Copyright of SHELL UK LTD PROVING CONTAINMENT FOR CCS IN GOLDENEYE DEVEX, Aberdeen, 15 May, 2013 Cliff Lovelock Senior Production Geologist, Shell U.K. Ltd 1
Transcript
Page 1: DEVEX 2013 Proving containment for CCS in Goldeneye · Lista Fm Maureen Fm Ekofisk Fm Tor Fm Mackerel Fm Herring Fm Hidra Fm Plenus Marl Mbr Rødby Fm Heather Fm Kimm. Cl. Fm Valhall/Wick

Copyright of SHELL UK LTD

PROVING CONTAINMENT FOR CCS IN GOLDENEYE

DEVEX, Aberdeen,

15 May, 2013

Cliff Lovelock

Senior Production Geologist, Shell U.K. Ltd

1

Page 2: DEVEX 2013 Proving containment for CCS in Goldeneye · Lista Fm Maureen Fm Ekofisk Fm Tor Fm Mackerel Fm Herring Fm Hidra Fm Plenus Marl Mbr Rødby Fm Heather Fm Kimm. Cl. Fm Valhall/Wick

Copyright of SHELL UK LTD

DEFINITIONS AND CAUTIONARY NOTE

The companies in which Royal Dutch Shell plc directly and indirectly owns investments are separate entities. In this presentation “Shell”, “Shell group” and “Royal Dutch Shell” are sometimes used for convenience where references are made to Royal Dutch Shell plc and its subsidiaries in general. Likewise, the words “we”, “us” and “our” are also used to refer to subsidiaries in general or to those who work for them. These expressions are also used where no useful purpose is served by identifying the particular company or companies. ‘‘Subsidiaries’’, “Shell subsidiaries” and “Shell companies” as used in this presentation refer to companies over which Royal Dutch Shell plc either directly or indirectly has control. Companies over which Shell has joint control are generally referred to “joint ventures” and companies over which Shell has significant influence but neither control nor joint control are referred to as “associates”. In this presentation, joint ventures and associates may also be referred to as “equity-accounted investments”. The term “Shell interest” is used for convenience to indicate the direct and/or indirect (for example, through our 23% shareholding in Woodside Petroleum Ltd.) ownership interest held by Shell in a venture, partnership or company, after exclusion of all third-party interest.

This presentation contains forward-looking statements concerning the financial condition, results of operations and businesses of Royal Dutch Shell. All statements other than statements of historical fact are, or may be deemed to be, forward-looking statements. Forward-looking statements are statements of future expectations that are based on management’s current expectations and assumptions and involve known and unknown risks and uncertainties that could cause actual results, performance or events to differ materially from those expressed or implied in these statements. Forward-looking statements include, among other things, statements concerning the potential exposure of Royal Dutch Shell to market risks and statements expressing management’s expectations, beliefs, estimates, forecasts, projections and assumptions. These forward-looking statements are identified by their use of terms and phrases such as ‘‘anticipate’’, ‘‘believe’’, ‘‘could’’, ‘‘estimate’’, ‘‘expect’’, ‘‘goals’’, ‘‘intend’’, ‘‘may’’, ‘‘objectives’’, ‘‘outlook’’, ‘‘plan’’, ‘‘probably’’, ‘‘project’’, ‘‘risks’’, “schedule”, ‘‘seek’’, ‘‘should’’, ‘‘target’’, ‘‘will’’ and similar terms and phrases. There are a number of factors that could affect the future operations of Royal Dutch Shell and could cause those results to differ materially from those expressed in the forward-looking statements included in this presentation, including (without limitation): (a) price fluctuations in crude oil and natural gas; (b) changes in demand for Shell’s products; (c) currency fluctuations; (d) drilling and production results; (e) reserves estimates; (f) loss of market share and industry competition; (g) environmental and physical risks; (h) risks associated with the identification of suitable potential acquisition properties and targets, and successful negotiation and completion of such transactions; (i) the risk of doing business in developing countries and countries subject to international sanctions; (j) legislative, fiscal and regulatory developments including regulatory measures addressing climate change; (k) economic and financial market conditions in various countries and regions; (l) political risks, including the risks of expropriation and renegotiation of the terms of contracts with governmental entities, delays or advancements in the approval of projects and delays in the reimbursement for shared costs; and (m) changes in trading conditions. All forward-looking statements contained in this presentation are expressly qualified in their entirety by the cautionary statements contained or referred to in this section. Readers should not place undue reliance on forward-looking statements. Additional risk factors that may affect future results are contained in Royal Dutch Shell’s 20-F for the year ended December 31, 2012 (available at www.shell.com/investor and www.sec.gov ). These risk factors also expressly qualify all forward looking statements contained in this presentation and should be considered by the reader. Each forward-looking statement speaks only as of the date of this presentation, May 15, 2013. Neither Royal Dutch Shell plc nor any of its subsidiaries undertake any obligation to publicly update or revise any forward-looking statement as a result of new information, future events or other information. In light of these risks, results could differ materially from those stated, implied or inferred from the forward-looking statements contained in this presentation.

We may have used certain terms, such as resources, in this presentation that United States Securities and Exchange Commission (SEC) strictly prohibits us from including in our filings with the SEC. U.S. Investors are urged to consider closely the disclosure in our Form 20-F, File No 1-32575, available on the SEC website www.sec.gov. You can also obtain these forms from the SEC by calling 1-800-SEC-0330.

Page 3: DEVEX 2013 Proving containment for CCS in Goldeneye · Lista Fm Maureen Fm Ekofisk Fm Tor Fm Mackerel Fm Herring Fm Hidra Fm Plenus Marl Mbr Rødby Fm Heather Fm Kimm. Cl. Fm Valhall/Wick

Copyright of SHELL UK LTD

AGENDA

� Brief outline of the Longannet CCS project

� How much containment do we need?

�Cap-rock

�Overburden

�Beyond?

� Some other considerations

� Conclusions

3

Page 4: DEVEX 2013 Proving containment for CCS in Goldeneye · Lista Fm Maureen Fm Ekofisk Fm Tor Fm Mackerel Fm Herring Fm Hidra Fm Plenus Marl Mbr Rødby Fm Heather Fm Kimm. Cl. Fm Valhall/Wick

Copyright of SHELL UK LTD

CO2 piped to St Fergus Gas Terminal using existing National Grid gas pipeline

CO2 stored in the depleted gas reservoir, injecting via existing platform wells

Carbon capture technology provided by Aker Clean Carbon, already tested on site with mobile pilot plant

CO2 transported to Goldeneye field using existing101 km offshore pipeline

CO2 extracted from flue gas at Scottish Power’s 2.4 GW coal-fired Longannet Power Station

THE LONGANNET TO GOLDENEYE PROJECT

Page 5: DEVEX 2013 Proving containment for CCS in Goldeneye · Lista Fm Maureen Fm Ekofisk Fm Tor Fm Mackerel Fm Herring Fm Hidra Fm Plenus Marl Mbr Rødby Fm Heather Fm Kimm. Cl. Fm Valhall/Wick

Copyright of SHELL UK LTD

Can the Goldeneye site safely store a volume of CO2 delivered over

the proscribed time period from the power plant

Does it have the capacity

Can we transport and inject it

Will the CO2 stay in the store

Can it be monitored and can corrective measures be deployed

THE SUBSURFACE WORKFLOW

Page 6: DEVEX 2013 Proving containment for CCS in Goldeneye · Lista Fm Maureen Fm Ekofisk Fm Tor Fm Mackerel Fm Herring Fm Hidra Fm Plenus Marl Mbr Rødby Fm Heather Fm Kimm. Cl. Fm Valhall/Wick

Copyright of SHELL UK LTD

HOW MUCH CONTAINMENT DO WE NEED?

6

� Definitions taken from the EU directive3.‘storage site’ means a defined volume area within a geological formation used for the geological storage of CO2

and associated surface and injection facilities;

5. ‘leakage’ means any release of CO2 from the storage complex;

6. ‘storage complex’ means the storage site and surrounding geological domain which can have an effect on overall storage integrity and security; that is, secondary containment formations;

16. ‘migration’ means the movement of CO2 within the storage complex;

15. ‘CO2 plume’ means the dispersing volume of CO2 in the geological formation;

17. ‘significant irregularity’ means any irregularity in the injection or storage operations or in the condition of the storage complex itself, which implies the risk of a leakage or risk to the environment or human health;

19. ‘corrective measures’ means any measures taken to correct significant irregularities or to close leakages in order to prevent or stop the release of CO2 from the storage complex;

Page 7: DEVEX 2013 Proving containment for CCS in Goldeneye · Lista Fm Maureen Fm Ekofisk Fm Tor Fm Mackerel Fm Herring Fm Hidra Fm Plenus Marl Mbr Rødby Fm Heather Fm Kimm. Cl. Fm Valhall/Wick

Copyright of SHELL UK LTD

REGIONAL GEOLOGY

No

rdla

nd

GpPle

Pli

Mio

ce

ne

Oli

go

ce

ne

Eo

ce

ne

Pa

lae

oc

en

eL

. Cre

tac

eo

us

L. J

ura

ssic

E.

Cre

tac

eo

us

We

stra

yG

pS

tro

nsa

yG

pM

ora

y G

pM

on

tro

se G

pC

ha

lk G

pC

rom

er

Kn

oll

Gp

Hu

mb

er

Gp

Undiff.

Lark

Fm

Horda

Fm

Do

rno

ch

Fm

Lis

ta F

m

Maureen Fm

Ekofisk Fm

Tor Fm

Mackerel

Fm

Herring Fm

Hidra Fm

Plenus Marl Mbr

Rødby Fm

Heather Fm

Kim

m.

Cl.

Fm

Va

lha

ll/W

ick

Sst

Fm

s

Beauly

Mbr

U. D. Sst

L. D. Sst

Dor. Mst

“Lista

Mst”

Me

y S

st M

br

Bal

mo

ral

Captain

Yawl

Scapa

Punt

Burns

Sst Mbr

LithologyStrat. Aquifers

Se

co

nd

ary

Co

nta

ine

rS

tora

ge S

eal

Sto

rag

e S

ite

Co

mp

lex

Se

al

Aquifer

Aquiclude

Mixed/Unknown

Sand

Mud/Claystone

Chalk

Coal

Volcanic

Aquifers Column

Lithology Column

Key

Marl

v v

v

. ..

. .. . .

.

. .. . .

.

. .. . .

.

. .. . .

.

. .. . .

.. .. . .

.

. .. . .

.

. .. . .

.

. .. . .

.

. ..

. ..

. ..

. ..

. ..

. ..

. ..

. ..

. ..

. ..

. ..

. ..

. ..

. ..

Reservoir

Local oil source, regional gas source

W E

Goldeneye

Grampian

Arch

Glenn Ridge

AtlanticCromarty Hannay

Coals

Page 8: DEVEX 2013 Proving containment for CCS in Goldeneye · Lista Fm Maureen Fm Ekofisk Fm Tor Fm Mackerel Fm Herring Fm Hidra Fm Plenus Marl Mbr Rødby Fm Heather Fm Kimm. Cl. Fm Valhall/Wick

Copyright of SHELL UK LTD

A STORAGE COMPLEX FOR GOLDENEYE

Overburden

Complex Seal

Hydraulically connected

Captain

Lista & Dornoch

Page 9: DEVEX 2013 Proving containment for CCS in Goldeneye · Lista Fm Maureen Fm Ekofisk Fm Tor Fm Mackerel Fm Herring Fm Hidra Fm Plenus Marl Mbr Rødby Fm Heather Fm Kimm. Cl. Fm Valhall/Wick

Copyright of SHELL UK LTD

PRIMARY BARRIER – RESERVOIR CAPROCK

Reservoir

Stage I C

harge

Stage II Charge

Stage III Charge

Regional tilt (East Greenland doming)

NE North Sea uplift/hiatus (North Atlantic rifting)

Marginal North Sea uplift (Alpine compression?)

From Goldeneye asset integrated geochemistry report, 2000

Page 10: DEVEX 2013 Proving containment for CCS in Goldeneye · Lista Fm Maureen Fm Ekofisk Fm Tor Fm Mackerel Fm Herring Fm Hidra Fm Plenus Marl Mbr Rødby Fm Heather Fm Kimm. Cl. Fm Valhall/Wick

Copyright of SHELL UK LTD

CHARACTERISING THE STORAGE COMPLEX

� The overburden has been mapped and modelled

� Geochemistry and Geomechanics of the caprock has been explored

Page 11: DEVEX 2013 Proving containment for CCS in Goldeneye · Lista Fm Maureen Fm Ekofisk Fm Tor Fm Mackerel Fm Herring Fm Hidra Fm Plenus Marl Mbr Rødby Fm Heather Fm Kimm. Cl. Fm Valhall/Wick

Copyright of SHELL UK LTD

SOME COMPLICATED OVERBURDEN GEOLOGY

Horizon slice (semblance volume) along one Eocene coal bed

Palaeo-shorelineDrainage network

Page 12: DEVEX 2013 Proving containment for CCS in Goldeneye · Lista Fm Maureen Fm Ekofisk Fm Tor Fm Mackerel Fm Herring Fm Hidra Fm Plenus Marl Mbr Rødby Fm Heather Fm Kimm. Cl. Fm Valhall/Wick

Copyright of SHELL UK LTD

MORE COMPLICATED OVERBURDEN GEOLOGY

Page 13: DEVEX 2013 Proving containment for CCS in Goldeneye · Lista Fm Maureen Fm Ekofisk Fm Tor Fm Mackerel Fm Herring Fm Hidra Fm Plenus Marl Mbr Rødby Fm Heather Fm Kimm. Cl. Fm Valhall/Wick

Copyright of SHELL UK LTD

HOW MUCH AQUIFER DO WE NEED IN THE STORAGE COMPLEX?

110km long aquifer model

Including

� other fields

� and aquifer extension

scenarios

Page 14: DEVEX 2013 Proving containment for CCS in Goldeneye · Lista Fm Maureen Fm Ekofisk Fm Tor Fm Mackerel Fm Herring Fm Hidra Fm Plenus Marl Mbr Rødby Fm Heather Fm Kimm. Cl. Fm Valhall/Wick

Copyright of SHELL UK LTD

SOME OTHER CONSIDERATIONS

Geochemistry

� Reactive transport modelling in

PHREEQC shows 0 or –veporosity change in the caprock upon interaction with CO2

Geomechanics

� Modelled the effect of

repressurising the field and introducing cold CO2 into the

reservoir

� Models show that neither condition compromises caprock integrity

May 15, 2013

���� Time (year)

�� ��change in mineral abundance (mole/kgW)

Porosity

CO2

MontmorillioniteCalcite

AlbiteChamosite

10.1 10 100 1000 10000

Kaolinite

Dawsonite

Ankerite

Quartz

-10

0

10

20

Page 15: DEVEX 2013 Proving containment for CCS in Goldeneye · Lista Fm Maureen Fm Ekofisk Fm Tor Fm Mackerel Fm Herring Fm Hidra Fm Plenus Marl Mbr Rødby Fm Heather Fm Kimm. Cl. Fm Valhall/Wick

Copyright of SHELL UK LTD

CONCLUSIONS

� Every way we have looked at the storage complex, we see no

evidence that a leak is likely to occur when Goldeneye is filled with CO2

Specifically, we have shown:

� Goldeneye has a competent seal

�No evidence for leakage during its life as a hydrocarbon reservoir

� Sufficient baffles and additional capacity in the overburden to contain any migration from the storage site

� Fluid chemistry and geomechanical effects do not significantly weaken

the cap-rock

Page 16: DEVEX 2013 Proving containment for CCS in Goldeneye · Lista Fm Maureen Fm Ekofisk Fm Tor Fm Mackerel Fm Herring Fm Hidra Fm Plenus Marl Mbr Rødby Fm Heather Fm Kimm. Cl. Fm Valhall/Wick

Copyright of SHELL UK LTD

ACKNOWLEDGEMENTS

Thanks to:

� Department of Energy and Climate Change for supporting the

project as part of the UK Demonstration competition

� Our consortium partners, ScottishPower and National Grid

� Our storage partner CO2 Deepstore

� Team of over 120 professionals who contributed 20 man years work

Knowledge Transfer is the major product from the DECC Demo 1 Project

� The detail of the work undertaken in FEED is available for all to read here: http://www.decc.gov.uk/en/content/cms/emissions/ccs/demo_prog/feed/scottish_power/scottish_power.aspx

� 280 reports in 11 months – 75% of which have been made public!