Director ’s update CSIRO Astronomy and Space Science Lewis Ball CASS Chief 11 June 2013
Transcript

Director’s update

CSIRO Astronomy and Space Science

Lewis BallCASS Chief11 June 2013

ATUC 11 June 2013

ATUC members

• John Dickey, UTAS (Chair)• James Allison, U Sydney• Virginia Kilborn, Swinburne• Ryan Shannon, CASS• Stephen Ord, ICRAR – Curtin• Minh Huynh, ICRAR – UWA• Tobias Westmeier, ICRAR – UWA• Sarah Reeves, U Sydney• Vikram Ravi, U Melbourne

• Chris Phillips (Secretary)

Thank you

ATUC 11 June 2013

• Exciting science

• Vibrant and well resourced user community

• Technology advances

• SOC and remote operations

• New opportunities

• LOTS OF CHALLENGES

The big picture

ATUC 11 June 2013

• SKA moving into engineering design phase• 3 years from ~ October 2013• Costed at: €90 million +

• 28 M€ for SKA Office staff and operations (30%)• 63 M€ for Work Package Consortia (70%)

• Most of work will be delivered by international consortia• Funded directly from member countries – funding will

not flow through SKAO or consortium leads• Bids submitted last week

SKA Pre-construction

Bidding consortia

ATUC 11 June 2013

• Other major awards to• ICRAR - Curtin University (AA-low and CSP)• Aurecon (Infrastructure)

CSIRO/DIICCSRTE funding

ATUC 11 June 2013

ASKAP• Now

• 36 antennas, infrastructure (except power)and fibre to Perth all complete.• PAF-PAF-PAF 3-beam image.• 4 PAFs on-site (Mk I) + single pixel feed

• Next• BETA (6 ants + Mk I PAFs + h/w correlator) • ADE prototyping underway• 6 Mk II PAFs installation early 2014• 12 Mk II PAFs installed + commissioned by end 2014

• Phase 2 funding• Secured $6M within CSIRO• Strong optimism for another $6M +12 Mk II PAFs = total 24 Mk II

Shared risk Partial array Unified program

Staged roll-out plan for Mk II PAFs 12 18 24 Construction and commissioning will retain priority

– Goal is to collect science data overnight (weekends) Continue through start of normal ASKAP operations (12 – 18 months) Single unified program (not fragmented proposals/projects) Immediate public data release following verification Seeking input and feed-back from SSTs and broader astronomy

community to help CASS design observing strategy

ASKAP Early Science

ATUC 11 June 2013

ATNF operations

• 2013/14: Sufficient funds from CSIRO + CRIS to deliver Parkes + ATCA + 30% Mopra + ramp up of ASKAP

• Don’t expect an increase from CSIRO beyond that level• Further ramp up of ASKAP operations costs will be

partially offset by increased contribution from astro to science operations

• Remaining deficit (assuming ongoing external funds for Mopra and CRIS equivalent) is ~10% of total ops ($16.5m year + overheads)

• Must achieve further savingsor offset with external revenue

ATUC 11 June 2013

Dual strategy

Even assuming funding from NCRIS 2 we will need:

•External funding for partial operations of Parkes and/or ATCA – The Mopra model(could also apply to ASKAP for 2015/16 and beyond)

•Further operations costs reductions for Parkes/ATCA e.g.• wideband receivers at Parkes, no receiver changes;• Further support and fault response reductions;• reduced observing duty cycle• LBA/ATCA capability reductions

ATUC 11 June 2013

Thanks and best wishes

• Robert Braun• SKA Science Director• Manchester

• Carole Jackson• WA Premier’s Fellow• U Curtin

ATUC 11 June 2013

Thank youAstronomy & Space ScienceLewis Ball

t +61 2 9372 4300E [email protected] www.csiro.au/cass

Astronomy and Space Science

We acknowledge the Wajarri Yamatji people asthe traditional owners of the MRO site.