DFCM ADDENDUM COVER PAGE, OCTOBER 2019
DFCM Addendum No.2
Date: November 6, 2019
To: Pre-Qualified General Contractors
From: Lucas Davis – DFCM Project Manager Reference: DHS-DJJS Millcreek Youth Center Department of Human Services DFCM Project 19152430
Pages Content: Addendum Cover Page 1 Re-upload of Drawings from Addendum No. 1 4 Total Pages: 5
Note: This Addendum shall be included as part of the Contract Documents. Items in this Addendum apply to all drawings and specification sections whether referenced or not involving the portion of the work added, deleted, modified, or otherwise addressed in the Addendum. Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may subject the Bidder to Disqualification.
Click here to enter text.
2.1 Schedule Changes: There are no project schedule changes within this addendum. 2.2 General Items: Re-upload of Drawings from Addendum No. 1 due to file corruption. 1.2 Enter text here Enter text here 1.2 Enter text here Enter text here 1.2 Enter text here Enter text here 1.2 Enter text here Enter text here
FD FD
OFFICE
119
BD. RM.
118
BD. RM.
117
BD. RM.
116
BD. RM.
115
LINEN
112
BD. RM.
111
BD. RM.
110
BD. RM.
109
BD. RM.
108
BD. RM.
107
BD. RM.
106
MECH.
105
JAN.
104
STAFF RR
103
CORRIDOR
102
SPARK
TRAINING
AREA
101
STORAGE
121GROUP
RM.
120
SHWR
113
SHWR
114
CONTRACT LIMIT LINE
CONTRACT LIMIT LINE
CONTRACT LIMIT LINE
LIBRARY
201
CORRIDOR
205
MECH.
206
JAN.
204STAFF RR
203
INCENTIVE
SPACE
207
AV
STORAGE
208
MUSIC
ROOM
209
STORAGE
211
MUSIC
STORAGE
210
YOUTH RR
202
MECH.
305
CORRIDOR
304
JAN.
303
STAFF
RESTROOM
302
LG. OPEN
GROUP
THERAPY
301
SMALL
GROUP
THERAPY
ROOM
314
GROUP
THERAPY
ROOM
313
STAFF
THERAPY
ROOM
312
FUTURE
STAFF
THERAPY
ROOM
311
STORAGE
CLOSET
310
DE-ESCALATION
ROOM
309
STAFF
THERAPY
ROOM
308
STAFF
THERAPY
ROOM
307
STAFF
THERAPY
ROOM
306
STORAGE
315
ph: (801) 533-2100
A R C H I T E C T S
S L C, Utah 84111577 South 200 East
jrcadesign.com
12345
A
B
C
D
2345
DATE
PROJECT #:
REVISION
10/1
7/2
019 1
1:2
7:1
4 A
MC
:\U
sers
\chansen\D
ocum
ents
\18038 -
DJJS
Mill
cre
ek Y
outh
Cente
r R
enovation_v19_chansen.r
vt
AE131
COTTAGE
FURNISHINGS
PLANS
09/30/2019
DH
S D
JJS
MIL
LC
RE
EK
YO
UT
H C
EN
TE
R R
EN
OV
AT
ION
79
0 W
ES
T 1
2T
H S
TR
EE
T,
OG
DE
N,
UT
AH
84
40
4
DF
CM
PR
OJE
CT
NO
: 1
91
52
43
0
18038
CONSTRUCTION DOCUMENTS
NORTHPROJECT
16'8'0"
SCALE 1/8" = 1'-0"AE131
C5 COTTAGE A FURNISHINGS PLAN
KEY NOTES:
SCALE 1/8" = 1'-0"AE131
A4 COTTAGE B FURNISHINGS PLANSCALE 1/8" = 1'-0"AE131
A2 COTTAGE C FURNISHINGS PLAN
10/25/2
019
Addendum
GENERAL NOTES:
1. FURNITURE TO BE PROVIDED BY OWNER. LAYOUT IS FOR COORDINATION WITH ELECTRICAL PLANS & SPACE REQUIREMENTS.
3
1
1
1
1 1
LIBRARY201
MECH.206
CORRIDOR205
JAN.204
STAFF RR203
YOUTH RR202
AVSTORAGE
208
STORAGE211
MUSICSTORAGE
210
MUSICROOM
209
INCENTIVESPACE
207
LG. OPENGROUP
THERAPY301
JAN.303
STAFFRESTROOM
302
MECH.305
STAFFTHERAPY
ROOM306
STAFFTHERAPY
ROOM307
STAFFTHERAPY
ROOM308
CORRIDOR304
DE-ESCALATIONROOM
309
STORAGECLOSET
310
FUTURESTAFF
THERAPYROOM
311
STAFFTHERAPY
ROOM312
GROUPTHERAPY
ROOM313
SMALLGROUP
THERAPYROOM
314
STORAGE315
YOUTH RR316
11 1615134 7 9 10
R
Q
P
O
R
Q
P
O
ph: (801) 533-2100
A R C H I T E C T S
S L C, Utah 84111
577 South 200 East
jrcadesign.com
12345
A
B
C
D
DATE
PROJECT #:
REVISION
09/30/2019
DH
S D
JJS
MIL
LCR
EEK
YOU
TH C
ENTE
R R
ENO
VATI
ON
790
WES
T 12
TH S
TREE
TO
GDE
N, U
TAH
8440
4
18038
CONSTRUCTION DOCUMENTS
635 South State StreetSalt Lake City, Utah 84111
BNACONSULTING
SALT
LA
KE
S
T.G
EORG
E
P:801.532.2196F:801.532.2305
www.bnaconsulting.com
ã 2019 BNACONSULTING
10/25/19 Addendum1
DFCM
PRO
JECT
NO
: 191
5243
0
E202
COTTAGEPOWERPLANS
1
AD3-5 FOR REFERENCE ONLY
AD3-6 FOR REFERENCE ONLY