+ All Categories
Home > Documents > Digging Deeper: 2019 Year in Review and 2020 Site Planning ... · –Tentative completion summer...

Digging Deeper: 2019 Year in Review and 2020 Site Planning ... · –Tentative completion summer...

Date post: 20-Sep-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
46
Meeting Guidelines If you are participating on a computer, tablet, or smartphone you can ask questions by writing them in the chat window and sending directly to Katherine Jenkins. We will point out the chat window at the start of the meeting. Katherine will monitor the chat window for questions and comments from participants. If you are participating by phone, text questions to Katherine’s cell (720-930-0842) as the chat window is not available for phone participants. We will write the questions down as they come in and review them for everyone in the middle and end of the presentation. Thank you all for joining and for working with us on this new virtual meeting format. If you have any questions, please email [email protected] or [email protected] We will begin shortly… COLORADO .. Department of Public - Health & Environment
Transcript
Page 1: Digging Deeper: 2019 Year in Review and 2020 Site Planning ... · –Tentative completion summer 2020 –Based on recommendations from 2019 safety and operational ... –Repository

Meeting Guidelines

• If you are participating on a computer, tablet, or smartphone you can ask questions by writing them in the chat window and sending directly to Katherine Jenkins.– We will point out the chat window at the start of the meeting.– Katherine will monitor the chat window for questions and comments from participants.– If you are participating by phone, text questions to Katherine’s cell (720-930-0842) as the

chat window is not available for phone participants.– We will write the questions down as they come in and review them for everyone in the

middle and end of the presentation.

• Thank you all for joining and for working with us on this new virtual meeting format. If you have any questions, please email [email protected] or [email protected]

We will begin shortly…

j~~ COLORADO • .. ~ Department of Public

-~ Health & Environment

Page 2: Digging Deeper: 2019 Year in Review and 2020 Site Planning ... · –Tentative completion summer 2020 –Based on recommendations from 2019 safety and operational ... –Repository

U.S. Environmental Protection Agency – April 20202

2019 Year in Reviewand Plan for 2020

Bonita Peak Mining District

Page 3: Digging Deeper: 2019 Year in Review and 2020 Site Planning ... · –Tentative completion summer 2020 –Based on recommendations from 2019 safety and operational ... –Repository

Objectives• Communicate BPMD Superfund work

completed in 2019• Provide overview of planned 2020 work• Discuss ways to get/stay involved in the

BPMD Superfund process

Page 4: Digging Deeper: 2019 Year in Review and 2020 Site Planning ... · –Tentative completion summer 2020 –Based on recommendations from 2019 safety and operational ... –Repository

Outline• Site overview• 2019 work completed• 2020 work planned• How to engage in the Superfund process

Page 5: Digging Deeper: 2019 Year in Review and 2020 Site Planning ... · –Tentative completion summer 2020 –Based on recommendations from 2019 safety and operational ... –Repository

Site Overview

Page 6: Digging Deeper: 2019 Year in Review and 2020 Site Planning ... · –Tentative completion summer 2020 –Based on recommendations from 2019 safety and operational ... –Repository

• Site listed on NPL in September 2016

• 48 mining/milling source areas• 3 main drainages• 4 operable units (OUs)

– Sitewide (OU1)– Mayflower Tailings (OU2)– Groundwater system (OU3)– Ben Franklin (OU4)

BPMD Superfund Site

BPMD source areas

OU3

OU2

OU4

Page 7: Digging Deeper: 2019 Year in Review and 2020 Site Planning ... · –Tentative completion summer 2020 –Based on recommendations from 2019 safety and operational ... –Repository

DiscoveryandNotification

Remedial Investigation/Feasibility Study

CloseoutRecord of Decision

Remedial Design/Remedial Action

Site Closeout

Community Involvement

State/Tribal Involvement

Superfund Process

Page 8: Digging Deeper: 2019 Year in Review and 2020 Site Planning ... · –Tentative completion summer 2020 –Based on recommendations from 2019 safety and operational ... –Repository

2019 Work Completed

Page 9: Digging Deeper: 2019 Year in Review and 2020 Site Planning ... · –Tentative completion summer 2020 –Based on recommendations from 2019 safety and operational ... –Repository

• Risk assessment• Remedial investigation• Response actions

• Groundwater system evaluations

• Community involvement

2019 BPMD Activities

Page 10: Digging Deeper: 2019 Year in Review and 2020 Site Planning ... · –Tentative completion summer 2020 –Based on recommendations from 2019 safety and operational ... –Repository

Risk Assessments• Finalized Aquatic Baseline Ecological Risk Assessment (BERA)

– Fish/bug populations impacted– High metals, low pH drives risk

• Finalized Baseline Human Health Risk Assessment (HHRA)– Exposures limited to camping (not ATV)– Two dispersed campsite areas to be addressed under IROD– Two additional campsite areas to be further evaluated

• Terrestrial BERA– Sample collection complete– To be finalized fall 2020

Page 11: Digging Deeper: 2019 Year in Review and 2020 Site Planning ... · –Tentative completion summer 2020 –Based on recommendations from 2019 safety and operational ... –Repository

Remedial Investigation• Goal: Multi-year characterization of

nature and extent of contamination across the site, determine how contaminants are transported

• High flow/low flow surface water sampling

• Monthly surface water and draining mines sampling

Water sensors deployed in 2019 to collect surface water data

Page 12: Digging Deeper: 2019 Year in Review and 2020 Site Planning ... · –Tentative completion summer 2020 –Based on recommendations from 2019 safety and operational ... –Repository

• American Tunnel Well– Monitoring well installed August 2019

between bulkheads 2 and 3– Improve understanding of water levels

in the tunnel and connection with larger Bonita Peak groundwater system.

• BPMD 2016-2018 Seeps, Springs, and Draining Mines Characterization Report– MSI

Groundwater System

Sampling locations for seeps, springs, and draining mine characterizations

~ 51r8(;1'11 (loo.,g9

• Dr., rang Mine

a DP1 Mfle

• S.::epi'Sp.i;n~

Page 13: Digging Deeper: 2019 Year in Review and 2020 Site Planning ... · –Tentative completion summer 2020 –Based on recommendations from 2019 safety and operational ... –Repository

Mayflower Remedial Investigation• Remedial investigation (RI) for OU2 is ongoing

– SGC is conducting the RI– Additional RI work planned for 2020– Evaluate nature and

extent of sources andfate and transport of contaminants

Example visual model of Mayflower Mill area

High-Flow Conditi,ons, Dissolved M angan-es-e

M MW-' 7 - • 100 Hillside F'

/

:a ~3.5iA [pl e) - M 300 "'i

Dissolved Mn in GW / Seep = ~200 ug/l Disso lved M n in SW = 556 ug/l

4353 B - 556

Page 14: Digging Deeper: 2019 Year in Review and 2020 Site Planning ... · –Tentative completion summer 2020 –Based on recommendations from 2019 safety and operational ... –Repository

Response Actions• Response Actions pursuant to

2019 IROD• Kittimac sludge management• Ben Franklin work by DRMS and

property owner• Ongoing interim water treatment

plant (IWTP) operations Ben Franklin Limestone Channel

Page 15: Digging Deeper: 2019 Year in Review and 2020 Site Planning ... · –Tentative completion summer 2020 –Based on recommendations from 2019 safety and operational ... –Repository

Interim Remedial Actions• Interim Record of Decision

(IROD) finalized in May 2019– 23 source areas

• IROD work at Henrietta mine completed– Soil debris removal– Mine drainage control

Henrietta mine

Page 16: Digging Deeper: 2019 Year in Review and 2020 Site Planning ... · –Tentative completion summer 2020 –Based on recommendations from 2019 safety and operational ... –Repository

Ben Franklin• DRMS safety closure at Ben Franklin

mine to– Eliminate open stope hazard along roadway– Prevent infiltration into closure and adit– Amend the backfill surface– Amend and revegetate the waste rock

borrow/removal area• Property owner installed limestone pH

buffering for adit discharge; Adit discharge channel alignment

Before stope closure

After stope closure

Page 17: Digging Deeper: 2019 Year in Review and 2020 Site Planning ... · –Tentative completion summer 2020 –Based on recommendations from 2019 safety and operational ... –Repository

IWTP Sludge Management at Kittimac• Sludge from IWTP stabilized with Kittimac tailings• Site revegetated and fenced• Groundwater monitoring wells installed

Kittimac site

Page 18: Digging Deeper: 2019 Year in Review and 2020 Site Planning ... · –Tentative completion summer 2020 –Based on recommendations from 2019 safety and operational ... –Repository

Community Involvement• Finalized Community Involvement Plan• Revised Southern Ute Indian Tribe

Communications Plan• Updated Alert and Notification Plan• Digging Deeper series• Fact Sheets

– Innovative technologies– Risk assessments– Initial site goals– Selected site strategy

..o:~ ..... r~Jm 1114 II .. Ullill ..i d...-iilojllo

Page 19: Digging Deeper: 2019 Year in Review and 2020 Site Planning ... · –Tentative completion summer 2020 –Based on recommendations from 2019 safety and operational ... –Repository

Innovative Technologies• Biocement pilot study at Kittimac• Fiber optic distributed temperature

sensors (FO-DTS)• Centrifuge study at Gladstone

treatment plant• Pilot testing plans for in-situ

stabilization at 2 waste rock piles• Fort Lewis College autonomous

robotics testing in Gold King MineExample of data from FO-DTS. Blue shows highly conductive zones where subsurface water may be in connection with or close to the stream.

California Gulch ,,. , I

~.

' ~,--J

~--- . J ~ -- ...,.

~~ .,

nl!4

Page 20: Digging Deeper: 2019 Year in Review and 2020 Site Planning ... · –Tentative completion summer 2020 –Based on recommendations from 2019 safety and operational ... –Repository

State of Colorado 2019• ASARCO

– 3D aerial imagery and modeling of Silver Lake basin completed

• Amy and Aspen– Site characterization field work completed

• Health and Safety Training – With EPA assistance, completed free 8-hour

and 40-Hour OSHA Health and Safety Trainings to 31 people

• DRMS Ben Franklin safety closure and remedial action contractor for property owner

COLOR:ADO Hazardous Materials & Waste Management Division Department of Public 1--fealt & Envi ·onment

COLORADO Division of Reclamation, Mining and S,af,ety

Department of Natural Resources

Page 21: Digging Deeper: 2019 Year in Review and 2020 Site Planning ... · –Tentative completion summer 2020 –Based on recommendations from 2019 safety and operational ... –Repository

US Forest Service 2019• LiDAR• Environmental DNA

– Rocky Mountain Research Station has led the collection of aquatic genetic material to determine local fish species occurrence

– https://www.fs.fed.us/rm/boise/AWAE/projects/eDNAtlas/edna-atlas-contacts.html

• Navy Benthic Microbial Fuel Cell assistance– “A battery that obtains energy from bacterial respiration in sediments.”

Dr. Y. Meriah Arias-Thode• Aerial Electromagnetic Survey• US Army Corps of Engineers Remediation of Abandoned Mine Sites

(RAMS) Program– Cooperated in demonstrating near surface geophysics tools and bringing

other technology to the BPMD

--REST SE , __ .

__ 1· · s· --1 . I

. . . . . .· .

· .......... -.

,' llENt .lGRK-l -

Page 22: Digging Deeper: 2019 Year in Review and 2020 Site Planning ... · –Tentative completion summer 2020 –Based on recommendations from 2019 safety and operational ... –Repository

Questions?• Please send your questions, if you haven’t already, via chat

to Katherine Jenkins

• Katherine will be tracking questions and responding to you directly via chat. She will let you know your question has been received.

Page 23: Digging Deeper: 2019 Year in Review and 2020 Site Planning ... · –Tentative completion summer 2020 –Based on recommendations from 2019 safety and operational ... –Repository

Planned 2020 Work

Page 24: Digging Deeper: 2019 Year in Review and 2020 Site Planning ... · –Tentative completion summer 2020 –Based on recommendations from 2019 safety and operational ... –Repository

EPA 2020 Priority Activities• Site Management Plan• IWTP Operation and

maintenance• Sitewide repository planning• Oversight of Mayflower Remedial

Investigation• Continue remedial actions

• Develop of Upper Animas and Groundwater System Remedial Investigation work plan

• Red & Bonita bulkhead test• Standardizing private property

access requests

Page 25: Digging Deeper: 2019 Year in Review and 2020 Site Planning ... · –Tentative completion summer 2020 –Based on recommendations from 2019 safety and operational ... –Repository

• BPMD Superfund site selected to conduct an Adaptive Management (AM) pilot study– Develop a Site Management Plan

(SMP) which will provide a framework for achieving site goals by:

• Establishing priority areas for future work

• Planning for continued monitoring, evaluation, and adaptive management

Site Management PlanEPA Site Goals

1) Improve water quality with focus on mine drainage

2) Stabilize source areas with a focus on solid media

3) Minimize unplanned releases

Page 26: Digging Deeper: 2019 Year in Review and 2020 Site Planning ... · –Tentative completion summer 2020 –Based on recommendations from 2019 safety and operational ... –Repository

Site Management Plan• Selected strategy focuses on the Bonita Peak

Groundwater System and Upper Animas mine drainages– RI/FS and bulkheading of mine drainages connected

to groundwater system (OU3)– RI/FS of Upper Animas source areas

• Site Management Plan actions will take place concurrently with ongoing work at the BPMD site– Gladstone IWTP– Sitewide repository– Work pursuant to 2019 IROD

Upper Cement Creek and Upper Animas source areas of focus for selected site strategy

Page 27: Digging Deeper: 2019 Year in Review and 2020 Site Planning ... · –Tentative completion summer 2020 –Based on recommendations from 2019 safety and operational ... –Repository

• Development of SMP is ongoing– CAG and Silverton Planning Group will review draft documents as

they are available. – Final SMP released to public in September 2020

• Community Involvement with SMP– EPA will present the final SMP in Digging Deeper public meeting – Fact sheets will explain sections in an overview format

Site Management Plan Schedule

Page 28: Digging Deeper: 2019 Year in Review and 2020 Site Planning ... · –Tentative completion summer 2020 –Based on recommendations from 2019 safety and operational ... –Repository

Gladstone IWTP• Plant upgrades:

– Tentative completion summer 2020– Based on recommendations from

2019 safety and operational assessment

– Ensure operational stability and continuous, year-round operation

Gladstone IWTP

Page 29: Digging Deeper: 2019 Year in Review and 2020 Site Planning ... · –Tentative completion summer 2020 –Based on recommendations from 2019 safety and operational ... –Repository

Sitewide Repository• Goal: manage IWTP sludge and mining wastes as

EPA implements future remediation activities

• Looking to site on Mayflower impoundment(s)

• Geotechnical field investigations conducted in Fall 2019 evaluated impoundment stability– All four impoundments would be geotechnically stable

for repository placement

• Pre-design geotechnical evaluations to ensure construction material compatibility

Drilling soil borings as part of repository geotechnical investigations

Page 30: Digging Deeper: 2019 Year in Review and 2020 Site Planning ... · –Tentative completion summer 2020 –Based on recommendations from 2019 safety and operational ... –Repository

Sitewide Repository Schedule• Goal: sitewide repository operational by spring/summer

2021• Preliminary milestone dates:

– Proposed Plan, Feasibility Study, Public Meeting and Public Comment Period: June 2020

– Repository Interim Record of Decision: Fall 2020– Repository Design: Fall 2020 – Winter 2020/2021– Construction: Spring 2021

Page 31: Digging Deeper: 2019 Year in Review and 2020 Site Planning ... · –Tentative completion summer 2020 –Based on recommendations from 2019 safety and operational ... –Repository

2020 Remedial ActivitiesKoehler, Junction, Longfellow

1. Remove sediment from pond2. Maintain flow path for discharging

water3. Address elevated soil

concentrations

Page 32: Digging Deeper: 2019 Year in Review and 2020 Site Planning ... · –Tentative completion summer 2020 –Based on recommendations from 2019 safety and operational ... –Repository

2020 Remedial ActivitiesNatalie/Occidental

1. Maintain flow path for discharging water

Page 33: Digging Deeper: 2019 Year in Review and 2020 Site Planning ... · –Tentative completion summer 2020 –Based on recommendations from 2019 safety and operational ... –Repository

Remedial Investigation Planning• Multi-year sampling effort• Goal: Determine nature and extent of contamination, fate and

transport of contaminants – Soil, surface water, groundwater, sediment, mine waste

sampling • 2020 will focus on identifying data gaps and data collection

needs in future– Emphasis Upper Animas and Bonita Peak groundwater

system

Page 34: Digging Deeper: 2019 Year in Review and 2020 Site Planning ... · –Tentative completion summer 2020 –Based on recommendations from 2019 safety and operational ... –Repository

OU3 Groundwater System• Multi-year effort starting 2021• Goal is to understand:

– How ground water moves through mine workings

– How ground water impacts surface water

– What remedies would be effective at achieving goals

Three-dimensional model of Sunnyside, Red and Bonita, Mogul, and Gold King mine workings and conceptual groundwater surface

11ri(.tlo) _u.J w .:. ;n

111»lo> • 11 :Ynn

110031) • l1M111 1

11t )Jo) 11:001)

• 11 :-11111

11·00,) • 1 11 1111 1

•I IHIIII ,,.,,. 1 J.111U

• 1 }«1'],)

- - - - - - - -

. - - ----

Page 35: Digging Deeper: 2019 Year in Review and 2020 Site Planning ... · –Tentative completion summer 2020 –Based on recommendations from 2019 safety and operational ... –Repository

Red and Bonita Bulkhead Test• Summer 2020• Head testing at:

– 50 ft hydraulic head– 100 ft hydraulic head

• Visual inspection of bulkhead• Sampling of nearby seeps and

springs, Cement Creek• End of test: draw down and treat

discharge at Gladstone treatment plant during draw down

Red and Bonita mine

Page 36: Digging Deeper: 2019 Year in Review and 2020 Site Planning ... · –Tentative completion summer 2020 –Based on recommendations from 2019 safety and operational ... –Repository

• EPA working with property owners to acquire access agreements for work planned in next several years– Duration: 5 years– Goal: standardize process, minimize impacts to owners

through repetitive requests, increase project efficiency– Streamlined approach to include multiple properties by

same owner in one form– Interagency coordination

Private Property Access

Page 37: Digging Deeper: 2019 Year in Review and 2020 Site Planning ... · –Tentative completion summer 2020 –Based on recommendations from 2019 safety and operational ... –Repository

US Forest Service 2020• Brooklyn mine May 2019 IROD

implementation– Mine Portal Mine-Influenced Water (MIW)

Discharge– Mining-Related Source/Stormwater Interactions– Mine Portal Pond Sediments

-o.E.5T SE ·.·.--. . I' . ' l

. - . . ,I SI . I

. . . . .· .

·fi . ......._... -.. - '

· lt711ENr ,oaro -_ -

Page 38: Digging Deeper: 2019 Year in Review and 2020 Site Planning ... · –Tentative completion summer 2020 –Based on recommendations from 2019 safety and operational ... –Repository

1. Implement storm water diversion2. Remove sediment from pond3. Maintain flow path for discharging water

2020 Remedial ActivitiesBrooklyn

Page 39: Digging Deeper: 2019 Year in Review and 2020 Site Planning ... · –Tentative completion summer 2020 –Based on recommendations from 2019 safety and operational ... –Repository

State of Colorado 2020

• ASARCO• Present interactive 3D program to SJCHS for a future museum

display• Amy and Aspen

• Complete in-situ stabilization treatability studies; finish RI; and continue to develop FFS for 2021

• Health and Safety Training • Free 8-hour training for 2020 *(Covid-19 dependent)

• Historic and Interpretive signs• Outdoor panels to be fabricated and installed at Kittimac,

Gladstone, Mayflower Mine and Silver Lake• IROD Interim Sites

• Ben Butler - Safety closure and amend mine waste removal and backfill area with run on controls

• Campgrounds 4 and 7 – Finish site characterization and design and bid for fall 2020 or spring 2021 construction

COLORADO Hazardous Materials & Waste Management Division Depamne,t of Pub ·c Healf'l & - virornnent.

Division. of Reclamation, Mining and Safety

Department of Natural Resources

Page 40: Digging Deeper: 2019 Year in Review and 2020 Site Planning ... · –Tentative completion summer 2020 –Based on recommendations from 2019 safety and operational ... –Repository

2020 Remedial ActivitiesBen Butler

1. Implement storm water diversion

NOTE: DRMS implementing safetyclosure and amending mine waste.

Page 41: Digging Deeper: 2019 Year in Review and 2020 Site Planning ... · –Tentative completion summer 2020 –Based on recommendations from 2019 safety and operational ... –Repository

2020 Remedial ActivitiesCampsite Area 4

1. Address elevated soil concentrations

Page 42: Digging Deeper: 2019 Year in Review and 2020 Site Planning ... · –Tentative completion summer 2020 –Based on recommendations from 2019 safety and operational ... –Repository

1. Address elevated soil concentrations

2020 Remedial ActivitiesCampsite Area 7

Page 43: Digging Deeper: 2019 Year in Review and 2020 Site Planning ... · –Tentative completion summer 2020 –Based on recommendations from 2019 safety and operational ... –Repository

Stakeholder Engagement Options

Page 44: Digging Deeper: 2019 Year in Review and 2020 Site Planning ... · –Tentative completion summer 2020 –Based on recommendations from 2019 safety and operational ... –Repository

Get Involved!• BPMD Community Advisory Group

(CAG) – monthly meetings• Digging Deeper series – public meetings• Monthly Newsletters• Fact Sheets

– Innovative technologies– Risk assessments– Initial site goals– Selected site strategy

Katherine [email protected]

Laura [email protected]

BPMD Superfund Site Websitehttp://epa.gov/superfund/bonita-peak

Page 45: Digging Deeper: 2019 Year in Review and 2020 Site Planning ... · –Tentative completion summer 2020 –Based on recommendations from 2019 safety and operational ... –Repository

Questions?• Please send your questions if you haven’t already via chat

to Katherine Jenkins

• Katherine will be tracking questions and responding to you directly via chat. She will let you know your question has been received.

Page 46: Digging Deeper: 2019 Year in Review and 2020 Site Planning ... · –Tentative completion summer 2020 –Based on recommendations from 2019 safety and operational ... –Repository

Thank You!

www.epa.gov/superfund/bonita-peak


Recommended