distribution project progress report 17 Mar 15

Date post: 16-Nov-2015
Category:
Upload: abhishek-tiwari
View: 219 times
Download: 3 times
Share this document with a friend
Description:
how to prepare ppt for review meeting of distribution project progress project
20
Advisory | Planning & Engineering | Transactions | Project Management | Operations & Maintena Managing Director’s Review Meeting 31 March 2015 NIT # 196 M/s GKC-APL JV, Hyderabad
Transcript
BOO Update31 March 2015
*
M/s GKC-APL JV, Hyderabad, NIT # 196
New PSS –
Mayabigha and Majhwe, Nawada –
Land Made Available on 17-12-2014 - Boundary wall work started at both PSS.
Dakhshini Jehanabad –
Boundary wall Completed. 33KV foundation work of equipment is completed and 11KV equipment foundation is also completed except BPI foundation. Control room brick work with roof casting completed . Remaining works like fixing of doors & window, plaster work, electrification etc. to be done.
R & M work – 39 Nos – Work of R&M in progress at all PSS . All PTRs augmented so for (Total 05 Nos.). 52 nos. 33 KV VCB erected out of total 72 (71%) and 127nos. 11KV VCB erected out 131(97%). During last month 1 nos. 33KV VCB erected.
*
New 11 KV line –176.38 CKm - 84 rail poles out of total 2304(3%) & 315 PSC poles erected out of 1546 (18%). During last month only 20 nos. PSC Poles & zero rail pole erected. Stringing not started yet. Progress is extremely slow.
*
S. No.
Overall %
Supply
Erection
1
196
48.00%
29.00%
38.50%
58.00%
7.00%
32.50%
36.00%
3.00%
19.50%
30.17%
3
204
78.65%
64.13%
71.39
88.80%
24.30%
56.55
61.26%
16.59%
38.92
54.923
6
207
Payment Status of Special Plan(BRGF) Projects Phase-I (Gaya, Nawada & Jehanabad)
Sl. No.
LOA Date
Agreement Date
Expenditure (In Cr.)
Gaya Jehanabad & Nawada District
Nos
12
12
Nos
24
24
Nos
Nos
Nos
39
Nos
5
5
5
100.00%
Nos
29
29
Nos
846
846
244
28.84%
Kms
3096
3096
760
24.55%
Nos
2856
2856
103
3.61%
Nos
2
2
2
2
2
b
Nos
345.0
345.0
253
345.0
Nos
4140.0
4140.0
 
 
 
 
*
Nos
Nos
729
729
Nos
1706
1958
Nos
602
494
 
 
 
 
*
Nos
3
3
3
3
3
b
Nos
135
135
135
135
Nos
952
952
253
952
Nos
672
672
100
672
 
 
 
 
*
- Gaya
- Nawada
- JEHANABAD
Sl. No.
Land Made available by 11.09.2014
Boundary wall of PSS Completed & Structure foundation, Equipment Foundation of 33 KV upto transformer foundation completed 11 KV side equipment foundation completed except BPI foundation .Control room brick work with roof casting completed . Remaining works like Plaster, Fixing of door & window, electrification etc. to be done
Total No. of Augmentation PSS in scope:- 5
Sl. No.
1X10+1X3.15=13.15
4
Progress Report of Special Plan(BRGF) Phase I
Total No. of New PSS in scope:- Nil
Sl. No.
Sl. No.
Progress Report of Special Plan(BRGF) Phase I
Total No. of New PSS in scope:- 2 nos.
Sl. No.
Land Made Available by 17.12.2014.
Boundary Wall Completed, Ms Angles Fixing Wip, Plastering wip, Control Room Foundations RCC Wip, Equipment Foundations Pit Excavations Wp
2
Mayabigha
2x10
*
Sl.No.
Particular
Rail Pole(LOA Quantity)CKm
PSC Pole(LOA Quantity)CKm
Proposed Qty (In Nos)
Pole dumped at site
Sl.No.
Particular
Rail Pole(LOA Quantity)CKM
Proposed Qty (In Nos)
Pole dumped at site
Sl.No.
Particular
Rail Pole(LOA Quantity)CKM
Proposed Qty (In Nos)
Pole dumped at site
Rail Pole(LOA Quantity)CKM
PSC Pole(LOA Quantity)CKM
Kadirganj Town
Pachiya
0
5.47
0
93
0
120
0
45
0
0
Hemja
0
6
0
102
0
110
0
0
0
0
Daulatia Village
Aathi
3.29
0
56
0
56
0
0
0
0
0
Sl.No.
Particular
Rail Pole(LOA Quantity)CKM
Proposed Qty (In Nos)
Pole dumped at site
Rail Pole(LOA Quantity)CKM
PSC Pole(LOA Quantity)CKM

Recommended