1 DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY Board of Directors Meeting of the Environmental Quality and Operations Committee 5000 Overlook Avenue, SW, Room 407 Thursday, March 15, 2018 9:30 a.m. BY EXCEPTION ONLY * I. Call to Order James Patteson Chairperson 9:30 a.m. II. Path to Asset Management Work Plan Leonard Benson *9:55 a.m. III. Clean Rivers Update Status Carlton Ray 10:05 a.m. IV. Grand Opening of the Clean Rivers Tunnel System Carlton Ray 10:10 a.m. V. Water Main History and Associated Cost Charles Kiely 10:20 a.m. VI. Sewage Pumping Station Flood Protection Status Craig Fricke 10:30 a.m. VII. Action Items Len Benson Joint Use 1. Contract No.: DCFA #463 – AECOM Services of DC, Construction Management Services, Anacostia River Combined Sewer Overflow (CSO) Control Projects, Division Z – Popular Point Pumping Station Replacement and Main Outfall Sewers Diversion 2. Contract No.: DCFA #425 – HDR, Inc., Grit, Screens, and Primary Facilities Upgrades Non Joint Use 1. Contract No. 150220 – Fort Myer Construction Corporation, Division PR-A1-Potomac River Project A1 (GI) *10:40 a.m. VIII. AWTP Status Updates Aklile Tesfaye 1. BPAWTP Performance *10:45 a.m. IX. Water Quality Monitoring Charles Kiely 1. Coliform Testing 2. LCR Compliance Testing Environmental Quality and Operations Committee - I. Call to Order - James Patteson 1
Transcript
Page 1: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

1

DISTRICT OF COLUMBIAWATER AND SEWER AUTHORITY

Board of Directors

Meeting of the Environmental Quality and Operations Committee

5000 Overlook Avenue, SW, Room 407Thursday, March 15, 2018

9:30 a.m.BY EXCEPTION ONLY *

I. Call to Order James PattesonChairperson

9:30 a.m. II. Path to Asset Management Work Plan Leonard Benson

*9:55 a.m. III. Clean Rivers Update Status Carlton Ray

10:05 a.m. IV. Grand Opening of the Clean Rivers Tunnel System Carlton Ray

10:10 a.m. V. Water Main History and Associated Cost Charles Kiely

10:20 a.m. VI. Sewage Pumping Station Flood Protection Status Craig Fricke

10:30 a.m. VII. Action Items Len Benson

Joint Use

1. Contract No.: DCFA #463 – AECOM Services of DC, Construction Management Services, Anacostia River Combined Sewer Overflow (CSO) Control Projects, Division Z – Popular Point Pumping Station Replacement and Main Outfall Sewers Diversion

2. Contract No.: DCFA #425 – HDR, Inc., Grit, Screens, and Primary Facilities Upgrades

Non Joint Use

1. Contract No. 150220 – Fort Myer Construction Corporation, Division PR-A1-Potomac River Project A1 (GI)

*10:40 a.m. VIII. AWTP Status Updates Aklile Tesfaye

1. BPAWTP Performance

*10:45 a.m. IX. Water Quality Monitoring Charles Kiely

1. Coliform Testing2. LCR Compliance Testing

Environmental Quality and Operations Committee - I. Call to Order - James Patteson

1

Page 2: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

2

*10:50 a.m. X. Fire Hydrant Upgrade Program Jason Hughes

1. Status Report of Public Fire Hydrants2. Out of Service Fire Hydrant Map

10:55 a.m. XI. Executive Session*

11:00 a.m. XII. Adjournment James PattesonChairperson

* The DC Water Board of Directors may go into executive session at this meeting pursuant to the District of Columbia Open Meetings Act of 2010, if such action is approved by a majority vote of the Board members who constitute a quorum to discuss: matters prohibited from public disclosure pursuant to a court order or law under D.C. Official Code § 2-575(b)(1); contract negotiations under D.C. Official Code § 2-575(b)(1); legal, confidential or privileged matters under D.C. Official Code § 2-575(b)(4); collective bargaining negotiations under D.C. Official Code § 2-575(b)(5); facility security under D.C. Official Code § 2-575(b)(8); disciplinary matters under D.C. Official Code § 2-575(b)(9); personnel matters under D.C. Official Code § 2- 575(b)(10); proprietary matters under D.C. Official Code § 2-575(b)(11); decision in an adjudication action under D.C. Official Code § 2-575(b)(13); civil or criminal matters where disclosure to the public may harm the investigation under D.C. Official Code § 2-575(b)(14), and other matters provided in the Act.

Follow-up Items from Prior Meetings:

1. Manager, Program Services: Provide updates regarding change order rates and general contract management performance as part of the next CIP quarterly update. [To be included in the CIP Quarterly Update, May 2018]

2. AGM, Wastewater Treatment, DC Water: Provide update of research activities regarding trends and technologies that optimize treatment process capacity and facilitate energy neutral operations. [Target: April 2018 EQ&Ops Cmte Mtg]

3. The IMA Regional Committee (RC) brief the EQ & Ops Cmte on the work of the IMA RC [Target: June 2018 EQ&Ops Cmte Mtg]

4. Chief Financial Officer, DC Water: Include a definition for “Customer Affordability” as part of the discussion on Path to Achieve Asset Management. [Ongoing]

5. Interim General Manager / CEO, DC Water: Provide the Committee with DC Water testimony prepared for DC Council’s Oversight hearing on March 2, 2018. [BOD Secretary distributed to full Board, 2/28/18]

6. Interim General Manager / CEO, DC Water: Will provide the BOD with DC Water response to DOEE Public Notice of proposal to change WQS. [BOD Secretary distributed to full Board, 2/21/18]

7. Chief Engineer, DC Water: Will brief the Cmte regarding certain Engineering SOP pertinent to recommendations for contract award and projection of CIP cashflow. [Target: May 2018 EQ&Ops Cmte Mtg]

8. Chief Engineer, DC Water: Provide update on flood vulnerability and protection of other critical DC Water facilities. [On current agenda]

9. Assistant General Manager, Customer Service: Provide water main break data over the past 10 years. [On current agenda]

Environmental Quality and Operations Committee - I. Call to Order - James Patteson

2

Page 3: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

District of Columbia Water And Sewer Authority

Path to Achieve Asset Management

Environmental Quality & Operations Committee MeetingMarch 15, 2018

Environmental Quality and Operations Committee - 9:30- II. Path to Asset Management Work Plan - Len Benson

3

Page 4: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

2

Path to Achieve Asset Management

Collaborative effort by Residents and Ratepayers, the Board of Directors, and

the Executive Team

• Explore investment in infrastructure

What is needed to fully meet asset management principles?

What are our peer utilities doing?

What is the cost of pro-active investment, as compared with addressing issues as they arise?

• Exploration of alternative revenue sources

What funds could be available, other than from ratepayers?

• Community outreach and education

Explain infrastructure investment, and consequences of investment

Gather ideas about addressing affordability

• Impact on the financial plan

What is the impact on the operating budget, and what is the impact of pro-active investment as compared with addressing issues as they arise?

What could be financed through debt?

What are appropriate levels of PAYGO?

• Customer affordability

What ways can we help ensure affordability?

What are our peer utilities doing to meet this challenge?

Environmental Quality and Operations Committee - 9:30- II. Path to Asset Management Work Plan - Len Benson

4

Page 5: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

Path to Achieve Asset Management Committee Assignments

Explore investment in infrastructure Environmental Quality and Operations

Committee

Exploration of alternative revenue sources Finance and Budget Committee

Community outreach and education Retail Rates Committee

Impact on the financial plan Finance and Budget Committee

Customer affordability Retail Rates Committee

3

Committee Assignments

Committee reviews/discussions are intended to ensure optimization, accountability and transparency throughout the budget preparation process

Environmental Quality and Operations Committee - 9:30- II. Path to Asset Management Work Plan - Len Benson

5

Page 6: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

January 4, 2018 – Full Board Budget Workshop

January 2018 – Committee Meetings• EQ & Ops Committee

• Retail Rates Committee• Finance and Budget Committee

February 2018 – Committee Meetings• EQ & Ops Committee

• Retail Rates Committee

• Finance and Budget Committee

March 1, 2018 – Full Board Meeting• Approved Baseline FY 2018 – FY 2027• Committed to a “Pathway to Asset Management”

March – September• Committee Reviews

November • Budget presented to the Board

4

BOD Discussion and Action Capital Improvement Program (CIP) FY’ 18 thru FY’ 27

Environmental Quality and Operations Committee - 9:30- II. Path to Asset Management Work Plan - Len Benson

6

Page 7: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

April - What are peer utilities experiencing?

• Age of system

• Materials and design

• Service life

• Infrastructure failure experience

• Infrastructure investment approach

April, May & June – What is needed to fully meet asset management principles?

• Current state of repair

• Site visits

5

EQ & Ops Committee Proposed Work Plan

Explore

Investment in

Infrastructure

1. What is needed

to fully meet

asset

management

principles?

2. What are our peer

utilities doing?

3. What is the cost

of pro-active

investment vs.

addressing issues

as they arise.

Environmental Quality and Operations Committee - 9:30- II. Path to Asset Management Work Plan - Len Benson

7

Page 8: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

June – What is the cost of pro-active investment vs. addressing issues as they arise?

• Cost of emergency repairs

Direct costs

Indirect costs

Socioeconomic costs

• Other impacts

Continued failures, breaks, backups, etc

Water quality and discolored water

Continually adjusting priorities & changing plans

Capitalization of emergency repairs

Risk of SSO Consent Decree

Safety

Socioeconomic impacts

• Examples

6

EQ & Ops Committee Proposed Work Plan

Explore

Investment in

Infrastructure

1. What is needed to

fully meet asset

management

principles?

2. What are our peer

utilities doing?

3. What is the cost

of pro-active

investment vs.

addressing

issues as they

arise?

Environmental Quality and Operations Committee - 9:30- II. Path to Asset Management Work Plan - Len Benson

8

Page 9: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

July - What is needed to fully meet asset management principles?

• Review of previously presented scenarios

• Alternative ramp up scenarios

• Tours and site visits

7

EQ & Ops Committee Proposed Work Plan

Explore

Investment in

Infrastructure

1. What is needed

to fully meet

asset

management

principles?

2. What are our peer

utilities doing?

3. What is the cost

of pro-active

investment vs.

addressing issues

as they arise?

Environmental Quality and Operations Committee - 9:30- II. Path to Asset Management Work Plan - Len Benson

9

Page 10: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

District of Columbia Water and Sewer AuthorityHenderson J. Brown, IV, Interim CEO and General Manager

March 15, 2017

Environmental Quality & Operations Committee Meeting

Briefing for:

DC Clean Rivers ProjectQuarterly Update

Briefing on:

Environmental Quality and Operations Committee - *9:55 a.m. III. Clean Rivers Update Status -Carlton Ray

10

Page 11: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

Agenda

Overview

Progress Summary – March 2018 Consent Decree

Progress Summary – Remaining Projects

2

Environmental Quality and Operations Committee - *9:55 a.m. III. Clean Rivers Update Status -Carlton Ray

11

Page 12: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

DC Clean Rivers Project Overview

• DC Clean Rivers Project: $2.7 Billion• Nitrogen Removal: $950 Million• Total > $ 3.5 Billion• 25 yr implementation (2005 – 2030)• 96% reduction in CSOs & flood relief in Northeast Boundary• Approx 1 million lbs/yr nitrogen reduction predicted

DC CLEAN RIVERS PROJECT AND

NITROGEN REMOVAL PROGRAMS

Place in operation by

March 23, 2018

Controls Combined

Sewer OverflowsAddresses Chronic Sewer Flooding

2142

1063

49

3254

1282

638

48

1968

391638

48

1077

54 79 5138

0

500

1000

1500

2000

2500

3000

3500

AnacostiaRiver

PotomacRiver

RockCreek

TotalSystem

CSO

Ove

rflo

w (

mg/

avg

year

)

1996 2017 2018 LTCP Completed

3

Environmental Quality and Operations Committee - *9:55 a.m. III. Clean Rivers Update Status -Carlton Ray

12

Page 13: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

4

Clean Rivers Project Status

W

A

CB E

G N

N

N

HAnacostia River Tunnel - $254 M

Blue Plains Tunnel - $326 M

P First Street Tunnel - $158 M

JNortheast Boundary Tunnel - $580 M

D

I

U

Z

Y

PR-B

RC-A

PR-A

Potomac River Tunnel

S

Kennedy Street GI (by DDOT)

Consent Decree Deadline: Place in operation all Anacostia facilities south of RFK stadium by March 23, 2018

Division Name

W Blue Plains Tunnel Site Prep

A Blue Plains Tunnel

C CSO 019 Overflow and Diversions

B Tingey Street Diversions

E M Street Diversion Sewer

G CSO 007 Diversion Facilities

N Low Impact Development @ DC Water Facilities

P First Street Tunnel

S Irving Street Green Infrastructure

H Anacostia River Tunnel

D JBAB Overflow & Diversion Facilities

I Main Pumping Station Diversions

U Northeast Boundary Util ity Relocations

Z Poplar Point Pumping Station & MOS Diversion

Blue Plains Tunnel Dewatering Pumping Station and

Enhanced Clarification Facility

(Managed by DWE)

PR-B CSO 021 Diversions at Kennedy Center

RC-A Rock Creek Green Infrastructure Project A

RC-B Kennedy Street Green Infrastructure (by DDOT)

J Notheast Boundary Tunnel

PR-A Potomac River GI Project A

-- Potomac Tunnel EA

Completed Projects

Projects in Construction

Y

Projects in Procurement

Projects in Planning

RC-B

Environmental Quality and Operations Committee - *9:55 a.m. III. Clean Rivers Update Status -Carlton Ray

13

Page 14: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

Anacostia River Tunnel System South of RFK Place in operation by March 23, 2018

Z

Blue

Plains

Tunnel

Poplar Point PS

Anacostia River Tun.

Main PS Diversions

Tingey St Div. Sewer

CSO 007

CSO 019

Northeast

Boundary

Tunnel

M St Div. Sewer

First St Tunnel

JBAB Diversions

J

Legend

Completed Construction

A Blue Plains Tunnel

B Tingey Street Diversion Sewer

C CSO 019 Overflow and Diversion Structures

D JBAB Overflow and Potomac Outfall Sewer Diversion

E M Street Diversion Sewer (CSOs 015, 016 and 017)

G CSO 007 Diversion Structure and Diversion Sewer

H Anacostia River Tunnel

I Main Pumping Station Diversions

N LID at DC Water Facilities

P First Street Tunnel

J Northeast Boundary Tunnel

S Irving Street Green Infrastructure

Y Blue Plains Dewatering Pumping Station and ECF

Z Poplar Point Pumping Station Replacement

TDPS / ECF

I

H

D

Place in operation by 3/23/18

All Anacostia CSOs will be intercepted

by the 2018 tunnel system (CSOs 005,

007, 009, 010, 011, 011a, 012, 013, 014,

015, 016, 017, 018 and 019)

Ultimate volume of Anacostia River

tunnel system in 2023 (from Blue Plains

to Northeast area of the District) is about

190 million gallons

Volume provided in 2018 (Blue Plains to

RFK) is more than 100 million gallons

5

Environmental Quality and Operations Committee - *9:55 a.m. III. Clean Rivers Update Status -Carlton Ray

14

Page 15: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

MAJOR ACCOMPLISHMENTS FY 2017 4TH QUARTER UPDATE FORMARCH 2018 CONSENT DECREE

6

PROGRESS SUMMARY

Environmental Quality and Operations Committee - *9:55 a.m. III. Clean Rivers Update Status -Carlton Ray

15

Page 16: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

Division D – JBAB Overflow and Diversion Structures StatusKey MapComplete:

Drop shaft cover waterproofing and backfill

Architectural finishes

Electrical and instrumentation fit-out

Startup and testing – at JBAB and remainder of tunnel sites

Remaining:

Substantial completion achieved in February 2018

7

Overflow Structure Veneer Stone Wall Tide Gate in Overflow Structure

Environmental Quality and Operations Committee - *9:55 a.m. III. Clean Rivers Update Status -Carlton Ray

16

Page 17: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

Key Map

Division H – Anacostia River Tunnel Project Status

Electrical and instrumentation hookups

Startup and testing

Removal of temporary bulkheads

Complete:

CSO 019

CSO 018

M Street

CSO 007

CSO 005

Poplar Point

Remaining:

Substantial completion achieved in February 2018

8

CSO 018 Shaft and Near Surface Structures M Street Shaft Waterproofing

CSO 018 Upper Area Ventilation Control Vault ART Tunnel

Environmental Quality and Operations Committee - *9:55 a.m. III. Clean Rivers Update Status -Carlton Ray

17

Page 18: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

Division I – Main Pumping Station Diversions Project Status

Key Map

Ting

ey St.,

SE

O StreetPS

Main PS

Tiber Creek SewerCS0 012

CS0 011

CS0 011a

CS0 009

CS0 010

B Street/New Jersey Ave Sewer Canal St

Sewer

N Tiber Creek Diversion Chamber

B Street/ New Jersey Ave &

CSO 009 Diversion Chamber

Shaft

Tide Gate and Ventilation

Control Chambers

Complete:

CSO

009/011

A

Main

Pumping

Station

Drop

Shaft

(MPS-DS)

(By

others)

CSO

012

Surge

Storage

Electrical and instrumentation fit-out

Startup and testing

Punch list

Remaining:

Substantial completion achieved on February 15, 2018

9

Surge Tank / Conjunction Chamber Facade

Ventilation Control Facility

Environmental Quality and Operations Committee - *9:55 a.m. III. Clean Rivers Update Status -Carlton Ray

18

Page 19: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

Division Z – Poplar Point Pumping Station Status

• Start of Operational Demonstration occurred on February 13, 2018

• Consent Decree obligations can be met after sufficient operation

has been performed in core function (pumping sewage) to

demonstrate facility operation

10

Main Outfall Sewer Diversion Chamber

Poplar Point Pump Station Building Facade

Odor Control Equipment

Key Map

Pump Room

Environmental Quality and Operations Committee - *9:55 a.m. III. Clean Rivers Update Status -Carlton Ray

19

Page 20: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

AECOM Construction Management Contract

Item Value

Original Contract Value $ 4,891,074.00

Supplemental Agreement #1 $ 1,992,719.57

Subtotal $ 6,883,793.57

Proposed Supplemental Agreement #2 $ 740,000.00

Total $ 7,623,793.57

11

Budget

TimeItem Value

Notice to Proceed Oct 22, 2014

Original Duration 958 days

Supplemental Agreements #1 + #2 549 days

Final Completion Dec 31, 2018

DC Water Board in May 2017

14% of construction cost

Environmental Quality and Operations Committee - *9:55 a.m. III. Clean Rivers Update Status -Carlton Ray

20

Page 21: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

Rationale for Supplemental Agreement #2

AECOM has performed well to date

Value of supplemental agreement is based on:

Time for construction contractor to compete project

Estimate of staff required to address outstanding construction work,

punch list, startup and closeout activities

Staff will be reduced as the project slows down

Less expensive to keep CM on board than to address in another

manner

Would lose historical knowledge

Would take time to get someone else up to speed

12

Environmental Quality and Operations Committee - *9:55 a.m. III. Clean Rivers Update Status -Carlton Ray

21

Page 22: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

Anacostia River Tunnel Commissioning Awareness

Consent Decree: System south of RFK must be placed in operation by March 23, 2018

Plan for how to accomplish is included in each of the existing contractor’s work requirements (all Divisions)

Follow up global commissioning awareness meeting held January 12, 2018

Monthly coordination meetings between contractors with interfaces

Important because of interconnections in system

All ART System Project CSO Controls are active (starting from February 28, 2018)

• Attended by multiple DC Water Departments, contractors, CMs and engineers

• Make sure plan is coordinated – get everyone on the same page

• Address safety• Address contractor interfaces and scheduling• Identify issues, areas for improvements

13

Tunnel System Schematic – South

of RFK Stadium

Be ready to receive flow March 23, 2018

Environmental Quality and Operations Committee - *9:55 a.m. III. Clean Rivers Update Status -Carlton Ray

22

Page 23: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

MAJOR ACCOMPLISHMENTS FY 2017 4TH QUARTER UPDATE FORREMAINING PROJECTS

14

PROGRESS SUMMARY

Environmental Quality and Operations Committee - *9:55 a.m. III. Clean Rivers Update Status -Carlton Ray

23

Page 24: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

555555555555555555

Division U – Northeast Boundary Tunnel Utility Relocations

15

Purpose: Clear surface work sites to make way for NEBT Tunnel Contractor

Contractor achieved Substantial Completion on November 27, 2017

Remaining work includes punch list items, Pepco, WG, Verizon, and

some weather dependent activities such as paving

Project completed under budget Zone

to be

cleared

of

utilities

Example: 4th & Rhode Island Ave NE

Key Map

Rhode Island Ave – Pepco Manhole

Restoration work at 6th Street

Ultrasonic Thickness Testing on 48” Water main

Contractor: Fort Myer Construction CorporationContract Price: $16.99M - Percent Complete: 96%

Financials as of February 1, 2018

Environmental Quality and Operations Committee - *9:55 a.m. III. Clean Rivers Update Status -Carlton Ray

24

Page 25: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

Division J – Northeast Boundary Tunnel

111111111111111111111111111 16

Commissioned Tunnel Boring Machine

on 1/23/2018

Approved major Design Packages

including CSO 019 Final TBM

Breakout, W St. Final MOT and Temp

Site Work, Mt. Olivet Rd 60% SOE

Approved CSO 019 60% Force Main

Relocation Maintenance of Flow

Mobilizing to CSO 019 site on 3/5/18

Mobilizing to Mt Olivet site on 3/14/18

Mobilizing to W St. site on 4/20/18

TBM arrival expected on 4/16/18

Milestone Date

NTP September 15, 2017

Construction Start March 2018

Construction Complete August 2023

Key Map

Design-Builder: Salini Impregilo Healy JVContract Price: $580M - Percent Complete: 3%

Financials as of February 1, 2018

Environmental Quality and Operations Committee - *9:55 a.m. III. Clean Rivers Update Status -Carlton Ray

25

Page 26: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

Division PR-B – CSO 021 Diversion Facilities (Kennedy Center)

Structure will intercept flows from CSO 021 and

redirect them to future Potomac River Tunnel

during wet weather

Completed construction of ~75% of Diversion Chamber

Drop/Vent structure ~ 80% complete

Ventilation Control Facility (VCF) ~ 80% complete

Financials as of February 1, 2018

Design-Builder: Davis ConstructionContract Price: $33.95M - Percent Complete: 83%

17

DCCR pat of site

Clean Rivers - CSO 021 Diversion Facilities Kennedy Center for the Performing Arts (KCPA) Expansion

Rehearsal space, parking garage, pavilions,

reflecting pool and other enhancements

constructed by KCPA

Key Map

Installation of Flume Pipe for 108” Outfall Sewer

Regular coordination on

a tight construction site

DC Water under contract with Davis Construction Kennedy Center is proceeding with Whiting Turner to complete the project

Environmental Quality and Operations Committee - *9:55 a.m. III. Clean Rivers Update Status -Carlton Ray

26

Page 27: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

tttttttttttttttttttttttttttttttttt

Division RC-A – Rock Creek GI Project A

Project Boundary:

18

Key Map

Project facilities are being designed, permitted, and

constructed in three phases:

Phases 1/1A and 2: Design and permitting complete;

construction underway

Phase 3: Design and permitting underway; alley

permeable pavement construction underway

Construction started in September 2017

Construction progress

Phase 1 – 80% complete

Phase 1A – 50% complete

Phase 2 – 25% complete

Phase 3 – 12% complete

Financials as of February 1, 2018

Design-Builder: Anchor ConstructionContract Price: $27M - Percent Complete: 25%

Functional testing of completed

facilities started in October 2017

Project scheduled to be placed in

operation by March 30, 2019

Environmental Quality and Operations Committee - *9:55 a.m. III. Clean Rivers Update Status -Carlton Ray

27

Page 28: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

11111111111111111111111111

Division PR-A – Potomac River Project A

19

Project Boundary:

Key Map

Procurement underway

Project includes:

Planter

Bioretention

Alley Permeable

Pavement

Parking Lane

Permeable

Pavement

Item Status

Contract Award April 9, 2018

Construction NTP April 30, 2018

Place in Operation CD Deadline June 23, 2019

Environmental Quality and Operations Committee - *9:55 a.m. III. Clean Rivers Update Status -Carlton Ray

28

Page 29: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

Division PR-A – Potomac River Project ABids, Recommendation, and Next Steps

Bids received on February 14, 2018 included:

Anchor Construction Corporation $8,984,628.00

Corman Kokosing Construction Company $10,010,290.00

Fort Myer Construction Corporation $6,265,502.47

Engineer’s Estimate $7,763,663.46

It is recommended that Fort Myer Construction Corporation be awarded the

Division PR-A1 Construction Contract in the amount of $6,265,502.47

Next steps:

20

Event Date

EQ & Ops Committee March 15, 2018

Board of Directors Meeting April 5, 2018

Contract Award April 9, 2018

Notice to Proceed April 30, 2018

Environmental Quality and Operations Committee - *9:55 a.m. III. Clean Rivers Update Status -Carlton Ray

29

Page 30: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

Drain the Rain! Rock Creek and Potomac Green Infrastructure Project Areas

Voluntary, Free Downspout Disconnection Program with Rain

Barrels

Contracted with Rock Creek Conservancy

Pilot implementation completed - Over 120 downspout

disconnections completed to date

Canvassing and installations to begin in additional

neighborhoods in Spring 2018

Key Map

21

Environmental Quality and Operations Committee - *9:55 a.m. III. Clean Rivers Update Status -Carlton Ray

30

Page 31: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

Kennedy Street GI Challenge Streetscape Project Kennedy Street Green Infrastructure

Streetscape Project

Being constructed and managed with

District Department of

Transportation’s (DDOT) Kennedy

Street Improvements Project

Construction of GI is underway and

DDOT anticipates completion in

Spring 2018. Groundbreaking – October 21, 2016

DC Water GI Challenge

Streetscape

(100 Block Kennedy Street NW)

DDOT – Kennedy Street NW Improvement

(Georgia Avenue – New Hampshire Avenue NW)

Key Map

22

Environmental Quality and Operations Committee - *9:55 a.m. III. Clean Rivers Update Status -Carlton Ray

31

Page 32: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

Green Jobs MOA:GI Certification Program

Status: Training:

Three rounds of training completed Fall

2016, Spring 2017, and Fall 2017

Next DC training to be held beginning in

April 2018

Interested candidates should attend

mandatory informational session on March

21 (registration: tinyurl.com/GI2018MAR)

Exam:

Third National GI Certification Program

(NGICP) exam held November 14, 2017

15 Partner jurisdictions, in addition to DC Water,

formalized to date (commitments totaling over

$500K)

Third Train-the-Trainer workshop to be held in

San Francisco March 7-9, 2018

Website: www.ngicp.org

23

Environmental Quality and Operations Committee - *9:55 a.m. III. Clean Rivers Update Status -Carlton Ray

32

Page 33: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

Green Alley Partnership with DDOT

DC Water has partnered with

DDOT to construct permeable

pavement with alley work

Standard green alley approach to

facilitate construction and permitting

Blanket permit via Department of

Energy and Environment secured to

allow for fast implementation

AlleyPalooza 5 launched April 20,

2017

DC Water funding construction of

seven alleys (six in Rock Creek and

one in Potomac River) under Green

Alley Partnership

24

AlleyPalooza 5 Kickoff – April 20, 2017

Key Map

Benefits:• Reduces costs for DC Water’s GI Program for

CSO control• Advances District’s Sustainable DC Plan• Reduces disruption for residents

Rock Creek Sewershed Alleys in Green Alley Partnership

Environmental Quality and Operations Committee - *9:55 a.m. III. Clean Rivers Update Status -Carlton Ray

33

Page 34: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

DC Clean Rivers Schedule

Time now

25

Com

plet

edM

arch

201

8

CD

Dea

dlin

e M

arch

202

5G

oal 2

023

Oth

er

1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

W Blue Plain Tunnel Site PrepA Blue Plain Tunnel (D/B)C CSO 019 Overflow and DiversionsB Tingey Street Diversions (D/B)E M Street Diversion Sewer (CSOs 015, 016 and 017)N Low Impact DevelopmentG CSO 007P First Street NW Tunnel (D/B)S Irving Street Green Infrastructure (GI)

H Anacostia River Tunnel (D/B)D JBAB Overflow and Potomac Outfall Sewer Div. (D/B)I Main PS Diversions (D/B)Z Poplar Point PS Replacement and MOS DiversionY Tunnel Dewatering Pumping Station and ECF (D/B) Thru May 2023

U Advance Utiltiy Relocation NEBTJ Northeast Boundary Tunnel (D/B)

PR-B CSO 021 Diversion FacilityPR-A Potomac GI Project 1RC-A Rock Creek GI Project 1

Kennedy Center StreetscapeAlley Palooza

Design Contractor Procurement Permitting / Engineering Construction Completed

DIV DC Clean Rivers Jobs

Thru Dec 2022

CY 2010 CY 2011 CY 2018CY 2013 CY 2014 CY 2015 CY 2016 CY 2017CY 2012

Thru March 2019

A/E Procurement

Environmental Quality and Operations Committee - *9:55 a.m. III. Clean Rivers Update Status -Carlton Ray

34

Page 35: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

FY2017 Spending Status

26

Clean Rivers is on track to meet its planned FY18 spending.

Environmental Quality and Operations Committee - *9:55 a.m. III. Clean Rivers Update Status -Carlton Ray

35

Page 36: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

Clean Rivers Budget for Completed Contracts

27

$-

$50,000,000

$100,000,000

$150,000,000

$200,000,000

$250,000,000

$300,000,000

$350,000,000

Blue PlanisTunnel

Tingey StreetDiversions

CSO 019Diversion and

OverflowStructures

M StreetDiversions

Irving StreetGreen

Infrastructure

Low ImpactDevelopment

First StreetTunnel

Blue PlainsTunnel Site

Prep

33

0,5

61

,00

0

16

,05

6,5

73

27

,89

0,0

00

29

,75

0,0

00

5,1

40

,74

0

3,5

83

,75

7

15

7,6

75

,00

0

6,5

56

,00

0

31

8,7

35

,11

9

15

,55

3,4

24

25

,60

6,4

21

33

,30

8,0

17

5,4

61

,23

9

3,2

29

,04

1

15

5,3

97

,34

3

7,2

87

,85

2

Clean Rivers Budget Performance

Contract Budget Cost at Completion

Overall Clean Rivers is $12.6 M under budget for construction contracts that are completed

Blue Plains Tunnel

Environmental Quality and Operations Committee - *9:55 a.m. III. Clean Rivers Update Status -Carlton Ray

36

Page 37: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

Clean Rivers Budget for Active Contracts

28

Clean Rivers expenditures to date on active contracts are not expected to exceed budget

Environmental Quality and Operations Committee - *9:55 a.m. III. Clean Rivers Update Status -Carlton Ray

37

Page 38: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

DC Water Delivers on a Cleaner Anacostia River

Grand Opening of the Clean Rivers Tunnel System! Come Join Us!

Looking forward to celebrating March 22, 2018

Location: 2600 Independence Avenue SE

(near RFK Stadium’s Lot 8)

Time: 1-2:30 pm

29

Environmental Quality and Operations Committee - *9:55 a.m. III. Clean Rivers Update Status -Carlton Ray

38

Page 39: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

water main break review:

a brief review of an operational norm

Environmental Quality and Operations Committee

Thursday March 15, 2018

Environmental Quality and Operations Committee - 10:10 a.m. V. Water Main History and Associated Cost -Charles Kiely

39

Page 40: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

agenda

q&aops

initiatives

water quality did it

by the dollar

how cold is too cold

historical glance

Environmental Quality and Operations Committee Meeting20180315 2

Environmental Quality and Operations Committee - 10:10 a.m. V. Water Main History and Associated Cost -Charles Kiely

40

Page 41: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

agenda

q&aops

initiatives

water quality did it

by the dollar

how cold is too cold

historical glance

Environmental Quality and Operations Committee Meeting20180315 3

Environmental Quality and Operations Committee - 10:10 a.m. V. Water Main History and Associated Cost -Charles Kiely

41

Page 42: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

historical glance: by the year

reported main breaks per fiscal year

Environmental Quality and Operations Committee Meeting20180315 4

434

553485

539

310

417

550 584

433 408

--

100

200

300

400

500

600

700

2008 2009 2010 2011 2012 2013 2014 2015 2016 2017Reported Main Breaks

Environmental Quality and Operations Committee - 10:10 a.m. V. Water Main History and Associated Cost -Charles Kiely

42

Page 43: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

historical glance: by comparison

• how do we compare?• National average: 25 breaks / 100 miles

of pipe

• DC Water: 30.6 breaks / 100 miles of pipe in FY 2017

• Based on the 2017 AWWA Utility Benchmarking Survey, breaks per 100 mile for combined utilities ranged from 10 to 49.

Environmental Quality and Operations Committee Meeting20180315 5

Environmental Quality and Operations Committee - 10:10 a.m. V. Water Main History and Associated Cost -Charles Kiely

43

Page 44: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

agenda

q&aops

initiatives

water quality did it

by the dollar

how cold is too cold

historical glance

Environmental Quality and Operations Committee Meeting20180315 6

Environmental Quality and Operations Committee - 10:10 a.m. V. Water Main History and Associated Cost -Charles Kiely

44

Page 45: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

how cold is too cold?

20180315 Environmental Quality and Operations Committee Meeting 7

0

50

100

150

200

250

Reported Main Breaks Per Month

FY 2013 FY 2014 FY 2015 FY 2016 FY 2017

Environmental Quality and Operations Committee - 10:10 a.m. V. Water Main History and Associated Cost -Charles Kiely

45

Page 46: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

how cold is too cold?

20180315 Environmental Quality and Operations Committee Meeting 8

0

50

100

150

200

250

Reported Main Breaks Per Month

FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018

Environmental Quality and Operations Committee - 10:10 a.m. V. Water Main History and Associated Cost -Charles Kiely

46

Page 47: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

how cold is too cold?

20180315 Environmental Quality and Operations Committee Meeting 9

0

50

100

150

200

250

Reported Main Breaks Per Month

FY 2018

Environmental Quality and Operations Committee - 10:10 a.m. V. Water Main History and Associated Cost -Charles Kiely

47

Page 48: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

how cold is too cold?

20180315 Environmental Quality and Operations Committee Meeting 10

0

50

100

150

200

250

Reported Main Breaks Per Month

FY 2018

Environmental Quality and Operations Committee - 10:10 a.m. V. Water Main History and Associated Cost -Charles Kiely

48

Page 49: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

how cold is too cold?

20180315 Environmental Quality and Operations Committee Meeting 11

02468

101214161820

12

/1/2

01

7

12

/2/2

01

7

12

/3/2

01

7

12

/4/2

01

7

12

/5/2

01

7

12

/6/2

01

7

12

/7/2

01

7

12

/8/2

01

7

12

/9/2

01

7

12

/10

/20

17

12

/11

/20

17

12

/12

/20

17

12

/13

/20

17

12

/14

/20

17

12

/15

/20

17

12

/16

/20

17

12

/17

/20

17

12

/18

/20

17

12

/19

/20

17

12

/20

/20

17

12

/21

/20

17

12

/22

/20

17

12

/23

/20

17

12

/24

/20

17

12

/25

/20

17

12

/26

/20

17

12

/27

/20

17

12

/28

/20

17

12

/29

/20

17

12

/30

/20

17

12

/31

/20

17

1/1

/20

18

1/2

/20

18

1/3

/20

18

1/4

/20

18

1/5

/20

18

1/6

/20

18

1/7

/20

18

1/8

/20

18

1/9

/20

18

1/1

0/2

01

8

1/1

1/2

01

8

1/1

2/2

01

8

1/1

3/2

01

8

1/1

4/2

01

8

1/1

5/2

01

8

1/1

6/2

01

8

1/1

7/2

01

8

1/1

8/2

01

8

1/1

9/2

01

8

1/2

0/2

01

8

1/2

1/2

01

8

1/2

2/2

01

8

1/2

3/2

01

8

1/2

4/2

01

8

1/2

5/2

01

8

1/2

6/2

01

8

1/2

7/2

01

8

1/2

8/2

01

8

1/2

9/2

01

8

1/3

0/2

01

8

1/3

1/2

01

8

Reported Main Breaks by Day vs Average Daily Temperature

Reported Main Breaks

16◦F25-20◦F 60-20◦F45-55◦F 25-40◦F 35-50◦F 55-30◦F

Environmental Quality and Operations Committee - 10:10 a.m. V. Water Main History and Associated Cost -Charles Kiely

49

Page 50: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

how cold is too cold?

20180315 Environmental Quality and Operations Committee Meeting 12

02468

101214161820

12

/1/2

01

7

12

/2/2

01

7

12

/3/2

01

7

12

/4/2

01

7

12

/5/2

01

7

12

/6/2

01

7

12

/7/2

01

7

12

/8/2

01

7

12

/9/2

01

7

12

/10

/20

17

12

/11

/20

17

12

/12

/20

17

12

/13

/20

17

12

/14

/20

17

12

/15

/20

17

12

/16

/20

17

12

/17

/20

17

12

/18

/20

17

12

/19

/20

17

12

/20

/20

17

12

/21

/20

17

12

/22

/20

17

12

/23

/20

17

12

/24

/20

17

12

/25

/20

17

12

/26

/20

17

12

/27

/20

17

12

/28

/20

17

12

/29

/20

17

12

/30

/20

17

12

/31

/20

17

1/1

/20

18

1/2

/20

18

1/3

/20

18

1/4

/20

18

1/5

/20

18

1/6

/20

18

1/7

/20

18

1/8

/20

18

1/9

/20

18

1/1

0/2

01

8

1/1

1/2

01

8

1/1

2/2

01

8

1/1

3/2

01

8

1/1

4/2

01

8

1/1

5/2

01

8

1/1

6/2

01

8

1/1

7/2

01

8

1/1

8/2

01

8

1/1

9/2

01

8

1/2

0/2

01

8

1/2

1/2

01

8

1/2

2/2

01

8

1/2

3/2

01

8

1/2

4/2

01

8

1/2

5/2

01

8

1/2

6/2

01

8

1/2

7/2

01

8

1/2

8/2

01

8

1/2

9/2

01

8

1/3

0/2

01

8

1/3

1/2

01

8

Reported Main Breaks by Day vs Average Daily Temperature

Reported Main Breaks

IMT Activation

16◦F25-20◦F 60-20◦F45-55◦F 25-40◦F 35-50◦F 55-30◦F

Environmental Quality and Operations Committee - 10:10 a.m. V. Water Main History and Associated Cost -Charles Kiely

50

Page 51: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

how cold is too cold?

• break activity has been mostly seasonal

• pipe condition plays a roleo age, material type, etc.

• system information is very criticalo valve status

opumping operations

oCIP planning

Environmental Quality and Operations Committee Meeting20180315 13

Environmental Quality and Operations Committee - 10:10 a.m. V. Water Main History and Associated Cost -Charles Kiely

51

Page 52: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

agenda

q&aops

initiatives

water quality did it

by the dollar

how cold is too cold

historical glance

Environmental Quality and Operations Committee Meeting20180315 14

Environmental Quality and Operations Committee - 10:10 a.m. V. Water Main History and Associated Cost -Charles Kiely

52

Page 53: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

by the dollar • the average main break costs have

fluctuated between $8,000.00 -$20,000.00 per location

• operational overtime, contractor costs, and public restoration costshave been leading contributors to increased costs.

• annual expenditures in these areas have continued to expand and contract

Environmental Quality and Operations Committee Meeting20180315 15

Environmental Quality and Operations Committee - 10:10 a.m. V. Water Main History and Associated Cost -Charles Kiely

53

Page 54: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

by the dollar

20180315 Environmental Quality and Operations Committee Meeting 16

$10,394

$8,608 $8,811 $7,680

$5,809 $6,017

$8,680 $7,470

$9,023

$0

$2,000

$4,000

$6,000

$8,000

$10,000

$12,000

FY2009 FY2010 FY2011 FY2012 FY2013 FY2014 FY2015 FY2016 FY2017

water ongoing capital expenditures($1,000’s)

WOG

Environmental Quality and Operations Committee - 10:10 a.m. V. Water Main History and Associated Cost -Charles Kiely

54

Page 55: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

by the dollar

20180315 Environmental Quality and Operations Committee Meeting 17

FYSPECIAL PROJECTS

HIGH COST JOBS > $100,000

TOTAL

# COST # COST

FY 13 2 $846,140.93 3 $641,915.14 $1,488,056.07

FY 14 0 $0.00 2 $489,205.56 $489,205.56

FY 15 0 $0.00 6 $1,025,803.27 $1,025,803.27

FY 16 0 $0.00 7 $917,134.82 $917,134.82

FY 17 3 $657,301.89 4 $770,920.61 $1,428,222.50

5 $1,503,442.82 22 $3,844,979.40 $5,348,422.22

Environmental Quality and Operations Committee - 10:10 a.m. V. Water Main History and Associated Cost -Charles Kiely

55

Page 56: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

by the dollar

20180215 Environmental Quality and Operations Committee Meeting 18

HIGH COST JOBS FISCAL YEAR

REPAIR RESTORATION COST

4th St & M St SW 16 $69,540.79 $37,658.84 $107,199.63

14th St & New York Ave NW 16 $68,694.68 $32,246.78 $100,941.46

4560 Macarthur Blvd NW 17 $58,486.90 $354,364.04 $412,850.94

1818 Kalorama Rd NW 17 $12,773.61 $96,180.03 $108,953.64

16th St & Somerset Pl NW 17 $86,663.62 $26,174.55 $112,838.17

Environmental Quality and Operations Committee - 10:10 a.m. V. Water Main History and Associated Cost -Charles Kiely

56

Page 57: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

by the dollar • 4560 MacArthur Blvd., NW Main

RepairoReported: May 17, 2017oRepaired: May 19, 2017 oRepair: 30-inch broken water main

repaired and a new 6-inch blow off valve installed

oAsset Data:o Main – 30-inch cast irono Org. Installed – 01.01.1860

o ~157 years oldowith 86% of the costs towards roadway

restoration

Environmental Quality and Operations Committee Meeting20180315 19

Environmental Quality and Operations Committee - 10:10 a.m. V. Water Main History and Associated Cost -Charles Kiely

57

Page 58: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

by the dollar • 1818 Kalorama Road, NW Main Repair

oReported: November 16, 2016

oRepaired: November 17, 2016

oRepair: 6-inch broken water main repaired (main broke two additional times during recharge)

oAsset Data:o Main – 6-inch cast iron

o Org. Installed – 07.11.1893

o ~123 years old!

owith 88% of the costs towards roadway restoration

Environmental Quality and Operations Committee Meeting20180315 20

Environmental Quality and Operations Committee - 10:10 a.m. V. Water Main History and Associated Cost -Charles Kiely

58

Page 59: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

by the dollar

20180315 Environmental Quality and Operations Committee Meeting 21

$594,085.44

$156,883.31

$481,024.18$599,249.40

$183,952.58

$47,829.70

$332,322.25

$544,779.09 $317,885.42

$586,968.03

$0.00

$200,000.00

$400,000.00

$600,000.00

$800,000.00

$1,000,000.00

$1,200,000.00

FY 13 FY 14 FY 15 FY 16 FY 17

repair vs restoration cost

Repair Restoration

Environmental Quality and Operations Committee - 10:10 a.m. V. Water Main History and Associated Cost -Charles Kiely

59

Page 60: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

agenda

q&aops

initiatives

water quality did it

by the dollar

how cold is too cold

historical glance

Environmental Quality and Operations Committee Meeting20180315 22

Environmental Quality and Operations Committee - 10:10 a.m. V. Water Main History and Associated Cost -Charles Kiely

60

Page 61: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

water quality did it

• they tried to tell us• get the unlined cast iron out

• 1350 miles of pipe in the water distribution system• approximately 740 miles are unlined cast iron

• creates water quality challenges• not always the oldest pipe

Environmental Quality and Operations Committee Meeting20180315 23

Environmental Quality and Operations Committee - 10:10 a.m. V. Water Main History and Associated Cost -Charles Kiely

61

Page 62: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

water quality did it

• routine flushing within 83 areas every 1-4 months to maintain clear water

• that’s approximately 12,540 homeso ~ 3 blocks per area

o ~ 50 homes per block

• working to keep it clear

Environmental Quality and Operations Committee Meeting20180315 24

Environmental Quality and Operations Committee - 10:10 a.m. V. Water Main History and Associated Cost -Charles Kiely

62

Page 63: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

water quality did it

• ice slurry traveling down the main

Environmental Quality and Operations Committee Meeting20180315 25

Environmental Quality and Operations Committee - 10:10 a.m. V. Water Main History and Associated Cost -Charles Kiely

63

Page 64: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

water quality did it

• ice pigging results

Environmental Quality and Operations Committee Meeting20180315 26

Environmental Quality and Operations Committee - 10:10 a.m. V. Water Main History and Associated Cost -Charles Kiely

64

Page 65: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

agenda

q&aops

initiatives

water quality did it

by the dollar

how cold is too cold

historical glance

Environmental Quality and Operations Committee Meeting20180315 27

Environmental Quality and Operations Committee - 10:10 a.m. V. Water Main History and Associated Cost -Charles Kiely

65

Page 66: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

operational initiatives

• continued in-house main replacementso removing unlined cast mainso small areas/neighborhoods with highest complaintso dedicated internal operational resources (with support from DETS)

• improved efficiencies o L.A.M.B.o data collection and analysis o improved valve system datao cost effective system analysis (i.e. RedZone)

• continue to highlight and support addressing the WQ challenges in the system

• all working towards providing outstanding customer service.

20180315 Environmental Quality and Operations Committee Meeting 28

Environmental Quality and Operations Committee - 10:10 a.m. V. Water Main History and Associated Cost -Charles Kiely

66

Page 67: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

operational initiatives • in-house main replacement (example)

Evarts St NE Main Replacement & Upgrade Project

oReplace approx. 315 feet of water main

oUpgrade 11 lead service lines

oConstruction start: May 2018

oConstruction completion*: August 2018

oAsset Data:o Main – 8-inch cast iron

o Org. Installed – 06/24/1920

o ~98 years old

Environmental Quality and Operations Committee Meeting20180315 29

Environmental Quality and Operations Committee - 10:10 a.m. V. Water Main History and Associated Cost -Charles Kiely

67

Page 68: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

operational initiatives

• continued in-house main replacementso removing unlined cast mainso small areas/neighborhoods with highest complaintso dedicated internal operational resources (with support from DETS)

• improved efficiencies o L.A.M.B.o data collection and analysis o improved valve system datao cost effective system analysis (i.e. RedZone)

• continue to highlight and support addressing the WQ challenges in the system

• all working towards providing outstanding customer service.

20180315 Environmental Quality and Operations Committee Meeting 30

Environmental Quality and Operations Committee - 10:10 a.m. V. Water Main History and Associated Cost -Charles Kiely

68

Page 69: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

agenda

q&aops

initiatives

water quality did it

by the dollar

how cold is too cold

historical glance

Environmental Quality and Operations Committee Meeting20180315 31

Environmental Quality and Operations Committee - 10:10 a.m. V. Water Main History and Associated Cost -Charles Kiely

69

Page 70: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

q&a

Environmental Quality and Operations Committee Meeting20180315 32

Environmental Quality and Operations Committee - 10:10 a.m. V. Water Main History and Associated Cost -Charles Kiely

70

Page 71: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

Environmental Quality and Operations Committee Meeting20180315 33

Environmental Quality and Operations Committee - 10:10 a.m. V. Water Main History and Associated Cost -Charles Kiely

71

Page 72: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

Environmental Quality and Operations Committee Meeting20180315 34

Environmental Quality and Operations Committee - 10:10 a.m. V. Water Main History and Associated Cost -Charles Kiely

72

Page 73: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

Sewage Pumping StationsFlood Protection Status

O Street Sewage Pumping Station

Main Sewage Pumping Station

Main sewage pumping station

Environmental Quality and Operations Committee - 10:20 a.m. VI. Sewage Pumping Station Flood Protection Status- Craig Fricke

73

Page 74: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

2

Agenda

Introduction / Background

Pumping Station Risk Categorization

Proposed Main Pumping Station Flood Hardening Project

O Street Pumping Station and Headquarters

O Street Sewage Pumping Station

Main Sewage Pumping Station

Summary

Environmental Quality and Operations Committee - 10:20 a.m. VI. Sewage Pumping Station Flood Protection Status- Craig Fricke

74

Page 75: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

Introduction / Background• Risk assessment is based on a 2014 evaluation of 2010 FEMA

flood mapping• Currently updating with 2017 FEMA mapping

• All datums corrected to historic DC Datum based on “US Army Corps of Engineers, Flood Emergency Manual (draft, October 2015)”

• Risk impacted by infrastructure configuration– Elevations of entrances, floor, pumping equipment

– Means of stormwater conveyance

– Further investigations and site visits would be required to confirm risk level and protection requirements

3

Environmental Quality and Operations Committee - 10:20 a.m. VI. Sewage Pumping Station Flood Protection Status- Craig Fricke

75

Page 76: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

4

Pump Station (PS)

At Risk with 100-year

Floodplain (FEMA 2010)

At Risk with 500-year

Floodplain (FEMA 2010)

1 Rock Creek PS No Yes

2 Potomac PS No Yes

3 3rd & Const. Ave PS No Yes

4 Main St PS Yes Yes

5 O St PS No No

6 New Poplar Point PS No No

7 East Side PS Yes Yes

8 Earl Place PS No No

9 Upper Anacostia PS No Yes

PS Flood Risk Categorization

Environmental Quality and Operations Committee - 10:20 a.m. VI. Sewage Pumping Station Flood Protection Status- Craig Fricke

76

Page 77: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

5

Notes:1. Risk imagery taken from current

(2017) FEMA map resources web site

Main and O Street Pump Station (PS) Inundation

HIGH RISK(1% annual chance, or 100-year floodplain)

MODERATE RISK(0.2% annual chance, or 500-year floodplain)O STREET

SEWAGE PS

MAIN PUMP STATION

Environmental Quality and Operations Committee - 10:20 a.m. VI. Sewage Pumping Station Flood Protection Status- Craig Fricke

77

Page 78: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

6

MOTOR ROOM FF @ El 10.50’

STORM SIDE

SANITARY SIDEF.F. EL. -13.20’

Main Sewage PS

Storm Side FF @ El -7.55’

Sanitary Side FF @ El – 13.20’

500 yr Flood @ El 14.84’

100 yr Flood @ El 10.74’

Environmental Quality and Operations Committee - 10:20 a.m. VI. Sewage Pumping Station Flood Protection Status- Craig Fricke

78

Page 79: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

7

Project budget: $1,598,569Grant support: 75%

Completion date: 09/30/2018

Main Pumping Station, Front Entrance

FEMA Grant Funding for Main PS Flood Mitigation

Hazard Mitigation GrantPDMCPJ-03-DC-2014-002

Flood Mitigation to Elev. +13.8 ft. (i.e.. above FEMA 100-year event; ~equiv. to Cat 2 Hurricane surge)

Scope of Grant• Interior watertight doors

• Disconnect floor drains

• Sealing of building penetrations

• Exterior doorway protection

• Modification of elevator shaft

• Parging of ventilation shaft

• Modifications to inflatable dam control structures

• Exterior equipment protection (e.g. hvac and transformers)

Environmental Quality and Operations Committee - 10:20 a.m. VI. Sewage Pumping Station Flood Protection Status- Craig Fricke

79

Page 80: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

8

New Headquarters Building

O Street PS

Interior first floor level: +15.0 ft. (both HQ and PS)Exterior grade level: +11.0 ft.

500-year flood: +14.84 ft.

O Street PS and Headquarters

100-year flood: +10.74 ft.

Environmental Quality and Operations Committee - 10:20 a.m. VI. Sewage Pumping Station Flood Protection Status- Craig Fricke

80

Page 81: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

Summary• Two of nine stations currently at risk under a 100-yr flood

• Six of nine stations at risk under a 500-yr flood

• Project currently proposed for Main PS to protect it to over the 100-year flood

• Currently no funding included in CIP for flood protection at any of the other sewage pump stations.

• DC Water Emergency Management Plan – Addresses flood preparation for all DC Water facilities including pumping

stations

9

Environmental Quality and Operations Committee - 10:20 a.m. VI. Sewage Pumping Station Flood Protection Status- Craig Fricke

81

Page 82: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

Environmental Quality and Operations Committee - 10:30 a.m. VII. Action Items

82

Page 83: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

Environmental Quality and Operations Committee - 10:30 a.m. VII. Action Items

83

Page 84: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

Environmental Quality and Operations Committee - 10:30 a.m. VII. Action Items

84

Page 85: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

Environmental Quality and Operations Committee - 10:30 a.m. VII. Action Items

85

Page 86: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

Environmental Quality and Operations Committee - 10:30 a.m. VII. Action Items

86

Page 87: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

Environmental Quality and Operations Committee - 10:30 a.m. VII. Action Items

87

Page 88: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

Environmental Quality and Operations Committee - 10:40 a.m. VIII. AWTP Status Updates - Aklile Tesfaye

88

Page 89: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

Environmental Quality and Operations Committee - 10:40 a.m. VIII. AWTP Status Updates - Aklile Tesfaye

89

Page 90: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

Environmental Quality and Operations Committee - 10:40 a.m. VIII. AWTP Status Updates - Aklile Tesfaye

90

Page 91: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

Environmental Quality and Operations Committee - 10:40 a.m. VIII. AWTP Status Updates - Aklile Tesfaye

91

Page 92: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

Environmental Quality and Operations Committee - 10:40 a.m. VIII. AWTP Status Updates - Aklile Tesfaye

92

Page 93: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

Environmental Quality and Operations Committee - 10:40 a.m. VIII. AWTP Status Updates - Aklile Tesfaye

93

Page 94: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

Environmental Quality and Operations Committee - 10:40 a.m. VIII. AWTP Status Updates - Aklile Tesfaye

94

Page 95: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

Environmental Quality and Operations Committee - 10:40 a.m. VIII. AWTP Status Updates - Aklile Tesfaye

95

Page 96: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

Environmental Quality and Operations Committee - 10:40 a.m. VIII. AWTP Status Updates - Aklile Tesfaye

96

Page 97: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

Environmental Quality and Operations Committee - 10:40 a.m. VIII. AWTP Status Updates - Aklile Tesfaye

97

Page 98: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

Environmental Quality and Operations Committee - 10:40 a.m. VIII. AWTP Status Updates - Aklile Tesfaye

98

Page 99: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

Environmental Quality and Operations Committee - 10:40 a.m. VIII. AWTP Status Updates - Aklile Tesfaye

99

Page 100: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

Environmental Quality and Operations Committee - 10:40 a.m. VIII. AWTP Status Updates - Aklile Tesfaye

100

Page 101: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

Environmental Quality and Operations Committee - 10:40 a.m. VIII. AWTP Status Updates - Aklile Tesfaye

101

Page 102: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

Environmental Quality and Operations Committee - 10:40 a.m. VIII. AWTP Status Updates - Aklile Tesfaye

102

Page 103: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

Environmental Quality and Operations Committee - 10:40 a.m. VIII. AWTP Status Updates - Aklile Tesfaye

103

Page 104: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

Environmental Quality and Operations Committee - 10:40 a.m. VIII. AWTP Status Updates - Aklile Tesfaye

104

Page 105: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

Environmental Quality and Operations Committee - 10:40 a.m. VIII. AWTP Status Updates - Aklile Tesfaye

105

Page 106: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

Breakdown of Defective

Breakdown of Others

Private Hydrants:

• In Service:

• Out-of-Service (OOS):

140 2 1 2

5

0 0 0

0 2 7

0 3

4

0 1 7 17

Needs Valve Investigation for Low Flow/Pressure or Shut Test for Replacement

1 2 1 1

2 30 0 1

Needs Replacement

Days Days

Temporarily OOS as part of operations such as a main repair

0 2 7 0

Construction* - OOS

*Fire hydrants not accessible due to construction activities. Also includes new hydrants which have not yet been

commissioned or old hydrants which will be abandoned as part of ongoing construction projects.

Defective 22

29

3 8

Obstructed Hydrant – OOS

hydrant due to operation impeded by an obstruction.

0 0 0 0 0 0

Days Days0-7 8-14 15-30 31-60 61-90 91-120 > 120

Days Days

1,318

1,179

139

0-7 8-14 15-30 31-60 61-90

4

Others

91-120 > 120Total

Days Days Days Days Days Days Days

Hydrant Needs Repair/Investigation

Status of Private Fire Hydrants-Based on FEMS Inspection Reporting

TotalDays

Public Fire Hydrants: 9,548In Service: 9,501 9,502 9,497

9,548(Dec 04, 2017) (Jan 02, 2018) (Mar 05, 2018)(Feb 01, 2018)

9,5479,509

March 5, 2018Status Report of Public Fire Hydrants for DC Water Services Committee -

December January MarchCmte. Report Cmte. Report Cmte. Report

FebruaryCmte. Report

51

Note: The number of public hydrants in the DC Water system fluctuates; this number fluctuates as hydrants are

added and removed during development or construction activities as well as at the request of the Fire Dept.

Breakdown of Public Fire Hydrants Out-of-Service (OOS) as of March 5, 2018

Marked Out-of-Service (OOS) 47 45 51

% OOS requiring repair or replacement (DC Water goal is 1% or less OOS) 0.30% 0.27% 0.23%

OOS - due to inaccessibility or temp construction work 18 19 29

OOS - defective requiring repair/replacement 29 26 22

38

0 0

19

0.20%

19

9,547

0 1 1 0 0

Environmental Quality and Operations Committee - 10:50 a.m. X. Fire Hydrant Upgrade Program -Jason Hughes

106

Page 107: DISTRICT OF COLUMBIA WATER AND SEWER ......District of Columbia Water And Sewer Authority Path to Achieve Asset Management Environmental Quality & Operations Committee Meeting March

kj

!

!

kj

1

!

")

kj

1

!

")

")

")

")

")

")

!

!

kj

!

!

!

")

kj

")

")")

!

!

!!

")

")

1

!

1

")

!

kj

")

!

!

")

!

!

!

kj

!

!

")

!

Sources: Esri, HERE, DeLorme, USGS, Intermap, INCREMENT P, NRCan, EsriJapan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), MapmyIndia,NGCC, © OpenStreetMap contributors, and the GIS User Community

Map of Public Out-of-Service Hydrants

LegendOOS Hydrants

! Defective

kj New Construction

1 Obstructed

") Temporary

March 5, 2018

Environmental Quality and Operations Committee - 10:50 a.m. X. Fire Hydrant Upgrade Program -Jason Hughes

107


Recommended