Disclaimer
This Report, including the data and information contained in this Report, is provided to you on an
“as is” and “as available” basis at the sole discretion of the Government of Alberta and subject to the
terms and conditions of use below (the “Terms and Conditions”). The Government of Alberta has
not verified this Report for accuracy and does not warrant the accuracy of, or make any other
warranties or representations regarding, this Report. Furthermore, updates to this Report may not
be made available. Your use of any of this Report is at your sole and absolute risk.
This Report is provided to the Government of Alberta, and the Government of Alberta has obtained
a license or other authorization for use of the Reports, from:
Shell Canada Energy, Chevron Canada Limited. and Marathon Oil Canada Corporation, for
the Quest Project
(collectively the “Project”)
Each member of the Project expressly disclaims any representation or warranty, express or
implied, as to the accuracy or completeness of the material and information contained herein, and
none of them shall have any liability, regardless of any negligence or fault, for any statements
contained in, or for any omissions from, this Report. Under no circumstances shall the Government
of Alberta or the Project be liable for any damages, claims, causes of action, losses, legal fees or
expenses, or any other cost whatsoever arising out of the use of this Report or any part thereof or
the use of any other data or information on this website.
Terms and Conditions of Use
Except as indicated in these Terms and Conditions, this Report and any part thereof shall not be
copied, reproduced, distributed, republished, downloaded, displayed, posted or transmitted in any
form or by any means, without the prior written consent of the Government of Alberta and the
Project.
The Government of Alberta’s intent in posting this Report is to make them available to the public
for personal and non-commercial (educational) use. You may not use this Report for any other
purpose. You may reproduce data and information in this Report subject to the following
conditions:
• any disclaimers that appear in this Report shall be retained in their original form and
applied to the data and information reproduced from this Report
• the data and information shall not be modified from its original form
• the Project shall be identified as the original source of the data and information, while this
website shall be identified as the reference source, and
• the reproduction shall not be represented as an official version of the materials reproduced,
nor as having been made in affiliation with or with the endorsement of the Government of
Alberta or the Project
By accessing and using this Report, you agree to indemnify and hold the Government of Alberta and
the Project, and their respective employees and agents, harmless from and against any and all
claims, demands, actions and costs (including legal costs on a solicitor-client basis) arising out of
any breach by you of these Terms and Conditions or otherwise arising out of your use or
reproduction of the data and information in this Report.
Your access to and use of this Report is subject exclusively to these Terms and Conditions and any
terms and conditions contained within the Report itself, all of which you shall comply with. You will
not use this Report for any purpose that is unlawful or prohibited by these Terms and Conditions.
You agree that any other use of this Report means you agree to be bound by these Terms and
Conditions. These Terms and Conditions are subject to modification, and you agree to review them
periodically for changes. If you do not accept these Terms and Conditions you agree to immediately
stop accessing this Report and destroy all copies in your possession or control.
These Terms and Conditions may change at any time, and your continued use and reproduction of
this Report following any changes shall be deemed to be your acceptance of such change.
If any of these Terms and Conditions should be determined to be invalid, illegal or unenforceable
for any reason by any court of competent jurisdiction then the applicable provision shall be severed
and the remaining provisions of these Terms and Conditions shall survive and remain in full force
and effect and continue to be binding and enforceable.
These Terms and Conditions shall: (i) be governed by and construed in accordance with the laws of
the province of Alberta and you hereby submit to the exclusive jurisdiction of the Alberta courts,
and (ii) ensure to the benefit of, and be binding upon, the Government of Alberta and your
respective successors and assigns.
IFC – Issued for Construction
®
Jul 30, 2013
IFC – Issued for Construction
®
Jul 30, 2013
IFC – Issued for Construction
®
Jul 30, 2013
IFC – Issued for Construction
®
Jul 30, 2013
SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV DATEDESCRIPTIONISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
NOTES:
CLIENTAPP
PEMAPEMCPDPCSPRSCKDBY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAMQUEST CCS PROJECT
R
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE STATED.3 . LOW POINTS AND DRAINS REQUIRE ET AND INSULATION.
12327
CO2
FROM 8TH STAGE C02 VENTCOLLECTION HEADER
247.010
12809
CO2 RELIEF / VENT
FROM 1ST STAGE C02 VENTCOLLECTION HEADER
247.001
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION GENERAL NOTES & CONNECTION DETAILS.
13011
VENT GAS
TO S-24603246.026
12471
CO2 VENT
FROM PV-247001247.001 12474
VENT GAS
TO S-24603246.026
FREE DRAINING
FREE DRAINING
MD
-
EM
EM---LMFKHKBGBISSUED FOR CONSTRUCTION10/12/121
LMFKHKBGBISSUED FOR DESIGN09/15/110
ISSUED FOR PHA III07/11/11G
ISSUED FOR ESTIMATE04/20/11F
ISSUED FOR PHA II03/01/11E
ISSUED FOR CLIENT REVIEW01/10/11D
ISSUED FOR INTERNAL REVIEW12/02/10C
246.
032
FILE
:\\F:
\102
5\D
RA
WIN
GS
\CO
2\24
6\24
6.03
2.pi
d M
OD
EL
DA
TE:1
0/12
/201
2 2:
42:1
9 P
M B
Y:m
ak65
766
1
VENT GAS COLLECTIONUNIT 246 - REGENERATION/COMMON
246.0000.000.041.032
3
3
24"-VA-247001-PJB(0.4)24"-VA-247001-PJB(0.4)
14"-VA-247002-PJB(0.4)
8"-VA-247009-PJE(C)8"-VA-247009-PJE(C)
FREE DRAINING
FREE DRAINING
FREE DRAINING
N/AET 10
ISSUED FOR CONSTRUCTION
01 Nov 2012
IFC – Issued for Construction
®
Jul 30, 2013
IFC – Issued for Construction
®
Jul 30, 2013
IFC – Issued for Construction
®
Jul 30, 2013
IFC – Issued for Construction
®
Jul 30, 2013
ISSUED FOR CONSTRUCTION
09 Sep 2013
ISSUED FOR CONSTRUCTION
09 Sep 2013
ISSUED FOR CONSTRUCTION
09 Sep 2013
SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV DATEDESCRIPTIONISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
NOTES:
CLIENTAPP
PEMAPEMCPDPCSPRSCKDBY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAMQUEST CCS PROJECT
R
RECIRCULATION FROM PUMP DISCHARGE THROUGH PUMP SEAL CHAMBER THROUGH A FLOW CONTROL ORIFICE AND BACK TO THE PUMP SUCTION
FO
1/2"
PLUGGEDQUENCH
SEAL PLAN: 14
SEAL GLAND
EQUIPMENT # SERVICEP&ID #
INSTRUMENTSPUMP TRIM #
FO (1)PROCESS LINE #
1 . SEE DRAWING 200.000.000.041.007 THROUGH 016 FOR SYMBOL IDENTIFICATION. GENERAL NOTES & CONNECTION DETAILS.
2 . SEAL FLUSH TAKE-OFF POINTS TO BE AT A HIGHER ELEVATION THAN THE PUMP SEAL GLAND TO ENSURE ADEQUATE SELF-VENTING OF MECHANICAL SEALS.
PLUGGEDVENT
RECIRCULATION THROUGH PUMP SEAL CHAMBER THROUGH A FLOW CONTROL ORIFICE AND BACK TO THE PUMP SUCTION
FO
1/2"
PLUGGED QUENCH
PLUGGED DRAIN
SEAL PLAN: 13/61
SEAL GLAND
EQUIPMENT # SERVICEP&ID #
INSTRUMENTSPUMP TRIM #
FOPROCESS LINE #
246.006
246.006
STRIPPER REFLUX PUMP
PLUGGED VENT
AMINE RE-INVENTORY PUMP
AMINE MAKE-UP PUMP
FO-246261
FO-246271
FO-246281
FO-246291
RECOVERED CLEAN CONDENSATE PUMP
STRIPPER REFLUX PUMP
RECIRCULATION THROUGH PUMP SEAL CHAMBER THROUGH A FLOW CONTROL ORIFICE AND BACK TO THE PUMP SUCTION
FO 1/2"
SEAL PLAN: 13
SEAL GLAND
EQUIPMENT # SERVICEP&ID #
INSTRUMENTSPUMP TRIM #
FOPROCESS LINE #
246.022
246.022
WATER MAKE-UP PUMP
V
FO-246150
FO-246151WATER MAKE-UP PUMP
PUMP GEARBOX OIL COOLING
EQUIPMENT # SERVICEP&ID #
LINE NUMBERS
TW CWR
246.022
246.022
WATER MAKE-UP PUMP
V
TW-246150
TW-246151WATER MAKE-UP PUMP
3/4"
14201
246.025
CWS
14202
246.025
CWR
TW
DEMIN WATER SUPPLY PUMP
DEMIN WATER SUPPLY PUMP
246.012
246.012
246.021
246.021
246.023
246.023
FO-246171
FO-246181
FO-246301
FO-246311
P-246022-PJB(0.4)
P-246023-PJB(0.4)
P-246086-DAB
P-246087-DAB
SC-246003-SAB
SC-246004-SAB
WI-246002-UJB(0.4)
WI-246003-UJB(0.4)
PT-246001-PJB(0.4)
PT-246002-PJB(0.4)
PT-246009-DAB
PT-246010-DAB
PT-246012-SAB
PT-246013-SAB
PT-246016-UJB(0.4)
PT-246017-UJB(0.4)
RECOVERED CLEAN CONDENSATE PUMP
INSTRUMENTS
PLUGGEDDRAIN
(1)
3/4"
SC-246018-SAG
SC-246019-SAG
PT-246014-SAG
PT-246015-SAG
-
-
EM
BB---SLKHKBGBISSUED FOR CONSTRUCTION07/08/132
---SLKHKBGBISSUED FOR CONSTRUCTION02/05/131
246.
049
FIL
E:\\
F:\1
025\
DR
AW
ING
S\C
O2\
246\
246.
049.
pid
MO
DE
L D
AT
E:7
/15/
2013
2:2
5:53
PM
BY
:bes
2945
1
2
OH3 PUMPS SEAL PLAN & OIL COOLING DETAILS
UNIT 246 - REGENERATION/COMMON
246.0000.000.041.049
CWS
OIL COOLER
TAG #
P-24604
P-24605
P-24603B
P-24603A
P-24608B
P-24610A
P-24610B
P-24608A
P-24609A
P-24609B
P-24609B
P-24609A
2"-CWR-246026-UAB2"-CWS-246043-UAB
2"-CWS-246042-UAB 2"-CWR-246025-UAB
E-24609B
E-24609A
FO
(2)
FO (2)
PROCESS PROCESS
PROCESSPROCESS
TO PROCESS DRAWING
P&ID NO.
ET 1038
3 . INSULATION AND TRACING IN FLUOR SCOPE
3
3
3
ET 1
038
BACKFLUSH
V
CSO
3/4"
3/4"
ET 1
038
ET 1
038
FLUORVENDOR
FO-246282
FO-246292
VEN
DO
R
FLU
OR
1/2"2
1/2" TUBING
2
2
2
ET 1038
ET 1038
2"x1"
2"x1"2
2
E-24609X
ET 1038
ET 1038
33
2
2
IFC – Issued for Construction
®
Jul 30, 2013
ISSUED FOR CONSTRUCTION
09 Sep 2013
ISSUED FOR CONSTRUCTION
09 Sep 2013
ISSUED FOR CONSTRUCTION
09 Sep 2013
ISSUED FOR CONSTRUCTION
09 Sep 2013
LP STEAM
FROM HEADER
285.217
DEMIN W
ATER
FROM HEADER
285.217
WASTE W
ATER
TO W
WTP 271
285.217
INSTRUMENT AIR
FROM HEADER
285.217
UTILITY AIR
FROM HEADER
285.217
LOW TEMP HP STEAM
FROM HEADER
285.217
HOT DEMIN W
ATER
TO V-25102
285.217
RICH AMINE
FROM V-44118
285.217
T
LEAN AMINE
TO V-44118
285.217
T
LP CONDENSATE
FROM HEADER TRAPS
285.217
NITROGEN
FROM HEADER
285.217
RECOVERED CLE
AN
CONDENSATE
TO TK-25101
285.217
UTILITY W
ATER
FROM HEADER
285.217
D
12460
NITROGEN
TO DISTRIBUTION
246.030
12458
UTILITY AIR
TO DISTRIBUTION
246.030
12459
INSTRUMENT AIR
TO DISTRIBUTION
246.037
12614
WASTE W
ATER
FROM P-24603A/B / P-24607
246.027 12686
RICH AMINE
TO E-24602A/B
246.001
12470
UTILITY W
ATER
TO DISTRIBUTION
246.031
12681
HOT DEMIN W
ATER
FROM E- 24606A/B246.020
12615
RECOVERED CLE
AN
CONDENSATE
FROM P-24608A/B246.027
12238
LEAN AMINE
FROM P-24602A/B/C
246.011
12137
DEMIN W
ATER
TO P-24610A/B
246.023
D
2 . ALL INSTRUMENT TAG NUMBERS ARE PREFIXED BY "246" UNLESS OTHERWISE NOTED.
D
DD
TWO PHASE FLO
W
5 . LOCALIZED DEGASSING OF CO2 MAY OCCUR AT RESTRICTIONS, BENDS, TEES, ETC. RESULTING IN LOCALIZED TWO-PHASE FLOW AND VIBRATION.
1 . SEE DRAWINGS 200.0000.000.041.007 THRU 016 FOR SYMBOL IDENTIFICATION GENERAL NOTES & CONNECTION DETAILS.
NA
TWO PHASE FLO
W
4 . CONNECTION FOR TEMPORARY SUPPLY.
D
D
RS
RS
RSRS
RS RS
RS
3 . CONNECTION FOR UTILITY WATER TO QUENCH POC IF REQUIRED BY WWTU.
D
246
285
285
2"-SCL-246009-SAB
1"
2"x3/4"
246
285
SAB
246
ET 10
50H 50
ET 10
38
2"-SCL-246009-SAB
2"x1"
2"x1"
285
246
ET 10
38 ET 10
50
ET 10
50
ET 10
50
ET 10
38
1"
2" 2" 2"
18"
3/4"
ET 10 ET 10
5
2"-GI-246001-ULB
6"-WI-246001-UJB(0.4)
3/4"1"
2"-SS-285058-SAG
1"
4"-W
P-285034-PJB
(0.4)
1"
2"-AU-246001-ULB
2"-SS-248001-SAG
3"-AI-246001-ULB
6"-W
I-285003-UJB
(0.4)
6"-SC-285210-SAB
H
ET 10 ET 10
5
3/4"3/4"
3/4"
2"-W
U-246001-UAB
4"-W
P-246002-PJB
(0.4)
36"-SL-285145-SAB
2"-AU-285148-ULB
3"-AI-285150-ULB
1"
ET 10
3/4"
2"-W
U-285041-UAB
3/4"
285
2"-GI-285068-ULB
248
6"-W
I-285002-UJB
(0.4)
10"-P-285156-DJE
(0.4)
ET 10
SAG
H
2"-SCL-2 85001-SAB
14"-P-285155-DAG
3/4"
1"
3/4"
6"-W
I-246007-UJB
(0.4)
10"-P-246002-DJE
(0.4)
14"-P-246081-DAG
6"-SC-246008-SAB
ET 1050
ET 1050
44 4
1"-GI-285069-ULB
246
285
SHELL DWG NO.: REV.
SHELL CANADA
SCALE: NONE
REV DATEDESCRIPTIONISSUED
C
D
A
B
4 3 2 1
4 3 2 1
C
D
NOTES:
CLIENTAPP
PEMAPEMCPDPCSPRSCKDBY
QUEST CCS PROJECT
PIPING AND INSTRUMENT DIAGRAMQUEST CCS PROJECT
R
3/4"3/4"
14048
TO DISTRIBUTION
LP STEAM
246.029
14049
TO V-24607
LP CONDENSATE
246.029
D
1"
1"-AU-285149-ULB
D
2"x1"
DD
N/A
1"-WU-285042-UAB
US-246-01-9
ET 10
50
1"-SS-285064-SAG
D
3/4"
D
2"
ET 10
63
ET 10
50
RS
US-246-01-9
US-246-01-9
3/4"
10"-SL-246012-SAB
36"-SL-246001-SAB
ET 10
63
3
D
H 50
D
ET 10
50
TWO PHASE FLOW
14104
LP STEAM
TO DISTRIBUTION
246.003
12545
LOW TEMP HP STEAM
TO E-24802
248.002
-
EM
BB---SLKHKBGBISSUED FOR CONSTRUCTION07/08/132
LMFKHKBGBISSUED FOR CONSTRUCTION09/28/121
MDEMLMFKHKBGBISSUED FOR DESIGN09/15/110
ISSUED FOR PHA III07/11/11G
ISSUED FOR ESTIMATE04/20/11F
ISSUED FOR PHA II03/01/11E
ISSUED FOR CLIENT REVIEW01/10/11D
246.
101
FIL
E:\\
F:\1
025\
DR
AW
ING
S\C
O2\
246\
246.
101.
pid
MO
DE
L D
AT
E:7
/18/
2013
1:1
7:56
PM
BY
:bes
2945
1
2
NORTH BATTERY LIMITS
UNIT 246 - REGENERATION/COMMON
246.0000.000.041.101
ET 10
38
D
1"-SCL-246008-SAB
1"-SL-246023-SAB
H 50 H 50
D1"
2"x1"
2"x1"
094
FT
094
FI
2
2 2 22
2
2
2
2
2
2
2
22
22
2
22 2 2
ET 10
38
ET 10
38
2 2 2
2
H 50
2
H 50
2
1"
2
ET 10
506"-W
I-246001-UJB
(0.4)
2
IFC – Issued for Construction
®
Jul 30, 2013