Sr. No. Description of Work Amount (Rs.) 1 Construction Cost Total Rs. Add 5% for PST Total Bid Amount (In Figures) Total Bid Amount (In Words) GRAND SUMMARY LAHORE DEVELOPMENT AUTHORITY LDA CITY HOUSING SCHEME, FEROZPUR ROAD, LAHORE DEVELOPMENT OF INFRASTRUCTURE IN LDA CITY, LAHORE Construction of Bridge at Butcher Khana Distributory at Chenab Road LDA City, Lahore Estimated Cost (Rs. - Million) = 74.917
Transcript
Page 1: DEVELOPMENT OF INFRASTRUCTURE IN LDA CITY, …...Sr. No. Description of Work Amount (Rs.) 1 Construction Cost Total Rs. Add 5% for PST Total Bid Amount (In Figures) Total Bid Amount

Sr. No. Description of Work Amount (Rs.)

1 Construction Cost

Total Rs.

Add 5% for PST

Total Bid Amount (In Figures)

Total Bid Amount (In Words)

GRAND SUMMARY

LAHORE DEVELOPMENT AUTHORITY

LDA CITY HOUSING SCHEME, FEROZPUR ROAD, LAHORE

DEVELOPMENT OF INFRASTRUCTURE IN LDA CITY, LAHORE

Construction of Bridge at Butcher Khana Distributory at Chenab Road LDA City, Lahore

Estimated Cost (Rs. - Million) = 74.917

Page 2: DEVELOPMENT OF INFRASTRUCTURE IN LDA CITY, …...Sr. No. Description of Work Amount (Rs.) 1 Construction Cost Total Rs. Add 5% for PST Total Bid Amount (In Figures) Total Bid Amount

Sr.

No.Description of Items Quantity

Unit Of

Rate

Rate

(Rs.)Amount

1

Construction of cast in place reinforced cement concrete

piles 760mm dia (30" Dia) with concrete (4000 PSI

Cylinder strength) Excluding Steel Reinforcement as per

drawings and specifications

2700.00 Rft

2

Excavation in foundation of building, bridges and other

structures, including dagbelling, dressing, refilling around

structure with excavated earth, watering and ramming

lead upto one chain (30 m) and lift upto 5 ft. (1.5 m) in

Ordinary Soil

7392.00 1000Cft

3

Cement concrete plain including placing, compacting,

finishing and curing complete (including screening and

washing of stone aggregate) Ratio 1:3:6

462.00 cft

4

Reinforced cement concrete in slab of rafts / strip

foundation, base slab of column and retaining walls; etc

and other structural members other than those not

requiring form work (i.e horizontal shuttering) complete in

All respect. 4000 psi cylindrical strength

7392.00 cft

5

Reinforced cement concrete in roof slab, beams,columns

lintels, girders and other structural members laid in situ

or precast laid in position, or prestressed members cast

in situ, complete in all respects:-4000 psi cylindrical

strength

26185.44 cft

6

Fabrication of mild steel reinforcement bar cage for

R.C.C. bored piles, including cutting, bending, laying in

position,welding and fastening, including cost of binding

wire and labour charges for binding of steel

reinforcement (also includes removal of rust from the

bars):- Deformed Bars

74576.16 kg

7

Fabrication of mild steel reinforcement for cement

concrete, inclouding cutting, bending wire and labour

charges for bibdibg of steel reinforcement (also

incloudes removal of rust from bars G-60

198036.66 kg

8

Lifting, transporting and placing precast prestressed

concrete B eam, Girder and other members (excluding

battens) etc. in to Position on the bridge to correct

alignment and level, etc. complete

15378.00 100Cft

9Providing and laying bituminous tack coat, using 10 lbs.

of bitumen per 100 Sft6600.00 100Sft

10

Asphaltic Wearing Course 2" thick - Providing and laying

plant premixed bituminous carpet at project site

,including compaction and finishing to required camber,

grade and density with 4.5% Bitumen.

6600.00 100Sft

11

Pavement marking in Thermoplastic paint for lines of

15cm wide. 1.5 mm thick with glass beads as per NHA

Specs.

165.64 Rft

12

Manufactured trade mark expansion joints for bridges

movement , upto 50mm (European make), complete in

all respects

264.00 Rft

13Supplying and Filling Local sand including watering,

Compaction complete in all respect.2112.00 100Cft

DEVELOPMENT OF INFRASTRUCTURE IN LDA CITY, LAHORE

Total:

Construction of Bridge at Butcher Khana Distributory at Chenab Road LDA City, Lahore

ABSTRACT OF COST

Page 3: DEVELOPMENT OF INFRASTRUCTURE IN LDA CITY, …...Sr. No. Description of Work Amount (Rs.) 1 Construction Cost Total Rs. Add 5% for PST Total Bid Amount (In Figures) Total Bid Amount

Sr. No. Description of Work Amount (Rs.)

1 Construction Cost

Total

Add 5% for PST

Total Bid Amount (In Figures)

Total Bid Amount (In Words)

Estimated Cost (Rs. - Million) = 36.999

LAHORE DEVELOPMENT AUTHORITY

LDA CITY HOUSING SCHEME, FEROZPUR ROAD, LAHORE

DEVELOPMENT OF INFRASTRUCTURE WORK IN LDA CITY,

LAHORE

GRAND SUMMARY

REHABLITATION AND IMPROVEMENT OF ENTRY POINTS OF JINNAH SECTOR

LDA CITY , LAHORE

Page 1 of 1

Page 4: DEVELOPMENT OF INFRASTRUCTURE IN LDA CITY, …...Sr. No. Description of Work Amount (Rs.) 1 Construction Cost Total Rs. Add 5% for PST Total Bid Amount (In Figures) Total Bid Amount

Sr.

No.Description of Items

Rate

(Rs.)

Amount

(Rs.)

1 Dismantling of road metling i/c its removal from site 9,180.00 100 Cft

2Dismantling of road pavement etc i/c screening, stacking

of byproduct upto one chain lead 30 m27,000.00 100 Cft

3 Dismantling of RCC i/c its removal from site 800.00 100 Cft

4 Dismantling of Brick Masonary 600.00 100 Cft

5

Cement concrete plain including placing, compacting,

finishing and curing complete (including screening and

washing of stone aggregate) Ratio 1:3:6

480.00 100 Cft

6

Reinforced cement concrete in roof slab, beams,columns

lintels, girders and other structural members laid in situ

or precast laid in position, or prestressed members cast

in situ, complete in all respects: Type B (nominal mix 1:

1½: 3)

2,099.20 1 Cft

7

Reinforced cement concrete in slab of rafts / strip

foundation, base slab of column and retaining walls; etc

and other structural members other than those

mentioned in 6 above not requiring form work (i.e

horizontal shuttering) complete in All respect. Type B

(nominal mix 1: 1½: 3)

787.20 1 Cft

8

Fabrication of mild steel reinforcement for cement

concrete, including cutting, bending wire and labour

charges for bibdibg of steel reinforcement (also

incloudes removal of rust from bars G-60

9,167.33 100 Kgs

9 Excavations & Removal of Malba 41,540.00 1000 Cft

10Supplying and Filling Local sand including watering,

Compaction complete in all respect.30,820.00 100 Cft

11 Reuse of existing material as a sub base 18,900.00 100 Cft

12

Providing and laying sub-base course of crushed stone

product of approved quality and grade at project site ,

including placing, mixing,spreading and compaction of

sub-base material to required depth, camber, grade to

achieve 100%maximum modified AASHO dry density

24,921.90 100 Cft

13

Providing and laying Base course WBM (Sikhanwali) at

project site of crushed stone product of approved

quality and grade, including placing, mixing,spreading

and compaction of base material to required depth,

camber, grade to achieve 100%maximum modified

AASHO dry density

41,994.00 100 Cft

14 P/F of road edging, complete in all respects 2,150.00 1 Rft

DEVELOPMENT OF INFRASTRUCTURE WORK IN LDA CITY, LAHORE

REHABLITATION AND IMPROVEMENT OF ENTRY POINTS OF JINNAH SECTOR

LDA CITY , LAHORE

ABSTRACT OF COST

Unit of

RateQuantity

Page 5: DEVELOPMENT OF INFRASTRUCTURE IN LDA CITY, …...Sr. No. Description of Work Amount (Rs.) 1 Construction Cost Total Rs. Add 5% for PST Total Bid Amount (In Figures) Total Bid Amount

Sr.

No.Description of Items

Rate

(Rs.)

Amount

(Rs.)

DEVELOPMENT OF INFRASTRUCTURE WORK IN LDA CITY, LAHORE

REHABLITATION AND IMPROVEMENT OF ENTRY POINTS OF JINNAH SECTOR

LDA CITY , LAHORE

ABSTRACT OF COST

Unit of

RateQuantity

15

Providing and laying bituminous priming coat, using 10

lbs. kerosene oil and 10 lbs. binder per 100 Sft. or 0.5 Kg

kerosene and 0.5 Kg binder per square metre.

61,200.00 100 Sft

16Providing and laying bituminous tack coat, using 10 lbs.

of bitumen per 100 Sft19,160.00 100 Sft

17

Asphaltic Base Course 3" thick - Providing and laying

plant premixed bituminous carpet at project site

,including compaction and finishing to required camber,

grade and density with 3.5% Bitumen.

18,200.00 100 Sft

18

Asphaltic Wearing Course 2" thick - Providing and laying

plant premixed bituminous carpet at project site

,including compaction and finishing to required camber,

grade and density with 4.5% Bitumen.

62,160.00 100 Sft

19P/F Kerb Stones Type-1 (K-5) (Size: 12"x18"x6")

including painting with CR Paint.8,190.00 1 Rft

20C.R paint on old kerb stone including brushing and

scraping complete in al respects44,800.00 1 Sft

21

Pavement marking in Thermoplastic paint for lines of

15cm wide. 1.5 mm thick with glass beads as per NHA

Specs.

50,400.00 1 Rft

22

Providing & Fixing low profile single side reflective Cat

Eyes as approved by The Engineer Incharge complete in

all respect.

2,640.00 1 Each

23

P/F TRAFFIC SIGNS CATEGORY III (REGULATORY &

INFORMATORY SIGNS) COMPLETE IN ALL

RESPECTS

4.00 1 Each

24

P/F TRAFFIC SIGNS CATEGORY I & II (REGULATORY

AND WARNING SIGNS) COMPLETE IN ALL

RESPECTS

4.00 1 Each

25

Providing and laying 80mm Tuff pavers (50% Grey / 50%

Coloured), having 7000 PSI, crushing strength of

approved manufacturer, over 2" to 3" sand cushion i/c

grouting with sand in joints i/c finishing to required slope,

complete in all respect.

8,000.00 1 Sft

26 Raising of Manhole 5.00 1 Each

27Providing & Installation of cantilever Gantry as per

drawing & specification, complete in all respects2.00 1 Each

28Providing and fixing G.I. pipe railing, as per standard

drawing150.00 1 Rft

29P/F Planters Ornamental and painting as per directions

of Engineer In Charge. Complete In all respects.5.00 1 Each

30Re-Fixing of Exisiting Kerb Stones, complete in all

respects6,000.00 1 Rft

Total Cost


Recommended