending, laying in
position,welding and fastening, including cost of binding
wire and labour charges for binding of steel
reinforcement (also includes removal of rust from the
bars):- Deformed Bars
74576.16 kg
7
Fabrication of mild steel reinforcement for cement
concrete, inclouding cutting, bending wire and labour
charges for bibdibg of steel reinforcement (also
incloudes removal of rust from bars G-60
198036.66 kg
8
Lifting, transporting and placing precast prestressed
concrete B eam, Girder and other members (excluding
battens) etc. in to Position on the bridge to correct
alignment and level, etc. complete
15378.00 100Cft
9Providing and laying bituminous tack coat, using 10 lbs.
of bitumen per 100 Sft6600.00 100Sft
10
Asphaltic Wearing Course 2" thick - Providing and laying
plant premixed bituminous carpet at project site
,including compaction and finishing to required camber,
grade and density with 4.5% Bitumen.
6600.00 100Sft
11
Pavement marking in Thermoplastic paint for lines of
15cm wide. 1.5 mm thick with glass beads as per NHA
Specs.
165.64 Rft
12
Manufactured trade mark expansion joints for bridges
movement , upto 50mm (European make), complete in
all respects
264.00 Rft
13Supplying and Filling Local sand including watering,
Compaction complete in all respect.2112.00 100Cft
DEVELOPMENT OF INFRASTRUCTURE IN LDA CITY, LAHORE
Total:
Construction of Bridge at Butcher Khana Distributory at Chenab Road LDA City, Lahore
ABSTRACT OF COST
Sr. No. Description of Work Amount (Rs.)
1 Construction Cost
Total
Add 5% for PST
Total Bid Amount (In Figures)
Total Bid Amount (In Words)
Estimated Cost (Rs. - Million) = 36.999
LAHORE DEVELOPMENT AUTHORITY
LDA CITY HOUSING SCHEME, FEROZPUR ROAD, LAHORE
DEVELOPMENT OF INFRASTRUCTURE WORK IN LDA CITY,
LAHORE
GRAND SUMMARY
REHABLITATION AND IMPROVEMENT OF ENTRY POINTS OF JINNAH SECTOR
LDA CITY , LAHORE
Page 1 of 1
Sr.
No.Description of Items
Rate
(Rs.)
Amount
(Rs.)
1 Dismantling of road metling i/c its removal from site 9,180.00 100 Cft
2Dismantling of road pavement etc i/c screening, stacking
of byproduct upto one chain lead 30 m27,000.00 100 Cft
3 Dismantling of RCC i/c its removal from site 800.00 100 Cft
4 Dismantling of Brick Masonary 600.00 100 Cft
5
Cement concrete plain including placing, compacting,
finishing and curing complete (including screening and
washing of stone aggregate) Ratio 1:3:6
480.00 100 Cft
6
Reinforced cement concrete in roof slab, beams,columns
lintels, girders and other structural members laid in situ
or precast laid in position, or prestressed members cast
in situ, complete in all respects: Type B (nominal mix 1:
1½: 3)
2,099.20 1 Cft
7
Reinforced cement concrete in slab of rafts / strip
foundation, base slab of column and retaining walls; etc
and other structural members other than those
mentioned in 6 above not requiring form work (i.e
horizontal shuttering) complete in All respect. Type B
(nominal mix 1: 1½: 3)
787.20 1 Cft
8
Fabrication of mild steel reinforcement for cement
concrete, including cutting, bending wire and labour
charges for bibdibg of steel reinforcement (also
incloudes removal of rust from bars G-60
9,167.33 100 Kgs
9 Excavations & Removal of Malba 41,540.00 1000 Cft
10Supplying and Filling Local sand including watering,
Compaction complete in all respect.30,820.00 100 Cft
11 Reuse of existing material as a sub base 18,900.00 100 Cft
12
Providing and laying sub-base course of crushed stone
product of approved quality and grade at project site ,
including placing, mixing,spreading and compaction of
sub-base material to required depth, camber, grade to
achieve 100%maximum modified AASHO dry density
24,921.90 100 Cft
13
Providing and laying Base course WBM (Sikhanwali) at
project site of crushed stone product of approved
quality and grade, including placing, mixing,spreading
and compaction of base material to required depth,
camber, grade to achieve 100%maximum modified
AASHO dry density
41,994.00 100 Cft
14 P/F of road edging, complete in all respects 2,150.00 1 Rft
DEVELOPMENT OF INFRASTRUCTURE WORK IN LDA CITY, LAHORE
REHABLITATION AND IMPROVEMENT OF ENTRY POINTS OF JINNAH SECTOR
LDA CITY , LAHORE
ABSTRACT OF COST
Unit of
RateQuantity
Sr.
No.Description of Items
Rate
(Rs.)
Amount
(Rs.)
DEVELOPMENT OF INFRASTRUCTURE WORK IN LDA CITY, LAHORE
REHABLITATION AND IMPROVEMENT OF ENTRY POINTS OF JINNAH SECTOR
LDA CITY , LAHORE
ABSTRACT OF COST
Unit of
RateQuantity
15
Providing and laying bituminous priming coat, using 10
lbs. kerosene oil and 10 lbs. binder per 100 Sft. or 0.5 Kg
kerosene and 0.5 Kg binder per square metre.
61,200.00 100 Sft
16Providing and laying bituminous tack coat, using 10 lbs.
of bitumen per 100 Sft19,160.00 100 Sft
17
Asphaltic Base Course 3" thick - Providing and laying
plant premixed bituminous carpet at project site
,including compaction and finishing to required camber,
grade and density with 3.5% Bitumen.
18,200.00 100 Sft
18
Asphaltic Wearing Course 2" thick - Providing and laying
plant premixed bituminous carpet at project site
,including compaction and finishing to required camber,
grade and density with 4.5% Bitumen.
62,160.00 100 Sft
19P/F Kerb Stones Type-1 (K-5) (Size: 12"x18"x6")
including painting with CR Paint.8,190.00 1 Rft
20C.R paint on old kerb stone including brushing and
scraping complete in al respects44,800.00 1 Sft
21
Pavement marking in Thermoplastic paint for lines of
15cm wide. 1.5 mm thick with glass beads as per NHA
Specs.
50,400.00 1 Rft
22
Providing & Fixing low profile single side reflective Cat
Eyes as approved by The Engineer Incharge complete in
all respect.
2,640.00 1 Each
23
P/F TRAFFIC SIGNS CATEGORY III (REGULATORY &
INFORMATORY SIGNS) COMPLETE IN ALL
RESPECTS
4.00 1 Each
24
P/F TRAFFIC SIGNS CATEGORY I & II (REGULATORY
AND WARNING SIGNS) COMPLETE IN ALL
RESPECTS
4.00 1 Each
25
Providing and laying 80mm Tuff pavers (50% Grey / 50%
Coloured), having 7000 PSI, crushing strength of
approved manufacturer, over 2" to 3" sand cushion i/c
grouting with sand in joints i/c finishing to required slope,
complete in all respect.
8,000.00 1 Sft
26 Raising of Manhole 5.00 1 Each
27Providing & Installation of cantilever Gantry as per
drawing & specification, complete in all respects2.00 1 Each
28Providing and fixing G.I. pipe railing, as per standard
drawing150.00 1 Rft
29P/F Planters Ornamental and painting as per directions
of Engineer In Charge. Complete In all respects.5.00 1 Each
30Re-Fixing of Exisiting Kerb Stones, complete in all
respects6,000.00 1 Rft
Total Cost