+ All Categories
Home > Documents > DIRTT Resume

DIRTT Resume

Date post: 01-Apr-2016
Category:
Upload: workscapes
View: 221 times
Download: 1 times
Share this document with a friend
Description:
DIRTT Resume
Popular Tags:
8
Transcript
Page 1: DIRTT Resume
Page 2: DIRTT Resume
Page 3: DIRTT Resume
Page 4: DIRTT Resume
Page 5: DIRTT Resume

Clean

Speed to install

Real time changes

No down time

Built to exact specifications

Full range of accessories for performance & productivity

98% on time installation

Reconfiguration ease as you grow or change

competitive advantages

Page 6: DIRTT Resume
Page 7: DIRTT Resume

DIRTT is an agile architectural option with many great benefits.

• Schedule: We are faster than any competitor with 4 week fabrication time, can install approximately 8,000 sq. ft. or more per week and one week delivery times. Making short deadlines possible. Product arrives at our warehouse to hold until site is ready, assuring no delays.

• Flexibility: With up to 2.1/2” height adjustment, changes in level in flooring are not an issue.

• Aesthetics: A fit and finish that produces unsurpassed detail and virtually no punch items.

• Sustainability: Factory produced, so there is no on-site waste of product, no off gassing VOCs. Can install while other trades are still in operation- no down times.

• Installation: We use our own factory certified crews. With onsite inspections from the manufacturer. We have installed more than 100,000 LF locally in 4 short years.

• Costs: Costs are kept to a minimum for glass installations: extrusions ship from our Savannah plant and all glass is locally sourced.

References:Darden Restaurants Headquarters, over 6,000 LF DIRTT wallsContact: David Clark, facilities, 407-245-4102

LSQ Financial Services, over 900 LF DIRTT walls and two expansionsContact: Shaun Schlossmacher, GC AD Owens, 407-228-6485

Siemens Shared Services, over 900 LF glass DIRTT wallsContact: Stephen Ball, CB Richard Ellis, project PM, 321-377-8568

Adventist Health Systems, over 2,400 LF DIRTT walls (another 1,700 due in October 2012)Contact: Toni Berrios, Building Manager AHS, 407-357-2466

University of Central Florida, College of Medicine, 100 LF DIRTT wallsContact: Barbara O’Hara, Facilities 407-823-4070

Additional Workscapes DIRTT projects:NASCAR, Daytona BeachAmway CenterFlorida HospitalHealth CentralOld Florida National BankSun Trust (Orlando, Los Angeles, Miami)

DIRTT References

Page 8: DIRTT Resume

w w w . w o r k s c a p e s . c o m

DIRTT Representative in your area

F U R N I T U R E | A R C H I T E C T U R A L P R O D U C T S

Becky WilfordNorth Florida

[email protected]

Jay LovellCentral Florida

[email protected]

Daniel ZavalaSouth Florida

[email protected]


Recommended