All Agency Project Request 2007 - 2009 Biennium Agency Institution Building No. Building Name University of Wisconsin Madison 285-0A-0008 MEMORIAL UNION Mem Union Coffee House Rmdl Project Title Project Description Project Justification This project converts the former STA Travel office (Rooms 1218, 1219, and 1219A) into Peet's Coffee & Tea venue (~1,079 SF) and renovates the adjacent restrooms (~492 SF). The design solution includes secure entryways, room finishes as per vendor specifications, adequate electrical and plumbing services to brewing and dispensing equipment, and a new air handling unit connected to campus central steam and chilled water utilities. The small mezzanine room located above room 1219A may need to be removed to accommodate the new air handling unit. The consultant should also investigate the potential of providing an air handling unit adequate to serve the deli located in Room 1314 as well as the coffee house operation. Recent student surveys and a peer review identified a dedicated coffee house operation as the highest priority. Establishing a dedicated coffee house operation provides a service not currently met in the union and should assist in fostering campus community development. 08B2V Project No. A/E Consultant Requirements Consultants should have specific expertise and experience in the design and coordination of institutional food service operations as part of a design team. Work includes site surveys, acquiring field data, and verifying as-built conditions to assure accurate development of design and bidding documents, and production of necessary design and bidding documents. Consultants should indicate specific projects from past experience (including size, cost, and completion date) in their letter of interest and when known, include proposed consulting partners and specialty consultants. Under the terms of the coffee house franchise, Peet's will provide plan layouts, specifications, and elevation details for the coffee house. The consultant will be responsible for providing final design and bidding documents. A/E Selection Required? Project Intent This project creates a dedicated coffee house operation to address student surveys and peer review findings. All building services will be renovated and sized to accommodate the new coffee house, and if possible, the mechanical systems will be sized to include the deli operation. 2/22/2008 Page 1 of 3 UW-MSN_08B2V_Mem Union Coffee House Rmdl
Transcript
Page 1: DFDIS - WisBuild - All Agency Project Requestwisbuild.doa.state.wi.us/Dfd_img/project_attachments/08B... · 2008-03-19 · All Agency Project Request 2007 - 2009 Biennium Project

All Agency Project Request2007 - 2009 Biennium

Agency Institution Building No. Building NameUniversity of Wisconsin Madison 285-0A-0008 MEMORIAL UNION

Mem Union Coffee House RmdlProject Title

Project Description

Project Justification

This project converts the former STA Travel office (Rooms 1218, 1219, and 1219A) into Peet's Coffee & Tea venue (~1,079 SF) and renovates the adjacent restrooms (~492 SF). The design solution includes secure entryways, room finishes as per vendor specifications, adequate electrical and plumbing services to brewing and dispensing equipment, and a new air handling unit connected to campus central steam and chilled water utilities. The small mezzanine room located above room 1219A may need to be removed to accommodate the new air handling unit. The consultant should also investigate the potential of providing an air handling unit adequate to serve the deli located in Room 1314 as well as the coffee house operation.

Recent student surveys and a peer review identified a dedicated coffee house operation as the highest priority. Establishing a dedicated coffee house operation provides a service not currently met in the union and should assist in fostering campus community development.

08B2VProject No.

A/E Consultant Requirements

Consultants should have specific expertise and experience in the design and coordination of institutional food service operations as part of a design team. Work includes site surveys, acquiring field data, and verifying as-built conditions to assure accurate development of design and bidding documents, and production of necessary design and bidding documents. Consultants should indicate specific projects from past experience (including size, cost, and completion date) in their letter of interest and when known, include proposed consulting partners and specialty consultants.

Under the terms of the coffee house franchise, Peet's will provide plan layouts, specifications, and elevation details for the coffee house. The consultant will be responsible for providing final design and bidding documents.

A/E Selection Required?

Project Intent

This project creates a dedicated coffee house operation to address student surveys and peer review findings. All building services will be renovated and sized to accommodate the new coffee house, and if possible, the mechanical systems will be sized to include the deli operation.

2/22/2008 Page 1 of 3UW-MSN_08B2V_Mem Union Coffee House Rmdl

Page 2: DFDIS - WisBuild - All Agency Project Requestwisbuild.doa.state.wi.us/Dfd_img/project_attachments/08B... · 2008-03-19 · All Agency Project Request 2007 - 2009 Biennium Project

All Agency Project Request2007 - 2009 Biennium

Project Budget

Construction Cost:

Contingency:A/E Design Fees:DFD Mgmt Fees:Equipment/Other:

$329,000

6%15%

4%$138,000

$49,200$19,700$15,100

$551,000

Funding Source Total

$0$0

$0$0

GFSB - []PRSB - []

GiftsGrants

$551,000Agency/Institution Cash [AGF0]

Project Scope Consideration Checklist

1. Will the building or area impacted by the project be occupied during construction? If yes, explain how the occupants will be accommodated during construction.

Y N

The existing coffee house space to be renovated in the building is currently vacant. All project work will be coordinated through campus physical plant and Union staff to minimize disruptions to the Memorial Union daily operations and activities.

2. Is the project an extension of another authorized project? If so, provide the project #...

3. Are hazardous materials involved? If yes, what materials are involved and how will they be handled?

4. Will the project impact the utility systems in the building and cause disruptions? If yes, to what extent?

The design will provide electrical and plumbing services to brewing and dispensing equipment. A new air handling unit with campus steam and chilled water connections will be installed in the mezzanine level.

5. Will the project impact on the utility capacities supplying the building? If yes, to what extent?

6. Will the project impact the heating plant or the primary electrical system supplying the campus or institution? If yes, to what extent?

7. Have you identified the WEPA designation of the project...Type I, Type II, or Type III?

8. Is the project affected by historic status?Type III.

Project Schedule

03/2008

06/2008

12/2009

07/200809/2009

SBC Approval:

Bid Opening:

Project Close Out:

Construction Start:Substantial Completion:

Project Contact

Angela Pakes [email protected](608) 262-6384 x

Contact Name:Email:

Telephone No.:A/E Selection: 04/2008

Haz Mats: $0

$0Building Trust Funds [BTF]

Construction Total: $329,000

$551,000

$0Other Funding Source

2/22/2008 Page 2 of 3UW-MSN_08B2V_Mem Union Coffee House Rmdl

Page 3: DFDIS - WisBuild - All Agency Project Requestwisbuild.doa.state.wi.us/Dfd_img/project_attachments/08B... · 2008-03-19 · All Agency Project Request 2007 - 2009 Biennium Project

All Agency Project Request2007 - 2009 Biennium

9. Are there any other issues affecting the cost or status of this project?Memorial Union is listed by the Wisconsin Historical Society.

10. Will the construction work be limited to a particular season or window of opportunity? If yes, explain the limitations and provide proposed solution.The Union prefers the coffee house to be open for the beginning of the fall 2008 semester.

2/22/2008 Page 3 of 3UW-MSN_08B2V_Mem Union Coffee House Rmdl

Page 4: DFDIS - WisBuild - All Agency Project Requestwisbuild.doa.state.wi.us/Dfd_img/project_attachments/08B... · 2008-03-19 · All Agency Project Request 2007 - 2009 Biennium Project

REV

ERS E

OSM

OSI

SSY

STEM

(C)

A1 P

l an an

d El

evat

ions

1210

UP DN1200B

2

43

6

7

8

6 EQ. PANELS

SOLID RIFT CUT OAK WD. TRIM ON P.LAM COVERED 1/2" MDF AT BACK WALL TYP.

CROWN MOULDING

PL-6 TYP.P-1 TYP.

CTB-2 TYP. WC-1 TYP.

BEHIND STAINLESS

LC

± 0'-0"FLOOR

± 8'-2 1/2"TOP RAIL

± 9'-0SOFFIT

LC

± 0'-0"FLOOR

± 8'-2 1/2"TOP RAIL

± 9'-0SOFFIT

± 10'-0CEILING

± 2'-10"CHAIR RAIL

CTB-1 TYP.

3'-0"MIN. CLR

WD TYP.

"ORDER HERE" SIGN

PENDANT FIXTURE CENTERED OVER ESPRESSO

"PICK UP" SIGN

P-1 TYP.P-1 TYP.

CTB-2 TYP.

± 0'-0"FLOOR

± 8'-2 1/2"TOP RAIL

± 9'-0SOFFIT

± 10'-0CEILING

2 EQ. PANELS 2 EQ. PANELS

VERIFY WINDOW SIZES AND SILL HIEGHTS IN FIELD

4 EQ. PANELSBEYOND

± 0'-0"FLOOR

± 8'-2 1/2"TOP RAIL

± 10'-0CEILING

± 2'-10"CHAIR RAIL

P-1 TYP.

CTB-1 TYP.

P-3 TYP.

5" TYP.

6 EQ. PANELSARTWORK(SMALL) ARTWORK

(LARGE)

± 0'-0"FLOOR

± 8'-2 1/2"TOP RAIL

± 10'-0CEILING

± 2'-10"CHAIR RAIL

CTB-1 TYP.

P-3 TYP.P-1 TYP.

± 0'-0"FLOOR

± 8'-2 1/2"TOP RAIL

± 10'-0CEILING

± 2'-10"CHAIR RAIL

6 EQ. PANELS

CTB-1 TYP.

P-3 TYP.P-1 TYP.

5

3 EQ. PANELS 2 EQ. PANELSDOOR. VERIFY TYPE AND SIZE IN FIELD

± 0'-0"FLOOR

± 8'-2 1/2"TOP RAIL

± 9'-0SOFFIT

± 10'-0CEILING

± 2'-10"CHAIR RAIL

P-1 TYP.PL-6 TYP. P-3 TYP.

CTB-2 TYP. CTB-1 TYP.CTB-1 TYP.

PlanScale: 1/4" = 1'-0"

1

Customer SideScale: 1/4" = 1'-0"

2

Seating Area - BanquetScale: 1/4" = 1'-0"

7

Employee SideScale: 1/4" = 1'-0"

4

Wall PanelingScale: 1/4" = 1'-0"

5

Seating Area - Bar Scale: 1/4" = 1'-0"

6

Seating Area - TablesScale: 1/4" = 1'-0"

8

Wall PanelingScale: 1/4" = 1'-0"

5

Wall Legend

NEW WALL TO FILL (E) OPENING. TYPE TO MATCH (E) AND PREPARE TO RECEIVE PEET'S FINISHES.

PEET'S SIGN

BLAD

E SI

GN

BLADE SIGN

Peet's Kiosk @ University of Wisconsin

01 30 08

Page 5: DFDIS - WisBuild - All Agency Project Requestwisbuild.doa.state.wi.us/Dfd_img/project_attachments/08B... · 2008-03-19 · All Agency Project Request 2007 - 2009 Biennium Project

1210

UP DN1200B

A2 R

CP

& F

inish

Pl an

Finish Plan Legend

2. Base

1. Flooring

3. Ceilings

4. Wallcovering

PIONITE #AW871 SUEDE "VANILLA FIBER"PL-6

WC-1 WHITE FRP (FIBERGLASS REINFORCED PANEL) SEQUENCIA OR EQ., WITH MATCHING MOLDING @ ALL JOINT, CORNER, AND EDGE CONDITIONS. ALUMINUM "H" MOULDING AT BOTTOM TRANSITION TO VINYL

RCPScale: 1/4" = 1'-0"

1

L1

L4

L17

Lighting Schedule PENDANT LIGHT FIXURE

RECESSED ADJUSTABLE DOWN LIGHT

RECESSED ADJUSTABLE DOWN LIGHT

PROVIDE BLOCKING FOR HANGING SIGNS, TYP. 1

RCP Key Notes

Finish PlanScale: 1/4" = 1'-0"

2

CT-2 QUARRY TILE 6"x6" DALTILE ASHEN GRAY T-03 GROUT - MAPEI #47 - CHARCOAL - WIDTH 1/4". SEALER - AQUA MIX INC. "SEALER'S CHOICE 15 GOLD", APPLY AT ONE GALLON PER 1000 SF.REFER TO DRAWING FOR LAYOUT.

DALTILE ASHEN GRAY 6" COVE BASE W/3/8". REFER TO DRAWING FOR LAYOUT.CTB-2

CLG-1

9'-0" AFF

REV

ERSE

OSM

OSI

SSY

STEM

(C)

UP DN1200B

1220

CUSTOMER AREA

BACK BAR

BACK OF HOUSE

SEATING AREA

SCT-3

TYP.

SCT-3 SCT-3

SCT-3 TYP.

SS

SS

SCT-3

SCT-3

PL-2

5 TYP.

2 TYP.

1

3

CT-2

CT-2

CT-2

CT-1

CT-1

CT-1

CT-1

CT-1 PORCELAIN TILE 20"x20" DALTILE "VERANDA" #P506 - LEATHER. GROUT - MAPEI #47 - CHARCOAL - WIDTH 3/16".SEALER - AQUA MIX INC. "SEALER'S CHOICE 15 GOLD" APPLY AT ONE GALLON PER 1000 SF. REFER TO DRAWING FOR LAYOUT.

4" HIGH STRIPS (3.5" IF TOPSET) RIPPED FROM PORCELAIN TILE 20"x20" DALTILE "VERANDA" #P506 - LEATHER. MATCH BASE HEIGHT WITH PANELLING AT FRONT OF BAR MILLWORK. REFER TO DWG FOR LAYOUT

CTB-1

ARMSTRONG "CIRRUS" 2'x2'x3/4" SUSPENDED ACOUSTICAL PANEL WITH TEGULAR EDGES. COLOR:CREAM. ARMSTRONG "SUPERFINE" 9/16" GRID, COLOR:CREAM.

GYPSUM BOARD TYPE "X" WITH #5 FINISH UNLESS OTHERWISE NOTED. CLG-1

ACT-1

4

LC

1'-0

"1'

-6"

4'-0

"1'

-0"

2'-0

"

10'-0

"

L4

L17L17 L172'-0" 2'-0"

L4 L4 L4 L4 L4 L4

L4 L4 L4 L4 L4 L4

2'-7 1/2"3'-0"3'-0"3'-0"3'-0"3'-0"3'-0"

L1L1

L1

G.211

2 BEGIN CEILING GRID WITH FULL TILE.

ACT-1

10'-0" AFF

L2

RECESSED DOWN LIGHT

L12L12a COMBINATION EXIT & EMERGENCY TWIN HEAD LIGHTING W/INTEGRAL BATTERY UNIT

L9RECESSED 2'-0"x4'-0" FLUORESCENT FIXTURE, 2 LAMPS, ELECTRONIC BALAST

2

L17 L17

L1L1L1

L2L2

L2L2L2L2L2

L2L2

L2L2

L2L2

L2L2

L17 L17

L2

L17

L17

L17

L17

L17

L17

L9

L2

"ORDER HERE" AND "PICK UP" SIGNS. SET OF 2. (G.2)

L9

2'-3"4'-6"4'-6"

L12

L12a

ACT-1

10'-0" AFF

2 TYP.

5 TYP.

2TYP.

6

6

6

5. PaintMANUFACTURER: BENJAMIN MOORE #OC-8, ELEPHANT TUSKGYP BD/PLASTER: FIRST COAT VINYL LATEX ENAMEL UNDERCOATSECOND & THIRD COATS: EGGSHELL VINYL LATEX ENAMELWOOD: FIRST COAT OIL BASE ENAMEL UNDERCOATSECOND & THIRD COATS: SEMIGLOSS VINYL LATEX ENAMEL

P-1

MANUFACTURER: BENJAMIN MOORE #2108-10, FERRET BROWNGYP BD/PLASTER: FIRST COAT VINYL LATEX ENAMEL UNDERCOAT SECOND & THIRD COATS: EGGSHELL VINYL LATEX ENAMEL WOOD: FIRST COAT OIL BASE ENAMEL UNDERCOATSECOND & THIRD COATS: SEMIGLOSS VINYL LATEX ENAMEL

P-3

TOBACCO BROWN GRANITE, HONED

STAINLESS STEEL

1.

2.

3.

Finish Plan General NotesON PAINTED SURFACES APPLY FIRST COAT OF PAINT PRIOR TO THE INSTALLATION OF TRIM.

ALL PAINTED SURFACES TO BE BACK ROLLED FOR FINAL FINISH.

PATCH AND REPAIR ALL SURFACES TO MATCH EXISTING FINISHES.

Finish Plan Key Notes

6. Counter TopsSCT-3

SS

7. Wood Trim

WD WOOD. RED RIFT OAK WITH BAKE-TOP FINISH

INSTALL 1/8" SCHLUTER - DECO-M/AE STRIP AT CERAMIC TILE TRANSITION. FINISH: SOLID BRASS.

HEAVY LONG DASHED LINE INDICATES EXTENT OF WAINSCOT. SEE ALSO INTERIOR ELEVATIONS.

START POINT OF FULL TILE

1

2

3

TILE TO RUN COMPLETELY BELOW STAINLESS STEEL CABINETRY.4

NEVAMAR "AGED ELEMENTS" #EM-6-1T, TEXTUREDPL-2

5 HEAVY SHORT DASHED LINE INDICATES EXTENT OF CROWN MOULDING, CHAIR RAIL, AND BOTTOM RAIL. (NO WAINSCOT).

6 PEET'S TILE TO TRANSITION TO/FROM (E) TILE.

1

L1

G.2G.2

SCT-3

Peet's Kiosk @ University of Wisconsin

01 30 08

Page 6: DFDIS - WisBuild - All Agency Project Requestwisbuild.doa.state.wi.us/Dfd_img/project_attachments/08B... · 2008-03-19 · All Agency Project Request 2007 - 2009 Biennium Project

REV

ERSE

OSM

OSI

SSY

STEM

(C)

A1 P

la n a n

d El

evat

ions

1210

UP DN1200B

Equipment PlanScale: 1/4" = 1'-0"

1

A3 E

quip

men

t Plan

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

Equipment Plan General NotesCOMPLY WITH MANUFACTURERS RECOMMENDATIONS FOR A COMPLETE AND FULLY OPERATIONAL INSTALLATION.

FOR SHELVING OVER 5-0" TALL, LAG-BOLT WALL UNITS TO WALL FRAMING. AT ISLAND UNITS, BOLT TO FLOOR AT EACH OF FOUR CORNERS. SEE DETAIL 5/A7.1

ALL CRACKS AND CREVICES AT OR NEAR FOOD PREPARATION EQUIPMENT SHALL BE SEALED.

PROVIDE SPACE FOR NON-FOOD ITEMS, CLEANERS, TOWELS, AND APPAREL.

PROVIDE SEPARATE STORAGE CONTAINER FOR SOILED LINENS, TOWELS, AND APPAREL.

ALL SHELVING OVER WET AREAS SHALL BE METAL.

A MINIMUM OF 20-FT CANDLES (215 LUX) OF LIGHT MEASURED 30" OFF THE FLOOR IS PROVIDED IN ALL FOOD PREPARATION AREAS DURING GENERAL CLEANUP ACTIVITIES.

A MINIMUM OF 10-FT CANDLES (108 LUX) OF LIGHT MEASURED 30" OFF THE FLOOR IS PROVIDED IN UTENSIL CLEANING AREA (BACK BAR AREA).

ALL FOOD-RELATED AND UTENSIL-RELATED EQUIPMENT SHALL MEET OR BE EQUIVALENT TO SANITATION STANDARDS ESTABISHED BY AN AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI) ACCREDITED PROGRAM.

ALL UTENSILS TO BE WASHED IN SCULLERY AND/OR IN DISHWASHER. HAND SINKS NOT TO BE USED FOR THIS PURPOSE.

THE UNDERSIDE OF ALL COUNTERTOPS SHALL BE WHITE. SURFACE SHALL BE SMOOTH AND EASILY CLEANABLE.

ALL COUNTERTOPS SHALL HAVE AN EASILY CLEANABLE SURFACE.

ALL FOOD SHALL BE STORED AT LEAST 6" OFF THE FLOOR.

ALL CONTAINERS STORED ON DOLLIES, RACKS, OR PALLETS SHALL BE EASILY MOVABLE.

SHELVING TO BE CONSTRUCTED SO AS TO BE EASILY CLEANABLE.

ALL EQUIPMENT SHALL BE EITHER EASILY MOVABLE (IE., ON CASTERS), LIGHT ENOUGH SO AS TO BE EASILY MOVED BY ONE PERSON, INSTALLED ON RAISED MINIMUM 6" ROUNDED METAL LEGS, OR SEALED IN POSITION ON 4" MINIMUM HIGH CONTINUOUSLY AND INTEGRALLY COVED BASE OR COVED CONCRETE CURB TO FACILITATE EASE OF CLEANING.GAPS AND SPACES BETWEEN EQUIPMENT BASE AND TOP OF ISLANDS SHALL BE SEALED WITH A NON-HARDENING SILICONE SEALANT.

ALL EQUIPMENT ON COUNTERS, TABLES, AND SHELVES THAT ARE NOT EASILY LIFTED ARE TO BE INSTALLED ON APPROVED 4" LEGS, OR SEALED TO TABLE, SHELVES, ETC.

ALL EQUIPMENT, FLASHINGS, AND BACKSPLASHES ARE TO BE ADEQUATELY SEALED TO THE WALL AND ABUTTING EQUIPMENT, OR MOVED AWAY FROM THE WALL 6" FOR EVERY 4 LINEAR FEET OF EQUIPMENT FRONTAL LENGTH, OR AWAY FROM EACH OTHER.

ALL UTENSIL WASHING SINKS, STEAM TABLES, ICE MACHINES AND BINS, DISPLAY CASES, AND OTHER SIMILAR EQUIPMENT WHICH DISCHARGE LIQUID WASTE, SHALL HAVE THIS WASTE CONVEYED BY A SEWER LINE AND DISPOSED THEREIN BY AN INDIRECT CONNECTION INTO A FLOOR SINK, FUNNEL DRAIN, OR EQUIVALENT DEVICE. INDIRECT WASTE RECEPTORS SHALL BE LOCATED SO AS TO BE READILY ACCESSIBLE FOR INSPECTION AND CLEANING. DRAIN LINES SHALL NOT CROSS ANY AISLE, TRAFFIC AREA, OR DOOR OPENING.

16.

17.

18.

19.

Equipment/Fixture Plan Key Notes SEAL BETWEEN BACKSPLASH AND WAINSCOT, TYP.1

2 CONTRACTOR TO CHANGE DOOR SWING OF REFRIGERATOR AS REQ'D TO MATCH PLAN

TBD

TBD

Mfgr/Cat. number/Spec.

TBD

Technical Equipment Schedule

Check Printer

Terminal Power Suppy

Point of Sale Register

T.3

T.2T.1

ItemNo. Qty.Am

ps/

Wat

ts

Phas

e

Vol

tage

Electrical Remarks

120

120

120

10W

20A/200W Dedicated circuit for each POS2

T.6 Cash Drawer IBM 120

2

2

2

Graphics and Hardware

Soap DispenserH.3

Paper Towel DispenserSurface Mounted

H.1

G.2G.1

Kimberly ClarkIn Sight - One Pak #91011

Commercial Displayers.

Commercial Displayers.

DescriptionNo. Qty. Specification/Mfgr/Model

American Specialties, Inc.#0245-SS

Line Signs (set)

"Peet's Coffee & Tea" Drink Menu

Undercounter Trash CanH.4 TBD

2

11

1

2

G.4 1 Peet's Illuminated Cabinet Sign (Type 4) 9'-1/2" x 2'-2"

Neon Images

H.2 1 Paper Towel Dispenser Stock Room only

Fort Howard

G.5 Peet's Non-Illuminated Blade Sign (Type 9) 2'-6" x 2'-4 1/2"

2 Neon Images

T.1T.2T.3T.6H.4

E.9 M.1

G.4

M.2

M.3 E.1E.10

E.19P.10

E.16 S.1P.7P.6

H.3H.1

E.11 E.7E.6

E.13

E.2E.4

E.5 E.2E.3

E.19 S.5S.4

P.1

E.14E.12

P.10P.14

H.2H.3 E.21a

F.13 TYP.F.2 TYP.M.4S.10S.9S.7

2

1

3 CUT IN STONE COUNTER TOP.

3

F.3 TYP.

F.6 TYP.

F.3 TYP.

F.6 TYP.

F.5 TYP.

F.4 TYP.

F.7

Encore HUDLR3852

BunnTD4T brew through #3250.0005

BunnBrewWISE Dual Soft HeatDBC #33500.006

Mfgr/Cat. number/Spec.

Pastry CaseE.9

Ice Tea Dispenserw/ Brew-ThroughLid

Hot Water Machine(5 gallons)

Coffee Brewer

E.6

E.5

E.4

BunnHSX-60-208 212F #12500.0032

Equipment ScheduleItemNo. Qty.

1

1

208

120/240

29A

29.1A

Filte

red

Electrical

Phas

e

Vol

tage

Amps

Heig

htM

ount

ing

Remarks

To F

.S.

Wat

er

Wat

er

Con

d.W

ast e

/

Col

d

Indi

rect

Hot

Plumbing

Was

te

Ven

t

Sani

tary

Blend-TecSmoother 13 (CA1-31C-Peets)

Blender

E.12

Silver KingSKR27

Undercounter Refrigerator

E.10 1 115 2.2 A

SchaererAmbiente 15SO Duo PS

Espresso Maker /GrinderE.1 1/2"208/220 30A 1"

San Jamar C4300CV

Hoshizaki KM-500MAH

Vertical Cup Dispensers

Ice Maker

E.13

1 115 9A 3/4"

1 120/160 15.8A

120 13A

Provide black side color.1

2

1

9

1

3

2

1

2

1/4"

1/2"

1/4"

1/2"

E.21a2

E.11

E.19

1 Hoshizaki #B 500

E.14 1

Ice Bin 3/4"

Ice Cart Ice-O-Matic #CRT125 3/4"

Provide pressure regulator if needed. Install on 6" metal legs

Inventory Shelving Eagle or Equal

E.16 1 Undercounter Fridge Silver King SKR48 3.11151

E.3 1 Coffee Brewer StandBunn 2SH Stand#27875 2SH 120V 120

E.7 1 Ice Tea Brewer Bunn TB3 Iced Tea Brewer#367000.009

1201

E.2 Coffee ServersBunn 1.5 gallon servers27850.0000SH SVR 1.5G 50/603

E.21b1

Plumbing and Stainless Schedule

S.7

No. Qty.

Wat

er

Filte

red

Dom

e sti c

Col

dW

ater

Hot

Col

dW

ater

Sani

tary

Was

t e/

Indi

rect

To F

.S.

Con

d.

Ven

t

Was

t e

Plumbing Remarks

S.10S.9

S.6

Mou

ntin

gH

eight

Custom by Claas Concepts

Mfgr/Cat. number/Spec.

Condiment Tray

Item

Lid Holder

Trash Chute111

S.13 1 Syrup Tray Custom stainless by West Star 3/4"

P.10 3 Floor Sink-Alt Locations

Kohler #6454 w/half grate (6461-FH) or Zurn 1900-2 or conmm Enamel #906-2 2"

P.1 1" maxCirqua Lp150 or Lp500fWater FilterReverse Osmosis 1 Install per manufacturer specifications.

P.6P.7

1

1

P.14 1

Utility Sink Faucet Chicago #50-LESSSSPT-L9JKCP 1/2" 1/2" 18"

Filtered Water Faucet at Utility Sink

Chicago #350-GN8AE3CP 1/2" 18"

Hand Sink w/ Faucet Universal EHS-1, Fisher 3984-2300 1/2" 1/2" 1 1/2"

S.1 1 Utility Sink Unit Custom stainless cab by West Star

S.4 Drink Unit Custom stainless cab by West Star

Stainless Urn Cabinet

1

1 Custom stainless cab by West Star

Provide with undercounter dump cart and drain trough3/4"

S.51 Stainless Espresso Unit Custom stainless cab by West Star

Custom by Claas ConceptsCustom by Claas Concepts

Furniture

Custom Leather Cushion for F.4F.5

F.3 GAR #205PSW GR.7 Vinyl, padded seat w/ CA.T.B. #117. Stain: Walnut Vinyl: Vintage (GR.7) Tobbacco (VT-3)

DescriptionNo. Qty. Specification/Mfgr/Model

Interior Chair

Interior Custom PewF.4 TBD

F.6 Interior Table

TBD30"H x 24" DiaBase: West Coast Industries 41.112017Mw/ Black Winkle Fin. and Superlevel Glides

F.2 Interior Stool GAR #2205PSW GR.7 Vinyl, padded seat w/ CA.T.B. #117. Stain: Walnut Vinyl: Vintage (GR.7) Tobbacco (VT-3)

F.13 Stand-up Counter Ref. Plan for LengthSupport: 3" dia steel w/ black wrinkle fin.Base: West Coast Industries 45.5100 w/ black wrinkle fin.

F.7 1 Interior Accessible Table 36"w x 36"d x 30"h

2

7

3

3

19

5

Millwork Schedule

POSM.1

No. ItemQty.

1

ADA POSM.2 1

Espresso Wall and Pass-ThruM.3 1

Condiment CartM.4 1

E.21b

S.6

S.13

G.5

G.5

Peet's Kiosk @ University of Wisconsin

01 30 08


Recommended