+ All Categories
Home > Documents > Development on the Move Stamford Downtown Building...

Development on the Move Stamford Downtown Building...

Date post: 27-Jul-2020
Category:
Upload: others
View: 2 times
Download: 0 times
Share this document with a friend
15
Development on the Move Stamford Downtown Building Inventory: 1996-2021 Fall 2019
Transcript
Page 1: Development on the Move Stamford Downtown Building ...stamford-downtown.com/wp-content/uploads/2019/10/... · 2001 Park Square West: Phase 1 - 101 Summer Street 143 A 2002 Archstone-

Development on the MoveStamford Downtown Building Inventory:

1996-2021

Fall 2019

Page 2: Development on the Move Stamford Downtown Building ...stamford-downtown.com/wp-content/uploads/2019/10/... · 2001 Park Square West: Phase 1 - 101 Summer Street 143 A 2002 Archstone-

Stamford Downtown Residential Inventory

At a Glance (Pre-1996 – 2020)

Recently Completed 2017-18Units

UConn Stamford Dormitories 116

Atlantic Station (Phase 1) 325

Vela on the Park 209

Residence Inn by Marriott (extended stay) 156

New Inventory Totals: 806

Under Construction 2018-20Units

The Smyth 414

URBY Stamford 648

36 Atlantic Street 20

Atlantic Station (Phase 2) 325

UC Inventory Totals: 1,407

Note: Within a 1 mile radius of Stamford Downtown

Year Apartments & Condominiums Basis as of 1996

1997 -2018

FacilityBuilt Within a ¼ mile radius of Stamford Downtown

Pre-1996 1,968 A +C1990 The Classic - 25 Forest Street 144 C1986 Canterbury Green - 201 Broad Street 106 C1986 The Wescott - 1450 Washington Boulevard 280 A1989 The Biltmore - 127 Greyrock Place 161 A+C1996 Parc Grove - 200 Broad Street 401 A+C1999 Stamford Corners - 1455 Washington Boulevard 195 A+C2001 Park Square West: Phase 1 - 101 Summer Street 143 A2002 Archstone- Bedford & North 160 A2001 AVA Stamford - 50 Forest 306 A2001 Village at Stamford - 500 Bedford Street 160 A2005 Mill River House - 35 West Broad Street 92 A2006 Adams Mill River House- 25 Adams 60 C2006 Metropolitan - 1515 Summer Street 51 A2009 Glenview House - 25 Glenbrook Road 142 A2008 Eastside Commons - 840 East Main Street 108 C2009 100 Prospect Street 94 A2008 11 Forest Street 16 A2009 Trump Parc - 7 Broad Street 166 A+C2011 The Blvd. - 1201 Washington Boulevard 94 A

2012 Highgrove - 70 Forest Street 92 A

N/A 65 Prospect 127 AN/A 77 Prospect 143 AN/A Hoyt Bedford - 112 Hoyt Street 352 AN/A Morgan Manor - 83-95 Morgan Street 243 A2013 Parallel 41 - 1340 Washington Boulevard 124 A2013 The Moderne – 163 Franklin Street 58 A2014 75 Tresser – 75 Tresser Boulevard 344 A2014 The Verano – 750 Summer Street 58 A2015 66 Summer – 66 Summer Street 209 A2016 Summer House – 184 Summer Street 226 A2016 Element One – 111 Morgan Street 175 A2016 Bedford Hall - 545 Bedford Street 82 A2017 UConn Stamford Dormitories 116 A2018 Atlantic Station – 355 Atlantic Street 325 A2018 Vela on the Park - 1011 Washington Boulevard 209 A

SUBTOTALS: 2,659 5,071Cumulative Total: 7,730

Source: Stamford Downtown A: apartments C: condos

Planned With Land Use Approvals 2019-21Units

True North 212

1 Atlantic Street 77

733-777 Summer Street 376

Planned Inventory Totals 665

Page 3: Development on the Move Stamford Downtown Building ...stamford-downtown.com/wp-content/uploads/2019/10/... · 2001 Park Square West: Phase 1 - 101 Summer Street 143 A 2002 Archstone-

Stamford Downtown Development Overview

2013-2021

Residential Units Completed 2013-2018 1,926 residential units

Hotel Units Completed 2018-2019 156 extended stay hotel rooms

Residential Units Under Construction 2018-2020 1,407 residential units

Residential Units Planned Land Use Approvals 2019-2021 665 residential units

Total Units 4,154 residential & hotel units

Page 4: Development on the Move Stamford Downtown Building ...stamford-downtown.com/wp-content/uploads/2019/10/... · 2001 Park Square West: Phase 1 - 101 Summer Street 143 A 2002 Archstone-

Residential Apartments Opened 2013-2018

Parallel 41 124 residential units

The Moderne 58 residential units

75 Tresser 344 residential units

The Verano 58 residential units

66 Summer 209 residential units

Summer House 226 residential units

Element One 175 residential units

Bedford Hall 82 residential units

UConn Stamford Dormitories 116 residential units

Atlantic Station (Phase 1) 325 residential units

Vela on the Park 209 residential units

Total: 1,926 residential units

Page 5: Development on the Move Stamford Downtown Building ...stamford-downtown.com/wp-content/uploads/2019/10/... · 2001 Park Square West: Phase 1 - 101 Summer Street 143 A 2002 Archstone-

Recently Completed

UConn Stamford Dormitories900 Washington Boulevard

116 student apartments

Residence Inn by Marriott25 Atlantic Street

156 extended stay hotel rooms

UC Funds

Page 6: Development on the Move Stamford Downtown Building ...stamford-downtown.com/wp-content/uploads/2019/10/... · 2001 Park Square West: Phase 1 - 101 Summer Street 143 A 2002 Archstone-

Atlantic Station (Phase 1)355 Atlantic Street

25-story tower housing 325 apartments and 15,985+ sf of retail and restaurants

RXR/Cappelli Atlantic Station Owners, LLC.

Recently Completed

Vela on the Park1011 Washington Boulevard

209 residential units

and 3,669 sf of ground floor retail space

Trinity Financial/Berkshire Communities

Page 7: Development on the Move Stamford Downtown Building ...stamford-downtown.com/wp-content/uploads/2019/10/... · 2001 Park Square West: Phase 1 - 101 Summer Street 143 A 2002 Archstone-

Apartments & Hotel UnitsUnder Construction

2019-2021

URBY Stamford 648 residential units

The Smyth 414 residential units

36 Atlantic Street 20 residential units

Atlantic Station (Phase 2) 325 residential units

Total: 1,407 units

Page 8: Development on the Move Stamford Downtown Building ...stamford-downtown.com/wp-content/uploads/2019/10/... · 2001 Park Square West: Phase 1 - 101 Summer Street 143 A 2002 Archstone-

URBY Stamford57 Greyrock Place

648 residential units and 5,100 sf. ft. retail

Ironstate Development Co./Brookfield Property Group

Estimated Completion: Late 2019

Under Construction

Page 9: Development on the Move Stamford Downtown Building ...stamford-downtown.com/wp-content/uploads/2019/10/... · 2001 Park Square West: Phase 1 - 101 Summer Street 143 A 2002 Archstone-

The Smyth885 Washington Blvd.

414 residential units and 19,333 sq. ft. retail

LMC, A Lennar Company

Estimated Completion: 2020

Under Construction

Page 10: Development on the Move Stamford Downtown Building ...stamford-downtown.com/wp-content/uploads/2019/10/... · 2001 Park Square West: Phase 1 - 101 Summer Street 143 A 2002 Archstone-

36 Atlantic Street36 Atlantic Street

20 residential units

36 Atlantic Street, LLC.

Under Construction

Page 11: Development on the Move Stamford Downtown Building ...stamford-downtown.com/wp-content/uploads/2019/10/... · 2001 Park Square West: Phase 1 - 101 Summer Street 143 A 2002 Archstone-

Atlantic Station (Phase 2)421 Atlantic Street

25-story tower housing 325 apartments and 14,100 sf of retail

RXR/Cappelli Atlantic Station Owners, LLC.

Under Construction

Page 12: Development on the Move Stamford Downtown Building ...stamford-downtown.com/wp-content/uploads/2019/10/... · 2001 Park Square West: Phase 1 - 101 Summer Street 143 A 2002 Archstone-

Apartments Planned WithLand Use Approvals

2019-2021

True North 212 residential units

1 Atlantic Street 77 residential units

733-777 Summer Street 376 residential units

Total: 665 residential units

Page 13: Development on the Move Stamford Downtown Building ...stamford-downtown.com/wp-content/uploads/2019/10/... · 2001 Park Square West: Phase 1 - 101 Summer Street 143 A 2002 Archstone-

True North245 Atlantic St.

212 residential units, 5 stories, 2 levels of parking

True North Stamford, LLC.

Apartments Planned WithLand Use Approvals

Page 14: Development on the Move Stamford Downtown Building ...stamford-downtown.com/wp-content/uploads/2019/10/... · 2001 Park Square West: Phase 1 - 101 Summer Street 143 A 2002 Archstone-

Apartments Planned WithLand Use Approvals

1 Atlantic Street1 Atlantic Street

Convert existing commercial to 77 residential units and ground floor retail

SH Atlantic LLC

Page 15: Development on the Move Stamford Downtown Building ...stamford-downtown.com/wp-content/uploads/2019/10/... · 2001 Park Square West: Phase 1 - 101 Summer Street 143 A 2002 Archstone-

Apartments Planned WithLand Use Approvals

733-777 Summer Street733-777 Atlantic Street

376 residential units

Summer Street Property, LLC


Recommended