March 31, 2020 Mr Joseph Werning Division Administrator Federal Highway Administration 100 Centennial Mall N Rm 220 Lincoln NE 68508-3803 Mr Mokhtee Ahmad Regional Administrator Federal Transit Administration 901 Locust St #404 Kansas City MO 64106-2329
Gentlemen:
Re: Amendment 2 to the State Transportation Improvement Program for FY 2020-2023 Attached for your approval is Amendment 1 to Nebraska’s State Transportation Improvement Program (STIP) for fiscal years 2020 through 2023. In addition to State project and transit adjustments, it includes MAPA’s Amendment 5 and Modification 1. The summary has been updated to demonstrate fiscal constraint.
Kendall Tonjes Highway Program Manager
[email protected] [email protected]
cc: C Wacker
NEBRASKAGood Life. Great Journey.
DEPARTMENT OF TRANSPORTATION
March 3, 2020
Mr. Greg Youell, Executive Director
Omaha-Council Bluffs Metropolitan Area2222 Cuming StreetOmaha, NE 68102-4328
Dear Mr. Youell:
SUBJECT: State Approval of MAPA's FY2020 - 2025 TIP Amendment #5
As the Governor's designee, I am approving Amendment #5 to the MAPA FY 2020-2025 TransportationImprovement Program (TIP) as approved by the MAPA Board of Directors on February 27th, 2020 by Resolution2020-14 and detailed in the attached correspondence.
The Nebraska Department of Transportation finds the amendment to be part of a fiscally constrained TIP and inaccordance with MAPA's public participation process as outlined in their public participation plan.
MAPA's TIP is included in Nebraska's STIP by reference. These amendment projects get included in Nebraska'sSTIP when we notify FHWA of a STIP Revision and get their final approval. If you have any questions, pleasecall Craig Wacker at 402-479-4623.
Sincerely,
M.u
w
Ryan Huff, P.E.
Chief Strategy OfficerStrategic Planning DivisionNebraska Department of Transportation
CC: J. Luther, FHWAD. Nguyen, FTAE. Steinman FTAC. Wacker, NDOTJ. Gibson, NDOTA. Starr, NDOTK. Ruse, NDOTK. Tonjes NDOTJ. Kamarad, NDOTM. Helgerson, MAPA/Transportation & Data ManagerDivision file
Kyle Schneweis. P.E.. Director
Department of Transportation
1500 Highway 2PO Box 94759Lincoln, NE 68509-4759
dot.nebraska.gov
OFFICE 402-471-4567 FAX 402-479-4325
March 2, 2020 Mr. Craig Wacker Nebraska Department of Transportation P.O. Box 94759 Lincoln, Nebraska 68509 Dear Mr. Wacker: Enclosed is Resolution 2020-15 taken by the MAPA Board of Directors at their February 27, 2020 meeting. This
resolution is for the 5th amendment to the MAPA FY 2020 – 2025 Transportation Improvement Program (TIP). A copy of
this amendment is also included in this packet.
Please review the proposed TIP amendment for addition to Nebraska’s STIP, which includes MAPA’s TIP. Please contact
me if you have any questions.
Sincerely, Michael Helgerson Transportation & Data Manager Enclosures cc: Justin Luther, FHWA Nebraska
Luke Pitts, NDOT Kari Ruse, NDOT Jeff Rumery, Metro Transit Curt Simon, Metro Transit Eva Steinman, FTA Region VII
FY2020-2025 Amendment 5 - ProposedEffective Date 02/27/2020
ONEDOT STIP Approval Date
RevisionsLead Agency Project Name Description Date Added
Document Revision
Section 5.4 - Grouped Project Categories is updated to include anew category: Discretionary Projects. All projects programmedwith DPS or DPU funding that are not included under a differentprogram have been added to this category.
02/06/2020
Funding Increase
Metro Bus RollingStock
$1,912,500 of FTA 5339(b) funds programmed in FY2020 for 30'bus replacement.
01/31/2020
Metro Bus RollingStock
$2,000,000 of FTA 5339(b) funds programmed in FY2020 for 35'bus replacement, $1,912,500 of FTA 5339(b) funds programmedin FY2020 for 30' bus replacement, and $75,000 of FTA 5339(b)funds programmed in FY2020 for Rebuild Spare Parts/Assoc.Capital Maint.
01/31/2020
Metro Bus SupportEquipment &Facilities
$196,875 of FTA 5339(b) funds programmed in FY2020 for ShopEquipment, $75,000 of FTA 5339(b) funds programmed inFY2020 for Computer Hardware, $300,000 of FTA 5339(b) fundsprogrammed in FY2020 for Computer Software, and $150,000 ofFTA 5339(b) funds programmed in FY2020 for Misc. Equipment
02/03/2020
Project Added - New
NDOT ENOA TransitOperatingCosts
$1,116,353 of CMAQ funds programmed in FY2020 for TransitOperations
02/06/2020
3/24/2020 2020 Transportation Improvement Program
https://mapacog.knack.com/2020-transportation-improvement-program#amendandmods/amendmod-details/5e1f4308dca1bf00193f5abc/project-descri… 1/2
Omaha Signal Operations 72nd Street
TIP ID 2020-017
Description Improved signal operations at approximately 36 signals through the use data collection and analysis
Grouped Project Category Planning
Length (mi)
Control # NE-22802
Lead Agency Omaha
Project Type Planning
Project Cost $180,000
Location Approximately 36 signals on or adjacent to 72nd Street within the City of Omaha
Map
Project Funding*Amounts in thousands of U.S. dollars
Fiscal Year Project Phase Funding Source Total* Federal* State* Local*
2020 General Planning CMAQ $180.00 $144.00 $0.00 $36.00
_______ Line removed through amendment or modification
Map tiles by Carto,…
+–
3/24/2020 2020 Transportation Improvement Program
https://mapacog.knack.com/2020-transportation-improvement-program#amendandmods/amendmod-details/5e1f4308dca1bf00193f5abc/project-descri… 2/2
Revision HistoryRevision Name Date Description
FY2020-2025 AdministrativeModification 1
01/15/2020 NE-22802
FY2020-2025 Amendment 1 09/24/2019 $144,000 of CMAQ funding is programmed for GeneralPlanning in FY2020
3/24/2020 2020 Transportation Improvement Program
https://mapacog.knack.com/2020-transportation-improvement-program#amendandmods/amendmod-details/5e1f4308dca1bf00193f5abc/project-descri… 1/2
Omaha Signal Operations West Center Road
TIP ID 2020-019
Description Improved signal operations at approximately 63 signals through the use data collection and analysis
Grouped Project Category Planning
Length (mi)
Control # NE-22800
Lead Agency Omaha
Project Type Planning
Project Cost $315,000
Location Approximately 63 signals on or adjacent to West Center Road within the City of Omaha
Map
Project Funding*Amounts in thousands of U.S. dollars
Fiscal Year Project Phase Funding Source Total* Federal* State* Local*
2020 General Planning CMAQ $315.00 $252.00 $0.00 $63.00
_______ Line removed through amendment or modification
Map tiles by Carto,…
+–
3/24/2020 2020 Transportation Improvement Program
https://mapacog.knack.com/2020-transportation-improvement-program#amendandmods/amendmod-details/5e1f4308dca1bf00193f5abc/project-descri… 2/2
Revision HistoryRevision Name Date Description
FY2020-2025 AdministrativeModification 1
01/15/2020 NE-22800
FY2020-2025 Amendment 1 09/24/2019 $252,000 of CMAQ funding is programmed for GeneralPlanning in FY2020
3/24/2020 2020 Transportation Improvement Program
https://mapacog.knack.com/2020-transportation-improvement-program#amendandmods/amendmod-details/5e1f4308dca1bf00193f5abc/project-descri… 1/2
Omaha Signal Operations L Street/Q Street
TIP ID 2020-018
Description Improved signal operations at approximately 52 signals through the use data collection and analysis
Grouped Project Category Planning
Length (mi)
Control # NE-22801
Lead Agency Omaha
Project Type Planning
Project Cost $260,000
Location Approximately 52 signals on or adjacent to L Street and Q Street within the City of Omaha
Map
Project Funding*Amounts in thousands of U.S. dollars
Fiscal Year Project Phase Funding Source Total* Federal* State* Local*
2020 General Planning CMAQ $260.00 $208.00 $0.00 $52.00
_______ Line removed through amendment or modification
Map tiles by Carto,…
+–
3/24/2020 2020 Transportation Improvement Program
https://mapacog.knack.com/2020-transportation-improvement-program#amendandmods/amendmod-details/5e1f4308dca1bf00193f5abc/project-descri… 2/2
Revision HistoryRevision Name Date Description
FY2020-2025 AdministrativeModification 1
01/15/2020 NE-22801
FY2020-2025 Amendment 1 09/24/2019 $208,000 of CMAQ funding is programmed for GeneralPlanning in FY2020
Prepared by:
Program Management Division September 3, 2019 Approved by FHWA & FTA September 30, 2019
Nebraska’s Statewide Transportation Improvement Program
Fiscal Years 2020—2023
Kyle Schneweis—Director
Amendment 1—November 8, 2019
Amendment 2—March 31, 2020
Nebraska’s transportation planning process, as well as that of the four metropolitan planning areas is being car-ried out in accordance with all federal laws, rules and regulations.
Nebraska’s 2019 through 2022 STIP includes the following:
Financial information showing expected state highway cash revenues for the STIP period,
A summary by fund category of all federal funds expected to be received and obligated by NDOT and the four MPO’s during the STIP period,
A detailed listing of state highway and local projects, excluding projects in the Lincoln, South Sioux City , Grand Island and Omaha MPO’s. MPO projects are included by reference and are shown as a line item by funding cat-egory in the STIP,
A listing of Section 5310 and 5311 transit projects,
Listings of BIA and Federal Lands projects if available at the time of publication. If unavailable, these will be added by revision as they are received.
Additional information on the development of and details included in the STIP can be found at:
http://www.dot.nebraska/projects/publications/stip
Performance Management Inclusion in NDOT STIP
Introduction Federal requirements for implementing performance measures have evolved and now require the State Transportation Improve-ment Plan (STIP) to include provisions for Performance Measures. In July of 2012, federal transportation legislation called the “Moving Ahead for Progress in the 21st Century Act,” commonly referred to as MAP-21, initiated the requirements for perfor-mance measures for state Department of Transportations, transit providers, and for MPOs. In 2015, newly enacted surface transportation legislation called the Fixing America’s Surface Transportation Act (FAST Act), Public Law No. 114-94, required a performance-based approach for the Statewide and Metropolitan Transportation Planning Process, and for transportation deci-sion-making. Final rulemaking and target setting for transportation performance measures began in 2016. Performance measures for the national goals of safety, infrastructure condition, air quality, and transportation system performance were de-veloped in 2017. The implementation of FAST Act requirements for performance measures are currently taking place at the time of this amendment in the spring of 2018. The following sections describe NDOT’s use of performance management in its processes and decision making related to STIP Development.
Cooperation To implement the performance measure requirements of the FAST Act, NDOT has worked with its transportation partners (i.e., the MPOs and transit providers) since 2016. The effort has led to provisions for developing and sharing transportation perfor-mance data, the selection of performance targets, the reporting of performance targets, the reporting of performance to be used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data for State asset management plans, pursuant to 23 C.F.R. 450.314(h).
Project Selection Process The STIP’s purpose is to provide for the development and integrated management and operation of state’s transportation sys-tems. These systems and their performance are complex since they interact with the natural and man-made environment. To better understand the correlation between NDOT action, the environment, and various performance outcomes, the NDOT engag-es in data collection. This data allows decision makers to assess the performance of the system. Unfortunately, data is only the reflection of a complicated interplay between NDOT decisions and the environment. As such, the NDOT leverages perfor-mance outcomes as only a part of its project selection process for the STIP. Other things that NDOT considers in its project se-lection process includes funding, stakeholder input, project readiness, other NDOT performance metrics, and a host of other factors. To put it another way, no single performance number or combination of numbers decide which projects are added to the STIP. The following paragraphs further describes how NDOT is using performance based activities to inform its business practices and influence its planning documents for STIP development. As mentioned previously, transportation systems are comprised of complex interactions between the user, the environment, materials, etc. Federal performance measures set forth in MAP-21 and the FAST Act are essentially high level reflect reflections of what is happening; but may not be able to explain all of what is happening. This is why the NDOT also employs numerous other performance based activities to inform its decision making and project selection.
At the lowest levels of the organization, teams are beginning to measure daily activity and report performance to their peers during a daily huddle. This performance data is used by the manager to assess the team’s productivity and effectiveness. Ulti-mately, the manger’s performance evaluation is tied to the performance of the team he or she manages. In addition to this, the NDOT is going through an effort to consolidate its data into one single “data warehouse”. The data warehouse will serve a central point where all data collected by the NDOT can be accessed for analysis and reporting. Cur-rently, data is stored in different locations and in different formats, making it difficult to compile and analyze. These efforts to centralize and standardize data are leading to better real time management of projects and processes through the use of dashboards and other reporting. Another effort related to the formation of a data warehouse is NDOT’s business analytics contract. The NDOT has hired a da-ta scientist to help it study statistical correlations between actions, environment and performance outcomes. These studies use statistical models and tools to test hypotheses against performance data. The results of these studies give NDOT a better understanding of which “inputs” have the greatest influence on a desired outcome. For example, NDOT is studying which fac-tors have the greatest influence on number of bids we receive. If we can pinpoint the factors with the greatest influences, we may be able to exploit this knowledge to attract more bids to drive down contract awards. Through these types of studies, NDOT hopes to refine its business practices to improve project delivery and cost effectiveness. The measurement and analysis activities described in the previous paragraphs are important, since they provide quantifiable insights. However, data alone cannot sufficiently inform all aspects of decision making. This data needs to accompany vari-ous planning exercises, like the 3C planning process, to fully form a comprehensive decision making process. For example, planning documents such as the Strategic Highway Safety Plan, the Transportation Asset Management Plan, Freight Plan and others are informed by data and give stakeholders context within they can set a vision, goals, and objectives. At the same time, technological changes, policy changes and other cultural shifts may change the stakeholder’s values, which creates the need to reevaluate which data we collect and analyze. In the end, NDOT needs both data and the 3C planning process to con-tinually refine the decision making related to projects selected for the STIP. The preceding paragraphs describe how multiple inputs, including performance measures influence the program of projects published in the STIP. With that in mind, it’s important to explore the individual performance measures that influence NDOT’s decision making. The following paragraphs describe the specific federal performance measures along with associated NDOT targets.
Safety When it comes to improving safety, the NDOT uses a strategic approach that is based on available safety information for its Highway Safety Improvement Program (HSIP). In accordance with the FHWA final safety performance measure (PM1), NDOT’s HSIP established safety performance measure requirements for the purposes of carrying out the HSIP and also to assess fatali-ties and serious injuries on all public roads. NDOT’s Strategic Highway Safety Plan (SHSP) is a major component and require-ment of the HSIP in accordance with 23 U.S.C. § 148. The NDOT SHSP is a statewide-coordinated safety plan that provides a comprehensive framework for reducing highway fatalities and serious injuries on all public roads. NDOT’s plan identifies the most important safety needs and helps to make decisions on projects for safety concerns. NDOT’s SHSP can be found at. https://dot.nebraska.gov/safety/shsp/ With these things in mind, the NDOT emphasizes the selection of projects for its HSIP that address the two infrastructure-based Critical Emphasis Areas in the SHSP, Roadway Departure crashes and Intersection crashes. Projects are selected from hazard-ous location analysis in one of three different multi-disciplinary safety committees which oversee the HSIP. Before a project is selected, accident studies, collision diagrams, and maps are examined and occasionally a field review is performed. Benefit/cost ratios are also calculated and used for project selection. Each year the selected projects go through a review and are priori-tized in the HSIP Strategic Plan. These projects are then programed in the STIP according to readiness, funding availability, and competing needs.
Safety Targets
The technical provisions for performance measures are specified in the NDOT MPO Operating Manual. To meet the intent of 23 CFR 450.216 (f) (1) and future updates required in 23 CFR 450.216 (f) (2) required for the evaluation of system performance, the actual adopted Safety targets are displayed in Table 1.
Safety Performance Measures - 23 CFR 490 Subpart B
Safety performance measure targets: 1) Number of Fatalities 2) Rate of Fatalities per 100 million VMT 3) Number of Serious Injuries 4) Rate of Serious Injuries per 100 million VMT 5) Number of Non-Motorized Fatalities and Non-Motorized Serious Injuries
2017 20192017 2019
Yearend
Actual Values
NDOR
Target 2015-
2019A
Actual 2011-
2019B
Baseline 2012-
2017C
Target
Achieved?
Number of Fatalities 236.4 239.2 228 0 239 230.7 225.6 Yes No
Fatality Rate 1.104 1.185 1.09 0.00 1.18 1.118 1.119 Yes Yes
Number of Serious Injuries 1488.8 1451.3 1478 0 1540 1528.7 1548.4 Yes Yes
Serious Injury Rate 6.710 6.710 7.03 0.00 7.50 7.405 7.685 Yes Yes
Number of Non-motorized Fatalities
and Serious Injuries135.4 139.4 143 0 140* 138.3 138.6 Yes Yes
Baseline Year 2017
Calendar Years: 2015 Thru 2019
Calendar Years: 2013 Thru 2017
HSIP Apport.
Year
Target
Calendar
Year
Implementation
Year
2018 2019 2022
If a State has not met or made significant progress toward meeting its targets, the State must comply with the provisions set forth in 23 USC 148(i) for the subsequent fiscal year. The State shall:
1. Use obligation authority equal to the HSIP apportionment for the year prior to the target year, only for HSIP projects.
CONFIDENTIAL INFORMATION: Federal Law, 23 U.S.C. §409, prohibits the production of this document or its contents in discovery or its use in evidence in a State or Federal Court. The State of Nebraska has
not waived any privilege it may assert as provided by that law through the dissemination of this document and has not authorized further distribution of this document or its contents to anyone other than the
original recipient.
2. Submit an HSIP Implementation Plan that describes actions the State will take to meet or make significant progress toward meeting its targets. The HSIP Implementation Plan should guide the State's project decisions so that the
combined 148(i) provisions lead to the State meeting or making significant progress toward meeting its safety performance targets in subsequent years.
(B) Actual performance is the 5-year rolling average ending in the year for which the targets were established.
(C) Baseline performance is the 5-year rolling average that ends prior to the year in which the targets were established. Baseline performance is calculated in
order to compare whether the actual outcome was better than the baseline performance
If the State is determined to have not met or made significant progress toward meeting its CY targets, the State will have to use obligation authority equal to
the defined HSIP apportionment year only for HSIP projects in the defined implementation year and submit an HSIP Implementation Plan for the same year.
NEBRASKA HSIP PERFORMANCE MEASURES - Baseline Target Year
(A) Calendar Year (CY) 2019 Targets are established and reported in the August 31, Baseline Year HSIP Annual Report.
Met/Not Met
HSIP PERFORMANCE MEASURE
Projected 2015-
2019 Actual
Avg
Better
Than
Baseline?
Met or Made
Significant
Progress?
2019 Yearend
Actual Values
Projected
2015-2019
Rolling Avg.
5-Year Rolling Average
*Selected target based on projected 5 year trend lines, 10 year trend line projection of 145.6 as well as 2017 yearend vaule 143
Performance Measures #2 and #3 The Nebraska DOT (NDOT) Performance Measure 2 Infrastructure Condition, and Performance Measure 3 System Reliability and Freight Movement performance targets were set on May 20, 2018. The targets are in support of the seven national goals set for the Federal-aid Highway program. The goals are:
• Safety o To achieve a significant reduction in traffic fatalities and serious injuries on all public roads.
• Infrastructure condition o To maintain the highway infrastructure asset system in a state of good repair.
• Congestion reduction o To achieve a significant reduction in congestion on the National Highway System.
• System reliability o To improve the efficiency of the surface transportation system.
• Freight movement and economic vitality o To improve the National Highway Freight Network, strengthen the ability of rural communities to access national and
international trade markets, and support regional economic development. • Environmental sustainability
o To enhance the performance of the transportation system while protecting and enhancing the natural environment. • Reduced project delivery delays
o To reduce project costs, promote jobs and the economy, and expedite the movement of people and goods by accelerating project completion through eliminating delays in the project development and delivery process, including reducing regulatory burdens and improving agencies' work practices.
In order to monitor progress towards these goals, MAP-21 and the FAST Act require the establishment of a number of performance measures by FHWA and the establishment of targets by state DOTs, public transit providers, and metropolitan planning organizations (MPOs). These measures and targets are outlined in the following tables Titled Infrastructure Condition and System Reliability and Freight Movement. States and MPOs will be required to evaluate conditions for these measures; set targets; describe how the projects included in the Statewide Transportation Improvement Program (STIP) and each MPO’s Transportation Improvement Program (TIP) will help achieve progress towards the targets; and report on actual results and whether targets were met for the performance period.
Infrastructure Condition
Performance Measures 2 (PM2) Baseline 2-Year Target
4-Year Target
Percentage of Pavements of the Interstate System in Good Condition
50.0%
Percentage of Pavements of the Interstate System in Poor Condition
5.0%
Percentage of Pavements of the Non-Interstate NHS in Good Condition
63.4% 40.0% 40.0%
Percentage of Pavements of the Non-Interstate NHS in Poor Condition
11.5% 10.0% 10.0%
Percentage of NHS Bridges Classified as in Good Condition 61.0% 55.0% 55.0%
Percentage of NHS Bridges Classified as in Poor Condition 1.9% 10.0% 10.0%
System Reliability and Freight Movement
Performance Measures 3 (PM3) Baseline 2-Year Target
4-Year Target
Percent of the Person-Miles Traveled on the Interstate That Are Reliable
98.9% 98.9% 98.9%
Percent of the Person-Miles Traveled on the Non-Interstate NHS That Are Reliable
92.6%
Truck Travel Time Reliability (TTTR) Index 1.10 1.10 1.10
NDOT met with MPO’s to discuss performance measures, target setting and the process the NDOT was pursuing in setting targets. Once NDOT set its targets for PM 2 and PM 3 there was individual coordination efforts with MPOs as they set their own targets. NDOT uses a performance-based approach to manage its pavement and bridge transportation assets. Each year, NDOT reviews the asset management measures and practices in order to define clear standards, provide the best service, and report on the progress made toward reaching performance goals. This information is compiled and disseminated in NDOT’s annual report found at https://dot.nebraska.gov/news-media/annual-report/.
Moving forward, NDOT will continue to use state performance measures for management of assets and reporting to the annual report. In addition, NDOT will report the following pavement indices to the FHWA to be used in determining targets and/or progress towards target achievement for national performance measures:
1. Average IRI 2. Cracking Percentage 3. Average Depth of Rutting 4. Average Height of Faulting
These indices will be used to determine whether a pavement section is considered Good, Fair, or Poor. NDOT will report the following bridge indices to the FHWA to be used in determining targets and/or progress towards target achievement for national performance measures: 1. Deck rating 2. Superstructure rating 3. Substructure rating 4. Culvert rating These indices will be used to determine whether a structure is considered Good, Fair, or Poor. In some cases, if the state does not meet its targets, there will be restrictions on how certain funding programs can be used or additional planning efforts may be required. Several offices across the NDOT will be working together to implement the required performance measures, target setting, and reporting. The performance measures and targets will be integrated directly and indirectly throughout the planning and programming process. The Nebraska DOT will also continue to coordinate with the state’s public transit providers and MPOs on target setting and monitoring.
Fixed TaxIncremental Tax (C)
LB 610.2015Subtotal
Variable Tax(A)
Wholesale Tax(B)
Total Tax
MOTOR FUEL TAX
NDOTCity/
County Total7.5¢2.0¢
9.5¢3.7¢6.4¢
19.6¢
2.8¢4.0¢
6.8¢0.0¢3.3¢
10.1¢
10.3¢6.0¢
16.3¢3.7¢9.7¢
29.7¢Effective 7-1-2019 thru 12-31-2019
HIGHWAYALLOCATION
FUND
COUNTIES CITIES
STATE HIGHWAYTRUST FUND
HEAVY VEHICLE USE TAXTruck & Trailer Sales Tax
Tire Tax > 40 Pounds
HIGHWAYCASHFUND
NDOTROADS
OPERATIONSCASH FUND
TRANSPORTATIONINFRASTRUCTURE
BANK (TIB)
FEDERALHIGHWAY
TRUSTFUND
BUILD NEBRASKA ACT1/4 of 1% of
General Fund Sales Tax
(A) Adjusted semi-annually. 100% to NDOT(B) Adjusted semi-annually. 66% - NDOT 34% - Cities & Counties(C) Increases 1.5¢ January 1 each year thru 2019. NDOT share 100% to TIB July 2016 thru June 2033.
MOTOR FUEL TAX
FIXED
INCREMENTAL
5% WHOLESALE
July 2019
100%
66%
2¢
7.5¢
Nebraska Transportation Financing
2.8¢
4¢
34%
50% 50%
85%
VARIABLE
(C)
MOTOR VEHICLE SALES TAXBased on purchase price of any vehicle required to be registered.
5%
STATE HIGHWAYCAPITAL
IMPROVEMENTFUND
RECREATION ROAD FUND
MOTOR VEHICLE FEE FUND(Distributed based on the
Highway Allocation Factors)
STATE AID BRIDGE FUND
MOTOR VEHICLE REGISTRATIONS
$15.00 on Passenger Cars(Fees on other vehicles vary)
53.3%46.6%
FEDERAL MOTOR FUEL TAXES18.4¢ Gasoline 18.4¢ Gasohol 24.4¢ Diesel
(2.86¢ each to Mass Transit Account)
15%
GRADE CROSSING FUND
0.5%
TRAIN MILE TAX
$1.50
FY FY FY FY FY2018 2019 2020 2021 2022
ReceiptsMotor Fuel Tax 172,224 172,063 177,592 178,782 182,400Diesel Fuel Tax 86,981 87,257 91,067 93,906 95,800Registrations 45,349 43,448 43,931 44,566 45,500Sales Tax on Motor Vehicles 120,628 124,494 127,042 130,727 133,300Other State Receipts 10,265 11,324 10,575 10,675 10,900
Sub-Total State Receipts 435,448 438,586 450,208 458,656 467,900
Federal = State system 269,711 273,949 364,859 341,015 293,000Federal = Local system 31,587 45,670 36,000 36,000 36,000
Federal Transit 9,608 11,499 9,000 9,000 9,000Counties, Cities, & Others 25,657 24,006 21,000 21,000 21,000State Highway Capital Improvement Fund 96,406 63,271 70,325 72,875 72,875Rec Road / Grade Xing / St Aid Bridge 9,925 4,568 8,198 8,293 8,300State Transportation Infrastructure Bank 7,482 9,400 28,067 28,563 28,600State Patrol Carrier Enforcement Transfer Out (8,201) (8,570) (8,960) (9,216) (9,216)General Fund Transfer (7,500) (7,500)
Total Receipts * $870,123 $854,879 $978,697 $966,186 $927,459
Expenditures:Administration 17,879 20,871 18,706 19,078 19,500Supportive Services 28,709 34,204 28,399 28,609 29,200Capital Facilities 4,681 4,279 10,000 10,000 10,000Highway Operations 150,588 167,727 159,856 161,444 164,700Construction = Support & Research 16,957 18,584 19,000 19,400 19,800
Sub Total Non-Construction 218,814 245,665 235,961 238,531 243,200
State System 487,404 429,154 596,569 576,766 588,300Planning & Non-Program projects 71,268 71,657 72,000 72,000 72,000
Sub Total Construction 558,672 500,811 668,569 648,766 660,300
TOTAL STATE HIGHWAY EXPENDITURES 777,486 746,476 904,530 887,297 903,500
48,105 57,096 45,000 45,000 45,000MPO 2,091 2,139 2,100 2,100 2,100Public Transit and Rail 15,488 16,798 17,000 17,000 17,000
TOTAL LOCAL ROADWAY EXPENDITURES 65,684 76,033 64,100 64,100 64,100
Total Expenditures $843,170 $822,509 $968,630 $951,397 $967,60026,953 32,370 10,067 14,789 (40,141)
Fund Balance June 30 $109,322 $141,692 $151,759 $166,548 $126,407
Outstanding Contractual Obligations 549,470$ 694,968$
Z:\Bud & Finance\Budget\State Highway Funds 2270 & 2271 June Financial - Statement of Changes\[STATE HIGHWAY FUND_2270_2271_Change in Fund Balances FederaController Division, Budget & Finance SectionBecky Fleming, Budget & Finance Manager
STATE HIGHWAY FUNDS 2270 & 2271STATEMENT OF RECEIPTS, EXPENDITURES, and
CHANGES IN FUND BALANCES(DOLLARS IN THOUSANDS)
Actual Projected
State Highway System Construction:
Local System (includes ARRA)
Receipts Over (Under) Expenditures
8/13/2019 9:39
Interpreting the project details:
Control and Project Numbers - Project identifiers assigned by NDOT. The first digit in the control number is the field district in which the project is located.
Jurisdiction – entity responsible for carrying out the project.
Work Phases- PE – preliminary engineering ROW – right-of-way acquisition Const / CE – utilities, construction and construction engineering
Fund type and amount expected to be obligated in each fiscal year - Estimates are in year-of-expenditure dollars. For this STIP period, estimates are inflated at a rate of 5% for FY-20 and FY-21 and 3% per year thereafter.
STIP AdjustmentsControl No
Project No Location RevisionA-1
AmountA-2
AmountDiff NHPP STP BRO SFTY LIN MAPA NHFP TAP EM Comments
FY-20 A-1 Amount 112,503 153,005 2,093 27,951 8,500 55,683 10,730 10,587 50,58031883 BRO-7071(9) Monroe Southwest Remove, obligated in FY-19 604 0 (604) (604)32301 BRO-7087(4) Winnebago North Add project 0 10 10 1061645 BRO-7024(25) Cozad Southwest Add project 0 8 8 881014 BRO-7442(1) Naper Southeast Add project 0 8 8 801022 STP-NBIS(120) 2020 State FC Bridge Inspection Add project 0 80 80 8051399 NH-2-1(123) Cody Ave East, Alliance Remove, obligated in FY-19 1,735 0 (1,735) (1,735)51603 NH-80-1(201) Bushnell Interchange - West Kimball Add project 0 975 975 97532239 STP-91-5(125) US-81 West Add project 0 2,552 2,552 2,55201019 STP-NBIS(119) BrM Support & Maintenance Add project 0 400 400 40013402 BRO-7076(25) Crete Northwest Remove PE, obligated in FY-19 30 0 (30) (30)13403 BRO-7078(20) Touhy Northwest Remove PE, obligated in FY-19 30 0 (30) (30)13405 BRO-7049(24) Sterling Northwest Remove PE, obligated in FY-19 20 0 (20) (20)71018 HSIP-1315(11) Benkelman Northeast Add project to Minor Safety List 0 130 130 13013338 NH-77-1(135) Pickrell North Add Safety funds, adjust estimate 0 463 463 46322277 MAPA-5009(3) 120th St, Stonegate - Roanoke, Omaha Adjust funding 0 13,914 13,914 13,914 MAPA A-4
A-2 Changes (760) 3,032 (658) 593 0 0 0 0 13,914A-1 plus A-2 Amount 111,743 156,037 1,435 28,544 8,500 55,683 10,730 10,587 64,494Amount Shown in A-2 Summary 111,743 156,037 1,435 28,544 8,500 55,683 10,730 10,587 64,494Difference 0 0 0 0 0 0 0 0 0
STIP AdjustmentsControl No
Project No Location RevisionA-1
AmountA-2
AmountDiff NHPP STP BRO HSIP LIN MAPA TAP Comments
FY-21 A-1 Amount 144,701 121,643 4,764 9,682 7,000 16,366 4,99313411 NH-2-7(120) N-2 and N-75 Near Nebraska City Add project 0 400 400 40013362 BRO-7080(54) Seward Northwest Move const from FY-21 to FY-22 1,397 0 (1,397) (1,397)32301 BRO-7087(4) Winnebago North Add project 0 1,100 1,100 1,10013186 STP-HSIP-41-6(115) Adams West Remove safety funds, adjust estimate 428 0 (428) (428)13186 STP-HSIP-41-6(115) Adams West Remove safety funds, adjust estimate 4,787 5,014 227 22713338 NH-77-1(135) Pickrell North Add Safety funds, adjust estimate 6,245 7,078 833 83313358 NH-80-8(160) Goehner - Milford Adjust estimates 9,332 14,640 5,308 5,30842732 NH-80-7(161) Aurora East & West Adjust estimates 7,820 11,252 3,432 3,432
A-2 Changes 9,973 227 (297) (428) 0 0 0A-1 plus A-2 Amount 154,674 121,870 4,467 9,254 7,000 16,366 4,993Amount Shown in A-2 Summary 154,674 121,870 4,467 9,254 7,000 16,366 4,993Difference 0 0 0 0 0 0 0
Control No
Project No Location RevisionA-1
AmountA-2
AmountDiff NHPP STP BRO EM LIN SFTY Comments
FY-22 A-1 Amount 200,304 121,196 3,190 0 7,00013362 BRO-7080(54) Seward Northwest Move const from FY-21 to FY-22 0 1,397 1,397 1,39761645 BRO-7024(25) Cozad Southwest Add project 0 928 928 92881014 BRO-7442(1) Naper Southeast Add project 0 950 950 95032313 BRO-7054(22) Center West Move const from FY-22 to FY-24 1,228 0 (1,228) (1,228)32314 BRO-7059(16) Jackson Street in Madison Move const from FY-22 to FY-24 528 0 (528) (528)32315 BRO-7059(17) Norfolk North Move const from FY-22 to FY-24 581 0 (581) (581)42795 NH-80-6(114) Shelton - Wood River Adjust estimates 12,748 9,545 (3,203) (3,203)
A-2 Changes (3,203) 0 938 0 0 0 0 0 0A-1 plus A-2 Amount 197,101 121,196 4,128 0 7,000 0 0 0 0Amount Shown in A-2 Summary 197,101 121,196 4,128 0 7,000Difference 0 0 0 0 0 0 0 0 0
STIP AdjustmentsControl No
Project No Location RevisionA-1
AmountA-2
AmountDiff NHPP STP MAPA TAP LIN BRO Comments
FY-23 A-1 Amount 137,126 88,137 24,315 1,152 9,500 3,97522783 NH-30-7(121) US-30 / Industrial Dr., Blair Add project 0 360 360 36022763 STP-91-6(115) Dodge Southwest Bridge Add project 0 180 180 18042892 BRO-7063(8) Genoa West Move const from FY-23 to FY-24 707 0 (707) (707)81036 BRO-7045(37) Atkinson Southeast Move const to FY-24 563 0 (563) (563)51462A STP-30-1(139) Chappell East Add project 0 5,600 5,600 5,60022277 MAPA-5009(3) 120th St, Stonegate - Roanoke, Omaha Adjust funding 13,914 0 (13,914) (13,914) MAPA A-4
A-2 Changes 360 5,780 (13,914) 0 0 (1,270)A-1 plus A-2 Amount 137,486 93,917 10,401 1,152 9,500 2,705Amount Shown in A-2 Summary 137,486 93,917 10,401 1,152 9,500 2,705Difference 0 0 0 0 0 0
Fund NHPP STP BRO SFTYSTP
LINCOLNSTP
MAPANHFP TAP RTP EM State
Total Fed Funds
Beginning Bal 0 63,564 0 22,612 10,056 44,369 0 5,292 0 123,001 142,000 268,894
FY Alloc/ Apport 179,168 81,895 3,777 19,719 7,977 20,241 10,730 5,801 1,217 0 408,000 330,525
New Balance 179,168 145,459 3,777 42,331 18,033 64,610 10,730 11,093 1,217 123,001 550,000 599,419
Adjustments* 26,730 (30,485) 221 (434) (126) 379 0 50 (2) 406 0 0
Adjusted Balance 152,438 175,944 3,556 42,765 18,159 64,231 10,730 11,043 1,219 122,595 550,000 599,419
FY Planned 111,743 156,037 1,435 28,544 8,500 55,683 10,730 10,587 917 64,494 541,093 448,669
FY End Balance 40,695 19,907 2,121 14,221 9,659 8,548 0 456 302 58,101 8,907 150,750
FY Alloc/ Apport 184,543 84,352 3,777 20,311 8,216 20,848 0 5,975 1,254 0 419,000 329,276
New Balance 195,238 134,259 5,898 34,532 17,875 29,396 0 6,431 1,555 58,101 427,907 483,286
FY Planned 154,674 121,870 4,467 9,254 7,000 16,366 0 4,993 51,524 76,466 370,148
FY End Balance 40,564 12,389 1,431 25,278 10,875 13,030 0 1,438 1,555 6,577 351,442 113,139
FY Alloc/ Apport 190,079 86,882 3,777 20,920 8,463 21,474 0 6,154 1,291 0 423,000 339,040
New Balance 200,643 129,271 5,208 46,198 19,338 34,503 0 7,593 2,846 6,577 774,442 452,179
FY Planned 197,101 121,196 4,128 5,862 7,000 6,834 0 1,463 0 172,600 343,583
FY End Balance 3,542 8,076 1,080 40,336 12,338 27,670 0 6,130 2,846 6,577 601,842 108,596
FY Alloc/ Apport 195,782 89,489 3,777 21,547 8,717 22,118 0 6,339 1,330 0 423,000 349,098
New Balance 169,324 127,564 4,857 61,884 21,055 49,788 0 12,469 4,176 6,577 1,024,842 457,695
FY Planned 137,486 93,917 2,705 30 9,500 10,401 0 1,152 0 213,581 255,191
FY End Balance 31,838 33,647 2,152 61,854 11,555 39,387 0 11,317 4,176 6,577 811,261 202,504
$30 million transferred from NHPP to STP in FY-21, 22, 23
NHPP - National Highway Performance Program Grouped Project Categories:NHFP - National Highway Freight Program TAP - Transportation AlternativesSTP - Surface Transportation Program - includes all funds allocated under this program except Minor SFTY - Safety projects that are not regionally significant
those allocated to Lincoln and MAPA. Also includes miscellaneous funds apportioned RTP - Rec Trails Programfor use on any elibigle Title 23 project; Congestion Mitigation, Equity Bonus, Redistributed funds, Extension of Allocated Programs, etc.
BRO - Surface Transportation Program Funds set aside for off system bridgesSTP Lincoln - STP funds allocated for use in the Lincoln Metroplitan Planning AreaSTP MAPA - STP funds allocated for use in the Omaha Metroplitan Planning AreaEM - Earmarks - Discretionary, Demonstration, Federal Lands and other funds not distributed by federal formulaSFTY - Highway Safety Improvement Program (includes Rail Safety)
FY - 2023
Fund Descriptions:
Summary by Fund Type
FY
FY - 2020FY - 2021
FY - 2022
Fund NHPP STP BRO SFTY LIN MAPA FP TAP RTP EMAdjustments 26,730 (30,485) 221 (434) (126) 379 0 50 (2) 406
*Adjustments made to projects that are not on the current STIP, such as letting adjustments, modified agreements and final vouchers. Transfers between apportionments.
Date C.N Proj. No. Reason FundAmount ($1,000)
Transfer NH funds to STP NHPP 30,000 FV Final Voucher - closing project adjustmentTransfer NH funds to STP STP (30,000) MA Mod. Agmt. - adjustments for C.O.'s, overruns, etc.
10/17/19 31951 77-3(127) MA NHPP 240 Let Adj Post-letting adjust to low bid amount10/22/19 42569 136-4(113) FV STP (8) CE Adj CE Adjustment - Adjust CE to contract amount10/22/19 42569 136-4(113) FV STP (62) PE Adj PE Adjustment - Adjust PE to contract amount10/22/19 22682 D2(113) FV SFTY (15)10/22/19 80984 281-4(126) FV NHPP (11)10/22/19 42674 80-6(108) MA NHPP 2410/22/19 71161 23-2(128) MA STP 11510/22/19 22587 28(115) PE Adj MAPA 39510/22/19 80985 20-2(143) Let Adj NHPP (23)10/22/19 80985 20-2(143) Let Adj STP (3)10/22/19 80992 183-3(120) Let Adj STP (71)10/22/19 81020 7-4(119) Let Adj STP (160)10/22/19 42883 2-4(113) Let Adj NHPP (2)10/22/19 32310 81-4(127) Let Adj NHPP (287)10/22/19 22686 77-3(140) Let Adj NHPP (29)10/22/19 22650 80-9(108) Let Adj NHPP (154)10/21/19 00975 STWD(151) MA SFTY 10010/21/19 00976 STWD(152) MA SFTY 10010/22/19 42892 7063(8) PE Adj BRO 30710/22/19 13147 5205(1) CE Adj SFTY 1310/22/19 42792 80-8(157) Let Adj NHPP (138)10/22/19 42533 53-1(104) Let Adj STP 7210/25/19 13079 55(172) FV TAP (7)10/25/19 13079 55(172) FV TAP (5)10/24/19 32185 7952(2) FV SFTY (10)10/24/19 13297 2-7(117) Let Adj SFTY (12)10/24/19 22561 92-7(107) FV STP (34)10/30/19 61594 30-2(147) Let Adj STP (146)10/30/19 12785 7066(43) FV BRO (8)10/30/19 12785 7066(43) FV BRO (10)10/30/19 13175 7078(31) CE Adj BRO 2810/29/19 13402 BRO-7076(25) PE Adj BRO 25810/30/19 51472 20-1(142) Let Adj NHPP (269)10/30/19 61638 80-4(150) FV NHPP (27)10/30/19 61008 2-2(112) FV NHPP (12)
Adjustments *
10/28/19 42609 L63A(101) FV STP (80)10/30/19 32081A 5305(11) FV SFTY (10)10/30/19 80876 7-4(115) FV STP (19)10/30/19 51473 ITSN(22) FV NHPP (56)10/30/19 22620 D2(110) MA NHPP 310/30/19 22577 275-7(195) MA NHPP 11710/30/19 NA 2018(5) MA RTP (22)10/30/19 NA 2020(101) MA RTP 2011/4/19 00958A NBIS(108) FV STP (11)11/5/19 71166 61-2(113) FV STP (317)11/5/19 71166 61-2(113) FV SFTY (101)
11/13/19 61658 80-2(113) FV NHPP (16)11/5/19 22595 80-9(82) FV NHPP (999)
11/13/19 13324 49(47) FV SFTY (9)11/13/19 13324 49(47) FV SFTY (30)11/13/19 80940 7-4(117) FV STP (17)11/15/19 51545 385-3(122) Close NHPP (362)11/18/19 22741 50-2(137) Let Adj SFTY 8011/18/19 71196 10-1(114) Let Adj STP (721)11/18/19 22528 480-9(104) FV NHPP (421)11/18/19 22615 75-2(179) FV SFTY (20)11/20/19 22571 28(114) PE Adj TAP 1611/20/19 13326 77-2(165) Let Adj NHPP 211/19/19 32228 15-3(116) Let Adj STP (105)11/19/19 42726 92-4(113) Let Adj STP 6411/20/19 61620 83-3(110) Let Adj NHPP (241)11/20/19 13272 15-2(126) Let Adj STP (328)11/20/19 51507 26-1(167) Let Adj NHPP 42811/20/19 51507 26-1(167) Let Adj SFTY 511/20/19 51519 80-2(103) MA NHPP 22511/20/19 61380 61-2(112) MA STP 29611/19/19 31951 77-3(127) MA NHPP 7511/20/19 13184 136-6(122) FV NHPP (58)11/20/19 32124 L20A(102) Let Adj STP 6311/20/19 42780 8-5(111) Let Adj STP (259)11/20/19 00919A STWD(139) MA SFTY 5611/20/19 00919A STWD(139) MA SFTY 1011/20/19 00919A STWD(139) MA SFTY 3411/25/19 13402 BRO-7076(25) PE Adj BRO (2)11/25/19 13273 6-6(162) Let Adj STP (241)11/21/19 71164 10-1(112) Let Adj STP (310)11/25/19 22276 5061(5) PE Adj MAPA 211/25/19 42764 281-2(128) MA NHPP 8211/21/19 71167 83-1(115) Close NHPP (11)11/25/19 61465 83-3(109) Close NHPP (90)11/21/19 22707 80-9(103) FV NHPP (16)
11/25/19 80987 183-4(116) FV STP (10)11/26/19 22341 89(25) Withdraw SFTY (24)11/26/19 42846 10(67) MA SFTY 10012/9/19 22449 5001(17) Let Adj SFTY (133)
12/10/19 12946 5266(2) FV TAP (9)12/10/19 12946 5266(2) FV TAP (63)12/10/19 12946 5266(2) FV TAP (3)12/10/19 12946 5266(2) FV TAP 012/9/19 22290 5023(14) Close MAPA (78)
12/11/19 22702 64-7(127) Let Adj SFTY 46112/11/19 42606 22-4(109) FV STP (22)12/13/19 51406 20-1(140) FV NHPP (23)12/13/19 13241 65-1(108) FV STP (33)12/17/19 13212 34(42) Let Adj TAP (167)12/17/19 00889 NBIS(100) FV STP (18)12/17/19 22290 5023(14) ROW Adj MAPA 4312/17/19 22438 5003(10) Let Adj SFTY (50)12/19/19 81028 83-4(120) Let Adj NHPP (25)12/19/19 80991 83-4(119) Let Adj NHPP 2212/19/19 22702 64-7(127) Let Adj SFTY (5)12/19/19 42322 7040(25) PE Adj BRO 212/19/19 31883 7071(9) Let Adj BRO 6412/19/19 31208 7084(7) Let Adj BRO (293)12/19/19 11781 7080(27) Let Adj BRO (34)12/19/19 61640 80-5(82) Let Adj NHPP 012/19/19 61590 30-2(144) Let Adj NHPP 51412/19/19 61590 30-2(144) Let Adj STP 30912/19/19 32236 14-4(115) Let Adj STP 1,00012/19/19 81015 7008(13) Let Adj BRO 3212/19/19 22482 6-7(180) Close SFTY (355)12/19/19 22727A 28(124) Close MAPA (26)12/19/19 22728A 28(125) Close MAPA (76)12/19/19 11845 6-6(146) Close STP (62)12/19/19 13339 77-1(136) Close NHPP (117)
1/2/20 22638 680-9(37) Let Adj NHPP 401/6/20 61565A 80-3(153) Let Adj NHPP 5841/8/20 31817A 20-7(116) MA EM 2041/8/20 42606A 22-4(110) FV STP (63)1/6/20 71087 34-2(123) FV NHPP (223)1/8/20 51229 26-1(171) FV NHPP (166)1/8/20 42834 281-1(120) FV STP (316)1/2/20 00841C STWD(130) FV STP (115)1/2/20 00841C STWD(130) FV STP (21)1/3/20 13263 26-1(123) FV NHPP (16)1/3/20 13263 26-1(123) FV SFTY (602)1/2/20 22702 64-7(127) PE Adj SFTY 41
1/2/20 22648 370-7(127) MA SFTY 171/3/20 13328 34-7(131) Withdraw SFTY (113)1/6/20 22237 5011(9) CE Adj MAPA 911/8/20 61560 2-3(121) FV NHPP (16)1/6/20 32130 14-3(116) Close STP (245)
1/21/20 22568 75-3(119) Let Adj NHPP (338)1/21/20 13332 33-6(111) Let Adj SFTY 131/14/20 81015 7008(13) PE Adj BRO 21/23/20 13213 55(177) MA TAP 161/23/20 13223 136-7(125) FV NHPP (96)1/23/20 12347 7066(29) FV BRO (19)1/23/20 12347 7066(29) FV BRO (69)1/23/20 51468 L62A(101) FV NHPP (1)1/24/20 13268 43-2(107) Let Adj STP 871/24/20 13325 105-1(108) Let Adj STP 61/23/20 32263 15-4(121) Let Adj STP (12)1/22/20 22635 80-9(95) Let Adj NHPP (190)1/23/20 32262 14-3(119) Let Adj STP 1,0011/23/20 22523 89(29) Close TAP (15)1/23/20 22523 89(29) Close TAP (2)1/23/20 22523 89(29) Close TAP (2)1/24/20 61583 21-2(112) MA STP 301/30/20 42863 5409(3) PE Adj SFTY 172/3/20 31951 77-3(127) MA NHPP 652/3/20 13212 34(42) Let Adj TAP 37
1/31/20 51548 20-2(142) MA NHPP 11/31/20 10584A 79-2(108) MA STP 2711/30/20 32155 75-4(112) Let Adj NHPP 2,1652/5/20 70862 7044(29) FV BRO (6)
2/13/20 13151 ITSN(41) FV NHPP (1)2/13/20 13151 ITSN(41) FV NHPP (35)2/12/20 22277 MAPA-5009(3) PE Adj MAPA 192/21/20 51459 80-2(97) Close NHPP (2,220)2/21/20 51444 80-2(95) Close NHPP (284)2/21/20 51444 80-2(95) Close NHPP (875)2/24/20 51517 80-2(102) FV NHPP (124)2/24/20 51543 92-1(126) FV STP (11)2/13/20 22438 5003(10) Let Adj SFTY 102/24/20 11781 7080(27) Let Adj BRO 212/21/20 42764 281-2(128) MA NHPP 612/21/20 42866 81-2(147) MA NHPP 782/19/20 22449 5001(17) Let Adj SFTY (2)2/26/20 13361 7076(24) PE Adj BRO 102/26/20 61490 80-3(144) MA NHPP 362/24/20 31892 84-5(109) MA STP 653/2/20 31975A 54(22) FV TAP (4)
3/2/20 31817A 20-7(116) MA EM 2023/2/20 42772 80-5(79) FV NHPP (12)
3/10/20 22730 480-9(8) FV NHPP (123)3/10/20 61602 61-3(113) FV STP (72)3/11/20 13315 5202(9) FV LIN (65)3/11/20 51588 80-1(198) FV NHPP (47)3/11/20 11776 7034(18) FV BRO (4)3/11/20 11776 7034(18) FV BRO (11)3/9/20 22276 5061(5) PE Adj MAPA 9
3/12/20 00927 NBIS(105) FV STP (2)3/12/20 00927A NBIS(109) FV STP (9)3/12/20 00989 NBIS(111) FV STP (9)3/11/20 13233 5215(3) Close LIN (61)3/9/20 32258 12-5(121) FV STP (93)
3/12/20 61634 80-4(146) MA NHPP 1223/12/20 32169 22(32) Let Adj TAP 2313/18/20 42435 7030(32) FV BRO (7)3/18/20 42435 7030(32) FV BRO (40)3/18/20 61614 61-3(112) FV STP (84)3/18/20 51512 ENH-79(42) PE Adj TAP 273/20/20 32062 15-4(120) MA STP 225
Projects in these categories are not listed in the STIP individually unless
Grouped Project Categories 2020 2021 2022 2023
Minor Safety Projects 1,086 0 0 0
Transportation Alternatives 10,587 4,993 1,463 1,152
Recreational Trails 917 0 0 0
Grouped Project Estimates by Fiscal Year
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
00841GControl No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
NDOT Improvement NDOT/LPA Workforce Development and Training Program FY-2020 NDOT/LPA Workforce Development
Statewide
$872Estimate ($1,000)
FY22
Project No STP-STWD(178)
FY23
PE
STP 0872 00 0 0
00959Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Washington
NDOT Improvement Lighting
Statewide Lighting 0.00 0.0
At several intersections statewide
$471Estimate ($1,000)
FY22
Project No HSIP-STWD(142)
FY23
PE
State 00 01 0 0
Const / CE
SFTY 0423 00 0 0
State 047 00 0 0
01019Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
NDOT Improvement Hire consultant to assist br division to develop AASHTOWare for NBIS program BrM Support & Maintenance
Statewide
$500Estimate ($1,000) A-2 Add projectFY22
Project No STP-NBIS(119)
FY23
PE
STP 0400 00 0 0
State 0100 00 0 0
01022Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
NDOT Improvement NBIS required fracture critical inspection of 13 state bridges due in 2020 2020 State FC Bridge Inspection
Statewide
$100Estimate ($1,000) A-2 Add projectFY22
Project No STP-NBIS(120)
FY23
PE
STP 080 00 0 0
State 020 00 0 0
1
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
11599Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Jefferson
NDOT Improvement Replace bridge on new shifted alignment and associated approach work Blue River South of Fairbury N-8 51.55 0.9
Realigned N-8 over the Blue River south of Fairbury
$8,656Estimate ($1,000)
FY22
Project No STP-8-6(104)
FY23
PE
State 00 0250 0 0
ROW
State 035 00 0 0
Const / CE
STP-AC 00 00 6670 0
State 00 00 1701 0
STP 00 00AC Conv 0 6670
State 00 00AC Conv 0 -6670
11718Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Jefferson
NDOT Improvement Mill, resurf 24' rdwy, br repair, br replace
Fairbury North N-15 10.11 11.0
N-15 from US-136 in Fairbury north to N-4
$7,690Estimate ($1,000)
FY22
Project No STP-15-1(110)
FY23
Const / CE
STP 05,587 00AC Conv 0 0
State 0-5,587 00AC Conv 0 0
11895Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Pawnee
NDOT Improvement Mill, resurf 24' rdwy w/4'-6' earth shld, replace 3 br's, conc repair in Du BoisPawnee City Southeast N-50 0.00 12.4
N-8 from Pawnee City to N-50, then south on N-50 to NE/KS state line
$9,815Estimate ($1,000)
FY22
Project No STP-50-1(109)
FY23
PE
State 00 0410 0 0
ROW
State 00 0115 0 0
Const / CE
STP-AC 07,236 00 0 0
STP 03,236 00AC Conv 0 0
State 0-3,236 00AC Conv 0 0
State 02,054 00 0 0
STP 00 00AC Conv 4000 0
State 00 00AC Conv -4000 0
2
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
12080Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Seward
NDOT Improvement Urban reconstruction
US-34 North & South, Seward N-15 66.24 1.4
N-15 from BNSF DOT#083457X north 1.4 mi to Seward
$6,015Estimate ($1,000)
FY22
Project No STP-15-2(117)
FY23
PE
State 00 0257 0 0
ROW
State 0280 00 0 0
Const / CE
STP-AC 00 00 4267 0
State 00 00 1211 0
STP 00 00AC Conv 0 4267
State 00 00AC Conv 0 -4267
12704Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Cass
NDOT Improvement Conc repair, mill, asph widen/resurf 22' rdwy to 28', br replacement Weeping Water Spur S-13K 0.00 1.9
Weeping Water Spur (S-13K) from N-50 to Weeping Water
$2,909Estimate ($1,000)
FY22
Project No STP-S13K(103)
FY23
PE
State 00 097 0 0
ROW
State 020 00 0 0
Const / CE
STP 00 00 2212 0
State 00 00 580 0
12790BControl No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Seward
NDOT Improvement 6-Lane interstate expansion including gr, str, surf, and s shld Seward - Lincoln I-80 377.90 17.1
I-80 from apprx 1.2 mi west of Sewarc to 0.7 mi west NW 48th St
$340,947Estimate ($1,000)
FY22
Project No NH-80-8(162)
FY23
PE
State 0100,000 00 0 0
Const / CE
NHPP 00 216,8520 0 0
State 00 24,0950 0 0
3
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
13028Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Gage
NDOT Improvement Mill, asph resurf 24' rdwy w/6' earth shld
E Jct US-136 - Lewiston Spur N-4 167.47 12.3
N-4 from the East jct US-136 to 3.5 mi east of the Lewiston Spur (S-67A)
$5,634Estimate ($1,000)
FY22
Project No STP-4-6(114)
FY23
PE
State 0181 00 0 0
Const / CE
STP 00 4,2540 0 0
State 00 1,1990 0 0
13098Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Richardson
NDOT Improvement Mill, widen/resurf existing 24' rdwy to 28'
US-75 - N-67 N-62 21.20 9.0
N-62 from US-75 east to N-67
$4,221Estimate ($1,000)
FY22
Project No STP-62-7(105)
FY23
PE
State 0120 00 0 0
ROW
State 100 00 0 0
Const / CE
State 00 00 0 826
STP 00 3,2650 0 0
13102Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Nemaha
NDOT Improvement Asph resurf 24' rdwy w/8' earth shld
Peru Spur - S Jct US-75 N-67 25.83 5.5
N-67 from Peru Spur (S-64G) west to the south jct US-75
$4,204Estimate ($1,000)
FY22
Project No STP-67-1(120)
FY23
PE
State 00 00 15 0
Const / CE
STP 00 3,3510 0 0
State 00 8380 0 0
4
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
13103Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Nemaha
NDOT Improvement Cold-in-place recycle, widen/resurf 24' rdwy to 28', br repair N Jct US-75 - Brock N-67 34.36 6.5
N-67 from N Jct US-75 west to approx 0.2 mi east of Brock
$5,274Estimate ($1,000)
FY22
Project No STP-67-1(121)
FY23
PE
State 6000 00 0 0
ROW
State 00 00 2 0
Const / CE
STP 00 3,6390 0 0
State 00 1,0330 0 0
13104Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Otoe
NDOT Improvement Mill, resurf 24' rdwy w/6' earth shld, br repair
N-105 North N-67 43.57 8.6
N-67 from N-105 north to E Jct N-128. Includes segment on Talmage Spur (S-66D)
$5,515Estimate ($1,000)
FY22
Project No STP-67-1(122)
FY23
PE
State 0240 00 0 0
ROW
State 300 00 0 0
Const / CE
STP 00 3,8960 0 0
State 00 1,3490 0 0
13161Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Seward
County Improvement New roadway
Karol Kay Blvd, Bader-Hillcrest, Seward 0.00 0.3
Extension of Karol Kay Blvd, from Bader Ave to Hillcrest Dr in Seward
$1,272Estimate ($1,000)
FY22
Project No URB-6763(1)
FY23
PE
STP 00 0176 0 0
STP 00 012 0 0
Local 00 065 0 0
ROW
STP 00 025 0 0
Local 00 06 0 0
Const / CE
STP 0646 00 0 0
Local 0342 00 0 0
5
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
13182Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Seward
NDOT Improvement Br rehab, approaches
Blue River, Beaver Crossing L-80E 8.23 0.0
L80E over the west fork of Big Blue river 0.4 mi south of Beaver Crossing
$1,218Estimate ($1,000)
FY22
Project No STP-L80E(113)
FY23
PE
State 00 00 42 0
ROW
State 00 00 0 1
Const / CE
STP 00 9400 0 0
State 00 2350 0 0
13183Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Jefferson
NDOT Improvement Br redeck and associated approach work Blue River Bridge West of Fairbury US-136 149.31 0.0
US-136 over the Blue River 0.6 mi west of Fairbury
$3,246Estimate ($1,000)
FY22
Project No NH-136-6(121)
FY23
PE
State 00 00 110 0
ROW
State 00 00 0 1
Const / CE
NHPP 00 2,4420 0 0
State 00 6930 0 0
13186Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Gage
NDOT Improvement Mill, widen/resurf to 28' rdwy, conc repair, br deck overlay, intersection Adams West N-41 74.46 11.3
N-41 from US-77 east to just east of N-43, including S-34C
$6,553Estimate ($1,000) A-2 Remove safety funds, adjust estimateFY22
Project No STP-HSIP-41-6(1
FY23
PE
State 00 0225 0 0
ROW
State 00 060 0 0
Const / CE
STP-AC 05,014 00 0 0
State 01,254 00 0 0
STP 5,0140 00AC Conv 0 0
State -5,0140 00AC Conv 0 0
6
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
13188Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Pawnee
NDOT Improvement Bridge redeck, approach slabs
Turkey Creek South of Steinauer N-4 189.57 0.0
N-4 over Turkey Creek 1.4 mi southeast of Steinauer
$1,096Estimate ($1,000)
FY22
Project No STP-4-7(107)
FY23
PE
State 00 00 41 0
ROW
State 00 00 0 1
Const / CE
STP 00 8430 0 0
State 00 2110 0 0
13201Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Seward
NDOT Improvement Bridge and associated approach work
Bee Spur Bridge S-80B 1.00 0.0
S-80B (Bee Spur) over Plum Creek
$931Estimate ($1,000)
FY22
Project No STP-S80B(114)
FY23
PE
State 00 00 40 0
ROW
State 00 00 0 4
Const / CE
STP 00 6920 0 0
State 00 1950 0 0
13236Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Johnson
NDOT Improvement Conc repair, joint/crack seal, mill, resurf, culv, guardrail Tecumseh North N-50 32.06 5.9
N-50 from Tecumseh north to approx 2.0 mi north of N-41
$6,637Estimate ($1,000)
FY22
Project No STP-50-1(113)
FY23
PE
State 00 0400 0 0
ROW
State 00 010 0 0
Const / CE
STP-AC 04,850 00 0 0
State 01,377 00 0 0
STP 00 00AC Conv 4850 0
State 00 00AC Conv -4850 0
7
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
13238Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Jefferson
NDOT Improvement Br replacement and associated approach work Rose Creek Bridge West of Reynolds N-8 38.52 0.2
N-8 over Rose Creek 1.0 mi west of Reynolds
$2,080Estimate ($1,000)
FY22
Project No STP-8-6(115)
FY23
PE
State 00 065 0 0
ROW
State 010 00 0 0
Const / CE
STP 00 00 1604 0
State 00 00 401 0
13245Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Jefferson
NDOT Improvement Conc repair, mill, resurf, br repair/overlay
Diller South N-103 0.00 4.4
N-103 from N-8 north to Diller
$1,841Estimate ($1,000)
FY22
Project No STP-103-1(111)
FY23
PE
State 00 0100 0 0
ROW
State 00 010 0 0
Const / CE
STP 01,350 00 0 0
State 0381 00 0 0
13246Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Jefferson
NDOT Improvement Conc repair, resurf 24' rdwy w/10' shld, 8' surf Jansen East US-136 156.24 9.8
US-136 from Jansen east to 0.2 mi east of the Jefferson/Gage Co line
$6,610Estimate ($1,000)
FY22
Project No NH-136-6(124)
FY23
PE
State 00 023 0 0
ROW
State 01 00 0 0
Const / CE
NHPP-AC 5,2690 00 0 0
State 1,3170 00 0 0
NHPP 00 00AC Conv 0 5269
State 00 00AC Conv 0 -5269
8
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
13249Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Otoe
County Improvement Reconstruct crushed rock rdwy with one continuous curve, br replacement Palmyra Southwest 0.00 0.9
From 1st St/'H' St in Palmyra, southwest to intersection Otoe Cnty Rds 6 & 'G'
$1,460Estimate ($1,000)
FY22
Project No HRRR-7915(1)
FY23
PE
SFTY 00 0226 0 0
State 00 04 0 0
Local 00 025 0 0
ROW
SFTY 00 040 0 0
Local 00 04 0 0
Const / CE
SFTY 01,045 00 0 0
Local 0116 00 0 0
13250Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Butler
NDOT Improvement Mill, resurf 24 rdwy w/10' shld, 8' surf
David City North N-15 92.68 5.6
N-15 from David City north to N-64 including 0.3 mi on N-64
$3,082Estimate ($1,000)
FY22
Project No STP-15-2(124)
FY23
PE
State 00 030 0 0
ROW
State 00 01 0 0
Const / CE
STP 02,441 00 0 0
State 0610 00 0 0
13259Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Saunders
NDOT Improvement Bridge replacement
Elm Creek South of Fremont US-77 111.44 0.0
US-77 over Elm Creek 1.5 mi south of Fremont
$1,718Estimate ($1,000)
FY22
Project No NH-77-2(163)
FY23
PE
State 00 00 85 0
ROW
State 00 00 0 5
Const / CE
NHPP 00 1,2700 0 0
State 00 3580 0 0
9
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
13264Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Cass
NDOT Improvement Mill, asph resurf 24' rdwy w/10' shld, 8' surf
N-50 East US-34 352.65 7.7
US-34 from approx 0.2 mi east of N-50 east to approx 1.1 mi west of N-67
$8,322Estimate ($1,000)
FY22
Project No NH-34-7(130)
FY23
PE
State 00 0250 0 0
ROW
State 00 0136 0 0
Const / CE
NHPP-AC 06,205 00 0 0
State 01,731 00 0 0
NHPP 6,2050 00AC Conv 0 0
State -6,2050 00AC Conv 0 0
13265Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Saline
NDOT Improvement Mill, resurf, br repair
Wilber North N-103 33.25 9.5
N-103 from Wilber north to the W Jct N-33
$5,458Estimate ($1,000)
FY22
Project No STP-103-1(112)
FY23
PE
State 00 00 30 0
Const / CE
STP 00 4,3420 0 0
State 00 1,0860 0 0
13266Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Gage
NDOT Improvement Mill, asph resurf 24' rdway, br repair/overlay Barneston East N-8 86.64 12.1
N-8 from just west 1st St in Barneston, east to Jct N-99
$4,100Estimate ($1,000)
FY22
Project No STP-8-6(116)
FY23
PE
State 00 0120 0 0
Const / CE
STP 03,100 00 0 0
State 0880 00 0 0
10
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
13268Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Otoe
NDOT Improvement Mill, widen/resurf 24' rdwy to 28', br repair/overlay, scour mitigation at CBC Eagle South N-43 22.30 8.0
N-43 from E Jct N-2 north to US-34
$4,992Estimate ($1,000)
FY22
Project No STP-43-2(107)
FY23
PE
State 00 0388 0 0
ROW
State 00 011 0 0
Const / CE
STP 03,675 00 0 0
State 0918 00 0 0
13270Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Gage
NDOT Improvement Mill, widen/resurf 24' rdwy to 28', 1 br repair, 2 br replacements Adams - Sterling N-41 85.48 6.7
N-41 from just east of N-43 to just east of the east limits of Sterling
$7,230Estimate ($1,000)
FY22
Project No STP-41-6(118)
FY23
PE
State 00 0242 0 0
ROW
State 012 00 0 0
Const / CE
STP-AC 00 00 5581 0
State 00 00 1395 0
STP 00 00AC Conv 0 5581
State 00 00AC Conv 0 -5581
13273AControl No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Seward
NDOT Improvement Urban reconstruction, curb inlets, storm sewer, lighting In Milford US-6 292.26 1.0
US-6 from just west of west lmts Milford to approx 0.2 mi east 'B' St in Milford
$3,966Estimate ($1,000)
FY22
Project No STP-6-6(163)
FY23
PE
State 0134 00 0 0
ROW
State 300 00 0 0
Const / CE
STP 00 00 0 2961
State 00 00 0 841
11
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
13275Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Pawnee
NDOT Improvement Resurf existing rdwy & s-shld, curb and flume, br repair and gdrl W Jct N-4 - Tecumseh N-50 20.03 12.0
N-50 from just east of west jct N-50, east to Tecumseh
$9,212Estimate ($1,000)
FY22
Project No STP-50-1(114)
FY23
PE
State 250 00 0 0
Const / CE
STP-AC 00 00 0 7350
State 00 00 0 1837
STP 00 7,3500AC Conv 0 0
State 00 -7,3500AC Conv 0 0
13276Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Otoe
NDOT Improvement Conc repair, resurf, repair 5-br's, replace 1-br sized CBC w/br sized CBC Syracuse South N-50 37.93 14.0
N-50 from 2.0 mi north of N-41 north to Syracuse
$7,624Estimate ($1,000)
FY22
Project No STP-50-1(115)
FY23
PE
State 00 0756 0 0
ROW
State 015 00 0 0
Const / CE
STP-AC 00 00 5482 0
State 00 00 1371 0
STP 00 00AC Conv 0 5482
State 00 00AC Conv 0 -5482
13277Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Nemaha
NDOT Improvement Mill, resurf, br repair
Nemaha South N-67 12.13 1.5
N-67 from Co Rd 724 to approx 0.2 mi south of the north limits of Nemaha
$1,908Estimate ($1,000)
FY22
Project No STP-67-1(124)
FY23
PE
State 00 085 0 0
ROW
State 00 014 0 0
Const / CE
STP 01,411 00 0 0
State 0398 00 0 0
12
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
13278Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Butler
NDOT Improvement Mill, asph resurf 24' rdwy w/10' shld, 8' surf, br repair N-92 South N-15 76.12 11.0
N-15 from Seward/Butler Co line north to the E Jct N-92
$5,376Estimate ($1,000)
FY22
Project No STP-15-2(127)
FY23
PE
State 00 0211 0 0
Const / CE
STP-AC 04,132 00 0 0
State 01,033 00 0 0
STP 00 00AC Conv 4132 0
State 00 00AC Conv -4132 0
13292Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Seward
NDOT Improvement Br replacement and associated approach work, replace flumes Staplehurst Spur Bridge S-80C 2.61 0.1
S-80C (Staplehurst Spur) over the Big Blue River 0.9 mi east of Staplehurst
$1,867Estimate ($1,000)
FY22
Project No STP-S80C(115)
FY23
PE
State 610 00 0 0
ROW
State 00 00 1 0
Const / CE
STP 00 1,4440 0 0
State 00 3610 0 0
13295Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Pawnee
NDOT Improvement Mill, resurf, culv, curb ramp, sidewalk
Table Rock West N-4 191.97 5.1
N-4 from W Jct N-50 to Table Rock, including a segment on N-50
$4,352Estimate ($1,000)
FY22
Project No STP-4-7(108)
FY23
PE
State 00 0261 0 0
ROW
State 00 075 0 0
Const / CE
STP 03,128 00 0 0
State 0888 00 0 0
13
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
13299Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Seward
NDOT Improvement Mill, resurf, rumble strips
Seward West US-34 285.71 13.7
US-34 from just west York/Seward Co line east to Seward
$7,124Estimate ($1,000)
FY22
Project No STP-34-6(142)
FY23
PE
State 00 00 15 0
Const / CE
STP 00 5,6870 0 0
State 00 1,4220 0 0
13300Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Seward
NDOT Improvement Mill, resurf
Goehner North L-80G 0.00 5.7
Link L-80G from just south of I-80 north to US-34 north of Goehner
$1,676Estimate ($1,000)
FY22
Project No STP-L80G(116)
FY23
Const / CE
STP 00 1,3410 0 0
State 00 3350 0 0
13301Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Seward
NDOT Improvement Mill, resurf
Utica South L-80F 0.00 5.7
Link L-80F from just south I-80 north to US-34 north of Utica
$1,677Estimate ($1,000)
FY22
Project No STP-L80F(117)
FY23
PE
State 10 00 0 0
Const / CE
STP 00 00 0 1341
State 00 00 0 335
14
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
13302Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Saline
NDOT Improvement Mill, resurf
Jct US-6/N-15 - Crete N-33 0.00 11.1
N-33 from Jct US-6 & N-15, southeast to Crete
$8,138Estimate ($1,000)
FY22
Project No STP-33-6(109)
FY23
PE
State 1030 00 0 0
ROW
State 00 00 5 0
Const / CE
STP 00 6,4240 0 0
State 00 1,6060 0 0
13307Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Richardson
NDOT Improvement Conc repair, mill & resurf existing rdwy & s-shld, br repair, modify turn lanes Verdon East & West US-73 8.14 13.9
US-73 from 5.4 mi southeast of N-67 to 0.2 mi east of Jct US-75
$8,734Estimate ($1,000)
FY22
Project No NH-73-1(119)
FY23
PE
State 00 0661 0 0
ROW
State 01 00 0 0
Const / CE
NHPP-AC 00 00 6299 0
State 00 00 1773 0
NHPP 00 00AC Conv 0 6299
State 00 00AC Conv 0 -6299
13325Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Nemaha
NDOT Improvement Replace br, add approaches
N-62 South Bridge N-105 17.71 0.0
N-105 over Long Branch Creek just north of Pawnee/Richarson/Nemaha Co line
$1,836Estimate ($1,000)
FY22
Project No STP-105-1(108)
FY23
PE
State 00 0166 0 0
ROW
State 00 012 0 0
Const / CE
STP 01,326 00 0 0
State 0332 00 0 0
15
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
13326Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Saunders
NDOT Improvement Bridge repair/overlay, seal conc bridge rail, replace guardrail Wahoo Viaduct US-77 92.05 0.0
US-77 br locations approx 0.3 mi south and 1.4 mi north W Jct N-92 west of Wahoo
$2,033Estimate ($1,000)
FY22
Project No NH-77-2(165)
FY23
PE
State 00 0150 0 0
Const / CE
NHPP 01,506 00 0 0
State 0377 00 0 0
13330Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Otoe
NDOT Improvement Mill and resurface existing rdwy with asphalt, earth shld, culv repair, gdrl Burr Spur S-66E 0.00 6.2
S66E (Burr Spur) from jct N-50 to just west of 6th street in Burr
$2,489Estimate ($1,000)
FY22
Project No STP-S66E(104)
FY23
PE
State 00 011 0 0
Const / CE
STP 00 00 1982 0
State 00 00 496 0
13338Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Gage
NDOT Improvement Conc repair, mill, resurf, br repair/overlay, reconstruct median Pickrell North US-77 31.09 7.9
US-77 from 1.0 mi north of Pickrell Spur to 1.8 mi south of Cortland
$9,715Estimate ($1,000) A-2 Add Safety funds, adjust estimateFY22
Project No NH-77-1(135)
FY23
PE
State 00 0352 0 0
Const / CE
SFTY 0463 00 0 0
NHPP-AC 07,078 00 0 0
State 052 00 0 0
State 01,770 00 0 0
NHPP 7,0780 00AC Conv 0 0
State -7,0780 00AC Conv 0 0
16
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
13344Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Jefferson
NDOT Improvement Replace existing bridge with triple 10'x12' CBC Steele City Spur Bridge S-48A 0.15 0.0
S-48A approx 0.3 mi north of Steel City
$494Estimate ($1,000)
FY22
Project No STP-S48A(101)
FY23
PE
State 015 00 0 0
ROW
State 100 00 0 0
Const / CE
STP 00 00 0 375
State 00 00 0 94
13356Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Seward
NDOT Improvement Conc repair, mill, resurf existing rdwy & s-shld & ramps, br repair York/Seward County Line - Goehner I-80 365.14 7.5
I-80 from York/Seward county line, east to approx 0.5 mi west of Goehner
$6,217Estimate ($1,000)
FY22
Project No NH-80-8(159)
FY23
PE
State 10 00 0 0
Const / CE
NHPP 00 00 0 5594
State 00 00 0 622
13358Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Seward
NDOT Improvement Mill, resurf 4-lane rdwy and shld, conc repair, br repair Goehner - Milford I-80 372.68 9.4
I-80 from approx 0.4 mi west of Goehner to 0.4 mi west of Milford
$16,502Estimate ($1,000) A-2 Adjust estimatesFY22
Project No NH-80-8(160)
FY23
PE
State 00 0225 0 0
Const / CE
NHPP-AC 014,640 00 0 0
State 01,637 00 0 0
NHPP 14,6400 00AC Conv 0 0
State -14,6400 00AC Conv 0 0
17
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
13359Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Seward
NDOT Improvement Conc repair, mill, resurf rdwy and shld, br repair Milford - Lincoln I-80 381.71 13.2
I-80 from 0.4 mi west of Milford to 1.0 mi west of NW 48th St
$11,397Estimate ($1,000)
FY22
Project No NH-80-8(161)
FY23
PE
State 00 099 0 0
Const / CE
NHPP-AC 010,168 00 0 0
State 01,130 00 0 0
NHPP 00 00AC Conv 10168 0
State 00 00AC Conv -10168 0
13361Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Saline
County Improvement Bridge replacement and associated approach work Crete Tuxedo Park Rd
Tuxedo Park Rd bridge U062044305 in Crete
$1,614Estimate ($1,000) A-1 Add projectFY22
Project No BRM-7076(24)
FY23
PE
BRO 00 0430 0 0
Local 00 0108 0 0
ROW
BRO 08 00 0 0
Local 02 00 0 0
Const / CE
BRO 00 00 853 0
Local 00 00 213 0
13362Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Seward
County Improvement Bridge replacement and associated approach work Seward Northwest
Bluff Rd bridge #C008002010 just northeast of Seward
$2,208Estimate ($1,000) A-2 Move const from FY-21 to FY-22FY22
Project No BRO-7080(54)
FY23
PE
BRO 00 0262 0 0
Local 00 065 0 0
ROW
BRO 08 00 0 0
State 02 00 0 0
Const / CE
BRO 00 00 1397 0
State 00 00 474 0
18
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
13363Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Seward
County Improvement Bridge replacement and associated approach work Beaver Crossing South
Pioneers Rd bridge #C008004010 just south of Beaver Crossing
$2,126Estimate ($1,000) A-1 Add projectFY22
Project No BRO-7748(1)
FY23
PE
BRO 00 0435 0 0
State 00 0109 0 0
Local 00 022 0 0
ROW
BRO 08 00 0 0
State 02 00 0 0
Const / CE
BRO 1,2400 00 0 0
State 3100 00 0 0
13371Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Otoe
NDOT Improvement Bridge repair and epoxy polymer overlay
Nebraska City Missouri River Bridge N-2 508.16 0.0
N-2 bridge over the Missouri River east of Nebraska City
$1,283Estimate ($1,000)
FY22
Project No NH-2-7(119)
FY23
PE
State 00 036 0 0
Other 00 083 0 0
Const / CE
NHPP 0284 00 0 0
State 071 00 0 0
Other 0809 00 0 0
13381Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Saunders
NDOT Improvement Br repair/overlay, abutment and approach work, replace expansion joints, gdrl Ashland Viaduct N-66 97.43 0.0
N-66 viaduct over BNSF approx 0.1 mi NW jct N-66 & US-6 in Ashland
$1,397Estimate ($1,000)
FY22
Project No STP-66-6(109)
FY23
PE
State 00 0153 0 0
Const / CE
STP 0995 00 0 0
State 0249 00 0 0
19
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
13392Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Saunders
NDOT Improvement Mill, resurf
Ashland East N-66 97.84 3.1
N-66 from just east of Ashland to near the Eugene T Mahoney Park entrance
$1,537Estimate ($1,000)
FY22
Project No STP-66-6(110)
FY23
PE
State 00 00 1 0
Const / CE
STP 00 1,2290 0 0
State 00 3070 0 0
13393Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Cass
NDOT Improvement Mill, resurf
Greenwood East US-6 331.22 9.7
US-6 from Greenwood to approx 0.2 mi west Ashland & N-63 from I-80 to Jct US-6
$4,655Estimate ($1,000)
FY22
Project No STP-6-6(164)
FY23
PE
State 00 00 1 0
Const / CE
STP 00 3,7230 0 0
State 00 9310 0 0
13394Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Saunders
NDOT Improvement Mill, resurf
Wahoo East US-77 95.41 16.0
US-77 approx 0.4 mi west S Jct US77/N-92 with N-109 to just east of E Jct N-92
$7,374Estimate ($1,000)
FY22
Project No NH-77-2(167)
FY23
PE
State 1430 00 0 0
Const / CE
NHPP 00 5,7850 0 0
State 00 1,4460 0 0
20
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
13398Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Johnson
NDOT Improvement Mill, resurf existing rdwy and s-shld w/asph, br repair and gdrl Tecumseh East US-136 211.33 10.8
US-136 from just east N-50 to approx 1.1 mi east N Jct N-105
$4,638Estimate ($1,000)
FY22
Project No NH-136-7(127)
FY23
PE
State 01 00 0 0
Const / CE
NHPP 00 00 3710 0
State 00 00 927 0
13401Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Nemaha
NDOT Improvement Reconstruct s-shld, rumble strips
Auburn North US-75 28.80 13.4
US-75 from approx 0.6 mi north Auburn to 0.2 mi south N-128 south Nebraska City
$477Estimate ($1,000)
FY22
Project No NH-75-1(109)
FY23
PE
State 00 01 0 0
Const / CE
NHPP 3810 00 0 0
State 950 00 0 0
13402Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Saline
County Improvement Bridge replacement
Crete Northwest
Cnty Rd 2050 br between Cnty Rd 'A' and Cnty Rd 'B' northwest of Crete
$1,373Estimate ($1,000) A-2 Remove PE, obligated in FY-19FY22
Project No BRO-7076(25)
FY23
PE
BRO 00 030 0 0
State 00 08 0 0
Const / CE
BRO 00 00 0 1000
State 00 00 0 335
21
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
13403Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Saunders
County Improvement Bridge
Touhy Northwest
Rd 31 approx 0.6 mi south intersection with 'H' Rd northwest of Touhy
$559Estimate ($1,000) A-2 Remove PE, obligated in FY-19FY22
Project No BRO-7078(20)
FY23
PE
BRO 00 030 0 0
State 00 08 0 0
Const / CE
BRO 00 00 0 417
State 00 00 0 104
13405Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Johnson
County Improvement Bridge
Sterling Northwest
Cnty Rd 738 approx 0.5 mi east intersection with 612 Ave northwest of Sterling
$925Estimate ($1,000) A-2 Remove PE, obligated in FY-19FY22
Project No BRO-7049(24)
FY23
PE
BRO 00 020 0 0
State 00 05 0 0
Const / CE
BRO 00 00 0 600
State 00 00 0 300
13411Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Otoe
NDOT Improvement Crack seal rdwy & s-shld
N-2 and N-75 Near Nebraska City N-2 503.47 3.5
N-2 and US-75 segments near Nebraska City
$505Estimate ($1,000) A-2 Add projectFY22
Project No NH-2-7(120)
FY23
PE
State 05 00 0 0
Const / CE
NHPP 4000 00 0 0
State 1000 00 0 0
22
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
13413Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Gage
NDOT Improvement Mill, resurf
Beatrice Southeast US-136 166.00 9.4
US-136 from approx 0.2 mi east Jefferson/Gage Co Line to Beatrice
$3,010Estimate ($1,000)
FY22
Project No NH-136-6(128)
FY23
PE
State 010 00 0 0
Const / CE
NHPP 2,4000 00 0 0
State 6000 00 0 0
13415Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Cass
NDOT Improvement Mill, ovly
Murdock Spur - N-50 N-1 7.33 6.2
N-1 from S13A (Murdock Spur) to Jct N-50Includes S13A (Murdock Spur)
$1,050Estimate ($1,000)
FY22
Project No STP-1-7(109)
FY23
PE
State 00 01 0 0
Const / CE
STP 8390 00 0 0
State 2100 00 0 0
20626Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Dodge
NDOT Improvement ROW, grading conc pvmt for 4-lane divided expressway, Str, lighting and util North Bend - Fremont US-30 414.94 10.7
US-30 (new alignment) from west of North Bend to the Fremont Bypass
$119,500Estimate ($1,000)
FY22
Project No S-30-6(1044)
FY23
PE
State 00 04,000 0 0
ROW
State 00 02,500 0 0
State 03,000 00 0 0
Const / CE
State 30,0000 00 0 0
State 00 00 20000 0
State 00 00 0 60000
23
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
21209Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Cass
NDOT Improvement 4-lane divided expressway
Murray - Plattsmouth US-34 373.33 6.8
US-34 from N-1 north 6.3 mi and on US-75 from US-34 north 1.2 mi
$48,087Estimate ($1,000)
FY22
Project No NH-75-2(128)
FY23
PE
State 00 0813 0 0
State 00 01,024 0 0
Local 00 037 0 0
ROW
State 00 0823 0 0
Local 00 077 0 0
Const / CE
EM 20,0000 00 0 0
State 23,8200 00 0 0
Local 1,4930 00 0 0
21704Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Washington
NDOT Improvement Mill, resurf, br repair, br replacements
Blair - Herman US-75 116.35 9.8
US-75 from Blair to 0.2 mi north of the Burt Co line
$11,860Estimate ($1,000)
FY22
Project No STP-75-3(107)
FY23
PE
State 00 01,746 0 0
ROW
State 00 0550 0 0
Const / CE
STP 07,582 00 0 0
State 01,982 00 0 0
22177Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Dodge
NDOT Improvement New viaduct
23rd St Viaduct, Fremont 0.5
23rd St from Colorado Ave to Nye Ave in Fremont
$1,325Estimate ($1,000)
FY22
Project No STPN-TMT-5616
FY23
PE
Local 00 025 0 0
Local 0100 00 0 0
ROW
Local 1,2000 00 0 0
24
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
22339Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Dodge
NDOT Improvement Mill, asph resurf 24' rdwy w/10' shld, 8' surf
North Bend - Fremont US-30 407.50 16.0
US-30 from 3.1 mi east of N-79 east to Fremont
$4,851Estimate ($1,000)
FY22
Project No S-30-6(1048)
FY23
PE
State 030 00 0 0
Const / CE
State 00 00 4821 0
22455Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Dodge
NDOT Improvement Conc repair, mill, asph resurf, br repair
In Snyder & East N-91 188.91 4.4
N-91 from approx 0.1 mi east of Snyder east to US-275
$5,702Estimate ($1,000)
FY22
Project No STP-91-6(113)
FY23
PE
State 00 0286 0 0
ROW
State 083 00 0 0
Const / CE
STP-AC 00 00 4154 0
State 00 00 1179 0
STP 00 00AC Conv 0 4154
State 00 00AC Conv 0 -4154
22508Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Washington
NDOT Improvement 2-lane conc pvmt, storm sewer, bike trail
Blair South Bypass 0.00 1.0
Bypass road from US-30 at Hollow Rd east to US-75 at Co Rd P35
$11,816Estimate ($1,000)
FY22
Project No STP-DPS-3854(1)
FY23
PE
EM 00 0579 0 0
ROW
STP 00 01,200 0 0
Local 00 0300 0 0
Const / CE
Local 09,737 00 0 0
25
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
22543Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Cass
NDOT Improvement Mill, resurf 24' rdwy, rebuild/resurf shld, br repair Union - Murray US-34 366.38 7.3
US-75 & 34 from south of Jct US-34 & 75 near Union, north to south of Jct N-1
$5,671Estimate ($1,000)
FY22
Project No NH-34-7(129)
FY23
PE
State 00 00 35 0
ROW
State 00 00 0 1
Const / CE
NHPP 00 4,3900 0 0
State 00 1,2450 0 0
22568Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Washington
NDOT Improvement Mill, resurf
Fort Calhoun South US-75 101.35 5.3
US-75 from 0.2 mi north of Douglas/Washington Co line north to Fort Calhoun
$4,108Estimate ($1,000)
FY22
Project No NH-75-3(119)
FY23
PE
State 00 0310 0 0
ROW
State 00 012 0 0
Const / CE
NHPP 02,971 00 0 0
State 0815 00 0 0
22582Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Dodge
NDOT Improvement Mill, resurf, resurf ramps, br repair/overlay
Douglas County Line North US-275 152.44 4.5
US-275 from E Jct US-30 to Dodge/Douglas Co line, incl US-30 br repair/overlay
$4,242Estimate ($1,000)
FY22
Project No NH-275-6(139)
FY23
PE
State 00 0142 0 0
Const / CE
NHPP-AC 00 00 3280 0
State 00 00 820 0
NHPP 00 00AC Conv 0 3280
State 00 00AC Conv 0 -3280
26
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
22590Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Washington
NDOT Improvement Mill, conc repair, urban resurf, ADA curb ramps In Blair N-91 229.97 0.5
N-91 from US-30/75 in Blair southwest 0.5 mi
$687Estimate ($1,000)
FY22
Project No NH-91-7(111)
FY23
PE
State 00 045 0 0
Local 00 010 0 0
ROW
State 00 010 0 0
Local 00 02 0 0
Const / CE
NHPP 0364 00 0 0
State 075 00 0 0
Local 0181 00 0 0
22599Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Washington
NDOT Improvement Mill, asph resurf, br deck repair/overlay
Blair Southwest US-30 440.37 5.8
US-30 from just northeast of N-31 northeast to Blair
$4,642Estimate ($1,000)
FY22
Project No NH-30-7(118)
FY23
PE
State 1470 00 0 0
ROW
State 00 00 10 0
Const / CE
NHPP 00 3,5830 0 0
State 00 9020 0 0
22688Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Dodge
NDOT Improvement Mill, resurf EB rdwy, shld, rumble strips, br repair/overlay Fremont Northeast Bypass US-30 426.09 3.3
EB US-30 from US-77 to just north of US-275 east of Fremont
$2,848Estimate ($1,000)
FY22
Project No NH-30-6(138)
FY23
PE
State 00 0103 0 0
Const / CE
NHPP 02,196 00 0 0
State 0549 00 0 0
27
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
22691Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Dodge
NDOT Improvement Conc repair, crack/joint seal, roadway sealer, br repair Fremont - US-30 US-77 115.15 1.4
US-77 from 23rd St in Fremont to 0.3 mi south of US-30
$1,112Estimate ($1,000)
FY22
Project No S-77-3(1037)
FY23
PE
State 09 00 0 0
Const / CE
State 00 00 0 1103
22713Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Dodge
NDOT Improvement Concrete repair and rehab
Fremont North, US-30 - US-275 (NB) US-77 117.43 7.1
US-77 from approx 0.6 mi north US-30 grade separation to N Jct US-275/N-91
$4,324Estimate ($1,000)
FY22
Project No NH-77-3(138)
FY23
PE
State 00 00 37 0
Const / CE
NHPP 00 3,4300 0 0
State 00 8570 0 0
22720Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Dodge
NDOT Improvement Gr, conc pvmt & s-shld reconstruction, culv, br repairs, gdrl US-275 East of Fremont - Arlington US-30 429.28 3.9
US-30 from approx 0.6 mi east US-275 gr separation east to west lmts Arlington
$13,031Estimate ($1,000)
FY22
Project No NH-30-6(139)
FY23
PE
State 8630 00 0 0
ROW
State 00 00 100 0
Const / CE
NHPP 00 9,4530 0 0
State 00 2,6150 0 0
28
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
22722Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Dodge
NDOT Improvement Gr, new bridges, conc pvmt for new 4-lane divided expressway, ramps Fremont Southeast Beltway 112.43 3.3
US-77 from Platte River on new alignment to new US-275 interchange SE of Fremont
$56,611Estimate ($1,000)
FY22
Project No S-77-3(1036)
FY23
PE
State 00 02,034 0 0
ROW
State 00 03,200 0 0
Const / CE
State 6,6700 00 0 0
State 31,3770 00 0 0
Local 13,3300 00 0 0
22731Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Cass
NDOT Improvement Bridge repair/overlay, inlets, replace expansion joints, gdrl Plattsmouth - Bellevue Bridges US-34 382.10 4.1
US-34 bridges from approx 1.4 mi north Plattsmouth to 0.6 mi north Jct US-75
$4,800Estimate ($1,000)
FY22
Project No NH-34-7(132)
FY23
PE
State 00 0145 0 0
Const / CE
NHPP-AC 00 00 3724 0
State 00 00 931 0
NHPP 00 00AC Conv 0 3724
State 00 00AC Conv 0 -3724
22752Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Dodge
NDOT Improvement Mill, resurf, br repair
North Bend - US-30 N-79 42.29 2.1
N-79 from 0.5 mi south North Bend to new US-30 Rogers - North Bend alignment
$4,078Estimate ($1,000)
FY22
Project No STP-79-3(108)
FY23
PE
State 00 0141 0 0
ROW
State 020 00 0 0
Const / CE
STP 00 00 3071 0
State 00 00 846 0
29
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
22763Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Dodge
NDOT Improvement Br repair
Dodge Southwest Bridge N-91 182.94 0.0
N-91 bridge over west tributary of Pebble creek approx 0.9 mi southwest Dodge
$225Estimate ($1,000) A-2 Add projectFY22
Project No STP-91-6(115)
FY23
PE
State 05 00 0 0
Const / CE
STP 00 00 0 180
State 00 00 0 40
22766Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Cass
NDOT Improvement Replace viaduct
Louisville Viaduct N-50 76.11 0.0
N-50 viaduct in Louisville
$2,925Estimate ($1,000)
FY22
Project No STP-50-2(138)
FY23
PE
State 00 00 0 1
Const / CE
STP 00 2,3390 0 0
State 00 5850 0 0
22774Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Dodge
NDOT Improvement Replace pot bearings in steel girder spans and associated work Missouri River Bridge in Blair US-30 450.55 0.0
US-30 bridge over Missouri River in Blair
$376Estimate ($1,000)
FY22
Project No STR-30-6(1050)
FY23
PE
State 10 00 0 0
Other 10 00 0 0
Const / CE
State 00 00 0 187
Other 00 00 0 187
30
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
22783Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Washington
NDOT Improvement Install traffic signs, advanced beacons, pvmt sensors & intersection improvementUS-30 / Industrial Dr., Blair US-30 449.88 0.0
US-30 at intersection with Industrial Drive in Blair
$410Estimate ($1,000) A-2 Add projectFY22
Project No NH-30-7(121)
FY23
PE
State 05 00 0 0
Const / CE
NHPP 00 00 0 360
State 00 00 0 45
22795Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Cass
NDOT Improvement Build new rdwy on shifted alignment and bridge spanning floodway, RR Xing N-66 Connection in Louisville N-66 111.30 0.6
N-66 from N Jct N-50 to Walnut St in Louisville, shifted rdwy E of Main - Walnut
$4,574Estimate ($1,000) A-1 Add projectFY22
Project No STP-66-7(119)
FY23
PE
State 0141 00 0 0
ROW
State 4000 00 0 0
Const / CE
STP 00 00 0 3226
State 00 00 0 807
31490Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Madison
NDOT Improvement Mill, asph widen/resurf 24' rdwy to 28', br repair Newman Grove North & South N-45 0.00 9.2
N-45 from Jct N-91 to Jct N-32 except for a small segment; Includes L-58B
$3,856Estimate ($1,000)
FY22
Project No STP-45-3(106)
FY23
PE
State 00 0388 0 0
ROW
State 00 054 0 0
Const / CE
STP 02,659 00 0 0
State 0755 00 0 0
31
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
31510Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Knox
NDOT Improvement Bridge replacement, add approaches
Niobrara South Bridge N-14 198.59 0.0
N-14 1.0 mi south of Niobrara over Burgess Creek
$2,855Estimate ($1,000)
FY22
Project No STP-14-4(109)
FY23
PE
State 00 0253 0 0
ROW
State 00 06 0 0
Const / CE
STP 02,025 00 0 0
State 0571 00 0 0
31515Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Wayne
NDOT Improvement Mill, resurf existing rdwy, blade widen, conc repair, culv, gdrl North Jct US-81 - N-35 N-98 7.46 13.0
N-98 from N Jct US-81, east to Jct N-35
$7,867Estimate ($1,000)
FY22
Project No STP-98-5(106)
FY23
PE
State 00 030 0 0
ROW
State 050 00 0 0
Const / CE
STP-AC 00 00 6230 0
State 00 00 1557 0
STP 00 00AC Conv 0 6230
State 00 00AC Conv 0 -6230
31674Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Knox
NDOT Improvement Gr, str, surf 24' rdwy w/8' shld, 2' surf
Niobrara East & West N-12 151.48 10.6
N-12 east and west of Niobrara on shifted alignment
$214,797Estimate ($1,000)
FY22
Project No S-12-5(1011)
FY23
PE
State 00 06,147 0 0
Other 00 01,886 0 0
ROW
State 00 04 0 0
Other 00 08,730 0 0
Const / CE
Other 198,0300 00 0 0
32
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
31677Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Cedar
NDOT Improvement Mill, resurf rdwy, replace urban section in Randolph, br repair/replace US-81 - Belden US-20 373.95 10.5
US-20 from US-81 east to approx 1.0 mi west of N-57 west of Belden
$13,717Estimate ($1,000)
FY22
Project No NH-20-5(112)
FY23
PE
State 00 0500 0 0
ROW
State 00 054 0 0
Const / CE
NHPP-AC 010,530 00 0 0
State 02,633 00 0 0
NHPP 00 00AC Conv 5000 0
State 00 00AC Conv -5000 0
NHPP 00 00AC Conv 0 5530
State 00 00AC Conv 0 -5530
31821 Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Knox
County Improvement Br replacement and associated approach work Verdigre North
Co Rd 3.5 mi north of Verdigre crossing Verdigris Creek
$1,956Estimate ($1,000)
FY22
Project No BRO-7054(19)
FY23
PE
BRO 00 0258 0 0
State 00 069 0 0
ROW
BRO 00 08 0 0
State 00 02 0 0
Const / CE
BRO 1,2350 00 0 0
State 3840 00 0 0
33
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
31832Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Knox
NDOT Improvement Mill, resurf, br repair / replace
Bloomfield - US-81 N-84 22.39 11.5
N-84 from the east limits of Bloomfield east to Jct US-81
$6,369Estimate ($1,000)
FY22
Project No STP-84-5(108)
FY23
PE
State 00 0218 0 0
ROW
State 055 00 0 0
Const / CE
STP-AC 00 00 4877 0
State 00 00 1219 0
STP 00 00AC Conv 0 4877
State 00 00AC Conv 0 -4877
31916Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Cedar
NDOT Improvement Mill, resurf 24' rdwy to 28' w/6' earth shld, br repair, curb/flume, gdrl Coleridge - Hartington N-57 57.88 8.7
N-57 from 875 Rd north of Coleridge north to N-84 near Hartington
$6,296Estimate ($1,000)
FY22
Project No STP-57-4(116)
FY23
PE
State 00 0209 0 0
ROW
State 00 010 0 0
Const / CE
STP-AC 04,742 00 0 0
State 01,335 00 0 0
STP 4,7420 00AC Conv 0 0
State -4,7420 00AC Conv 0 0
31922Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Burt
NDOT Improvement Asph resurf 24' rdwy w/10' shld, 8' surf
Lyons - Walthill US-77 148.77 15.1
US-77 from 0.3 mi south of Lyons north to 0.2 mi north of N-94
$8,715Estimate ($1,000)
FY22
Project No NH-77-3(126)
FY23
PE
State 350 00 0 0
Const / CE
NHPP 00 6,9440 0 0
State 00 1,7360 0 0
34
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
31949Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Cuming
NDOT Improvement Conc repair, mill, widen/resurf 24' rdwy to 28', br repair, extend culv, gdrl West Point West N-32 62.41 10.9
N-32 from near Wisner Rd to approx 0.2 mi east of west lmts West Point
$6,564Estimate ($1,000)
FY22
Project No STP-32-6(113)
FY23
PE
State 00 0195 0 0
ROW
State 00 05 0 0
Const / CE
STP-AC 05,091 00 0 0
State 01,273 00 0 0
STP 5,0910 00AC Conv 0 0
State -5,0910 00AC Conv 0 0
31983Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Platte
NDOT Improvement Replace (SB) & repair (NB) br's over Loup River, CBC to replace br at S030 37787Columbus South Bridges US-30 377.73 0.0
US-30 br's over Loup River & US-30 br approx 0.2 mi north of south lmts Columbus
$10,028Estimate ($1,000)
FY22
Project No NH-30-5(131)
FY23
PE
State 01,052 00 0 0
ROW
State 200 00 0 0
Const / CE
NHPP 00 00 0 6976
State 00 00 0 1980
31989Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Thurston
NDOT Improvement Widen resurf 24' rdwy to 28' w/4' earth shld Macy - Winnebago US-75 158.43 9.6
US-75 from approx 3.0 mi south of N-94 north to 0.9 mi south of the S Jct US-77
$10,744Estimate ($1,000)
FY22
Project No STP-75-4(115)
FY23
PE
State 2820 00 0 0
ROW
State 00 00 272 0
Const / CE
STP 00 7,9500 0 0
State 00 2,2400 0 0
35
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
32124Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Cuming
NDOT Improvement Mill, resurf rdwy and shld, br repair/overlay
Beemer North L-20A 0.00 5.3
L-20A from N-51 south to US-275 in Beemer
$2,478Estimate ($1,000)
FY22
Project No STP-L20A(102)
FY23
PE
State 00 085 0 0
Const / CE
STP 01,914 00 0 0
State 0479 00 0 0
32127Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Knox
NDOT Improvement Mill, asph resurf
N-121 West N-59 16.00 9.0
N-59 from approx 9.0 mi east of Creighton east to N-121
$3,164Estimate ($1,000)
FY22
Project No STP-59-5(108)
FY23
PE
State 00 075 0 0
Const / CE
STP 02,471 00 0 0
State 0618 00 0 0
32128Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Knox
NDOT Improvement Conc repair, mill, resurf, trench widening, br repair Creighton East N-59 6.42 9.6
N-59 from approx 0.7 mi east of Creighton east to 540th Ave
$4,491Estimate ($1,000)
FY22
Project No STP-59-5(109)
FY23
PE
State 00 0163 0 0
ROW
State 00 07 0 0
Const / CE
STP-AC 03,412 00 0 0
State 0909 00 0 0
STP 3,4120 00AC Conv 0 0
State -3,4120 00AC Conv 0 0
36
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
32136Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Thurston
NDOT Improvement Asph resurf 24' rdwy w/8' shld, 2' surf., br
Pender - Emerson N-9 17.85 12.1
N-9 from Pender north to Emerson, including the Thurston Spur (S-87A)
$7,716Estimate ($1,000)
FY22
Project No STP-9-4(116)
FY23
PE
State 00 00 20 0
Const / CE
STP 00 6,1570 0 0
State 00 1,5390 0 0
32137Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Dixon
NDOT Improvement Mill, resurf 24' rdwy, w/8' s shld, bridges repair/replace/rehab, guardrail North of Dixon - South of Martinsburg US-20 399.15 9.6
US-20 from 0.2 mi west of N-116 east to 0.8 mi east of E Jct N-9
$10,129Estimate ($1,000)
FY22
Project No NH-20-6(110)
FY23
PE
State 00 0236 0 0
ROW
State 00 043 0 0
Const / CE
NHPP-AC 07,684 00 0 0
State 02,166 00 0 0
NHPP 7,6840 00AC Conv 0 0
State -7,6840 00AC Conv 0 0
32139Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Burt
NDOT Improvement Conc repair, resurf existing rdwy w/asph, curb & flume, br repair, culv, gdrl Decatur - Macy US-75 149.19 7.8
US-75 from 0.1 mi north of N-51 in Decatur, north to 1.0 mi south of Macy
$6,044Estimate ($1,000)
FY22
Project No STP-75-3(118)
FY23
PE
State 080 00 0 0
Const / CE
STP 00 4,7710 0 0
State 00 1,1930 0 0
37
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
32150A Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Dakota
NDOT Improvement Resurf, br repair
SW of Hubbard - US-75/77 N-35 59.03 9.4
N-35 from approx 0.4 mi SW of Hubbard, northeast to Jct US-75/77
$5,532Estimate ($1,000)
FY22
Project No NH-35-4(127)
FY23
PE
State 00 00 1 0
Const / CE
NHPP 00 4,4250 0 0
State 00 1,1060 0 0
32190Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Platte
County Improvement New viaduct
Columbus East Viaduct 0.00 0.0
E 29th Ave, from E 8th St north to US-301.0 mi east of Columbus
$13,983Estimate ($1,000)
FY22
Project No RRZ-71(33)
FY23
PE
SFTY 00 0237 0 0
State 00 0722 0 0
State 00 020 0 0
Other 00 0113 0 0
Local 00 0677 0 0
Const / CE
SFTY 010,382 00 0 0
Other 01,221 00 0 0
Local 0611 00 0 0
32213Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Antelope
NDOT Improvement Bridge replacement
Clearwater East Bridge US-275 35.96 0.0
US-275 over a stream 4.7 mi east of Clearwater
$878Estimate ($1,000)
FY22
Project No NH-275-5(145)
FY23
PE
State 00 050 0 0
ROW
State 00 09 0 0
Const / CE
NHPP 0640 00 0 0
State 0179 00 0 0
38
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
32220Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Cuming
NDOT Improvement Replace br's w/CBC and associated rdwy work Wisner Southeast Bridges US-275 104.68 0.0
US-275 over a stream approx 2.6 mi southeast of Wisner
$2,816Estimate ($1,000)
FY22
Project No NH-275-6(143)
FY23
PE
State 00 0205 0 0
ROW
State 00 027 0 0
Const / CE
NHPP 02,038 00 0 0
State 0546 00 0 0
32223Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Cuming
NDOT Improvement Bridge replacements, pvmt replacement as needed, gdrl Pender South Bridges N-9 13.97 0.0
N-9 at two br's one approx 4.0 north Jct N-91/N-51 & 0.9 mi south of S Jct N-16
$2,617Estimate ($1,000)
FY22
Project No STP-9-3(105)
FY23
PE
State 10 00 0 0
Const / CE
STP 00 00 0 2093
State 00 00 0 523
32228Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Colfax
NDOT Improvement Br repair/overlay, painting
In Schuyler N-15 108.33 0.0
N-15 viaduct approx 0.2 mi south of 16th St in Schuyler
$1,044Estimate ($1,000)
FY22
Project No STP-15-3(116)
FY23
PE
State 00 024 0 0
ROW
State 00 01 0 0
Const / CE
STP 0815 00 0 0
State 0204 00 0 0
39
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
32234Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Platte
NDOT Improvement Urban reconstruction, lighting, traffic signals, ADA 23rd St, Columbus US-30 379.44 2.7
US-30 from just east of N Jct US-81 east to 11th Ave in Columbus
$18,277Estimate ($1,000)
FY22
Project No NH-30-5(134)
FY23
PE
State 00 0831 0 0
Local 00 032 0 0
ROW
State 0160 00 0 0
Local 040 00 0 0
Const / CE
NHPP-AC 13,2650 00 0 0
State 5060 00 0 0
Local 3,4430 00 0 0
NHPP 00 00AC Conv 7265 0
State 00 00AC Conv -7265 0
NHPP 00 00AC Conv 0 6000
State 00 00AC Conv 0 -6000
32236 Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Knox
NDOT Improvement Mill, widen/resurf 24' rdwy to 28', replace 1 br, repair 1 br, culv, flumes Verdigre - Niobrara N-14 187.98 11.5
N-14 from Jct N-84 & S-54A (Verdigre Spur) north to W Jct N-12 in Niobrara
$0Estimate ($1,000)
FY22
Project No STP-14-4(115)
FY23
Const / CE
STP 04,880 00AC Conv 0 0
State 0-4,880 00AC Conv 0 0
40
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
32238Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Dixon
NDOT Improvement Mill, resurf, 2 bridge replacements
E Jct US-20 - N-12 N-9 50.98 10.0
N-9 from E Jct US-20, northeast to N-12 0.5 mi south of Ponca
$7,158Estimate ($1,000)
FY22
Project No STP-9-4(118)
FY23
PE
State 00 0520 0 0
ROW
State 00 085 0 0
Const / CE
STP-AC 05,113 00 0 0
State 01,440 00 0 0
STP 5,1130 00AC Conv 0 0
State -5,1130 00AC Conv 0 0
32239Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Platte
NDOT Improvement Mill, conc repair, asph widen/resurf to 28', br repair US-81 West N-91 144.51 8.9
N-91 from approx 2.5 mi east of Lindsay, east to approx 0.1 mi west jct US-81
$6,206Estimate ($1,000) A-2 Add projectFY22
Project No STP-91-5(125)
FY23
Const / CE
STP 02,552 00AC Conv 0 0
State 0-2,552 00AC Conv 0 0
32240Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Knox
NDOT Improvement Mill, resurf 24' rdwy with 5' earth shld
Crofton West N-12 177.16 12.0
N-12 from Hoboe Creek east to E Jct N-121
$5,271Estimate ($1,000)
FY22
Project No STP-12-5(120)
FY23
PE
State 020 00 0 0
Const / CE
STP 00 4,2010 0 0
State 00 1,0500 0 0
41
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
32249Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Burt
NDOT Improvement Deploy closed circuit TV cameras
District 3 CCTV Cameras US-77 141.31 0.0
At 7 locations on US-77, N-32, US-20 and US-81 in District 3
$309Estimate ($1,000)
FY22
Project No ITS-NH-STP-77-3
FY23
PE
State 00 013 0 0
Const / CE
NHPP 0143 00 0 0
STP 088 00 0 0
State 065 00 0 0
32252Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Knox
NDOT Improvement Br repair/overlay
Standing Bear Bridge NE of Niobrara N-14 203.30 0.0
N-14 Standing Bear Bridge over Missouri River northeast of Niobrara
$691Estimate ($1,000)
FY22
Project No STP-14-4(118)
FY23
PE
State 00 028 0 0
Other 00 013 0 0
Const / CE
STP 0354 00 0 0
State 088 00 0 0
Other 0208 00 0 0
32256Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Cedar
NDOT Improvement Mill, resurf 28' rdwy, br repair/overlay, extend culv, seal br rail, culv, gdrl Hartington North N-57 67.33 6.7
N-57 from Norwegian Bow Cr bridge approx 0.2 mi north Hartington to Jct N-12
$5,295Estimate ($1,000)
FY22
Project No STP-57-4(118)
FY23
PE
State 00 0176 0 0
ROW
State 00 010 0 0
Const / CE
STP-AC 04,087 00 0 0
State 01,022 00 0 0
STP 4,0870 00AC Conv 0 0
State -4,0870 00AC Conv 0 0
42
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
32257 Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Burt
NDOT Improvement Conc repair, mill, resurf, br replacement
Tekamah North US-75 133.44 6.1
US-75 from just north of Tekamah north to 8.8 mi south of Decatur
$7,300Estimate ($1,000)
FY22
Project No STP-75-3(122)
FY23
Const/CE
STP 05,612 00AC Conv 0 0
State 0-5,612 00AC Conv 0 0
32262Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Boone
NDOT Improvement Conc repair, mill, inlay, curb and gutter, sidewalk ramps, br In Albion, Petersburg & Elgin N-14 121.43 3.8
Three segements of N-14 in the areas of Albion, Petersburg and Elgin
$3,552Estimate ($1,000)
FY22
Project No STP-14-3(119)
FY23
PE
State 00 0329 0 0
ROW
State 00 024 0 0
Const / CE
STP 02,492 00 0 0
State 0707 00 0 0
32263Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Cedar
NDOT Improvement Mill, asph resurf rdwy, br repait, earth shld rehab N-59 - N-84 N-15 182.94 9.8
N-15 from N-59 north to approx 0.2 mi south of N-84
$3,489Estimate ($1,000)
FY22
Project No STP-15-4(121)
FY23
PE
State 00 085 0 0
Const / CE
STP 02,651 00 0 0
State 0753 00 0 0
43
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
32278Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Knox
NDOT Improvement Br Redeck
Santee South Bridge S-54D 1.57 0.0
S-54D (Santee Spur) over Lost Creek approx 1.6 mi northeast of N-12
$454Estimate ($1,000)
FY22
Project No STP-S54D(104)
FY23
PE
State 00 00 1 0
Const / CE
STP 00 3620 0 0
State 00 910 0 0
32280Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Knox
NDOT Improvement Mill,resurf existing rdwy, br repair, w iden turn lanes & shld,curb & flume,gdrlCrofton North N-121 66.73 9.7
N-121 from N-12 north to approx 1.4 mi east of the Knox/Cedar Co line
$4,902Estimate ($1,000)
FY22
Project No STP-121-4(113)
FY23
PE
State 00 0550 0 0
ROW
State 00 020 0 0
Const / CE
STP 03,466 00 0 0
State 0866 00 0 0
32283Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Pierce
NDOT Improvement Mill, resurf existing rdwy, add s-shld, repair light poles Pierce Northwest N-13 9.24 4.7
N-13 from approx 0.4 mi SE of NW lmts of Pierce, NW to just NW of Jct N-121
$2,022Estimate ($1,000)
FY22
Project No STP-13-4(112)
FY23
PE
State 00 064 0 0
ROW
State 00 05 0 0
Const / CE
STP 01,562 00 0 0
State 0391 00 0 0
44
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
32284Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Antelope
NDOT Improvement Resurf
US-20 - N-59 N-14 170.91 8.3
N-14 from Jct US-20 to Jct N-59
$3,936Estimate ($1,000)
FY22
Project No STP-14-4(117)
FY23
PE
State 00 00 1 0
Const / CE
STP 00 3,1480 0 0
State 00 7870 0 0
32285Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Burt
NDOT Improvement Mill, resurf, br repair, replace approaches
Tekamah South US-75 126.19 5.8
US-75 from Washington/Burt Co line to 0.4 mi north of south limits of Tekamah
$3,295Estimate ($1,000)
FY22
Project No STP-75-3(123)
FY23
PE
State 00 0142 0 0
ROW
State 00 020 0 0
Const / CE
STP 02,506 00 0 0
State 0627 00 0 0
32286Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Colfax
NDOT Improvement Mill, resurf, br repair
N-91 South N-15 111.25 15.3
N-15 from approx 1.8 mi north of US-30 north of Schuyler to N-91
$8,045Estimate ($1,000)
FY22
Project No STP-15-3(119)
FY23
PE
State 00 0191 0 0
Const / CE
STP-AC 00 00 6283 0
State 00 00 1571 0
STP 00 00AC Conv 0 6283
State 00 00AC Conv 0 -6283
45
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
32287Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Platte
NDOT Improvement Conc repair, mill, resurf existing rdwy and s-shld, br repair, culv, gdrl Columbus East & North US-30 382.10 7.7
US-30 from Columbus east approx 2.3 mi; includes rwo segments on US-81
$6,737Estimate ($1,000)
FY22
Project No NH-30-5(135)
FY23
PE
State 00 0574 0 0
Const / CE
NHPP-AC 04,930 00 0 0
State 01,233 00 0 0
NHPP 4,9300 00AC Conv 0 0
State -4,9300 00AC Conv 0 0
32288Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Cedar
NDOT Improvement Mill, resurf existing rdwy w/asph, restore turf shld, replace fly-by lane, gdrl N-12 North & South N-15 192.74 9.3
N-15 from N-84 to W jct N-12; and E jct N-12 to just south of South Dakota line
$4,340Estimate ($1,000)
FY22
Project No STP-NH-15-4(12
FY23
PE
State 1240 00 0 0
Const / CE
NHPP 00 00 0 1038
STP 00 00 0 2335
State 00 00 0 843
32289Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Cuming
NDOT Improvement Mill, resurf rdwy & s-shld w/asph, br repair/replace, culv and gdrl N. Jct. N-51 - S. Jct. N-9 N-16 0.00 10.6
N-16 from Jct N-51 to S Jct N-9
$6,227Estimate ($1,000)
FY22
Project No STP-16-3(110)
FY23
PE
State 10 00 0 0
Const / CE
STP-AC 00 00 0 4981
State 00 00 0 1245
STP 00 4,9810AC Conv 0 0
State 00 -4,9810AC Conv 0 0
46
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
32290Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Stanton
NDOT Improvement Mill, resurf rdwy & s-shld w/asph, br repair and gdrl N-57 East N-32 47.46 15.0
N-32 from just east Jct N-57 to just west of intersection with Wisner Rd
$5,340Estimate ($1,000)
FY22
Project No STP-32-6(115)
FY23
PE
State 10 00 0 0
Const / CE
STP 00 4,2710 0 0
State 00 1,0680 0 0
32291Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Antelope
NDOT Improvement Resurf
Orchard East & West US-20 328.83 8.8
US-20 from Holt/Antelope Co line east to Royal
$5,086Estimate ($1,000)
FY22
Project No NH-20-5(113)
FY23
PE
State 00 00 1 0
Const / CE
NHPP 00 4,0680 0 0
State 00 1,0170 0 0
32292Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Platte
NDOT Improvement Mill, resurf existing rdwy & s-shld w/asphalt, br repair/replace, gdrl Monroe East & West N-22 75.95 13.2
N-22 from Nance/Platte Co line east to approx 0.3 mi west of US-81
$9,554Estimate ($1,000)
FY22
Project No STP-22-5(119)
FY23
PE
State 10 00 0 0
Const / CE
STP-AC 00 00 0 7642
State 00 00 0 1911
STP 00 7,6420AC Conv 0 0
State 00 -7,6420AC Conv 0 0
47
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
32293Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Pierce
NDOT Improvement Mill, resurf rdwy & s-shld w/asph, br repair, culv extenstions and gdrl S. Jct. N-98 - US-20 US-81 168.94 11.1
US-81 from approx 0.2 mi south of S Jct N-98 to 0.2 mi north of Jct US-20
$6,250Estimate ($1,000)
FY22
Project No NH-81-4(126)
FY23
PE
State 10 00 0 0
Const / CE
NHPP 00 00 0 4999
State 00 00 0 1250
32294Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Pierce
NDOT Improvement Resurf
In Plainview & West US-20 351.87 4.0
US-20 from 1.0 mi west of the Antelope/Pierce Co line thru Plainview
$2,147Estimate ($1,000)
FY22
Project No NH-20-5(114)
FY23
PE
State 00 00 1 0
Const / CE
NHPP 00 1,7170 0 0
State 00 4290 0 0
32295Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Thurston
NDOT Improvement Mill, resurf existing rdwy & s-shld w/asph, replace br sized CBC's, gdrl N-94 - Winnebago US-77 163.91 5.6
US-77 from just north of Jct N-94 to just south of Jct US-275 south of Winnebago
$3,221Estimate ($1,000)
FY22
Project No NH-77-4(127)
FY23
PE
State 01 00 0 0
Const / CE
NHPP 00 00 0 2576
State 00 00 0 644
48
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
32296Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Burt
NDOT Improvement Mill, resurf existing rdwy & s-shld, culv, br repair and gdrl US-77 - US-75 N-51 24.49 11.0
N-51 from just west of Jct US-77, east to just west of S jct US-75
$8,009Estimate ($1,000)
FY22
Project No STP-51-7(106)
FY23
PE
State 00 0604 0 0
ROW
State 0150 00 0 0
Const / CE
STP 00 00 5804 0
State 00 00 1451 0
32297Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Cedar
NDOT Improvement Conc pvmt repair, sealing cracks & joints, replace CBC, conc pvmt, storm sewer In Hartington N-57 66.06 2.0
N-57 from S Jct N-84 to just north Norwegian Bow Creek Bridge in Hartington
$1,039Estimate ($1,000)
FY22
Project No STP-57-4(120)
FY23
PE
State 00 04 0 0
ROW
State 02 00 0 0
Const / CE
STP 8220 00 0 0
State 2110 00 0 0
32301Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Thurston
County Improvement Bridge replacement and associated approach work Winnebago North
Co Rd 897 (B Ave) C008710425 0.2 mi west of US-75/77, 2.7 mi north of Winnebago
$1,299Estimate ($1,000) A-2 Add projectFY22
Project No BRO-7087(4)
FY23
PE
BRO 00 0189 0 0
ROW
BRO 010 00 0 0
Const / CE
BRO 1,1000 00 0 0
49
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
32302Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Cuming
NDOT Improvement PE, ROW and utilites for 4-lane divided expressway w/bypass around Scribner Scribner - West Point US-275 114.00 19.7
US-275 from Scribner to West Point
$124,521Estimate ($1,000)
FY22
Project No S-275-6(1050)
FY23
PE
State 00 011,521 0 0
ROW
State 00 05,000 0 0
Const / CE
State 020,000 00 0 0
State 50,0000 00 0 0
State 00 00 0 38000
32312Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Dixon
NDOT Improvement Grading, bridge replacements, rdwy surfacing and gdrl Norfolk NE Bridges N-116 0.62 0.0
At various highway bridge locations northeast of Norfolk
$11,340Estimate ($1,000) A-1 Add earmarked fundsFY22
Project No STP-D3(107)
FY23
PE
State 00 01 0 0
Const / CE
STP-AC 5710 00 0 0
EM 8,5000 00 0 0
State 2,2680 00 0 0
STP 00 5710AC Conv 0 0
State 00 -5710AC Conv 0 0
32313Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Knox
County Improvement Bridge
Center West
Rd 881 (Bazille St) approx 0.7 mi west of intersection N-13 in Center
$1,248Estimate ($1,000) A-2 Move const from FY-22 to FY-24FY22
Project No BRO-7054(22)
FY23
PE
BRO 020 00 0 0
Const / CE
BRO 00 1,2280 0 0
50
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
32314Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Madison
County Improvement Bridge
Jackson Street in Madison
Jackson Street south of 2nd St N in Madison
$673Estimate ($1,000) A-2 Move const from FY-22 to FY-24FY22
Project No BRO-7059(16)
FY23
PE
BRO 010 00 0 0
Local 03 00 0 0
Const / CE
BRO 00 5280 0 0
Local 00 1320 0 0
32315Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Madison
County Improvement Bridge
Norfolk North
W Eisenhower Ave approx 0.4 mi east intersection US-81 north of Norfolk
$582Estimate ($1,000) A-2 Move const from FY-22 to FY-24FY22
Project No BRO-7059(17)
FY23
PE
BRO 01 00 0 0
Const / CE
BRO 00 5810 0 0
32319Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Stanton
NDOT Improvement Corridor study for NEPA & Tr Operation, Hwy & Br Design, Survey, ROW Plans Norfolk - Wisner US-275 86.10 15.7
US-275 from N-57 approx 8.6 mi east Norfolk to Wisner
$2,688Estimate ($1,000)
FY22
Project No S-275-6(1052)
FY23
PE
State 02,688 00 0 0
32319AControl No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Stanton
County Improvement 4-lane gr, str, surf
N-57 - East Jct N-15 US-275 86.08 10.0
US-275 from Jct N-57 to east Jct N-15 north of Pilger
$25,000Estimate ($1,000)
FY22
Project No TIB-275-6(149)
FY23
PE
State 00 050 0 0
Const / CE
EM 19,9600 00 0 0
State 4,9900 00 0 0
51
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
32320Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Knox
NDOT Improvement Br replacement, build temp br due to March 2019 flood event Niobrara West Bridges N-12 159.83 0.0
N-12 bridges west of Niobrara (Site#'s D3-3 and D3-4)
$48,231Estimate ($1,000)
FY22
Project No ER-12-5(122)
FY23
Const / CE
ER 047,265 00ER Conv 0 0
STP 0-47,265 00ER Conv 0 0
STP 047,265 00AC Conv 0 0
State 01,000 00AC Conv 0 0
41086Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Adams
NDOT Improvement Gr, culv, 1.9 mi conc pvmt - 5 lane urban section, 3.2 mi 4-lane divided sectionHastings Southeast US-6 212.70 2.4
US-6 from just west 'J' St to just west BNSF RR xing approx 1.3 mi east Hastings
$35,439Estimate ($1,000)
FY22
Project No S-6-4(1022)
FY23
PE
State 00 0220 0 0
State 00 01,733 0 0
Local 00 0433 0 0
ROW
State 04,800 00 0 0
Local 01,200 00 0 0
Const / CE
State 00 20,9600 0 0
State 00 8530 0 0
Local 00 5,2400 0 0
52
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
41704Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Hall
NDOT Improvement 4 lane divided rdwy on new alignment
US-281 West, Grand Island US-30 308.84 3.7
US-30 from 1.4 mi west of Grand Island to 0.4 mi west of N-2
$29,257Estimate ($1,000)
FY22
Project No S-30-4(1046)
FY23
PE
State 00 0910 0 0
State 00 01,216 0 0
Local 00 0191 0 0
ROW
State 03,861 00 0 0
State 02 00 0 0
Local 0508 00 0 0
Const / CE
State 00 00 20370 0
Local 00 00 2199 0
41977Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Polk
NDOT Improvement Urban
In Stromsburg US-81 78.26 0.7
US-81 in Stromsburg
$1,399Estimate ($1,000)
FY22
Project No NH-81-2(134)
FY23
PE
State 420 00 0 0
Const / CE
NHPP 00 1,0630 0 0
State 00 2940 0 0
53
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
42335 Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Merrick
County Improvement Br replacement and associated approach work Palmer Northwest
Merrick Rd over Rock Creek 5.7 mi north and 1.8 mi west of Palmer
$1,099Estimate ($1,000)
FY22
Project No BRO-7061(27)
FY23
PE
BRO 00 040 0 0
State 00 07 0 0
Local 00 05 0 0
ROW
BRO 04 00 0 0
State 01 00 0 0
Const / CE
BRO 8340 00 0 0
State 2080 00 0 0
42404Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
York
NDOT Improvement Asph resurf 24' rdwy w/6'-10' shld, 2' - 8' surf, br repair Henderson Spur S-93A 0.00 6.7
Henderson Spur (S-93A) except for approx 0.3 mi section
$4,582Estimate ($1,000)
FY22
Project No STP-S93A(107)
FY23
PE
State 0151 00 0 0
Const / CE
STP 00 3,5450 0 0
State 00 8860 0 0
42543Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Thayer
NDOT Improvement Widen/resurf existing 24'-rdwy to 28', shld widening, br sized culvs, gdrl Nuckolls Co Line - L85F US-136 116.28 12.1
US-136 from Nuckolls Co line to 1.2 mi west of Jct US-81
$8,985Estimate ($1,000)
FY22
Project No STP-136-5(113)
FY23
PE
State 0276 00 0 0
ROW
State 4000 00 0 0
Const / CE
STP 00 6,2890 0 0
State 00 2,0200 0 0
54
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
42564AControl No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
York
NDOT Improvement Mill, conc resurf 24' rdwy, asph resurf 8' shld, intersection median islands York West US-34 262.04 9.8
US-34 from 0.2 mi east of the Henderson Spur east to the south jct with US-81
$7,565Estimate ($1,000)
FY22
Project No STP-34-5(117)
FY23
PE
State 00 0105 0 0
ROW
State 00 01 0 0
Const / CE
STP-AC 05,967 00 0 0
State 01,492 00 0 0
STP 5,9670 00AC Conv 0 0
State -5,9670 00AC Conv 0 0
42573Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Sherman
NDOT Improvement Mill, resurf 24' rdwy w/4' earth shld, conc repair, br North Jct N-92 - N-70 N-58 41.82 10.4
N-58 from N Jct N-92 north to N-58
$5,762Estimate ($1,000)
FY22
Project No STP-58-2(109)
FY23
PE
State 00 0145 0 0
ROW
State 00 012 0 0
Const / CE
STP-AC 04,484 00 0 0
State 01,121 00 0 0
STP 4,4840 00AC Conv 0 0
State -4,4840 00AC Conv 0 0
42576 Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Sherman
NDOT Improvement Conc repair, asph resurf, br repair
Ravenna North N-68 2.20 12.0
N-68 from 0.1 mi north Buffalo/Sherman Co line north to L82A & east to N-58
$5,451Estimate ($1,000)
FY22
Project No STP-68-2(103)
FY23
Const / CE
STP 04,088 00AC Conv 0 0
State 0-4,088 00AC Conv 0 0
55
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
42602Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Sherman
NDOT Improvement Widen/resurf 24' rdwy to 28', br repair
Loup City West N-92 308.81 11.5
N-92 from Custer/Sherman Co. line east to 0.1 mi east of N-58
$6,756Estimate ($1,000)
FY22
Project No STP-92-4(110)
FY23
PE
State 0258 00 0 0
ROW
State 500 00 0 0
Const / CE
STP-AC 00 00 0 5033
State 00 00 0 1415
STP 00 5,0330AC Conv 0 0
State 00 -5,0330AC Conv 0 0
42605Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Greeley
NDOT Improvement Mill, resurf 24' rdwy w/earth shld, curb/flumes Scotia East N-22 15.81 8.4
N-22 from 0.1 mi east of Scotia east to US-281
$6,267Estimate ($1,000)
FY22
Project No STP-22-4(113)
FY23
PE
State 045 00 0 0
ROW
State 500 00 0 0
Const / CE
STP-AC 00 00 0 4938
State 00 00 0 1234
STP 00 4,9380AC Conv 0 0
State 00 -4,9380AC Conv 0 0
42608Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Clay
NDOT Improvement Conc repair, mill, asph resurf
S Jct N-14 - Ong Spur N-74 52.03 12.5
N-74 from S jct N-14 east to just east of Ong Spur; includes Ong Spur
$4,141Estimate ($1,000)
FY22
Project No STP-74-5(110)
FY23
PE
State 00 0175 0 0
Const / CE
STP 03,164 00 0 0
State 0802 00 0 0
56
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
42610Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Clay
NDOT Improvement Mill, conc repair, asph resurf, br repair, replace median, lighting Harvard - Sutton US-6 227.98 16.2
US-6 from 0.3 mi east of the Harvard Spur to Sutton including S-18A
$5,784Estimate ($1,000)
FY22
Project No STP-6-5(114)
FY23
PE
State 00 0145 0 0
ROW
State 00 010 0 0
Const / CE
STP-AC 04,503 00 0 0
State 01,126 00 0 0
STP 00 00AC Conv 4503 0
State 00 00AC Conv -4503 0
42611Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Thayer
NDOT Improvement Mill, asph resurf rdwy, shld, curb/flumes, br repair Hardy - Chester N-8 7.28 17.5
N-8 from just west Main St in Hardy to just west of east lmts Chester & S-85A
$6,614Estimate ($1,000)
FY22
Project No STP-8-5(108)
FY23
PE
State 00 0316 0 0
ROW
State 00 010 0 0
Const / CE
STP-AC 05,030 00 0 0
State 01,258 00 0 0
STP 5,0300 00AC Conv 0 0
State -5,0300 00AC Conv 0 0
42612 Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Buffalo
NDOT Improvement Widen/resurf 24' rdwy to 28', br repair, rumble strips, urban section Pleasanton South N-10 65.46 10.4
N-10 from approx 4.9 mi north Jct N-40 to approx 0.4 mi north of S Loup River
$10,272Estimate ($1,000)
FY22
Project No STP-10-2(122)
FY23
Const/CE
STP 07,277 00AC Conv 0 0
State 0-7,277 00AC Conv 0 0
57
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
42617Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Webster
NDOT Improvement Mill, resurf 24' rdwy w/3' earth shld, br replacement Red Cloud West US-136 64.35 10.9
US-136 from Franklin/Webster Co line east to US-281 in Red Cloud
$11,641Estimate ($1,000)
FY22
Project No STP-136-4(115)
FY23
PE
State 00 0856 0 0
ROW
State 00 0186 0 0
Const / CE
STP-AC 08,356 00 0 0
State 02,243 00 0 0
STP 8,3560 00AC Conv 0 0
State -8,3560 00AC Conv 0 0
42619Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Webster
NDOT Improvement Remove brick, reconstruct urban section, pvmt repair, mill and resurf In Red Cloud US-281 5.84 0.3
On US-281 at the jct with US-136 in Red Cloud
$2,682Estimate ($1,000)
FY22
Project No STP-281-1(117)
FY23
PE
State 00 00 76 0
Const / CE
STP 00 1,9750 0 0
State 00 4940 0 0
Local 00 1370 0 0
42673 Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Hall
NDOT Improvement Mill, resurf dual 24' rdwy, widen shoulders, br repair Wood River - Platte River I-80 299.38 11.5
I-80 from 0.8 mi west of Wood River to 1.2 mi west of west Gr Island Interchange
$11,455Estimate ($1,000)
FY22
Project No NH-80-6(107)
FY23
Const/CE
NHPP 05,770 00AC Conv 0 0
State 0-5,770 00AC Conv 0 0
58
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
42716Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Clay
NDOT Improvement Br repair/redeck, abutment repair, add approaches Deweese Spur Bridge S-18C 4.79 0.0
Deweese Spur (S-18C) 0.4 mi northest of Deweese
$836Estimate ($1,000)
FY22
Project No STP-S18C(107)
FY23
PE
State 00 00 55 0
ROW
State 00 00 0 1
Const / CE
STP 00 6110 0 0
State 00 1690 0 0
42732Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Hamilton
NDOT Improvement Mill, asph resurf, conc repair, br repair
Aurora East & West I-80 329.06 8.9
I-80 from approx 2.9 mi west of Aurora east to 5.4 mi east of Aurora
$12,687Estimate ($1,000) A-2 Adjust estimatesFY22
Project No NH-80-7(161)
FY23
PE
State 00 0124 0 0
Const / CE
NHPP-AC 011,252 00 0 0
State 01,311 00 0 0
NHPP 11,2520 00AC Conv 0 0
State -11,2520 00AC Conv 0 0
42742Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Adams
NDOT Improvement Replace superstructure, approach slabs
Hastings Regional Center Spur Bridge S-1C 0.30 0.0
At bridge over Pawnee Creek on S-1C (Hastings Regional Center Spur)
$794Estimate ($1,000)
FY22
Project No STP-S01C(102)
FY23
PE
State 220 00 0 0
Const / CE
STP 00 6180 0 0
State 00 1540 0 0
59
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
42756Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Buffalo
NDOT Improvement Replace dual 4-lane conc rdwy, br widen/redeck, ramp, culv, asph resurf Dawson Co Line - Odessa I-80 255.09 9.9
I-80 from Dawson/Buffalo Co line east to 0.4 mi west of Odessa
$45,050Estimate ($1,000)
FY22
Project No NH-80-5(76)
FY23
PE
State 02,550 00 0 0
ROW
State 10 00 0 0
Const / CE
NHPP-AC 00 00 0 33995
State 00 00 0 8504
NHPP 00 33,9950AC Conv 0 0
State 00 -33,9950AC Conv 0 0
42756AControl No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Buffalo
NDOT Improvement Crossovers
Dawson Co Line - Odessa Crossovers I-80 255.09 0.0
Along I-80 between the Dawson Co line and the Odessa Interchange
$2,889Estimate ($1,000)
FY22
Project No NH-80-5(77)
FY23
PE
State 050 00 0 0
Const / CE
NHPP 00 00 2555 0
State 00 00 284 0
42765Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Buffalo
NDOT Improvement Widen/resurf 24' rdwy to 28', earth shld widen, culvs, asph patching Shelton Link L-10D 0.28 3.7
Shelton Link (L-10D) from I-80 north to US-30
$2,508Estimate ($1,000)
FY22
Project No STP-L10D(104)
FY23
PE
State 00 0200 0 0
ROW
State 00 0409 0 0
Const / CE
STP 01,481 00 0 0
State 0418 00 0 0
60
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
42766Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Hall
NDOT Improvement Mill, resurf existing rdwy, extend culv, br repair and gdrl Prosser Spur S-40D 1.13 5.0
Prosser Spur (S-40D) from approx 0.3 mi south of Jct N-11, south to Prosser
$2,477Estimate ($1,000)
FY22
Project No STP-S40D(107)
FY23
PE
State 150 00 0 0
Const / CE
STP 00 00 0 1970
State 00 00 0 492
42774Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Fillmore
NDOT Improvement Widen/resurf, modify loop/ramp terminals, conc repair Fairmont West Interchange US-6 256.00 0.5
US-6 from approx 0.2 mi east of west lmts Fairmont, east to 0.3 mi west 6th Ave
$966Estimate ($1,000)
FY22
Project No STP-6-5(115)
FY23
PE
State 00 030 0 0
ROW
State 00 018 0 0
Const / CE
STP 0734 00 0 0
State 0184 00 0 0
42776Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Hall
NDOT Improvement Repair/overlay 3 br, sealing, approach slabs, mill, resurf rdwy In Grand Island Bridges US-30 313.66 0.4
Jct US-30/US-281/N-2 and from Old Lincoln Hwy to Grant St in Grand Island
$5,163Estimate ($1,000)
FY22
Project No NH-30-4(162)
FY23
PE
State 00 0274 0 0
ROW
State 027 00 0 0
Const / CE
NHPP 00 00 3766 0
State 00 00 869 0
Local 00 00 227 0
61
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
42777Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Hamilton
NDOT Improvement Resurf
US-34 - W Jct I-80 N-2 367.24 3.3
N-2 from E Jct US-34 south to just north of I-80
$1,619Estimate ($1,000)
FY22
Project No STP-2-5(103)
FY23
PE
State 00 00 1 0
Const / CE
STP 00 1,2940 0 0
State 00 3240 0 0
42779Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Fillmore
NDOT Improvement Mill, resurf rdwy and shld
Sutton - Grafton US-6 242.43 7.4
US-6 from near NE limits Sutton to approx 0.2 mi east of west limits of Grafton
$3,361Estimate ($1,000)
FY22
Project No STP-6-5(116)
FY23
PE
State 00 013 0 0
ROW
State 00 015 0 0
Const / CE
STP 02,596 00 0 0
State 0737 00 0 0
42781Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Buffalo
NDOT Improvement Conc repair, resurf, ADA ramps, br repair
Gibbon - Shelton US-30 285.71 7.3
US-30 from just west of L-10C in Gibbon to 0.2 mi east of Shelton
$4,956Estimate ($1,000)
FY22
Project No STP-30-4(161)
FY23
PE
State 00 0280 0 0
ROW
State 029 00 0 0
Const / CE
STP 3,6280 00 0 0
State 1,0190 00 0 0
62
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
42782Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Polk
NDOT Improvement Conc pvmt reconstruction, repair, mill, asph resurf In Stromsburg & North US-81 78.26 4.5
US-81 from approx 0.1 mi north of south lmts Stromsburg to 0.2 mi south of N-92
$7,708Estimate ($1,000)
FY22
Project No NH-81-2(145)
FY23
PE
State 00 0299 0 0
ROW
State 05 00 0 0
Const / CE
NHPP-AC 00 00 5767 0
State 00 00 1637 0
NHPP 00 00AC Conv 0 5767
State 00 00AC Conv 0 -5767
42783Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Howard
NDOT Improvement Mill, resurf
N-11 West N-92 333.92 10.1
N-92 from Sherman/Howard Co line east to 0.4 mi west of N-11 including S-47A
$5,608Estimate ($1,000)
FY22
Project No STP-92-4(115)
FY23
PE
State 00 022 0 0
Const / CE
STP 00 00 4469 0
State 00 00 1117 0
42784Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Adams
NDOT Improvement Mill, resurf existing rdwy, install granular subdrains, construct beveled edge Trumbull Spur S-1D 0.00 5.4
Trumbull Spur (S-1D) from US-34/281 to Trumbull
$1,421Estimate ($1,000)
FY22
Project No STP-S01D(103)
FY23
PE
State 00 025 0 0
Const / CE
STP 1,1170 00 0 0
State 2790 00 0 0
63
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
42785Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Polk
NDOT Improvement Mill, asph resurf rdwy and shld, repair 1 br, replace 2 br Oscelola East & West US-81 83.11 12.2
US-81 from 0.2 mi east of W Jct N-92 west of Osceola east to E Jct N-92
$7,965Estimate ($1,000)
FY22
Project No NH-81-2(146)
FY23
PE
State 00 0465 0 0
ROW
State 00 055 0 0
Const / CE
NHPP-AC 05,938 00 0 0
State 01,507 00 0 0
NHPP 5,9380 00AC Conv 0 0
State -5,9380 00AC Conv 0 0
42786Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Sherman
NDOT Improvement Resurf
Hazard East N-2 316.69 6.2
N-2 from just northwest of N-10 southeast to 1.0 mi southeast of Sweetwater
$3,200Estimate ($1,000)
FY22
Project No NH-2-4(111)
FY23
PE
State 00 00 20 0
Const / CE
NHPP 00 2,5440 0 0
State 00 6360 0 0
42787Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Hall
NDOT Improvement Resurf
Cairo - Grand Island N-2 343.73 12.5
N-2 from Cairo southeast to US-281 in Grand Island
$9,216Estimate ($1,000)
FY22
Project No NH-2-4(112)
FY23
PE
State 00 053 0 0
ROW
State 010 00 0 0
Const / CE
NHPP-AC 00 00 7292 0
State 00 00 1662 0
Local 00 00 199 0
NHPP 00 00AC Conv 0 7292
State 00 00AC Conv 0 -7292
64
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
42788Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Adams
NDOT Improvement Replace US-6 conc pvmt; repair conc pvmt seal cracks & joints ADA curb ramps US-6 & US-34, Hastings US-6 211.29 2.3
US-6 & US-34 segments at US-6/34/281 intersection in Hastings
$8,265Estimate ($1,000)
FY22
Project No NH-6-4(129)
FY23
PE
State 00 0614 0 0
ROW
State 00 0400 0 0
Local 00 0100 0 0
Const / CE
NHPP-AC 05,433 00 0 0
State 0156 00 0 0
Local 01,562 00 0 0
NHPP 00 00AC Conv 5433 0
State 00 00AC Conv -5433 0
42789Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Fillmore
NDOT Improvement Right turn lane improvement, lighting, extend median drain pipe Geneva North US-81 40.15 0.2
US-81 approx 1.3 mi north of north lmts of Geneva
$388Estimate ($1,000)
FY22
Project No HSIP-81-1(122)
FY23
PE
State 00 027 0 0
Const / CE
SFTY 0320 00 0 0
State 041 00 0 0
42791Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Hamilton
NDOT Improvement Mill, resurf dual 24'rdwy and shld, conc repair, br repair/overlay, ramp resurf Phillips - Giltner I-80 318.58 6.3
I-80 from 0.4 mi east of Phillips to 0.4 mi west of Giltner
$8,701Estimate ($1,000)
FY22
Project No NH-80-7(163)
FY23
PE
State 0213 00 0 0
Const / CE
NHPP 00 00 0 7639
State 00 00 0 849
65
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
42794Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Buffalo
NDOT Improvement Conc repair, mill and resurf rdwy and s-shld, ramp repair/resurf, gdrl Gibbon - Shelton I-80 283.70 7.3
I-80 from just west Gibbon Interchange to just west Shelton Interchange
$7,730Estimate ($1,000)
FY22
Project No NH-80-6(113)
FY23
PE
State 00 032 0 0
Const / CE
NHPP-AC 00 00 6928 0
State 00 00 770 0
NHPP 00 00AC Conv 0 6928
State 00 00AC Conv 0 -6928
42795Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Hall
NDOT Improvement Conc repair, mill, resurf rdwy and shld, br repair Shelton - Wood River I-80 290.96 9.0
I-80 from just west of Shelton to just west of Wood River
$10,795Estimate ($1,000) A-2 Adjust estimatesFY22
Project No NH-80-6(114)
FY23
PE
State 00 0189 0 0
Const / CE
NHPP-AC 09,545 00 0 0
State 01,061 00 0 0
NHPP 00 00AC Conv 9545 0
State 00 00AC Conv -9545 0
42815Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Webster
NDOT Improvement Mill, resurf, curb/flumes, br, widen on S-91B Red Cloud North & Cowles Spur US-281 6.17 9.8
US-281 from Red Cloud to approx 0.3 mi north of Cowles Spur; includes S-91B
$4,970Estimate ($1,000)
FY22
Project No STP-281-1(118)
FY23
PE
State 2000 00 0 0
Const / CE
STP-AC 00 00 0 3816
State 00 00 0 954
STP 00 3,8160AC Conv 0 0
State 00 -3,8160AC Conv 0 0
66
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
42816Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Polk
NDOT Improvement Mill, resurf, br repair, lighting, gdrl
N-92 - Silver Creek N-39 0.00 9.8
N-39 from Jct N-92 to Jct US-30 west of Siver Creek
$4,867Estimate ($1,000)
FY22
Project No STP-39-2(107)
FY23
PE
State 00 0102 0 0
Const / CE
STP 00 00 3812 0
State 00 00 953 0
42817Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Nuckolls
NDOT Improvement Mill, repair and resurf existing rdwy and s-shld, curb repair, br repair, gdrl Superior North & South N-14 0.00 6.4
N-14 in two segments from Nebraska/Kansas State line to S Jct US-136
$4,040Estimate ($1,000)
FY22
Project No STP-14-1(123)
FY23
PE
State 00 0141 0 0
ROW
State 05 00 0 0
Const / CE
STP 00 00 3115 0
State 00 00 779 0
42819Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Hall
NDOT Improvement Mill, resurf existing rdwy and s-shld w/asph, br repair and gdrl In Grand Island & South (SB) US-34 226.74 5.4
US-34 from approx 0.3 mi N I-80 gr sep, north to Jct US-281 w/Stolley Park Rd
$2,730Estimate ($1,000)
FY22
Project No NH-34-4(134)
FY23
PE
State 10 00 0 0
Const / CE
NHPP 00 00 0 2183
State 00 00 0 546
67
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
42821Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Polk
NDOT Improvement Mill, resurf, br repair
Polk East N-66 11.60 9.4
N-66 from the east limits of Polk to US-81
$4,330Estimate ($1,000)
FY22
Project No STP-66-5(107)
FY23
PE
State 00 024 0 0
Const / CE
STP 03,445 00 0 0
State 0861 00 0 0
42822Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Polk
NDOT Improvement Mill, resurf existing rdwy & s-shld with asphalt, br repair, culv, gdrl Gresham North & South N-69 55.04 20.9
N-69 from jct US-34 to Jct US-81 & N-92
$9,262Estimate ($1,000)
FY22
Project No STP-69-2(105)
FY23
PE
State 00 0331 0 0
ROW
State 010 00 0 0
Const / CE
STP 7,1370 00 0 0
State 1,7840 00 0 0
42824Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Thayer
NDOT Improvement Mill, resurf existing rdwy, br replacment, br repair/ovly, culv and gdrl US-81 - Gilead US-136 129.74 6.5
US-136 from approx 0.2 mi west of Jct US-81 to approx 1.6 mi west Gilead
$3,715Estimate ($1,000)
FY22
Project No NH-136-5(112)
FY23
PE
State 01 00 0 0
Const / CE
NHPP 00 00 0 2971
State 00 00 0 743
68
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
42826Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Howard
NDOT Improvement Resurf
St Libory North & South US-281 78.45 6.1
US-281 from approx 1.8 mi south of Hall/Howard Co line to just north of N-58
$6,003Estimate ($1,000)
FY22
Project No NH-281-2(129)
FY23
PE
State 10 00 0 0
Const / CE
NHPP 00 4,8020 0 0
State 00 1,2000 0 0
42827Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Adams
NDOT Improvement Mill, resurf existing rdwy and s-shld with asphalt, br repair, culv repair, gdrlAyr North & South US-281 26.79 14.1
US-281 from Blue Hill to just north of W Assumption Rd south of Hastings
$9,153Estimate ($1,000)
FY22
Project No STP-281-1(119)
FY23
PE
State 00 046 0 0
ROW
State 010 00 0 0
Const / CE
STP 00 00 7278 0
State 00 00 1819 0
42829Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Clay
NDOT Improvement Resurf
Clay Center East N-41 0.34 11.6
N-41 from just east of Clay Center to Clay/Fillmore Co line
$5,998Estimate ($1,000)
FY22
Project No STP-41-5(108)
FY23
PE
State 10 00 0 0
Const / CE
STP 00 4,7980 0 0
State 00 1,1990 0 0
69
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
42841Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Hamilton
NDOT Improvement Conc repair, mill, resurf rdwy and shld, br repair/overlay Hampton - Henderson I-80 337.63 7.9
I-80 from 0.5 mi west of Hamption to 2.9 mi east of Henderson
$10,876Estimate ($1,000)
FY22
Project No NH-80-7(166)
FY23
PE
State 00 085 0 0
Const / CE
NHPP-AC 09,712 00 0 0
State 01,079 00 0 0
NHPP 9,7120 00AC Conv 0 0
State -9,7120 00AC Conv 0 0
42851Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Thayer
NDOT Improvement Grading, replace 2-bridges, pvmt reconstruction, gdrl and replace CCTV tower UPRR Viaduct North of Belvidere US-81 18.56 0.0
US-81(SB) br over Sandy Creek & at UPRR viaduct north of Belvidere Spur (S-85D)
$1,789Estimate ($1,000)
FY22
Project No NH-81-1(123)
FY23
PE
State 00 00 1 0
Const / CE
NHPP 00 1,4300 0 0
State 00 3580 0 0
42852Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Buffalo
NDOT Improvement Replace existing rdwy & s-shld with conc pvmt, reconstruct Intch, br replacementOdessa - Kearney (EB) I-80 263.31 9.3
I-80 (EB) approx 0.4 mi west Odessa Link L10-B to 0.4 mi west N-44 gr separation
$33,183Estimate ($1,000)
FY22
Project No NH-80-5(83)
FY23
PE
State 00 0899 0 0
ROW
State 020 00 0 0
Const / CE
NHPP-AC 00 00 28269 0
State 00 00 3995 0
NHPP 00 00AC Conv 0 8269
State 00 00AC Conv 0 -8269
NHPP 00 20,0000AC Conv 0 0
State 00 -20,0000AC Conv 0 0
70
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
42852AControl No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Buffalo
NDOT Improvement Construct crossover for Odessa - Kearney (EB) reconst project Odessa - Kearney East Crossover I-80 272.23 0.0
I-80 approx 0.4 mi west of N-44 gr separation in Kearney
$922Estimate ($1,000)
FY22
Project No NH-80-5(84)
FY23
PE
State 00 032 0 0
Const / CE
NHPP 00 00 801 0
State 00 00 89 0
42867Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Fillmore
NDOT Improvement Replace asph and base w/conc pvmt on drainable base, gdrl Fillmore/Saline County Line West N-74 86.97 1.0
N-74 from approx 3.4 mi east Ohiowa Spur (S-30C) to Fillmore/Saline county line
$1,634Estimate ($1,000)
FY22
Project No STP-74-5(114)
FY23
PE
State 00 0150 0 0
Const / CE
STP 01,187 00 0 0
State 0297 00 0 0
42868Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Nance
NDOT Improvement Mill, resurf, br repair
Fullerton North N-14 98.00 8.9
N-14 from north limits of Fullerton to just south of N-52
$4,616Estimate ($1,000)
FY22
Project No STP-14-3(120)
FY23
PE
State 00 0310 0 0
ROW
State 00 05 0 0
Const / CE
STP 03,441 00 0 0
State 0860 00 0 0
71
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
42869Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Polk
NDOT Improvement Conc repair, diamond grind, jt and crack seal, s-shld conc repair, conc sealer Columbus South US-81 104.80 4.8
US-81 from 0.4 mi south of N-64 to 0.7 mi south of S Jct US-30 south of Columbus
$3,528Estimate ($1,000)
FY22
Project No NH-81-2(148)
FY23
PE
State 01 00 0 0
Const / CE
NHPP 00 00 2822 0
State 00 00 705 0
42870Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Thayer
NDOT Improvement Reconstruct existing shoulders with concrete, br buttress remodel Hebron South - Bruning North Shlds US-81 8.10 16.9
US-81 from 1.7 mi south of L-85F to 0.5 mi south of Thayer/Fillmore Co Line
$13,987Estimate ($1,000)
FY22
Project No NH-81-1(124)
FY23
PE
State 075 00 0 0
Const / CE
NHPP-AC 00 00 11130 0
State 00 00 2782 0
NHPP 00 00AC Conv 0 11130
State 00 00AC Conv 0 -11130
42871Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Fillmore
NDOT Improvement Conc repair, jt and crack sealing, mill, resurf existing rdwy and s-shld Strang North US-81 28.38 6.5
US-81 from approx 0.6 mi north of N-74 to 1.8 mi south of N-41
$3,022Estimate ($1,000)
FY22
Project No NH-81-1(125)
FY23
PE
State 00 0267 0 0
Const / CE
NHPP 00 00 2204 0
State 00 00 551 0
72
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
42872Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Clay
NDOT Improvement Mill, resurf existing rdwy and s-shld w/asph, conc repair, ADA In Clay Center & North N-14 37.16 5.1
N-14 from approx 0.3 mi south Clay Center to W Jct US-6 & portions S-18D & N-41
$2,438Estimate ($1,000)
FY22
Project No STP-14-1(124)
FY23
PE
State 10 00 0 0
Const / CE
STP 00 00 0 1950
State 00 00 0 487
42885Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Adams
NDOT Improvement Intersection improvements
US-6 and Adams Central Intersection US-6 208.22 0.5
US-6/Adams Central Intersection approx 1.2 mi west S-1C Hastings Regional Center
$3,365Estimate ($1,000)
FY22
Project No MISC-6-4(1025)
FY23
PE
State 00 0336 0 0
Local 00 084 0 0
ROW
State 00 042 0 0
Local 00 042 0 0
Const / CE
State 01,834 00 0 0
Local 01,027 00 0 0
42886Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Hall
NDOT Improvement Replace conc pvmt & foundation course to lower rdwy for br vertical clearance Wood River Interchange I-80 300.00 0.3
On I-80 at Wood River interchange
$2,301Estimate ($1,000)
FY22
Project No NH-80-6(117)
FY23
PE
State 00 00 1 0
Const / CE
NHPP 00 2,1000 0 0
State 00 2000 0 0
73
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
42888Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Hamilton
NDOT Improvement Conc repair, mill, resurf existing rdwy & s-shld with asphalt, br repair Giltner East I-80 324.55 4.7
I-80 from Giltner Intch east to approx 2.7 mi west Aurora
$4,079Estimate ($1,000)
FY22
Project No NH-80-7(169)
FY23
PE
State 00 022 0 0
Const / CE
NHPP 00 00 3651 0
State 00 00 406 0
42889Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
York
NDOT Improvement Seal & replace expansion joints, br overlay
York Bypass Bridges US-81 61.23 0.0
US-81 bridges west of York
$472Estimate ($1,000)
FY22
Project No NH-81-2(149)
FY23
PE
State 00 00 1 0
Const / CE
NHPP 00 3770 0 0
State 00 940 0 0
42892Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Nance
County Improvement Bridge replacement
Genoa West
Cnty Rd br approx 0.25 mi south intersection with N 485th St west of Genoa
$757Estimate ($1,000) A-2 Move const from FY-23 to FY-24FY22
Project No BRO-7063(8)
FY23
PE
BRO 500 00 0 0
Const / CE
BRO 00 7070 0 0
42893Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Hall
NDOT Improvement Build new high mast lighting towers, install buried cable & control boxes Wood River Interchange Lighting I-80 299.80 1.0
I-80 at the Wood River Interchange
$220Estimate ($1,000)
FY22
Project No ELEC-80-6(1046)
FY23
PE
State 00 01 0 0
Const / CE
State 0219 00 0 0
74
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
42894Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Hall
NDOT Improvement Build new high mast lighting towers, install buried cable & control boxes West Grand Island Interchange Lighting I-80 311.50 1.5
I-80 at the Grand Island Interchange
$660Estimate ($1,000)
FY22
Project No ELEC-80-6(1047)
FY23
PE
State 00 03 0 0
Const / CE
State 0657 00 0 0
50937Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Sheridan
NDOT Improvement Asph widen/resurf 24' rdwy to 28'
Gordon North N-27 222.65 13.6
N-27 from US-20 in Gordon north to the South Dakota line
$11,099Estimate ($1,000)
FY22
Project No STP-27-4(107)
FY23
PE
State 00 00 235 0
ROW
State 00 00 0 1
Const / CE
STP 00 8,4660 0 0
State 00 2,3970 0 0
51003AControl No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Sheridan
NDOT Improvement Asph conc resurf/widen to 28' rdwy w/6' earth shld 6 Miles North Of Rushville North N-87 61.44 10.7
N-87 from 4.6 mi south of S Dakota line south 10.7 mi
$7,356Estimate ($1,000)
FY22
Project No STP-87-4(114)
FY23
PE
State 00 00 250 0
ROW
State 00 00 0 256
Const / CE
STP 00 5,2690 0 0
State 00 1,5810 0 0
75
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
51018Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Sioux
NDOT Improvement Asph resurf 24' rdwy w/6' earth shld
Watson Ranch South N-71 80.96 9.0
N-71 from approximately 9 mi north of the Sioux Co. line north 9.3 mi
$4,040Estimate ($1,000)
FY22
Project No STP-71-4(116)
FY23
PE
State 00 00 50 0
Const / CE
STP 00 3,1130 0 0
State 00 8770 0 0
51105Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Sioux
NDOT Improvement Mill, resurf 22' rdwy w/4' earth shld
Agate North & South N-29 40.84 14.8
N-29 from the Niobrara River near Agate north 9.1 mi
$3,050Estimate ($1,000)
FY22
Project No STP-29-4(106)
FY23
PE
State 00 070 0 0
Const / CE
STP-AC 02,384 00 0 0
State 0596 00 0 0
STP 2,3840 00AC Conv 0 0
State -2,3840 00AC Conv 0 0
51184Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Scotts Bluff
NDOT Improvement Mill, asph resurf existing rdwy to 28' top, br repair and gdrl Scottsbluff North N-71 64.49 6.8
N-71 from E jct US-26 north to the Sioux Co. line
$1,598Estimate ($1,000)
FY22
Project No STP-71-3(119)
FY23
PE
State 00 076 0 0
Const / CE
STP 00 00 1218 0
State 00 00 304 0
76
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
51185Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Dawes
NDOT Improvement Asph conc resurf 24'-rdwy with 7.5'-shld, 1.5'-surf, br repair Crawford North N-71 141.21 7.2
On N-71 from Crawford north 7.17 miles
$3,352Estimate ($1,000)
FY22
Project No STP-71-4(118)
FY23
PE
State 300 00 0 0
ROW
State 00 00 14 0
Const / CE
STP 00 2,5810 0 0
State 00 7270 0 0
51268Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Morrill
NDOT Improvement Mill, resurf existing rdwy & s-shld, br repair, culv, gdrl Broadwater Southwest N-92 64.62 8.0
N-92 from US-385 east to US-26 in Broadwater
$7,040Estimate ($1,000)
FY22
Project No STP-92-1(117)
FY23
PE
State 00 0161 0 0
ROW
State 0200 00 0 0
Const / CE
STP 00 00 5210 0
State 00 00 1469 0
51275AControl No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Cheyenne
NDOT Improvement Replace rest area building
Sidney EB Rest Area Buildings I-80 51.40 0.0
Along I-80 at the Sidney eastbound rest area
$4,028Estimate ($1,000)
FY22
Project No NH-80-1(169)
FY23
PE
State 00 0135 0 0
Const / CE
NHPP 03,504 00 0 0
State 0389 00 0 0
77
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
51276AControl No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Cheyenne
NDOT Improvement Replace rest area building
Sidney WB Rest Area Building I-80 61.37 0.0
Along I-80 at the Sidney westbound rest area
$1,119Estimate ($1,000)
FY22
Project No NH-80-2(92)
FY23
PE
State 1250 00 0 0
Const / CE
NHPP 00 8950 0 0
State 00 990 0 0
51299Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Morrill
NDOT Improvement New viaduct
BNSF, Bridgeport US-26 60.92 0.0
US-26 at BNSF grade crossing DOT#089-081B on the west edge of Bridgeport
$10,919Estimate ($1,000) A-2 Adjust estimatesFY22
Project No RRZ-TMT-26-1(1
FY23
PE
State 00 0352 0 0
ROW
State 1670 00 0 0
Const / CE
State 00 00 400 0
SFTY 00 8,0000 0 0
State 00 1,5000 0 0
Other 00 5000 0 0
78
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
51302Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Cheyenne
NDOT Improvement Conc pvmt, br repair/overlay, intersection improvements, shld widening Sidney Link L-17J 0.54 3.2
2.2 mi on Sidney Link (L17J) near I-80 Interchange and 0.9 mi on US-30
$10,886Estimate ($1,000)
FY22
Project No STP-L17J(107)
FY23
PE
State 00 0399 0 0
ROW
State 00 010 0 0
Const / CE
STP-AC 08,042 00 0 0
State 0480 00 0 0
Local 01,955 00 0 0
STP 4,0420 00AC Conv 0 0
State -4,0420 00AC Conv 0 0
STP 00 00AC Conv 4000 0
State 00 00AC Conv -4000 0
51392Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Scotts Bluff
NDOT Improvement Mill, resurf rdwy & shld, br repair/overlay, conc repair, ADA in Lyman Wyoming State Line East N-92 0.00 18.9
N-92 from Wyoming Line east to approx 2.5 mi west of Terrytown Spur, S-79H
$3,714Estimate ($1,000)
FY22
Project No STP-92-1(124)
FY23
PE
State 00 046 0 0
ROW
State 00 010 0 0
Const / CE
STP 02,833 00 0 0
State 0825 00 0 0
51401Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Cheyenne
NDOT Improvement Asph widen/resurf 24' rdwy to 28' w/4' earth shld Lodgepole - Chappell US-30 77.03 9.2
US-30 from Lodgepole to Chappell
$4,730Estimate ($1,000)
FY22
Project No STP-30-1(129)
FY23
PE
State 00 00 1 0
Const / CE
STP 00 3,7830 0 0
State 00 9460 0 0
79
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
51443Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Morrill
NDOT Improvement 4-lane reconstruction
L-62A North US-385 84.50 14.2
US-385 from L-62A north 14.2 mi
$38,049Estimate ($1,000) A-1 Advance Const to FY-20, Adjust estimatesFY22
Project No DPS-385-3(119)
FY23
PE
State 00 0583 0 0
Const / CE
EM 018,264 00 0 0
State 019,202 00 0 0
51462AControl No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Deuel
NDOT Improvement Mill, widen/resurf existing rdwy & s-shld w/asph, lighting, drainage improvementChappell East US-30 87.39 10.1
US-30 from approx 0.1 mi east Chappell to 2.2 mi east of E Jct N-27
$7,155Estimate ($1,000) A-2 Add projectFY22
Project No STP-30-1(139)
FY23
PE
State 0255 00 0 0
Const / CE
STP 00 00 0 5600
State 00 00 0 1300
51463A Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Deuel
NDOT Improvement Mill, widen/resurf existing rdwy to 28' w/asph, culv, br repair, gdrl US-138 West US-30 97.57 10.4
US-30 from approx 2.2 mi east N-27, east to approx 0.25 mi east US-138
$7,953Estimate ($1,000)
FY22
Project No STP-30-1(140)
FY23
PE
State 10 00 0 0
Const / CE
STP-AC 00 00 0 6362
State 00 00 0 1590
STP 00 6,3620AC Conv 0 0
State 00 -6,3620AC Conv 0 0
80
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
51470Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Morrill
NDOT Improvement Mill, resurf existing rdwy and s-shld with asphalt, drains Dalton North US-385 54.48 8.0
US-385 from the Cheyenne Co line north to 3.2 mi south of US-26/N-92
$3,861Estimate ($1,000)
FY22
Project No NH-385-3(120)
FY23
PE
State 00 016 0 0
Const / CE
NHPP 03,076 00 0 0
State 0769 00 0 0
51519 Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Deuel
NDOT Improvement Replace 4-lane conc pvmt and shld, br repair/replace, remove crossover Chappell - N-27 I-80 84.63 9.9
I-80 from approx 0.6 mi west of L-25A to 0.8 mi west of N-27
$49,878Estimate ($1,000)
FY22
Project No NH-80-2(103)
FY23
Const / CE
NHPP 5,9520 00AC Conv 0 0
Const / CE
NHPP 05,000 00AC Conv 0 0
State 0-5,000 00AC Conv 0 0
State -5,9520 00AC Conv 0 0
51535Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Cheyenne
NDOT Improvement 4 Lane conc pvmt replacement, br repair/rehab, rest area ramps, parking Brownson East I-80 46.81 7.1
I-80 from 2.0 mi west of L-17C east 7.4 mi
$37,318Estimate ($1,000)
FY22
Project No NH-80-1(192)
FY23
PE
State 00 01,341 0 0
ROW
State 00 012 0 0
Const / CE
NHPP-AC 032,368 00 0 0
State 03,597 00 0 0
NHPP 5,0000 00AC Conv 0 0
State -5,0000 00AC Conv 0 0
NHPP 00 00AC Conv 27368 0
State 00 00AC Conv -27368 0
81
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
51541Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Sheridan
NDOT Improvement Mill, resurf rdwy and shld, urban conc repair, br repair In Gordon & South N-27 210.14 12.5
N-27 from 0.4 mi south of the Niobrara River north through Gordon
$4,126Estimate ($1,000)
FY22
Project No STP-27-4(109)
FY23
PE
State 00 080 0 0
ROW
State 00 010 0 0
Const / CE
STP-AC 03,229 00 0 0
State 0807 00 0 0
STP 3,2290 00AC Conv 0 0
State -3,2290 00AC Conv 0 0
51544Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Sioux
NDOT Improvement Mill, resurf existing rdwy, curb ramps, br repair In Mitchell & North N-29 12.75 17.5
N-29 from Jct US-26 in Mitchell north to approx 5.4 mi north Str# S02902486
$4,375Estimate ($1,000)
FY22
Project No STP-29-4(110)
FY23
PE
State 00 0424 0 0
ROW
State 010 00 0 0
Const / CE
STP 00 00 3153 0
State 00 00 788 0
51546Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Garden
NDOT Improvement Mill, resurf existing rdwy, earth shld const, br repairs, culv and gdrl Oshkosh South N-27 110.18 8.7
N-27 from 4.0 mi north of the Deuel/Garden Co line north to US-26/N92 in Oshkosh
$3,480Estimate ($1,000)
FY22
Project No STP-27-3(102)
FY23
PE
State 00 0352 0 0
Const / CE
STP 00 00 2502 0
State 00 00 626 0
82
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
51548Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Sheridan
NDOT Improvement Mill, resurf, curb & gutter repair, br repair
Hay Springs - Rushville US-20 78.87 12.9
N-20 from W Jct N-87 east through Rushville
$4,356Estimate ($1,000)
FY22
Project No NH-20-2(142)
FY23
PE
State 00 040 0 0
ROW
State 00 010 0 0
Const / CE
NHPP 03,445 00 0 0
State 0861 00 0 0
51549Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Sioux
NDOT Improvement Mill, resurf 24' rdwy w/10' shld, 8' surf, conc repair, ramp repair Crawford West US-20 25.21 10.7
N-20 from 5.8 mi west of the Sioux/Dawes Co line to just west of Crawford
$3,412Estimate ($1,000)
FY22
Project No NH-20-1(148)
FY23
PE
State 00 014 0 0
Const / CE
NHPP 00 00 2718 0
State 00 00 680 0
51550Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Cheyenne
NDOT Improvement Mill, resurf rdwy and shld, conc repair, br repair Potter East & West US-30 37.11 14.9
US-30 from Kimball/Cheyenne Co line east to L-17C, including L-17B & L-17C
$5,843Estimate ($1,000)
FY22
Project No STP-30-1(137)
FY23
PE
State 00 0408 0 0
Const / CE
STP-AC 04,348 00 0 0
State 01,087 00 0 0
STP 00 00AC Conv 4348 0
State 00 00AC Conv -4348 0
83
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
51558Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Deuel
NDOT Improvement Mill, asph resurf rdwy and shld, conc repari, br repair Colorado Line - Chappell US-385 0.00 8.6
US-385 from NE/CO state line to E Jct US-30 in Chappell; includes L-25A segment
$4,298Estimate ($1,000)
FY22
Project No STP-385-2(113)
FY23
PE
State 00 0130 0 0
ROW
State 00 027 0 0
Const / CE
STP 03,313 00 0 0
State 0828 00 0 0
51560Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Kimball
NDOT Improvement Mill, Widen/resurf existing 24' rdwy to 28', br repair, gdrl Bushnell - Kimball US-30 9.56 11.4
US-30 from Jct L-53C, east to west limits limits of Kimball
$5,802Estimate ($1,000)
FY22
Project No STP-30-1(138)
FY23
PE
State 1490 00 0 0
ROW
State 00 00 10 0
Const / CE
STP 00 4,5140 0 0
State 00 1,1290 0 0
51561Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Banner
NDOT Improvement Mill, asph resurf, br repair
S Jct. N-71 East N-88 23.54 20.4
N-88 from S Jct N-71 to approx 0.4 mi east Banner/Morrill Co Line, incl S-4A
$8,001Estimate ($1,000)
FY22
Project No STP-88-1(110)
FY23
PE
State 10 00 0 0
Const / CE
STP 00 6,4000 0 0
State 00 1,6000 0 0
84
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
51583Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Kimball
NDOT Improvement Gr, replace conc pvmt 4-lane divided interstate Bushnell - West Kimball I-80 9.50 9.5
I-80 from 1.0 mi east of Bushnell to 1.7 mi west of Kimball
$40,927Estimate ($1,000)
FY22
Project No NH-80-1(196)
FY23
PE
State 00 01,709 0 0
Const / CE
NHPP-AC 00 00 34446 0
State 00 00 4772 0
NHPP 00 00AC Conv 0 10446
State 00 00AC Conv 0 -10446
NHPP 00 20,0000AC Conv 0 0
State 00 -20,0000AC Conv 0 0
51583AControl No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Kimball
NDOT Improvement Grading, lighting and paving an interstate median crossover Bushnell - West Kimball Crossover I-80 19.00 0.0
I-80 approx 1.7 mi west N-71 grade separation
$904Estimate ($1,000)
FY22
Project No NH-80-1(200)
FY23
PE
State 00 030 0 0
Const / CE
NHPP 7870 00 0 0
State 870 00 0 0
51584Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Kimball
NDOT Improvement 4-Lane gr, str, conc pvmt
West Kimball - East Kimball I-80 19.00 4.5
I-80 from 1.7 mi west of N-71 to 2.8 mi east of N-71
$26,064Estimate ($1,000)
FY22
Project No NH-80-1(197)
FY23
PE
State 00 00 5 0
Const / CE
NHPP 00 23,4530 0 0
State 00 2,6060 0 0
85
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
51585Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Cheyenne
NDOT Improvement 4-Lane gr, str, conc pvmt
Sidney - Sunol (EB) I-80 60.70 8.0
I-80 (EB) from approx 0.2 mi W Sidney (WB) rest area to approx 0.9 W L-17E link
$22,227Estimate ($1,000)
FY22
Project No NH-80-2(109)
FY23
PE
State 00 00 1 0
Const / CE
NHPP 00 20,0030 0 0
State 00 2,2230 0 0
51589Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Cheyenne
NDOT Improvement Joint seal
Sunol - Lodgepole I-80 68.67 6.8
I-80 from approx 1.0 mi west Sunol link L17E to 1.2 mi west Lodgepole link L17F
$601Estimate ($1,000)
FY22
Project No NH-80-2(111)
FY23
Const / CE
NHPP 00 00 541 0
State 00 00 60 0
51590Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Cheyenne
NDOT Improvement Joint seal mainline reconstructed conc pvmt West Sidney - East Sidney I-80 53.98 6.7
I-80 from approx 1.4 mi west N-19 to 0.7 mi east Sidney East link L17J
$613Estimate ($1,000)
FY22
Project No NH-80-1(199)
FY23
Const / CE
NHPP 00 00 0 552
State 00 00 0 61
51591Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Deuel
NDOT Improvement Joint seal
Oshkosh - I-76 I-80 94.56 7.5
I-80 from west N-27 to 0.5 mi west I-76
$224Estimate ($1,000)
FY22
Project No NH-80-2(112)
FY23
Const / CE
NHPP 00 2020 0 0
State 00 220 0 0
86
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
51598Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Kimball
NDOT Improvement Install new dynamic message signs
District 5 DMS I-80 2.71 0.0
I-80 at locations in Kimball and Deuel counties
$926Estimate ($1,000)
FY22
Project No ITS-NH-D5(104)
FY23
PE
State 00 04 0 0
Const / CE
NHPP 8300 00 0 0
State 920 00 0 0
51599Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Cheyenne
NDOT Improvement Install variable speed advisory sign systems
D5 Variable Speed Advisory Signs I-80 0.14 0.0
Along I-80 at 30 locations in Kimball, Cheyenne and Deuel counties
$3,526Estimate ($1,000)
FY22
Project No ITS-NH-D5(105)
FY23
PE
State 00 016 0 0
Const / CE
NHPP 03,159 00 0 0
State 0351 00 0 0
51603Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Kimball
NDOT Improvement Joint / crack seal
Bushnell Interchange - West Kimball I-80 9.00 11.0
I-80 from near Bushnell Interchange to just west of Kimball
$1,130Estimate ($1,000) A-2 Add projectFY22
Project No NH-80-1(201)
FY23
PE
State 05 00 0 0
Const / CE
NHPP 0975 00 0 0
State 0150 00 0 0
87
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
60823Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Hooker
NDOT Improvement Mill, widen/resurf rdwy to 24', curb, flumes, storm sewer Tryon - Mullen N-97 44.23 12.7
N-97 from near McPherson/Hooker Co line to approx 9.9 mi south of Mullen
$9,374Estimate ($1,000)
FY22
Project No STP-97-3(102)
FY23
PE
State 00 0791 0 0
ROW
State 00 034 0 0
Const / CE
STP-AC 06,659 00 0 0
State 01,890 00 0 0
STP 6,6590 00AC Conv 0 0
State -6,6590 00AC Conv 0 0
60942Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Custer
NDOT Improvement Viaduct rehab, br replacement, conc pvmt Ansley Viaduct US-183 88.85 0.6
US-183 from just east of W Jct N-2 to approx 0.1 mi north of E Jct N-92
$9,586Estimate ($1,000)
FY22
Project No STP-183-3(112)
FY23
Const / CE
STP 4,7930 00AC Conv 0 0
State 4,7930 00AC Conv 0 0
61361Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Lincoln
NDOT Improvement Urban reconstruction, 10" conc pvmt, storm sewer, lighting, tr signals, util Philip - 1st St (SB), North Platte 82.53 0.5
(SB)US-83 (Jeffers St) from Philip St south to 1st St in North PLatte
$4,048Estimate ($1,000)
FY22
Project No NH-83-2(130)
FY23
PE
State 0135 00 0 0
ROW
State 2000 00 0 0
Const / CE
NHPP 00 00 0 2892
State 00 00 0 821
88
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
61363Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Lincoln
NDOT Improvement Urban reconstruction, 10" conc pvmt, storm sewer, lighting, tr signals, util Leota - Philip (SB), North Platte 82.04 0.5
(SB)US-83 (Jeffers St) from Leota St south to Philip St in North Platte
$3,637Estimate ($1,000)
FY22
Project No NH-83-2(132)
FY23
PE
State 0124 00 0 0
ROW
State 1000 00 0 0
Const / CE
NHPP 00 00 0 2658
State 00 00 0 755
61370AControl No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Keith
NDOT Improvement Replace rest area building
Ogallala EB Rest Area Building I-80 122.70 0.0
EB Ogallala rest area 3.5 mi west of the Ogallala Interchange
$3,005Estimate ($1,000)
FY22
Project No NH-80-3(134)
FY23
PE
State 00 0144 0 0
Const / CE
NHPP 02,575 00 0 0
State 0286 00 0 0
61371A Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Keith
NDOT Improvement Replace rest area building
Ogallala WB Rest Area Buildings I-80 132.15 0.0
Along I-80 at the westbound Ogallala rest area
$1,234Estimate ($1,000)
FY22
Project No NH-80-3(155)
FY23
PE
State 00 00 121 0
Const / CE
NHPP 00 1,0020 0 0
State 00 1110 0 0
89
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
61457Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Dawson
County Improvement New viaduct
Lexington East Viaduct 0.00 0.0
County Rd 435 over UPRR/US-30/E Walnut St in Lexington
$11,174Estimate ($1,000)
FY22
Project No RRZ-TMT-1705(3
FY23
PE
SFTY 00 030 0 0
STP-AC 00 08 0 0
State 00 02 0 0
Other 00 02 0 0
Local 00 0821 0 0
ROW
SFTY 0170 00 0 0
STP 0159 00 0 0
State 010 00 0 0
Other 010 00 0 0
Local 051 00 0 0
Const / CE
STP 2900 00 0 0
SFTY 4,7720 00 0 0
State 2810 00 0 0
Other 2810 00 0 0
Local 4,2870 00 0 0
61515Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Custer
NDOT Improvement Mill, resurf 24'-rdwy w/s-shld, curb & flume, culv, gdrl, preserve br piles Westerville East N-70 88.12 9.3
N-70 from S Jct US-183 east to approx 0.3 mi east Custer/Valley Co line
$5,012Estimate ($1,000)
FY22
Project No STP-70-3(108)
FY23
PE
State 00 0100 0 0
ROW
State 00 01 0 0
Const / CE
STP-AC 03,929 00 0 0
State 0982 00 0 0
STP 3,9290 00AC Conv 0 0
State -3,9290 00AC Conv 0 0
90
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
61522Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Dawson
NDOT Improvement Mill, resurf ML I-80 w/asph, conc repair, ramp repair/resurf, gdrl Darr - Lexington I-80 230.55 7.1
I-80 from approx 0.6 mi west of Darr to approx 0.4 mi east of Lexington
$7,319Estimate ($1,000)
FY22
Project No NH-80-4(141)
FY23
PE
State 300 00 0 0
Const / CE
NHPP 00 6,5600 0 0
State 00 7290 0 0
61561Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Grant
NDOT Improvement Mill, asph resurf
Hyannis - Whitman N-2 145.44 13.6
N-2 from just west of W Jct N-61 in Hyannis east to approx 0.3 mi west Whitman
$6,586Estimate ($1,000)
FY22
Project No NH-2-2(117)
FY23
PE
State 00 0205 0 0
ROW
State 00 028 0 0
Const / CE
NHPP 05,082 00 0 0
State 01,271 00 0 0
91
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
61565Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Keith
NDOT Improvement 4-Lane divided interstate, str, ramps, new rest area, resurf L-51A Brule - Ogallala I-80 115.49 11.3
I-80 from 1.8 mi west of Brule east to 1.0 mi west of Ogallala interchange
$44,215Estimate ($1,000)
FY22
Project No NH-STP-80-3(15
FY23
PE
State 00 0751 0 0
ROW
State 00 01 0 0
Const / CE
NHPP-AC 036,115 00 0 0
STP 01,420 00AC Conv 0 0
NHPP 010,000 00AC Conv 0 0
STP-AC 01,420 00 0 0
State 05,928 00 0 0
State 0-11,420 00AC Conv 0 0
NHPP 10,0000 00AC Conv 0 0
State -10,0000 00AC Conv 0 0
NHPP 00 00AC Conv 16115 0
State 00 00AC Conv -16115 0
61566 Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Deuel
NDOT Improvement Gr, conc pvmt, interchange, 3 br replacements, MSE walls, lighting Big Springs West I-80 102.09 7.4
On section of I-80 and all of I-76 from Colorado line to I-80/I-76 interchange
$49,096Estimate ($1,000) A-1 Adjust estimatesFY22
Project No NH-80-2(100)
FY23
Const / CE
NHPP 00 00AC Conv 14712 0
Const / CE
NHFP 010,730 00AC Conv 0 0
State 0-10,730 00AC Conv 0 0
State 00 00AC Conv -14712 0
92
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
61569Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Hooker
NDOT Improvement Mill, resurf 24' rdwy, urban section in Mullen Mullen South N-97 56.82 10.2
N-97 from N-2 in Mullen south approx 10.2 mi
$5,369Estimate ($1,000)
FY22
Project No STP-97-3(104)
FY23
PE
State 00 0303 0 0
ROW
State 00 010 0 0
Const / CE
STP-AC 03,938 00 0 0
State 01,118 00 0 0
STP 3,9380 00AC Conv 0 0
State -3,9380 00AC Conv 0 0
61584Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Dawson
NDOT Improvement Bridge replacement and associated approach work Farmers/Merchant Canal Bridge, Cozad N-21 13.19 0.0
N-21 at Farmers/Merchant canal near Cozad
$467Estimate ($1,000)
FY22
Project No STP-21-2(113)
FY23
PE
State 017 00 0 0
ROW
State 50 00 0 0
Const / CE
STP 00 00 0 347
State 00 00 0 98
61586Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Keith
NDOT Improvement 4-Lane divided gr, conc pvmt, ramps, safety rest area parking Ogallala - Roscoe I-80 125.65 7.2
I-80 from approx 0.4 mi west of Ogallala to approx 1.1 mi west of Roscoe
$36,934Estimate ($1,000)
FY22
Project No NH-80-3(156)
FY23
PE
State 1,2310 00 0 0
ROW
State 00 00 100 0
Const / CE
NHPP 00 32,0430 0 0
State 00 3,5600 0 0
93
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
61586AControl No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Keith
NDOT Improvement Slip ramps and crossover repair work
Ogallala - Roscoe Crossovers I-80 125.65 0.0
Along I-80 from Ogallala to Roscoe
$770Estimate ($1,000)
FY22
Project No NH-80-3(157)
FY23
PE
State 00 020 0 0
Const / CE
NHPP 6750 00 0 0
State 750 00 0 0
61587Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Dawson
NDOT Improvement Conc pvmt
Lexington - Overton I-80 238.27 9.6
I-80 from approx 1.1 mi east of US-283 to approx 0.7 mi west of L-24B
$33,527Estimate ($1,000)
FY22
Project No NH-80-5(75)
FY23
PE
State 00 01,324 0 0
Const / CE
NHPP-AC 28,9830 00 0 0
State 3,2200 00 0 0
NHPP 00 00AC Conv 28983 0
State 00 00AC Conv -28983 0
61587AControl No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Dawson
NDOT Improvement Crossovers
Lexington - Overton Crossovers I-80 238.27 0.0
I-80 at two locations between Lexington and Overton
$1,134Estimate ($1,000)
FY22
Project No NH-80-5(78)
FY23
PE
State 00 080 0 0
Const / CE
NHPP 0949 00 0 0
State 0105 00 0 0
94
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
61593Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Keith
NDOT Improvement Mill, resurf rdwy w/conc pvmt and resurf s-shld w/asph Ogallala - Roscoe US-30 127.54 6.2
US-30 from approx 0.2 mi east Ogallala to approx 0.1 west Roscoe link (L-51B)
$3,731Estimate ($1,000)
FY22
Project No STP-30-2(146)
FY23
PE
State 00 060 0 0
Const / CE
STP 02,937 00 0 0
State 0734 00 0 0
61595Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Thomas
NDOT Improvement Mill, asph resurf, fog seal curbs, br repair/overlay Thedford West N-2 202.09 4.6
N-2 from approx 6.2 mi east of Seneca Spur (S-86A) to 3.3 mi west of Thedford
$2,886Estimate ($1,000)
FY22
Project No NH-2-2(120)
FY23
PE
State 00 095 0 0
Const / CE
NHPP 00 00 2233 0
State 00 00 558 0
61597Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Custer
NDOT Improvement Mill, resurf existing rdwy & s-shld, br repair, culv, ADA curb ramps Oconto North & South N-21 49.60 12.4
N-21 from approx 3.1 mi south to 9.0 mi north of Oconto
$5,249Estimate ($1,000)
FY22
Project No STP-21-3(105)
FY23
PE
State 00 0192 0 0
ROW
State 00 010 0 0
Const / CE
STP 03,931 00 0 0
State 01,116 00 0 0
95
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
61598Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Lincoln
NDOT Improvement Mill, resurf rdwy & s-shld, add'l passing lanes, 4-lane section, crossover Lake Maloney South US-83 61.82 14.9
US-83 from approx 0.2 north of Jct N-23 to 0.2 mi north of North Lake Road
$15,928Estimate ($1,000)
FY22
Project No NH-83-2(141)
FY23
PE
State 500 00 0 0
ROW
State 00 00 44 0
Const / CE
NHPP-AC 00 00 0 8148
State 00 00 0 2384
State 00 00 0 5302
NHPP 00 8,1480AC Conv 0 0
State 00 -8,1480AC Conv 0 0
61605Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Dawson
NDOT Improvement Mill, resurf rdwy, conc repair, joint/crack seal, br repair/overlay Eustis - Cozad N-21 2.55 12.5
N-21 from N-23 north to approx 0.2 mi south of I-80 south of Cozad
$7,682Estimate ($1,000)
FY22
Project No STP-21-2(114)
FY23
PE
State 00 0405 0 0
ROW
State 00 010 0 0
Const / CE
STP-AC 05,659 00 0 0
State 01,608 00 0 0
STP 00 00AC Conv 5659 0
State 00 00AC Conv -5659 0
61612Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Lincoln
NDOT Improvement Br redeck, replace approaches, abutments, GB on pile, bearing devices, gdrl North Platte East Bridge US-30 180.50 0.0
lS-30 over the North Platte River 0.4 mi east of North Plate
$2,289Estimate ($1,000)
FY22
Project No STP-30-2(148)
FY23
PE
State 00 075 0 0
Const / CE
STP 01,771 00 0 0
State 0443 00 0 0
96
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
61613Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
McPherson
NDOT Improvement Mill, widen/resurf 24' rdwy to 28' w/asph, curb & flume Tryon West N-92 190.26 13.6
N-92 from approx 0.8 mi west of Jct Tin Camp Rd to just east of W Jct N-97
$5,768Estimate ($1,000)
FY22
Project No STP-92-2(111)
FY23
PE
State 100 00 0 0
ROW
State 00 00 5 0
Const / CE
STP 00 4,6020 0 0
State 00 1,1510 0 0
61615Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Thomas
NDOT Improvement Mill, resurf, ADA
Halsey West & East N-2 221.49 6.7
N-2 from approx 5.0 mi west Halsey to 0.6 mi east Thomas/Blaine county line
$3,132Estimate ($1,000)
FY22
Project No NH-2-2(121)
FY23
PE
State 00 090 0 0
Const / CE
NHPP 02,369 00 0 0
State 0673 00 0 0
61616Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Blaine
NDOT Improvement Mill, resurf existing rdwy and s-shld w/asphalt, br repair, gdrl Halsey - Dunning N-2 228.14 10.7
N-2 from approx 0.5 mi east of Halsey east to approx 0.8 mi south of Dunning
$5,197Estimate ($1,000)
FY22
Project No NH-2-3(123)
FY23
PE
State 00 034 0 0
Const / CE
NHPP-AC 00 00 4108 0
State 00 00 1055 0
NHPP 00 00AC Conv 0 4108
State 00 00AC Conv 0 -4108
97
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
61617Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Lincoln
NDOT Improvement Conc repair, mill, resurf existing rdwy and s-shld Hershey - North Platte US-30 164.13 11.3
US-30 from approx 0.1 mi west Jct L-56C in Hershey to North Platte
$6,245Estimate ($1,000)
FY22
Project No STP-30-2(149)
FY23
PE
State 00 0219 0 0
Const / CE
STP 00 00 4821 0
State 00 00 1205 0
61618Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
McPherson
NDOT Improvement Mill, resurf existing 24'-rdwy, curb & flume, culv, earth shld const Tryon North N-97 31.06 13.1
N-97 from W Jct N-92, north to the McPherson/Hooker Co line
$5,847Estimate ($1,000)
FY22
Project No STP-97-3(106)
FY23
PE
State 00 0520 0 0
ROW
State 010 00 0 0
Const / CE
STP 00 00 4254 0
State 00 00 1063 0
61619Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Keith
NDOT Improvement Mill, resurf rdwy & s-shld, br repair, gdrl
Kingsley Dam South N-61 88.47 11.7
N-61 in 3-segments from N jct US-26 to just N of S end Kingley Dam;US-26 segment
$5,560Estimate ($1,000)
FY22
Project No STP-NH-61-2(11
FY23
PE
State 00 0241 0 0
Const / CE
STP 00 00 3009 0
NHPP 00 00 1246 0
State 00 00 1064 0
98
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
61628Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Custer
NDOT Improvement Mill, resurf existing rdwy and s-shld w/asphalt Anselmo - Merna N-2 258.04 12.3
N-2 from Anselmo to approx 1.1 mi southeast of W Jct N-92 southeast of Merna
$5,105Estimate ($1,000)
FY22
Project No NH-2-3(124)
FY23
PE
State 00 022 0 0
ROW
State 010 00 0 0
Const / CE
NHPP-AC 00 00 4058 0
State 00 00 1015 0
NHPP 00 00AC Conv 0 4058
State 00 00AC Conv 0 -4058
61629Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Keith
NDOT Improvement Conc repair, diamond grind and texture conc pvmt, conc seal and jt & crack seal Kingsley Dam N-61 96.05 2.4
N-61 from near south end Kingsley Dam to approx 0.5 mi south of north end of dam
$844Estimate ($1,000)
FY22
Project No STP-61-2(116)
FY23
Const / CE
STP 00 00 675 0
State 00 00 169 0
61630Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Lincoln
NDOT Improvement Mill, resurf rdwy & s-shld w/asph, replace at grade railroad crossing Wallace North N-25 80.51 12.2
N-25 from Jct N-23 to approx 0.5 mi north intersection with Meadow Lawns Road
$4,941Estimate ($1,000)
FY22
Project No STP-25-2(109)
FY23
PE
State 10 00 0 0
Const / CE
STP 00 00 0 3952
State 00 00 0 988
99
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
61631Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Keith
NDOT Improvement Mill, resurf rdwy & shld, curb/flumes, cable guardrail Garden/Keith Co. Line East US-26 128.71 7.8
US-26 from 1.7 mi east of Garden/Keith Co line to 2.7 mi west of Lakeview Rd
$3,264Estimate ($1,000)
FY22
Project No NH-26-2(152)
FY23
PE
State 00 013 0 0
Const / CE
NHPP 00 00 2601 0
State 00 00 650 0
61632Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Keith
NDOT Improvement Conc repair, asph resurf, ramps, joint seal, pvmt marking In Ogallala & Surrounding Area US-30 126.29 7.1
US-30, US-26 and N-61 in Ogallala and the surrounding area
$2,169Estimate ($1,000)
FY22
Project No STP-NH-30-2(15
FY23
Const / CE
STP 00 1,2480 0 0
NHPP 00 4870 0 0
State 00 4340 0 0
61633Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
McPherson
NDOT Improvement Mill, widen/resurf existing rdwy to 28' w/asph, curb & flume, culv Tryon South N-97 19.90 10.9
N-97 from E Jct N-92 south approx 6.7 mi & approx 0.2 mi east Tryon - E Jct N-97
$6,386Estimate ($1,000)
FY22
Project No STP-97-3(107)
FY23
PE
State 01 00 0 0
Const / CE
STP 00 00 0 5108
State 00 00 0 1277
61635Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Dawson
NDOT Improvement Viaduct repair
Cozad Viaduct N-21 13.67 0.0
Viaduct over US-30 and UPRR in Cozad
$1,872Estimate ($1,000)
FY22
Project No STP-21-2(116)
FY23
PE
State 00 00 1 0
Const / CE
STP 00 1,4970 0 0
State 00 3740 0 0
100
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
61637Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Lincoln
NDOT Improvement Crack seal
South Channel Platte River - Brady I-80 185.74 12.7
I-80 from approx 4.7 mi west Maxwell Spur S56A to 0.6 mi west Brady Link L56D
$366Estimate ($1,000)
FY22
Project No NH-80-4(149)
FY23
PE
State 00 023 0 0
Const / CE
NHPP 00 00 309 0
State 00 00 34 0
61639Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Lincoln
NDOT Improvement Crack seal
Sutherland - Hershey I-80 157.74 6.4
I-80 from approx 0.3 mi west of N-25 to 0.4 mi west of L-56C
$168Estimate ($1,000)
FY22
Project No NH-80-3(161)
FY23
PE
State 00 01 0 0
Const / CE
NHPP 00 00 150 0
State 00 00 17 0
61641Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Lincoln
NDOT Improvement Crack seal
Brady East I-80 198.40 7.2
I-80 from approx 0.6 mi west of L-56D to 2.6 me we of the Lincoln/Dawson Co line
$197Estimate ($1,000)
FY22
Project No NH-80-4(151)
FY23
PE
State 00 01 0 0
Const / CE
NHPP 0176 00 0 0
State 020 00 0 0
101
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
61642Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Dawson
NDOT Improvement Crack seal existing asphalt rdwy
Gothenburg - Darr I-80 215.60 15.0
I-80 from approx 0.5 mi west N-21 grade separation south of Cozad to Darr
$421Estimate ($1,000)
FY22
Project No NH-80-4(152)
FY23
PE
State 00 01 0 0
Const / CE
NHPP 3780 00 0 0
State 420 00 0 0
61643Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Keith
NDOT Improvement Crack seal
Big Springs - Brule I-80 106.31 9.2
I-80 from 1.1 mi west of Big Springs to 1.8 mi west of Brule
$893Estimate ($1,000)
FY22
Project No NH-80-3(162)
FY23
PE
State 00 00 1 0
Const / CE
NHPP 00 8030 0 0
State 00 890 0 0
61645Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Dawson
County Improvement Bridge replacement and associated approach work Cozad Southwest
East Midway Lake bridge 5.5 mi south & 2.0 mi west of Cozad
$1,489Estimate ($1,000) A-2 Add projectFY22
Project No BRO-7024(25)
FY23
PE
BRO 00 0255 0 0
Local 00 064 0 0
ROW
BRO 08 00 0 0
Local 02 00 0 0
Const / CE
BRO 00 00 928 0
Local 00 00 232 0
102
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
61647Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Dawson
NDOT Improvement Mill, resurf rdwy & s-shld, repair 2 andreplace 2-br's w/br sized CBC's, gdrl Lexington North N-21 28.62 8.0
N-21 from approx 0.4 mi So. of north lmts Lexington to 6.6 mi So. Eddyville Road
$3,809Estimate ($1,000)
FY22
Project No STP-21-2(118)
FY23
PE
State 00 055 0 0
ROW
State 00 010 0 0
Const / CE
STP 02,995 00 0 0
State 0749 00 0 0
61650Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Lincoln
NDOT Improvement Install overhead dynamic message signs
District 6 Overhead DMS I-80 156.02 0.0
I-80 at four locations from Sutherland to Gothenburg
$654Estimate ($1,000)
FY22
Project No ITS-NH-D6(106)
FY23
PE
State 00 08 0 0
Const / CE
NHPP 0567 00 0 0
State 079 00 0 0
61653Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Grant
NDOT Improvement Install sidemount dynamic message signs District 6 Sidemount DMS N-2 144.87 0.0
At 14 highway locations in district 6
$2,447Estimate ($1,000)
FY22
Project No ITS-NH-STP-D6(1
FY23
PE
State 00 011 0 0
Const / CE
STP 0557 00 0 0
NHPP 01,392 00 0 0
State 0487 00 0 0
103
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
61654Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Dawson
NDOT Improvement Install CCTV camera towers
District 6-Districtwide CCTV Cameras US-30 157.00 0.0
At 18 highway locations in District 6
$1,013Estimate ($1,000)
FY22
Project No ITS-NH-STP-D6(1
FY23
PE
State 00 010 0 0
Const / CE
NHPP 0178 00 0 0
STP 0624 00 0 0
State 0201 00 0 0
61655Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Lincoln
NDOT Improvement Repair, mill & resurf existing asph rdwy, br replacement and gdrl I-80 South S-56A 2.04 1.9
S-56A from just south I-80 grade sep to just south Ft McPherson Nat'l Cemetery
$5,380Estimate ($1,000)
FY22
Project No STP-S56A(108)
FY23
PE
State 0181 00 0 0
ROW
State 150 00 0 0
Const / CE
STP-AC 00 00 0 4147
State 00 00 0 1037
STP 00 4,1470AC Conv 0 0
State 00 -4,1470AC Conv 0 0
61656Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Deuel
NDOT Improvement Install variable speed advisory sign system
District 6 Variable Speed Advisory I-80 102.15 0.0
Along I-80 corridor in Deuel, Keith, Lincoln and Dawson counties
$4,315Estimate ($1,000)
FY22
Project No ITS-NH-D6(109)
FY23
PE
State 00 018 0 0
Const / CE
NHPP 00 00 3867 0
State 00 00 430 0
104
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
61661Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Dawson
NDOT Improvement Mill, conc repair, resurf rdwy & inside Shld, fog seal outside shld, br repair Gothenburg - Cozad I-80 212.70 9.3
I-80 from approx 0.9 mi east N-47 gr sep to 0.5 mi west N-21 gr sep
$3,799Estimate ($1,000)
FY22
Project No NH-80-4(153)
FY23
PE
State 00 030 0 0
Const / CE
NHPP 00 00 3392 0
State 00 00 377 0
61663Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Lincoln
NDOT Improvement Resurf rdwy & inside s-shld
Brady East I-80 198.40 7.2
I-80 approx 0.6 mi west L-56D gr separation to 2.6 mi west Lincoln/Dawson C/L
$1,475Estimate ($1,000)
FY22
Project No NH-80-4(154)
FY23
PE
State 00 00 1 0
Const / CE
NHPP 00 1,3270 0 0
State 00 1470 0 0
61664Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Dawson
NDOT Improvement Interstate reconstruction, br
Overton East I-80 248.11 6.8
I-80 from just west Overton Interchange, east to Dawson/Buffalo Co Line
$38,303Estimate ($1,000)
FY22
Project No NH-80-5(86)
FY23
PE
State 01,297 00 0 0
Const / CE
NHPP-AC 00 00 0 33305
State 00 00 0 3701
NHPP 00 33,3050AC Conv 0 0
State 00 -33,3050AC Conv 0 0
105
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
61666Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Lincoln
NDOT Improvement Mill, resurf existing rdwy
Sutherland South N-25 92.68 12.0
South of Sutherland
$5,997Estimate ($1,000)
FY22
Project No STP-25-2(110)
FY23
PE
State 00 00 1 0
Const / CE
STP 00 4,7970 0 0
State 00 1,1990 0 0
61667Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Custer
NDOT Improvement Resurf, replace curb & flume
Ansley North US-183 89.38 7.0
US-183 from approx 0.2 mi north of E JctN-92 to 0.2 mi north of N Jct N70
$2,771Estimate ($1,000)
FY22
Project No STP-183-3(121)
FY23
PE
State 00 00 1 0
Const / CE
STP 00 2,2160 0 0
State 00 5540 0 0
61668Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Keith
NDOT Improvement Mill, resurf existing rdwy to 28' top
Lemoyne East N-92 131.88 6.8
N-92 near Lemoyne, east to near S Jct N-61
$2,410Estimate ($1,000)
FY22
Project No STP-92-2(112)
FY23
PE
State 00 00 1 0
Const / CE
STP 00 1,9270 0 0
State 00 4820 0 0
106
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
61669Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Lincoln
NDOT Improvement Update and improve traffic signal controllers In North Platte Traffic Signals US-83 82.00 3.0
Along US-83 and US-30 at various Street locations in North Platte
$158Estimate ($1,000)
FY22
Project No ELEC-83-2(1035)
FY23
PE
State 00 02 0 0
Local 00 02 0 0
Const / CE
State 077 00 0 0
Local 077 00 0 0
61672Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Dawson
County Improvement Bridge
Cozad South
Approx 0.75 mi west intersection Rd 754 with N-21 south of Cozad
$870Estimate ($1,000)
FY22
Project No BRO-7296(1)
FY23
PE
BRO 80 00 0 0
Local 20 00 0 0
Const / CE
BRO 00 00 0 688
Local 00 00 0 172
61675Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
McPherson
NDOT Improvement Resurf
In Tryon and In Stapleton N-92 203.47 1.0
N-92 from W Jct N-97 to just east Tryon & near W lmts Stapleton to N Jct US-83
$1,755Estimate ($1,000)
FY22
Project No STP-92-2(113)
FY23
PE
State 10 00 0 0
Const / CE
STP 00 1,4030 0 0
State 00 3510 0 0
107
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
61680Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Lincoln
NDOT Improvement Extend culverts, eliminate guardrail
Paxton East I-80 146.63 22.8
I-80 from approx 0.9 mi east Paxton Link L-51C to 7.4 mi west North Platte
$280Estimate ($1,000) A-2 Add projectFY22
Project No HSIP-80-3(166)
FY23
PE
State 030 00 0 0
Const / CE
SFTY 00 00 200 0
State 00 00 50 0
61681Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Dawson
NDOT Improvement Extend culverts and remove gdrl
Lexington East & West I-80 221.15 0.0
I-80 from approx 1.2 mi west N-21 grade sep to 0.6 mi east N-44 grade sep
$671Estimate ($1,000)
FY22
Project No HSIP-80-4(156)
FY23
PE
State 00 01 0 0
Const / CE
SFTY 6030 00 0 0
State 670 00 0 0
61684Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Dawson
NDOT Improvement Pavement repair and concrete curb repair In Gothenburg N-47 62.90 1.6
N-47 from 7th St/US30 Viaduct to just north of north lmts Gothenburg & L24D link
$701Estimate ($1,000)
FY22
Project No STP-47-2(113)
FY23
PE
State 00 00 1 0
Const / CE
STP 00 5600 0 0
State 00 1400 0 0
108
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
61685Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Custer
NDOT Improvement Mill, patch, resurf, intersection improvement In Broken Bow N-2 277.87 2.4
N-2 in Broken Bow. Includes N-2/N-70 intersection improvements & 0.6 mi N-21
$1,755Estimate ($1,000)
FY22
Project No NH-2-3(125)
FY23
PE
State 00 00 1 0
Const / CE
NHPP 00 1,4030 0 0
State 00 3510 0 0
70207Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Phelps
NDOT Improvement
Atlanta - Holdrege US-6 150.35 6.5
$3,836Estimate ($1,000)
FY22
Project No NH-6-3(128)
FY23
PE
State 00 00 1 0
Const / CE
NHPP 00 3,0680 0 0
State 00 7670 0 0
70510Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Franklin
NDOT Improvement Mill, asph resurf, curb/flumes, br repair
Franklin South N-10 0.00 7.9
N-10 from Kansas Line north to S Jct US-136; includes approx 1.0 mi on US-136
$6,200Estimate ($1,000)
FY22
Project No STP-10-1(104)
FY23
PE
State 00 0265 0 0
ROW
State 00 0152 0 0
Const / CE
STP 04,504 00 0 0
State 01,279 00 0 0
109
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
70585Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Hayes
NDOT Improvement RESURF
Palisade North N-25A 0.00 6.0
PALISADE NORTH
$2,777Estimate ($1,000)
FY22
Project No S-25A-1(1006)
FY23
PE
State 00 00 81 0
ROW
State 00 00 0 4
Const / CE
State 00 2,6920 0 0
70587Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Furnas
NDOT Improvement Mill, resurf existing rdwy and s-shld w/asphalt, br repair, gdrl Cambridge South N-47 7.70 5.4
N-47 from approximately 4.4 mi south Cambridge, north to jct US-6/34
$2,350Estimate ($1,000)
FY22
Project No STP-47-1(101)
FY23
PE
State 0133 00 0 0
ROW
State 50 00 0 0
Const / CE
STP 00 00 0 1769
State 00 00 0 443
70592Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Franklin
NDOT Improvement Mill, widen/resurf existing rdwy to 28' br repair & widening, gdrl Naponee - Bloomington US-136 41.59 5.7
US-136 from just west jct S-31C to just east Central Ave in Bloomington
$5,578Estimate ($1,000)
FY22
Project No STP-136-4(110)
FY23
PE
State 0520 00 0 0
Const / CE
STP 00 4,0460 0 0
State 00 1,0120 0 0
110
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
70639AControl No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Harlan
NDOT Improvement Replace two bridges, add new approaches and gr beam on piles, gdrl Orleans South Bridges N-89 63.28 0.0
N-89 over Flag Creel & Republican River approx 0.5 and 1.5 mi south of Orleans
$6,430Estimate ($1,000)
FY22
Project No STP-89-3(111)
FY23
PE
State 00 0235 0 0
ROW
State 00 030 0 0
Const / CE
STP 04,802 00 0 0
State 01,363 00 0 0
70850Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Furnas
NDOT Improvement Asph resurf 24' rdwy, widen shld from 2' to 6', br Oxford North N-46 7.96 4.0
N-46 from US-136 in Oxford north to US-34
$3,430Estimate ($1,000)
FY22
Project No STP-46-1(105)
FY23
PE
State 00 0300 0 0
ROW
State 00 037 0 0
Const / CE
STP 02,409 00 0 0
State 0684 00 0 0
70886AControl No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Hitchcock
NDOT Improvement Hydrated lime slurry stablization, resurf, conc repair, br repair Culbertson South N-17 6.80 10.3
N-17 from Culbertons South to 6.8 mi north of the Kansas line
$5,131Estimate ($1,000)
FY22
Project No STP-17-1(108)
FY23
PE
State 00 090 0 0
ROW
State 060 00 0 0
Const / CE
STP 00 00 3878 0
State 00 00 1103 0
111
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
70919Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Chase
NDOT Improvement Mill, widen/resurf existing 24'-rdwy to 28', urban section, curb & flume, culv Champion Spur S-15A 0.00 6.7
S-15A (Champion Spur) from US-6 in Imperial southwest to Champion
$5,333Estimate ($1,000)
FY22
Project No STP-S15A(101)
FY23
PE
State 00 0112 0 0
ROW
State 015 00 0 0
Const / CE
STP 00 00 4165 0
State 00 00 1041 0
71018Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Dundy
County Improvement Widen and realign rdwy
Benkelman Northeast 0.00 0.4
Snake Rd to Max-Wanuneta Rd northeast of Benkelman
$211Estimate ($1,000) A-1 Move ROW to FY-20, adjust estimateFY22
Project No HSIP-1315(11)
FY23
PE
SFTY 00 045 0 0
State 00 02 0 0
Local 00 011 0 0
ROW
SFTY 016 00 0 0
Local 02 00 0 0
Const / CE
SFTY 0108 00 0 0
Local 027 00 0 0
71100Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Chase
NDOT Improvement Mill, resurf 24' rdwy w/6' earth shld, curb/flume Enders South N-61 26.87 3.6
N-61 from approx 2.5 mi north of Dundy/Chase Co line north to E Jct US-6
$1,325Estimate ($1,000)
FY22
Project No STP-61-1(109)
FY23
PE
State 055 00 0 0
Const / CE
STP 00 00 0 1015
State 00 00 0 255
112
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
71162Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Dundy
NDOT Improvement Mill, resurf 24' rdwy with 4' earth shld
Indian Creek North N-61 11.93 6.5
N-61 from just north Indian Creek to approx 5.9 mi south of Dundy/Chase Co line
$2,573Estimate ($1,000)
FY22
Project No STP-61-1(111)
FY23
PE
State 010 00 0 0
Const / CE
STP 00 00 0 2050
State 00 00 0 513
71163Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Franklin
NDOT Improvement Mill, widen/resurf 24' rdwy to 28', extend culv, curb & flume, gdrl Franklin North N-10 7.33 6.8
N-10 from US-136 north of Franklin north to approx 6.2 mi south of N-4
$4,370Estimate ($1,000)
FY22
Project No STP-10-1(111)
FY23
Const / CE
STP 03,138 00AC Conv 0 0
State 0-3,138 00AC Conv 0 0
71165Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Gosper
NDOT Improvement Mill, widen/resurf 24' rdwy to 28', urban resurf, br repair, curb/flume In Arapahoe & North US-283 20.59 10.8
US-283 from Arapahoe to approx 3.0 mi south of N-18
$6,165Estimate ($1,000)
FY22
Project No STP-283-1(117)
FY23
PE
State 00 0265 0 0
ROW
State 025 00 0 0
Const / CE
STP 00 00 4527 0
State 00 00 1348 0
113
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
71171Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Furnas
NDOT Improvement Br replacement, add approaches
Arapahoe West Bridge US-6 125.68 0.0
US-6 over Muddy Creek 0.2 mi west of Arapahoe
$1,897Estimate ($1,000)
FY22
Project No NH-6-3(127)
FY23
PE
State 00 060 0 0
ROW
State 05 00 0 0
Const / CE
NHPP 00 00 1429 0
State 00 00 403 0
71176Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Frontier
NDOT Improvement 2 Br replacements and associated approach work Stockville East & Curtis South Bridges N-18 10.63 0.0
N-18 over Medicine Creek 0.3 mi east of Stockville and 0.2 mi south of Curtis
$3,312Estimate ($1,000)
FY22
Project No STP-18-2(111)
FY23
PE
State 1260 00 0 0
ROW
State 00 00 1 0
Const / CE
STP 00 2,5480 0 0
State 00 6370 0 0
71182Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Hitchcock
NDOT Improvement Mill, resurf, curb/flumes, br repair/overlay
Trenton North N-25 13.24 9.6
N-25 from approx 0.6 mi south of Trenton north to US-6
$6,312Estimate ($1,000)
FY22
Project No STP-25-1(111)
FY23
PE
State 00 0390 0 0
ROW
State 00 020 0 0
Const / CE
STP-AC 04,597 00 0 0
State 01,305 00 0 0
STP 4,5970 00AC Conv 0 0
State -4,5970 00AC Conv 0 0
114
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
71183Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Perkins
NDOT Improvement Mill, widen/resurf 24' rdwy to 28'
Chase/Perkins Co Line North N-61 53.56 10.6
N-61 from Chase/Perkins Co line north to the E Jct N-23
$4,539Estimate ($1,000)
FY22
Project No STP-61-2(114)
FY23
PE
State 00 0120 0 0
Const / CE
STP 03,535 00 0 0
State 0884 00 0 0
71189Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Phelps
NDOT Improvement Mill, resurf, curb ramps, br repair
Holdrege South US-183 20.97 9.4
US-183 from just south jct N-4, north to just south jct US-6 & 34 in Holdrege
$5,095Estimate ($1,000)
FY22
Project No NH-183-1(118)
FY23
PE
State 00 051 0 0
ROW
State 00 010 0 0
Const / CE
NHPP-AC 04,027 00 0 0
State 01,007 00 0 0
NHPP 4,0270 00AC Conv 0 0
State -4,0270 00AC Conv 0 0
71190Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Perkins
NDOT Improvement Resurf
Brandon - E Jct N-61 N-23 8.12 13.3
N-23 from just east of Brandon east to just east of E jct N-61 east of Grant
$5,869Estimate ($1,000)
FY22
Project No STP-23-2(129)
FY23
PE
State 0212 00 0 0
Const / CE
STP 00 00 4526 0
State 00 00 1131 0
115
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
71191Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Kearney
NDOT Improvement Mill, resurf existing rdwy & s-shld w/asph, culv, br repair, gdrl Minden North N-10 34.20 11.7
N-10 from 0.6 mi north of Minden north to 0.5 mi north of the Buffalo Co line
$5,573Estimate ($1,000)
FY22
Project No STP-10-1(113)
FY23
PE
State 200 00 0 0
Const / CE
STP-AC 00 00 0 4442
State 00 00 0 1111
STP 00 4,4420AC Conv 0 0
State 00 -4,4420AC Conv 0 0
71192Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Frontier
NDOT Improvement Mill, asph resurf, curb/flumes, add passing lanes Frazier Creek North & South US-83 35.00 9.8
US-83 from 8.6 mi north of Frontier Co line north to 3.2 mi south of S Jct N-23
$8,187Estimate ($1,000)
FY22
Project No NH-83-1(118)
FY23
PE
State 00 028 0 0
ROW
State 00 0136 0 0
Const / CE
NHPP-AC 03,082 00 0 0
State 03,863 00 0 0
State 01,078 00 0 0
NHPP 3,0820 00AC Conv 0 0
State -3,0820 00AC Conv 0 0
71196Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Kearney
NDOT Improvement Mill, resurf, shld widening, br repair
N-4 - Minden N-10 20.38 13.8
N-10 from N-4 north to just south of US-6/34 in Minden
$6,973Estimate ($1,000)
FY22
Project No STP-10-1(114)
FY23
Const / CE
STP 05,186 00AC Conv 0 0
State 0-5,186 00AC Conv 0 0
116
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
71208Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Harlan
NDOT Improvement Resurf
N-46 - Atlanta US-6 140.40 10.0
US-6 from approx 0.2 mi west of N-46 to approx 0.7 mi southwest of Atlanta
$5,845Estimate ($1,000)
FY22
Project No NH-6-3(129)
FY23
PE
State 00 00 1 0
Const / CE
NHPP 00 4,6750 0 0
State 00 1,1690 0 0
71209Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Hitchcock
NDOT Improvement Mill, trench widen/resurf existing 24' rdwy to 28', br repair, gdrl Palisade - N-25 US-6 57.36 6.6
US-6 from Palisade southeast to just southeast of Jct N-25
$4,657Estimate ($1,000)
FY22
Project No NH-6-2(132)
FY23
PE
State 300 00 0 0
ROW
State 00 00 5 0
Const / CE
NHPP 00 3,6980 0 0
State 00 9240 0 0
71223Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Harlan
NDOT Improvement Mill, resurf existing rdwy & s-shld w/asph, culv, curb & flume, br repair, gdrl In Orleans and East US-136 22.30 5.2
US-136 from approx 0.1 mi NW of Jct N-89 to Jct US-183; includes 0.1 mi on N-89
$2,191Estimate ($1,000)
FY22
Project No STP-136-3(111)
FY23
PE
State 10 00 0 0
Const / CE
STP 00 00 0 1752
State 00 00 0 438
117
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
71224Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Phelps
NDOT Improvement Mill, resurf existing rdwy and s-shld with asphalt, gdrl Holdrege - Funk US-6 159.64 7.1
US-6 from approx 0.2 mi west of east lmts Holdrege to 0.7 mi east of Funk
$3,110Estimate ($1,000)
FY22
Project No NH-6-3(131)
FY23
PE
State 10 00 0 0
Const / CE
NHPP 00 00 0 2487
State 00 00 0 622
71228Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Kearney
NDOT Improvement Resurf
Wilcox - W Jct US-6/34 N-44 25.50 7.0
N-44 from approx 0.5 mi north Wilcox to W Jct US-6/34
$2,303Estimate ($1,000)
FY22
Project No STP-44-1(105)
FY23
PE
State 00 00 1 0
Const / CE
STP 00 1,8420 0 0
State 00 4600 0 0
71229Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Franklin
NDOT Improvement Resurf
N-4 - Wilcox N-44 20.00 5.5
N-44 from Jct N-4 to Wilcox
$1,823Estimate ($1,000)
FY22
Project No STP-44-1(106)
FY23
PE
State 00 00 1 0
Const / CE
STP 00 1,4580 0 0
State 00 3640 0 0
118
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
71232Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Frontier
NDOT Improvement Mill, resurf existing rdwy & s-shld, br repair, add passing lanes Wellfleet South US-83 44.75 11.0
US-83 from approx 0.3 mi south of S Jct N-23 to 0.3 mi south Wellfleet
$15,830Estimate ($1,000)
FY22
Project No NH-83-1(120)
FY23
PE
State 2590 00 0 0
ROW
State 00 00 62 0
Const / CE
NHPP 00 9,1140 0 0
State 00 2,6180 0 0
State 00 3,7770 0 0
80640Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Cherry
NDOT Improvement Mill, resurf 24' rdwy w/3.5' s-shld, erosion erosion control curb & flume, culv Snake River North & South N-61 190.78 15.0
N-61 from 9.6 mi south of Snake River, north to 11.7 mi south of Niobrara River
$7,994Estimate ($1,000)
FY22
Project No STP-61-4(107)
FY23
PE
State 00 0380 0 0
ROW
State 00 025 0 0
Const / CE
STP-AC 06,071 00 0 0
STP 06,071 00AC Conv 0 0
State 01,518 00 0 0
State 0-6,071 00AC Conv 0 0
80662Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Cherry
NDOT Improvement Widen/resurf 24' rdwy to 28'
Merriman South N-61 219.63 6.1
N-61 from 2.0 mi north of Niobrara River north 6.1 mi to W Jct US-20
$3,525Estimate ($1,000)
FY22
Project No STP-61-4(110)
FY23
PE
State 00 00 390 0
ROW
State 00 00 0 135
Const / CE
STP 00 2,3400 0 0
State 00 6600 0 0
119
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
80683Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Keya Paha
NDOT Improvement Cold-in-place recycle 28' rdwy w/2' earth shld, br Burton East N-12 65.46 12.7
N-12 from 0.6 mi east of Burton Creek east to the south jct N-137
$7,473Estimate ($1,000)
FY22
Project No STP-12-3(106)
FY23
PE
State 2230 00 0 0
Const / CE
STP 00 5,6400 0 0
State 00 1,6100 0 0
80690AControl No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Keya Paha
NDOT Improvement Mill, widen/resurf 24' rdwy to 28', curb/flumes, br repair Niobrara River - N-7 US-183 207.17 4.3
US-183 from just north of Brown/Keya Paha Co line north to N-7
$3,463Estimate ($1,000)
FY22
Project No STP-183-4(113)
FY23
PE
State 00 0120 0 0
ROW
State 010 00 0 0
Const / CE
STP 00 00 2666 0
State 00 00 667 0
80731Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Cherry
NDOT Improvement Mill, widen/resurf existing 22'-rdwy to 24'
Merritt Reservoir North N-97 110.35 5.1
N-97 from 0.1 mi south Merritt Res Rec Rd (R-16C) north 5.05 mi
$2,357Estimate ($1,000)
FY22
Project No STP-97-4(110)
FY23
PE
State 1400 00 0 0
ROW
State 00 00 50 0
Const / CE
STP 00 1,7340 0 0
State 00 4330 0 0
120
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
80758 Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Holt
County Improvement 2 bridge replacements and associated approach work O'Neill West
Co Rd 4.0 mi west of O'Neill over the Elkhorn River & overflow stream
$2,163Estimate ($1,000)
FY22
Project No BRO-7045(28)
FY23
PE
BRO 00 0315 0 0
State 00 058 0 0
Local 00 044 0 0
ROW
BRO 00 044 0 0
State 00 06 0 0
Local 00 07 0 0
Const / CE
BRO 01,300 00 0 0
State 0192 00 0 0
Local 0197 00 0 0
80785Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Wheeler
NDOT Improvement Bridge replacement and associated approach work Ericson South 0.3
County Rd 0.7 mi southeast of Ericson over the Cedar River
$1,790Estimate ($1,000) A-1 Add projectFY22
Project No BR-2325(3)
FY23
PE
BRO 00 0200 0 0
STP 00 0120 0 0
State 00 082 0 0
ROW
STP 00 059 0 0
State 00 015 0 0
Const / CE
STP 01,051 00 0 0
State 0263 00 0 0
121
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
80804Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Brown
NDOT Improvement Rural - mill, TW and resurf to 28', curb & flume; urban conc pvmt, curb ramps In Ainsworth & South N-7 36.36 7.2
N-7 from 6.7 mi south of south lmts Ainsworth to W Jct US-20 in Ainsworth
$6,317Estimate ($1,000)
FY22
Project No STP-7-4(112)
FY23
PE
State 600 00 0 0
Const / CE
STP-AC 00 00 0 4924
State 00 00 0 1333
STP 00 4,9240AC Conv 0 0
State 00 -4,9240AC Conv 0 0
80854Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Keya Paha
NDOT Improvement Mill, resurf existing 24' rdwy to 28' and gdrl
Norden East N-12 29.13 11.2
N-12 from approx 0.1 mi west Norden to approx 5.0 mi west Jct Meadville Road
$6,058Estimate ($1,000)
FY22
Project No STP-12-3(110)
FY23
PE
State 0218 00 0 0
Const / CE
STP-AC 00 00 0 4672
State 00 00 0 1168
STP 00 4,6720AC Conv 0 0
State 00 -4,6720AC Conv 0 0
80859Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Loup
NDOT Improvement Asph resurf 24' rdwy w/6' shld, 2' surf
Blaine/Loup Co Line Southeast N-91 24.66 6.3
N-91 from approx 0.1 mi west of Blaine/Loup Co line southeast 6.5 mi
$2,459Estimate ($1,000)
FY22
Project No STP-91-3(112)
FY23
PE
State 110 00 0 0
Const / CE
STP 00 1,7870 0 0
State 00 6610 0 0
122
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
80862Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Cherry
NDOT Improvement Mill, resurf 24' rdwy w/4' earth shld
Grant/Cherry Co Line North (3R Resurf) N-61 165.86 7.4
N-61 from the Grant/Cherry Co. line north 7.4 mi
$2,989Estimate ($1,000)
FY22
Project No STP-61-4(114)
FY23
PE
State 130 00 0 0
Const / CE
STP 00 2,3800 0 0
State 00 5960 0 0
80863Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Brown
NDOT Improvement Replace pvmt, curb, drainage, curb ramps In Ainsworth US-20 241.95 1.4
US-20 in Ainsworth
$5,653Estimate ($1,000)
FY22
Project No NH-20-3(113)
FY23
PE
State 00 0206 0 0
ROW
State 00 050 0 0
Const / CE
NHPP-AC 04,204 00 0 0
State 01,193 00 0 0
NHPP 4,2040 00AC Conv 0 0
State -4,2040 00AC Conv 0 0
80864Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Holt
NDOT Improvement 40'-66' b-b urban reconstruction
E Jct US-20 South In O'Neill US-281 182.81 0.5
US-281 from approx 0.4 mi north Elkhorn River to E Jct US-20 & US-275 in O'Neill
$3,395Estimate ($1,000)
FY22
Project No NH-281-4(124)
FY23
PE
State 00 0118 0 0
ROW
State 00 020 0 0
Const / CE
NHPP 02,537 00 0 0
State 0720 00 0 0
123
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
80865Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Cherry
NDOT Improvement Urban reconstruction, curb inlets & storm sewer, curb & flume, resurf In Valentine US-83 212.78 2.1
US-83 from N Jct US-20 in Valentine northwest to N-12
$7,150Estimate ($1,000)
FY22
Project No NH-STP-83-4(11
FY23
PE
State 00 0885 0 0
ROW
State 00 0100 0 0
Const / CE
STP 0319 00 0 0
NHPP-AC 04,499 00 0 0
State 01,347 00 0 0
NHPP 4,4990 00AC Conv 0 0
State -4,4990 00AC Conv 0 0
80866Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Loup
NDOT Improvement Widen/resurf 22' rdwy to 28', br repair/overlay, curb/flumes US-183 Southeast N-96 0.00 13.6
N-96 from US-183 southeast to approx 1.7 mi north of the Calamus River
$6,725Estimate ($1,000)
FY22
Project No STP-96-3(101)
FY23
PE
State 00 0215 0 0
ROW
State 00 022 0 0
Const / CE
STP-AC 05,054 00 0 0
State 01,434 00 0 0
STP 5,0540 00AC Conv 0 0
State -5,0540 00AC Conv 0 0
80867Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Cherry
NDOT Improvement Asph resurf existing rdwy and shld
Sparks East N-12 18.64 3.5
N-12 from 0.6 mi east of Sparks Rd to juest west of the Cherry/Keya Paha Co line
$1,658Estimate ($1,000)
FY22
Project No STP-12-2(107)
FY23
PE
State 00 06 0 0
Const / CE
STP 00 00 1252 0
State 00 00 400 0
124
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
80868Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Keya Paha
NDOT Improvement Mill, resurf existing rdwy to 28' with asph, curb & flume, br repair, gdrl Rock/Keya Paha County Line North N-7 73.15 4.5
N-7 from just south Niobrara River bridge to approx 6.7 mi SE of jct US-183
$2,815Estimate ($1,000)
FY22
Project No STP-7-4(118)
FY23
PE
State 00 034 0 0
ROW
State 010 00 0 0
Const / CE
STP 00 00 2217 0
State 00 00 554 0
80869Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Rock
NDOT Improvement Mill, widen/resurf 24' rdwy to 28'
Rose South US-183 148.23 6.4
US-183 from Loup/Rock Co line north 6.4 mi to Rose
$2,631Estimate ($1,000)
FY22
Project No STP-183-4(115)
FY23
PE
State 90 00 0 0
Const / CE
STP 00 2,0970 0 0
State 00 5250 0 0
80870Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Keya Paha
NDOT Improvement Mill, resurf 24' rdwy w/4' shld, 2' surf
Norden West N-12 22.16 7.0
N-12 from Norden west to the Cherry/Keya Paha Co. line
$2,004Estimate ($1,000)
FY22
Project No STP-12-3(108)
FY23
PE
State 00 00 12 0
Const / CE
STP 00 1,5930 0 0
State 00 3990 0 0
125
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
80902Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Blaine
NDOT Improvement Mill, asph resurf rdwy and shld, br repair/overlay Brewster North N-7 0.00 8.4
N-7 from N-91 south of Brewster, north to 2.5 mi south of Blaine/Brown Co line
$2,652Estimate ($1,000)
FY22
Project No STP-7-3(103)
FY23
PE
State 00 040 0 0
Const / CE
STP 02,035 00 0 0
State 0577 00 0 0
80944Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Cherry
NDOT Improvement Bridge replacement, re-aligned rdwy resurf, curb & flume, gdrl Minnechaduza Creek Bridge N-12 3.78 0.4
N-12 bridge over Minnechaduza Cr on new alignment approx 3.0 mi east Valentine
$2,293Estimate ($1,000)
FY22
Project No STP-12-2(106)
FY23
PE
State 074 00 0 0
ROW
State 500 00 0 0
Const / CE
STP 00 00 0 1735
State 00 00 0 434
80956Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Holt
NDOT Improvement Replace two bridge's 40' clear rdwy, replace rdwy to accomodate br work, gdrl O'Neill Southeast Bridges US-20 310.67 0.5
US-20 from approx 0.2 mi NW of Elkhorn River br to 0.2 SE of Dry Creek br
$5,257Estimate ($1,000)
FY22
Project No NH-20-4(126)
FY23
PE
State 00 00 168 0
ROW
State 00 00 0 30
Const / CE
NHPP 00 4,0470 0 0
State 00 1,0120 0 0
126
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
80967Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Brown
NDOT Improvement Bridge repair/overlay
Long Pine Bridge US-20 250.01 0.2
US-20 over Long Pine Creek 1.7 mi west ot the Brown/Rock Co line
$1,889Estimate ($1,000)
FY22
Project No NH-20-3(114)
FY23
PE
State 00 0102 0 0
Const / CE
NHPP 01,430 00 0 0
State 0357 00 0 0
80991Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Cherry
NDOT Improvement Microsurfacing
S-16B North & South US-83 186.93 10.2
US-83 from 9.1 mi south of Valentine Refuge Spur (S-16B) north approx 10.2 mi
$983Estimate ($1,000)
FY22
Project No NH-83-4(119)
FY23
PE
State 00 01 0 0
Const / CE
NHPP 0786 00 0 0
State 0196 00 0 0
80993Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Rock
NDOT Improvement Microsurface 24' rdwy w/8' shld, 2' s urf
Rose North US-183 154.62 17.6
US-183 from Rose to 9.8 mi south of Bassett
$1,648Estimate ($1,000)
FY22
Project No STP-183-4(117)
FY23
PE
State 00 01 0 0
Const / CE
STP 1,3180 00 0 0
State 3290 00 0 0
127
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
81002Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Cherry
NDOT Improvement Mill, resurf rdwy and shld, curb/flumes
Snake River - Niobrara River N-61 205.77 10.3
N-61 from approx 5.4 mi north of Snake River to 1.4 mi south of Niobrara River
$7,106Estimate ($1,000)
FY22
Project No STP-61-4(116)
FY23
PE
State 00 0198 0 0
Const / CE
STP-AC 02,763 00 0 0
State 0691 00 0 0
STP 2,7630 00AC Conv 0 0
State 6910 00AC Conv 0 0
81003Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Boyd
NDOT Improvement Mill/resurf existing rdwy w/asph, widen turf shld, curb & flume, culv, br repairIn Butte & North N-11 181.82 7.3
N-11 from approx 0.3 mi west of Butte north to the South Dakota line
$4,882Estimate ($1,000)
FY22
Project No STP-11-4(118)
FY23
PE
State 1140 00 0 0
Const / CE
STP 00 3,8140 0 0
State 00 9540 0 0
81005Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Rock
NDOT Improvement Mill, resurf existing rdwy and s-shld, curb & gutter repair Bassett South US-183 172.21 10.1
US-183 from approx 9.9 mi South Bassett, north to E Jct US-20 & N-7 in Bassett
$4,796Estimate ($1,000)
FY22
Project No STP-183-4(118)
FY23
PE
State 01 00 0 0
Const / CE
STP 00 00 3836 0
State 00 00 959 0
128
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
81007Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Brown
NDOT Improvement Microsurfacing
Ainsworth Area Microsurfacing N-7 8.36 31.6
Various locations on US-20 and N-7 in the Ainsworth area
$2,159Estimate ($1,000)
FY22
Project No STP-NH-7-4(122)
FY23
PE
State 01 00 0 0
Const / CE
NHPP 00 00 0 834
STP 00 00 0 892
State 00 00 0 432
81008Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Cherry
NDOT Improvement Microsurfacing
Valentine Area Microsurfacing US-20 111.94 58.3
Various locations on US-20, US-83 and N-12 in the Valentine area
$3,976Estimate ($1,000)
FY22
Project No NH-STP-20-2(14
FY23
PE
State 00 01 0 0
Const / CE
STP 00 00 310 0
NHPP 00 00 2870 0
State 00 00 795 0
81009Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Holt
NDOT Improvement Microsurfacing
O'Neill Area Microsurfacing US-20 309.06 50.6
Various locations on US-275, US-281, US-20, N-70 & N-95 in the O'Neill area
$3,562Estimate ($1,000)
FY22
Project No NH-STP-20-4(12
FY23
PE
State 10 00 0 0
Const / CE
NHPP 00 1,7760 0 0
STP 00 1,0730 0 0
State 00 7120 0 0
129
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
81010Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Holt
NDOT Improvement Diamond grinding, joint and panel repair
In O'Neill US-20 307.61 1.8
US-20 from just west of E Jct US-281 & NW Jct US275 to just southeast of O'Neill
$480Estimate ($1,000)
FY22
Project No RD-20-4(1031)
FY23
PE
State 00 02 0 0
Const / CE
State 0478 00 0 0
81014Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Boyd
County Improvement Bridge replacement and associated approach work Naper Southeast 0.0
Co Rd 902 bridge C000801605 4.0 mi south and 5.0 mi west of Naper
$1,172Estimate ($1,000) A-2 Add projectFY22
Project No BRO-7442(1)
FY23
PE
BRO 00 0170 0 0
Local 00 042 0 0
ROW
BRO 08 00 0 0
Local 02 00 0 0
Const / CE
BRO 00 00 950 0
81017Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Garfield
NDOT Improvement Deploy CCTV cameras
District 8 CCTV Cameras N-11 93.70 0.0
Distict 8 - at 5 locations districtwide
$229Estimate ($1,000)
FY22
Project No ITS-STP-D8(103)
FY23
PE
State 00 09 0 0
Const / CE
STP 0172 00 0 0
State 048 00 0 0
130
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
81021Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Cherry
NDOT Improvement Install culvert
Alkali Pond Culvert N-97 104.17 0.0
N-97 approx 1.3 mi north of Brownlee Rd
$182Estimate ($1,000)
FY22
Project No STP-97-4(112)
FY23
PE
State 00 01 0 0
Const / CE
STP 0145 00 0 0
State 036 00 0 0
81024Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Holt
NDOT Improvement Mill, asph resurf, curb/flumes, br repair
Boyd/Holt Co Line North & South US-281 204.09 5.8
US-281 from approx 3.9 south to 1.9 mi north Holt/Boyd county line
$3,362Estimate ($1,000)
FY22
Project No NH-281-4(128)
FY23
PE
State 10 00 0 0
Const / CE
NHPP 00 00 0 2689
State 00 00 0 672
81025Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Holt
NDOT Improvement Mill, asph resurf, br repair
Eagle Creek North & South US-281 196.88 7.2
US-281 from approx 11.6 mi north O'Neill to 3.9 mi south Holt/Boyd Co Line
$3,830Estimate ($1,000)
FY22
Project No NH-281-4(129)
FY23
PE
State 00 0305 0 0
Const / CE
NHPP 02,820 00 0 0
State 0705 00 0 0
131
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
81026Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Holt
NDOT Improvement Mill, asph resurf existing rdwy & s-shld, br repair, erosion control curb, gdrl Stafford - Holt/Antelope County Line US-20 320.74 8.1
US-20 from SE jct US-275 east to Holt/Antelope Co line
$4,147Estimate ($1,000)
FY22
Project No NH-20-4(127)
FY23
PE
State 00 0114 0 0
Const / CE
NHPP 00 00 3226 0
State 00 00 807 0
81027Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Cherry
NDOT Improvement Mill, asph resurf, curb/flumes
Merriman - Eli US-20 135.84 10.2
US-20 from just west of E Jct N-61 in Merriman, east to intersection with Eli Rd
$4,721Estimate ($1,000)
FY22
Project No NH-20-2(145)
FY23
PE
State 00 0267 0 0
Const / CE
NHPP 00 00 3563 0
State 00 00 891 0
81030Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Cherry
NDOT Improvement Microsurfacing existing rdwy, fog seal s-shld and erosion control surf & curb Merriman Area Microsurfacing US-20 118.25 13.9
US-20 from approx 16.9 to 8.5 mi west Merriman; N-61 E Jct US-20 to SD Line
$1,556Estimate ($1,000)
FY22
Project No NH-STP-20-2(14
FY23
PE
State 00 00 1 0
Const / CE
STP 00 4940 0 0
NHPP 00 7500 0 0
State 00 3110 0 0
132
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
81036Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Holt
County Improvement Bridge
Atkinson Southeast
477 Ave approx 0.7 mi south intersection with US-20 southeast Atkinson
$613Estimate ($1,000) A-2 Move const to FY-24FY22
Project No BRO-7045(37)
FY23
PE
BRO 050 00 0 0
Const / CE
BRO 00 5630 0 0
81037Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Cherry
NDOT Improvement Replace conc rdwy & s-shld, curb inlets, curb & flume, br repair, lighting, gdrlWest 4th Street in Valentine US-83 213.36 0.8
US-83 from approx 0.1 mi west Jct N-12 to Minnechuduza Cr bridge in Valentine
$5,702Estimate ($1,000)
FY22
Project No NH-83-4(121)
FY23
PE
State 026 00 0 0
Const / CE
NHPP 00 4,5410 0 0
State 00 1,1350 0 0
81039Control No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Holt
NDOT Improvement Br replacment due to March 2019 flood event Nobrara River at Holt/Boyd Co Line US-281 208.01 0.0
US-281 over the Niobrara River at the Holt/Boyd Co Line
$29,630Estimate ($1,000)
FY22
Project No ER-281-4(130)
FY23
Const / CE
STP 0-23,680 00ER Conv 0 0
ER 023,680 00ER Conv 0 0
STP 023,680 00 0 0
State 05,950 00 0 0
133
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
GIAMPOControl No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Improvement
Listed in GIAMPO's 2020 - 2023 TIP
Estimate ($1,000)
FY22
Project No
FY23
SFTY 0406 00 0 0
State 02,167 00 0 0
Local 0292 00 0 0
NHPP 11,0590 00 0 0
SFTY 9820 00 0 0
State 7,2940 00 0 0
Local 1,4900 00 0 0
State 00 00 20915 0
NHPP 00 00 2183 0
134
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
LincolnControl No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Improvement
Listed in Lincoln's 2020 - 2023 TIP
Estimate ($1,000)
FY22
Project No
FY23
NHPP 04,049 00 0 0
EM 031,000 00 0 0
TAP 094 00 0 0
State 011,341 00 0 0
LN 09,363 00 0 0
Other 01,791 00 0 0
LC 08,500 00 0 0
SFTY 04,771 00 0 0
LN 7,5400 00 0 0
STP 6,1500 00 0 0
NHPP 3,5280 00 0 0
TAP 1,5010 00 0 0
LC 7,0000 00 0 0
State 32,4540 00 0 0
SFTY 1,9350 00 0 0
LN 00 00 7141.4 0
LC 00 00 7000 0
NHPP 00 00 3204 0
State 00 00 30801 0
SFTY 00 00 5632 0
TAP 00 00 20.5 0
Other 00 00 0 2066.4
LN 00 00 0 12568.4
State 00 00 0 32430
TAP 00 00 0 573
STP 00 00 0 9722
LC 00 00 0 9500
135
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
MAPAControl No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Improvement
Listed in MAPA's 2020 - 2023 TIP
Estimate ($1,000)
FY22
Project No
FY23
EM 015,230 00 0 0
Local 0-12,037 00 0 0
TAP 03,143 00 0 0
SFTY 09,324 00 0 0
MAPA 055,683 00 0 0
STP 02,841 00 0 0
NHPP 031,062 00 0 0
State 08,786 00 0 0
NHPP 23,8990 00 0 0
Local 11,4260 00 0 0
State 5,2810 00 0 0
TAP 3,4920 00 0 0
EM 3,0640 00 0 0
SFTY 9320 00 0 0
STP 7,8850 00 0 0
MAPA 16,3660 00 0 0
STP 00 00 4137.65 0
MAPA 00 00 6833.53 0
TAP 00 00 1442 0
NHPP 00 00 19471 0
State 00 00 5083 0
Local 00 00 -5269.87 0
NHPP 00 00 0 2938
MAPA 00 00 0 10401.02
Local 00 00 0 -2795.19
TAP 00 00 0 579
State 00 00 0 22768
136
Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023
SIMPCOControl No
CountyLengthHwy Begin RP
Total Project Cost:
Jurisdiction
Location:
Detailed Termini:
Prev FY FY21FY20 Future FY
Improvement
Listed in SIMPCO's 2020 - 2023 TIP
Estimate ($1,000)
FY22
Project No
FY23
State 02,400 00 0 0
SFTY 030 00 0 0
NHPP 010,700 00 0 0
SFTY 300 00 0 0
NHPP 6,1340 00 0 0
SFTY 00 00 30 0
SFTY 00 00 0 30
137
FTA Program Budget and Federal Funds Source FFY Apport. Location Fund Scope 2019-2020 2020-2021 2021-2022 2022-2023Budget
Planning Federal 442-00 2,343,284$ -$ 595,000$ 615,000$
Planning Local/State 442-00 585,821$ -$ 148,750$ 153,750$ Planning Total 442-00 2,929,105$ -$ 743,750$ 768,750$
Federal Funds Source
Grant NE-80-0024 2014 Urban Federal 442-00 103,652$ -$ -$ -$
Application 1815-2019-2 2016-2017 Urban Federal 442-00 2,239,632$ -$ -$ -$
Application 1815-2020-# (estimated) 2020 Urban Federal 442-00 -$ -$ 595,000$ -$
Application 1815-2021-# (estimated) 2021 Urban Federal 442-00 -$ -$ -$ 615,000$ 2,343,284$ -$ 595,000$ 615,000$
FTA Program Budget and Federal Funds Source FFY Apport. Location Fund Scope 2019-2020 2020-2021 2021-2022 2022-2023Budget
Third Party Contract Federal 117-00 152,640$ 168,000$ 185,000$ 185,000$
Third Party Contract Local/State 117-00 38,160$ 42,000$ 46,250$ 46,250$ Third Party Contract Total 117-00 190,800$ 210,000$ 231,250$ 231,250$
Federal Funds Source
Grant NE-2019-001-01 2017 Rural Federal 117-00 32,000$ 32,000$ -$ -$
Application 1815-2020-# (estimated) 2020 Rural Federal 117-00 -$ -$ 40,000$ 40,000$
NDOT (FHWA CMAQ) 2020-2023 Urban Federal 117-00 120,640$ 136,000$ 145,000$ 145,000$ 152,640$ 168,000$ 185,000$ 185,000$
FTA Program Budget and Federal Funds Source FFY Apport. Location Fund Scope 2019-2020 2020-2021 2021-2022 2022-2023Budget
Bus-Rolling Stock Federal 111-00 256,021$ 438,150$ 383,555$ 748,099$
Bus-Rolling Stock Local/State 111-00 64,006$ 109,538$ 95,889$ 187,025$ Bus-Rolling Stock Total 111-00 320,027$ 547,688$ 479,444$ 935,124$
Federal Funds Source
Grant NE-16-X040 2013 Rural Federal 111-00 27,404$ 32,000$ -$ -$
Grant NE-2016-007-01 2014 Rural Federal 111-00 2,421$ -$ -$ -$
Grant NE-2017-009-01 2016 Rural Federal 111-00 226,196$ 406,150$ -$ -$
Application 1815-2019-5 2017-2019 Rural Federal 111-00 -$ -$ 383,555$ 748,099$ 256,021$ 438,150$ 383,555$ 748,099$
Budget
Bus-Equipment_Facilities Federal 114-00 50,000$ 50,000$ 50,000$ 50,000$
Bus-Equipment_Facilities Local/State 114-00 12,500$ 12,500$ 12,500$ 12,500$ Bus-Equipment_Facilities Total 114-00 62,500$ 62,500$ 62,500$ 62,500$
Federal Funds Source
Application 1815-2019-5 2017-2019 Rural Federal 114-00 50,000$ 50,000$ 50,000$ -$
Application 1815-2020-# (estimated) 2020 Rural Federal 114-00 -$ -$ 50,000$ 50,000$ 50,000$ 50,000$ 50,000$
Budget
Third Party Contract Federal 117-00 48,007$ 55,000$ 55,000$ 55,000$
Third Party Contract Local/State 117-00 12,002$ 13,750$ 13,750$ 13,750$ Third Party Contract Total 117-00 60,009$ 68,750$ 68,750$ 68,750$
Federal Funds Source
Grant NE-2016-007-02 2014 Rural Federal 117-00 8,007$ -$ -$ -$
Grant NE-2017-009-02 2016 Rural Federal 117-00 40,000$ -$ -$ -$
Application 1815-2019-5 2017-2019 Rural Federal 117-00 -$ 55,000$ 55,000$ 55,000$ 48,007$ 55,000$ 55,000$ 55,000$
Budget
Operating Assistance Federal 300-00 40,458$ -$ -$ -$
Operating Assistance Local/State 300-00 40,458$ -$ -$ -$ Operating Assistance Total 300-00 80,916$ -$ -$ -$
Federal Funds Source
Grant NE-2016-007-02 2014 Rural Federal 300-00 7,819$ -$ -$ -$
Grant NE-2017-009-03 2016 Rural Federal 300-00 32,639$ -$ -$ -$ 40,458$ -$ -$ -$
Nebraska Department of Transportation
Statewide Transportation Improvement Program
Public Transit ServicesUpdated: 3/31/2020
Metropolitan Planning
5
3
0
3
Vanpools
5
3
0
7
Enhanced Mobility of Seniors and Individuals with Disabilities
5
3
1
0
R
U
R
A
L
Nebraska Department of Transportation
Statewide Transportation Improvement Program
Public Transit ServicesUpdated: 3/31/2020
FTA Program Budget and Federal Funds Source FFY Apport. Location Fund Scope 2019-2020 2020-2021 2021-2022 2022-2023Budget
Bus-Rolling Stock Federal 111-00 110,000$ 113,000$ 116,004$ 104,000$
Bus-Rolling Stock Local/State 111-00 27,500$ 28,250$ 29,001$ 26,000$ Bus-Rolling Stock Total 111-00 137,500$ 141,250$ 145,005$ 130,000$
Federal Funds Source
Grant NE-2016-009-01 2014 Gr Island Federal 111-00 19,016$ -$ -$ -$
Application 1815-2019-7 2017-2019 Gr Island Federal 111-00 90,984$ 113,000$ 110,897$ -$
Application 1815-2020-# (estimated) 2020 Gr Island Federal 111-00 -$ -$ 5,107$ 104,000$ 110,000$ 113,000$ 116,004$ 104,000$
Budget
Bus-Equipment_Facilities Federal 114-00 102,025$ -$ -$ -$
Bus-Equipment_Facilities Local/State 114-00 25,507$ -$ -$ -$ Bus-Equipment_Facilities Total 114-00 127,532$ -$ -$ -$
Federal Funds Source
Grant NE-2018-016-01 2016 Gr Island Federal 114-00 102,025$ -$ -$ -$ 102,025$ -$ -$ -$
Budget
Third Party Contract Federal 117-00 32,939$ -$ -$ -$
Third Party Contract Local/State 117-00 8,235$ -$ -$ -$ Third Party Contract Total 117-00 41,174$ -$ -$ -$
Federal Funds Source
Grant NE-2016-009-03 2014 Gr Island Federal 117-00 32,939$ -$ -$ -$ 32,939$ -$ -$ -$
Budget
Operating Assistance Federal 300-00 20,000$ -$ -$ -$
Operating Assistance Local/State 300-00 20,000$ -$ -$ -$ Operating Assistance Total 300-00 40,000$ -$ -$ -$
Federal Funds Source
Grant NE-2016-009-02 2014 Gr Island Federal 300-00 20,000$ -$ -$ -$ 20,000$ -$ -$ -$
FTA Program Budget and Federal Funds Source FFY Apport. Location Fund Scope 2019-2020 2020-2021 2021-2022 2022-2023Budget
Bus-Rolling Stock Federal 111-00 342,597$ 511,409$ 449,192$ 349,538$
Bus-Rolling Stock Local/State 111-00 85,650$ 127,853$ 112,298$ 87,385$ Bus-Rolling Stock Total 111-00 428,247$ 639,262$ 561,490$ 436,923$
Federal Funds Source
Grant NE-2018-016-02 2016 Lincoln Federal 111-00 161,627$ -$ -$ -$
Application 1815-2019-4 2017-2019 Omaha Federal 111-00 180,970$ 317,520$ 247,290$ -$
Application 1815-2019-7 2017-2019 Lincoln Federal 111-00 -$ 193,889$ 201,902$ 99,538$
Application 1815-2020-# (estimated) 2020 Lincoln Federal 111-00 -$ -$ -$ -$
Application 1815-2020-# (estimated) 2020 Omaha Federal 111-00 -$ -$ -$ 250,000$ 342,597$ 511,409$ 449,192$ 349,538$
Budget
Bus-Equipment_Facilities Federal 114-00 6,296$ 5,000$ 5,000$ 5,000$
Bus-Equipment_Facilities Local/State 114-00 1,574$ 1,250$ 1,250$ 1,250$ Bus-Equipment_Facilities Total 114-00 7,870$ 6,250$ 6,250$ 6,250$
Federal Funds Source
Grant NE-2016-010-04 2014 Lincoln Federal 114-00 1,296$ -$ -$ -$
Grant NE-2017-015-02 2015 Lincoln Federal 114-00 5,000$ -$ -$ -$
Application 1815-2019-7 2017-2019 Lincoln Federal 114-00 -$ 5,000$ 5,000$ 5,000$ 6,296$ 5,000$ 5,000$ 5,000$
Budget
Third Party Contract Federal 117-00 45,770$ 47,288$ 48,000$ 48,000$
Third Party Contract Local/State 117-00 11,443$ 11,822$ 12,000$ 12,000$ Third Party Contract Total 117-00 57,213$ 59,110$ 60,000$ 60,000$
Federal Funds Source
Grant NE-2016-010-03 2014 Lincoln Federal 117-00 45,770$ -$ -$ -$
Grant NE-2017-015-03 2015 Lincoln Federal 117-00 -$ 47,288$ -$ -$
Application 1815-2019-7 2017-2019 Lincoln Federal 117-00 -$ -$ 48,000$ 48,000$ 45,770$ 47,288$ 48,000$ 48,000$
Budget
Operating Assistance Federal 300-00 8,000$ -$ -$ -$
Operating Assistance Local/State 300-00 8,000$ -$ -$ -$ Operating Assistance Total 300-00 16,000$ -$ -$ -$
Federal Funds Source
Grant NE-2016-010-02 2014 Lincoln Federal 300-00 8,000$ -$ -$ -$ 8,000$ -$ -$ -$
5
3
1
0
S
M
A
L
L
U
R
B
A
N
Enhanced Mobility of Seniors and Individuals with Disabilities
Enhanced Mobility of Seniors and Individuals with Disabilities
5
3
1
0
L
A
R
G
E
U
R
B
A
N
Nebraska Department of Transportation
Statewide Transportation Improvement Program
Public Transit ServicesUpdated: 3/31/2020
FTA Program Budget and Federal Funds Source FFY Apport. Location Fund Scope 2019-2020 2020-2021 2021-2022 2022-2023Budget
Bus-Rolling Stock Federal 111-00 627,305$ 500,000$ 500,000$ 500,000$
Bus-Rolling Stock Local/State 111-00 156,827$ 125,000$ 125,000$ 125,000$ Bus-Rolling Stock Total 111-00 784,132$ 625,000$ 625,000$ 625,000$
Federal Funds Source
Grant NE-2018-015-04 2016 Rural Federal 111-00 127,305$ -$ -$ -$
Application 1815-2019-6 2019 - 2020 Rural Federal 111-00 500,000$ 500,000$ 500,000$ -$
Application 1815-2021-# (estimated) 2021 Rural Federal 111-00 -$ -$ -$ 500,000$ 627,305$ 500,000$ 500,000$ 500,000$
Budget
Third Party Contract Federal 170-00 1,749,871$ 1,749,871$ 1,750,000$ 1,750,000$
Third Party Contract Local/State 170-00 437,468$ 437,468$ 437,500$ 437,500$ Third Party Contract Total 170-00 2,187,339$ 2,187,339$ 2,187,500$ 2,187,500$
Federal Funds Source
Grant NE-2017-013-03 2015 Rural Federal 170-00 1,749,871$ 1,749,871$ -$ -$
Application 1815-2019-6 2019 - 2020 Rural Federal 170-00 -$ -$ 1,250,000$ -$
Application 1815-2021-# (estimated) 2021 Rural Federal 170-00 -$ -$ 500,000$ 1,750,000$ 1,749,871$ 1,749,871$ 1,750,000$ 1,750,000$
Budget
Bus Equipment & Facilities Federal 114-00 650,000$ 3,000,000$ 750,000$ 750,000$
Bus Equipment & Facilities Local/State 114-00 162,500$ 750,000$ 187,500$ 187,500$ Bus Equipment & Facilities Total 114-00 812,500$ 3,750,000$ 937,500$ 937,500$
Federal Funds Source
Application 1815-2019-6 2019 - 2020 Rural Federal 114-00 650,000$ 3,000,000$ -$ -$
Application 1815-2021-# (estimated) 2021 Rural Federal 114-00 -$ -$ 750,000$ -$
Application 1815-2022-# (estimated) 2022 Rural Federal 114-00 -$ -$ -$ 750,000$ 650,000$ 3,000,000$ 750,000$ 750,000$
Budget
Operating Assistance Federal 300-00 3,800,000$ 3,876,000$ 3,953,520$ 4,000,000$
Operating Assistance Local/State 300-00 3,800,000$ 3,876,000$ 3,953,520$ 4,000,000$ Operating Assistance Total 300-00 7,600,000$ 7,752,000$ 7,907,040$ 8,000,000$
Federal Funds Source
Grant NE-2018-015-03 2016 Rural Federal 300-00 714,569$ -$ -$ -$
Application 1815-2019-3 2017-2019 Rural Federal 300-00 3,085,431$ 3,876,000$ 505,279$ -$
Application 1815-2020-# (estimated) 2020 Rural Federal 300-00 -$ -$ 3,448,241$ -$
Application 1815-2021-# (estimated) 2021-2022 Rural Federal 300-00 -$ -$ -$ 4,000,000$ 3,800,000$ 3,876,000$ 3,953,520$ 4,000,000$
Budget
RTAP Federal 435-00 137,000$ 138,056$ 139,000$ 188,510$
RTAP Local/State 435-00 -$ -$ -$ -$ RTAP Total 435-00 137,000$ 138,056$ 139,000$ 188,510$
Federal Funds Source
Grant NE-2017-013-01 2015 Rural Federal 435-00 51,338$ -$ -$ -$
Grant NE-2018-015-01 2016 Rural Federal 435-00 18,662$ 70,000$ 44,399$ -$
Application 1815-2019-3 2017-2019 Rural Federal 435-00 67,000$ 68,056$ 94,601$ 188,510$ 137,000$ 138,056$ 139,000$ 188,510$
Budget
State Admin Federal 610-00 860,562$ 802,740$ 829,515$ 902,520$
State Admin Local/State 610-00 -$ -$ -$ -$ State Admin Total 610-00 860,562$ 802,740$ 829,515$ 902,520$
Federal Funds Source
Grant NE-2017-013-06 2015 Statewide Federal 610-00 90,172$ -$ -$ -$
Grant-NE-2018-015-01 2016 Statewide Federal 610-00 770,390$ -$ -$ -$
Application 1815-2019-3 2017-2019 Statewide Federal 610-00 -$ 802,740$ 829,515$ 902,520$ 860,562$ 802,740$ 829,515$ 902,520$
Budget
Non-Operating Assistance Federal 620-00 3,869,992$ 4,141,760$ 4,200,000$ 4,300,000$
Non-Operating Assistance Local/State 620-00 967,498$ 1,035,440$ 1,050,000$ 1,075,000$ Non-Operating Assistance Total 620-00 4,837,490$ 5,177,200$ 5,250,000$ 5,375,000$
Federal Funds Source
Grant NE-2018-015-03 2016 Rural Federal 620-00 69,992$ -$ -$ -$
Application 1815-2019-3 2017-2019 Rural Federal 620-00 3,800,000$ 4,141,760$ -$ -$
Application 1815-2020-# (estimated) 2020 Rural Federal 620-00 -$ -$ 4,200,000$ -$
Application 1815-2021-# (estimated) 2021-2022 Rural Federal 620-00 -$ -$ -$ 4,300,000$ 3,869,992$ 4,141,760$ 4,200,000$ 4,300,000$
Budget
Intercity Bus Federal 634-00 510,712$ 458,152$ 458,151$ 458,152$
Intercity Bus Local/State 634-00 510,712$ 458,152$ 458,151$ 458,152$ Intercity Bus Total 634-00 1,021,424$ 916,304$ 916,302$ 916,304$
Federal Funds Source
Grant NE-2018-015-02 2016 Rural Federal 634-00 52,561$ -$ -$ -$
Application 1815-2019-3 2017-2019 Rural Federal 634-00 458,151$ 458,152$ 458,151$ 458,152$ 510,712$ 458,152$ 458,151$ 458,152$
Rural Area Grants and Rural Transit Assistance Program (RTAP)
5
3
1
1
a
n
d
5
3
1
1
(
b
)
(
3
)
Nebraska Department of Transportation
Statewide Transportation Improvement Program
Public Transit ServicesUpdated: 3/31/2020
FTA Program Budget and Federal Funds Source FFY Apport. Location Fund Scope 2019-2020 2020-2021 2021-2022 2022-2023Budget
Bus-Equipment_Facilities Federal 596,819$ 101,356$ -$ -$
Bus-Equipment_Facilities Local/State 149,205$ 25,339$ -$ -$ Bus-Equipment_Facilities Total 746,024$ 126,695$ -$ -$
Federal Funds Source
Grant NE-2016-004-01 2013 Gr Island Federal 96,819$ -$ -$ -$
Grant NE-2018-012-01 2014 Gr Island Federal -$ 101,356$ -$ -$
Application 1815-2020-1 2017-2019 Gr Island Federal 500,000$ -$ -$ -$ 596,819$ 101,356$ -$ -$
Bus and Bus Facilities5
3
3
9
S
M
U
R
B
M46Cell:
5310 Rural Bus-Rolling Stock: Application 1815-2019-5 Federal Budget for FY 2022-2023 includes both FFYs 18 and 19 apportionments until the STIP is updated in 2020 to include FY 2023-2024.Comment:
M94Cell:
5310 Small Urban Grand Island Bus-Rolling Stock: 1815-2020-# (pending FY 20 apportionment) is programmed at $109,107, $5,107 to cover the remaining projected cost for two (2) small buses and $104,000 Comment:
as the remaining funds from the apportionment. Other funds, either as carryover from prior fiscal years or a new apportionment may need to be programmed.
M139Cell:
5310 Large Urban Lincoln FFY 20 Pending Apportionment: An estimated amount is programmed in FY 2022-2023 though it is to identify the apportionment amount only. It is projected the amount will be Comment:
carried forward into FY 2023-2024.
M140Cell:
5310 Large Urban Omaha FFY 20 Estimated Apportionment: An estimated amount is programmed in FY 2022-2023 though it is to identify the allocation of the apportionment by the Metropolitan Area Comment:
Planning Agency (MAPA). This amount will likely be carried forward into FY 2023-2024.
K206Cell:
Rouch, Ken:Comment:
As per Eva Steinman, FTA, this amount needed increasing, and especially because of adding the Cedar County project.
J287Cell:
Rouch, Ken:Comment:
In July 2020 determine the funds expended to date for the Bus Facility. Then, allocate remaining funds to the column 2020-2021.
Note: on 3/24/20 I increased amount to $500,000 to make sure it was adequate.