    Standard Factory BuildingType ST- 1

    FACTORY TYPEDetached single-storey with mezzanine floor WINDOWSAluminium frame with rayban glass 5mm.LAND PLOT AREA22,50m x 76m WALLBrickwall with plastered and painted on both sides,Ceramic Tile on toilet wall only,BUILDING COVERAGE AREA22.50m x 62,OOm : 1,395 ROOFMetal roofing with heat insulation and jack roof,LETTABLE AREAGround floorMezzanlne floorTotal

    FLOOR FINISHESNon-metallic floor harderner on ground floor, Concretetrowelled finlsh on mezzanine floor and ceramic tileson toilet area.HEIGHTGround floor to mezzanine : 3.50Mezzaninefloor to ceiling : 2.70Ground floor to roof : 6,20WATER SUPPLYClean water is available,ELECTRICITY SUPPLYReady to connect at 380 V or 20 KV/50 HZ,TRUCTURESteel and concrete structure are designed accordingto IndonesianStandard. LIGHTNING PROTECTIONElectrostatic system.FLOOR LIVE LOAD DESIGNProduction floor : 750

    Mezzaninefloor : 250FIRE FIGHTING SYSTEMFour portable fire extinguishers are provided.

    OILETfloor staff : 2 mono block closets and 1washbasin.oilet for labor on the ground flooremale : 5 squatting closets, 4 wash basins,Male : 4 squatting closets, 1 urinal block, 2wash basins,

    TELECOMMUNlCATiONTelephone lines are ready to connect,SEWERAGESewer line to Waste Water Treatment Plant,OTHERSCarparksfor five cars, loadingarea and landscaplng.DOORne rolling door and one emergency steel door at

    floor, Aluminiumframe with rayban glass 5 mm,lywood and melamine for toilet,

    Note: Speclflcatlon Is sublect to change without prior notice

    ontact Person Asep Sugiharto 081317920943

  • 8/6/2019 Dikontrakan Bangunan Pabrik 2

    2/8

    aanclard Factory Building Type ST-1 ,* --- "-

    s S,i, 'k.

    ELEVATION

    FRON T ELEVATION ( 1 UNIT ) SECTION A - A

    PRDUCTION AREA

    GROUND FLOOR PLAN

    Note: S~eclficatlons subleci to chanae without prior notice

    MEZZANINE FLOOR PLAN

  • 8/6/2019 Dikontrakan Bangunan Pabrik 2

    3/8

    FACTORY TYPESlngle-storey with mezzanine floor WINDOWSRayban glass 5mm with aluminium frame at officearea.LAND PLOT AREA44m x 115m WALLSPrecast concrete wall, painted nside and pearlstonefinish outside.Toilet area with brick wall, plastered & painted andceramic tile inside.BUILDING COVERAGE AREA(24.34mx 84.16m) +(2.86mx 8.88m)LETTABLE AREAGround floorMezzanine floorotal

    ROOFMetal roofing with turbine ventilators.FLOOR FINISHEDNon-metallicfloor hardener on production area,trowelled finlsh floor on office and mezzanine area,ceramic tile on toilet area.HEIGHTGround floor to mezzanine : 3,25ezzanine floor to ceiling : 2.70Ground floor to roof : 5.95 WATER SUPPLYClean water is available.TRUCTUREeel and concrete structures are designed accordingIndonesian Standard. ELECTRICITY SUPPLYReady to connect at 380 V or 20 KV I 50 HZ

    LOOR LIVE LOAD DESIGNProduction floor : 750ffice and mezzanine floor : 250

    LIGHTNING PROTECTIONElectrostatic system.FIRE FIGHTING SYSTEMFour portable fire extinguisher are provided.OILET : 7 squattlng closets, 2 mono blockclosets, 6 wash basins, 1 urinal block, TELECOMMUNICATIONTelephone lines are ready to connect.ezzanine floor : 2 mono block closets, 2 wash basins. SEWERAGESewer line to Waste Water Treatment Plant,OOR : two sliding doors & two steelemergency doors.

    : two swing glass door at entrance.OTHERSGuard house, car park and driveway, landscaping.fencing etc.

    Note: Speclflcatlon Issubject to change without prior notice

  • 8/6/2019 Dikontrakan Bangunan Pabrik 2

    4/8

    uildingType ST - 2

    SIDEELEVATION-A

    PRODUCTIONAREA

    GARBAGEBOXa rGROUNDFLOORPLAN

    Note: S ecification s subect to chan e without rior notice

  • 8/6/2019 Dikontrakan Bangunan Pabrik 2

    5/8

    Building Type ST - 3

    FRONT ELEVATION

    TYPEwith mezzanine floorPLOT AREA5m x 155m

    COVERAGE AREAx 114M)+x 15.85M)AREAfloorfloor

    floor to mezzanine : 3.50 mfloor to ceiling : 2.75 mfloor to roof : 7.31 m

    eel and concrete structures are designed according

    LIVE LOAD DESIGNfloor : 750 Kg/ Sq.mand mezzaninefloor : 250 Kg/ Sq.m

    floor : 14 squatting closets, 14 monoblock closets, 10 wash basins,1 urinal block.: 2 mono block closets, 2 washbasins.

    DOORSProduction area : two sliding doors & two steelemergency doors.Office area : two swing glass door at entrance.WINDOWSRayban glass 5mm with aluminium frame at officearea.WALLSBrickwallwith plastered and paintedon both sides.Ceramic tile on toilet wall only.ROOFMetal roofing with turbine ventilators.FLOOR FINISHEDNon-metallic floor hardener on production area.Trowelled finish floor on office and mezzanine area,ceramic tile on toilet area.WATER SUPPLYClean water is available.ELECTRICITY SUPPLYReady to connect at 380 V or 20 KV / 50 HZ.LIGHTNING PROTECTIONElect!ostastic system.FIRE FIGHTING SYSTEMFour portable fire extinguisherare provided.TELECOMMUNiCATlONTelephone lines are ready to connectSEWERAGESewer line to Waste Water Treatment Plant.OTHERSGuard house, car park and driveway, landscaping,fencing etc.

    N.ote: Speclflcotlon Issubject to change without prior notice

  • 8/6/2019 Dikontrakan Bangunan Pabrik 2

    6/8

    SIDE ELEVATION

    r-l GROUND FLOOR PLAN 6

    MEZZANINE FLOOR PLAN

    Note:Speciflcatlon Issubject to changewithout prior notice

  • 8/6/2019 Dikontrakan Bangunan Pabrik 2

    7/8

    TYPEed double-storey DOORSSteel rolling door at loadlng area. Aluminium framewith rayban glass 5 mm at entrance,Aluminium door and aluminium frame at toilet areaAND PLOT AREA5m x 18m WINDOWSAluminium frame with rayban glass 5mm.AIN BUILDING SIZE WALLSBrickwall with plastered and painted on both sides,Ceramic tile on toilet area.ETTABLE AREAfloor ROOFMetal roofing with heat insulation.

    FLOOR FINISHINGProduction area with non metallic floor hardener.Ceramic tiles on toilet area,oor to second floor : 4.00: 3.80WATER SUPPLYClear water is available.

    eel and concrete structures are designed accordingIndonesian standard. ELECTRICITY SUPPLYReady to connect at 380 V or 20 KV/50 HZ.LIGHTNING PROTECTIONElectrostatic System.Kg/ Sq.mKg/ Sq.m FIRE FIGHTING SYSTEMFour portable fire extinguisher are provided.

    LIVE LOAD DESIGNfloor : 750: 400TELECOM MUNlCATiONTelephone lines are ready to connect.: 1 mono block closet, 2 squattingclosets, 3 wash basins, 1 urinal block,: 1 mono block closet, 2 squattingclosets, 3 wash basins, 1 urinal block,SEWERAGESewer line to Waste Water Treatment Plant.emaleOTHERSCar park and loading area,econd floor : 1 mono block closet, 2 squattingclosets, 3 wash basins, 1 urinal block.: 1 mono block closet, 2 squattlngclosets, 3 wash basins, 1 urinal block.

    Note: Speclflcatlon Issubject to change wlthout prior notice

  • 8/6/2019 Dikontrakan Bangunan Pabrik 2

    8/8

    6FRONT ELEVATION

    hSIDE ELEVATION

    SECOND FLOOR PLAN

    8.50

    GROUND FLOOR PLAN

    6.50 18.W8.00 18.008.00 18.00


Recommended