DIT Campus Network
Final Presentation
Team Members
Honoratha ShayoVincent JacobIvan Masue
Fredrik AnderssonOmbeni MnzavaSylvester Kimbi
Background
Goals
What we have achieved
Problems encountered
Future work
Video
Q&A
Contents
Background
Dar es Salaam Institute of Technology (DIT)
Background cont... ICT situation at DIT
No connection between buildings in CampusOnly two computer labs were networked
Users of the network 1800(+) Students450(+) Staffs
SIDA
Goals
Primary goal To design and deploy a core campus network,
including;Basic Internet network
DNS, DHCP, Dial-in, Web and E-mail servers
Database and Web server
Training of system administrators
Secondary goalsEstablish a suitable dedicated connection to the Internet for DIT via satellite
Connecting DIT to TIX
Achievements
Configured all necessary services, including e-mail, web, DNS, Dial-in, FTP, DHCP and database
Configured switches and router
Performed an entire network test bed
Delivered technical evaluation document for alternative solutions to upgrade DIT Internet connection
Delivered administrator manual
Clarified information about connection to TIX
1
2
3 45
6
7
8
9
10
11
12
13
14
1516
17
18
19
20
21
No. 1 to 21 Backbone switches
UTP cable
Fiber cable
DHCP & DNS PRIM WEB, MAIL & FTP DIAL-UP AUTH
Back-up server
Servers
DNS SEC
Servers
Modem Bank
TTCL
Modem
LC
SC
SC
SCSC
SC SC
SC
SC
SC
SC
SC
SC
SC
SC
SC
SC
SC
SC
SC
SC
SC
SC
SC
SC
SC
SC
SC
SC
LC
LC
LC LC
LCLC
LCLC
SC Fiber connector (Subscriber connector)LC Fiber connector (Lucent connector)
LC
LC LC
Backbone connectivity
Hardware specifications
Switches;- HP Procurve 2524 40 pcs.
- HP Procurve 2824 4 pcs.
- HP Procurve 5308XL 1 pcs.
UPS’s;- PowerWare 5125 3KVA 2 pcs.
Hardware specifications cont…
Router;- Cisco 7206VXR/NPE-G1 1 pcs.
Servers;- Dell PowerEdge 1750 single cpu 1
pcs.
- Dell PowerEdge 1750 dual cpu 4 pcs.
- Dell PowerEdge 2650 dual cpu 1 pcs.
Virtual LAN’s
Problems encountered
Delay of active equipments delivery
Delay of passive network (implementation of fibre)
Problems with existing Internet connection (Net Solution)
Current project status
Testing of fiber terminations have been done
This week electrical cabling for switches will be done
More security for some cabinets will also be done this week
UPS’s for all cabinets have arrived
Future work
Reliable and permanent solution for Internet Connection
Connection To TIX
Development Of ICT security policy
3-Minute Video
Q&A
Thank you for listening !
For further information visit our web at;
http://www.csd.ssvl.kth.se/~csd2004-team7