Page 1
(Distribution Southern Zone, Chittagong)SL.No ID-No Date of Birth Name, District and
Qualification and Date ofjoining
Designation and PresentPosting
Topics of Foreign Training andDuration
Country Inspection Topics and its Duration Comments
1 1-0510 31.01.61 Mr. Md. Azharul IslamPabnaB.Sc.Engg. (Elec.)31.03.83 (AE) 01.02.92(SDE) 21.01.03(XEN) 10.09.13(SE) 13.12.15 (Addl. CE)
Addl. CE Distribution SouthernZone Chittagong.
1) Grid Connected WindEnergy from 01.09.96 to30.08.97
Germany, 1) Technical orientation &quality test witness on 10 Nos.-5/6.67 MVA, 33/11 KV PowerTransformer from 15.11.13 to21.11.13 in China. 2) Quality acceptance test of 33KV ACR from 20.06.14 to 26.06.14for 7 days in Australia. 3) Detail drawing againstShahjibazar 330 CCPP Projectfrom 26.07.15 to 08.08.15 inChina.
2 1-0732 23.02.61 Mr. Iqbal Karim,
Chittagong, B.Sc.Engr.(Elec.),
19.5.86(AE) 21.11.99(SDE) 10.07.05(XEN) 08.02.16 (SE)
SE Attach to CE
Distribution SouthernZone Chittagong.
i) Power Transformer from25.07.03 to 07.08.03
ii) Pre-Paid Metering from16.08.01 to 26.08.01
iii) Training on Pre-PaymentMetering System From15.01.06 to 15 Days
Iran
South Africa,Tanzania,
U.K.
1) Technical orientation &quality test witness of insulatoragainst Chitt. zone power dist.system dev. project from 28.08.15to 03.09.15 in China.
3 1-01747 25.08.75 Mr. Md. Kenoyar Hossain, Bogra B.Sc.Engr (Elec.) 07.04.2006 (AE) 16.06.14 (SDE) 05.11.14 (XEN, Incharge)
Asstt. CE (XEN) incharge Distribution SouthernZone Chittagong.
1) Supply of 11KV LightingArrester & 11KV DOFC theProgram titled “TechnicalOrientation and Quality TestWitness” for 07 (seven) days inChina at March/11 2) Quality acceptance testagainst Chittagong Hill TrackElectrification Project from04.04.15 to 10.04.15 in India. 3) Inspection of generator testagainst Bibiana south projectfrom 09.05.16 to 15.05.16 inGermany.
Page 2
4 11-0373 31.12.57 Mr. Md. Shafiur Rahman Comilla Diploma (Elec.)
29.07.82(SAE), 22.04.10(AE) 25.06.15 (SDE)
SDE Office of CE,Distribution SouthernZone Chittagong.
ZRS, PDB, ChittagongSL.No ID-No Date of Birth Name, District and
Qualification and Date ofjoining
Designation and PresentPosting
Topics of Foreign Training andDuration
Country Inspection Topics and its Duration Comments
1 1-01103 15.02.69 Mr. Golam Hyder Talukder,
Barisal, B.Sc.Engr.(Mech),
19.07.94 (AE) 01.07.03 (SDE) 31.07.12 (XEN) 0175-5582417 0171-1152235 0155-4398791
XEN, Zonal Repairing Shop,
PDB, Chittagong.
1) Training on LV Protection ofDistribution Transformer fromSeptember/05 for 15 days. 2) “Factory Training" aganistDohazari 100 MW PeakingPower Plant ConstructionProject for 30 (Thirty) daysfrom 15.06.2011 to14.07.2011(Excluding traveltime) (bond for 5 years)
China
China
1) inspection (Factory visit atsite) against Chittagong PowerStation 1No Unit (Turbine,Boiler, Electrical, I & C &Operation) from 13.09.10 to20.09.10 for 08 days in China. 2) Technical orientation &Quality test witness from20.04.15 to 30.04.15 in China.
2 1-01783 01.04.84 Mrs. Arifar Yasmin Feni B.Sc.Eng(Mech.) 31.05.09(AE) 24.12.14 (SDE) 25.06.15 (SDE)
SDE Zonal Repairing Shop,
PDB, Chittagong.
1) Testing & Inspection on 33KVCapacitor Bank and at theManufacturer Premises from09.04.07 to 16.04.07 for 07 days inIndia.
3 1-01898 26.06.84 Ms. Nilufarin Akter Chapainawabganj B.Sc. Engg. (Mech.) 20.04.11 (AE) 01816359292 [email protected]
AE, Zonal Repairing Shop,
PDB, Chittagong.
Page 3
Central Computer Centre, ChittagongSL.No ID-No Date of Birth Name, District and
Qualification and Date ofjoining
Designation and PresentPosting
Topics of Foreign Training andDuration
Country Inspection Topics and its Duration Comments
1 9-0004 05.06.66 Mr. Engr. Manik ChandraGhosh Khulna B.Sc. Engineering (EEE) 24.01.96 (Asst. Programmer) 01711354469 [email protected]
System Analyst Chittagong ComputerCenter, PDB, Chittagong.
1) PSCDP tarining program on"Project Management (Batch-2)" from 02.09.13 to 13.09.13
Thailand
2 1-01999 12.12.81 Mr. Engr. Sheikh Md.Zakaria Chittagong B.Sc. Engineering (CSE) 02.10.11 (AE) 01818244822 [email protected]
Assistant Engineer Chittagong ComputerCenter, PDB, Chittagong.
3 12.02.84 Engr. Nazia Fatema Patuakhali B.Sc. Engineering (Mech.) 05.12.11 (Asst. Programmer) 01720355355 [email protected]
Assistant Programmer Chittagong ComputerCenter, PDB, Chittagong.
O & M Circle, Chittagong (North)SL.No ID-No Date of Birth Name, District and
Qualification and Date ofjoining
Designation and PresentPosting
Topics of Foreign Training andDuration
Country Inspection Topics and its Duration Comments
1 1-0749 01.06.62 Mr. Mohammad MoqbulHossain, B-Bharia, B.Sc.Engr.(Mech.),
30.08.86 (AE) 019.03.98(SDE) 10.07.05(XEN) 29.01.15 (SE, Incharge)
SE (Incharge)O & M Circle, Chittagong(North)
1) Single Phase Electronic Meterfrom 02.01.05 to 06.02.05 in India.
2) "Technical Orientation &Quality test witness" of 11 KVSingle Phase PotentialTransformer from 01.10.13 to07.10.13 in China. 3) Technical orientation &quality test witness from13.06.15 to 19.06.15 in China. Participation in the Electricitytransmission and distribution ofSouth Asia from 23.04.16 to07.05.16 in USA.
Page 4
S & D Division, Mohra1 1-01751 01.10.78 Mr. Mithu Kumar Biswas
Chittagong B.Sc.Engr (Elec.) 12.05.08 (AE) 16.06.14 (SDE) 24.11.14 (XEN, Incharge)
XEN (Incharge) S & DDivision,Mohra,PDB,Chittagong.
1) Training Instrumentation,Control + HT Switchgear(Electrical) aganist KaptaiHydro Power Plant (Unit-3) for30 days (G.O. Issued dated01.07.10). 2) Operation & maintenanceof steam turbine from28.10.13 to 08.11.13
Italy
India
2 1-02007 03.12.79 Mr. Md. Asaduzzaman Chuadanga B.Sc. Engg. (Elect.) 02-10-11 (AE) 01714443173 [email protected]
AE, Sales & DistributionDivision Mohra, PDB, Chittagong.
S & D Division, Hathazari1 1-01380 01.04.72 Mr. Mohammad Hossain
Imam, Chittagong, B.Sc.Engr.(Elec.),
05.03.2000(AE) 25.06.09(SDE) 21.12.11(XEN Incharge)
XEN(Incharge), S & DDivision,Mohra,PDB,Chittagong.
1) "Technical Operation &Quality Test Witness" from07.09.09 to 16.09.09 in China. 2) "Technical Orientation &Quality Test Witness for Meter &Meter Enclosure" from 16.03.14to 25.03.14 in China.A20 3) Factory acceptance Test of 33KV guy insulator against Ctg.Power Distribution dev. Projectfrom 10.11.15 to 17.11.15 in China
2 1-01975 18.07.83 Mr. Md. Abdullah Al MamunSardar Rajshahi B.Sc. Engg. (Elect.) 02-10-11 (AE) 01717853702 [email protected]
AE
Sales and DistributionDivision Hathazari, PDB,Chittagong.
Page 5
S & D Division,Fauzdarhat1 1-01356 01.03.74 Mr. Shakh Md. Mahfuzul
Hoque, Norail, B.Sc.Engr.(Elec.),
05.03.2000(AE) 25.06.09(SDE) 16.10.2011 (XEN, Incharge) 18.06.15 (XEN)
XEN,
Distribution Division,Fouzderhat, PDB,Chittagong
1) Training on Split Bolt Lien Tape ConnectorG-452 (Greater Rajshahi Proj).For March/06 for 07 days
India 1)"Workshop on NumericalRelays in MV/LT Systems" from27.09.10 to 29.09.10 in India. 2) Technical orientation &quality test witness againstSCADA Project from 23.03.15 to31.03.15 in China.
S & D Division, Barabkundo1 1-01302 10.05.73 Mr. Prasenjit Chakraborty,
Chittagong B.Sc.Engr.(Mech.),
13.07.99(AE) 26.07.05(SDE), 16-10-11 (XEN, Incharge) 18.06.15 (XEN) 01755584894
XEN Sales & DistributionDivision, Barabkunda, PDB, Chittagong.
1) Training on MeterTechnology against SCADAProject from 12.03.15 to28.03.15 .
Singapore 1) Technical know-how &Technology Transfer onoperation & maintenance of 400kw & 3150kw Feed pump motors"from 22.11.07 to 28.11.07 inChina. 2) "Factory Acceptance Test (FAT)& Technical Orientation Course"against Greater ChittagongPower Distribution Project SCADA-Rehabilitation & Extension inSep/2011 for 07 days or from thedate of actual journey (excludingtravell time) in New Zealand.
2 11-0470 01.01.63 Mr. Md. Ainal Hoque Chapainawabganj Diploma (Elect.) 25-8-84 (SAE) 27-12-11 (AE)
AE Sales & DistributionDivision, Barabkunda, PDB, Chittagong.
Page 6
O & M Circle, Chittagong (South)SL.No ID-No Date of Birth Name, District and
Qualification and Date ofjoining
Designation and PresentPosting
Topics of Foreign Training andDuration
Country Inspection Topics and its Duration Comments
1 1-0779 03.05.63 Mr. Md. Samsul Alam,
Khustia, B.Sc.Engr.(Mech.),
30.08.86(AE) 19.03.98 (SDE) 09.12.07(XEN, rev.) 23.04.09(XEN) 29.01.15 (SE, Incharge)
SE (Incharge)
O & M Circle, Chittagong(South), PDB,Chittagong.
1)145KV &36KV CT & PT From08.10.03 to 08.01.04 for 90 days
2)VCB & Control Panel From02.07.04 for 14 Days
3) Management of WindPower Development (Sida)from 27.08.07 to 28.09.07 for33days
China,
India &China
Sweden
1)15.01.02 to 24.01.02 inSingapore 2) 300 Nos 11KV CurrentTransformer (CT) 11KV PotentialTransformer (PT) from Oct/2006for 07 days in China 3) Inspection of ProgrammableAMR Meter from 30.09.2012 to11.10.2012 in Switzerland.
A proposal sent toministry onOct/2015 for"FactoryAcceptance Test "of insulatoragainst Chitt. Dist.Project from08.11.15 to 14.11.15in China
Distribution Division, Potia1 1-01401 13.04.73 Mr. Md. Abu Sayed,
Pabna, B.Sc.Engr.(Mech.),
05.03.2000(AE) 25.06.09(SDE) 28.06.12 (XEN, Incharge)
XEN Distribution Division PDB, Patia, Chittagong.
1) "Technical orientation &Quality test witness " from01.10.13 to 07.10.13 in China. 2) Factory test witness ofinsulator from 30.08.15 to05.09.15 in China.
2 1-02012 18.01.86 Mr. Ismail Hossen Faridpur B.Sc. Engg. (Elect.) 02-10-11 (AE) 01710234244 [email protected]
AE Distribution Division PDB, Patia, Chittagong.
1)25.9.02 to 30.9.02 in India 2) "Technical Orientation &Quality Test Witness" on 11KVLighting Arrester from 20.07.13 to26.07.13 in China. 3) Quality acceptance test ofbattery & battery charger from20.06.14 to 26.06.14 for 7 days inIndia. 4) Technical orientation &quality test witness of 33 KV discinsulator against Chit. Dis . Dev.Project from 04.10.15 to 15.10.15in India & China.
Page 7
Distribution Division, Coxs'Bazar1 1-01212 01.07.68 Mr. Md. Mostafizur Rahman,
Potuakhali, B.Sc.Engr.(Elec.),
19.03.98(AE) 06.10.04(SDE) 31.10.13 (XEN)
XEN Distribution Division PDB, Cox'bazar.
1) A training titled "SCADACommunication System"against Greater ChittagongElectricity Distribution Project,SCADA rehabilitation, PDB,Chittagong from 19.07.2012 to16.08.2012
NewZealand 1) "Work Shop Test" for Dohazari100MW Peaking Power PlantConstruction Project fromJanuary/11 for 07(Seven) days inChina. 2) Quality acceptance test ofbattery & battery charger from20.06.14 to 26.06.14 for 7 days inIndia. 3) Technical orientation &quality test witness of 33 KV discinsulator against Chit. Dis . Dev.Project from 04.10.15 to 15.10.15in India & China.
2 1-02006 01.01.87 Mr. Reazul Hoque Madaripur B.Sc. Engg. (Elect.) 02-10-11 (AE) 01913444878 [email protected]
AE Distribution Division PDB, Cox'bazar.
3 11-0457 10.12.59 Mr. Md. Jasim Uddin Khan Munshiganj Diploma (Elect.) 25-8-84 (SAE) 27-12-11 (AE)
AE Distribution Division PDB, Cox'bazar.
4 11-0633 02.02.61 Mr. Ashok Roy Chittagong Diploma (Elect.) 25.08.04 (SAE) 28.12.15 (AE)
AE Distribution Division PDB, Cox'bazar.
Page 8
O & M Circle, Chittagong (East)SL.No ID-No Date of Birth Name, District and
Qualification and Date ofjoining
Designation and PresentPosting
Topics of Foreign Training andDuration
Country Inspection Topics and its Duration Comments
1 1-0701 01.03.61 Mr. Sarder AzamMohammed, Potuakhali, B.Sc.Engr.(Elec.),
07.04.86(AE) 04.02.97(SDE) 02.01.05(XEN) 23.09.15 (SE)
SE O & M Circle, ChittagongMetro (East), PDB,Chittagong.
1) 1)GIS From 15.06.04 for 07Days
Germany 1)25.9.02 to 30.9.02 in India 2) "Technical Orientation &Quality Test Witness" on 11KVLighting Arrester from 20.07.13 to26.07.13 in China. 3) Quality acceptance test ofbattery & battery charger from20.06.14 to 26.06.14 for 7 days inIndia. 4) Technical orientation &quality test witness of 33 KV discinsulator against Chit. Dis . Dev.Project from 04.10.15 to 15.10.15in India & China.
2 11-0347 02.04.58 Mr.Md. Kazi Nurul Islam Chittagong. Diploma (Elec.) 12.08.82 (SAE) 22.04.10(AE) 21.12.14 (SDE)
SDE SCADA, System ControlCentr, O & M Circle,Chittagong Metro (East),PDB, Chittagong.
1)A training titled "SCADACommunication System"against Greater ChittagongElectricity Distribution Project,SCADA rehabilitation, PDB,Chittagong from 19.07.2012 to16.08.2012
NewZealand
S & D Division, Kalurghat1 1-01735 28.12.78 Mr.A.F.M. Nur Uddin Ahmed
Nokhali B.Sc.Engr(Mech.) 07.04.06 (AE) 27.12.2011(SDE) 13.08.14 (XEN,in charge)
XEN (Incharge), Sales & DistributionDivision, Kalurghat,PDB, Chittagong.
1) Metering & Backup meteringSystem Ges Current Transformer(CT) against "Factory TestWitness" from 28.07.09 to05.08.09 for 09 days in India. 2) Technical orientation &quality test witness on 10 Nos.-5/6.67 MVA, 33/11 KV PowerTransformer from 15.11.13 to21.11.13 in China. 3) Technical Orientation &Quality Test Witness of 33/11 KVPower Transformer from01.02.2015 to 07.02.2015 in China.
2 1-01982 18.01.83 Mr. Nurul Amin Comilla B.Sc. Engg. (Elect.) 02-10-11 (AE) 01717660586 [email protected]
AE, Sales & DistributionDivision, Kalurghat, PDB, Chittagong.
Page 9
S & D Division, Patharghata1 1-01358 31.12.75 Mr. Md. Kamal Hossain,
B-Baria, B.Sc.Engr.(Elec.),
05.03.2000(AE) 25.06.09(SDE) 16-10-11 (XEN, Incharge) 18.06.15 (XEN)
XEN Sales & DistributionDivision Pathorgata, PDB,Chittagong.
1) “Supply of 110V, 3X5(6) AMPS, 3-Phase, 4-Wire, 3-Element,Outdoor Type Double TariffProgrammable Consumer EnergyMeter with Remote AutomatedReading System” from 30.11.09 to14.12.09 in Singapore. 2) Technical Orientation andQuality Witness aganist CentralZone Power Distribution ProjectJune/11 for 07 days in China. 3) Factory acceptance test of 33KV disc insulator against Chitt.zone power dist. system dev.project from 25.10.15 to 31.10.15in India & China.
2 Mr. Md. Jahangir Alam Diploma Engr. SAE 04.02.16(AE)
AE (Incharge) Sales & DistributionDivision Pathorgata, PDB,Chittagong.
3 Mr. Md. Mostafa Kamal Diploma Engr. SAE 04.02.16(AE)
AE (Incharge) Sales & DistributionDivision Pathorgata, PDB,Chittagong.
Page 10
S & D Division, Stadium1 1-01217 01.01.65 Mr. Ashok Kumar Chowdhury
Rangamati, B.Sc.Engr.(Elec.),
19.03.98(AE) 06.10.04(SDE) 31.10.13 (XEN)
XEN S & D, Stadium, PDB,Chittagong.
1) A training titled "SCADACommunication System"against Greater ChittagongElectricity Distribution Project,SCADA rehabilitation, PDB,Chittagong from 19.07.2012 to16.08.2012 2) PSCDP training program on"Instrumentation & Controlsystem of Steam TurbinePower Plant" from 26.08.13 to06.09.13 3) Training on MeterTechnology against SCADAProject from 12.03.15 to28.03.15 . 4) Training against Hil TractsProject A60from 12.03.15 to28.03.15 .
NewZealand
Vietnam.
Singapore
1)Power Transformer From12.07.04 for 07 Days In China, 2) "Work Shop Test" forHathazari 100MW Peaking PowerPlant Construction Project fromJanuary/11 for 07(Seven) days inChina.
2 11-0306 20.12.59 Mr.Md.Mozibur Rahman Potuakhali B.Sc.Eng(Power) 20.10.81(SAE) 22.04.10(AE) 21.12.14 (SDE, Incharge) 25.06.15 (SDE)
SDE Sales & DistributionDivision, Stadium, PDB,Chittagong.
3 1-01973 10.06.83 Mr. Faizul Alim Alo Coxs'Bazar B.Sc. Engg. (Elect.) 02-10-11 (AE) 01818143143 [email protected]
AE, Sales & DistributionDivision, Stadium, PDB,Chittagong.
4 1-02017 25.11.86 Mr. Md. Sultan Mahamud Naogan B.Sc. Engg. (Elect.) 16-10-11 (AE)
AE, Sales & DistributionDivision, Stadium, PDB,Chittagong.
Page 11
S & D Division, Sholoshahar1 1-0965 01.06.61 Mr. B.M. Jahangir,
Shariatpur,AMIE(Elec.),30.8.86(SAE) 02.03.93(AE) 12.07.02(SDE) 21.07.11 (XEN)
XEN Sales & DistributionDivision, Solashahar PDB, Chittagong.
1)Traning on Gas TurbineManufacturer CompanyAgainst Tongi 80 MW From25.07.04 foro One Month 2) "Orientation &Manufacture's Test Prosses atManufacture's Workshop"from 21.04.08 to 30.04.08 for 10days.
China,
CzechRepublic
1) Witnessing of manufacturingprocess against shikalbaha 150MW P/S from 18.11.15 to 24.11.15in China.
2 1-01943 02.07.82 Suparna Chowdhury Chittagong B.Sc. Engg. (Elect.) 02-10-11 (AE) 01816268237 [email protected]
AE, Sales & DistributionDivision, Solashahar PDB, Chittagong.
S & D Division, Bakulia1 1-01701 08.09.78 Mr.Shek Kausar Masum
Noakhali B.Sc.Eng(Computer) 07.04.06(AE) 7.12.2011(SDE) 10.09.14 (XEN, Incharge) 01721278130
XEN (Incharge)
Sales & DistributionDivision, Bakulia, PDB,Chittagong.
1) 400V, 3x10(60) Amps ThreePhase 4-Wire, D-Element,Outdoor Type Double TariffElectronic Consumer EnergyMeter from October/10 for 10days in China. 2) "Pre-Paid e-metering SystemSoftware Development" from09.01.2012 to 19.01.2012 for 10(Ten) days (excluding traveltime) in China. 3) Quality test witness of 11 KVdisk insulator against Chitt.Zone power dist. system dev.project from 15.01.16 to 21.01.16in India & China.
2 1-02015 14.12.85 Mr. Md. Tareq Sefati Naogan B.Sc. Engg. (Mech.) 16-10-11 (AE)
AE
Sales & DistributionDivision, Baklia, PDB,Chittagong.
3 Mr. Md. Nazrul Islam Diploma SAE 04.02.16 (AE)
AE (Incharge)
Sales & DistributionDivision, Baklia, PDB,Chittagong.
S & D Division, Madarbari
Page 12
1 1-01279 01.01.72 Mr. Md. Shahidul IslamMridha, Manikgong, B.Sc.Engr.(Elec.),
24.06.99(AE) 26.07.05(SDE), 10.03.11 (XEN Incharge) 18.06.15 (XEN)
XEN Sales & DistributionDivision, PDB,Madarbari, Chittagong.
1) Design,Installation,Testing,Operation & Maintenance on CT, PT,CTV, Against G/Ctg. FromAug./04 for 10 days. 2) Training on Design, Supply,Installation, Testing andCommissioning of 1000KWCapacity Wind Mill PowerPlant (WBHPP) on turnkeybasis at Kutubdia Island,cox's Bazar ``TechnicalOrientation and Quality TestWitness from 18.12.07 to31.12.07 for 14 days.
China,
China,
1) Technical orientation &quality test witness againstChit. Dis . Dev. Project Pur -117for 7 days Dec/2015 in India &China.
O & M Circle, Chittagong (West)SL.No ID-No Date of Birth Name, District and
Qualification and Date ofjoining
Designation and PresentPosting
Topics of Foreign Training andDuration
Country Inspection Topics and its Duration Comments
1 1-0620 10.03.61 Mr. Prabir Kumar Sen, Chittagong, B.Sc.Engr.(Elec.),
24.01.85(AE) 09.01.95(SDE) 09.03.04(XEN) 13.01.15 (SE)
SE O & M Circle, ChittagongMetro (West), PDB,Chittagong.
1) Training on SCADA SystemFrom 01.12.88 to 10.03.89
UK 1) "Technical Orientation andQuality Test Witness" in order topurchase (a)33KV CT 150-300/5/5A-400 Nos. (b)33KV CT 200-400/5/5A-400 Nos. (c) 33KV CT 300-600/5/5A-200 Nos. from15.02.2012 to 24.02.2012 for 7days (excluding travel time) inChina.
2 11-0385 21.08.59 Mr.Topon Kanti Mollik Chittagong
Diploma(Elec.),
17.07.83(SAE), 22.04.10(AE), 06.01.16 (SDE, Incharge)
SDE, Incharge O & M Circle Chittagong(West) PDB, Chittagong.
S & D Division, Agrabad
Page 13
1 1-01286 05.04.73 Mr. Morshed MonjurulIslam Barisal, B.Sc.Engr.(Mach.),
24.06.99(AE) 26.07.05(SDE), 05.05.11 (XEN Incharge) 22.02.2016 (XEN)
XEN Sales & DistributionDivision, Agrabad, PDB,Chittagong.
'Factory Training" againstDaudkandi 50MW PeakingPower Plant ConstructionProject for 30(Thirty) daysfrom 30.05.2011 to 30.06.2011(Excluding travel time) (Bond for 5 years)
China 1) Central Zone PowerDistribution Project, a TechnicalOrientation and Quality TestWitness Program named of 11KVCapacitor Bank on April/2011 for07(Seven) days in India. 2) Technical orientation &quality test witness againstChit. Dis . Dev. Project Pur -117for 7 days Dec/2015 in China.
2 11-0296 10.10.57 Mr. Ashis Chowdhury Chittagong Diploma(Elec.) 02.11.81(SAE) 22.04.10(AE) 21.12.14 (SDE) 25.06.15 (SDE)
SDE Sales & DistributionDivision, Agrabad, PDB,Chittagong.
3 1-01680 04.11.77 Mr.Md.Shah Rawaz Mia Barisal B.Sc.Eng(Mech) 07.04.2006(AE) 18.08.2011 (SDE) 01.07.14 (XEN, Incharge)
XEN (Incharge), Sales & DistributionDivision, Rampur, PDB,Chittagong.
1) Purchasing Double tariff non-programmable energy meterfrom 30.10.12 to 09.11.12 inIndia. 2) Basic design Approvalmeeting from 21.07.15 to 04.08.15in China.
4 1-02022 02.11.82 Mr. Sayed Amir Hossain Rajshahi B.Sc. Engg. (Elect.) 16-10-11 (AE)
AE
Sales & DistributionDivision, Rampur, PDB,Chittagong. 5 1-02087 10.01.89 Mr. Md. Jalal Uddin
Chittagong B.Sc. engg. (Elect.) 17.12.13 (AE)
AE
Sales & DistributionDivision, Rampur, PDB,Chittagong.
S & D Division, Khulshi
Page 14
1 1-01253 22.07.69 Mr. Imam Hossain Barisal, B.Sc.Engr.(Mach.),
10.06.99(AE),
27.07.05(SDE), 16-10-11 (XEN, Incharge) 28.05.14 (XEN)
XEN,Sales & DistributionDivision PDB, Khulsi, Chittagong
1) Training on GraterChittagong Power DistributionProject Against 33KV CapacitorBank for 29.05.07 to 09.06.07for 10 days 2) Administration ofEnvironmental and socialconsideration process forimplementation from 18.05.08to 31.05.08 for 15 days
China 1) Technical orientation &quality test witness on 10 Nos.-10/13.33 MVA, 33/11 KV PowerTransformer from 15.11.13 to21.11.13 in China. 2) international trainingprogram on Solar EnergyTechnology & Applications from10.11.14 to 28.11.14 in India.
A proposal sent toministry onOct/2015 for"FactoryAcceptance Test "of insulatoragainst Chitt. Dist.Project from08.11.15 to 14.11.15in China
S & D Division,Numuring1 11-0222 07.01.58 Mr. Md. Akkach Ali
Kishorgonj, Diploma(Power)
19.06.80.(SAE),
17.09.09(AE) 25.06.15 (SDE)
XEN, Incharge S & D Division,Numuring
S & D Division, Pahartali1 1-01724 01.10.80 Mr.A.S.M. Mizanur Rahman
Potuakhali B.Sc.Eng(Mech) 12.09.06(AE) 27.12.2011(SDE) 16.09.14 (XEN, Incharge)
XEN (Incharge) S & D Division, Pahartali
PDB, Chittagong.
1) Training on "ThermalPower Engineering Course"for Gas Turbine and CoalFired steam turbine from12.05.09 to 05.07.09 2) Chandpur 150 MW CCPPProject aganist Operation GBCUnit Including Gas FillingMetering Unit etc. GBC ChiefOperator from 30.05.2011 to12.08.2011 for 75 days (Bond for 5 years)
Japan
France &China
S & D Division, Halishahar1 1-01207 18.07.67 Mr.Bireswar Shaha
Comilla, B.Sc.Engr.(Elec.) 19.03.98(AE) 06.10.04(SDE) 31.10.13 (XEN) 0171-1356520
XEN Sales & DistributionDivision Halishohore, PDB,Chittagong.
1) Training on Tower Design &Transmission Line Design &Installation, Testing &Maint.for 06 Weeks in July/06.
China. 1) Engine & Generator TestWitness against Thohazari100MW Power StationConstruction Project PDB, Chittagong fromNovember/10 for 10 days in Italy& Finland.
2 Ismail Hossain AE
1) Quality test witness of 11 KVdisk insulator against Chitt.Zone power dist. system dev.project from 15.01.16 to 21.01.16in India & China.
O & M Circle, Rangamati
Page 15
SL.No ID-No Date of Birth Name, District andQualification and Date of
joining
Designation and PresentPosting
Topics of Foreign Training andDuration
Country Inspection Topics and its Duration Comments
1 1-0778 13.09.61 Mr. Md. Motiur Rahman, Kustia, B.Sc.Engr.(Mech.),
30.08.86(AE) 21.11.99 (SDE) 05.01.06(XEN, CurrentCharge) 23.04.09(XEN) 29.01.15 (SE, Incharge)
SE (Incharge) O & M Circle, Rangamati
1)Traning on Gas TurbinePower Station Against Tongi80 MW From 25.07.04 for ThreeMonth (Bond for 03 Years) 2) Technology TransferTraining from 07.07.15 to13.07.15
China,
India
1)Preshipment Inspection onTwist Type Wire Seal From15.8.02 to 20.8.02 in USA. 2) Inspection on 01.09.03 to10.09.03 in Germany. 3) witnessing of manufacturingprocess against Shajibazar 330mw Project Feb/2016 in China.
Distribution Division, Rangamati1 1-01779 20.12.83 Mr.Sabuj Kanti Mojumder
Chittagong B.Sc.Eng(Mech 31.05.09(AE) 24.12.14 (SDE) 25.06.15 (SDE) 12.04.16 (XEN, Incharge) 0171-8077247
XEN, Incharge Distribution Division,PDB, Rangamati.
1) Gopalganj 100 MW PeakingPower Plant ConstructionProject on a Training programtitled ''Operation &Maintenance Training onEngine Generation Unit (HFOfired) at manufacturers'factory” from 12/09/2011 to11/10/2011 for 30 (thirty) days. (Bond for 5 years)
Norway 1) Inspection against Faridpur50MW Peaking Power PlantConstruction Project from08.02.11 to 16.02.11 for 07 days inGermany. 2) Technical orientation &quality test witness againstChit. Dis . Dev. Project Pur -117for 7 days Oct/2015 in China.
A proposal sent toministry onOct/2015 for"FactoryAcceptance Test "of insulatoragainst Chitt. Dist.Project from08.11.15 to 14.11.15in China
2 1-01858 01.10.86 Mr. Chingla Mong Marma Khagrashari B.Sc. Engg. (Elect.) 04.11.10 (AE) 06.01.16 (SDE, Incharge) 01553221755 [email protected]
SDE, Incharge Distribution Division,PDB, Rangamati.
1)Training agains Chit. HillTracts for 7 days /2015
India A proposal sent toministry dated21.04.16 forTraining ofTechnologytransfer againstChitt. Hill tracksproject from20.05.16 to 26.05.16in India.
Distribution Division, Khagrasari
Page 16
1 1-01128 14.06.60 Mr. Md. Abu Jafar, Chittagong, B.Sc.Engr.(Mech.),
19.07.84(AE) 27.04.04 (SDE) 31.10.13 (XEN)
XEN Distribution Division,Khagrasari
1) Central Zone PowerDistribution Project, a "TechnicalOrientation and Quality TestWitness" Program named of11KV Capacitor Bank inApril/2011 for 07(Seven) days inChina. 2) Technical Orientation andQuality Test witness of 03 Nos.-33/11 KV, 16/20 MVA PowerTransformer from 20.12.2013 to26.12.13 in China.
A proposal sent toministry dated12.07.15 forManufacturerFactory TestWitness &Inspection againstShahjibazar 330MW CCPP projectfrom 25.07.15 to31.07.15 inGermany.
2 11-0380 04.10.57 Mr. Md. Khorshed AlamSarkar Comilla Diploma engg. (Elect.) 15.09.80 (SAE) 02.11.10 (AE) 06.01.16 (SDE, Incharge)
SDE, Incharge Distribution Division,Khagrasari
Distribution Division, Bandarban1 1-01738 15.09.75 Mr. Mohammad Abdul
Kader Goni Dhaka B.Sc.Engr(Elect.) 07.04.06 (AE) 27.12.2011(SDE) 16.09.14 (XEN, Incharge)
XEN (Incharge) Distribution Division,PDB, Bandarban.
1) "Factory Acceptance Test (FAT)& Technical Orientation Course"against Greater ChittagongPower Distribution Project SCADA-Rehabilitation & Extension inSept/2011 for 07 days or from thedate of actual journey (excludingtravell time) in New Zealand. 2) Factory Acceptance Test from28.06.14 to 04.07.14 in Bangalore,India.
2 11-0413 01.06.59 Mr. Ashutosh Barua Chittagong Diploma (Mech.) 01.08.83 (SAE) 27.12.11 (AE)
AE, Distribution Division,PDB, Bandarban.
(Distribution Central Zone, Mymensingh)
Page 17
SL.No ID-No Date of Birth Name, District andQualification and Date of
joining
Designation and PresentPosting
Topics of Foreign Training andDuration
Country Inspection Topics and its Duration Comments
1 1-0550 01.08.59 Mr. Md. FakhruzzamanJamalpurB.Sc.Engg. (Elec.)28.12.83(AE) 01.02.92(SDE) 09.03.03(XEN) 25.10.2011 (SE , Incharge) 02.06.14 (SE)
Addl. CE (Incharge) Distribution CentralZone, Mymensingh
1)Combined Cycle PowerStation Operation &Maintenance in August/98 for03 Month
Japan 1)Witness of Transformer TestFrom 25.07.04 for 11 Days InChina. 2) Inspection against CentralZone Distribution Project,Mymensingh from 12.05.2012 to21.05.2012 for 7 days in India. 3) Witness of factory test of 33 &11 KV POwer Cable from 15.04.14to 21.04.14 in China.
2 1-0882 08.04.59 Mr. Md. Rakibul Islam, Mymensing, AMIE(Elec.) 25.08.84(SAE) 23.01.89(AE) 18.06.2000 (SDE) 02.07.09 (XEN) (In-charge), 08.02.11 (XEN)
Asst. CE (XEN) Distribution CentralZone, PDB, Mymensingh.
1) Techinal Oritentation onPerformed Termination fordifferent size of Conductors. 07 Days, January/06 India. 2) Inspection against CentralZone Distribution Project,Mymensingh from 12.05.2012 to21.05.2012 for 7 days in India 3) Manufacturer Factory TestWitness & Inspection againstShahjibazar 330 MW CCPP projectfrom 25.07.15 to 31.07.15 inGermany. .
(O & M Circle, Mymensingh)SL.No ID-No Date of Birth Name, District and
Qualification and Date ofjoining
Designation and PresentPosting
Topics of Foreign Training andDuration
Country Inspection Topics and its Duration Comments
1 1-0684 12.01.60 Mr. Shahadat Hossain KhanEusufzai, Mymensing, B.Sc.Engr.(Mech.),
30.12.85(AE) 04.02.97(SDE) 21.07.04(XEN) 23.09.15 (SE) 01755582461
SE O & M Circle, PDB,Mymensingh. & PD (Addl. Charge) Shirajganj 300-400 MWPower PlantConstruction Project
1) 7 transmission Project inFrance for 06 weeks,1994 2) Purchasing Double tariff non-programmable energy meterfrom 30.10.12 to 09.11.12 inIndia. 3) Witnessing of manufacturingprocess against Chandpur 150MW CCPP from 21.04.15 to27.04.15 in China.
Sales & Distribution Division-1 (North), Mymensingh
Page 18
SL.No ID-No Date of Birth Name, District andQualification and Date of
joining
Designation and PresentPosting
Topics of Foreign Training andDuration
Country Inspection Topics and its Duration Comments
1 1-01319 14.08.73 Mr. A.K.M. Jasim Uddin, Shariatpur, B.Sc.Engr.(Mech.),
20.01.2000(AE) 26.07.05(SDE), 16-10-11 (XEN, Incharge) 18.06.15 (XEN)
XEN S & D Division-1 (North) PDB, mymensingh.
1) Training on Pre-PaymentMetering System From11.09.06 for 15 Days
U.K.
2 1-02007 30.12.88 Mr. Md. Touhidul Islam Sherpur B.Sc. Engg. (Elect.) 02-10-11 (AE) 01712814183 [email protected]
AE S & D Division-1 (North) PDB, mymensingh.
Sales & Distribution Division-2 (South), MymensinghSL.No ID-No Date of Birth Name, District and
Qualification and Date ofjoining
Designation and PresentPosting
Topics of Foreign Training andDuration
Country Inspection Topics and its Duration Comments
1 1-01689 28.02.76 Mr.Jahangir Alam Jewel Mymensingh B.Sc.Eng(Mech) 07.04.2006(AE) 27.12.2011(SDE) 13.08.14 (XEN,in charge)
XEN (Incharge) S & D-2, PDB,Mymensingh.
1) A training titled "SCADACommunication System"against Greater ChittagongElectricity Distribution Project,SCADA rehabilitation, PDB,Chittagong from 19.07.2012 to16.08.2012
NewZealand 1) Technical Orientation andQuality Test Witness against 05-set Oil Centrifuging Machine &08 Nos. Current Injection setform January/11 for 07 days inChina & Malyasia. 2) Witness of factory test ofconductor from 15.04.14 to21.04.14 in Vietnam. 3) Visit of distributiontransformer burnt out protectionsystem from 12.07.14 to 22.07.14in Malaysia. 4)Tehnical orientation & Qualitytest witness from 26.09.15 to01.10.15 in China.
2 11-0231 02.03.58 Mr. A.S.M Abdul Awal Mymensingh Diploma (Elect.) 27.06.80 (SAE) 04.11.13 (AE)
AE S & D-2, PDB,Mymensingh.
Page 19
3 1-01844 04.07.86 Mr. Md. Abul Kalam Azad Gazipur B.Sc. Engg. (Elect.) 04.11.10 (AE) 06.01.16 (SDE, Incharge) 01672244741 [email protected]
SDE, Incharge S & D-2, PDB,Mymensingh.
Training on Operation &Maintenance from 01.05.16 to15.05.16
India 1) Technical orientation &quality test witness on 10 Nos.-10/13.33 MVA, 33/11 KV PowerTransformer from 15.11.13 to21.11.13 in China.
4 Mr. Biplab Kumar Gosshami
B.Sc. Engg. 25.06.15 (AE)
AE S & D-2, PDB,Mymensingh.
S & D Division, Gafargaon, Mymensingh.1 1-01463 12.12.72 Mr. Abu Zahid Mohammad
Anwaruzzaman Kushtia, B.Sc.Engr.(Computer) 14.03.2000(AE) 08.12.09(SDE) 01556336586
XEN (Incharge) S & D Division,Gafargaon,Mymensingh.
1) A training titled "SCADACommunication System"against Greater ChittagongElectricity Distribution Project,SCADA rehabilitation, PDB,Chittagong from 19.07.2012 to16.08.2012
NewZealand 1) Technical orientation &quality test witness Bheramarapower station Jan/2016 in India.
2 1-01945 15.07.87 Mr. Md. Mofazzal Hossain Mymensingh B.Sc. Engg. (Mech.) 02.10.11 (AE) 01710524758 [email protected]
AE, Sales & DistributionDivision, PDB,Gafargaon,Mymensingh.
Sales & Distribution Division, Netrokona
Page 20
1 1-01205 02.04.70 Mr. Md. Habibur Rahman, Netrocona B.Sc.Engr.(Mach.),
19.03.98(AE),
26.07.05(SDE), 0.03.11 (XEN Incharge) 2.1.2012(XEN, Incharge) 28.05.14 (XEN)
XEN Sales & DistributionDivision, Netrokona
1) Training on Battery &Battery Charger fromSeptember/06 for 07 days 2) Training on ElectricitySector Advisor TQM Promotionfrom 17.02.07 to 03.03.07 for 15days 3) Training on InnovativeTechnologies inTransmission & Distributionsystems, central Institute forrural Electrification/ Indiafrom 19.10.2009 to 11.12.2009
India
Japan
India
Bhaluka Electric Supply, Mymensingh1 11-0367 01.01.62 Mr.Md.Shaha Alam Sekh
Chandpur Diploma(Elec.) 09.08.82 (SAE) 22.04.10 (AE) 25.06.15 (SDE)
SDE (RE), Bhaluka Electric Supply
PDB, Mymensingh.
Distribution Division, Kishoreganj1 1-01213 20.09.68 Mr. Md. Obaidul Islam,
Jamalpur, B.Sc.Engr.(Elec.),
19.03.98(AE) 06.10.04(SDE) 06.07.10 (XEN Incharge) 18.06.15 (XEN) 0172015221
XEN Distribution Division, PDB, Kishoreganj.
1) Factory Training for PowerTransformer and ControlProtection Panel From03.09.01 to 23.11.01 2) A training titled "SCADACommunication System"against Greater ChittagongElectricity Distribution Project,SCADA rehabilitation, PDB,Chittagong from 19.07.2012 to16.08.2012 3)Training on Operation &Maintenance from 01.05.16 to15.06.16
South Korea,
NewZealand
India
2 1-02092 Mr. Sumon Kumar Kundu Norail B.Sc.Engr.(Elect.) 13.04.14 (AE)
AE Distribution Division,PDB, Kishoreganj.
3 1-02077 30.10.88 Mr. Touhidur Rahman Khan Dhaka B.Sc.Engr.(Mech.) 17.12.13 (AE)
AE Distribution Division,PDB, Kishoreganj.
Page 21
Bajitpur Electric Supply1 1-01876 15.08.83 Mr. Md. Salah Uddin
Chapainawabganj B.Sc. Engg. (Elect.) 01.12.10 (AE) 06.01.16 (SDE, incharge) 01719474987
RE (SDE, Incharge) Bajitpur Electric Supply,PDB, Kishoreganj.
2 11-0485 06.01.64 Mr. Md. Osman Gani Tangail Diploma (Elect.) 25.08.84 (SAE) 04.11.13 (AE)
RE (AE) Bajitpur Electric Supply,PDB, Kishoreganj.
S & D Division, PDB, Bhairab, Kishoreganj1 1-0887 15.08.61 Mr. Mirza Md.
Kamruzzaman, Tangile,AMIE(Elec.),25.8.84(SAE) 10.09.89(AE) 18.06.2000(SDE) 31.10.13 (XEN)
XEN S & D Division, PDB,Bhairab, Kishoreganj
1) “Technical Orientation andQuality Test Witness” on BarCoded Plastic Seal & Accessoriesfor 05(Five) days in Brazil. 2010
2 11-0411 06.09.59 Mr. Md. Oahedul IslamTalukdar Tangail Diploma (Mech.) 31-7-83 (SAE) 27-12-11 (AE)
AE S & D Division, PDB,Bhairab, Kishoreganj
Operation & Maintenance ofMARK Vie DCS from 01.07.13 to10.07.13 in USA.
Sales & Distribution Division, Sherpur
Page 22
1 1-01419 01.12.70 Mr. Indrajit Debnath, Kishorgonj, B.Sc.Engr.(Mech.),
05.03.2000(AE) 08.12.09(SDE) 28.06.12 (XEN, in charge) 22.02.16 (XEN)
XEN Sales & DistributionDivision, PDB, Sherpur.
1) Acceptance for the projecton StrengtheningManagement andPerformance Standards inPower Sector of Bangladeshthrough promotion of TQM (J-08-22662) from 22.02.09 to07.03.09 for 14 days. 2) PSCDP Training Program on"Operation & Maintenance ofGas Turbine" from 30.09.13 to11.10.13
Japan
Thailand
2 Mr. Md. Rasel Uddin AE Sales & DistributionDivision, PDB, Sherpur.
3 11-0487 01.01.59 Mr. Md. Abdus Sattar Jamalpur Diploma (Civil) 25.08.84 (SAE) 04.11.13 (AE)
AE Sales & DistributionDivision, PDB, Sherpur.
3 1-02022 08.06.86 Mr. Md. Mahathy Hasansuman Tangail B.Sc. Engg. (Elect.) 16-10-11 (AE)
AE Sales & DistributionDivision, PDB, Sherpur.
1) Technical orientation &quality test witnes of powertransformer from 23.04.16 to29.04.16 in China.
(O & M Circle, Tangail)
Page 23
SL.No ID-No Date of Birth Name, District andQualification and Date of
joining
Designation and PresentPosting
Topics of Foreign Training andDuration
Country Inspection Topics and its Duration Comments
1 1-0664 13.12.59 Mr. Mrinal Kanti Sen,B-Bharia, B.Sc.Engr.(Elec.),
17.10.85(AE) 17.06.95(SDE) 21.07.04(XEN) 28.07.15 (SE) 01841121241
SE O & M Circle, PDB,Tangail
i) Training against GreaterChittagong Power DistributionProject on 33KV CapacitorBank & 33KV Gas InsulatorSwitchgear against FactoryTest Witness & Orientation ofGas Insulated Switchgearfrom 25.08.07 for 10 (days)
Germany 1) "Witness of factory test of sub-station gantry & hardware" from10.05.14 to 16.05.14 in India. 2) Witnessing of manufacturingprocess against Barapukuria P/Sfrom 20.05.15 to 28.05.15 inChina.
A proposal sent toministry dated10.05.16 forConstructiondrawing reviewmeeting againstBarapukuria 275MW project from28.05.16 to 10.06.16in China.
2 1-01420 05.06.74 Mr. Mohammad AnowarulIslam, Tangail, B.Sc.Engr.(Metallurgi.),
19.03.2003(AE) 28.01.14 (SDE) 02.03.14 (XEN, Incharge)
XEN (In charge), sales and DistributionDiv-2., PDB, Tangail.
1) Factory test witness of Pin for11 KV Pin Insulator & Fittings for11 KV Dis Insulator from 26.06.14to 30.06.14 in China.
3 1-02087 10.12.88 Mr.Md. Moshiur Rahman Chuadanga B.Sc. Engg (Elect.) 17.12.13 (AE)
AE sales and DistributionDiv-2., PDB, Tangail.
4 Mr.Md. Moshiur Rahman B.Sc. Engg 25.06.15 (AE)
AE sales and DistributionDiv-2., PDB, Tangail.
Sales and Distribution Div., Bhuapur, PDB, Tangail.
Page 24
1 1-01734 22.10.74 Mr. Md. Sahabuddin Rajshahi B.Sc.Engr(Mech.) 27.12.06 (AE) 27.12.2011(SDE) 28.01.14 (XEN, Incharge) 01715-602947
XEN (In charge), Sales and DistributionDiv., Bhuapur, PDB,Tangai
Factory Training againstBaghabari 50MW PeakingPower Plant ConstructionProject '' from 30.05.2011 to30.06.2011 for 30(Thirty) days(Bond for 5 years)
China 1) "Training for Technical Know-How & Technology Transfer"against Supply of Self CleaningAir Filter from 19.12.08 to24.12.08 for 05 days in Malaysia.
2) “Witnessing ofmanufacturing process & testsof the equipment atmanufacturer's works includingtransfer of technical know-howon Blade Kit, Turbine RotorStage-3 with Hardware kits GesShroud Assembly of TurbineNozzle Stage-3 with hard warekits Complete Set” from 10.01.11to 17.01.11 in USA. 4) Basic Engineering ReviewMeeting against BHOLA 225 mwccpp Project from 16 - 27August/2013 in China. (Departfrom China due to misconductactivity)
2 11-0218 30.08.57 Mr. Jibon Kishnu Debonath Mymensingh, Diploma(Mech.)
19.06.80.(SAE),
17.09.09(AE) 25.06.15 (SDE)
XEN (In charge), Sales and DistributionDiv., Bhuapur, PDB,Tangai
3 Mr. Sajjadul Islam Rana B.Sc. Engg. 25.06.15(AE)
AE Sales and DistributionDiv., Bhuapur, PDB,Tangai
Sales and Distribution Div., Ghatail, PDB, Tangail.
Page 25
1 1-01204 30.12.69 Mr. Shuresh Chandra Pal, Gajipur, B.Sc.Engr.(Mech.),
19.03.98(AE) 06.10.04(SDE) 31.10.13 (XEN)
XEN Sales and DistributionDiv., Ghatail, PDB,Tangail.
1) Basic Engineering DrawinReview & Approval ofDaudkhandi/ Baghabari 50MWPeaking Power ConstructionProject from 09.08.10 to 18.08.10for 10 days in China. 2) Material witness Inspection(Engine and Generator) againstBagabari 50MW Peaking PowerPlant for 07 days in Finland. 3) international trainingprogram on Solar EnergyTechnology & Applications from10.11.14 to 28.11.14 in India.
S & D Division, Sakhipur, PDB, Tangail.1 1-01385 23.11.69 Mr. Md. Shahdat Ali,
Tangail, B.Sc.Engr.(Elec.),
05.03.2000(AE) 25.06.09(SDE) 2.1.2012(XEN, Incharge) 22.02.16 (XEN)
XEN Sales & DistributionDivision, Sakhipur, PDB,Tangail.
1) Training on StrengtheningManagement andPerformance Standard inPower Sector throughpromotion of TQM (PI Solving)from 23.02.08 to 09.03.08 for 16days(by JICA).
Japan 1) "Technical Orientation &Quality Test Witness" of 150 KmGuy-Wire from 08.05.13 to14.05.13 in China.
2 11-0329 20.02.58 Mr.Md.Rafiqual Islam Tangail B.Sc.Eng(Elec.) 02.08.82(SAE) 22.04.10(AE) 21.12.14 (SDE)
SDE (Incharge) Sales & DistributionDivision, Sakhipur, PDB,Tangail.
S & D Division-1, Tangail1 1-01409 01.01.71 Mr. Md. Sahagir Hossain
Khulna B.Sc.Engr.(Elec.), 05.03.2000 (AE) 17.11.13 (SDE) 21.01.14 (XEN, Incharge)
XEN Sales & DistributionDivision-1, PDB, Tangail.
1) Technical orientation &quality tes+A103t witness from01.04.15 to 07.04.15 in India.
S & D Division, Kalihati, PDB, Tangail.
Page 26
1 1-01754 11.01.76 Mr. Mohammed Abdur Rouf
Mymensingh, B.Sc.Engr(Mach.) 12.05.08 (AE) 16.06.14 (SDE)
XEN (Incharge) S & D Division, Kalihati,PDB, Tangail.
Chandpur 150 MW CCPP Projectaganist Operation &Maintenance Training from30.05.2011 to 12.08.2011 for 75days (Bond for 5 years)
China 1) "Work Shop Test" forHathazari 100MW Peaking PowerPlant Construction Project from24.02.11 to 02.03.11 for 07(Seven)days in China.
Sales & Distribution Division, Jamalpur1 1-01316 18.11.72 Mr. S.M. Iqbal,
Barisal, B.Sc.Engr.(Elec.),
20.01.2000(AE) 26.07.05(SDE), 21.12.11(XEN Incharge) 18.06.15 (XEN) 0175-5582475 0175-5582418
XEN Distribution Division,PDB, Jamalpur.
1) On Job Training onInstallation of V.H.F.Equipment From 03.07.03 for01 Month 2) Training on Gater1132/33KV Sub-Station PowerTransformer, 33KV 11KV GasInsulated Switchgear, 33/11KVSub-station & Control Panel &Protection Equipment AgainstChittagong Power DistributionProject ''Design &Maintenance of 33KV GasInsulated Switchgear'' from10.07.07 to 24.08.07 for 42days. 3) “Factory Training" aganistDohazari 100 MW PeakingPower Plant ConstructionProject for 30 (Thirty) daysfrom15.06.2011 to 14.07.2011. (Bond for 5 years)
Newzeland
China
China
A proposal sent toministry dated04.05.16 for Factoryacceptance test ofenergy meter from20.05.16 to 25.05.16in India.
Central Store, Tongi1 1-02080 10.07.85 Moushumi Begam,
PabnaB.Sc. Engg. (Elect.) 17.12.13
AE
Central Store
PDB, Tongi, Gazipur.
Page 27
2 1-0967 21.02.60 Mr. M. M. Siddique,Rajbari,AMIE(Elec.),29.9.88(SAE) 02.03.93(AE) 12.07.02(SDE) 21.07.11 (XEN)
XEN
ZRS,
PDB, Tongi, Gazipur.
1) Training on 1132/33KV Sub-Station/ Power Transformer,33KV 11KV Gas InsulatedSwitchgear, 33/11KV Sub-station & Control Panel &Protection Against ChittagongPower Distribution Project''Design & Maintenance ofPower Transformer'' 10.07.07to 24.08.07 for 42 days.
China 1)Practical Demonstration(PPRP) From 25.07.04 to 7 Days InChina, 2) Training for Technical know-how and Technology Transfer of1.00 Lac Liter Transformer Oilfrom October./09 for 07 days inIndia. 3) Step-up TransformersInspection against Bera 70MWPeaking Power PlantConstruction Project (Materialswitness Inspection) fromOctober/10 for 07 days in SouthKorea. 4) To purchase Two Color Offsetmachine from 07.10.12 to14.10.12 in Germany. 5) "Technical Orientation &Quality test witness" of 11 KVSingle Phase PotentialTransformer from 01.10.13 to07.10.13 in China. 6) Witnessing of manufacturingagainst Shahjibazar PowerStation from 15.04.15 to 21.04.15in Netherlands 7) Witnessing of manufacturingagainst Shahjibazar PowerStation from 15.04.15 to 21.04.15in USA
Page 28
Distribution northern zone, PDB, Rajshahi.SL.No ID-No Date of Birth Name, District and
Qualification and Date ofjoining
Designation and PresentPosting
Topics of Foreign Training andDuration
Country Inspection Topics and its Duration Comments
1 1-0573 31.08.60 Mr. Md. Hazrat AliPabnaB.Sc.Engg. (Elec.)09.10.84(AE) 18.03.93(SDE) 17.05.03(XEN) 30.06.14 (SE)
Addl. CE , Incharge Distribution northernzone, PDB, Rajshahi.
1) 132/33KV,SF-6 Breaker from01.04.2000 to 14.05.2000 for 45days
2)Power Distribution Projectthrough promotion of TQMfrom 17.02.2004 to 20.03.2004for 35 days
3) Training on 1132/33KV Sub-Station/ Power Transformer,33KV 11KV Gas InsulatedSwitchgear, 33/11KV Sub-station & Control Panel &Protection Equipment AgainstChittagong Power DistributionProject ''Design &Maintenance of 33/33KV Sub-Station'' from 10.07.07 to24.08.07 for 45 days
India,
Japan,
China
1) "Technical Orientation &Quality Test Witness" of 150 KmGuy-Wire from 08.05.13 to14.05.13 in China.
A proposal sent toministry dated04.05.2015 againstShikalbaha 225MW Dual FuelCCPP Project from25.05.15 to 31.05.15in Germany.
2 1-01282 31.12.74 Miss Khaleda Yasriba Lima,
Jhenaidah, B.Sc.Engr.(Civil.),
24.06.99(AE) 26.07.05(SDE), 21.12.11(XEN Incharge) 18.06.15 (XEN)
Astt. CE office of the CE,Distribution northernzone, PDB, Rajshahi.
1) Training for Technical Know-how & Technology Transfer from29.06.06 to 06.06.06 in India. 2) Inspection against ChittagongPC Pole Construction Plant from16.04.2012 to 26.04.2012 in China.
3 1-01428 10.11.71 Mr. Md. Rafiqul Islam, Rajshahi, B.Sc.Engr.(Elec.),
05.03.2000(AE) 25.06.09(SDE) 05.11.14 (XEN, Incharge) 22.02.16 (XEN)
Astt. CE Attach to CE,Distribution northernzone, PDB, Rajshahi.
1) PSCDP training on PublicPrivate Partnership (PPP)training programfrom on18.11.13 to 29.11.13
Thailand 1) 132KV Current Transformer &Voltage Transformer againstDawadkandi 50MW PeakingPower Plant from October/10 for07 days in China. 2) "Technical orientation &Quality test witness " from01.10.13 to 07.10.13 in China.
Page 29
4 11-0299 11.09.59 Mr. Md. Delwar Hossain, Lalmonirhat Diploma(Power) 20.10.81(SAE) 22.04.10(AE) 21.12.14 (SDE) 25.06.15 (SDE)
SDE CE Office, Distributionnorthern zone, PDB,Rajshahi.
5 11-0407 01.07.58 Mr. Khan Md. Ziaul Hoque Bogra Diploma (Mech.) 31.07.83 (SAE) 02.11.10 (AE) 06.01.16 (SDE, Incharge) 06.01.16 (SDE)
SDE (incharge) CE Office, Distributionnorthern zone, PDB,Rajshahi.
(O & M Circle, Rajshahi)SL.No ID-No Date of Birth Name, District and
Qualification and Date ofjoining
Designation and PresentPosting
Topics of Foreign Training andDuration
Country Inspection Topics and its Duration Comments
1 1-0855 08.01.64 Mr. Mohammad AbdurRashid, Natore,B.Sc.Engr.(Elec.)13.12.88(AE) 21.11.99(SDE) 10.02.09 (XEN) (In-charge), 08.02.11 (XEN)
SE (Incharge) O & M Circle-1, PDB,Rajshahi.
1)Shahijebazar 60MW GasTurbine P/St.Operation andMaintenance. From 18.04.97to 29.04.97 2) Gas Turbine P/St.Operationand Maintenance. From10.04.00 to 09.04.00, 01(Month) 3) Traning on Gas TurbineManufacturer CompanyAgainst Tongi 80 MW From25.07.04 to 07.08.04 (Bond for03 Years from 01.07.04 to 14days)
WestGermany
France
China
1) "Technical orientation andquality test witness" against400V, 3X10(60)Amps Three Phase4-Wire, D-Element, Outdoor TypeDouble Tariff ElectronicConsumer Energy Meter fromOctober/10 for 10 days in China. 2) Factory test witness of 3phase x-former againstChapainawabganj Power plantcons. Project from 23.04.16 to01.05.16 in China.
Page 30
2 1-0628 26.01.60 Mr. S.M. Touhidul Karim,
Khustia, B.Sc.Engr.(Elec.),
26.5.85(AE) 09.01.95(SDE) 09.03.04(XEN) 17.02.15 (SE)
SE O & M Circle-2, PDB,Rajshahi.
1)Operation andMaintenance of GTPS. From06.05.90 to 30.06.90 for08(Weeks)2)Training on Baghabari100MW P/St. From 17.09.01 to15.12.01 for 03 Months 3) Supply & Retrofitting on-line Machinery Protection &Management System from11.10.09 to 05.11.09 for 26days. 4) Training on Power StationRehbilatation Projec (Phase-2) Bheramara Gas TurbinePower Station Rehbilatation''Lube Oil Cooler, AVR, FireFighting System '' for 07 days.
France,
India
Bahrain
China.
1) "Practical Demonstration toImport Technical know how"against PPRP on Gas Turbine in2006 for 07 days in America 2) Witnessing of manufacturingprocess against ChittagongPower Station from 02.10.15 to08.10.15 in China.
S & D Division-1, Rajshahi1 1-01804 18.06.84 Mr. Md. Modasser Hossain
Rajshahi. B.Sc.Engr(Computer) 01.06.09 (AE) 21.12.14 (SDE) 25.06.15 (SDE) 12.04.16 (XEN, Incharge)
XEN, Incharge S & D-1, PDB, Rajshahi.
1) "Technical Orientation &Quality Test Witness" from15.08.13 to 22.08.13 in China &South Korea.
2 11-0451 17.12.59 Mr. Md. Abdul Hannan Rajshahi Diploma (Elect.) 25-8-84 (SAE) 27-12-11 (AE)
AE S & D-1, PDB, Rajshahi.
3 11-0459 16.11.62 Mr. Md. Abul HossainMondol Rajshahi Diploma (Elect.) 25-8-84 (SAE) 27-12-11 (AE)
AE S & D-1, PDB, Rajshahi.
Page 31
S & D Division-2, Rajshahi1 1-01184 21.03.70 Mr. Md. Moklesur Rahman,
Rajshahi, B.Sc.Engr.(Mech.),
14.12.97(AE) 27.04.04(SDE) . 31.07.12 (XEN)
XEN Sales & DistributionDivision-2 PDB, Rajshahi.
11/10/1999 To 20/10/199910(Ten) Daya On ProcessControl Operation andManagement(PCOM)
China 1) "Technical Orientation &Quality Test Witness" from15.08.13 to 22.08.13 in China &South Korea. 2) Basic Design Approval ofGhorasal Repowering Projectfrom 27.03.16 to 05.04.16 inChina.
S & D Division-3, Rajshahi1 1-01403 16.04.73 Mrs. Sherin Yasmin,
Rajshahi, B.Sc.Engr.(Elec.),
05.03.2000(AE) 25.06.09(SDE) 28.06.12 (XEN, Incharge)
XEN (Incharge), S & D-3, PDB, Rajshahi.
1) Training on ''Orientation &Training for Technical know-how & Technology Transfer"against 11KV VCB withSwitchgear Cubicles, 11KV BusSupport Insulators & 33KV BusSupport Insulators From06.11.07 to 12.11.07 for 07days.
China. Inspection against 275Barapokuria P/stn project for 7days Feb/2016 in China.
2 11-0399 01.02.60 Mr. Md. Moazzem Hossain Natore Diploma(Elec.) 31.07.83 (SAE) 02.11.10 (AE) 06.01.16 (SDE, Incharge)
SDE (incharge) Sales & Distribution -3 PDB, Rajshahi.
3 11-0341 10.04.58 Mr.Md. Amirul Islam Nababgonj, Diploma(Elec.) 07.08.82 (SAE) 22.04.10(AE)
AE Sales & Distribution -3 PDB, Rajshahi.
S & D Division-4, Rajshahi1 1-0938 31.12.63 Mr. Md. Jahangir Alam
Nawabganj B.Sc.Engr.(Elec),06.09.90(AE) 11.11.2001(SDE) 02.07.19 (Rev. XEN), 21.07.11 (XEN)
XEN Sales & Distribution-4,PDB, Rajshahi.
1)Factory Test witness,Orientation & TechnicalTraining on 11 KV Singlephase Potential Transformerand 11KV Single phasecurrent transformer from25.07.04 to 29.07.04
China, 1) "Quality acceptance Test" of11 KV LA, 33 KV LA from 01.05.13to 07.05.13 in India.
Page 32
2 11-0267 11.10.55 Mr. A. H.M Maynul Kabir Jypurhat, Diploma (Power.)
13.12.80(SAE), 17.09.09(AE) 25.06.15 (SDE)
SDE Sales & Distribution-4,PDB, Rajshahi. (Freedomfighter)
3 1-02072 12.08.87 Mr. Md. Abdul Monnaf Sirajganj B.Sc.Engr.(Elec),17.12.13 (AE)
AE Sales & Distribution-4,PDB, Rajshahi.
4 11-0454 01.01.58 Mr. Abu Hena MostafaKamal Rajshahi Diploma (Elect.) 25-8-84 (SAE) 27.12.2011 (AE)
AE Sales & Distribution-4,PDB, Rajshahi.
S & D Division-5, Rajshahi1 1-01626 31.12.76 Mr.Md.Rabiul Islam
Natore B.Sc.Eng(Elec) 06.2006(AE) 18.08.2011 (SDE) 24.03.14 (XEN, Incharge) 0175-1657415
XEN (Incharge), Sales & DistributionDivision-5, PDB,Rajshahi.
1) Katakhalir 50 MW peakingpower plant arranged by M/s.Dongfang ElectricInternational Corporation(DEC), China from 22.09.12
China 1) Technical know-how andTechnology Transfer on 1.00 LacLiter Transformer Oil againstfrom Sept./09 for 07 days inIndia. 2) Inspection of 11 KV switchgearagainst Santahar 50 MW andKatakhali 50 MW Peaking PowerPlant Construction Project inMarch/2012 for 7 days (excludingtravel time) in China.
Page 33
2 1-01660 09.11.79 Mr. Md. Abdur Rashid Sirajgonj B.Sc.Eng(Elec) 07.04.2006(AE) 18.08.2011 (SDE) 08.04.14 (XEN) 01716518016
XEN (Incharge), Sales & DistributionDivision, Godagari,Rajshahi.
1) Central Zone PowerDistribution Project, a TechnicalOrientation and Quality TestWitness Program for 11KV DropOut Fuse Link, 11KV LightningArrester, 200 Amps MCCB, 100Amps MCCB & Transformer Oil atJune/2011 for 07 days in China.
Chapainawabganj Electric Supply1 1-01020 08.09.66 Mr. Md. Zakir Hossain,
Rajshahi,B.Sc.Engr.(Mech),19.07.94(AE) 03.02.03(SDE) 31.07.12 (XEN)
RE (XEN), Chapainababgonj E/S,PDB, Chapainababgonj
1) Training On Operation &Maintenance of 100 MW GTUnit, Baghabari,Sirajgonj.From 16.10.01 To13.12.01(3 Month) 2) 'Wind Turbine Technology& Applications from 22.02.06to 03.03.06 for 12 days
India
India
Pre-Shipment Inspection. From15.06.97 to 29.06.97 in Germany.
2 1-01961 12.11.84 Mr. Md. Golam Morselin Chapainawabganj B.Sc. Engg. (Mech.) 02-10-11 (AE) 01716035462
AE ChapainawabgonElectric Supply PDB, Chapainawabgon.
1) Technical orientation &Quality test witness from20.04.15 to 30.04.15 in China.
S & D-2, PDB, Chapainawabganj 1 1-01663 22.07.75 Mr.Md.Ruhul Karim
Natore B.Sc.Eng(Mech) 06.2006(AE) 18.08.2011 (SDE) 13.07.14 (XEN, Incharge)
XEN(Incharge) S & D-2, PDB,Chapainawabganj
1) Shantahar 50 MW peakingpower plant arranged by M/s.Dongfang ElectricInternational Corporation(DEC), China from 22.09.12 for1 month
China 1) "Basic Design" against Sylhet150MW Gas Turbine Power Planfrom 28.07.10 to 11.08.10 for 15days in China 2) "Engine Inspection" againstSantahar 50 MW and Katakhali50 MW Peaking Power PlantConstruction Project at July/2011for 07 days in Germany.
Page 34
Sales & Distribution Division, Natore1 1-01673 27.09.77 Mr.Md.Mahbubul Alam
Chowdhury Naogaon B.Sc.Eng(Computer) 07.04.2006(AE) 18.08.2011 (SDE) 09.04.14 (XEN, Incharge)
XEN (Incharge), Sales & DistributionDivision, Natore
1) Central Zone PowerDistribution Project, a "TechnicalOrientation and Quality TestWitness" Program named of11KV Capacitor Bank atApril/2011 for 07(Seven) days inChina.
2 11-0338 07.03.58 Mr.Md. Abdul Kashid Pabna, Diploma(Elec.) 09.08.82 (SAE) 22.04.10(AE) 21.12.14 (SDE) 25.06.15 (SDE)
SDE Natore Electric Supply, PDB, Natore.
3 11-0458 02.11.59 Mr. Md. Abdul Auwal Natore Diploma (Elect.) 25-8-84 (SAE) 27-12-11 (AE)
AE, Natore Electric Supply, PDB, Natore.
(O & M Circle, Bogra)SL.No ID-No Date of Birth Name, District and
Qualification and Date ofjoining
Designation and PresentPosting
Topics of Foreign Training andDuration
Country Inspection Topics and its Duration Comments
1 1-0791 23.02.58 Mr. Md. Abul Hossain,Khustia,B.Sc.Engr.(Elec.),
30.08.86(AE) 21.11.99 (SDE) 17.09.09 (XEN)
SE (Incharge) O & M Circle, PDB, Bogra
1) Orientation & TechnicalTraining on PowerTransformer from 14.03.05 for07 days. 2) Orientation & TechnicalTraining on 33 KV XLPE Cables13.03.2005 for 07 days.
India
India.
1) Inspectionagainst Sikalbahapower Station on ''Witnessingof Manufacturing Process andTest of the equipment atmanufacture's works includingTransfer of Technical-KnowHow” in August/2011 for 07(Seven) days from the date ofactual journey(Excluding traveltime) in Czech Republic.
Page 35
S & D Division-1, Bogra1 1-01439 01.11.74 Mr. Dewan Md. Abu Hena
Mostafa Kamal, Naugaon, B.Sc.Engr.(Mech.),
05.03.2000(AE) 18.08.2011 (SDE) 17.11.13 (XEN, Incharge)
XEN (Incharge) Sales & DistributionDivision-1 PDB, Bogra.
1) Training on Single Phase &Three Phase Pre-paymentMeters From 08.11.07 to15.11.07 for 07 days.
South Africa. 1) "Technical Orientation &Quality Test Witness" on 05 Nos.20/26 MVA 33/11 KV PowerTransformer from 20.12.2013 to26.12.13 in China. 2) Factory test witness of 3phase x-former againstChapainawabganj Power plantcons. Project from 23.04.16 to01.05.16 in China.
2 Mr. Arindam Kumar Kundu AE (Incharge) Sales & DistributionDivision-1 PDB, Bogra.
S & D Division-2, Bogra.1 1-01185 21.11.66 Mr. Md. Tofazzal Hossain
Pramanik, Bogra, B.Sc.Engr.(Mech.),
14.12.97(AE) 27.04.04(SDE) . 31.10.13 (XEN)
XEN Sales & DistributionDivision-2 PDB, Bogra.
1) Orientation & TechnicalTraining on Currency TransferSystem From 14.03.05 for 7 daysin India & Malaysia. 2) Inspection against CentralZone Power Distribution Project,Mymensingh from 06.06.12 to12.06.12 in UK. 3) Witness of factory test ofconductor (Pkg-18) from 20.04.14to 26.04.14 in China.
2 11-0320 16.10.57 Mr.Md.Abdul Jalil Bogra B.Sc.Eng(Power) 08.10.81(SAE) 22.04.10(AE) 21.12.14 (SDE) 25.06.15 (SDE)
SDE Sales & DistributionDivision-2 PDB, Bogra.
3 Mr. Suranjan saha Diploma engg SAE 04.02.16 (AE)
AE (Incharge) Sales & DistributionDivision-2 PDB, Bogra.
Page 36
S & D Division-3, Bogra1 1-01392 28.03.70 Mr. Md. Anowarul Islam,
Gaibandha, B.Sc.Engr.(Mech.),
05.03.2000(AE) 25.06.09(SDE) 28.06.12 (Xen, incharge)
XEN (Incharge), S & D Division-3, Bogra
1) 11 KV Metering CT. From 24.01.05 to 30.01.05 for07days in China. 2) A training titled "SCADACommunication System"against Greater ChittagongElectricity Distribution Project,SCADA rehabilitation, PDB,Chittagong from 19.07.2012 to16.08.2012
China.
NewZealand
1) Workshop test Witness ofstep-up X-former againstGhorasal 365 MW CCPP projectfrom 13.04.16 to 22.04.16 inChina.
Sales & Distribution Division, Sherpur 1 1-01261 11.03.70 Mr. Shaikh Firoj Kabir
Satkhira B.Sc.Engr.(Elec.),
10.06.99(AE),
26.07.05(SDE), 10.03.11 (XEN Incharge) 28.05.14 (XEN)
XEN S & D Division, Sherpur,PDB, Bogra.
1) PSCDP Training program on"Performance Management(Batch-1) " from 26.08.13 to06.09.13
Thailand 1)Orientation & Training againstturbine pump spares for Khulnapower station in Czech Republicfor 07 days,Dec/06 2) Inspection against CentralZone Power Distribution Project,Mymensingh from 14.06.2012 to24.06.2012 for 7 daysin China 3) witnessing of manufacturingprocess from 30.01.15 to 06.02.15in France.
Sales & Distribution Division, Dupchachia, PDB, Bogra1 1-01695 01.03.81 Mr.Md. Jahangir Alam
Naogaon B.Sc.Eng(Computer) 02.06.2006(AE) 27.12.2011(SDE) 16.09.14 (XEN, Incharge)
XEN (Incharge) Sales & DistributionDivision, Dupchachia,PDB, Bogra
1)Training against Daudkandi(Titas)50MW Peaking PowerPlant Construction Project for30(Thirty) days from30.05.2011 to 30.06.2011(Excluding travel time) (Bond for 5 years) 2) Training against Chitg."Jan/2016 in China for 7 days
China 1) "Work Shop Test" for Dohazari100MW Peaking Power PlantConstruction Project fromJanuary/11 for 07(Seven) days inChina. 2) "Technical Orientation &Quality Test Witness for Meter &Meter Enclosure"Aug/2015 inChina for 7 days pur -170
Sales & Distribution Division, PDB, Santahar1 11-0261 11.08.59 Mr. Md. Zillur Rahman
Talukder Bogra, Diploma (Civil)
07.08.80(SAE), 17.09.09(AE) 25.06.15 (SDE)
XEN, inchargeSales & DistributionDivision, PDB, Santahar
Page 37
Jaypurhat Electric Supply1 1-01748 15.07.74 Mr. Md.Faridul Hasan,
Bogra B.Sc.Engr (Elec.) 12.05.08 (AE) 16.06.14 (SDE) 05.11.14 (XEN, Incharge)
RE, XEN (Incharge) Jaypurhat ElectricSupply PDB, Bogra.
1) "Pre-shipment Inspection" ofCoal Pulverizer HP 703 Bowl Millagainst from 16.09.09 to 21.09.09for 07 days in China. 2) Technical orientation &quality test witness of DCSagainst Shikalbaha 225 MW CCPPproject from 20.10.15 to 29.10.15in China.
ZRS, Bogra.1 1-01197 30.10.70 Mr. Md. Mizanur Rahman,
Naoga, B.Sc.Engr.(Elec.),
19.03.98(AE) 06.10.04(SDE) 31.10.13 (XEN)
XEN , ZRS, PDB, Bogra..
1) Safe, Reliable & efficientOperation and maintenanceof I & C System, ProtectionCircuits/Loops, Test adjustand setting of I & Cequipment system from21.03.2004 for 06 Months.(Bond for 03 Years)
China 1) “Witnessing of ManufacturingProcess and Tests of theEquipment at Manufacturer'sworks including transfer ofTechnical Know-how” from30.08.10 to 05.09.10 for 07 days inChina. 2) “Witnessing of ManufacturingProcess and Tests of theEquipment at Manufacturer'sworks including transfer ofTechnical Know-how” againstBarapukuria Coal Fired PowerPlant in August/2011 for 03(three) days in China (excludingtravell time). 2)"Coal Power Genaration" from10.06.13 to 14.06.13 in Thailand.
2 11-0442 06.03.61 Mr. Md. Abdul Hannan Bagura Diploma (Civil) 03-1-84 (AE) 27-12-11 (AE)
AE ZRS, PDB, Bogra..
Page 38
S & D Division, PDB, Naogan 1 1-01275 31.12.68 Mr. Shankar Kumer Dev
Kurigram, B.Sc.Engr.(Mach.),
10.06.99(AE),
26.07.05(SDE), 10.03.11 (XEN Incharge) 28.05.14 (XEN)
XEN S & D Division, PDB,Naogan
1) Attending the CounterpartTraining Program of JICA inpower Sector from 28.11.12 to22.12.12. 2) Operation & Maintenanceof Distribution Substationtraining program from11.02.13 to 22.02.13 3) PSCDP training Programnamed "Project Management(Batch-3)" from 15.12.13 to21.12.13
Japan
Thailand
Thailand
1) Contract No.pur-163/6-project/lot-1/2010/304 Dt.27/10/2010 and Contract No.pur-163/6-project/lot-2/2010/305 Dt.27/10/2010 against DOFC withfuse link, 11 KV Lighting Arrester& 200 Amps MCCB, 100AmpsMCCB, 95 rm Copper Lug & 70 rmCopper Lug against Renovation& Augmentation of DistributionLines & 11/0.4 KV Sub-Stationunder 6(six) Distribution zonefrom December/10 for 07 (seven)days in China2) TechnicalOrientation & Quality TestWitness of 33/11 KV PowerTransformer from 01.02.2015 to07.02.2015 in China.
2 1-01966 01.07.84 Mr. Md. Fazlul Karim Naogan B.Sc. Engg. (Elect.) 02-10-11 (AE) 01719254499 [email protected]
AE S & D Division, PDB,Naogan
3 1-01963 01.01.85 Mr. Md. Abdur Rokib Bagura B.Sc. Engg. (Elect.) 02.10.11 (AE) 01714777401 [email protected]
AE S & D Division, PDB,Naogan
1) Technical Orientation &Quality Test Witness from25.04.14 to 01.05.14 in China.
(O & M Circle, Pabna)
Page 39
SL.No ID-No Date of Birth Name, District andQualification and Date of
joining
Designation and PresentPosting
Topics of Foreign Training andDuration
Country Inspection Topics and its Duration Comments
1 1-0643 10.02.61 Mr. S.M. Rezaual Karim,
Bogura , B.Sc.Engr.(Elec.),
12.08.85(AE) 17.06.95(SDE) 10.07.05(XEN) 25.01.16 (SE)
SE O & M Circle, Pabna
1)Power Transformerfrom 08.10.03 to 08.01.04 for 90days 2) Operation & Maintenanceof Protection System & RelayCoordination trainingprogram from 14.01.13 to25.01.13
China
Thailand
1) Power Plant Inspection July/10for 04 days in China.
S & D Division-1, Pabna1 1-01287 29.09.73 Mr. Ziaul Islam
Pabna, B.Sc.Engr.(Elec.),
24.06.99(AE) 26.07.05(SDE), 10.03.11 (XEN Incharge) 18.06.15 (XEN)
XEN Sales & DistributionDivision-1, PDB, Pabna.
Training On Factory Test onXLPE Concentric Copper Cablefrom January/06 for 03 days.
South Africa 1) Inspection of LightningArrester from 02.10.12 to 11.10.12in China. 2) Factory test witness of Pin for11 KV Pin Insulator & Fittings for33 KV Disc Insulator from26.06.14 to 30.06.14 in China.
2 1-01813 27.12.83 Mr. Md. Sana Ullah Pabna B.Sc. Engg. (Mech) 04.11.10 (AE) 06.01.16 (SDE, Incharge) 01712937996 [email protected]
SDE, Incharge S & D-1, PDB, Pabna.
G.O. issued dated12.07.15 forTechnicalOrientation &Quality testWitness from22.07.15 to 28.07.15in China.
S & D Division-2, Pabna1 1-01449 19.10.73 Mr. Mohammad Giasuddin,
Narayanognj, B.Sc.Engr.(Elec.),
05.03.2000(AE) 25.06.09(SDE) 01.01.14 (XEN,in charge) 01675-571307
XEN (incharge) S & D-2, PDB, Pabna.
1) "Work Shop Test" forHathazari 100MW Peaking PowerPlant Construction Project from24.02.11 to 02.03.11 for 07(Seven)days in China. 2) "Milling System Performance& Combustion Optimization"against "NTPC Limited" from14.12.10 to 16.12.10 in India.
Page 40
2 11-0396 31.12.60 Mr. Md. Ohidur Rahman Pabna Diploma engg. (Mech.) 31.07.83 (SAE) 02.11.10 (AE) 06.01.16 (SDE, Incharge)
SDE, Incharge S & D-2, PDB, Pabna.
3 11-0483 01.01.60 Mr. Md. Golam Mottalib Pabna Diploma (Civil) 25.08.84 (SAE) 27-12-11 (AE)
AE, S & D-2, PDB, Pabna.
Shirajganj Electric Supply1 1-01617 15.01.80 Mr. A B M Hamidur Rahman
Bogura B.Sc.Eng(Elec.) 07.06.2006(AE) 18.08.2011 (SDE) 07.04.14 (XEN, Incharge)
RE, XEN (Incharge) Sirajganj E/S, PDB,Sirajganj.
1) 400V, 3x10(60) Amps ThreePhase 4-Wire, D-Element,Outdoor Type Double TariffElectronic Consumer EnergyMeter from October/10 for 10days in China. 2) Technical orientation &Quality test witness of 11 KVswitchgear Cubicles Set from21.07.14 to 27.07.14 in China.
A proposal sent toministry dated09.05.16 for Pre-deliveryinspection of DiscInsulator againstRajshahi zonepower dist. Dev.Project from15.05.16 to 21.05.16in India & China
Sales & Distribution Division, Ishwardi, PDB, Pabna1 1-01805 13.04.83 Mr. Md. Hasibur Rahman
Jaypurhat B.Sc.Engr(Computer) 01.06.09 (AE) 21.12.14 (SDE) 25.06.15 (SDE) 12.04.16 (XEN, Incharge) 01716251771
XEN, Incharge Sales & DistributionDivision, Ishwardi, PDB,Pabna
1) Quality acceptance test of 33KV lightning Arrester from20.05.14 to 26.05.14 for 7 days inIndia.
2 1-01986 10.12.88 Mr. Md. Arifur Rahman Potuakhali B.Sc. Engg. (Mech.) 02-10-11 (AE) 01728449448 [email protected]
AE Sales & DistributionDivision, PDB, Pabna
(Distribution Zone, Comilla)
Page 41
SL.No ID-No Date of Birth Name, District andQualification and Date of
joining
Designation and PresentPosting
Topics of Foreign Training andDuration
Country Inspection Topics and its Duration Comments
1 1-0583 31.10.61 Mr. A.B.M. AbdullahJamalpurB.Sc.Engg. (Elec.)09.10.84(AE) 28.04.94(SDE) 24.08.03(XEN) 25.08.14 (SE)
CE (Addl. Charge) Distribution Zone, PDB,Comilla & SE O & M Circle, PDB,Comilla.
1) Sub-Station Orientation &Technical Training FromFebruary /01 3 Months. 2) Orientation & TechnicalTraining From August /05 for 7days. 3) PSCDP Training on "ContractManagement (Batch-2)" from11.11.13 to 22.11.13 4) Technology TransferTraining against 10- townproject from 13.04.15 to19.04.15
China.
China.
Thailand
Germany
1) 33 KV. Pin Insulator, 33 KV.Disk Insulator & 33 KV.Suspension Disk Fitting fromJuly/05 8 days in China.
2 1-01855 20.12.85 Mr. Md. Nurul Afsar Comilla B.Sc. Engg. (Comp.) 04.11.10 (AE) 06.01.16 (SDE, Incharge) 01673706225
SDE, Incharge Office of CE ,Distribution Zone, PDB,Comilla
1) A training titled "SCADACommunication System"against Greater ChittagongElectricity Distribution Project,SCADA rehabilitation, PDB,Chittagong from 19.07.2012 to16.08.2012
NewZealand
3 11-0495 01.04.61 Mr. Md. Nurul Huda Noakhali Diploma(Elec.) 25.08.84 (SAE) 04.11.13(AE)
AE Office of CE ,Distribution Zone, PDB,Comilla
O & M Circle, Comilla
Page 42
SL.No ID-No Date of Birth Name, District andQualification and Date of
joining
Designation and PresentPosting
Topics of Foreign Training andDuration
Country Inspection Topics and its Duration Comments
Comilla Computer Centre
SL.No ID-No Date of Birth Name, District andQualification and Date of
joining
Designation and PresentPosting
Topics of Foreign Training andDuration
Country Inspection Topics and its Duration Comments
1 9-0001 05.11.1966 Mr. Md. Nitish KumarBishwash Magura M.Sc. engg. (Comp.) B. Sc. engg. (EEE) 22.09.1990 (AssistantProgrammer)
SE(Senior SystemAnalyst)
Comilla ComputerCentre, PDB, Comilla
Distribution Division, Comilla1 11-0372 31.12.58 Mr. Md. Ismil Miah
Chandpur Diploma (Elec.)
29.07.82(SAE), 22.04.10(AE) 06.01.16 (SDE, Incharge)
SDE, Incharge Burichang ElectricSupply PDB, Comilla.
S & D Division-1, Comilla1 11-0354 01.10.61 Mr. Md. Salim
Laxmipur Diploma(Elec.) 02.08.82 (SAE) 22.04.10(AE) 21.12.14 (SDE) 25.06.15 (SDE)
SDE Sales & DistributionDivision-1 PDB, Comilla.
2 Mr. Tanvir MahmudulHasan
AE Sales & DistributionDivision-1 PDB, Comilla.
G.O. issued dated14.03.2016 forObservation &inspection ofsteam turbineagainstBarapukuria 275MW project from13/06/16 to04/07/16 in China.
S & D Division-2, Comilla
Page 43
1 1-01331 01.10.70 Mr. Mohammad AbdulKader, Chittagong, B.Sc.Engr.(Elec.),
20.01.2000 (AE) 08.12.09(SDE) 16-10-11 (XEN, Incharge)
XEN (Incharge), Sales & DistributionDivision-2 PDB, Comilla.
1)Training on Technical know-how in 400 Sets 11KV Load BreakSwitch from 28.09.06 to 05.10.06for 07 days in China. 2) Modernisation of PowerDestribution Sector from 15.12.09to 11.01.2010 in India.
2 1-01892 15.05.87 Mr. Pervaz Ahmed Tangail B.Sc. Engg. (Elect.) 01.12.10 (AE) 06.01.16 (SDE, Incharge) 0174-8777948 [email protected]
SDE (Incharge), Sales & DistributionDivision-2 PDB, Comilla.
1)"Coal Power Genaration" from10.06.13 to 14.06.13 in Thailand. 2) "Essentials of Coal Marketsand Trading" from 2.06.14 to3.06.14 in Singapore.
3 11-0440 31.01.61 Mr. Md. Rabiul Hoque Feni Diploma (Mech.) 25-8-83 (SAE) 27-12-11 (AE)
AE (RE), Chuddagram E/S, PDB,Comilla.
S & D Division-3, Comilla1 1-01412 01.11.75 Mr. Md. Bashiruzzaman Mia
Khulna B.Sc. engg (Mech.) 05.03.2000 (AE) 02.03.14 (XEN, Incharge) 01752971143
XEN (Incharge) Sales & DistributionDivision-3 PDB, Comilla.
1) "Technical Orientation &Quality Test Witness" on 05 Nos.20/26 MVA 33/11 KV PowerTransformer from 20.12.2013 to26.12.13 in China. 2) Tarif energy Meter FactoryAcceptance Test from 15.09.14 to19.09.14 for 5 days in Singapore. 3) Energy meter testing andsealing program from 8-10March/2016 in India.
2 11-0349 10.02.59 Mr.Md. Abdul Munaf Comilla. Diploma(Civil) 03.08.82 (SAE) 22.04.10(AE) 21.12.14 (SDE)
SDE (Incharge) Sales & DistributionDivision-3 PDB, Comilla.
Page 44
3 1-01924 06.04.86 Mr. Md. Mehedi HasanBhuiyan Comilla B. Sc. Engg. (Elect.) 24.07.11 (AE)
AE, Sales & DistributionDivision-3 PDB, Comilla.
A proposal sent toministry dated10.05.16 forConstructionDrawing reviewmeeting againstBarapukuria 275MW project from28.05.16 to 10.06.16in China.
4 1-01953 01.07.86 Mr. Shakil Md. Nahid Noakhali B.Sc. Engg. (Elect.) 02-10-11 (AE) 01757019597 [email protected]
AE, Sales & DistributionDivision-3 PDB, Comilla.
5 1-02075 31.10.88 Mr. Md. Ezaharul Islam Dinajpur B.Sc. Engg. (Mech.) 17.12.13 (AE)
AE, Sales & DistributionDivision-3 PDB, Comilla.
S & D Division, Daulatganj, Comilla.1 1-01650 11.12.77 Mr.Mirza Mohammad Hafiz
Comilla B.Sc.Eng(Elec) 07.06.2006(AE) 25.06.15 (SDE)
XEN (Incharge), Sales & DistributionDivision, PDB, Daulatganj,Comilla.
'Factory Training" againstDaudkandi 50MW PeakingPower Plant ConstructionProject for 30(Thirty) daysfrom 30.05.2011 to 30.06.2011(Excluding travel time) (Bond for 5 years)
China 1) Technical Orientation andQuality Test Witness for 07 daysin India (G.O. Issued dt.09.11.10).
A proposal sent toministry Ref. No.BPDB/Training/TF-3/2016/399 Date-31.03.2016 formanagementmeeting withmanufacturersrepresentativeand witnessing ofmanufacturingprocess againstBheramara PowerStation from24.06.16 to 30.06.16in USA.
Page 45
2 1-01793 25.10.86 Mr. Farhan Hussain Dhaka B.Sc. Engg (Elect.) 31.05.09 (AE) 21.12.14 (SDE) 25.06.15 (SDE) 12.04.16 (XEN, Incharge)
XEN (Incharge), Sales & DistributionDivision, PDB, Daulatganj,Comilla.
Distribution Division, B-Baria1 1-01383 21.04.70 Mr. Md. Abdul Hannan,
Shirajgonj, B.Sc.Engr.(Mech.),
05.03.2000(AE) 25.06.09(SDE) 2.1.2012(XEN, Incharge) 22.02.16 (XEN)
XEN , Distribution Division,PDB, B-Baria.
1) Safe, Reliable, & EfficientOperation Of the unit in shiftFrom 21.03.2004 for 06 Months(Bond for 03 Years from21.03.04 to 17.09.04)
China, 1) Coal Pulverizer HP 703 BowlMill against "Pre-shipmentInspection" from 16.09.09 to21.09.09 for 07 days in China.
2 11-0481 31.08.58 Mr. Md. Ashraf Uddin B-Baria Diploma (Elect.) 25-8-84 (SAE) 27-12-11 (AE)
AE Distribution Division PDB, B-Baria.
S & D Division, Ashuganj, B-Baria. 1 1-01187 10.08.70 Mr. Chandan Kumer
Shutradhar, Manikgong, B.Sc.Engr.(Mech.),
12.12.97(AE) 27.04.04(SDE) . 06.05.10 (XEN, Incharge) 18.06.15 (XEN)
XEN Sales & DistributionDivision, Ashuganj, PDB,B-Baria.
1) A training titled "SCADACommunication System"against Greater ChittagongElectricity Distribution Project,SCADA rehabilitation, PDB,Chittagong from 19.07.2012 to16.08.2012
NewZealand 1) Technical Orientation andQuality Test Witness (a)Hydraulic Hand Trolley (3-TonCapacity)-06 Nos & (b) Fork Lift (5-Ton Capacity)-04 Nos. for 07 daysin China
2 11-0179 31.12.58 Mr. Md. Syed Mannan Jamalpur, Diploma(Elec.)
20.06.80(SAE), 23.04.09(AE) 13.04.14 (SDE)
SDE (Incharge) Sales & DistributionDivision, Ashuganj, PDB,B-Baria.
1) ''Electrical MaintenanceTesting & Inspection'' from22.11.10 to 24.11.10 in India.
S & D Division, Sarail,B-Baria.
Page 46
1 1-01672 20.09.78 Mr.Subrata Roy Netrokona B.Sc.Eng(Computer) 06.2006(AE) 18.08.2011 (SDE) 08.04.14 (XEN)
XEN (Incharge) Sales & DistributionDivision, Sarail PDB,B-Baria.
1) “Technical Orientation andQuality test witness'' Supply ofTransformer Accessories (CopperCables)" against Central zonepower distribution Project, PDB,Mymensingh at May/2011 for 07(Seven) days from the date ofactual journey(Excluding traveltime) in China. 2) A proposal sent to ministry on04.08.2011 on DecentralizedDistributed Generation in India.
S & D Division, Chandpur1 1-01450 09.11.72 Mr. Abdul Fattah Md.
Mustafizur Rahman, Fheni, B.Sc.Engr.(Mech.),
05.03.2000(AE) 25.06.09(SDE) 24.07.13 (XEN, Incharge) 01711369435 01818165424
XEN (Incharge), S & D Division,Chandpur
1) A training titled "SCADACommunication System"against Greater ChittagongElectricity Distribution Project,SCADA rehabilitation, PDB,Chittagong from 19.07.2012 to16.08.2012
NewZealand 1) Training. 33KV Pin Insulator with Pin,33KV Disc Insulator, etc.September/05 for 07 days India& China.
O & M Circle, Noakhali
Page 47
SL.No ID-No Date of Birth Name, District andQualification and Date of
joining
Designation and PresentPosting
Topics of Foreign Training andDuration
Country Inspection Topics and its Duration Comments
1 1-0851 31.12.62 Mr. Mohammad MofazzalHossain, Chandpur, B.Sc.Engr.(Elec.),
18.2.88(AE) 21.11.99(SDE) 11.10.10 (XEN)
SE, Incharge O & M Circle, Noakhali
1)Training on Megar test withthe required test Equipment18.10.01 to 18.11.01
2) "Foreign Training" onEnegry Meter from 15.10.09 to29.10.09 for 15 days.
UK
Singapore.
1)Training on 132/33KV Sub-Station/ Power Transformer,33KV 11KV Gas InsulatedSwitchgear, 33/11KV Sub-Station& Control Panel & ProtectionEquipment Against ChittagongPower Distribution Project''Design & Maintenance ofControl Panel & ProtectionEquipment'' from 10.07.07 to24.08.07 to 45 days in China. 2) Technical orientation &quality test witness againstSCADA Project from 23.03.15 to31.03.15 in China.
S & D Division, Laxmipur 1 11-0202 31.12.57 Mr. Shiekh Md. Dildar
Hossain Bhiuyan Chittagong Diploma Engg. (Elect.) 24.06.80 (SAE) 02.11.10 (AE) 21.12.14 (SDE) 25.06.15 (SDE)
XEN (Incharge) S& D Division, PDB,Laxmipur.
2 11-0242 14.09.57 Mr. Md. Siraj Uddin Noakhali, Diploma (Elec.)
03.07.80(SAE), 17.09.09(AE) 25.06.15 (SDE)
XEN (Incharge) S& D Division, PDB,Laxmipur.
3 Mr. Nurul Huda Diploma engg.
AE S& D Division, PDB,Laxmipur.
Sales & Distribuition Division, Noakhali
Page 48
1 1-01629 02.03.72 Mr.Md.Saifur Rahman Chittagong B.Sc.Eng(Elec) 07.04.2006(AE) 18.08.2011 (SDE) 24.03.14 (XEN, Incharge)
XEN (Incharge) Sales & DistribuitionDivision, Noakhali
1) 10-Town Power DistributionProject for Quality AcceptanceTest of 33 KV LA from 15.09.13 to18.09.13 in India.
2 1-02019 6.2.1985 Mr. Hossain MahmudShamim Farhad Noakhali B.Sc. Engg. (Elect.) 16.10.2011 (AE)
AE, Sales & DistribuitionDivision, Noakhali
2) Conference Against HatiaProject for 2 days In India onApril/2016
S & D Division, Choumuhoni, PDB, Noakhali1 11-0057 15.07.58 Mr. Nurul Haque
Comilla Diploma(Elec.)
21.08.78(SAE), 28.04.04(AE), 10.02.10(SDE) 21.01.14 (XEN, Incharge)
XEN (Incharge) S & D Division,Choumuhoni, PDB,Noakhali.
Distribuition Division, Feni1 1-01612 01.01.78 Mr.Mohammed Shahidul
Islam Feni B.Sc.Eng(Elec) 07.04.2006(AE) 18.08.2011 (SDE) 21.01.14 (XEN, Incharge)
XEN (InCharge) Distribution Division,PDB, Feni.
1) "Step up Transformer" againstSylhet 150MW Combined CyclePower Station ConstructionProject from 15.01. 2011 to 22.01.2011 for 07(Seven) days in China.
2 1-02024 01.01.88 Mr. Md. Mozammel HaqueChowdhury Bagerhat B.Sc. Engg. (Elect.) 16-10-11 (AE)
AE Distribution Division,PDB, Feni.
3 1-02095 Mr. A.A. Zihad Bin Mahmud Gaibandha B.Sc.Engr.(Elect.) 13.04.14 (AE)
AE, Sales & DistributionDivision, PDB, Feni
Page 49
4 11-0460 10.04.63 Mr. Md. Nurul Islam Khan Gazipur Diploma (Elect.) 25.08.84 (SAE) 27.12.11 (AE)
AE, Sales & DistributionDivision, PDB, Feni
Hatia Electric Supply1 11-0434 31.12.59 Mr. Gazi Gias Uddin
Noakhali Diploma (Mech.) 08-8-83 (SAE) 27-12-11 (AE)
RE (AE), Hatia Electric Supply,PDB, Noakhali.
(Distribution Zone, Sylhet)SL.No ID-No Date of Birth Name, District and
Qualification and Date ofjoining
Designation and PresentPosting
Topics of Foreign Training andDuration
Country Inspection Topics and its Duration Comments
O & M Circle, SylhetSL.No ID-No Date of Birth Name, District and
Qualification and Date ofjoining
Designation and PresentPosting
Topics of Foreign Training andDuration
Country Inspection Topics and its Duration Comments
1 1-0586 15.05.59 Mr. Ratan Kumar Biswas, Chittagong, B.Sc.Engr.(Elec.),
09.10.84(AE) 28.04.94(SDE) 30.10.03(XEN) 01.10.14 (SE)
SE O & M Circle, Sylhet & CE (Add. Charge) Distribution Zone, PDB,Sylhet
Training on 'PowerDistribution' throughpromotion of TQM from23.01.05 to 19.02.05 in Japan.
Japan 1)Pre-Payment Metaring from17.02.07 to 22.02.07 for 07 days inSouth Africa. 2) "Developments in RenewableEnergy Technologies" against"NTPC Limited" from 07.03.11 to09.03.11in India. 3) Witnessing of manufacturingprocess against Tongi PowerPlant from 22.10.14 to 28.10.14 inChina.
Page 50
Distribution Division, Sylhet1 1-01806 06.01.79 Mr. Engr. Shyamal Chandra
Sarker Sunamganj B.Sc. Engineering (CSE) 01.06.09 (AE) 21.12.14 (SDE) 25.06.15 (SDE) 12.04.16 (XEN, Incharge) 01733608330 [email protected]
XEN (Incharge) Distribution Division,PDB, Sylhet
S & D Division-1, Sylhet1 1-01129 01.12.67 Mr. Mohammed Abdul
Quadir, Moulovibazar B.Sc.Engr.(Mech),
19.07.94(AE) 01.07.03 (SDE) 31.10.13 (XEN)
XEN
Sales & DistributionDivision-1 PDB, Sylhet.
1) Training on 11 KV. Pre- PaidMetering (Sylhet) From21.08.04 for 07 Days in SouthAfrica.
1) A proposal sentto ministry dated06.11.2013 against"TechnicalOrientation &Quality TestWitness" on 20Nos. TransformerOil Testing Setfrom 07.11.2013 to15.11.2013 inChina.
2 11-0464 05.01.60 Mr. Sekh Md. Aminul Islam Chapainawabganj Diploma (Elect.) 25-8-84 (SAE) 27-12-11 (AE)
AE, Sales & DistributionDivision-1 PDB, Sylhet.
3 1-01901 24.03.82 Mr. Ziaul Hasan Tangail B.Sc. Engg. (Elect.) 20.04.11 (AE) 01716269783 [email protected]
AE, Sales & DistributionDivision-1 PDB, Sylhet.
4 1-02029 22.10.80 Mr. Md. Habibul Bahar Chittagong B.Sc. Engg. (Elect.) 16-10-11 (AE) 01816240333 [email protected]
AE, Distribution Division PDB, Sylhet.
1)Inspection againstShahjibazar 330 MW CCPP Projectfrom 17.09.15 to 23.09.15 inChina.
Page 51
S & D Division-2, Sylhet1 1-0973 16.03.59 Mr. Md. Nazrul Islam,
Comilla,AMIE(Elec.),30.08.86(SAE) 21.04.93 (AE) 03.02.03(SDE) 08.02.11 (XEN, Rev.) 18-08-11 (XEN)
XEN
Sales & DistributionDivision -2 PDB, Sylhet.
1) Supply of 11KV LightingArrester & 11KV DOFC theProgram titled “TechnicalOrientation and Quality TestWitness” for 07 (seven) days inChina at March/11
2 1-02017 15.08.88 Mr. Gias Ibne Alam Chittagong B.Sc. Engg. (Mech.) 16-10-11 (AE) 01813881455 [email protected]
AE, Sales & DistributionDivision-2 PDB, Sylhet.
3 1-02026 10.11.85 Mr. Nawaz Ahmed Khan Bagerhat B.Sc. Engg. (Elect.) 16-10-11 (AE) 01768974728 [email protected]
AE, Sales & DistributionDivision-2 PDB, Sylhet.
S & D Division-3, Sylhet1 1-01318 31.12.68 Mr. Ujwal Kumar Mohanta,
Norail, B.Sc.Engr.(Elec.),
20.01.2000(AE) 26.07.05(SDE), 21.12.11(XEN Incharge) 18.06.15 (XEN)
XEN Sales & DistributionDivision-3 PDB, Sylhet.
1) Training AutomationSystem from 22.10.07 to11.11.07 for 03(Weeks).
Russia Inspection of Emergency DieselGenerators against Santahar 50MW and Katakhali 50 MWPeaking Power PlantConstruction Project from13.03.12 to 20.03.12 for 7 days(excluding travel time) from thedate of actual journey in China.
A proposal sent toministry dated13.03.14 fortechnicalorientation &quality testwitness of Battery& battery Chargerfrom 30.04.14 to06.05.14 in India.
2 1-02081 22.08.90 Mr. Aniruddho Chakraborty Cox'sBazar B.Sc.Engr.(Elec.),
17.12.13(AE)
AE Sales & DistributionDivision-3 PDB, Sylhet.
Page 52
S & D Division-4, Sylhet1 11-0284 18.04.59 Mr. Md. Zinnath Ali
Narsingdhi. Diploma (Elec.)
05.08.81(SAE), 17.09.09(AE) 24.12.14 (SDE) 25.06.15 (SDE)
XEN, incharge S & D Division-4, Sylhet & XEN, incharge Energy Auditing UnitDivision, Sylhet.
2 11-0421 01.01.58 Mr. Md. Nizam Uddin Munshiganj Diploma (Elect.) 02-8-83 (SAE) 27-12-11 (AE)
AE S & D Division-4, Sylhet
3 1-02052 30.07.90 Mr. Md. Abdur Razzak Chittagong B.Sc. Engg. (Mech.) 17.12.13 (AE)
AE S & D Division-4,Kumargaon, Sylhet
Sales & Distribution Division, PDB, Sunamganj.
1 1-01291 26.11.74 Mr. Md. Kamruzzaman B.Sc. Engg (Mech.) 11.07.99 (AE) 13.08.14 (XEN, Incharge) 01711668463
XEN (In charge), Sales & DistributionDivision, PDB, Sunamganj.
PD (Addl. Charge) Renewable Energydependent Powergeneration Pilot Projectat Rural Haor Area.
1)Training on Operation &Maintenance from 01.05.16 to15.06.16
India
2 Mr.Sani das Chittagong B.Sc. Engg (Elect..) 30.09.15 (AE)
AE Sales & DistributionDivision, PDB, Sunamganj.
3 Mr. Nur Mohammad Tareq B.Sc. Engg (Mech.) 25.06.15 (AE)
AE Sales & DistributionDivision, PDB, Sunamganj.
Page 53
4 Mr. Nur Mohammad Tareq Diploma engg. SAE 04.02.16 (AE)
AE (Incharge) RE Dirai E/S, PDB,Sunamganj.
Sales & Distribution Division, Satok ,PDB, Sunamganj.
1 1-01265 22.07.74 Mr. Swagata Sarkar , Chittagong, B.Sc.Engr.(Elec.),
10.06.99(AE),
26.07.05(SDE), 16.10.11 (XEN, Incharge)
XEN (Incgharge), Sales & DistributionDivision, Satok PDB, Sunamganj.
1) Inspection against CentralZone Distribution Project,Mymensingh from 12.05.2012 to21.05.2012 for 7 days in India. 2) Pre shipment inspectionagainst renewable based powerplant construction project athaor area from 09.03.14 to15.03.14 in China.
O & M Circle, MoulobhibazarSL.No ID-No Date of Birth Name, District and
Qualification and Date ofjoining
Designation and PresentPosting
Topics of Foreign Training andDuration
Country Inspection Topics and its Duration Comments
1 1-0960 01.01.63 Mr. Md. Dulal Hossain,Noakhili,AMIE(Elec.),26.07.84(SAE) 02.03.93(AE) 12.07.02(SDE) 21.07.11 (XEN)
XEN S & D, Kulaura,PDB,Moulabhibazar. & SE (Addl. Charge) O & M Circle, PDB,Moulovibazar.
Training On 33/11KV 2x10MVA sub -station fromApril/06 for 10 Days.
India 1) "Technical Operation &Quality Test Witness" from07.09.09 to 16.09.09 in China.
2 1-02019 20.08.88 Mr. Md. Ikram HassanChowdhury Comilla B.Sc. Engg. (Mech.) 16-10-11 (AE) 01748529889 [email protected]
AE O & M Circle, PDB, Moulavibazar.
1)Training on Planning &development from 01.05.16 to15.05.16
India
Page 54
Distribution Division, Moulabhibazar1 1-01872 18.09.85 Mr. Sams E- Arefin
B-Baria B.Sc. Engg. (Elect.) 01.12.10 (AE) 06.01.16 (SDE, Incharge) 01717250830 [email protected]
SDE, Incharge Distribution Divion PDB, Moulabhibazar.
1) Technical orientation &quality test witness ofDistribution transformer (pkg-20) from 10.04.14 to 16.04.14 inChina.
2 11-0382 31.12.60 Mr.Md.Akkas Uddin Kishorgonj
Diploma(Elec.),
19.10.82(SAE), 22.04.10(AE),
AE, Distribution Divion PDB, Moulabhibazar.
S & D, Kulaura, PDB,Moulabhibazar.1 1-0960 01.01.63 Mr. Md. Dulal Hossain,
Noakhili,AMIE(Elec.),26.07.84(SAE) 02.03.93(AE) 12.07.02(SDE) 21.07.11 (XEN)
XEN S & D, Kulaura,PDB,Moulabhibazar. & SE (Addl. Charge) O & M Circle, PDB,Moulovibazar.
Training On 33/11KV 2x10MVA sub -station fromApril/06 for 10 Days.
India 1) "Technical Operation &Quality Test Witness" from07.09.09 to 16.09.09 in China.
2 1-02082 15.07.89 Mr.M. Ziauddin Ahmed Chittagong B.Sc. Engg. (Elect.) 17.12.13 (AE)
AE S & D, Kulaura,PDB,Moulabhibazar.
3 Mr. Md. Atiqur Rahman B.Sc. Engg. (Mech.) 25.06.15 (AE)
AE S & D, Kulaura,PDB,Moulabhibazar.
Sales & Distribution Division, PDB, Habiganj1 Mr. Noore Mohammad
Sarker B.Sc. Engg. (Mech.) 25.06.15 (AE)
AE S & D, Kulaura,PDB,Moulabhibazar.
Page 55
Sales & Distribution Division, Habiganj1 11-0229 29.11.57 Mr. Md. Rostam Ali
Howlader Jalokathi Diploma(Power)
23.06.80(SAE), 17.09.09(AE) 25.06.15 (SDE)
XEN, Incharge Sales & DistributionDivision Habiganj, PDB
(Distribution Zone, Rangpur)SL.No ID-No Date of Birth Name, District and
Qualification and Date ofjoining
Designation and PresentPosting
Topics of Foreign Training andDuration
Country Inspection Topics and its Duration Comments
1 1-0584 12.03.61 Mr. Md. Kausar Ameer Ali
Bogra
B.Sc.Engg. (Elec.)
09.10.84(AE) 28.04.94(SDE) 24.08.03(XEN) 25.08.14 (SE)
CE (Addl. Charge) Distribution Zone, PDB,Rangpur. & SE O & M Circle, PDB,Rangpur.
1)33 KV outdoor C.B &11 KVSwitchgear From 04.04.2000 to20.05.2000
2) Trouble shootingprograming energy meterfrom 21.08.04 to 10.09.04
3) "Supply and Installation ofPower System MeteringEquipment on Turnkey Basis"Section-6 from 02.01.09 to22.01.09 for 02(weeks)
India,
U.S.A
USA
1) FAT on Pre-Payment Metering.05 days in South Africa.Jan/07 2) Inspection June/08 for 06days in India. 3) Energy Meter on “TechnicalOrientation & Quality TestWitness” 16.11.09 for 10 days inSingapore. 4) See N.B.
4) N.B. 4) Inspection on Power Plant against IEL Consortium & Associates & Dutch Bangla Power Ltd. from 16.06.10 to 19.06.10 for 04 days in Finland. 5) Inspection on machinerise for establishing Rental Power Company EQ Capital Energy for Maximum 03 days (Excluding journey period) from the starting date in USA at January/11. 6) Inspection against 110V, 3´5(6)A, Three Phase 4-Wire, 3-Element, Double Tariff Programmable Energy Meterfor from May/11 for 10 (Ten) days or from the date of actual journey (excluding journey time) in Singapore. 7) Inspection of Programmable AMR Meter from 30.09.2012 to 11.10.2012 in Switzerland. 8) "Technical Orientation & Quality Test Witness for Meter & Meter Enclosure" from 16.03.14 to 25.03.14 in China. 9) Witnessing of manufacturing process against Barishal gas Turbine Power Plant from 01.02.15 to 15.02.15in USA. 10) Factory Test Witness of Gas Turbine against Shahjibazar 330 MW CCPP Project from 08.12.14 to 17.12.14 in Austria. 11)Construction Drawing Review Meeting against Barapukuria 275 MW Coal Based Power Plant from 15.01.16 to 21.01.16 in China. 12)Basic design engineering review meeting against Bibiana-3 CCPP project from 27.01.16 to 05.02.16 in India.
2 Mr. Abu Md. Majedul BariBhuiyan
AE Distribution Zone, PDB,Rangpur.
Page 56
O & M Circle, RangpurSL.No ID-No Date of Birth Name, District and
Qualification and Date ofjoining
Designation and PresentPosting
Topics of Foreign Training andDuration
Country Inspection Topics and its Duration Comments
Sales & Distribution Division-3, Rangpur
1 1-01787 21.01.85 Mr.Syed Ahmad Chapainababgonj B.Sc.Eng(Elec.) 01.06.09(AE) 21.12.14 (SDE) 25.06.15 (SDE) 12.04.16 (XEN, Incharge) 01748953545
XEN, Incharge Sales & DistributionDivision-3, Rangpur
1) Inspection against CentralZone Power Distribution Project,Mymensingh to inpect 33 KV XLPECable from 19.02.13 to 27.02.13 inIndia. 2) Quality acceptance testagainst Chittagong Hill TrackElectrification Project from07.04.15 to 13.04.15 in SouthKorea & China.
S & D Division, Lalmonirhat1 1-01712 12.09.79 Mr.Md.Hasnath Zaman
Dinajpur B.Sc.Eng(Elec) 06.2006(AE) 27.12.2011(SDE) 16.09.14 (XEN, Incharge) 01712-529880
XEN (Incharge) S & D Division, PDB,Lalmonirhat
1) "Work Shop Test" for Dohazari100MW Peaking Power PlantConstruction Project fromJanuary/11 for 07(Seven) days inChina. 2) Quality Test witness from 21-27 feb/2016 in China .
2 11-0336 11.11.57 Mr.S. M. Masudul Alam Lalmonirhat, B.Sc.Eng(Elec.) 09.08.82 (SAE) 22.04.10(AE) 21.12.14 (SDE)
SDE (Incharge) S & D Division,Lalmonirhat
Page 57
Sales & Distribution Division,Nilphamari1 1-01784 01.01.84 Mr. Md. Abu Sayed Sarkar
Kurigram, B.Sc.Eng(Elec.)
31.05.09(AE) 24.12.14 (SDE) 25.06.15 (SDE) 12.04.16 (XEN, Incharge) [email protected]
XEN, Incharge Sales & DistributionDivision, PDB,Nilphamari
1) “Technical Orientation andQuality test witness'' Supply ofTransformer Accessories (CopperCables)" against Central zonepower distribution Project, PDB,Mymensingh in June/2011 for 07(Seven) days from the date ofactual journey(Excluding traveltime) in China. 2) Basic Design Approval ofGhorasal Repowering Projectfrom 27.03.16 to 05.04.16 inChina.
2 1-01416 11.09.68 Mr. Md. Rezaul Karim, Nator, B.Sc.Engr.(Mech.),
05.03.2000(AE) 25.06.09(SDE) 28.06.12 (XEN, Incharge) 22.02.16 (XEN)
XEN Sales & DistributionDivision, PDB,Nilphamari
1) "Work Shop Test" forHathazari 100MW Peaking PowerPlant Construction Project from24.02.11 to 02.03.11 for 07(Seven)days in China.
3 1-01809 10.02.85 Mr. Md. Abdul Matin Lalmonirhat B.Sc. Engg. (Mech) 04.11.10 (AE) 06.01.16 (SDE, Incharge) 01721734233 [email protected]
SDE, Incharge Sales & DistributionDivision-Domar, PDB,Nilphamari
Page 58
4 1-01709 12.03.75 Mr. Al MamunMd.Mostafizur Rahman Gaibandha B.Sc.Eng(Elec) 07.04.06 (AE) 21.12.11(SDE) 16.09.14 (XEN, Incharge)
XEN (Incharge) Sales & DistributionDivision, PDB,Nilphamari
1) Training on Rehabilitationof GT of Shahijibazar PowerStation from 29.11.07 to 05.12.07 for 07 Days 2) Training on Shikhalbaha 60MW Generator ExcitationSystem "Demonstration onEquipment and Spares toimpart Technical Know-how"from 04.01.08 to 10.01.08, 07days. 3) 'Factory Training" againstSylhet 150 MW CombinedCycle Power PlantConstruction Project, BPDBfrom 10.07.2011 to 09.08.2011for 30 (thirty) days (Excludingtravel time).
Abu Dhabi.
CzechRepublic
China
1) Materials witness Inspectionagainst “Generator & ExciterInspection from October/10 for07 days in South Korea.
Attach ToMinistry ofPower ,Energy &MineralResources
Sales & Distribution Division, PDB, Syedpur1 1-01321 07.11.71 Mr. Mohammad Ali Zinnah,
Shirajgong, B.Sc.Engr.(Mech.),
20.01.2000(AE) 18.08.2011 (SDE) 17.11.13 (XEN, Incharge)
XEN, Incharge Sales & DistributionDivision, PDB, Syedpur
Factory Training againstBaghabari 50MW PeakingPower Plant ConstructionProject '' from 30.05.2011 to30.06.2011 for 30(Thirty) days (Bond for 5 years)
China 1) Inspection againstShahjibazar 330 MW CCPP Projectfrom 20.07.15 to 26.07.15 inChina.
2 11-0453 13.04.60 Mr. A.M. Helal Uddin Coxs'Bazar Diploma (Atom) 25.08.84 (SAE) 27-12-11 (AE)
AE, Sales & DistributionDivision, PDB, Syedpur
3 Mr. Sadi Sabbasachi AE, Sales & DistributionDivision, PDB, Syedpur
4 1-01819 11.10.85 Mr. Md. Moktar Hossain Chapainawabganj B.Sc. Engg. (Elect.) 04.11.10 (AE) 01722044335 [email protected]
AE (RE), Doani E/S, PDB,Lalmonirhat.
1) "Quality acceptance Test" of11 KV LA, 33 KV LA from 01.05.13to 07.05.13 in India.
Page 59
Sales & Distribution Division, Gaibandha1 1-01301 16.10.68 Mr. Zulkernaine Shafi,
Dhaka, B.Sc.Engr.(Mech.),
13.07.99(AE) 26.07.05(SDE), 25.10.2011 (XEN, Incharge) 18.06.15 (XEN)
XEN Sales & DistributionDivision, Gaibandha
1) Training on ConsultancyServices for Grid System Studyto Identify Reactive Powerrequirement from 02.11.04 for07 days
Canada
2 1-01792 22.10.78 Mr.Md. Shahnawaj Bogra B.Sc.Eng(Elec.) 02.06.09(AE) 21.12.14 (SDE) 25.06.15 (SDE) 12.04.16 (XEN, Incharge)
XEN, Incharge Sales & DistributionDivision, Gaibandha
1) Technical orientation &quality test witness of DCSagainst Shikalbaha 225 MW CCPPproject from 20.10.15 to 29.10.15in China.
3 11-0331 10.09.59 Mr.A.Z.M. Saiful IslamMondal Gaibandha, B.Sc.Eng(Elec.) 06.08.82(SAE) 22.04.10(AE) 21.12.14 (SDE)
SDE (Incharge) Sales & DistributionDivision, Gaibandha
4 11-0477 04.03.60 Mr. Abu Asad Pramanik Rangpur Diploma (Elec.) 25.08.84 (SAE) 27.12.11 (AE)
AE Sales & DistributionDivision, Gaibandha
5 1-02096 15.12.84 Mr. Md. Humayun KabirChowdhury Thakurgaon B.Sc.Engr(Elect.) 13.04.14 (AE)
AE Sales & DistributionDivision, Gaibandha
6 11-0477 04.03.60 Mr. Md. Abu Asad Pramanik Rangpur Diploma (Elect.) 25.08.84 (SAE) 27.12.11 (AE)
AE Sales & DistributionDivision, Gaibandha
Page 60
Kaliganj E/S, PDB, Lalmonirhat2 11-0416 26.06.58 Mr. Pradip Kumar Rudro
Kurigram Diploma (Power) 31-7-83 (SAE) 27-12-11 (AE)
AE, Kaliganj E/S, PDB,Gaibandha
S & D Division-1, Rangpur1 1-01738 15.09.75 Mr. Mohammad Abdul
Kader Goni Dhaka B.Sc.Engr(Elect.) 07.04.06 (AE) 27.12.2011(SDE) 16.09.14 (XEN, Incharge)
XEN (Incharge) S & D-1 PDB, Rangpur.
1) "Factory Acceptance Test (FAT)& Technical Orientation Course"against Greater ChittagongPower Distribution Project SCADA-Rehabilitation & Extension inSept/2011 for 07 days or from thedate of actual journey (excludingtravell time) in New Zealand. 2) Factory Acceptance Test from28.06.14 to 04.07.14 in Bangalore,India.
2 1-02064 03.06.90 Mr.Mohammad TanvirHossain Chandpur B.Sc.Engr(Mech.) 17.12.13 (AE)
AE, S & D-1 PDB, Rangpur.
3 1-02067 01.01.88 Mr. S.M. Tasnim Alam Mymensingh B.Sc.Engr(Elect.) 17.12.13 (AE)
AE, S & D-1 PDB, Rangpur.
Page 61
S & D Division-2, Rangpur1 1-01267 12.09.70 Mr. Md. Golam Mortuza,
Lalmonirhat, B.Sc.Engr.(Mech.),
10.06.99(AE),
26.07.05(SDE), 10.03.11 (XEN Incharge) 2.1.2012(XEN, Incharge) 28.05.14 (XEN)
XEN S & D-2, PDB, Rangpur.
Training on InnovativeTechnologies inTransmission & Distributionsystems, central Institute forrural Electrification/ Indiafrom 19.10.2009 to 11.12.2009
India 1) Technical Orientation andQuality test witness of GasFilling Instrument from 11.02.07to 13.02.07 for 03 Days in China. 2) Materials witness Inspectionagainst “Generator & ExciterInspection from October/10 for07 days in South Koria. 3) Material Witness Inspectionon 11 KV Switchgear againstBaghabari 50 MW Peaking PowerPlant Construction Project from14.12.10 to 23.12.10 in Germany. 4) Technical orientation &quality test witness of 11 KVLightning Arrester from 21.06.14to 27.06.14 in China.
Distribution Division, Kurigram,1 1-01642 29.09.75 Mr.Md.Ashraful Islam
Mandol Lalmanirhat B.Sc.Eng(Elec) 07.06.2006(AE) 28.01.14 (SDE) 05.11.14 (XEN, Incharge)
XEN (Incharge), Sales & DistributionDivision, PDB, Kurigram.
1) “Training in operation &Maintenance in similarcapacity & type of powerstation including transfer oftechnical know-how” againstChittagong Power Plant Unit-1(Turbine Division, BoilerDivision, Electrical Division,Instrument & ControlDivision, Operation Division)from August/10 for 15 days
China
Page 62
O & M Circle, DinajpurSL.No ID-No Date of Birth Name, District and
Qualification and Date ofjoining
Designation and PresentPosting
Topics of Foreign Training andDuration
Country Inspection Topics and its Duration Comments
1 1-0784 01.10.62 Mr. Md. Shahadat HossainSarker, Rangpur, B.Sc.Engr.(Mech.),
30.08.86(AE) 21.11.99 (SDE) 09.12.07(XEN, rev.) 17.09.09(XEN)
SE (Incharge) O & M Circle, PDB,Dinajpur
1) Pre-shipment Inspectionagainst 33KV ACSR Grossbeak-452.40Km & 33KV ACSR Merlin-346.80Km. And 33KV ACSR DOGConductor-2675.60Km form05.01.09 to 14.01.09 for 10 days inChina. 2) the Government of thepeople's republic of Bangladeshin respect of the composition ofBangladesh aganist PowerPlants and machnieries ofRental Power Company UnitedEnterprises & Co. Ltd formaximum 04 (four) days(excluding Journey period) From09.12.10 or from the starting dateof journey in Germany. 3) Inspection on PlantEquipment from 11.1.11 to18.1.11 in Germany. 3) Technical orientation &Quality test witness from30.03.14 to 05.04.14 in Germany. 4) Technology Transfer Trainingagainst 10- town project from01.04.15 to 14.04.15 in India.
Dinajpur Electric Supply1 11-0391 08.09.57 Mr. Md. Mahbubul Alam
Dinajpur Diploma engg. (Elect.) 17.07.83 (SAE) 02.11.10 (AE) 06.01.16 (SDE, Incharge)
SDE, Incharge Parbatipur E/S, PDB,Dinajpur.
Distribution Division, Thakurgaon
Page 63
1 1-01255 25.11.69 Mr. Alamgir MahfuzurRahman Naogaon, B.Sc.Engr.(Mach.),
10.06.99(AE),
27.07.05(SDE), 10.03.11 (XEN Incharge) 28.05.14 (XEN) 01755582327
XEN Distribution Division, PDB, Thakurgaon.
1) V.H.F. Equipment From Nov/03 for 01 Month
Newzealand 1) Factory test witness ofdifferent type of insulator withfittings from 10.05.14 to 16.05.14in china. 2)1) Factory test against chit.Power dis project Oct/2016 inchina.
Sales & Distribution Division, PDB, Panchagar.1 1-01222 20.04.66 Mr. Md. Ahsanul Kabir,
Rangpur, B.Sc.Engr.(Mech.),
19.03.98(AE) 06.10.04(SDE) 11.10.10 (XEN Incharge)
XEN (Incharge) Sales & DistributionDivision, PDB,Panchagar.
1) Training on 33/11KV 2x10MVA sub station from 19.03.06to 30.03.06 for 08 Days.
Thiland. 1) “Alternator Inspection”against Santahar 50 MW andKatakhali 50 MW Peaking PowerPlant Construction Project inJuly/2011 for 07 days inSouthKorea. 2) "Technical Orientation andQuality Test Witness" on 100Nos. Hydraulic Wire Cutter & 100Nos. Hydraulic Compressor from
07.12.2013 to 15.12.2013 in China 3) Quality test witness againstChitt. zone power dist. dev.project from 18-24 March/2016 inIndia & China2 11-0435 31.01.62 Mr. A.K.M Mohiuddin
Bagura Diploma (Mech.) 03-8-83 (SAE) 27-12-11 (AE)
AE (RE), Panchagar E/S, PDB, Thakurgaon.
S & D Division-1, Dinajpur1 1-01711 28.09.79 Mr.Md.Rubel Ahmed
Sirajgonj B.Sc.Eng(Computer) 06.2006(AE) 27.12.2011(SDE) 16.09.14 (XEN, Incharge)
XEN (Incharge) S & D Division-1,Dinajpur, PDB, Dinajpur
1) "Generator Circuit BreakerInspection" for Sylhet 150MWCombined Cycle Power PlantConstruction Project from04.02.11 to 11.02.11 for07(Seven) days in Switzerland 2) Factory acceptance test of 11KV pin insulator against Chitt.Zone power dist. System dev.Project from 08.11.15 to 14.11.15in India & China.
S & D Division-2, Dinajpur
Page 64
1 1-01800 01.01.81 Mr. Ahsan Mahmud Elahy Netrokhona B.Sc.Engr(Elec.) 31.05.09 (AE) 21.12.14 (SDE) 25.06.15 (SDE) 12.04.16 (XEN, Incharge)
XEN (Incharge) S & D Division-2,Dinajpur, PDB, Dinajpur
1) Central Zone PowerDistribution Project, a TechnicalOrientation and Quality TestWitness Program named of 11KVCapacitor Bank in May/2011 for07(Seven) days in India.
2 1-01434 27.07.72 Mr. Md. Shafiqul Islam, Kishorgonj, B.Sc.Engr.(Elec.),
05.03.2000(AE) 13.06.11 (SDE) 17.11.13 (XEN, Incharge)
XEN (Incharge) S & D Division-2,Dinajpur, PDB, Dinajpur
1) Technology TransferTraining against 10- townproject from 01.04.15 to14.04.15
India 1) "Work Shop Test" for Dohazari100MW Peaking Power PlantConstruction Project fromJanuary/11 for 07(Seven) days inChina.
(CE, Distribution Project)SL.No ID-No Date of Birth Name, District and
Qualification and Date ofjoining
Designation and PresentPosting
Topics of Foreign Training andDuration
Country Inspection Topics and its Duration Comments
1 1-0397 01.01.58 Mr. Abu Musa Masud AlFaruque, Nowgaon,B.Sc.Engg. (Elec.)09.03.81 (AE) 19.05.86(SDE) 28.09.99(XEN) 08.02.11 (SE) 15.12.14 (Addl. CE) 26.05.15 (CE)
CE Distribution Project,PDB, Dhaka.
I) Electric Power Engineering18.08.86 to 30.06.87
Norway (Post
Graduate)
04.10.02 to 10.10.02 In Indonesia,
2) "Work Shop Test" forHathazari 100MW Peaking PowerPlant Construction Project fromJanuary/11 for 07(Seven) days inChina. 3) "Technical Orientation &Quality Test Witness" onPortable Meter Testing Set from25.05.13 to 31.05.13 in Bulgeria. 4) Factory test witness againstShahjibazar 330 MW project from25.08.15 to 31.08.15 in France.
2 1-0627 12.11.60 Mr. A.B.M. Anowarul Azim, Dinajpur, B.Sc.Engr.(Civil.),
26.5.85(AE) 09.01.95(SDE) 09.03.04(XEN)
Asstt. CE (XEN) Distribution Project,PDB, Dhaka.
1)Hydro Power and theEnviournment From26.8.02to12.9.02
Norway 1)Training on 60 Nos.-11KV AutoCerceuit Recloser (ACR) in SouthKorea in 2006 for 07 Days.
On Lien
Central Zone Power Distribution Project, Mymensingh/Sylhet
Page 65
SL.No ID-No Date of Birth Name, District andQualification and Date of
joining
Designation and PresentPosting
Topics of Foreign Training andDuration
Country Inspection Topics and its Duration Comments
1 1-0369 10.12.57 Mr. Mahbubur Rahman,Kishoregonj,B.Sc.Engg. (Mech.)13.05.80 (AE) 04.02.86(SDE) 19.07.98(XEN) 15.12.14 (SE)
SE (PD), Central Zone PowerDistribution Project,PDB, Mymensingh.
1) Training on 33/11KV CircuitBreaker (9 Town) 07days, 2006 inIndia. 2) Inspection on SubstationEquipment & Mateerial againstCentral Zone Power DistributionProject, Mymensingh to from16.07.13 to 22.07.13 in Germany. 3) Technical Orientation &Quality Test Witness from07.06.15 to 21.06.15 inSwitzerland.
2 1-01722 12.04.77 Mr.Md.Rabiul Hasan Takurgaon B.Sc.Eng(Elec) 07.06.2006(AE) 16.06.14 (SDE)
XEN (Incharge) Office of PD, CentralZone DistributionProject PDB,Dhaka.
1) “Training in operation &Maintenance in similarcapacity & type of powerstation including transfer oftechnical know-how” againstChittagong Power Plant Unit-1(Turbine Division, BoilerDivision, Electrical Division,Instrument & ControlDivision, Operation Division)from August/10 for 15 days 2) Operation & maintenanceof gas turbine from 30.09.13 to11.10.13
China
Thailand
3 1-01360 05.07.72 Mr. Abul Bashar Md. FarukHossain, Narsingdi, B.Sc.Engr.(Elec.),
05.03.2000(AE) 25.06.09(SDE) 21.12.11(XEN Incharge) 18.06.15 (XEN)
XEN Central Zone powerDistribution ProjectDivision, PDB,Mymensingh.
1) Training Course in "TheImprovement for ElectricPower Distribution Grid" byJICA, Japan throughpromotion of TQM (PI Solving)from 21.08.07 to 29.09.07 for 40Days,
Japan 1) 11KV Switchgear againstDudkhandi 50MW Peaking PowerPlant Construction ProjectNovember/10 for 07 days inGermany. 2) Witness of factory test ofconductor from 15.04.14 to21.04.14 in Vietnam.
Page 66
4 1-01400 02.04.73 Mr. Md. Sana Ullaha, Naugaon, B.Sc.Engr.(Elec.),
14.03.2000(AE) 25.06.09(SDE) 28.06.12 (XEN, incharge)
XEN (Incharge), Central Zone powerDistribution ProjectDivision-2, PDB, Sylhet.
1) Training on "Improvementfor Electric Power DistributionGrid" from 01.09.09 to 10.10.09
2) A training titled "SCADACommunication System"against Greater ChittagongElectricity Distribution Project,SCADA rehabilitation, PDB,Chittagong from 19.07.2012 to16.08.2012
Japan
NewZealand
1) Training on ConsultancyServices for Grid System Study toIdentify Reactive Powerrequirement from 02.11.04 for 07days in Canada. 2)Witness of factory test of 33 &11 KV POwer Cable from 15.04.14to 21.04.14 in China.
5 1-01426 27.01.71 Mr. Chowdhury Md. AbuObayed, Shunamgonj, B.Sc.Engr.(Metallurgi.),
05.03.2000(AE) 08.12.09(SDE) 17.11.13 (XEN, Incharge) 22.02.16 (XEN)
XEN Central ZoneDistribution Project-3 PDB,Sylhet.
1) Training on Operation &Maintenance from 01.05.16 to15.06.16
India 1) Central Zone PowerDistribution Project, a TechnicalOrientation and Quality TestWitness Program named of 11KVCapacitor Bank in May/2011 for07(Seven) days in India.
6 11-0279 30.10.57 Mr. Md. Abul Kalam Jhalakathi, Diploma Engr.(Mech), 24.07.81 (SAE) 04.11.2013(AE) 24.12.14 (SDE)
XEN (Incharge), Central Zone powerDistribution Project-1Division, PDB,Mymensingh
7 11-0390 11.10.62 Mr.Md. Sanowar Hossain Tangail Diploma(Elec.),
16.07.83(SAE), 22.04.10(AE), 06.01.16 (SDE, Incharge)
SDE (Incharge), Central Zone powerDistribution Project-1Division, PDB,Mymensingh
8 11-0302 10.03.61 Mr. Md. Abdur Razzak, Tangail Diploma(Mech.) 19.10.81(SAE) 22.04.10(AE) 21.12.14 (SDE) 25.06.15 (SDE)
SDE Central ZoneDistribution Project-3 PDB,Sylhet.
9 11-0375 01.01.59 Mr. Md. Abdur Rab, Comilla
Diploma(Civil),
10.09.82(SAE), 22.04.10(AE), 25.06.15 (SDE) 0171-5097566
SDE Central ZoneDistribution Project PDB,Mymensing.
1) Approval of Engineering Dataand Detail Design againstHathazari 100 MW PeakingPower Plant Construction Projectfrom OCtober/10 for 07 days inChina.
Page 67
10 1-01895 20.12.84 Mr. Md. Samir Ashab Khulna B.Sc. Engg. (Mech.) 20.04.11 (AE) 01676121853 [email protected]
AE Central ZoneDistribution Project PDB,Mymensing.
1) Basic design engineeringreview meeting against Bibiana-3 CCPP project from 27.01.16 to05.02.16 in India.
11 1-02036 01.11.88 Mr. Anik Sarkar Kishoreganj B.Sc. Engg. (Elect.) 12.12.11 (AE)
AE Central ZoneDistribution Project PDB,Sylhet.
1) "Technical Orientation &Quality Test Witness for Meter &Meter Enclosure" from 16.03.14to 25.03.14 in China.
12 1-02042 04.01.83 Mr. KhandakarKamruzzaman Tangail B.Sc. Engg. (Elec.) 05.01.12 (AE)
AE Central ZoneDistribution Project PDB,Mymensing.
1) "Witness of factory test of sub-station gantry & hardware" from10.05.14 to 16.05.14 in India.
10 Town Power Distribution System Development ProjectSL.No ID-No Date of Birth Name, District and
Qualification and Date ofjoining
Designation and PresentPosting
Topics of Foreign Training andDuration
Country Inspection Topics and its Duration Comments
1 1-01211 01.08.71 Mr. Md. Mozaharul Islam, Shirajgong, B.Sc.Engr.(Mech.),
19.03.98(AE) 06.10.04(SDE) 31.10.13 (XEN)
XEN 10-town PowerDistributionDevelopment ProjectDivision-1, PDB,Rajshahi.
1) Training on Energy Meter,September/05 for 11days.
Australia &Singapore
1) Inspection against 10-TownPower Distribution project forQualitry Acceptance test of 33 KVCircuit breaker from 15.09.13 to18.09.13 in India
2 11-0335 01.01.61 Mr.Md. Abul Basher Sirajgonj, B.Sc.Eng(Civil) 13.08.82 (SAE) 22.04.10(AE) 21.12.14 (SDE) 25.06.15 (SDE)
SDE 10-town PowerDistributionDevelopment ProjectDivision-2, PDB, Bagura.
G.O. issued dated30.03.15 forTechnologyTransfer Trainingagainst 10- townproject from01.04.15 to 14.04.15in India.
Page 68
3 11-0478 25.08.62 Mr. Fazlur Rahman Bagura Diploma (Elect.) 25-8-84 (SAE) 27.12.2011 (AE)
AE 10-town PowerDistributionDevelopment ProjectDivision-2, PDB, Bagura.
4 - - Mr. Amal chandra Sarkar Diploma engg. (SAE) 07.02.16 (AE, incharge)
AE (incharge) 10-town PowerDistributionDevelopment ProjectDivision-3, PDB,Rangpur.
5 - - Mr. Rabiul Karim Diploma engg. (SAE)
SAE 10-town PowerDistributionDevelopment ProjectDivision-1, PDB,Rajshahi.6 - - Mr. Neser Ali
Diploma engg. (SAE)SAE 10-town PowerDistributionDevelopment ProjectDivision-1, PDB,Rajshahi.7 - - Mr. Zulfiker Ali
Diploma engg. (SAE)SAE 10-town PowerDistributionDevelopment ProjectDivision-3, PDB,Rangpur.
8 - - Mr. Biddut Kumar Shaha Diploma engg. (SAE)
SAE 10-town PowerDistributionDevelopment ProjectDivision-2, PDB, Bagura.
Page 69
Chittagong Hill Track Electrification Project
SL.No ID-No Date of Birth Name, District andQualification and Date of
joining
Designation and PresentPosting
Topics of Foreign Training andDuration
Country Inspection Topics and its Duration Comments
1 1-0787 01.01.58 Mr. U Ga Pru,KhagraChori,B.Sc.Engr.(Mech.),
30.8.86(AE) 21.11.99 (SDE) 05.01.06(XEN, CurrentCharge) 23.04.09 (XEN)
PD (Incharge), Hill Track ElectrificationProject
PDB, Rangamiti.
1) Training On 33KV AutoCerceuit Recloser (ACR) in2005 for 07 Days 2) Training on technologytransfer of CT, PT from 05.05.16to 11.05.16
South Korea
China
1)Inspection on 33 KV pininsulator, 33 KV disc insulatorand so on from 25.01.13 to31.01.13 in China.
2 1-01270 01.01.70 Mr. Uzzal Barua, Chittagong, B.Sc.Engr.(Elec.),
10.06.99(AE),
26.07.05(SDE), 10.03.11 (XEN Incharge) 2.1.2012 (XEN, Incharge) 28.05.14 (XEN)+A64
XEN Division-2 (Khagrasori) ,Office of PD, Hill TrackElectrification Project
PDB, Rangamiti.
1) Training on Gater1132/33KV Sub-Station PowerTransformer, 33KV 11KV GasInsulated Switchgear, 33/11KVSub-station & Control Panel &Protection Against ChittagongPower Distribution Project''Design & Maintenance ofPower Transformer'' 10.07.07to 24.08.07 for 42 days. 2) A training titled "SCADACommunication System"against Greater ChittagongElectricity Distribution Project,SCADA rehabilitation, PDB,Chittagong from 19.07.2012 to16.08.2012 3) A training againstChittagong Hill tractsJan/2016 in India for 7 days
China
NewZealand
1) Factory aceptance test of discinsulator against Chitt.zonepower dist. System dev. Projectfrom 03.11.15 to 09.11.15 inChina.
A proposal sent toministry dated21.04.16 forTraining ofTechnologytransfer againstChitt. Hill tracksproject from20.05.16 to 26.05.16in India.
3 1-01781 11.07.86 Mr.Shek Sakib Hossain Dhaka B.Sc.Eng(Elec.) 31.05.09(AE) 24.12.14 (SDE) 25.06.15 (SDE) 12.04.16 (XEN, Incharge)
XEN, Incharge Hill Track ElectrificationProject
PDB, Rangamiti.
1) Long Term Power SystemPlanning and Preparation ofFuture Project trainingprogram from 29.04.13 to10.05.13
Thailand
Page 70
4 - - Mr. Nurul Alam Diploma Engg. (SAE)
AE Hill Track ElectrificationProject
PDB, Rangamiti.
.A proposal sentto ministry dated25.04.16 for FactoryAcceptance Testagainst Chitt. Zonepower dist. Dev.Project from20.05.16 to 26.05.16in China.
5 - - Mr. Lavely Chakma Diploma Engg. (SAE)
SAE Hill Track ElectrificationProject
PDB, Rangamiti.
Urban Project, RajshahiSL.No ID-No Date of Birth Name, District and
Qualification and Date ofjoining
Designation and PresentPosting
Topics of Foreign Training andDuration
Country Inspection Topics and its Duration Comments
1 1-0573 31.08.60 Mr. Md. Hazrat AliPabnaB.Sc.Engg. (Elec.)09.10.84(AE) 18.03.93(SDE) 17.05.03(XEN) 30.06.14 (SE)
PD Urban Project, PDB,Rajshahi.
1) 132/33KV,SF-6 Breaker from01.04.2000 to 14.05.2000 for 45days
2)Power Distribution Projectthrough promotion of TQMfrom 17.02.2004 to 20.03.2004for 35 days
3) Training on 1132/33KV Sub-Station/ Power Transformer,33KV 11KV Gas InsulatedSwitchgear, 33/11KV Sub-station & Control Panel &Protection Equipment AgainstChittagong Power DistributionProject ''Design &Maintenance of 33/33KV Sub-Station'' from 10.07.07 to24.08.07 for 45 days
India,
Japan,
China
1) "Technical Orientation &Quality Test Witness" of 150 KmGuy-Wire from 08.05.13 to14.05.13 in China.
A proposal sent toministry dated04.05.2015 againstShikalbaha 225MW Dual FuelCCPP Project from15.05.15 to 21.05.15in Germany.
2 11-0491 18.05.62 Mr. Md. Golam Mostafa Diploma (Elect.) 25.08.84 (SAE) 04.11.13 (AE)
AE Urban Project, PDB,Rajshahi.
Page 71
Urban Project, ChittagongSL.No ID-No Date of Birth Name, District and
Qualification and Date ofjoining
Designation and PresentPosting
Topics of Foreign Training andDuration
Country Inspection Topics and its Duration Comments
1 1-01223 01.01.67 Mr. Md. Morshed Uddin, Laxmipur B.Sc.Engr.(Elec.),
19.03.98(AE) 06.10.04(SDE) 10.03.11 (XEN Incharge) 28.05.14 (XEN)
XEN Urban project Div., PDB,Chittagong
Design,Installation,Testing,Operation & Maintenance onControl & Protection AgainstG/Ctg. From 24.05.04 to03.06.04
China, 1) Quality acceptance test ofbattery & battery charger from20.06.14 to 26.06.14 for 7 days inIndia.
2 Mr. Nurul AbcharChowdhgury Diploma 29.01.15 (AE, Incharge)
AE(Incharge) Urban project Div., PDB,Chittagong
Pre-payment Metering Project, Distribution Comilla & Mymensingh Zone, Dhaka.SL.No ID-No Date of Birth Name, District and
Qualification and Date ofjoining
Designation and PresentPosting
Topics of Foreign Training andDuration
Country Inspection Topics and its Duration Comments
1 1-0755 03.04.61 Mr. K.M. Nazim Uddin,
Naogaon, B.Sc.Engr.(Mech.)
30.08.86(AE) 19.03.98 (SDE) 09.12.07(XEN, rev.) 23.04.09(XEN) 29.01.15 (SE, Incharge)
PD (Incharge) Pre-payment MeteringProject, DistributionComilla & MymensinghZone, Dhaka.
1)Orientation & TechnicalTraining With Factory testwitness from 01.05.04 to 07.05.04for 07 days in India. 2) "Approval of EngineeringDrawing Design & Data" forSantaher, 50MW Peaking PowerPlant Construction Project from23.02.11 to 01.03.11 for 07 (seven)days in China.
Page 72
2 1-01707 30.06.79 Mr.Rakash Chakma Rangamati B.Sc.Eng(Elec) 07.06.2006(AE) 21.12.11(SDE) 01.10.14 (XEN, Incharge)
XEN (Incharge) Pre-payment MeteringProject, DistributionComilla & MymensinghZone, Dhaka.
1) Inspection on 12 Meter SteelPole (350 daN-265 Nos. & 450daN-135 Nos. from 07 daysMarch/08 in China. 2) Inspection on Generator for 7(seven) days in 2008 in India. 3) Inspection r for 7 (seven) daysin 2009 in India. 4) Inspection on 11 KVswitchgear against Santahar 50MW and Katakhali 50 MWPeaking Power PlantConstruction Project from13.03.2012 to 20.03.2012 for 7days (excluding travel time) inChina.
3 1-01769 16.11.82 Mr. A.K.M. Anwar Hossain Manikgonj B.Sc.Engr(Mech.) 01.06.09 (AE) 24.12.14 (SDE) 25.06.15 (SDE)
XEN (Incharge) Pre-payment MeteringProject, DistributionComilla & MymensinghZone, Dhaka.
O&M Training on EngineGeneration Unit (HFO fired)at manufacturers' factory”against Gopalganj 100 MWPeaking P/S ConstructionProject from 12/09/2011 to11/10/2011 for 30 days. (Bond for 5 years)
Norway. 1) Factory witness test(Engineering Inspection) StemTurbine & Generator for SteamTurbine aganist Chandpur150MW Combined Cycle PowerStation Construction Project for10 days in China & Hangzhou,China.
4 1-01889 12.01.87 Mr. Nazmul Hasan Bhuiyan Dhaka B.Sc. Engg. (Elect.) 01.12.10 (AE) 06.01.16 (SDE, Incharge) 01911059193 [email protected]
SDE, Incharge Pre-payment MeteringProject, DistributionComilla & MymensinghZone, Dhaka.
Page 73
Consumer AffairsSL.NO. ID No. Date of
BirthName, Dist, Qualification
and Date of JoiningPlace of Posting Field of Training & Duration Country Inspection Comments
1 1-0843 06.05.65 Mrs. Pallabi Zaman,
Rajshahi, B.Sc.Engr.(Elec.),18.2.88(AE) 21.11.99(SDE) 11.10.10 (XEN)
SE (Incharge) Consumer Affair's, PDB,Dhaka.
1)Traning On Planning &Design Against 210 MW.Siddhirgong From 02.09.04 to01 (one) Month 2) Training on "EfficientEnergy Management andRenewable Energy" from21.04.08 to 25.04.08, 05 days. 3) Training on MeterTechnology against SCADAProject from 12.03.15 to28.03.15 .
Russia,
India.
Singapore
1) Inspection against “132KVTransformer from October/10 for07 days in China. 2) "Factory Acceptance Test (FAT)& Technical Orientation Course"against Greater ChittagongPower Distribution Project SCADA-Rehabilitation & Extension inSep/2011 for 07 days or from thedate of actual journey (excludingtravell time) in New Zealand. 3) Inspection on SubstationEquipment & Mateerial againstCentral Zone Power DistributionProject, Mymensingh to from16.07.13 to 22.07.13 in Germany.
2 11-0279 30.10.57 Mr. Md. Abul Kalam Jhalokathi Diploma Engr.(Elec.),
24.07.81 (SAE) 04.11.13 (AE)
AE Consumer Affair's, PDB,Dhaka.
Greater Chittagong Project, SCADASL.No ID-No Date of Birth Name, District and
Qualification and Date ofjoining
Designation and PresentPosting
Topics of Foreign Training andDuration
Country Inspection Topics and its Duration Comments
1 1-0712 30.06.58 Mr. Muhammad JoynalAbedin Feni, B.Sc.Engr.(Elec.),
07.04.86(AE) 04.02.98(SDE) 02.01.05(XEN) 25.01.16 (SE)
PD Greater ChittagongElectricity DistributionProject, SCADArehabilitation, PDB,Chittagong.
1) Power Distribution throughpromotion of TQM from18.3.02 to 18.4.022) MV Switchgear,VD4 and VBF11 days in India(Sept./2003) 3) 33KV Capacitor Bank Gi Dci"Design & Maintenance of33KV Capacitor Bank of GISfrom 20.04.07 to 05.05.07 for 14days.
Japan,
India, Nasic
Germany.
1) "Technical Orientation &Quality Test Witness" of 20 Nos.-Battery Charger from 15.01.14 to21.01.14 in India. 2) Technical orientation &quality test witness againstSCADA Project from 18.01.15 for10 days in NewZealand,Australia & Singapore. 3)Technical orientation &quality test witness againstSCADA project from 24.08.15 to02.09.15 in Singapore &Malaysia.
Page 74
2 1-01384 02.03.71 Mr. Md. Abdul Mannan,Chittagong,B.Sc.Engr.(Elec.),05.03.2000(AE)
25.06.09(SDE) 2.1.2012(XEN, Incharge) 22.02.16 (XEN)
XEN Greater ChittagongElectricity DistributionProject, SCADArehabilitation, PDB,Chittagong.
1) A training titled "SCADACommunication System"against Greater ChittagongElectricity Distribution Project,SCADA rehabilitation, PDB,Chittagong from 19.07.2012 to16.08.2012 2) Training on MeterTechnology against SCADAProject from 12.03.15 to28.03.15 .
NewZealand
Singapore
1) Orientation and TechnicalTraining on Kwh Meter TestingSet at HENAN STAR HI-TECH CO.LTD. from 23.02.06 to 01.03.06 for07 days in Zhenzhou, China,
2) Technical orientation &quality test witness of hardware& software of data centre from08.05.14 to 09.06.14 in Singapore& New Zealand.
3 1-02062 07.01.87 Arpana Barua Chittagong B.Sc. Engg. (Mech.) 17.12.13 (AE)
AE Operation Division,SCADA, PDB, Chittagong.
1) Training on MeterTechnology against SCADAProject from 12.03.15 to28.03.15 .
Singapore
4 Fahmida Jamali AE Greater ChittagongElectricity DistributionProject, SCADArehabilitation, PDB,Chittagong.
1) Pre-shipment inspection of2850 quintal HTS wire from 5-14March/2016 in China.
Solar Street Lighting Program in City Corporation Project, PDB, Dhaka. SL.No ID-No Date of Birth Name, District and
Qualification and Date ofjoining
Designation and PresentPosting
Topics of Foreign Training andDuration
Country Inspection Topics and its Duration Comments
1 1-0388 16.07.57 Mr. Md. Sarwar Hossain,Bogra, B.Sc.Engg. (Elec.)03.10.80 (AE) 19.05.86(SDE) 07.09.99(XEN) 18-8-2011 (SE) 25.08.14 ( Addl. CE) 13.01.15 (CE)
Project Coordinator (CE) Solar Street LightingProgram in CityCorporation Project,PDB, Dhaka.
I) Greater Dhaka Power Dist.Project. 07.01.87 to 16 Weeks.
2) PSCDP training program on"Contract Management (Batch-1)" from 02.09.13 to 13.09.13
U.K.
Thailand
1) Power Transformer FactoryTest Witness From 05.02.2004 to11.02.2004 in China, 2) Technical orientation &quality test witness ofDistribution transformer (pkg-20) from 10.04.14 to 16.04.14 inChina 3)Basic Design Approval ofGhorasal Repowering Projectfrom 27.03.16 to 05.04.16 inChina.
2 1-02074 12.12.84 Mr. H.M. Enamul Haque Bagerhat B.Sc. Engg. (Mech.) 17.12.13 (AE)
AE Solar Street LightingProgram in CityCorporation Project,PDB, Dhaka.
Page 75
3 1-02009 30.11.87 Mr. Md. AsaduzzamanChunnu Madaripur B.Sc.Eng(Elect.) 02-10-11 (AE) 01914781041 [email protected]
AE Solar Street LightingProgram in CityCorporation Project,PDB, Dhaka.
On StudyLeave
Chittagong Zone Electricity Distribution System Development Project, PDB, Chittagong.SL.No ID-No Date of Birth Name, District and
Qualification and Date ofjoining
Designation and PresentPosting
Topics of Foreign Training andDuration
Country Inspection Topics and its Duration Comments
Page 76
1 1-0669 30.12.60 Mr. Md. Abdul Mottalib FaridpurB.Sc.Engg. (Elec.)22.01.84(AE) 09.07.97(SDE) 24.08.03(XEN) 09.03.03(XEN) 28.01.14 (SE) 01755582470
PD (Addl. CE, Incharge)
Electricity DistributionSystem DevelopmentProject, PDB, Chittagong.
1) VCB Lightening Arrester March/05, 7 dyas India. 2) "Factory Test Witness" onMetering & Backup meteringSystem and Current Transformer(CT) from 28.07.09 to 03.08.09 inIndia. 3) Inspection on 33 KV pininsulator, 33 KV disc insulatorand so on from 04.02.13 to07.02.13 in India & from 25.01.13to 31.01.13 in China. 4) Technical orientation &quality test witness from10.04.14 to 14.04.14 in China &.From 27.05.14 to 28.05.14 in India
5) Quality acceptance testagainst Chittagong Hill TrackElectrification Project from07.04.15 to 13.04.15 in SouthKorea & China. 6) Factory acceptance test of 33KV disc insulator against Chitt.zone power dist. system dev.project from 25.10.15 to 31.10.15in India & China.
2 1-0744 10.02.63 Mr. Prabir Kumar Dey,
Chittagong,
B.Sc.Engr.(Elec.),
30.08.86(AE) 19.03.98(SDE) 10.07.05(XEN) 05.04.16 (SE) 01839905724
Deputy PD (SE) ,
Electricity DistributionSystem DevelopmentProject, PDB, Chittagong.
1)Operation andMaintenance of X-former andCkt.Breaker From 09.1.91 to8.4.91 2) Transmission Line DesignFrom 02.8.99 to 2.11.99
China,
Germany& Switzerland
1) Technical Orientation &Quality Test Witness from25.04.14 to 01.05.14 in China. 2) Factory acceptance test of 11KV pin insulator against Chitt.Zone power dist. System dev.Project from 08.11.15 to 14.11.15in India & China.
Page 77
3 1-01424 01.01.71 Mr. Sumanta KumarDebnath, Noakhali, B.Sc.Engr.(Mech.),
05.03.2000(AE) 25.06.09(SDE) 28.06.12 (XEN, in charge) 22.02.16 (XEN)
XEN Electricity DistributionSystem DevelopmentProject, PDB, Chittagong.
1) Supplying of 6mm dia 1000Quintal, 7mm dia 1000 Quintal,8mm dia 600 Quintal & 9mm Dia1400 Quintal High TensileSteel(HTS) Wire, "Pre-shipmentinspection (Foreign)” againstChittagong PC Pole ConstructionPlant, BPDB, Halishahar,Chittagong in June/2011 for 10(Ten) working days from thedate of actual journey in China.
2) Technical orientation &quality test witness 14.04.14 inChina &. From 27.05.14 to28.05.14 in India 3) Factory acceptance test of 33KV post insulator againstChitt.zone power dist. system dev.project from 06.11.15 to 12.11.15in China.4 1-01268 12.04.71 Mr. Md. Shahidul Islam,
Chittagong, B.Sc.Engr.(Elec.),
10.06.99 (AE) 26.07.05 (SDE) 30.07.13 (XEN, Incharge)
XEN (Incharge), Electricity DistributionSystem DevelopmentProject, PDB, Chittagong.
1) Seinar on Bently NevadaVibration monitoring Systemrom 27.08.01 to 31.08.01 fro 05days
2) Workshop Of ControlSystem Up-Gradation Contractfrom 16.05.04 to 28.05.04 for12 Days
3) Training on Control SystemUpgradation of GT Unit-2, GtUnit-3 for 23.02.07 to 08.04.07for 45
Singapore
Japan,
Japan
1)Orientation & TechnicalTraining With Factory TestWitness From 03.05.2004 for 07Days in China, 2) Technical orientation &quality test witness of 33 KV discinsulator against Chit. Dis . Dev.Project from 04.10.15 to 15.10.15in India & China.
5 11-0339 Mr. Mizanur RahmanBhuiyia
SDE Electricity DistributionSystem DevelopmentProject, PDB, Chittagong.
1) Factory aceptance test of discinsulator against Chitt.zonepower dist. System dev. Projectfrom 03.11.15 to 09.11.15 inChina.
Page 78
Rajshahi Zone Electricity Distribution System Development Project, PDB, Rajshahi.SL.No ID-No Date of Birth Name, District and
Qualification and Date ofjoining
Designation and PresentPosting
Topics of Foreign Training andDuration
Country Inspection Topics and its Duration Comments
1 1-0514 29.05.57 Mr. Sabbir SultanRajshahiB.Sc.Engg. (Elec.)31.03.83 (AE) 01.02.92(SDE) 21.01.03(XEN) 10.09.13(SE) 25.01.16(Addl. CE) 01787697196
PD (Addl. CE) Rajshahi ZoneElectricity DistributionSystem DevelopmentProject, PDB, Rajshahi.
1) Power Generation &Distribution from 07.10.89-30.12.90
2)Traning on Gas TurbineAgainst Tongi 80 MW From08.08.04 to 07.10.04 TwoMonth (Bond for 03 Yearsfrom 24.07.04 to 22.08.04) 3) Factory Training againstBheramara Power Stationfrom 01.02.15 to 14.02.15
Germany,
France,
USA
G.O. issued dated25.04.16 for Factoryacceptance test of11 KV Pin Insulatoragainst RajshahiZone power dist.Dev. Project from12.05.16 to 18.05.16in China..
2 1-0920 01.01.62 Mr. Md. Abdul Aziz,Jhinedha,B.Sc.Engr.(Mech.),07.04.86(AE) 11.11.01(SDE) 19.03.98(SDE) 23.04.09(XEN) 25.01.16 (SE)
Deputy PD Rajshahi ZoneElectricity DistributionSystem DevelopmentProject, PDB, Rajshahi.
Extensive Training on ABB'sMV products in their GlobalFeeder Focus Factory (GFFG)from 03.12.06 to 12.12.06
India. 1) Technical Orientation &Quality Test Witness of 11 KVACR from 21.04.15 to 27.04.15 inChina.
Page 79
3 1-01387 14.10.74 Mr. Uttpol Kumer Shaha, Dhaka, B.Sc.Engr.(Elec.),
05.03.2000(AE) 25.06.09(SDE) 2.1.2012 (XEN , Incharge) 22.02.16 (XEN)
XEN Rajshahi ZoneElectricity DistributionSystem DevelopmentProject, PDB, Bogra.
1) ontract No.pur-163/6-project/lot-1/2010/304 Dt.27/10/2010 and Contract No.pur-163/6-project/lot-2/2010/305 Dt.27/10/2010 against DOFC withfuse link, 11 KV Lighting Arrester& 200 Amps MCCB, 100AmpsMCCB, 95 rm Copper Lug & 70 rmCopper Lug against Renovation& Augmentation of DistributionLines & 11/0.4 KV Sub-Stationunder 6(six) Distribution zonefrom December/10 for 07 (seven)days in China 3) “Alternator Inspection”against Santahar 50 MW andKatakhali 50 MW Peaking PowerPlant Construction Project inJuly/2011 for 07 days in SouthKorea. 4) "Quality acceptance Test" of11 KV Auto Circuit Reclosure from03.06.13 to 12.06.13 in Australia.
A proposal sent toministry dated09.05.16 for Pre-deliveryinspection of 11KV Pin insulatoragainst RajshahiZone ElectricityDistributionSystemDevelopmentProject from24.05.16 to 04.06.16in India.
4 1-01289 29.09.71 Mr. Nizamul Haque Sarker Rajshahi, B.Sc.Engr.(Elec.),
24.06.99(AE) 26.07.05(SDE), 21.04.11 (XEN Incharge) 22.02.2016 (XEN)
XEN Rajshahi ZoneElectricity DistributionSystem DevelopmentProject, PDB, Rajshahi.
TQM in Power Distribution, January/05 for 35 days
Japan 1) Workshop on NumericalRelays in MV/LT Systems from27.09.10 to 29.09.10 in India. 2) Technical orientation &quality test witness on 30 Nos.-oil Centrifuging Machine from29.11.13 to 07.12.13 in China.
A proposal sent toministry dated09.05.16 for Pre-deliveryinspection of DiscInsulator againstRajshahi zonepower dist. Dev.Project from15.05.16 to 21.05.16in India & China
Page 80
5 11-0874 01.06.62 Mr.Md. Ismail HossainDiploma engg.25.08. 84 (SAE) 04.02.16 (AE)
AE Rajshahi ZoneElectricity DistributionSystem DevelopmentProject, PDB, Bogra.
A proposal sent toministry dated09.05.16 for Pre-deliveryinspection of 11KV Pin insulatoragainst RajshahiZone ElectricityDistributionSystemDevelopmentProject from24.05.16 to 04.06.16in India.
6 11-0632 01.06.62 Mr.Md. Azim UddinRajshahiDiploma(Civil.)25.08. 84 (SAE) 28.12.15 (AE)
AE Rajshahi ZoneElectricity DistributionSystem DevelopmentProject, PDB, Rajshahi.
G.O. issued dated25.04.16 for Factoryacceptance test of11 KV Pin Insulatoragainst RajshahiZone power dist.Dev. Project from12.05.16 to 18.05.16in China..
Rangpur Zone Electricity Distribution System Development Project, PDB, Rangpur.SL.No ID-No Date of Birth Name, District and
Qualification and Date ofjoining
Designation and PresentPosting
Topics of Foreign Training andDuration
Country Inspection Topics and its Duration Comments
1 1-0626 03.05.59 Mr. Md. Moazzam HossainDewan, Naogaon, B.Sc.Engr.(Elec.),
26.05.85(AE) 09.01.95(SDE) 09.03.04(XEN) 13.01.15 (SE)
PD Rangpur ZoneElectricity DistributionSystem DevelopmentProject, PDB, Rangpur
1) 230 KV Grid Sub-stationOperation and MaintenanceFrom April/1993 toSeptember/1993 +F554
South Korea& Germany
India
1) Pre-shipment Inspectionagainst 33KV ACSR Grossbeak-452.40Km & 33KV ACSR Merlin-346.80Km. And 33KV ACSR DOGConductor-2675.60Km form01.09.08 to 10.09.08 for 10 days inChina. 2)Training against hill Tracts for7 days
A proposal sent toministry dated21.04.16 forTraining ofTechnologytransfer againstChitt. Hill tracksproject from20.05.16 to 26.05.16in India.
Page 81
2 1-01216 01.01.70 Mr. Md. Lutful HaiderChowdhury, Dinajpur, B.Sc.Engr.(Mech.),
19.03.98(AE) 06.10.04(SDE) 31.10.13 (XEN)
XEN, Rangpur ZoneElectricity DistributionSystem DevelopmentProject, PDB, Rangpur
1) Technology TransferTraining against 10- townproject from 13.04.15 to19.04.15
Germany 1) "Work Shop Test" for Dohazari100MW Peaking Power PlantConstruction Project fromJanuary/11 for 07(Seven) days inChina.
3 - - Mr. Motiur Rahman Diploma engg. (SAE) 11.02.2016 (AE)
AE (Incharge) Rangpur ZoneElectricity DistributionSystem DevelopmentProject, PDB, Rangpur
Pre-Payment Metering Pilot Project Distribution Southern Zone, ChittagongSL.No ID-No Date of Birth Name, District and
Qualification and Date ofjoining
Designation and PresentPosting
Topics of Foreign Training andDuration
Country Inspection Topics and its Duration Comments
1 1-0713 05.06.60 Mr. Md. Kamal Uddin,Chittagong,B.Sc.Engr.(Mech.),07.04.86(AE) 04.02.98(SDE) 02.01.05(XEN) 25.01.16 (SE)
PD Pre-Payment MeteringPilot ProjectDistribution SouthernZone, Chittagong
Training on 2000 Nos.-250Amps MCCB.from 28.12.05to 03.01.06 07 days. 2) Training on ForeignTraining from 18.08.08 to29.08.08 for 10 days
China
South Africa
1) Test witness of meteringsystem from 16.05.13 to 18.05.13in India.
2 1-0971 01.04.59 Mr. Mohammed MazharulIslam, Chittagong, AMIE(Elec.),26.07.84(SAE) 21.04.93 (AE) 03.02.03(SDE) 18.08.11 (XEN)
XEN Pre-Payment MeteringPilot ProjectDistribution SouthernZone, Chittagong
1)Traning on Gas TurbineManufacturer CompanyAgainst Tongi 80 MW From07.08.04 for Two Month 2) Training on MeterTechnology against SCADAProject from 12.03.15 to28.03.15 .
France
Singapore
1) "Technical Orientation andQuality test Witness" inAugust/2011 for 10 (Ten) days inChina.
3 1-01978 17-01-83 Mr. Md. Rayhan UddinAhammed Comilla B.Sc. Engg. (Comp.) 02.10.2011 (AE)
AE Pre-Payment MeteringPilot ProjectDistribution SouthernZone, Chittagong