8 Report of the Diamond Drilling on the Marshall Lake Property Drill Hole SC-08-01 East West Resource Corporation I JS8-A Russell Street Thunder Bay, ON P7B 5N2 Thunder Bay Mining Division Sollas Lake Township Province of Ontario N.A. Bennett, HB.Sc July 2008 RECEIVED \'\D AUG 05 2008 GEOSCIENCE A SSESSMENT OFrlCE
Transcript
Page 1: DIAMOND DRILLING RPT SOLLAS LAKE AREA...INTRODUCTION This report summarizes a drill hole on claim TB30 14194 in May of 2008. This hole was part of a larger 2913.88m diamond drilling

8

Report of the Diamond Drilling on the Marshall Lake Property Drill Hole SC-08-01

East West Resource Corporation I JS8-A Russell Street Thunder Bay, ON P7B 5N2

Thunder Bay Mining Division Sollas Lake Township

Province of Ontario

N.A. Bennett, HB.Sc

July 2008

RECEIVED

\'\D AUG 05 2008

GEOSCIENCE ASSESSMENT OFrlCE

Page 2: DIAMOND DRILLING RPT SOLLAS LAKE AREA...INTRODUCTION This report summarizes a drill hole on claim TB30 14194 in May of 2008. This hole was part of a larger 2913.88m diamond drilling

TABLE OF CONTENTS

Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . .. . . ... 1

Property, Location and Access . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . .. . . . . . . . . . . . . . . . . . . . . . . . .. 1

Claim Status .............................................................................. ..

Previous Work ... .. . .. . .. . .. . .. . . . . . .. . . . .. . .. . .. . .. . .. . . .. .. . . .. . . . . .. . .. . . . . . .. .. . . .. . ... 2

Dates and Figures . . . . . . . .. . . . . . . . . . . . . . . . . .. . . . . . .. . . . . . . . . . . .. . . . . . . . . . . . . .. . . . . . . . . . . . . . . .. 3

Diamond Drill Results .................. ............................................. ..... 3

Analytical Methods ......................................................................... 4

Conclusions and Recommendations . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . ... 4

Statements of Qualifications ............................................................. 5

References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6

Appendix A: Property Location Map, Claim Continuity Map and Claim Status List.

Appendix B: Costs of Drill Program Appendix C: Plan Map 1 :20,000, Cross Section Map 1 :250, Drill Log, Assays

Page 3: DIAMOND DRILLING RPT SOLLAS LAKE AREA...INTRODUCTION This report summarizes a drill hole on claim TB30 14194 in May of 2008. This hole was part of a larger 2913.88m diamond drilling

INTRODUCTION

This report summarizes a drill hole on claim TB30 14194 in May of 2008. This hole was part of a larger 2913.88m diamond drilling program carried out on the Marshall Lake property. This program was conducted from May 5th 2008 to June 23rd 2008 drill hole SC-08-0 1 was drilled on May 6th and 7th of 2008. The Marshall Lake property is a 50:50 joint venture between East West Resource Corporation "East West" (1158-A Russell Street, Thunder Bay, Ontario, P7B 5N2) and Eyeconomy Holdings PLC "Eyeconomy" of the United Kingdom where the claims are 1 00% held by East West and Eyeconomy is earning a 50% interest by participating 50:50 in exploration expenditures. This drill program tested targets outlined by an airborne survey carried out on the property from 2006 to 2007, IP surveys and also focuses on the expansion of previously drilled mineralized zones. The hole SC-08-0 1 was designed to test an airborne anomaly which occurs roughly one kilometre south of a crossing of iron formation and a mafic dike. The hole was designed to test the dike for mineralization. This report includes one drill hole, totalling a length of213.36 meters.

PROPERTY, LOCATION AND ACCESS

The Marshall Lake property consists of 65 unpatented mining claims and 89 leased mining claims, making up a total size of 965 claim units or approximately 60 square miles. The property is located approximately 390 km north-northeast of the City of Thunder Bay, Ontario and can be easily accessed by following Highway 11117 west of the City of Thunder Bay to Highway 11 at Nipigon, Ontario Appendix A. One then travels north on Highway 11 for approximately 120 km turning north onto the Kinghorn Road, 7km east of Jellico. One then travels approximately 125 km north where the Kinghorn Road intersects the southern portion of the Marshall Lake property. Further access from this point is by ATV or on foot. Claim TB3014194 where drill hole SC-08-01 is located is on a non-contiguous claim that can be accessed off the Ogoki road which begins north of Geraldton (and before Nakina). The claim is about 50km down the Ogoki road and then one must make a right (north) down a I.Skm trail towards Meta Lake to access the drill site.

CLAIM STATUS

The drilling was carried out on one mining claim. This claim status for the claim is as follows:

Claim Recording Claim

Percent Work Total Total Township/Area Due Number Date Date

Option Required Applied Reserve

.. : .. _ .. . . • • •• It. SOlLAS LAKE

Claim Bank

" .

Page 4: DIAMOND DRILLING RPT SOLLAS LAKE AREA...INTRODUCTION This report summarizes a drill hole on claim TB30 14194 in May of 2008. This hole was part of a larger 2913.88m diamond drilling

A complete list of all the mining claims and leased claims that make up the Marshall Lake property is provided in Appendix A.

PREVIOUS WORK

1954 Teck Corporation discovered a high grade Cu/Zn showing to the South of Gripp Lake.

1955 Teck Corporation carried out magnetic surveys, EM surveys followed by a 20 hole diamond drilling program.

1958 George Langford carried out geological mapping for the Ontario Ministry of Northern Development and Mines, Ontario Geological Survey.

1961 Teck Corporation carried out a 12 hole diamond drilling program.

1962 Min-Ore Mines Ltd. carried out a six hole diamond drilling program.

1962 Sheridan Geophysics Ltd. carried out an EM survey, a magnetic survey and a four hole diamond drilling program.

1965 Vincent Feely carried out a diamond drilling program.

1965 Marshall Lake Mines Ltd. carried out a five hole diamond drilling program.

1968 Kendon Copper Mines Ltd. carried out a diamond drilling program.

1969 NWT Copper Mines Ltd. carried out a 13 hole diamond drilling program, as well as a property report.

1970 A.S. Bayne carried out a feasibility study.

1971 Teck Corporation carried out an EM survey, a magnetic survey and self potentia1.

1974 Giant Gripp Mines Inc. carried out an EM survey.

1976 St. Josephs Exploration completed a mapping program as well as a magnetic survey and soil sampling.

1978 Imperial Oil carried out a diamond drilling program.

1981 Corporation Falconbridge Copper carried out a ground magnetic survey, VLF-EM and soil geochemistry, followed by a geological report and plans.

2

Page 5: DIAMOND DRILLING RPT SOLLAS LAKE AREA...INTRODUCTION This report summarizes a drill hole on claim TB30 14194 in May of 2008. This hole was part of a larger 2913.88m diamond drilling

1983 Corporation Fa1conbridge Copper carried out a three hole diamond drilling program with assays and a report by G. Wells.

1989 S.E. Amukin carried out a geological program, Precambrian Geology: Little Marshall Lake Area.

1990 T. Keast carried out the writing of a report of work by Granges Inc. for NWT Copper Mines Ltd.

1992 Giant Gripp Mines Inc. carried out a diamond drilling program.

1993 H. Hugon wrote a report on the structure of the Marshall Lake for Challenger Minerals Ltd.

1994 Challenger Minerals Ltd. carried out an EM survey as well as diamond drilling with assays.

1995 Ian Campbell ~'fote the report for the airborne EM survey, airborne magnetic survey, and a five hole diamond drilling project for Consolidated Abitibi Resources.

1996 NWT Copper Mines Ltd. carried out a diamond drilling program.

2000 G. Stott carried out geological mapping for the Ontario Ministry of Northern Development and Mines, Ontario Geological Survey.

2006 East West and Eyeconomy acquire the entire Marshall Lake property and begin the current phase of exploration.

DA TES AND FIGURES

Diamond drilling on the Marshall Lake property within this report contains 1 hole (SC-08-01) within a 29l3.88m 20 hole drill program. Mobilization of the drill to the property occurred on May 5th

, 2008. Drilling was carried out by Cartwright Drilling Inc. of Goose Bay Labrador. The drilling of the hole was conducted on May 6th and May 7th of2008. This report and its accompanying log, figures and assays were produced in July of2008.

DIAMOND DRILL RESULTS

This drill hole tested an airborne anomaly identified during an airborne survey previously conducted on the property. The target was also selected due to the crossing of an iron formation with the targeted dyke about 1 km north from the drill site: and airborne anomaly. The hole was drilled to a depth of213.36 metres; logs and cross-sections are provided in Appendix C. A total of 63 samples were sent for geochemical analysis to

3

Page 6: DIAMOND DRILLING RPT SOLLAS LAKE AREA...INTRODUCTION This report summarizes a drill hole on claim TB30 14194 in May of 2008. This hole was part of a larger 2913.88m diamond drilling

ALS Chemex for copper, zinc, lead, silver as well as several other trace elements (ME­ICP41), certificates of analysis for all samples are provided in Appendix C. A summary of the drill hole location, depth, azimuth and dip is as follows:

Drill Hole SC-08-01

Claim Easting 3014194 469700

Northing 5589600

Depth (m) 213.36

Casing (m) 4.57

Azimuth 40

SC-08-01

This hole was designed to drill into a dike which intersects an iron formation to the north. An airborne anomaly was picked up by a previously flown survey by East West Resource Corporation. The hole was planned to intersect this anomaly and did as the anomaly was explained by 2 major zones of semi-massive to massive po, py, and graphite from 29.97m to 31.49m and another larger zone from 174.27m to the end of the hole at 213.36m. The bands of sulphide at the bottom of the hole began to run near paralld to the core axis. The results from the assays returned do not show any significant values; the only elevated value occurs in the sample taken from 59.l3m to 60.l3m and returned a value of 7060ppm copper.

ANAL YTICAL METHODS

All drill core samples where sent to ALS Chemex in Thunder Bay, Ontario for primary crushing, and then forwarded onto ALS Chemex in North Vancouver, British Columbia by ALS Chemex in Thunder Bay. A total of 63 samples were sent for assay and multi­element. The analyses were carried out by the ALS Chemex code ME-ICP41. Assay and analytical certificates for all samples taken are compiled in Appendix C.

CONCLUSIONS AND RECOMMENDATIONS

A total of 20 drill holes totalling 2913.88 metres were drilled during this program from May 5th to June 23rd of2008. The holes were drilled on the Gazooma, Gazooma North, Teck Hill, Marshall Gabbro, Southern Airbornes and Stanley Cup showings and targets. This report only includes the hole drilled on the claim TB3014194 which was named the Stanley Cup anomaly. This drill hole SC-08-01 returned no significant values of economic interest. The airborne anomaly however was explained by the extensive zones of semi-massive to massive po, py, and graphite. This is a non contiguous stand alone claim and without more knowledge of the surrounding area there are no further targets of interest at this moment in time in the development of the Marshall Lake project.

4

Dip -50

Page 7: DIAMOND DRILLING RPT SOLLAS LAKE AREA...INTRODUCTION This report summarizes a drill hole on claim TB30 14194 in May of 2008. This hole was part of a larger 2913.88m diamond drilling

REFERENCES

Amukin, S.E., 1989, Precambrian Geology, Little Marshall Lake Area, Ontario Ministry of Northern Development and Mines, Ontario Geological Survey, Map 2000 Series.

Campbell, I, 1996, Report on 1995 Exploration Program, Marshall Lake Property for OMEP; Consolidated Abitibi Resources Ltd.

Hugon, H., 1993, Marshall Lake Structural Model; Internal Company Report for Challenger Minerals Ltd.

Keast T., 1990, NWT Copper Mines Ltd #523. Report of Work; Granges Inc. unpublished report.

Langford. F.F., 1959, Geology of the Gripp Lake Area, Ontario Ministry of Northern Development and Mines, Ontario Geological Survey, Annual Report Volume.

Straub, K.H., Stott, G.M. and Phillips J., 2000, Precambrian Geology, Marshall Lake Area, Onaman-Tashota Greenstone Belt, Ontario Ministry of Northern Development and Mines, Ontario Geological Survey, Map P3424.

Wells, G., 1983, Summary Report Marshall Lake Project for Corp. Falconbridge Copper, unpublished Company Report.

5

Page 8: DIAMOND DRILLING RPT SOLLAS LAKE AREA...INTRODUCTION This report summarizes a drill hole on claim TB30 14194 in May of 2008. This hole was part of a larger 2913.88m diamond drilling

Statement of Qualifications

I, Neal A. Bennett, of 320 Fitzgerald St., Thunder Bay, Ontario, Canada, hereby certify that:

I graduated from Lakehead University with an HB.Sc. in Geology in 2007.

Employed during the summers of:

2005 - North American Palladium as a geological assistant. 2006 - To present, East West Resource Corporation and Mega Uranium Ltd., Thunder Bay, ON, Project Geologist.

I am a geologist and have been employed as a project geologist by East West Resource Corporation and Mega Uranium Ltd. since May 2007.

I wrote this report and completed it on July 29th, 2008.

I am not aware of any material fact or material changes with respect to the subject matter of this report, the omission of which would make this report misleading.

Dated at Thunder Bay, Ontario on: ---=1--+-"V\,U"--"=-.... {'"---------':~~\ f-/ ...... z'-&<-=·Lf::....::, ~) _______ _

~ --~-~~~~---=-Neal A. Bennett

6

Page 9: DIAMOND DRILLING RPT SOLLAS LAKE AREA...INTRODUCTION This report summarizes a drill hole on claim TB30 14194 in May of 2008. This hole was part of a larger 2913.88m diamond drilling

APPENDIX A

Claim Continuity Map, Location Map and Claim Status List

Page 10: DIAMOND DRILLING RPT SOLLAS LAKE AREA...INTRODUCTION This report summarizes a drill hole on claim TB30 14194 in May of 2008. This hole was part of a larger 2913.88m diamond drilling

D~ ~,.~ \~'.I.\

t, :. .

Ii

; .

~~ ro 0 ro IHH~

r A=H I Mi les ro 0

( ro

Echtflt

40 6tJ ~ IcJlolJttrrt., ~ -==:1

LAK[ NIPIGON

...- --......... • ./ ·Pillar-A.r1nstr~n~o

Location Map of the Marshall Lake Property

Page 11: DIAMOND DRILLING RPT SOLLAS LAKE AREA...INTRODUCTION This report summarizes a drill hole on claim TB30 14194 in May of 2008. This hole was part of a larger 2913.88m diamond drilling

MARSHALL LAKE CLAIMS

T h" A Claim Claim Recording Claim Percent

owns 'pI rea. " Number Umts Date Due Date Option

SOllAS LAKE '3014194 i 15 2006-Jul-3l """""""",,,,,,,=, ,~".,~~~~~,~~,,,, •. w_";:' ,'~""~.".""

2008-Jul-31 lOOro

SOllAS LAKE 4207314 15 2005-I\,ull:.18 2008-I\,~~.~18L"".,. 100% SOlLAS lAKE . 4207315 15 i 2005-Aug-18 i 2008-Aug-18 i 100% SOlLAS lAKE "4207316' Y ··1'5~~·1·-2005~A~9--18··2008=A~9~8+~--100% SOlLAS LAKE ; 4207317" 15 ,.. ... ····-8_,i2oo~-~~~=,!~I~· •.

SOllAS lAKE 4207411

SOlLAS lAKE : 420741'i' SOllAS ll\~~._ ... :~1~_1!5.~§§ •. L.

100%

100%

SUMMIT LAKE 12~~~.2~.l -08 i 100%

SUMMITlAKE .. J1?~-4~29Z.0~7.-I\U9-08+Z,O~~'A~9-08L 100%

SUMMIT lAKE ,1234630.~g.O.7:l\l1g:08J~~~~i\~~:g~1. :'1234631' . 200l-Aug-08 i 2009.Aug-08! 100%

__ "",'~Y,"',w"'~'m_vc,_,,~ ,.+ ___ w, __ , ___ "">-.'-,. _N"'~ __ ~N ," ,_., __ .,,~'-.""',,'_~ _" ~~~, _"'''' __ .~~u~,_~ ____ ,

SUMMIT lAKE ...•.. i~ 3011538 ,L~0£~:I\~g~~_J.~~g~~~g~2~.L .. 1g0o;. SUMMIT lAKE 3014193 ; 2006-Jun-20 ! 2008-Jun-20: 100%

SUMMIT LAKE ,·":"3014·196 : [2006-AU9-28: 2008-AU9-2S['100%

SUMMIT LAKET3014197" 15 ! 2006'A~9-28'r2008~A~9~28r"100D:' , ,- --'''W'-r ___ '~ _____ ~ ___ ~ ___ " "_~=~~~"~ ___ ~,," _____ !---___ v_,,"_~"~mm_~~"-~#' _'w_v __ ''¥"· "_~"" __ ~~~~---~r.-N-~~ ____ ''''' __ , __ ,,~ ___ v~,_, " .... "~~ ______ """'_"'~ _m,_,,,;

SUMMITlAKE : 3014198. 1 J"~~':',':',~~=~'~~:~'U 2008--Aug-2S1 100% SUMMIT lAKE-~j301-4-199 , ...... ·...-C5 .. __ · .. · 200S-Au9:2Sr'-1'00%

SUMMIT lAKE 'lQ .. l':f20g... 16 . l'

SUMMIT lAKE .:.']_QJ:!~Q1_;~_ .... SUMMIT lAKE 4204000 1

-~SUMMiTLAK"E~'-'~'-4-i64061 '-3"--' SUMMIT LAKE 4204004 3

SUMMIT lAKE 4204433 .. 7 SUMMIT LAKE~4204434S-"15 SUMMIT LAKE4204435-~--'" 15

SUMMIT LAKE

SUMMIT lAKE

SUMMIT lAKE

SUMMIT lAKE

SUMMIT lAKE

SUMMIT LAKE

SUMMIT lAKE

SUMMIT LAKE

SUMMIT LAKE

SUMMIT LAKE

SUMMIT lAKE

SUMMIT lAKE

SUMMIT lAKE .. SUMMIT lAKE

SUMMIT LAKE

SUMMIT lAKE

SUMMIT lAKE

SUMMIT lAKE

2006-Sep-11

Page 12: DIAMOND DRILLING RPT SOLLAS LAKE AREA...INTRODUCTION This report summarizes a drill hole on claim TB30 14194 in May of 2008. This hole was part of a larger 2913.88m diamond drilling

SUMMIT LAKE 4213141

SUMMIT LAKEll~J .. ~ .• ! 421 SUMMIT LAKE 4215366

_~~w~,',"""N,_''''~M~ ~H"V

SUMMIT LAKE . 4~1 033~;2009-0Ct-02

SUMMITLAKE L.41_219}ll L2P~_9.-0ct-02

. "4~2~2~1tOQ-8f!67-"""'" ' ..• ' .. " •. , 2007~~u~.~~7 2~~~~ug:~7., ...... "_~ .... . 2007-Sep-24 : Z009-Sep-24

-41?IQ~§.1 2007=S;p~24 . L2.:~ii?:sep-~~ r--·100~1o~· 4221089 . 2007 -Sep-24 j 2009-Sep-24 ! 100%

,"',_'''_'_''r ____ >'~_~, "_V,, ,~ ,,,',v~,,vv,vv v4'

1234627 " .... _._.+2007.AU~-g.~ .. J2009-Au9-08 : 100%

WILLET LAKE 1234632 ,. Y" • ~007 -~u.~:08 .T~~?.?:Aug:~8 • 1 00%

WILLET LAKE 1234634 2007-Aug-08 2009-Aug-08 100%

30'1v

4192 . 2006-Aug-28 2008 .. Aug-28 t

WILLET LAKE

WILLET LAKE

WILLET LAKE

WILLET LAKE

, "30'14195'-- "2006~~g~28r2008-A~g=28{" v AV. _ •• vv¥"mV''''NN¥~'V''N~~N~ W' __ " ~k. ¥ v,,~,,~v,,~v,,_v~. "F'~ v

2007-Aug-27 . 2009·Aug-27 i 100% i"~ vv~~~_ w-~_~ __ ~v··_~ ___ ~ ___ ~~ ___ ~_~'""t_~v

Z007-Aug-27 • 2009-AU,~:~TL 100%

• 2009-Aug-27 :

20~~.:~~~.:.~.7L : 2009-Aug-27 i

~ ,. ~~ ,vvv','_'V' __ w~~_~_

Page 13: DIAMOND DRILLING RPT SOLLAS LAKE AREA...INTRODUCTION This report summarizes a drill hole on claim TB30 14194 in May of 2008. This hole was part of a larger 2913.88m diamond drilling

Marshall Lake Property, Leased Claims Townshi Lease/License Short Descri tion

105011 KK22684 ET AL 105012 KK22696 105013 KK22697

KK22753 105395 KK22753 Summit Lake KK22798 105335 KK22798 Summit Lake KK22799 105 KK22799 Summit Lake KK22800 105331 KK22800 Summit Lake KK22801 105330 KK22801 Summit Lake KK22802 105329 KK22802 Summit Lake KK22808 105355 KK22808

KK23034 105328 16.24 KK23034 23035 105327 20.24 KK23035

Summit L 23036 105326 20.21 KK23036 Summit L 24194 1051 12.79 KK24194 Summit L 4195 105 13.23 KK24195 Summit Lake KK24196 105161-3 18.84 KK24196 Summit Lake KK24197 105161-4 23.52 KK24197 Summit Lake KK24198 105161-5 22.89 KK24198 Summit Lake KK24199 105161-6 12.90 KK24199 Summit Lake KK24200 105161-7 11.03 2009-Nov- KK24200 Summit Lake KK24201 105161-8 12.59 2009-Nov-30 KK24201 Summit Lake KK24202 105161-9 14.88 2009-Nov-30 KK24202 Summit Lake KK24203 105161-10 12.88 2009-Nov-30 KK24203 Summit Lake KK24204 105161-11 10.32 2009-Nov-30 KK24204 Summit Lake KK24205 105161-12 14.32 2009-Nov-30 KK24205 Summit Lake KK24301 105344 18.26 2010-Jun-30 KK24301 Summit Lake KK24302 105343 15.70 2010-Jun-30 KK24302 Summit Lake KK24303 105342 17.75 2010-Jun-30 KK24303 Summit Lake KK24304 105325 14.73 2010-Jun-30 KK24304 Summit Lake KK24305 105324 15.49 2010-Jun-30 KK24305 Summit Lake KK24306 105323 23.06 2010-Jun-30 KK24306 Summit Lake KK24310 105341 14.97 2010-Jun-30 KK24310 Summit Lake KK24311 105340 13.92 2010-Jun-30 KK24311 Summit Lake KK24312 105339 18.17 2010-Jun-30 KK24312 Summit Lake KK24313 105338 19.30 2010-Jun-30 KK24313 Summit Lake KK24314 105337 15. n-30 KK24314 Summit Lake KK24315 105336 17. 0-Jun-30 KK24315 Summit Lake KK243 5348 24. 0-Jun-30 KK24316 Summit Lake KK24 5350 14. 010-Jun-30 KK24317 Summit Lake KK24 5333 14 010-Jun-30 KK24319 Summit Lake KK24320 105332 2 10-Jun-30 KK24320 Summit Lake KK24321 105347 17.90 2010-Jun-30 KK24321 Summit Lake KK24322 105349 14.42 2010-Jun-30 KK24322 Summit Lake KK24328 105351 16.10 201 O-J u n-30 KK24328 Summit Lake KK2 105346 010-Jun-30 KK24329 Summit Lake K 105345 010-Jun-30 KK24330 Summit Lake K 105354 010-Jun-30 KK24346

105353 2010-Jun-30 KK24347 mit Lake 105352 2010-Jun-30 KK24348

Page 14: DIAMOND DRILLING RPT SOLLAS LAKE AREA...INTRODUCTION This report summarizes a drill hole on claim TB30 14194 in May of 2008. This hole was part of a larger 2913.88m diamond drilling

Summit Lake TB321308 2026-Nov-30 TB321308 ETAL Summit Lake TB321309 2026-Nov-30 TB321308 ET AL Summit Lake TB321310 2026-Nov-30 TB321308 ETAL Summit Lake TB321311 2026-Nov-30 TB321308 ET AL Summit Lake TB321312 2026-Nov-30 TB321308 ET Summit Lake TB321313 2026-Nov-30 TB321308 ET Summit Lake TB321314 2026-Nov-30 TB321308 ET Summit Lake TB321315 2026-Nov-30 TB321308 ETAL Summit Lake TB321380 2026-Nov-30 TB321308 ET AL Summit Lake TB321381 2026-Nov-30 TB321308 ET AL Summit Lake TB321382 107795 2026-Nov-30 TB321308 ETAL Summit Lake TB321383 107795 2026-Nov-30 TB321308 ET AL Summit Lake TB321384 107795 -Nov-30 TB321308 ET AL Summit Lake TB321385 107795 2026-Nov-30 TB321308 ETAL Summit Lake TB321386 107795 2026-Nov-30 TB321308 ETAL Summit Lake TB321387 107795 19.99 2026-Nov-30 TB321308 ETAL Summit Lake TB321388 107795 17.81 2026-Nov-30 TB321308 ETAL Summit Lake TB321389 107795 17.29 2026-Nov-30 TB321308 ETAL Summit Lake TB321713 104840 15.60 2008-Mar-31 TB321713-26 Summit Lake TB321714 104840 10.86 2008-Mar-31 TB321713-26 Summit Lake TB321715 104840 17.42 2008-Mar -31 TB321713-26 Summit Lake TB3217 14.24 2008-Mar-31 TB321713-26 Summit Lake TB3217 15.08 2008-Mar-31 TB321713-26 Summit Lake TB321718 15.14 2008-Mar-31 TB321713-26 Summit Lake TB321719 13.06 2008-Mar-31 TB321713-26 Summit Lake TB321720 13.69 2008-Mar-31 TB321713-26 Summit Lake TB321721 12.92 2008-Mar-31 TB321713-26 Summit Lake T 17.25 2008-Mar-31 TB321713-26 Summit La 15.47 2008-Mar-31

20.91 2008-Mar-Summit Lake 26.03 2008-Mar-31 TB321713-26 Summit Lake 840 20.05 2008-Mar-31 TB321713-26 Summit Lake 795 23.15 2026-Nov-30 TB321308 ET AL Summit Lake 795 24.54 2026-Nov-30 TB321308 ET Summit Lake 107871 12.23 2027 -Jun-30 TB395050-55 Summit Lake 107871 15.55 2027 -Jun-30 TB395050-55 Summit Lake 107871 18.79 2027 -Jun-30 TB395050-55 Summit Lake 107871 9.11 2027 -Jun-30 TB395050-55 Summit Lake 107871 15.60 2027 -Jun-30 TB395050-55 Summit Lake 107871 19.52 2027 -Jun-30 TB395050-55

Page 15: DIAMOND DRILLING RPT SOLLAS LAKE AREA...INTRODUCTION This report summarizes a drill hole on claim TB30 14194 in May of 2008. This hole was part of a larger 2913.88m diamond drilling

...... 'ry ~~''; '\~-

42G4435

42G4436

\.1)

4204439 : 1 "!-

<JO I 41 96

3014 198

(." ')

3014 HJ2

ADO} degroe gnd

.t:,- -

)~

1:' ~J •

lIil}-;',.5JJA6 ;;~ . ","::; 3014100

... 30 14201

.~

, '.'1 '1204442 42G4433

, _.. - .Jtt;I1.t"'J •• 4204434 K~ 24 197 . io~ - -•• ~;~.-,.~ ......... ~~ . . . •• .J " •• ~ ~ ... _ .' •

.. . - - TB32 1313 •

:104000 .. . • 420<100i- •• • -. • . ...

KK24346 KK22000 . ~ '-.-; .. " . • • ':;r." ra359~2 " ....

• • - - l1li

'" TB359983 · , :::0' -. . • _ . ' - . ~.~

, ..... " KK22s84 fB395055 1195406 . ·.c, , 4204004 . . ",-

~ .. ~: . '1191'.;>407,

- ----:;-<:-42044 40

'\:-Z H • • t ·

30 14197 ~O, 1538 . :·~'-.... 1 ;t~ -~.\\'l

4207356

~ .... ... _ KK24347 KK2280 1

~ ... ~ . .. -. - "'?"~ ... - • -

• 4207t.13

I,:)!:

4207414

420( ;3~G

...... 4~O!32(}

4207321

4207318

42073 10

1234GJ l

,:) v-'\'. ' 1234630 ,~

42'11033 .. ~ 422 1034 , 1234628 , I

!.;." _. • .~"c

\::.'

12]4629

--------,f "

-'

t. ,

l"l)

it

.. 123463,

'~J

:c.: 12:W)3{;

3011193

.1.: ... . I

42D7323

"oIl

1234637

4207317

42074 10

421,,3GG

, ,.* ~,,:".

422,,979

420731 4

't11 ..."

4207315

420741 I 4207412

4215365

) ~ ... l~ .... !"

~c. ."""

.';

1225980 i. ?,~'" ~i'a ~~'J 1

-- - -~

jU141~4

" :1\n-j',"1' ~ir. "

.,

422 71 90 E

Page 16: DIAMOND DRILLING RPT SOLLAS LAKE AREA...INTRODUCTION This report summarizes a drill hole on claim TB30 14194 in May of 2008. This hole was part of a larger 2913.88m diamond drilling

. '.~

421592 1 - j< . ... "-

.~"l-

). ~~

AD S3 dr.qrce grrd

_l.'~ ""

"0

422 108~

4215922

422 1086 " .. '

Y'. :~

.. <, ....

~) -;,'">

'i.!>1'; 4204435 .~')('

4204436 4204437

---~, 4204430 ; , 42044,,18

.;'" • ioo - 1195407

, \ .' !..~. 4204440 ,

4214 184

. - ..

.,

~ . • •

:. MdrJ",1I L,'ke . - : 4,21 '1246

... .. , . ,

4 400U • 4204001- .. · . .1· ..... '

KK22800 V '. ' • 4207318 • KK24346 -- . - KK 24347

w • •

~~ 4207-.1 i 3

. . .--. KK22801

• - 1-.-.. ... -• 4207320

420132 1

- - ; ~ • .?

420731 9

4207322

4221088

~.l ~~ ',f\ ~:~.) ~ 422 1087 30 1-.1 199 3014198 3014197 3011538 n"

4221085 \~'. ,

4221084

4221082 _ : ,. 422J08 1

.'r ~

30 14 192

- - '" .-'~ ._-,.. ...... ~----. ';'1>') 'I.""':~

] 014 195

'7" · ~.f:,'J. .

42084()2 42084{)1 301 1>04:\

422 1034

421 ';581

1234628

42 1'582

-,~

1234629

1234632

I)ur:fe~ &n\( 4225949 4225950

1234630

., 1234635 1234637

w¢ 12:!4636 1234638

4207317

'l~~ ~r-s. :t'-';

4207323 -..,~. 4207410

.--

, .-

Page 17: DIAMOND DRILLING RPT SOLLAS LAKE AREA...INTRODUCTION This report summarizes a drill hole on claim TB30 14194 in May of 2008. This hole was part of a larger 2913.88m diamond drilling

APPENDIXB

Costs of DriIJ Program

Page 18: DIAMOND DRILLING RPT SOLLAS LAKE AREA...INTRODUCTION This report summarizes a drill hole on claim TB30 14194 in May of 2008. This hole was part of a larger 2913.88m diamond drilling

SC-08-01 - Cost Summary

Drilling Cost

Cartwright Drilling SC-08-01 Drilling $34,355.17

Entire drill program is 29B.88m, this hole is 213.36m. Total breakdown of drill

costs works out to $161.02/m

Assays

ALS Chemex SC-08-01 (Cert # - TB08074710)

(Note - Assay certificate contains other samples besides SC-08-01)

Geologists

R. Middleton

N.Bennett

J.Laarman

Workers

B. King

G.Dunphy

M. King

Other Associated Costs

Drill supervision/Drill Planning

Drill supervision/Core logging

Drill supervision/Core logging

Cutting core

Hauling supplies

Hauling supplies

Quad rental 2 days @ $50/day X 3 Quads Truck rental 2 days @ $50/day

Core boxes 50 boxes @ $6.36/box Satellite Phone (Iridium - Field phone)

Satellite Phone (Signal Resources - Camp phone) Fuel (diesel)

Gas

Aroland Bunkhouse/Catering Trailer (2 days @ $20)

Total Cost:

Cost

$1,082.96

Cost

$300.00

$720.00

$500.00

Cost

$300.00

$200.00

$180.00

Cost

$300.00

$100.00

$318.00 $123.45

$18.25

$250.00

$150.00

$796.20 $40.00

$39,734.03

Page 19: DIAMOND DRILLING RPT SOLLAS LAKE AREA...INTRODUCTION This report summarizes a drill hole on claim TB30 14194 in May of 2008. This hole was part of a larger 2913.88m diamond drilling

APPENDIX C

Drill Logs, Assays, Plan Map and Cross Section

Page 20: DIAMOND DRILLING RPT SOLLAS LAKE AREA...INTRODUCTION This report summarizes a drill hole on claim TB30 14194 in May of 2008. This hole was part of a larger 2913.88m diamond drilling

, I

--- - -r---~~- - -- -

_o r

466500 mE

467500m

, , +------- -- --, ,

4,225,980

,

4

, .. . _- - - _ ... _, -------

-------- t- - - ---,

, -"',' '' ' ' ''1 ... .

_"i _ .. ,

-- - - ---------------

, _ ___ -l

I ,

, -- --- r------- -- ---- --,----

. -- - . - ~----------- -I

, , , ··1 -" -

, ... :.".

mE

-:.' ~ ~' - - _.

, I· .. ,

l _ _ __ _ _____ ~ _____ _

baim TB :3014194

@

, , Meta'Lake

-":... -.....:· .... k·---- ­I ,

"'r'

I -" I ' , .. ' [

I , ''' 1

_, _ ~ .d_ , I I

./ , - 7- -- ------- - --1----, ,

SC-OB-OI

Azimuth ,' ~ 40 Dip: - 50 Depth: 213,36m

, -- - - --r

g: , co

i ~ r-- - - -- --- - -- -- "-I

3

least , westlR E S O U RC E

COR PORAT I O:--, , ,

- - - - - - - - - - - - + - - - - - -' . o~_ ~11111111~!_;;;;;;;-' ~- ;_0;:_1".511- -""-""-",,-,,,,-,,,,-~5 _11_""_ .. - -II-~' J ..

-

----~---___ ~~~~Raftd~. ~. ---------~:J kilometres i Rgute1 : Drill Hole Plan

Marshall Lake P~y

467500 mE 468500 mE 469500 mE 470500 mE

Page 21: DIAMOND DRILLING RPT SOLLAS LAKE AREA...INTRODUCTION This report summarizes a drill hole on claim TB30 14194 in May of 2008. This hole was part of a larger 2913.88m diamond drilling

Hole 10; SC-08-01

Grid X: no grid

Grid Y: no grid

Drill Start:

Drll Finish:

Surveyed

From To

0,00 5,00

5,00 29,97

29,97 40,49

40.49 46,72

46,72 47.62

47,62 5591

5591 71,24

71,24 165,57

165,57 170,13

170,13 174,27

174,27 213,36

5C-08-01

Project: MARSHALL LAKE Year 2008 Claim: TB 3014194 TWP: Sollas lake

Easting: 469700,00 UTM Zone: 16 Grid Azimuth: Dip 50 Length: 213,36 Casing: left in Cemented

Northing: 5589600,00 Datum: NAD 83 True Azimuth: 40 Elev (m): 350,00 Core Size: BTW Casing (m): 4,57 Target:

06/05/2008 Log Start: 28/05/2008 Drill Company: Cartwright Drilling Drilled for: EAST WEST RESOURCES CORPORATION

07/05/2008 Log Finish: 29/05/2008 Foreman: leon Storage: Thunder Bay, Ont. 1158 Russell St.

Logged by: Jordan laarman Checked by: Comments:

Lithology Code

Overburden 14

Metasediments Sea

Graphitic sediments 6a

Metasediments Sea

Graphite 6aa

Metasediments S

Graphite 6a

Metasediments Sea

Graphite 6a

Metasediments Sea

Graphite 6a

Page 1 of 5

Page 22: DIAMOND DRILLING RPT SOLLAS LAKE AREA...INTRODUCTION This report summarizes a drill hole on claim TB30 14194 in May of 2008. This hole was part of a larger 2913.88m diamond drilling

From

0.00

5.00

29.97

40.49

46.72

To

5.00

29.97

40.49

Alteration

39.82

Lithology

Overburden

Metasediments

Code

14

Sca

5C-08-01

Unit is grey-green fine grain <1 mm biotite-silica foliated with white silica bands <1 mm to 1 cm in width. From 9.25 to 9.95m, there's dominant pod-like massive silica flooding in the unit and from 11.04 to 11.89m. Banding in unit is 20' to CA. Unit is greener is lesser chlorite-foliated parts. From 25.68 to 26.15m, there are up to 2cm silica bands with py at 20' to CA.

Graphitic sediments 6a

From 29.97 to 31.49 there's massive graphite with bands of sulphide. From 31.49 to 35.40m, graphite is interbanded with metasediments and sulphide in graphitic parts. From 35.40 to 40.49m, there's massive graphite with sulphide.

40.53 Carbonate 4

Calcite veining with py sulphide in graphite unit.

Mineralization

29.97 31.49 Min % Style

Po 10 banded

Py dissem in ban

31.49 35.40 Min % Style

Po 3 banded

35.40 41.35 Min % Style

Po 35 semi-massive

Py 20 semi-massive

46.72 Metasediments

Unit is darker grey and less banded.

47.62 Graphite

Massive graphite with py.

Mineralization

46.72 47.62 Min % Style

Semi-massive po and lesser py is from 35.40 to 38.14m. This is followed by dominant semi-massive py to 38.69m. After this, there's lesser sulphide bands to past the graphite zone and into metasediments at 41.35m.

Sca

6aa

Page 2 of 5

Sample From To Width

Page 23: DIAMOND DRILLING RPT SOLLAS LAKE AREA...INTRODUCTION This report summarizes a drill hole on claim TB30 14194 in May of 2008. This hole was part of a larger 2913.88m diamond drilling

From

47.62

55.91

71.24

To

55.91

Lithology

Py

Metasediments

SC-OS-Ol

Code

15 Py occurs as clots and in vugs.

5

Mineralization

55.07 66.38 Min % Style

Py 20 patches

71.24 Graphite 6a

Graphite with py mineralization.

Mineralization

66.38

165.57

Alteration

73.15

122.90

124.60

130.80

134.50

71.24 Min % Style

Po 50 semi-massive

Py 15 semi-massive

Metasediments 5ea

Metasediments with minor foliated po. From 104.01 to 104.52m, from 105.24 to 105.72m and from 136.96 to 137.44, there's coarse recrystallized feldspar-quartz with up to 2cm crystals of feldspar in the metasediments with minor sulphide. At iS6.g0m, the metasediments begin to get darker due to more carbonaceous content closer to underlying graphite lone.

79.39 Garnet 6

Alteration occurs more intensely in some areas with rounded 0.5cm garnets.

123.60 Garnet-biotite 5

128.18 Garnet 4

133.40 Gamet 5

Less than 0.5cm garnets run along foliation planes.

135.11 Biotite 6

Stong med-grained biotite alteration in metasediments.

Page 3 of 5

Sample From To Width

Page 24: DIAMOND DRILLING RPT SOLLAS LAKE AREA...INTRODUCTION This report summarizes a drill hole on claim TB30 14194 in May of 2008. This hole was part of a larger 2913.88m diamond drilling

SC-08-01

From To Lithology Code Sample From To Width

139.40 141.27 Garnet 4

Smaller up to 3mm garnets alteration occurs in areas.

150.60 151.22 Carbonate 4

Clots of calcite alteration.

Mineralization

89.24 89.27 Min % Style

Po 30 patchy, in clot

91.80 91.99 Min % Style

Po 30 in fractures

Py 15 massive with

109.52 109.61 Min % Style

Po 40 semi-massive

11506 115.65 Min % Style

Po 40 semi-massive

127.76 128.09 Min % Style

Po 15 veins 15cm long veins

Py 3 veins

128.70 128.92 Min % Style

Po 95 massive

Py 5 patches

Veining

103.73 103.87 Type si Orient: Min: qtz

Quartz vein with po and py mineralization.

148.19 148.24 Type si Orient: Min: qtz

White to pink quartz-feldspar vein.

Page 4 of 5

Page 25: DIAMOND DRILLING RPT SOLLAS LAKE AREA...INTRODUCTION This report summarizes a drill hole on claim TB30 14194 in May of 2008. This hole was part of a larger 2913.88m diamond drilling

From To Lithology

165.57 170.13 Graphite

Code

6a

5C-08-01

Graphite unit is mineralized and contains interbands of metasediment.

Mineralization

166.57 166.85 Min % Style

Po 80 massive

166.85 170.11 Min % Style

Po 50 semi-massive

170.13 174.27 Metasediments Sea

174.27 213.36 Graphite 6a

Unit contains dominant banded po throughout to the end of the hole. Further down the hole po bands move more parallel to CA.

Mineralization

174.27 183.77 Min % Style

Po 30 semi-massive Po bands begin at 174.27m at 30° to CA

183.77 186.27 Min % Style

Po 70 massive, semi

186.27 213.36 Min % Style

Po 30

Page 5 of5

Sample From To Width

Page 26: DIAMOND DRILLING RPT SOLLAS LAKE AREA...INTRODUCTION This report summarizes a drill hole on claim TB30 14194 in May of 2008. This hole was part of a larger 2913.88m diamond drilling

Rock Type Code

Primary Age Root Description Additional Notes

Code Quaternary

14 Overburden (Unsubdivided)

Proterozoic 13 Diabase (Unsubdivided)

Archean 12 Lamprophyre (Unsubdivided)

11 Late Structural Zones (Unsubdivided) 11a Shear zone (unsubdivided) 11b Breccia zone (unsubdivided) 11ba Tectonic breccia (late fault zones containing angular clasts) 11c Fault zone (gouge, lost core) 11d Vein (unsubdivided) 11da Quartz vein 11db Carbonate vein 11dc Quartz·carbonate vein

10 Late Felsic To Intermediate intrusions (Unsubdivided) 10a Granite rocks Granite, tonalite, granodiorite, trondjemite, quartz diorite, quartz monzonite 10b Syenitic rocks Syenite, monzonite, monzodiorite, quartz syenite 10e Quartz porphyry 10d Quartz-feldspar porphyry 10e Feldspar porphyry 10f Pegmatite

109 Aplite

9 Late Mafic·Ultramafic intrusions (unsubdivided) 9a Late Mafic intrusions (Unsubdivided) gaa Diorite gab Anorthosite 9ac

I Melanogabbro

) 9aca locally grading to granite in No. 34 zone 9acb 9ad

~ gae 9b Late Ultramafic intrusions (Unsubdivided) 9ba Hornblendile 9bb Pyroxenite (unsubdivided) 9bba Clinopyroxenite 9bbb Orthopyroxenite

9bc Peridotite (unsubdivided) 9bea Wehrlite

Page 1 of 5

Page 27: DIAMOND DRILLING RPT SOLLAS LAKE AREA...INTRODUCTION This report summarizes a drill hole on claim TB30 14194 in May of 2008. This hole was part of a larger 2913.88m diamond drilling

Rock Type Code

Primary Age Root Description Additional Notes

Code 9bcb Websterite

9bee Dunite

9bed Lherzolite

9bce Serpentinite

9c Hybrid zone complex mixing/assimilation zone of wall rock and chilled mafic-ultramafic units

9d Massive magmatic sulphide pyrrhotite, chalcopyrite, pentlandite

8 Early Felsic to Intermediate Meta-Intrusions (Unsubdivided) 8a Granite rocks Granite, tonalite, granodiorite, trondjemite, quartz diorite, quartz monzonite

8b Syenitic rocks Syenite, monzonite, monzodiorite, quartz syenite

Bc Quartz porphyry includes some amygdaloidal intrusions

8d Quartz-feldspar porphyry

8e Quartz-feldspar porphyritic Georgeson Porphyry 8f Feldspar porphyry

8g Aphyric intrusions very fine grained and lacking phenocrysts

8h Pegmatite

7 Early Mafic-Ultramafic intrusions (unsubdivided)

7a Early Mafic intrusions (Unsubdivided)

7aa Diorite

7ab Anorthosite

7ac Gabbro (unsubdivided) 7aca Feldspar glomeritic gabbor

7acb Clinopyroxene oikiocrystic gabbro

7ad Norite

7ae Granophyre

7b Early Ultramafic intrusions (Unsubdivided) 7ba Hornblendite

7bb Pyroxenite (unsubdivided)

7bc Peridotite (unsubdivided)

7bd Serpentinite

6 Chemical Metasedimentary Rocks (Unsubdivided)

6a Graphitic sediments (unsubdivided) 6aa Graphitic Argillite

6b Chert (unsubdivided)

Sc Iron formation (unsubdivided)

Sea Oxide facies iron formation

6eb

6ee Silicate facies iron formation

6ed Sulphide facies iron formation

6ed ~'d) Gee (unsubdividedj

6d mix sulphide, graphite, carbonate and/or argillite

Page 2 of 5

Page 28: DIAMOND DRILLING RPT SOLLAS LAKE AREA...INTRODUCTION This report summarizes a drill hole on claim TB30 14194 in May of 2008. This hole was part of a larger 2913.88m diamond drilling

Rock Type Code

Primary Age Root Description Additional Notes

Code

5 Clastic Metasedimentary Rocks (Unsubdivided) 5a Argillite (un subdivided)

5b Siltstone (unsubdivided)

5c Sandstone (unsubdivided) 5ca Wacke 5cb Arkose/Arenite 5cc Felsic volcanic, lithic sandstone

5ed Felsic volcanic, sandstone to siltstone 5ce Felsic volcanic, Pebbly Sandstone

5d Conglomerate (unsubdivided)

5da Polymictic, felsic volcanic conglomerate (unsudivided) rounded clasts identified 5dap Possible polymictic, felsic volcanic conglomerate (unsudivided) 5daa Boulder conglomerate 5daap Possible boulder conglomerate

5dab Cobble conglomerate

5dabp Possible cobble conglomerate 5dac Pebble conglomerate 5dacp Possible pebble conglomerate

5dad Cobble To boulder conglomerate 5dadp Possible cobble to boulder conglomerate 5dae Pebble To boulder conglomerate

5daep Possible pebble to boulder conglomerate 5daf Pebble To cobble conglomerate 5dafp Possible pebble to cobble conglomerate

5db Polymitic, felsic volcanic conglomerate and interbedded sandstone 5dbp Possible polymitic, Felsic volcanic conglomerate and interbedded sandstone 5dc Oligomictic, felsic volcanic conglomerate (unsudivided) rounded clasts identified 5dcp Possible oligomictic, felsic volcanic conglomerate (unsudivided) 5dd Polymictic, felsic to intermediate volcanic, pebble to boulder conglomerate 5ddp Possible polymictic, felsic to intermediate volcanic, pebble to boulder conglomerate 5de PolymictiC, intermediate volcanic, pebble to boulder conglomerate 5dep Possible, polymictic, intermediate volcanic, pebble to boulder conglomerate 5f Siliceous sedimentary breccia possibly intraformational breccia

4 Felsic Metavolcanic Rocks (Unsubdivided) 4a Massive lava flows (unsubdivided) 4aa Quartz porphyritic, fractured to autobrecciated massive, locally amygdaloidallava flows 4ab Quartz-feldspar porphyritic massive lava flows 4ac Feldspar porphyritic massive lava flows 4ad Amygdaloidal massive lava flows 4b ~fWS (unsubdivided) Quartz crystal bearing \AJith fefdspar crystals 'lJhich mayor may not be visible 4c " ) fragments are <2mm in size 4ca Quartz crystal tuff

Page 3 of 5

Page 29: DIAMOND DRILLING RPT SOLLAS LAKE AREA...INTRODUCTION This report summarizes a drill hole on claim TB30 14194 in May of 2008. This hole was part of a larger 2913.88m diamond drilling

Rock Type Code

Primary Age Root Description Additional Notes

Code 4cb Quartz-feldspar crystal tuff Nuinsco's QID unit 4cc Feldspar crystal tuff 4cd Lithic tuff 4ce Vi!ric tuff 4cf Monolithic fragmental units (unsubdivided) probably a component of lava flows 4cfa Monolithic lapilli-tuff fragments are >2mm to 64 mm in size 4cfb Monolithic lapilli-tuff to tuff breccia 4cfc Monolithic tuff-breccia or possibly breccia fragments are >64 mm in size 4cg Heterolithic fragmental units (unsubdivided) angular clasts observed 4cga Heterolithic lapilli-tuff fragments are >2mm to 64 mm in size 4cgb Heterolithic felsic lapilli-tuff to tuff-breccia

~ are >64 mm in size 4cgc Heterolithic felsic tuff-breccia or possibly breccia 4d Felsic unit of uncertain genesis (volcanic or sedimentary)

3 Intermediate Metavolcanic Rocks (Unsubdivided) 3a Massive lava flows (unsubdivided) 3aa Amygdaloidallava flows 3ab Feldspar porphyritic lava flows 3b Tuff (unsubdivided) fragments are <2mm in size 3ba Crystal tuff 3bb Lithic tuff 3bc Vitric tuff 3bd Lapilli tuff fragments are >2mm to 64 mm in size 3be Tuff breccia fragments are >64 mm in size

2 Mafic Metavolcanic Rocks (Un subdivided) 2a ~'id'd) 2aa flows

Zab ve lava flows Zac 2ad Amygdaloidal massive lava nows 2ae Porphyritic massive lava flows 2b Pillowed lava flows (unsubdivided) 2ba Pillow breccia/hyaloclastite 2bb Amygdaloidal pillowed lava flows 2c Tuff (unsubdivided) fragments are <2mm in size 2ca Crystal tuff 2cb Lithic tuff

2cc Vitric tuff 2ed Lapilli tuff fragments are >2mm to 64 mm in size 2ce Tuff breccia fragments are >64 mm in size

1 Uitramafic Metavolcanic Rocks (Unsubdivided) 1a Massive lava flows

Page 4 of 5

Page 30: DIAMOND DRILLING RPT SOLLAS LAKE AREA...INTRODUCTION This report summarizes a drill hole on claim TB30 14194 in May of 2008. This hole was part of a larger 2913.88m diamond drilling

Rock Type Code

Primary Age Root Description Additional Notes

Code lb Pillowed lava flows 1c Polysutured lava flows ld Spinifex-textured lava flows

Page 5 of 5

Page 31: DIAMOND DRILLING RPT SOLLAS LAKE AREA...INTRODUCTION This report summarizes a drill hole on claim TB30 14194 in May of 2008. This hole was part of a larger 2913.88m diamond drilling

Total Total Total Total

Cu ppm Zn ppm Agppm Au ppm

Hole Sample # From To Width

5C-08-01 G134560 29.37 30.37 1 156 300 0

5C-08-01 G134561 30.37 31.37 1 150 993 0

5C-08-01 G134562 31.37 32.47 1.1 148 507 0.2

5C-08-01 G134563 32.92 33.91 0.99 164 476 0.3

5C-08-01 G134564 33.91 34.91 1 89 207 0.2

5C-08-01 G134565 34.91 35.91 1 311 504 0

5C-08-01 G134566 35.91 36.68 0.77 286 1710 0

5C-08-01 G134567 36.68 37.68 1 393 1140 0

5C-08-01 G134568 37.68 38.68 1 289 1730 0.2

5C-08-01 G134569 38.68 39.15 0.47 223 1060 0.2

5C-08-01 G134570 39.15 40.15 1 105 99 0.2

5C-08-01 G134571 40.15 41.15 1 111 334 0.6

5C-08-01 G134572 59.13 60.13 1 7060 67 8.1

5C-08-01 G134573 62 63 1 272 67 0

5C-08-01 G134574 64.42 65.42 1 270 401 0

5C-08-01 G134575 65.42 66.42 1 184 132 0

5C-08-01 G134576 66.42 67.42 1 195 796 0

5C-08-01 G134577 67.42 68.42 1 133 592 0

5C-08-01 G134578 68.42 69.87 1.45 242 582 0

5C-08-01 G134579 70.24 71.24 1 401 289 0

5C-08-01 G134580 115.06 115.65 0.59 285 95 0.3

5C-08-01 G134581 166.57 167.57 1 282 268 0.3

5C-08-01 G134582 167.57 168.57 1 172 260 0.2

5C-08-01 G134583 168.57 169.57 1 205 183 0

5C-08-01 G134584 169.57 170.2 0.63 140 358 0

5C-08-01 G134585 174.4 175.4 1 124 1310 0.4

5C-08-01 G134586 175.4 176.7 1.3 95 1220 0.2

5C-08-01 G134587 176.78 177.68 0.9 146 1390 0.2

5C-08-01 G134588 178.15 179.15 1 204 2390 0.5 5C-08-01 G134589 179.15 180.15 1 104 2510 0.2

5C-08-01 G134590 180.15 181.15 1 62 1380 0 5C-08-01 G134591 181.15 182.15 1 171 1980 0.4

5C-08-01 G134592 182.15 183.15 1 53 1240 0 5C-08-01 G134593 183.15 184.15 1 319 1300 0.4 5C-08-01 G134594 184.15 185.15 1 461 1890 0.3 5C-08-01 G134595 185.15 186.15 1 514 1170 0.3 5C-08-01 G134596 186.15 187.15 1 368 118 0.8 5C-08-01 G134597 187.15 188.15 1 299 678 0.6 5C-08-01 G134598 188.15 189.15 1 319 2220 0.4 5C-08-01 G134599 189.15 190.15 1 235 852 0.5 5C-08-01 G134600 190.15 191.15 1 156 1640 0.3 5C-08-01 G134601 191.15 192.15 1 193 994 0.4

Page 32: DIAMOND DRILLING RPT SOLLAS LAKE AREA...INTRODUCTION This report summarizes a drill hole on claim TB30 14194 in May of 2008. This hole was part of a larger 2913.88m diamond drilling

5C-08-01 G134602 I 192.15 193.15 :L 147 2400 0.5

5C-08-01 G134603 193.15 194.15 1 97 1285 0.4

5C-08-01 G134604 194.15 195.15 1 159 1595 0.6

5C-08-01 G134605 195.15 196.15 1 1551 1750 O.G

5C-08-01 G134606 196.15 197.15 1 150 951 0.4

5C-08-01 G134G07 197.15 198.15 1 270 1240 0.8

5C-08-01 G134608 198.15 199.15 1 282 2020 0.8

5C-08-01 G134609 199.15 200.15 1 283 794 0.8

5C-08-01 G134610 200.151 201.15 1 1ffi 548 0.7 5C-08-01 G134611 201.15 202.15 1 13650 0.6

~G134612 202.15 203.15 1 209 1110 0.5 5C-08-01 G134613 203.15 204.22 1.07 335 346 0.8

5C-08-01 G134614 204.22 205.22 1 370 320 0.7

5C-08-01 G134615 205.22 206.22 1 390 3680 0.6 5C-08-01 G134616 206221 207.22 1 596 957 1.1 5C-08-01 G134617 207.22 208.22 1 390 89 0.9 5C-08-01 G134618 208.22 209.22 1 390 561 0.8 5C-08-01 G134619 209.22 210.22 1 358 1730 0.5 5C-08-01 G134620 210.22 211.22 1 365 1165 0.6 5C-08-01 G134621 211.~H2.22 1 41:1. 922 1.1 5C-08-01 G134622 212.22 213.36 1.14 366 553 0.8

Page 33: DIAMOND DRILLING RPT SOLLAS LAKE AREA...INTRODUCTION This report summarizes a drill hole on claim TB30 14194 in May of 2008. This hole was part of a larger 2913.88m diamond drilling

ME-ICP41 ME-ICP41 ME-ICP41 ME-ICP41 ME-ICP41 ME-ICP41 ME-ICP41 ME-ICP41

SAMPLE Ag AI As B Ba Be Bi Ca

ppm % ppm ppm ppm ppm ppm %

G134560 <0.2 1.77 2 <10 10 0.5 <2 1.08

G134561 <0.2 0.77 <2 <10 20 <0.5 2 0.44

G134562 0.2 1.59 2<10 70 1.3 <2 1.82

G134563 0.3 1.34 <2 <10 30 <0.5 <2 1.22

G134564 0.2 0.91 <2 <10 30 <0.5 <2 2.45

G134565 <0.2 1.59 <2 <10 10 0.7 4 0.58

G134566 <0.2 1.13 2 <10 20 0.6 <2 1.42

G134567 <0.2 1.02 <2 <10 30 0.7, 3 1.25

G134568 0.2 1.65 4 <10 20 1.8 3 0.86

G134569 0.2 2.43 <2 <10 10 1.6 2 1.64

G134570 0.2 1.56 <2 <10 10 1.7 3 0.61

G134571 0.6 1.55 <2 <10 20 0.9 3 2.26

G134572 8.1 3.82 5 <10 <10 0.6 10 12.9

G134573 <0.2 3.45 2 <10 10 1.4 4 0.38

G134574 <0.2 1.57 <2 <10 10 <0.5 4 0.34

G134575 <0.2 2.19 <2 <10 10 0.6 3 0.86

G134576 <0.2 2.16 <2 <10 20 0.5 2 1.15

G134577 <0.2 2.09 2 <10 20 1 <2 3.25

G134578 <0.2 2.43 7 <10 10 0.6 <2 2.14

G134579 <0.2 1.54 <2 <10 10 0.7 2 0.54

G134580 0.3 0.93 4 <10 10 <0.5 <2 1.44

G134581 0.3 1.21 <2 <10 40 <0.5 5 0.74

G134582 0.2 2.43 <2 <10 30 <0.5 <2 1.88

G134583 <0.2 2.23 <2 <10 50 <0.5 <2 0.97

G134584 <0.2 1.86 8 <10 60 <0.5 <2 0.23

G134585 0.4 1.5 <2 <10 20 0.7 <2 0.84

G134586 0.2 1.17 <2 <10 20 0.5 <2 0.53

G134587 0.2 2.19 3 <10 40 0.5 4 1.01

G134588 0.5 0.77 <2 <10 30 <0.5 6 0.26 G134589 0.2 1.14 <2 <10 10 0.7 2 1.67 G134590 <0.2 1 4 <10 30 0.7 <2 0.34 G134591 0.4 1.1 <2 <10 20 0.6 <2 0.44 G134592 <0.2 1.89 2 <10 60 <0.5 <2 0.48 G134593 0.4 0.88 2 <10 30 <0.5 5 0.43 G134594 0.3 1.19 9 <10 30 <0.5 4 0.83 G134595 0.3 1.11 2 <10 20 <0.5 5 0.83 G134596 0.8 1.19 2<10 40 <0.5 8 0.93 G134597 0.6 0.98 3<10 20 <0.5 6 1.68 G134598 0.4 1.29 <2 <10 10 <0.5 6 0.81 G134599 0.5 2.21 2 <10 40 <0.5 6 1.51 G134600 0.3 2.92 2 <10 30 <0.5 3 1.44 G134601 0.4 1.34 3 <10 30 0.6 4 0.55

Page 34: DIAMOND DRILLING RPT SOLLAS LAKE AREA...INTRODUCTION This report summarizes a drill hole on claim TB30 14194 in May of 2008. This hole was part of a larger 2913.88m diamond drilling

G134602 0.5 1 4 <10 40 <0.5 5 0.22

G134603 0.4 1.26 2 <10 40 0.6 2 0.49

Imj 0.6 0.98 <2 <10 30 0.5 5 0.22

G13 0.6 0.9 2 <10 40 <0.5 4 0.1

G1 0.4 0.98 a 40 <0.5 3 0.15

G134607 0.8 0.83 30 <0.5 6 0.14

G134608 0.8 0.66 20 <0.5

~ G134609 0.8 0.96 6 <10 30 <0.5 0.25

G134610 0.7 1.07 <2 <10 40 <0.5 0.34

G134611 0.6 1.11 7 <10 40 <0.5 0.43

G134612 0.5 1.61 4 <10 20 0.8 4 0.72

G134613 0.8 1.09 13 <10 20 <0.5 6 0.77

G134614 0.7 1.92 3 <10 20 0.6 7 1.76

G134615 0.6 1.55 <2 <10 10 <0.5 5 1.37

G134616 1.:1. 0.88 7 <10 20 <0.5 6 0.69

G134617 0.9 0.96 4 <10 30 <0.5 9 0.7

G134618 0.8 0.9 6 <10 20 0.5 10 0.68

G134619 0.5 0.96

I 10 0.9 8 0.65

G134620 0.6 0.94 10 0.9 8 0.61

G134621 1.1 0.84 10 0.5 9 0.44

G134622 0.8 1.19 10 0.9 9 0.78

Page 35: DIAMOND DRILLING RPT SOLLAS LAKE AREA...INTRODUCTION This report summarizes a drill hole on claim TB30 14194 in May of 2008. This hole was part of a larger 2913.88m diamond drilling

ME-ICP41 ME-ICP41 ME-ICP41 ME-ICP41 ME-ICP41 ME-ICP41 ME-ICP41 ME-ICP41 ME-ICP41

Cd Co Cr Cu Fe Ga Hg K La

ppm ppm ppm ppm % ppm ppm % ppm

0.5 34 75 156 11.3 <10 <1 0.11 10 1.9 41 30 150 11.1 <10 <1 0.08 10 1.4 49 170 148 10.25 <10 <1 0.09 10 1.1 50 53 164 10.65 <10 1 0.06 10

<0.5 37 53 89 6.07 <10 <1 0.16 20 0.8 93 255 311 16.8 10 <1 0.1 10 3.7 50 275 286 14.75 10 1 0.08 10 2.2 38 176 393 19.2 <10 <1 0.07 10 3.6 106 63 289 18.2 10 1 0.08 <10 2.2 37 339 223 13.55 10 <1 0.09 10

<0.5 30 157 105 8.29 10 <1 0.11 40 0.6 56 161 111 9.49 10 <1 0.12 10

<0.5 36 156 7060 14.15 20 <1 <0.01 <10 <0.5 37 63 272 11.6 10 <1 0.03 <10

0.6 73 581 270 14.7 <10 <1 0.08 10 <0.5 44 122 184 11.25 10 <1 0.08 10

1.4 50 150 195 13.5 10 <1 0.12 10 1.2 34 414 133 9.5 10 <1 0.09 10 0.8 66 66 242 19.1 10 1 0.09 10

<0.5 69 33 401 20.7 10 <1 0.04 10 <0.5 59 15 285 15.1 <10 <1 0.01 <10

0.6 77 49 282 23.8 <10 1 0.05 10 <0.5 39 85 172 12.5 <10 1 0.09 <10 <0.5 49 117 205 16.8 10 <1 0.27 <10 <0.5 33 91 140 11.65 10 <1 0.89 10

2.5 34 271 124 11.5 <10 1 0.12 10 2.2 31 134 95 8.54 <10 1 0.12 20 2.3 41 111 146 11.05 10 <1 0.37 20 4.3 57 95 204 14.5 <10 <1 0.2 10 4.6 32 49 104 9.9 <10 <1 0.06 100 2.5 32 23 62 5.72 <10 <1 0.09 30 3.5 61 24 171 13.45 <10 <1 0.1 10 2.2 28 59 53 5.99 10 <1 0.84 20 2.1 85 38 319 24.8 <10 <1 0.11 10 3.4 102 22 461 30.5 <10 <1 0.07 <10

2 102 14 514 30.8 <10 <1 0.03 20 <0.5 88 17 368 26.9 <10 <1 0.04 10

1.3 70 43 299 21 <10 <1 0.04 10 4.5 78 26 319 23.7 <10 <1 0.1 10 1.4 59 298 235 18.4 <10 1 0.16 10 3.2 38 102 156 12.25 10 <1 0.55 20 2.1 50 32 193 14.7 <10 <1 0.18 20

Page 36: DIAMOND DRILLING RPT SOLLAS LAKE AREA...INTRODUCTION This report summarizes a drill hole on claim TB30 14194 in May of 2008. This hole was part of a larger 2913.88m diamond drilling

5.9 40 101 147 11.8 <10 <1 0.26 10 2.7 26 42 97 8.53 <10 <1 0.26 20 3.7 41 45 159 12.6 <10 <1 0.36 20. 4.1 41 46 155 12.5 <10 <1 0,41 101

2 37 41 150 11.55 <10 <1 0.48 101 2.9 65 33 270 19.4 <10 <1 0.33 10 4.6 74 29 282 22 <10 <1 0.18 10 1.8 66 42 283 20.4 <10 <1 0.3 10 1.1 59 34 237 18.2 <10 <1 0.32 10

3 69 83 323 20.8 <10 1 0.18 10 2.5 52 77 209 16.4 <10 <1 0.22 20 0.7 83 31 335 25.3 <10 1 0.09 10

<0.5 76 29 370 23.5 <10 <1 0.09 10 8.9 56 26 390 17.5 <10 <1 0.02 10 1.7 101 6 596 31.2 <10 <1 0.03 10

<0.5 101 18 390 31.3 <10 <1 0.08 10 0.9 95 20 390 29 <10 <1 0.07 10 3.9 87 35 358 26 <10 1 0.07 10 2.3 85 46 365 26.2 <10 <1 0.05 10 1.8 93 72 411 28.3 <10 <1 0.03 <10 0.9 94 42 366 28.8 <10 <1 v.07 10

Page 37: DIAMOND DRILLING RPT SOLLAS LAKE AREA...INTRODUCTION This report summarizes a drill hole on claim TB30 14194 in May of 2008. This hole was part of a larger 2913.88m diamond drilling

ME-ICP41 ME-ICP41 ME-ICP41 ME-ICP41 ME-ICP41 ME-ICP41 ME-ICP41 ME-ICP41 ME·ICP41

Mg Mn Mo Na Ni P Pb S Sb

% ppm ppm % ppm ppm ppm % ppm

1.06 748 2 0.02 141 360 9 6.83 <2 0.37 372 5 0.01 177 240 7 6.48 <2 0.44 529 3 0.02 241 300 7 5.91 <2 0.51 561 2 0.04 217 500 11 6.571-.:2 0.35 473 1 0.04 270 360 8 3.6 <2 0.95 941 3 0.03 248 290 20 >10.0 <2 0.74 786 4 0.03 250 300 5 <2 0.59 554 4 0.03 ~ <2 0.95 680 5 0.03 <2 1.64 1195 3 0.03 3 7 <2 1.08 836 6 0.04 <2 1.03 808 4 0.03 131 <2 2.66 1615 7 0.01 156 .6 <2 2.11 1155 9 0.02 165 4.33 <2 0.84 775 4 0.03 214 111 8.46 <2 1.17 857 4 0.02 132 570 12 6.78 <2 0.86 892 5 0.01 155 390 11 7.26 <2 1.18 1235 2 <0.01 134 250 10 5.08 <2

1 1485 3 0.01 185 290 10 >10.0 <2 0.61 976 7 0.02 264 330 5 9.93 <2 0.09 314 1 0.04 88 240 7 4.81 <2

0.3 330 2 0.07 150 240 9 >10.0 <2 0.8 789 1 0.03 79 360 9 7.2 <2

1.25 1000 1 0.02 103 230 9 8.3 <2 1.3 1170 <1 0.06 70 370 8 4.35 <2 0.6 609 4 0.03 105 360 14 6.49 <2

0.62 667 5 0.03 88 290 26 4.63 <2 1.41 1160 3 0.03 96 1040 19 6.04 <2 0.42 453 7 0.03 127 200 22 8.69 <2 0.5 506 6 0.03 E 150 54 5.78 <2

0.54 562 51 0.03 91 901 44 2.91 <2 0.58 751 6 0.03 260 41 7.65 <2 1.26 1330 5 0.04 78 890 43 2.6 <2 0.25 334 4 0.04 172 170 19 >10.0 <2 0.18 253 0.03 206 360 15 >10.0 <2 0.18 235 .02 205 200 8 >10.0 <2

301 190 280 14 >10.0 <2 0.23 619 150 310 11 >10.0 <2 0.27 379 167 120 16 >10.0 <2 0.8 782 3 <0.01 125 390 15 >10.0 <2

1.53 1420 3 <0.01 81 1170 23

~ 0.47 684 5 0.02 97 140 25

Page 38: DIAMOND DRILLING RPT SOLLAS LAKE AREA...INTRODUCTION This report summarizes a drill hole on claim TB30 14194 in May of 2008. This hole was part of a larger 2913.88m diamond drilling

0.51 835 9 <0.01 75 50 36 6.96 <2 0.59 960 8 <0.01 52 250 73 4.73 <2 0.54 899 9 <0.01 78 350 55 7.4 <2 0.52 858 9 <0.01 75 100 65 7.36 <2 0.56 909 7 0.01 74 280 42 6.67 <2 0.43 1210 6 <0.01 121 190 S9 >10.0 <2 0.29 570 7 <0.01 137 160 59 >10.0 <2 0.48 879 9 <0.01 126 370 38 >10.0 <2 0.55 947 8 <0.01 110 520 31 >10.0 <2 0.51 870 4 <0.01 128 180 29 >10.0 <2 0.55 833 4 0.03 98 870 23 9.78 <2 0.25 391 2 <0.01 154 290

~~ 0.32 529 3 <0.01 143 370 0.54 768 <1 <0.01 105 480 10 0.23 390 <1 <0.01 189 250 11 0.18 276 1~ 193 300 0.11 202 3 <0.01 181

~ 0.18 304 4 <0.01 163 0.25 373 5 <0.01 162 0.39 417 4 <0.01 176 110 0.4 380 4 <0.01 178 270 2 .0 <2

Page 39: DIAMOND DRILLING RPT SOLLAS LAKE AREA...INTRODUCTION This report summarizes a drill hole on claim TB30 14194 in May of 2008. This hole was part of a larger 2913.88m diamond drilling

ME-ICP41 ME-ICP41 ME-ICP41 ME-ICP41 ME-ICP41 ME-ICP41 ME-ICP41 ME-ICP41 ME-ICP41

Sc Sr Th Ti TI U V W Zn ppm ppm ppm % ppm ppm ppm ppm ppm

10 3 <20 0.09 <10 <10 77 <10 300 3 5 <20 0.03 <10 <10 21 <10 993 5 23 <20 0.12 <10 <10 34 20 507 4 15 <20 0.13 <10 <10 <10 476 3 30 <20 0.12 <10 <10 207 8 4 10 <10 6 0 504 6 6 <20 <10 46 <10 B 5 5 <10 38 <10 7 3 <10 47 <10 1730 7 11 <10 <10 71 <10 1060 6 7 0.08 <10 <10 44 <10 99 7 0.06 <10 <10 55 <10 334 6 111 <20 0.02 <10 <10 69 <10 67

12 2 <20 0.05 <10 <10 67 <10 67 11 3 <20 0.07 <10 <10 77 <10 401

8 4 <20 0.06 <10 <10 69 <10 132 9 16 <20 0.06 <10 <10 63 <10 796 9 58 <20 0.08 <10 <10 64 <10 592 6 33 <20 0.07 <10 <10 50 <10 582 6 9 <20 0.06 <10 <10 35 <10 289 2 13 <20 0.14 <10 <10 20 <10 4 17 <20 0.07 <10 <10 36 <10 8 14 <20 0.17 <10 <10 89 <10

10 4 <20 0.14 <10 <10 92 <10 183 9 6 <20 <10 77 <10 358

11 13 <20 <10 56 <10 1310 9 9 <20 1<10 44 <10 1220

11 13 <20 <10 64 <10 1390 9 7 <20 <10 31 <10 2390 9 13 <20 0.06 <10 <10 30 <10 2510 5 7 <20 0.07 <10 <10 24 <10 1380 6 5 <20 0.08 <10 <10 30 <10 1980

11 9 <20 0.16 10 <10 69 <10 1240 7 12 <20 0.04 <10 <10 28 <10 1300 4 22 <20 0.05 <10 <10 19 60 1890 3 25 <20 0.08 <10 <10 17 40 1170 3 28 <20 0.08 <10 <10 20 <10 118 3 24 <20 0.08 <10 <10 20 10 678 6 11 <20 0.05 <10 <10 26 <10 2220

10 10 <20 0.09 <10 <10 60 <10 852 14 17 <20 0.15 <10 <10 80 <10 1640 9 14 <20 0.08 <10 <10 38 <10 994

Page 40: DIAMOND DRILLING RPT SOLLAS LAKE AREA...INTRODUCTION This report summarizes a drill hole on claim TB30 14194 in May of 2008. This hole was part of a larger 2913.88m diamond drilling

12 6 <20 0.08 <10 <10 57 <10 2400 8 5 <20 0.09 <10 <10 44 <10 1285 9 5 <20 0.08 <10 <10 39 <10 1595 9 5 <20 0.08 <10 <10 38 <10 1750 8 6 <20 0.09 <10 <10 41 <10 951 6 4 <20 0.06 <10 <10 32 <10 1240 3 3 <20 0.04 <10 <10 20 <10 =i 9 5 <20 0.07 <10 <10 39 <10 9 5 <20 0.08 <10 <10 38 <10

11 5 <20 0.08 <10 <10 51 <10 1365 11 23 <20 0.08 <10 <10 49 <10 1110

5 5 <20 0.03 <10 <10 24 <10 346 7 7 <20 0.07 <10 <10 30 <10 320 4 25 <20 0.15 <10 <10 42 <10 3680 2 23 <20 0.07 <10 <10 13 <10 957 5 10 <20 0.03 <10 <10 15 <10 4 6 <20 0.03 <10 § 11 <10 5 5 <20 0.03 <10 16 <10 1730 5 3 <20 0.03 <10 <10 23 <10 1165 7 2 <20 0.03 <10 <10 37 <10 922 6 4 <20 0.03 <10 <10 29 <10 553

Page 41: DIAMOND DRILLING RPT SOLLAS LAKE AREA...INTRODUCTION This report summarizes a drill hole on claim TB30 14194 in May of 2008. This hole was part of a larger 2913.88m diamond drilling

A ALS Chemex To: EAST WEST RESOURCE CORPORATION

1204 ROLAND STREET Page: 1

Finalized Date: 17-JUN-2008 Account: NMZ THUNDER BAY ON P7B 5M4 EXCELLENCE IN ANAL YTICAL CHEMISTRY

ALS Canada Ltd.

212 Brooksbank Avenue North Vancouver BC V7 J 2C 1 Phone: 604 984 0221 Fax: 5049840218 www.alschemex.com

CERTIFICATE T808074710

Project NORTH MARSHALL

P.O. No.:

This report is for 118 Drill Core samples submitted to our lab in Thunder Bay, ON, Canada on 6-JUN-2008.

The following have access to data associated with this certificate: BOB MIDDLETON I TWEST - GENERAL WEB ACCO I

To: EAST WEST RESOURCE CORPORATION ATTN: BOB MIDDLETON 1204 ROLAND STREET THUNDER BAY ON P7B 5M4

ALS CODE

WEI-21

LOG-22

CRU-QC

PUL·QC CRU-31

SPL-21

PUL-31

ALS CODE

ME-ICP41

PGM-ICP23

This is the Final Report and supersedes any preliminary report with this certificate number. Results apply to samples as submitted. All pages ofthis report have been checked and approved for release.

SAMPLE PREPARATION DESCRIPTION

Received Sample Weight

Sample login Red wlo BarCode

Crushing QC Test

Pulverizing QC Test

Fine crushing • 70% <2mm

Split sample· riffle splitter

Pulverize split to 85% <75 um

ANAL YTICAL PROCEDURES DESCRIPTION INSTRUMENT

35 Element Aqua Regia ICP-AES ICP-AES

PI, Pd, Au 30g FA ICP ICp·AES

~ Signature: :;c:; ------Colin Ramshaw, Vancouver Laboratory Manager

Page 42: DIAMOND DRILLING RPT SOLLAS LAKE AREA...INTRODUCTION This report summarizes a drill hole on claim TB30 14194 in May of 2008. This hole was part of a larger 2913.88m diamond drilling

Method Analyte

Units Sample Description LOR

G134559 G134560 G134561 G134562 G134563

G134564 G134565 G134566 G134567 G134568

G134569 G134570 G134571 G134572 G134573

G134574 G134575 G134576 G134577 G134578

G134579 G134580 G134581 G134582 G134583

G134584 G134585 G134586 G134587 G134588

G134589 G134590 G134591 G134592 G134593

G134594 G134595 G134596 G134597 G134598

ALS Chemex EXCELLENCE IN ANAL YTICAL CHEMISTRY ALS Canada Ltd,

212 Brooksbank Avenue North Vancouver Be V7 J 2C 1 Phone: 604 984 0221 Fax 6049840218 www.alschemex.com

WEI-21 PGM·ICP23 PGM·ICP23 PGM·ICP23 ME-ICP41 ME·ICP41

RecvdWI Au PI Pd Ag AI

kg ppm ppm ppm ppm %

0.02 0.001 0,005 0,001 02 0.01

1.94 0.002 <0.005 0.001 0.2 0.17 1.97 <0.2 1.77 1.72 <0.2 0.77 1.86 0.2 1.59 1.58 0.3 1.34

1.92 0.2 0.91 1.58 <0.2 1.59 1.15 <0.2 1.13 1.78 <0.2 1.02 1.38 0.2 1.65

1.26 0.2 2.43 1.53 0.2 1.56 1.58 0.6 1.55 1.56 8.1 3.82 1.51 <0.2 3.45

1.55 <0.2 1.57 1.67 <0.2 2.19 2.28 <0.2 2.16 1.32 <0.2 209 1.61 <0.2 2.43

1.85 <0.2 1.54 1.04 0.3 0.93 1.73 0.3 1.21 1.71 0.2 2.43 1.57 <0.2 2.23

1.07 <0.2 1.86 1.64 0.4 1.50 1.49 0.2 1.17 2.11 0.2 2.19 1.74 0.5 0.77

1.56 0.2 1.14 1.56 <0.2 1.00 1.35 0.4 1.10 1.61 <0.2 1.89 1.77 0.4 0.88

1.79 0.3 1.19 1.73 0.3 1.11 1.80 0.8 1.19 1.93 0.6 0.98 1.67 0.4 1.29

To: EAST WEST RESOURCE CORPORATION 1204 ROLAND STREET THUNDER BAY ON P1B 5M4

Project: NORTH MARSHALL

I CERTIFICATE OF ANALYSIS

ME-ICP41 ME·ICP41 ME·ICP41 ME·ICP41 ME-ICP41 ME·ICP41

As B 8a Be 81 Ce

ppm ppm ppm ppm ppm Q/D

2 10 10 0.5 2 0.01

<2 <10 20 <0.5 <2 1.31 2 <10 10 0.5 <2 1.08

<2 <10 20 <0.5 2 0.44 2 <10 70 1.3 <2 1.82

<2 <10 30 <0.5 <2 1.22

<2 <10 30 <0.5 <2 2.45 <2 <10 10 0.7 4 0.58 2 <10 20 0.6 <2 1.42

<2 <10 30 0.7 3 1.25 4 <10 20 1.8 3 0.86

<2 <10 10 1.6 2 1.64 <2 <10 10 1.7 3 0.61 <2 <10 20 0.9 3 2.26 5 <10 <10 0.6 10 12.90 2 <10 10 1.4 4 0.3B

<2 <10 10 <0.5 4 0.34 <2 <10 10 0.6 3 0.8S <2 <10 20 0.5 2 1.15 2 <10 20 1.0 <2 3.25 7 <10 10 0.6 <2 2.14

<2 <10 10 0.7 2 0.54 4 <10 10 <0.5 <2 1.44 <2 <10 40 <0.5 5 0.74 <2 <10 30 <0.5 <2 1.88 <2 <10 50 <0.5 <2 0.97

8 <10 60 <0.5 <2 0.23 <2 <10 20 0.7 <2 0.84 <2 <10 20 0.5 <2 0.53 :I <10 40 0.5 4 1.01 <2 <10 30 <0.5 6 0.26

<2 <10 10 0.7 2 1.67 4 <10 30 0.7 <2 0.34

<2 <10 20 0.6 <2 0.44 2 <10 60 <0.5 <2 0.48 2 <10 30 <0.5 5 0.43

9 <10 30 <0.5 4 0.83 2 <10 20 <0.5 5 0.83 :2 <10 40 <0.5 8 0.93 3 <10 20 <0.5 6 1.68 <2 <10 10 <0.5 6 O.Bl

Page: 2-A Total # Pages: 4 (A· C)

Finalized Date: 11.JUN-2008 Account: NMZ

TB08074710

ME·ICP41 ME·ICP41 ME-ICP4!

Cd Co Cr

ppm ppm ppm

0.5 1 1

<0.5 15 4 0.5 34 75 1.9 41 30 1.4 49 170 1.1 50 53

<0.5 37 53 0.8 93 255 3.7 50 275 2.2 38 176 3.6 106 63

2.2 37 339 <0.5 30 157 0.6 56 161

<0.5 36 156 <0.5 37 63

0.6 73 581 <0.5 44 122 1.4 50 150 1.2 34 414 0.8 66 66

<0.5 69 33 <0.5 59 15 0.6 77 49

<0.5 39 85 <0.5 49 117

<0.5 33 91 25 34 271 2.2 31 134 2.3 41 111 4.3 57 95

4.6 32 49 2.5 32 23 3.5 61 24 2.2 28 59 2.1 85 38

3.4 102 22 2.0 102 14 <0.5 88 17 1.3 70 43 4.5 78 26

Page 43: DIAMOND DRILLING RPT SOLLAS LAKE AREA...INTRODUCTION This report summarizes a drill hole on claim TB30 14194 in May of 2008. This hole was part of a larger 2913.88m diamond drilling

A Method Analyte

Units Sample Description LOR

G134559 G134560 G134S61 G134562 G134563

G134564 G134565 Gl34566 G134567 G134568

G134569 G134570 G134571 G134572 G134573

G134574 8134575 G134576 G134577 G134578

G134579 G134580 G134581 G134562 G134583

8134584 G134585 G134586 G134567 G13458B

G134589 813459a G134591 G134592 G134593

G134594 G134595 G134596 G134597 8134598

ALS Chemex EXCELLENCE IN ANAL YTICAL CHEMISTRY ALS Canada Ltd.

212 Brooksbank Avenue North Vancouver BC V7 J 2C 1 Phone: 604 984 0221 Fax 6049840218 www.alschemex,com

ME-ICP41 ME-ICP41 ME·ICP41 ME-ICP41 ME-ICP41 ME-ICP41

Cu Fe G. Hg K La

ppm % ppm ppm % ppm

1 0.01 10 1 0.01 10

577 12.60 <10 <1 0.03 40 156 11.30 <10 <1 0.11 10 150 11.10 <10 <1 O.OB 10 14B 10.25 <10 <1 0.09 10 164 10.65 <10 1 0.06 10

89 6.07 <10 <1 0.16 20 311 16.8 10 <1 0.10 10 286 14.75 10 1 0.08 10 393 19.2 <10 <1 0.07 10 289 18.2 10 1 0,08 <10

223 13.55 10 <1 0.09 10 105 8.29 10 <1 0.11 40 111 9.49 10 <1 0.12 10

7060 14.15 20 <1 <0.01 <10 272 11.60 10 <1 0.03 <10

270 14.7 <10 <1 0.08 10 184 11.25 10 <1 0.08 10 195 13.50 10 <1 0.12 10 133 9.50 10 <1 0.09 10 242 19.1 10 1 0.09 10

401 20.7 10 <1 0.04 10 285 15.1 <10 <1 0.01 <10 282 23.8 <10 1 0.05 10 172 12.50 <10 1 0,09 <10 205 16.8 10 <1 0.27 <10

140 11.65 10 <1 0.89 10 124 11.50 <10 1 0.12 10 95 8.54 <10 i 0.12 20 146 11.05 10 <1 0.37 20 204 14.5 <10 <1 0.20 10

104 9,90 <10 <1 0.06 100 62 5.72 <10 <1 0.09 30 171 13.45 <10 <1 0.10 10 53 5.99 10 <1 0.84 20

319 24.8 <10 <1 a.lt 10

461 30,5 <10 <1 0.07 <10 514 30.8 <10 <1 0.03 20 368 26.9 <10 <1 0.04 10 299 21.0 <10 <1 0,04 10 319 23.7 <10 <1 0.10 10

To: EAST WEST RESOURCE CORPORATION 1204 ROLAND STREET THUNDER SAY ON P7S 5M4

Project: NORTH MARSHALL

I CERTIFICATE OF ANALYSIS

ME-ICP41 ME-ICP41 ME·ICP41 ME·ICP41 ME·ICP41 ME-ICP41

Mg Mn Mo Na NI P

% ppm ppm % ppm ppm

0.01 5 1 0.01 1 10

0.11 270 2 0.05 22 2740 1.06 748 2 0.02 141 360 0.37 372 5 0.01 177 240 0.44 529 3 0.02 241 300 0.51 561 :2 0.04 217 500

0.35 473 1 0.04 270 360 0.95 941 3 0.03 248 290 0.74 786 4 0.03 250 300 0,59 554 4 0.03 357 270 0.95 680 5 0.03 316 440

1.64 1195 3 0.03 236 860 1,08 B36 6 0,04 100 430 1.03 BOB 4 0.03 131 330 2.66 1615 7 0.01 156 200 2.11 1155 9 0.02 165 310

0.84 775 4 0.03 214 290 1,17 857 4 0.02 132 570 0.86 692 5 0.01 155 390 1.18 1235 2 <0.01 134 250 1.00 1485 3 0.01 185 290

0.61 976 7 0.02 264 330 0.09 314 1 0.04 88 240 0.30 330 2 0.07 150 240 0.80 789 1 0.03 79 360 1.25 1000 1 0.02 103 230

1.30 1170 <1 0.06 70 370 0.60 609 4 0,03 105 360 0.62 667 5 0.03 86 290 1.41 1160 3 0.03 96 1040 0.42 453 7 0.03 127 200

0.50 506 6 0.03 72 150 0.54 562 5 0.03 91 90 0.58 751 6 0.03 156 260 1.26 1330 5 0.04 78 890 0.25 334 4 0.04 172 170

0.18 253 3 0.Q3 206 360 0,18 235 3 0.02 205 200 0.22 301 1 <0.01 190 280 0.23 619 1 <0.01 150 310 0.27 379 3 <0.01 167 120

Page: 2· S Total # Pages: 4 (A. C)

Finalized Date: 17.JUN·2008 Account: NMZ

T808074710

ME-ICP41 ME-ICP41 ME-ICP41

Pb S Sb

ppm % ppm

2 0.01 2

51 4.20 6 9 6.83 <2 7 6.48 <2 7 5.91 <2 11 6.57 <2

8 3.60 <2 20 >10.0 <2 18 8.95 <2 27 >10.0 <2 47 >10.0 <2

35 7.00 <2 34 4.22 <2 83 6.25 <2 81 8.65 <2 16 4.33 <2

11 8.46 <2 12 6.76 <2 11 7.26 <2 10 5.0B <2 10 >10.0 <2

5 9.93 <2 7 4.81 <2 9 >10.0 <2 9 7.20 <2 9 S.30 <2

8 4.35 <2 14 6.49 <2 26 4.63 <2 19 6.04 <2 22 8.69 <2

54 5.78 <2 44 2.91 <2 41 7.65 <2 43 2.60 <2 19 >10.0 <2

15 >10.0 <2 8 >10.0 <2 14 >10.0 <2 11 >10.0 <2 16 >10.0 <2

Page 44: DIAMOND DRILLING RPT SOLLAS LAKE AREA...INTRODUCTION This report summarizes a drill hole on claim TB30 14194 in May of 2008. This hole was part of a larger 2913.88m diamond drilling

Method Analyte

Units Sample Description LOR

G134559 8134560 G134561 G134562 G134563

G134564 G134565 G134566 G134567 G134568

G134569 G134570 G134571 G134572 G134573

G134574 G134575 G134576 G134577 G134578

G134579 G134580 G134581 G134582 G134583

G134584 G134585 G134586 G134587 G134588

G134589 G134590 G134591 G134592 G134593

G134594 G134595 G134596 G134597 G134598

ALS Chemex EXCELLENCE IN ANAL YTICAL CHEMISTRY ALS Canada Ltd.

212 Brooksbank Avenue North Vancouver BC V7 J 2C 1 Phone 6049840221 Fax: 604 964 0218 www.alschemex.com

ME-ICP41 ME-ICP41 ME·ICP41 ME-ICP41 ME·ICP41 ME-ICP41

So Sr Ttl Ti TI U

ppm ppm ppm % ppm ppm

1 1 20 0,01 10 10

<1 100 <20 0.11 <10 <10 10 :3 <20 0.09 <10 <10 3 5 <20 0.03 <10 <10 5 23 <20 0.12 <10 <10 4 15 <20 0.13 <10 <10

3 30 <20 0,12 <10 <10 8 4 <20 0,09 <10 <10 ;) 6 <20 0.05 <10 <10 5 5 <20 0.05 <10 <10 7 3 <20 0.05 <10 <10

7 11 <20 0,08 <10 <10 6 7 <20 0.08 <10 <10 7 11 <20 0,06 <10 <10 6 111 <20 0.02 <10 <10 12 2 <20 0.05 <10 <10

11 3 <20 0.07 <10 <10 B 4 <20 0.06 <10 <:10 9 16 <20 0.06 <10 <10 9 58 <20 0.08 <10 <10 6 33 <20 0.07 <10 <10

6 9 <20 0.06 <10 <10 2 13 <20 0.14 <10 <10 4 17 <20 0.07 <10 <10 8 14 <20 0,17 <10 <10 10 4 <20 0.14 <10 <10

9 6 <20 0.19 <10 <10 11 13 <20 0,09 <10 <10 9 9 <20 0.09 <10 <10 11 13 <20 0.15 <10 <10 9 7 <20 0.06 <10 <10

9 13 <20 0,06 <10 <10 5 7 <20 0,07 <10 <10 6 5 <20 0.08 <10 <10 11 9 <20 0.16 10 <10 7 12 <20 0.04 <10 <10

4 22 <20 0.05 <10 <10 3 25 <20 0.08 <10 <10 3 28 <20 0,08 <10 <10 3 24 <20 0.06 <10 <10 6 11 <20 0.05 <10 <10

To: EAST WEST RESOURCE CORPORATION 1204 ROLAND STREET THUNDER BAY ON P7B 5M4

Project: NORTH MARSHALL

I CERTIFICATE OF ANALYSIS

ME·ICP41 ME·ICP41 ME-ICP41

V W Zn ppm ppm ppm

1 10 2

93 <10 131 77 <10 300 21 <10 993 34 20 507 42 <10 476

33 <10 207 61 <10 504 46 <10 1710 38 <10 1140 47 <10 1730

71 <10 1060 44 <10 99 55 <10 334 69 <10 67 67 <10 67

77 <10 401 69 <10 132 63 <10 796 64 <10 592 50 <10 582

35 <10 289 20 <10 95 36 <10 268 89 <10 260 92 <10 183

77 <10 358 56 <10 1310 44 <10 1220 64 <10 1390 31 <10 2390

30 <10 2510 24 <10 1380 30 <10 1980 69 <10 1240 28 <10 1300

19 60 1890 17 40 1170 20 <10 118 20 10 678 26 <10 2220

Page: 2 - C Total # Pages: 4 (A· C)

Finalized Date: 17-JUN-2008 Account: NMZ

T808074710

Page 45: DIAMOND DRILLING RPT SOLLAS LAKE AREA...INTRODUCTION This report summarizes a drill hole on claim TB30 14194 in May of 2008. This hole was part of a larger 2913.88m diamond drilling

Method Analyte

Units Sample Description LOR

G134599 G134600 G134601 G134602 G134603

G134604 G134605 G134606 G134607 G134608

G134609 G134610 G134611 G134612 G134613

G134614 G134615 G134616 G134617 G134618

G134619 G134620 G134621 G134622 G134623

G134624 G134625 G134626 G134627 G134628

G134629 G134630 G134631 G134632 G134633

G134634 G134635 G134636 G134637 G134638

ALS Chemex EXCELLENCE IN ANAL YTICAL CHEMISTRY AlS Canada Ltd.

212 Brooksbank Avenue North Vancouver 8e V7J 2C1 Phone: 6049840221 Fax: 604 984 0218 www.alschemex.com

WEI-21 PGM·ICP23 PGM·ICP23 PGM-ICP23 ME-ICP41 ME·ICP41 RecvdWt AU PI Pd Ag Al

kg ppm ppm ppm ppm %

0.02 0.001 0.005 0.001 0.2 0.01

1.63 0.5 2.21 1.52 0.3 2.92 1.52 0.4 1.34 1.51 0.5 1.00 1.52 0.4 1.26

1.69 0.6 0.98 1.46 0.6 0.90 1.42 0.4 0.98 1.65 0.8 0.83 1.79 0.8 0.66

1.57 0.8 0.96 1.68 0.7 1.07 1.76 0.6 1.11 1.59 0.5 1.61 1.75 0.8 1.09

1.85 0.7 1.92 1.81 0.6 1.55 1.96 1.1 0.88 1.85 0.9 0.96 1.73 0.8 0.90

1.98 0.5 0.96 1.58 O.S 0.94 1.62 1.1 0.84 2.37 0.8 1.19 1.86 0.002 <0.005 0.001 0.3 0.27

1.82 0.012 <0.005 0.002 0.3 1.51 1.28 0.008 <0.005 0.001 0.7 1.51 1.49 0.006 <0.005 0.004 0.4 2.31 1.83 0.003 <0.005 <0.001 0.5 2.86 1.68 0.005 <0.005 0.005 0.3 1.92

1.79 0.007 <0.005 <0.001 0.3 0.76 1.87 0.007 <0.005 <0.001 0.2 1.05 1.75 0.004 <0.005 0.001 0.2 1.23 1.88 0.004 <0.005 0.001 0.6 1.58 1.87 0.004 <0.005 <0.001 0.5 1.09

1.75 0.003 <0.005 0.001 0.3 0.61 1.88 0.005 <0.005 0.001 0.5 0.67 1.84 0.005 <0.005 0.002 0.4 1.61 1.82 0.005 <0.005 0.001 0.7 1.37 2.33 0.006 <0.005 0.001 1.1 0.98

To: EAST WEST RESOURCE CORPORATION 1204 ROLAND STREET THUNDER BAY ON P7B 5M4

Project NORTH MARSHALL

I CERTIFICATE OF ANALYSIS

ME-ICP41 ME-ICP41 ME·ICP41 ME~CP41 ME·ICP4i ME·ICP41 As S Sa Be 81 Ca

ppm ppm ppm ppm ppm %

2 10 10 0.5 2 001

2 <10 40 <0.5 6 1.51 2 <10 30 <0.5 3 1.44 3 <10 30 0.6 4 0.55 4 <10 40 <0.5 5 0.22 2 <10 40 0.6 2 0.49

<2 <10 30 0.5 5 0.22 2 <10 40 <0.5 4 0.10 4 <10 40 <0.5 3 0.15 6 <10 30 <0.5 6 0.14 10 <10 20 <0.5 8 0.18

6 <10 30 <0.5 5 0.25 <2 <10 40 <0.5 5 0.34 7 <10 40 <0.5 5 0.43 4 <10 20 0.8 4 0.72 13 <10 20 <0.5 6 0.77

3 <10 20 0.6 7 1.76 <2 <10 10 <0.5 5 1.37 7 <10 20 <0.5 6 0.69 4 <10 30 <0.5 9 0.70 6 <10 20 0.5 10 0.68

3 <10 10 0.9 6 0.65 5 <10 10 0.9 8 0.61 3 <10 10 0.5 9 0.44 2 <10 10 0.9 9 0.78

<2 <10 30 <0.5 <2 1.48

<2 <10 80 <0.5 <2 2.08 <2 <10 60 <0.5 2 3.54 <2 <10 110 <0.5 <2 3.18 <2 <10 140 <0.5 <2 2.54 <2 <10 70 <0.5 3 2.94

<2 <10 90 <0.5 3 1.11 3 <10 90 <0.5 2 1.98 3 <10 130 <0.5 2 1.35

<2 <10 50 <0.5 <2 1.95 <2 <10 110 <0.5 2 2.51

<2 <10 50 <0.5 <2 2.00 <2 <10 50 <0.5 <2 2.40 <2 <10 60 <0.5 3 3.05 <2 <10 40 <0.5 <2 2.27 <2 <10 50 <O.S <2 2.13

Page:3-A Total # Pages: 4 (A - C)

Finalized Date: 17-JUN-2008 Account: NMZ

T808074710

ME·ICP41 ME-ICP41 ME-ICP41 Cd Co Cr

ppm ppm ppm

0.5 1 1

1.4 59 29B 3.2 38 102 2.1 50 32 5.9 40 101 2.7 26 42

3.7 41 45 4.1 41 46 2.0 37 41 2.9 65 33 4.6 74 29

1.6 66 42 1.1 59 34 3.0 69 83 2.5 52 77 0.7 83 31

<0.5 76 29 8.9 56 26 1.7 101 6

<0.5 101 18 0.9 95 20

3.9 87 35 2.3 85 46 1.8 93 72 0.9 94 42 0.6 16 1

<0.5 34 1 <Q.5 21 ;\

<0.5 89 4 <0.5 30 4 <0.5 13 21

<0.5 12 17 <0.5 17 17 <0.5 14 22 <0.5 14 27 <0.5 13 14

<0.5 14 13 <0.5 14 20 <05 36 8 <0.5 50 6 <0.5 36 10

Page 46: DIAMOND DRILLING RPT SOLLAS LAKE AREA...INTRODUCTION This report summarizes a drill hole on claim TB30 14194 in May of 2008. This hole was part of a larger 2913.88m diamond drilling

Method Ana:lyte

Units Sample Description LOR

G134599 (;134600 G134601 G134602 G134603

G134604 G134605 G134601l G134607 G134608

G134609 G134610 G134611 G134612 G134613

G134614 G1341l15 G134616 G134617 G134618

G134619 G134620 G134621 G134622 G134623

G134624 G134625 G134626 G134627 G134628

G134629 G134630 G134631 G134632 G134633

G134634 G134635 G134636 G134637 G134638

ALS Chemex EXCELLENCE IN ANAL YTICAL CHEMISTRY ALS Canada Ltd,

212 Brooksbank Avenue North Vancouver Be V7 J 2C 1 Phone 6049840221 Fax, 604 984 0216 www,alschemex.com

ME-ICP41 ME-ICP41 ME-ICP41 ME-ICP41 ME-ICP41 ME-ICP41

Cu Fe Ga Hg K La

ppm % ppm ppm % ppm

1 om 10 1 0.01 10

235 18.4 <10 1 0,16 10 156 12,25 10 <1 0,55 20 193 14.7 <10 <1 0.18 20 147 11.80 <10 <1 0,26 10 97 8.53 <10 <1 0,26 20

159 12,60 <10 <1 0.36 2Q 155 12.50 <10 <1 0.41 10 150 11,55 <10 <1 OA8 10 270 19,4 <10 <1 0,33 10 282 22,0 <10 <1 0,18 10

283 20,4 <10 <1 0,30 10 237 18,2 <10 <1 0,32 10 323 20,8 <10 1 0,18 10 209 lilA <10 <1 0,22 20 335 25,3 <10 1 0,09 10

370 23.5 <10 <1 0,09 10 390 17,5 <10 <1 0.02 10 596 31,2 <10 <1 0,03 10 390 31.3 <10 <1 0,08 10 390 29.0 <10 <1 0,07 10

358 26.0 <10 1 0,07 10 365 26.2 <10 <1 0,05 10 411 28.3 <10 <1 0,03 <10 366 28,8 <10 <1 0,07 10 88 8,20 <10 <1 0,08 20

203 7,54 <10 <1 0.33 10 147 11.55 <10 <1 0,25 10 574 6.17 <10 <1 0.52 10 150 11.30 10 <1 0.62 10 36 15,6 10 <1 0.21 20

65 18.0 <10 <1 0,22 10 56 13,10 <10 <1 0.29 10 46 17,2 10 <1 OA5 10 70 22,0 10 <1 0,58 10 45 16.6 10 1 0,33 30

45 8.40 10 <1 0,15 40 65 15,15 10 <1 0,15 40 71 14.5 10 <1 0,18 20 113 15.8 10 1 0,16 20 114 21.2 10 <1 0,14 20

To: EAST WEST RESOURCE CORPORATION 1204 ROLAND STREET THUNDER SAY ON P7B 5M4

Project: NORTH MARSHALL

I CERTIFICATE OF ANALYSIS

ME-ICP41 ME-ICP41 ME-ICP41 ME-ICP41 ME-ICP41 ME-ICP41

Mg Mn Mo Na NI P

% ppm ppm % ppm ppm

0.01 5 1 0.01 1 10

0,80 782 3 <0,01 125 390 1,53 1420 3 <0,01 81 1170 0.47 684 5 0,02 97 140 0,51 835 9 <0.01 75 50 0,59 960 8 <0,01 52 250

0,54 899 9 <0,01 78 350 0,52 858 9 <0,01 75 100 0,56 909 7 0,01 74 280 0,43 1210 6 <0,01 121 190 0.29 570 7 <0,01 137 160

0.48 879 9 <0,01 126 370 0,55 947 6 <0,01 110 520 0.51 870 4 <0,01 128 180 0,55 833 4 0,03 98 870 0,25 391 2 <0.01 154 290

0,32 529 3 <0,01 143 370 0,54 768 <1 <0,01 105 480 0.23 390 <1 <0,01 189 250 0,18 276 1 <0,01 193 300 0,11 202 3 <0,01 181 190

0,16 304 4 <0,01 163 20 0.25 373 5 <0,01 162 50 0,39 417 4 <0,01 176 110 0.40 380 4 <0,01 178 270 0.28 633 <1 0.06 13 350

1,39 679 <1 0,19 16 380 1,19 1440 <1 0.26 27 160 2.09 664 <1 0,25 22 650 2.63 19BO "1 Q,22 19 330 1,52 2430 <1 0,08 35 1500

OAO 2590 <1 0,04 31 350 0,65 2160 <:1 0.11 29 640 0,72 2890 <1 0.11 32 500 0,82 2870 <1 0.10 31 200 0.06 2740 <1 0,16 28 2140

0.40 1145 <1 0,10 27 2950 0,48 1660 <1 0.11 36 2300 1,03 1315 <1 0,38 32 540 0,88 1330 <1 0,28 41 260 0.64 2370 1 0.16 36 400

Page: 3 - S Total # Pages: 4 (A - C)

Finalized Date: 17..JUN-2008 Account: NMZ

TB08074710

ME·ICP41 ME-ICP41 ME-ICP41

Pb S Sb

ppm % ppm

2 om 2

15 >10,0 <2 23 6,98 <2 25 8,95 <2 36 6.96 <2 73 4.73 <2

55 7.40 <2 65 7,36 <2 42 6,67 <2 59 >10,0 <2 59 ,.10,0 <2

38 >10,0 <2 31 >10,0 <2 29 >10,0 <2 23 9.78 <2 24 >10,0 <2

19 ,.10,0 <2 10 9,54 <2 11 9,Il3 <2 22 >10,0 <2 22 >10.0 <2

18 >10.0 <2 11l >10,0 <2 21 >10,0 <2 20 >10,0 <2 104 :2,66 <2

6 2A5 <2 30 3,78 <2 16 2,73 <2 16 2,32 <2 3 1.82 <2

2 3,07 <2 4 2.54 <2 <2 2.46 <2 4 2,85 <2 4 2.34 <2

4 1,54 2 2 2.49 <2 5 2.83 <2 3 4,13 2 5 3.79 <2

Page 47: DIAMOND DRILLING RPT SOLLAS LAKE AREA...INTRODUCTION This report summarizes a drill hole on claim TB30 14194 in May of 2008. This hole was part of a larger 2913.88m diamond drilling

M._d A .... lyte

Units Slimple Description LOR

G134599 G134600 G134601 G134602 G134603

G134604 G134605 G134606 G134607 G134608

G134609 G134610 G134611 G134612 G134613

G134614 G134615 G134616 G134617 G134618

G134619 G134620 G134621 G134622 G134623

G134624 G134625 G134626 G134627 G134628

G134629 G134630 G134631 G134632 G134633

G134634 G134635 G134636 G134637 G134638

ALS Chemex EXCELLENCE IN ANAL YTICAL CHEMISTRY ALS Canada ltd.

212 Brooksbank Avenue North Vancouver BC V7 J 2C 1 Phone: 604 984 0221 Fax: 604 984 0218 www.alschemex.com

ME-ICP41 ME-ICP41 ME-ICP41 ME·ICP41 ME·ICP41 ME-ICP41

So Sr Th TI n u ppm ppm ppm % ppm ppm

1 1 20 0.01 10 10

10 10 <20 0.09 <10 <10 14 17 <20 0.15 <10 <10 9 14 <20 0.08 <10 <10 12 6 <20 0.08 <10 <10 8 5 <20 0.09 <10 <10

9 5 <20 0.08 <10 <10 9 5 <20 0.08 <10 <10 8 6 <20 0.09 <10 <10 6 4 <20 0.06 <10 <10 3 3 <20 0.04 <10 <10

9 5 <20 0.07 <10 <10 9 5 <20 0.08 <10 <10 11 5 <20 0.08 <10 <10 11 23 <20 0.08 <10 <10 5 5 <20 0.03 <10 <10

7 7 <20 0.07 <10 <10 4 25 <20 0.15 <10 <10 2 23 <20 0.07 <10 <10 5 10 <20 0.03 <10 <10 4 6 <20 0.03 <10 <10

5 5 <20 0.03 <10 <10 5 3 <20 0,03 <10 <10 7 2 <20 0.03 <10 <10 6 4 <20 0.03 <10 <10 <1 158 <20 0.06 <10 <10

2 82 <20 0.18 <10 <10 2 106 <20 0.20 <10 <10 4 88 <20 0.26 <10 <10 3 81 <20 0.30 <10 <10 4 74 <20 0.17 <10 <10

1 29 <20 0.08 <10 <10 2 43 <20 0.11 <10 <10 2 38 <20 0.11 <10 <10 2 42 <20 0.15 <10 <10 3 161 <20 0.13 <10 <10

1 99 <20 0.16 <10 <10 2 114 <20 0.12 <10 <10 3 133 <20 0.21 <10 <10 2 76 <20 0.15 <10 <10 2 44 <20 0.12 <10 <10

To: EAST WEST RESOURCE CORPORATION 1204 ROLAND STREET THUNDER BAY ON P7B 5M4

Project NORTH MARSHALL

I CERTIFICATE OF ANALYSIS

ME-ICP41 ME·ICP41 ME·ICP41

v W Zn ppm ppm ppm

1 10 2

60 <10 852 80 <10 1640 38 <10 994 57 <10 2400 44 <10 1285

39 <10 1595 38 <10 1750 41 <10 951

32 <10 1240 20 <10 2020

39 <10 794 38 <10 548 51 <10 1365 49 <10 1110 24 <10 346

30 <10 320 42 <10 3680 13 <10 957 15 <10 89 11 <10 561

16 <10 1730 23 <10 1165 37 <10 922 29 <10 553 40 <10 296

63 <10 26 132 <10 82 86 <10 43 116 <10 60 74 <10 31

37 <10 21 70 <10 26 45 <10 29 83 <10 47 52 <10 46

79 <10 27 60 <10 37 164 <10 37 121 <10 29 105 <10 23

Page: 3 - C Total # Pages: 4 (A· C)

Finalized Date: 17..JUN-2008 Account: NMZ

T808074710

Page 48: DIAMOND DRILLING RPT SOLLAS LAKE AREA...INTRODUCTION This report summarizes a drill hole on claim TB30 14194 in May of 2008. This hole was part of a larger 2913.88m diamond drilling

Method Analyte

Units Sample Description LOR

G134639 G134640 G134641 G134642 G134643

G134644 G134645 G134646 G134647 G134648

G134649 G134650 G1346S1 G134652 G134653

G134654 G134655 G134656 G134657 G134658

G134659 G134660 G134661 G134662 G134663

G134664 G13466S G134666 G134667 G134668

G134669 G134670 G134671 G134672 G134673

G134674 G134675 G134676

ALS Chemex EXCELLENCE IN ANAL YTICAL CHEMISTRY ALS Canada Ltd

212 Brooksbank Avenue North Vancouver BC V7 J 2C1 Phone: 604 984 0221 Fax: 604 984 0218 www.alschemex.com

WEI-21 PGM-ICP23 PGM-ICP23 PGM-ICP23 ME-ICP41 ME-ICP41

RecvdWt Au PI Pd Ag AI

kg ppm ppm ppm ppm %

0.02 0.001 0.005 0.001 0.2 0.01

1.75 0.003 <0.005 <0.001 0.3 0.68 2.07 0.004 <0.005 0.001 0.3 0.77 1.90 0.006 <0.005 0.001 0.6 0.66 1.83 0.007 <0.005 <0.001 0.6 1.31 1.75 0.003 <0.005 <0.001 0.6 0.90

0.96 0.005 <0.005 0.001 0.5 0.60 1.89 0.003 <0.005 0.001 <0.2 0.83 1.73 0.005 <0.005 0.002 0.3 0.95 1.70 0.004 <0.005 <0.001 0.4 3.01 1.06 0.002 <0.005 0.001 0.3 2.73

1.71 0.002 0.005 0.010 0.2 2.36 1.73 0.004 <0.005 0.002 0.4 2.09 1.89 0.004 <0.005 0.001 0.5 1.24 1.22 0.004 <0.005 <0.001 0.4 1.19 1.12 0.006 <0.005 0.001 0.7 0.77

1.72 0.002 0.005 0.007 0.3 2.95 2.25 0.007 <0.005 0.001 0.5 0.81 1.94 0.006 <0.005 0.001 0.6 0.61 1.84 0.003 <0.005 0.001 0.4 1.99 1.82 0.005 <0.005 <0.001 0.5 0.B7

1.98 0.004 <0.005 <0.001 0.2 1.51 0.73 0.004 0.006 0.005 0.5 1.80 2.00 0.005 <0.005 0.003 0.4 0.47 2.00 0.009 <0.005 0.001 0.7 0.27 1.94 0.017 <0.005 0.001 0.4 0.53

1.64 0.010 <0.005 0.001 1.0 0.59 1.90 0.019 0.005 0.003 1.9 0.55 1.54 0.002 <0.005 0.002 0.3 2.85 1.95 0.007 <0.005 0.001 O.B DAB 1.87 0.003 <0.005 0.003 <0.2 1.11

1.81 0.005 0.005 0.002 0.3 1.01 1.B7 0.005 <0.005 0.001 0.6 0.87 1.47 0.005 <0.005 0.002 0.4 1.78 1.78 0.003 <0.005 0.002 0.8 1.77 1.77 0.004 <0.005 0.002 0.8 1.37

1.08 0.003 <0.005 0.001 0.2 1.13 0.62 0.002 <0.005 0.005 0.3 1.17 0.55 0.002 <0.005 0.003 <0.2 1.00

To EAST WEST RESOURCE CORPORATION 1204 ROLAND STREET THUNDER BAY ON P7B 5M4

Project: NORTH MARSHALL

I CERTIFICATE OF ANALYSIS

ME-ICP41 ME-ICP41 ME-ICP41 ME-ICP41 ME-ICP41 ME-ICP41

As B Ba Be Bi Ca

ppm ppm ppm ppm ppm %

2 10 10 0.5 2 0.01

2 <10 50 <0.5 <2 2.06 <2 <10 60 <0.5 <2 1.39 <2 <10 20 <0.5 <2 1.58 3 <10 90 <0.5 <2 2.66

<2 <10 70 <0.5 <2 1.34

2 <10 20 <0.5 <2 3.56 5 <10 40 <0.5 <2 5.01 2 <10 SO <0.5 <2 4.55

<2 <10 60 1.2 <2 6.85 <2 <10 150 0.9 <2 3.72

<2 <10 250 0.5 2 3.60 2 <10 140 0.5 2 4.30

<2 <10 60 <0.5 <2 3.64 <2 <10 80 <0.5 <2 3.84 <2 <10 40 <0.5 <2 2.14

2 <10 490 <0.5 2 2.56 <2 <10 30 <0.5 <2 2048 2 <10 50 <0.5 <2 2.17

<2 <10 80 <0.5 <2 2.52 <2 <10 90 <0.5 <2 2.71

<2 <10 120 <0.5 <2 3.67 <2 <10 80 <0.5 <2 2.70 2 <10 20 <0.5 <2 1.86

<2 <10 40 <0.5 <2 0.88 <2 <10 40 <0.5 <2 3.10

2 <10 30 <0.5 <2 4.69 3 <10 20 <0.5 <2 3.13

<2 <10 400 0.6 <2 5.11 <2 <10 70 <0.5 2 1.81 <2 <10 140 <0.5 <2 2.37

4 <10 60 <0.5 <2 2.87 5 <10 90 <0.5 <2 4.62 2 <10 90 <0.5 2 2.97 6 <10 60 <0.5 <2 3.03 5 <10 50 <0.5 <2 3.38

2 <10 60 <0.5 <2 3.84 6 <10 60 <0.5 <2 2.56

<2 <10 50 <0.5 <2 2.66

Page: 4-A Total # Pages: 4 (A - C)

Finalized Date: 17-JUN-2008 Account: NMZ

T808074710

ME-ICP41 ME-ICP41 ME-ICP41

Cd Co Cr

ppm ppm ppm

0.5 1 1

<0.5 12 13 <0.5 10 11 <0.5 17 10 <0.5 21 20 <0.5 9 12

<0.5 12 4 <0.5 41 4 <0.5 51 25 <0.5 51 6 <0.5 43 12

<0.5 25 51 <0.5 37 63 <0.5 47 7 <0.5 21 6 <0.5 18 7

<0.5 29 286 <0.5 47 21 <0.5 28 8 <0.5 18 29 <0.5 11 7

<0.5 15 3 <0.5 35 50 <0.5 15 16 <0.5 23 9 <0.5 14 1

<0.5 48 <1 <0.5 97 10 <0.5 23 20 <0.5 24 10 <0.5 26 29

<0.5 16 22 <0.5 26 5 <0.5 33 8 6.9 26 10 0.7 22 13

<0.5 1B 15 <0.5 20 4 <0.5 20 46

Page 49: DIAMOND DRILLING RPT SOLLAS LAKE AREA...INTRODUCTION This report summarizes a drill hole on claim TB30 14194 in May of 2008. This hole was part of a larger 2913.88m diamond drilling

A Method An.lyte

Units Sample Description LOR

G134639 G134640 G134641 G134642 G134643

G134644 G134645 G134646 G134647 G134648

G134649 G134650 G134651 G134652 G134653

G134654 G134655 G134656 G134657 G134658

G134659 G134660 G134661 G134662 G134663

G134664 G134665 G134666 G134667 G134668

G134669 G134670 G134671 G134672 G134673

G134674 G134675 G134676

ALS Chemex EXCELLENCE IN ANAL YTICAL CHEMISTRY ALS Canada Ltd.

212 Brooksbank Avenue North Vancouver BC V7 J 2C 1 Phone: 604 984 0221 Fax: 604 984 0218 www.alschemex.com

ME-ICP41 ME-ICP41 ME-ICP41 ME-ICP41 ME-ICP41 ME-ICP41 Cu Fe Ga Hg K La

ppm % ppm ppm % ppm

1 0.01 10 1 0.01 10

53 14.7 10 <1 0.15 40 40 15.7 10 <1 0.21 20 93 18.0 10 <1 0.12 30 96 18.1 10 <1 0.36 40 28 13.95 10 <1 0.18 10

52 7.16 <10 <1 0.08 80 23 4.40 <10 <1 0.11 100 62 7.36 <10 <1 0.15 60 125 8.13 10 <1 0.56 40 118 6.42 10 <1 0.65 20

58 3.75 10 <1 0.89 50 124 4.95 10 <1 0.55 60 156 5.23 10 <1 0.17 30 38 7.15 <10 <1 0.26 40 76 7.81 <10 <1 0.12 30

62 3.73 10 <1 1.60 10 60 7.82 10 <1 0.08 30 74 11.70 10 <1 0.13 40 57 10.10 10 <1 0.69 20 66 11.65 10 <1 0.35 30

45 9.41 10 1 0.34 30 94 5.71 10 <1 1.19 30 59 7.46 <10 <1 0.05 30 87 17.2 10 <1 0.05 10 69 9.85 <10 <1 0.10 50

95 10.20 <10 <1 0.05 100 179 16.9 <10 <1 0.21 90 29 c .n

u .• " 10 <1 1.20 60 101 12.20 <10 1 0.16 40 78 12.00 <10 1 0.72 30

98 9.92 <10 1 0.16 20 119 9.20 <10 1 0.19 40 107 6.89 10 <1 0.23 40 109 6.25 <10 1 0.11 20 128 6.94 <10 1 0.03 30

81 5.41 <10 <1 0.06 20 157 2.48 <10 1 0.20 10 47 4.05 <10 1 0.15 20

To: EAST WEST RESOURCE CORPORATION 1204 ROLAND STREET THUNDER BAY ON P7B 5M4

Project: NORTH MARSHALL

Page:4-B Total # Pages: 4 (A - C)

Finalized Date: 17-JUN-2008 Account: NMZ

CERTIFICATE OF ANALYSIS TB08074710

ME-ICP41 ME-ICP41 ME-ICP41 ME-ICP41 ME-ICP41 ME-ICP41 ME-ICP41 ME-ICP41 ME-ICP41 Mg Mn Mo Na Ni P Pb S Sb

% ppm ppm % ppm ppm ppm % ppm

0.01 5 1 0.01 1 10 2 0.01 2

0.43 2450 <1 0.11 22 1150 5 1.97 3 0.48 2700 <1 0.14 19 550 3 1.87 <2

0.37 1985 <1 0.14 19 1570 3 2.79 <2

0.67 2290 <1 0.18 46 3360 4 3.44 <2 0.40 2890 <1 0.07 23 300 2 1.93 2

0.50 833 <1 0.12 17 8730 6 2.71 <2 0.65 799 <1 0.20 15 >10000 6 1.84 2 0.78 1160 <1 0.21 33 5740 13 3.59 2 2.12 1165 <1 0.56 62 4820 5 3.30 <2 2.11 994 <1 0.53 64 3280 4 1.51 <2

2.11 640 <1 0.35 58 6060 3 0.40 <2 1.84 745 <1 0.35 155 6930 5 1.44 <2 0.90 792 <1 0.24 60 6850 6 2.43 <2 0.81 1025 <1 0.23 20 5740 3 2.18 <2

0.62 732 <1 0.21 45 3510 2 2.95 <2

3.34 708 <1 0.31 136 2060 3 0.41 2 0.55 894 <1 0.23 54 4100 3 3.08 2 0.48 1125 <1 0.17 34 4480 2 3.46 <2 1.65 1755 <1 0.39 75 2220 9 2.27 <2 0.68 1325 <1 0.18 30 3240 3 2.85 <2

1.08 1535 <1 0.38 24 3910 3 2.15 <2 i,7S 928 <1 0.16 118 3590 4 1.69 <2 0.41 663 <1 0.15 55 3280 2 1.84 <2 0.23 829 <1 0.07 42 700 2 3.41 <2 0.37 1080 <1 0.15 22 5220 3 3.12 <2

0.49 842 <1 0.17 34 >10000 5 5.10 <2 0.49 815 1 0.11 69 4600 3 7.77 2 2.41 1370 <1 0.47 48 5190 3 0.74 <2

0.37 1055 <1 0.10 33 2560 3 2.75 <2 1.29 1105 <1 0.13 88 2630 <2 1.79 2

0.65 938 <1 0.23 55 4650 <2 2.49 <2 0.65 1110 <1 0.18 48 4920 2 2.92 <2 1.17 673 <1 0.30 55 4390 7 2.86 <2 1.20 710 <1 0.22 41 6030 209 2.65 <2 0.88 678 <1 0.18 48 8680 38 3.36 2

0.83 647 <1 0.16 29 3380 37 3.11 <2 0.91 383 <1 0.24 33 3600 3 0.37 <2 0.76 809 <1 0.27 50 4020 <2 1.00 <2

Page 50: DIAMOND DRILLING RPT SOLLAS LAKE AREA...INTRODUCTION This report summarizes a drill hole on claim TB30 14194 in May of 2008. This hole was part of a larger 2913.88m diamond drilling

Method An"lyle

Units Sample Desc;ription LOR

G134639 G134640 G134641 G134642 G134643

G134644 G134645 Gl34646 G134647 G134648

G134649 G134650 G134651 G134652 G134653

G134654 G134655 G134656 G134657 G13465a

G134659 G134660 Gl34661 G134662 G134663

G134664 G134665 G134666 G134667 G134668

G134669 G134670 G134671 G134672 G134673

G134674 G134675 G134676

ALS ':=hemex EXCELLENCE IN ANAL YTICAL CHEMISTRY ALS Canada Ltd,

212 Brooksbank Avenue North Vancouver BC V7 J 2C 1 Phone: 604 984 0221 Fax 6049840218 www.alschemex.com

ME-ICP41 ME-ICP41 ME-ICP41 ME-ICP41 ME-ICP41 ME-ICP41

Sc Sr Tn Ti TI U ppm ppm ppm % ppm ppm

1 1 20 0.D1 10 10

1 75 <20 0.08 <10 <10 1 54 <20 0.11 <10 <10 1 65 <20 0,17 <10 <10 2 170 <20 0.16 <10 <10 1 27 <20 0.06 <10 <10

:1 281 <20 0.13 <10 <10 2 478 <20 0,12 <10 <10 3 448 <20 0.14 <10 <10 7 802 <20 0,34 <10 <10 10 238 <20 0.33 <10 <10

6 304 <20 0.24 <10 <10 5 438 <20 0.25 <10 <10 3 295 <20 0.15 <10 <10 2 390 <20 0.12 <10 <10 2 196 <20 0,10 <10 <10

4 179 <20 0,20 <10 <10 :2 207 <20 0.12 <10 <10 2 270 <20 0.12 <10 <10 6 228 <20 0,25 <10 <10 2 348 <20 0,17 <10 <10

5 485 <20 0,25 <10 <10 2 304 <20 0,22 <10 <10 1 188 <20 0.10 <10 <10

<1 97 <20 0.13 <10 <10 1 362 <20 0,11 <10 <10

1 623 <20 0,07 <10 <10 ::: 812 <20 0,08 <10 <10 6 630 <20 0,35 <10 <10 1 323 <20 0,14 <H) <10 2 394 <20 0.18 <10 <10

2 209 <20 0.15 <10 <10 3 471 <20 0.13 <10 <10 5 228 <20 0,17 <10 <10 4 338 <20 0.14 <10 <10 3 363 <20 A," <10 <10

2 251 <20 0.10 <10 <10 3 188 <20 0.13 <10 <1()

3 216 <20 0.12 <10 <10

To: EAST WEST RESOURCE CORPORATION 1204 ROLAND STREET THUNDER BAY ON P7B 5M4

Project: NORTH MARSHALL

I CERTIFICATE OF ANALYSIS

ME-ICP41 ME-ICP41 ME-ICP41

V W Zn

ppm ppm ppm

1 10 2

47 <10 22 43 <10 27 87 <10 53 90 <10 38 28 <10 17

46 <10 44 51 <10 78 53 <10 104 134 <10 111 123 <10 105

84 <10 63 85 <10 78 51 <10 89 52 <10 47 39 <10 34

65 <10 52 56 <10 61 68 <10 52 98 <10 92 87 <10 66

112 <10 75 sa <10 66 45 <10 43 74 <10 78 59 <10 72

39 <10 22 29 <10 20 107 <10 97 71 <10 68 58 <10 75

97 <10 53 79 <10 48 72 <10 90 62 <10 1380 50 <10 253

43 <10 154 47 <10 49 47 <10 38

Page: 4-C Total # Pages: 4 (A - C)

Finalized Date: 17-JUN-2008 Account: NMZ

T808074710

Page 51: DIAMOND DRILLING RPT SOLLAS LAKE AREA...INTRODUCTION This report summarizes a drill hole on claim TB30 14194 in May of 2008. This hole was part of a larger 2913.88m diamond drilling

Hole Sample # From To Width

5C-08-01 G134560 29.37 30.37 1 5C-08-01 G134561 30.37 31.37 1 5C-08-0l G134562 31.37 32.47 1.1 5C-08-01 G134563 32.92 33.91 0.99

5C-08-0l G134564 33.91 34.91 1 5C-08-01 G134565 34.91 35.91 1 5C-08-01 G134566 35.91 36.68 0.77 5C-08-01 G134567 I 36.68 37.68 1 5C-08-0l G134568 37.68 38.68 1

15C-08-01 G134569 38.68 39.15 0.47 5C-08-0l G134570 39.15 40.15 1 5C-08-01 G134571 40.15 41.15 1 5C-08-01 G134572 59.13 60.13 1 5C-08-01 G134573 62 63 1 5C-08-01 G134574 64.42 65.42 1 5C-08-01 G134575 65.42 66.42 1 5C-08-01 G134576 66.42 67.42 1. 5C-08-0l G134577 67.42 68.42 1 5C-08-01 G134578 68.42 69.87 1.45 5C-08-0l G134579 70.24 71.24 1 5C-08-0l G134580 115~115.65 0.59 5C-08-01 G134581 166. 167.57 1 5C-08-0l G134582 167.57 168.57 1 5C-08-01 G134583 168.57 169.57 1 5C-08-01 G134584 169.57 170.2 0.63 5C-08-01 G134585 174.4 175.4 1 5C-08-01 G134586 175.4 176.7 1.3 5C-08-01 G134587 176.78 177.68 0.9: 5C-08-01 G134588 178.15 179.15 1 5C-08-0l G134589 179.15 180.15 1 5C-08-01 G134590 180.15 181.15 1 5C-08-01 G134591 181.15 182.15 1 5C-08-01 G134592 182.15 183.15 1 5C-08-0l G134593 183.15 184.15 1 5C-08-01 G134594 184.15 185.15 1 5C-08-0l G134595 185.15 186.15 Ii

5C-08-01 G134596 186.15 187.15 11

5C-08-01 G134597 187.15 188.15 1!.

5C-08-01 G134598 188.15 189.15 11 5C-08-01 G134599 189.15 190.15 1[ 5C-08-01 G134600 190.15 191.15 f 5C-08-01 G134601 191.15 192.15 1 5C-08-01 G134602 192.15 193.15 1 5C-08-01 G134603 193.15 194.15 1 5C-08-01 G134604 194.15 195.15 1 5C-08-01 G134605 195.15 196.15 1

Page 52: DIAMOND DRILLING RPT SOLLAS LAKE AREA...INTRODUCTION This report summarizes a drill hole on claim TB30 14194 in May of 2008. This hole was part of a larger 2913.88m diamond drilling

5C-08-01 G134606 196.15 197.15 1

5C-08-01 G134607 197.15 198.15 1 5C-08-01 G134608 198.15 199.15 1 5C-08-01 G134609 199.15 200.15 1 5C-08-01 G134610 200.15 201.15 1 5C-08-01 G134611 201.15 202.15 1 5C-08-01 G134612 202.15 203.15 1 5C-08-01 G134613 203.15 204.22 1.07 5C-08-01 G134614 204.22 205.22 1 5C-08-01 G134615 205.22 206.22 1 5C-08-01 G134616 206.22 207.22 1 5C-08-01 G134617 207.22 208.22 1 5C-08-01 G134618 208.22 209.22 1 5C-08-01 G134619 209.22 210.22 1 5C-08-01 G134620 210.22 211.22 1 5C-08-01 G134621 211.22 212.22 1 5C-08-01 G134622 212.22 213.36 1.14