2495 Main Street, Suite 432, Buffalo, NY 14214 Donald R. McMahon, P.E. Michael J. Mann, P.E. Kenneth L. Fishman, PhD., P.E. John A. Minichiello, CPESC, CPSWQ James Bojarski, P.E. Shawn W. Logan, P.E. Andrew J. Nichols, P.E. Todd Swackhamer, P.E. Telephone: 716-834-8932 Fax: 716-834-8934 www.mmce.net July 2, 2009 File: 00-016 Mr. David Denk New York State Department of Environmental Conservation Division of Environmental Permits 270 Michigan Avenue Buffalo, New York 14203-2999 RE: Chaffee Facility – Proposed Borrow Area Comments and Responses for the Borrow Area Use Plan Sardinia, New York Dear Mr. Denk; McMahon & Mann Consulting Engineers, P.C. (MMCE), as requested by Waste Management of New York, LLC (WMNY), has performed additional studies for the Chaffee Facility Proposed Borrow Area. This letter describes the additional studies and provides responses to the New York State Department of Environmental Conservation (NYSDEC) June 11, 2009 comment letter. Specifically, we collected additional soils and groundwater information. Based on this additional information, the Borrow Area Use Plan (BAUP) submitted to the NYSDEC in March 2009 has the following revisions: The total proposed area will now be 29.4 acres instead of 30.9 acres, The West Area will now be 14.6 acres instead of 16.1 acres, The West Area excavation volume will now be 350,000 cubic yards instead of 400,000 cubic yards, The West Area reclamation grades have been revised to show a lowest elevation of 1443 feet instead of 1440 feet, and The West Area Sedimentation Basin has been revised to accommodate the revised grades and will also include a low permeability soil liner. Since the BAUP was submitted, MMCE has continued collecting groundwater elevation data from the three monitoring wells located within the Proposed Borrow Area. Included in Attachment A is a revised Table 1, which shows monthly groundwater elevations through June 2009. As shown in Table 1, the highest sand and gravel groundwater
Transcript

2495 Main Street, Suite 432, Buffalo, NY 14214

Donald R. McMahon, P.E.

Michael J. Mann, P.E. Kenneth L. Fishman, PhD., P.E.

John A. Minichiello, CPESC, CPSWQ James Bojarski, P.E.

Shawn W. Logan, P.E. Andrew J. Nichols, P.E.

Todd Swackhamer, P.E.

Telephone: 716-834-8932 • Fax: 716-834-8934 www.mmce.net

July 2, 2009 File: 00-016 Mr. David Denk New York State Department of Environmental Conservation Division of Environmental Permits 270 Michigan Avenue Buffalo, New York 14203-2999 RE: Chaffee Facility – Proposed Borrow Area

Comments and Responses for the Borrow Area Use Plan Sardinia, New York

Dear Mr. Denk; McMahon & Mann Consulting Engineers, P.C. (MMCE), as requested by Waste Management of New York, LLC (WMNY), has performed additional studies for the Chaffee Facility Proposed Borrow Area. This letter describes the additional studies and provides responses to the New York State Department of Environmental Conservation (NYSDEC) June 11, 2009 comment letter. Specifically, we collected additional soils and groundwater information. Based on this additional information, the Borrow Area Use Plan (BAUP) submitted to the NYSDEC in March 2009 has the following revisions:

• The total proposed area will now be 29.4 acres instead of 30.9 acres, • The West Area will now be 14.6 acres instead of 16.1 acres, • The West Area excavation volume will now be 350,000 cubic yards instead of

400,000 cubic yards, • The West Area reclamation grades have been revised to show a lowest

elevation of 1443 feet instead of 1440 feet, and • The West Area Sedimentation Basin has been revised to accommodate the

revised grades and will also include a low permeability soil liner. Since the BAUP was submitted, MMCE has continued collecting groundwater elevation data from the three monitoring wells located within the Proposed Borrow Area. Included in Attachment A is a revised Table 1, which shows monthly groundwater elevations through June 2009. As shown in Table 1, the highest sand and gravel groundwater

Chaffee Facility – Proposed Borrow Area July 2, 2009 File: 00-016 Page 2

level recorded in SB9-08 (West Area monitoring well) and SB4-08 (East Area monitoring well) is elevation (El.) 1439.15 feet and El. 1441.88 feet respectively. We reviewed existing information and collected additional data to estimate the lateral extent and depth of the clay till. We reviewed the information presented in the February 2005 Hydrogeologic Report, Part III of the 6 NYCRR Part 360 Permit Application for the Western Landfill Expansion. The Hydrogeologic Report presents a line showing the estimated southern boundary of the clay till at the Chaffee Facility. On June 17, 2009, WMNY excavated 12 test pits within the West Area to provide additional data regarding the lateral extent and depth of clay till. The test pits were logged by Earth Dimensions, Inc. (EDI) and the logs are included in Attachment B. The test pit locations are plotted on revised Figures 2, 3 and 4, included in Attachment C. Figure 3 shows the test pit locations and the elevation of the bottom of the clay till where present. The elevation of the bottom of the clay till is also included for the original borings. Based on this information, a refined lateral clay till extent line is shown on Figures 2, 3 and 4. We revised the West Area borrow area limit to exclude a portion in the southwest corner, based on the refined lateral extent line. This revision reduces the West Area by approximately 1.5 acres and decreases the borrow volume by approximately 50,000 cubic yards. As shown on Figure 4, the revised reclamation grades result in approximately 2.4 to 13.4 feet of clay till remaining across the borrow area floor. The Sedimentation Basin for the West Area is also revised. As indicated on Figure 4, portions of the basin will be constructed on each side of the lateral clay till extent line and will extend below the observed bottom of clay till. The basin bottom is raised 3 feet from El. 1440 feet to El. 1443 feet, providing approximately 4 feet of separation between the bottom of the basin and the highest recorded groundwater elevation in SB9-08. Additionally, as shown on Figures 5 and 7 in Attachment C, the basin will be constructed with a 9-inch thick low permeability soil liner to limit stormwater infiltration. The design is consistent with that used for the site’s existing sedimentation basins #1, #2 and #3. The Sedimentation Basin will operate as originally proposed to allow for continued surface water discharge to the NYSDEC jurisdictional wetland SD-1. Please consider the information and revisions discussed above and included in the attachments during your continued review of the March 2009 BAUP submittal. Our responses to the NYSDEC comments, considering this additional information are included in Attachment D.

Chaffee Facility – Proposed Borrow Area July 2, 2009 File: 00-016 Page 3

Please feel free to contact us with any additional comments or questions. Sincerely yours, McMAHON & MANN CONSULTING ENGINEERS, P.C.

Andrew J. Nichols, P.E.

Michael J. Mann, P.E. Attachments Attachment A – Revised Table 1 of the BAUP Attachment B – Test Pit Logs Attachment C - Revised Figures 2, 3, 4, 5, 6 and 7 of the BAUP Attachment D – Response to NYSDEC comments cc: Tom Lewis (WMNY) – 1 copy Rebecca Zayatz (WMNY) – 1 copy Marvin Zielonka (Town of Sardinia Code Enforcement) – 2 copies Town Board of Sardinia – 6 copies

ATTACHMENT A

Chaffee Facility Proposed Borrow Area File: 00-016Water Level Data

Well ID Northing EastingGround

Elevation

Top of PVC Casing

Elevation Screen LengthBottom of Screen

ElevationTop of Screen

Elevation10/16/08

Depth10/16/08 Elevation

11/3/08 Depth

11/3/08 Elevation

12/19/08 Depth

12/19/08 Elevation

1/27/09 Depth

1/27/09 Elevation

2/25/09 Depth

2/25/09 Elevation

3/19/09 Depth

3/19/09 Elevation

4/17/09 Depth

4/17/09 Elevation

5/22/09 Depth

5/22/09 Elevation

6/12/09 Depth

6/12/09 Elevation

SB4-08 7336.38 8958.20 1484.89 1486.28 10.00 1433.89 1443.89 48.70 1437.58 48.47 1437.81 48.1 1438.18 46.8 1439.48 46.2 1440.08 44.57 1441.71 44.4 1441.88 46.04 1440.24 47.29 1438.99SB6-08 7559.01 6498.77 1469.76 1471.64 10.00 1448.26 1458.26 10.75 1460.89 10.05 1461.59 6.3 1465.34 6.85 1464.79 6.35 1465.29 5.65 1465.99 6.15 1465.49 8.1 1463.54 8.92 1462.72SB9-08 7334.10 7049.47 1471.60 1473.70 10.00 1428.60 1438.60 38.20 1435.50 38.15 1435.55 37.15 1436.55 36.5 1437.20 35.8 1437.90 34.55 1439.15 34.84 1438.86 35.74 1437.96 36.4 1437.30

Survey locations from Wendel Duchscherer dated 9/9/08

Water Level Readings

ATTACHMENT B

ATTACHMENT C

NYSDECWETLAND SD-1

1460

1470

1478

1474

1464

1468

1472

1476

1462

1476

1474

1478

1476

147214

60

1470

1480

1480

1480

1480

1470

1470

1470

1470

1480

1480

1470

1470

1480

1480

1480

1470

1460

14701480

1480

1470

1480

14601460

1460

1450

1460

1450

1450

14501450

1470

1470

GP-11

GP-6

GP-5R

GP-1R

GP-3GP-4

GP-7

GP-8

GP-9

GP-10A

GP-13GP-12

GP-14

GP-15

GP-17

GP-16

SB7-08

SB3-08

SB4-08(WELL)SB9-08

(WELL)

NYSDECWETLAND SD-1

EXISTINGSEDIMENTATION

BASIN #5

EXISTING SEDIMENTATIONBASIN #2

EXISTING SEDIMENTATIONBASIN #3

NYSDEC 100'WETLAND BUFFER

EXISTING SCALEHOUSE

EXISTING ROLLOFFSTORAGE AREA

EXISTINGFUELING AREA

EXISTINGSITE ACCESS GATE

EXISTING OFFICEBUILDING

EXISTINGGARAGE

EXISTINGMAINTENANCEBUILDING

EXISTINGRECYCLING CENTER

EXISTINGSITE ACCESS GATE

EXISTING LANDFILLMAIN ENTRANCE

NYSDEC 100'WETLAND BUFFER

NYSDEC 100'WETLAND BUFFER

NYSDEC 100'WETLAND BUFFER

EXISTING SEDIMENTATIONBASIN #4

EXISTING POWERPRODUCTION PLANT

EXISTING FLARESTATION

1. Existing site contours are based on aerial photography dated February 12,2001, November 22, 2001 and April 13, 2003 compiled by LockwoodMapping Inc. of Rochester, NY, April 24, 2004 and July 12, 2007 compiledby Air Survey of Dulles, Virginia and ground surveys dated November 1,2007, performed by Wendel Duchscherer Survey and design subgradecontours from MMCE Cell 5 & 6 Construction Drawings, sheet 3 datedFebruary 2007.

2. Property lines are based on surveys performed by Deborah A. Naybor, PLS, P.C. dated June 2001 and by Gary E. Krull dated March 1994.

3. Survey of delineated wetlands was prepared by Deborah A. Naybor, PLS, P.C. dated August 2001 and by Wendel Duchscherer Survey dated September 16, 2008.

4. MW-15, 16, 17, 30, to 33, 12A and 12B locations are based on survey completed by Deborah A. Naybor, PLS,PC dated March 2001.

5. MW-2R location is based on survey completed by Deborah A. Naybor, PLS, PC dated April 2002.

6. MW-F locations are based on survey completed by Deborah A. Naybor, PLS, PC and submitted in "Data Report Hydrogeologic Studies, Chaffee Landfill Facility, Chaffee, New York," prepared by McMahon & Mann Consulting Engineers, PC dated September 2000.

7. MW-16(S) and 33(S) locations are based on survey completed by Deborah A. Naybor, PLS, PC dated May 2001.

8. MW-1BR, 4CR, 9R, 10R, 11R, 13R, 24AR, 24BR, 81, 80A, 80B and 82B locations are based on survey completed by Wendel Dushscherer Survey and submitted in "Well Installation Report, Chaffee Landfill," prepared by Golder Associates Inc. and dated October 2003.

9. OW-1(I), 1(S), 4(I), PW-2B locations are based on survey completed by Wendel Duchscherer Survey dated November 2001.

10. MB- 4 and MC-1A locations are based survey completed by M.J.R. Land Survey,PC dated June 2001.

11. P3-03 and 4-03 locations are based based on survey completed by Wendel Dushscherer Survey dated August 2003.

12. MW-L(I), L(S), M(I), M(S), N(I), N(S), O(I), O(S), P(I) and P(S) locations are based on survey completed by Wendel Duchscherer Survey dated August 25, 2005.

13. GP-2, 3, 4, 7, 8, 9, 10A, 11, 12, 13, 14, 15, 16 and 17 locations are based on survey completed by Deborah A. Naybor, PLS, PC dated March 2001.

14. GP-1R, 5R, and 6, locations are based on survey completed by Wendel Duchscherer Survey dated September 2003.

15. SB1-08, SB3-08, SB4-08, SB6-08, Sb7-08, SB8-08 and SB9-08 locations are based on survey completed by Wendel Duchscherer Survey dated September 8, 2008.

16. TP1-09 through TP12-09 locations are based on survey completed by WendelDuchscherer Survey dated June 19, 2009.

17. Hand auger and hollow stem boreholes designated L1 through L3, L7 and L13were located by Earth Dimensions Inc.

18. Approximate extent of clay till is based on the Clay Till Extent Investigationprepared by MMCE, dated March 2002. The extents have been revised in thewest borrow area based on test pits excavated in June 2009.

SB7-08

MW-F OW-4(I)

MW-33(S)MW-33

MW-O(S)

MW-O(I)

MW-15

MW-31MW-32 MW-30

MW-16(S)MW-16

MW-N(I)

MW-N(S)MW-L(S)

MW-L(I)

MW-M(S)

MW-M(I)

MW-P(S)

MW-P(I)

MW-80A

MW-82B

MW-7R

MW-14RMW-12B

MW-17

MW-R1AMW-R3MW-R4A

MW-K(S)

MW-4CR

MW-80B

MW-10RMW-12A MW-18BR

MW-1BR

OW-4(I)

MB-4

MW-52

MW-19

MW-72

MW-71

MW-F

MW-G(D)MW-G(I)

MW-G(S)

MC-5

MW-53

MW-51 MW-55MW-56

MW-20MW-21

MW-22

MW-70

SB1-08

L1D

TP9-09

TP7-09

TP8-09TP10-09

L2A

L2B

L2DL2E

TP11-09

TP12-09TP1-09

TP5-09TP6-09

L3EL3D

L3CL3B

L3A

SB6-08(WELL)

EXISTING SEDIMENTATIONBASIN #1

SB8-08

1440.67(26)

L1A

L1B

L1C

L13A

L13BL13CL13D

TP2-09

TP3-09

TP4-09L3F

L2C

TP5-09

L2D

L2E

TP7-09

SCALE: 1" = 300'0

75

150

225

300300

FACILITY SITE PLAN2 2

1SCALE: 1" = 300'

NOTE:UNAUTHORIZED ALTERATION OR ADDITIONTO ANY SURVEY, DRAWING, DESIGN,SPECIFICATION, PLAN, OR REPORT IS AVIOLATION OF SECTION 7209 PROVISION 2 OFTHE NEW YORK STATE EDUCATION LAW. REVISION NUMBER - 1

A.J.N.

CHECKED BY:

00-016

SCALE:

DATE:

JOB NO.

FIGURE

DWG. NO.

NEW YORK

2

MARCH 2009

DESIGNED BY:

00016-429

1" = 200'

D.R.M.

(716) 834-8932FAX: (716) 834-8934

ERIE COUNTY

BUFFALO, NY 14214

McMahon & MannConsulting Engineers, P.C.

2495 MAIN STREET, SUITE 432

REV 1

REV 2

REV 3

REV 4

REV 5

CHAFFEE FACILITY -SITE PLAN

7/2/09 - Revised west arealimits and added additional soils information

1460

1470

1450

1460

1450

1470

1470

GP-6

GP-5R

GP-1R

GP-3

MW-K(S)

MW-R3

MW-56MW-55

MW-82B

EXISTING SCALEHOUSE

MW-52

EXISTING SEDIMENTATIONBASIN #4

SB7-08

SB4-08(WELL)SB9-08

(WELL)

SB1-08

TP7-09

<1447.4TP10-09

<1451.3TP11-09

TP12-09TP1-09

TP3-09

<1465.3TP5-09TP6-09

SB6-08(WELL)

1446.86

SB8-08

1440.67

L3F

L3EL3D L3C

EXISTING SEDIMENTATIONBASIN #2 L3B

L3AEXISTING SEDIMENTATIONBASIN #3

L2A

L2B

L2D

L2E

L1D

L1A

L1B

L1C

L13A

L13B

L13C

L13D

MW-R1A

MW-1BR

L2C

TP9-09

3 32

3 33

3 33

3 32

TP8-09

MW-4CR

MW-R4A 1441.5

1442.8

1440.021437.57

1447.22

1442.91446.29

1438.22SB3-08

MW-51

MW-53

100' WETLAND BUFFER

GP-4

EXISTING PROPERTYBOUNDARY

EXISTING SEDIMENTATIONBASIN #1

EXISTING SEDIMENTATIONBASIN #5

TP4-09<1458.5

TP2-09

<1421.03

1. Existing site contours are based on aerial photography dated February 12, 2001,November 22, 2001 and April 13, 2003 compiled by Lockwood Mapping Inc. ofRochester, NY, April 24, 2004 and July 12, 2007 compiled by Air Survey ofDulles, Virginia and ground surveys dated November 1, 2007, performed byWendel Duchscherer Survey and design subgrade contours from MMCE Cell 5& 6 Construction Drawings, sheet 3 dated February 2007.

2. Property lines are based on surveys performed by Deborah A. Naybor, PLS,P.C. dated June 2001 and by Gary E. Krull dated March 1994.

3. Delineated wetland areas are based on a wetland location map prepared byWendel Duchscherer Survey dated September 16, 2008.

4. MW-51 to 56, R1A, R3, and R4A locations are based on survey completed byDeborah A. Naybor, PLS, PC dated March 2001.

5. MW-1BR, 4CR and 82B locations are based on survey completed by WendelDushscherer Survey and submitted in "Well Installation Report, ChaffeeLandfill," prepared by Golder Associates Inc. and dated October 2003.

6. MW-K(I) and K(S) locations are based on survey completed by Deborah A.Naybor, PLS, PC dated May 2001.

7. GP-2, 3, 4 and 6 locations are based on survey completed by Deborah A.Naybor, PLS, PC dated March 2001.

8. GP-1R and 5R locations are based on survey completed by WendelDuchscherer Survey dated September 2003.

9. SB1-08, SB3-08, SB4-08, SB6-08, Sb7-08, SB8-08 and SB9-08 locations are based on survey completed by Wendel Duchscherer Survey dated September 8, 2008.

10. TP1-09 through TP12-09 locations are based on survey completed by WendelDuchscherer Survey dated June 19, 2009.

11. Hand auger and hollow stem boreholes designated L1 through L3, L7 and L13were located by Earth Dimensions Inc.

12. Approximate extent of clay till is based on the Clay Till Extent Investigationprepared by MMCE, dated March 2002. The extents have been revised in thewest borrow area based on test pits excavated in June 2009.

SB7-08

TP4-09

TP5-09

<1458.5

1446.86

L2D

L2E

MW-R4A1441.5

EXISTING SITE PLAN3 3

1SCALE: 1" = 150'

SCALE: 1" = 150'

0 75 150150

1500

0

1480

1460

1440

1420200 400 600 800 1000 1200

SB6-08

BORROWAREA LIMIT

SB7-08 SB9-08

EDGE OF NYSDECWETLAND SD-1

SB8-08WETLAND BUFFERBORROW AREA

GEOLOGIC CROSS SECTION THROUGH WEST BORROW AREA3 3

2SCALE: 1" = 50'

GEOLOGIC CROSS SECTION THROUGH EAST BORROW AREA3 3

3SCALE: 1" = 50'

BORROWAREA LIMIT

WETLAND BUFFERBORROW AREA

SB3-08 SB4-08 SB1-08

SAND AND GRAVELDEPOSIT

TP10-09 TP9-09TP8-09 TP7-09

BORROWAREA LIMIT

BORROWAREA LIMIT

PROPERTY LINE

WETLANDBUFFER

NYSDECWETLAND AR-11

1500

0

1480

1460

1440

1420200 400 600 800 1000

EXISTING GROUNDSURFACE

EXISTING GROUNDSURFACE

SAND AND GRAVELDEPOSIT

APPROXIMATE BOTTOMOF CLAY TILL DEPOSIT

APPROXIMATE BOTTOMOF CLAY TILL DEPOSIT

NOTE:UNAUTHORIZED ALTERATION OR ADDITIONTO ANY SURVEY, DRAWING, DESIGN,SPECIFICATION, PLAN, OR REPORT IS AVIOLATION OF SECTION 7209 PROVISION 2 OFTHE NEW YORK STATE EDUCATION LAW. REVISION NUMBER - 1

A.J.N.

CHECKED BY:

00-016

SCALE:

DATE:

JOB NO.

FIGURE

DWG. NO.

NEW YORK

3

MARCH 2009

DESIGNED BY:

00016-430

AS SHOWN

D.R.M.

(716) 834-8932FAX: (716) 834-8934

ERIE COUNTY

BUFFALO, NY 14214

McMahon & MannConsulting Engineers, P.C.

2495 MAIN STREET, SUITE 432

CHAFFEE FACILITY -EXISTING CONDITIONS PLAN

AND CROSS SECTIONS

REV 1

REV 2

REV 3

REV 4

REV 5

7/2/09 - Revised west arealimits and added additional soils information

1460

1470

1450

1460

1450

1470

1470

GP-6

GP-5R

GP-1R

GP-3GP-4MW-4CR

MW-1BR

MW-K(S)

MW-R4A MW-R3

MW-56MW-55

MW-R1A

MW-82B

EXISTING PROPERTYBOUNDARY

EXISTING SCALEHOUSE

MW-52

EXISTING SEDIMENTATIONBASIN #4

EXISTING SEDIMENTATIONBASIN #5

4 42

4 43

4 43

0.5% SLOPE

1.0%

SLO

PE

EXISTING SEDIMENTATIONBASIN #1

1

54

1

64

SB9-08(WELL)

TP1-09

SB6-08(WELL)

1446.865.1

SB8-08

1440.67

L3F

L3EL3D L3C

L3AL2A

L2B

L2E

L1A

L1B

L1C

L13A

L13B

L13C

L13D

2% S

LOPE

TP3-09

TP2-09

TP11-09

TP7-09

TP10-09<1447.4

L2C

<1451.3

TP5-09TP6-09

SB7-08

4 42

1447.2213.4

TP8-09

TP12-09

L1D

TP9-09

1446.294.8

SB4-08(WELL)

SB1-08

<1421.03<33.5

1441.51442.8

MW-51

MW-53

1440.021437.57

SB3-081438.22

6.8

TP4-09

EXISTING SEDIMENTATIONBASIN #3

EXISTING SEDIMENTATIONBASIN #2 L3B

<1465.3<1458.5

L2D

100' WETLAND BUFFER

MW-R4A

1. Existing site contours are based on aerial photography dated February 12, 2001,November 22, 2001 and April 13, 2003 compiled by Lockwood Mapping Inc. ofRochester, NY, April 24, 2004 and July 12, 2007 compiled by Air Survey ofDulles, Virginia and ground surveys dated November 1, 2007, performed byWendel Duchscherer Survey and design subgrade contours from MMCE Cell 5& 6 Construction Drawings, sheet 3 dated February 2007.

2. Property lines are based on surveys performed by Deborah A. Naybor, PLS,P.C. dated June 2001 and by Gary E. Krull dated March 1994.

3. Delineated wetland areas are based on a wetland location map prepared byWendel Duchscherer Survey dated September 16, 2008.

4. MW-51 to 56, R1A, R3, and R4A locations are based on survey completed byDeborah A. Naybor, PLS, PC dated March 2001.

5. MW-1BR, 4CR and 82B locations are based on survey completed by WendelDushscherer Survey and submitted in "Well Installation Report, ChaffeeLandfill," prepared by Golder Associates Inc. and dated October 2003.

6. MW-K(I) and K(S) locations are based on survey completed by Deborah A.Naybor, PLS, PC dated May 2001.

7. GP-2, 3, 4 and 6 locations are based on survey completed by Deborah A.Naybor, PLS, PC dated March 2001.

8. GP-1R and 5R locations are based on survey completed by WendelDuchscherer Survey dated September 2003.

9. SB1-08, SB3-08, SB4-08, SB6-08, Sb7-08, SB8-08 and SB9-08 locations are based on survey completed by Wendel Duchscherer Survey dated September 8, 2008.

10. TP1-09 through TP12-09 locations are based on survey completed by WendelDuchscherer Survey dated June 19, 2009.

11. Hand auger and hollow stem boreholes designated L1 through L3, L7 and L13were located by Earth Dimensions Inc.

12. Approximate extent of clay till is based on the Clay Till Extent Investigationprepared by MMCE, dated March 2002. The extents have been revised in thewest borrow area based on test pits excavated in June 2009.

SB7-08

TP4-09

TP12-091452.3

2.4

1446.8613.4

L2D

L2E

1441.5

RECLAMATION PLAN4 4

1SCALE: 1" = 150'

SCALE: 1" = 150'

0 75 150150

GEOLOGIC CROSS SECTION THROUGH WEST BORROW AREA WITH RECLAMATION GRADES4 4

2SCALE: 1" = 50'

1500

0

1480

1460

1440

1420200 400 600 800 1000 1200

SB6-08

BORROWAREA LIMIT

SB7-08 SB9-08

EDGE OF NYSDECWETLAND SD-1

SB8-08WETLAND BUFFERBORROW AREA

BORROWAREA LIMIT

WETLAND BUFFERBORROW AREA

SB3-08 SB4-08 SB1-08

TP10-09 TP9-09TP8-09 TP7-09

BORROWAREA LIMIT

BORROWAREA LIMIT

PROPERTY LINE

WETLANDBUFFER

NYSDECWETLAND AR-11

1500

0

1480

1460

1440

1420200 400 600 800 1000

EXISTING GROUNDSURFACE

PROPOSEDGROUND SURFACE

SAND AND GRAVELDEPOSIT

APPROXIMATE BOTTOMOF CLAY TILL DEPOSIT

PROPOSEDGROUND SURFACE

GEOLOGIC CROSS SECTION THROUGH EAST BORROW AREA WITH RECLAMATION GRADES4 4

3SCALE: 1" = 50'

EXISTING GROUNDSURFACE

SAND AND GRAVELDEPOSIT

APPROXIMATE BOTTOMOF CLAY TILL DEPOSIT

NOTE:UNAUTHORIZED ALTERATION OR ADDITIONTO ANY SURVEY, DRAWING, DESIGN,SPECIFICATION, PLAN, OR REPORT IS AVIOLATION OF SECTION 7209 PROVISION 2 OFTHE NEW YORK STATE EDUCATION LAW. REVISION NUMBER - 1

A.J.N.

CHECKED BY:

00-016

SCALE:

DATE:

JOB NO.

FIGURE

DWG. NO.

NEW YORK

4

MARCH 2009

DESIGNED BY:

00016-431

AS SHOWN

D.R.M.

(716) 834-8932FAX: (716) 834-8934

ERIE COUNTY

BUFFALO, NY 14214

McMahon & MannConsulting Engineers, P.C.

2495 MAIN STREET, SUITE 432

CHAFFEE FACILITY -RECLAMATION PLAN AND

CROSS SECTIONS

REV 1

REV 2

REV 3

REV 4

REV 5

7/2/09 - Revised west arealimits, reclamation grades and added additional soils information

100' WETLAND BUFFER

5 52

5 55

1445

144714

47

1445

144714

47

1443

10.0'

WEST AREA SEDIMENTATION BASIN PLAN4 5

1SCALE: 1" = 50'

SCALE: 1" = 50'

0 25 5050

1. Existing site contours are based on aerial photography dated February12, 2001, November 22, 2001 and April 13, 2003 compiled byLockwood Mapping Inc. of Rochester, NY, April 24, 2004 and July 12,2007 compiled by Air Survey of Dulles, Virginia and ground surveysdated November 1, 2007, performed by Wendel Duchscherer Surveyand design subgrade contours from MMCE Cell 5 & 6 ConstructionDrawings, sheet 3 dated February 2007.

2. Property lines are based on surveys performed by Deborah A. Naybor,PLS, P.C. dated June 2001 and by Gary E. Krull dated March 1994.

3. Delineated wetland areas are based on a wetland location mapprepared by Wendel Duchscherer Survey dated September 16, 2008.

15' WIDE AQUATIC BENCH

PERMANENT POOLELEV. 1446

11

30" MIN.5.0'

HEAVY STONE (SEE OUTLETPROTECTION TABLE ON FIGURE 7)

ELEV. 1449

ELEV. 1443

SEPARATION GEOTEXTILE

EXISTING GROUND SURFACE

PROPOSED GRADE

SPILLWAY SECTIONSCALE: 1" = 5'5 5

3

14

10.0% SLOPE14

9" LOW PERMEABILITYSOIL LINER

0.5' TOPSOIL AND SEED APPROX.ELEV. 1444

ELEV. 1444.5

ELEV. 1446

SECTION THROUGH FOREBAY AND PERMANENT POOLSCALE: 1" = 5'5 5

4

14

PERMANENT POOLELEV. 1446

ELEV. 1443

FOREBAY WATERSURFACE ELEV. 1446

18.0'FOREBAY SPILLWAY

ANCHOR AS RECOMMENDED BYMANUFACTURER

3.0' TYP.

EROSION PROTECTION MAT

0.5' TOPSOIL AND SEED

PROPOSED GRADE

14

RECLAIMED BORROWAREA GRADES 15' WIDE AQUATIC BENCH

ELEV. 1443

ELEV. 1448

10.0% SLOPE ELEV. 1444.5

41

9" LOW PERMEABILITY SOILLINER

ELEV. 1446

PIPE BEDDING MATERIAL

0.5'(TYP.)

COMPACTED LOW PERMEABILITYSOIL LINER MATERIAL

0.5'(TYP.)

PERMANENT POOLELEV. 1446

12" DIAMETER OUTLET PIPE

EXISTING GROUND SURFACE

ELEV. 1450

ELEV. 1443

3.0' DIAMETER STANDPIPE WITHGRATE - SEE DETAIL

ELEV. 1445

MINIMUM 10' BACKFILLAROUND PIPE WITH LOW

PERMEABILITY SOIL LINER MATERIAL

0.5' TOPSOIL AND SEED

PROPOSED GRADE

AQUATIC BENCH

2

75

12" DIAMETER OUTLET PIPESECTION THROUGH OUTLET PIPESCALE: 1" = 5'5 5

5

ELEV. 1446

SECTION A-A

ELEV. 1444.5 74 LF @ 1.36% SLOPE

OUTLET PIPE CONTROL VALVE WITHCURB BOX AND STEM EXTENSION

9" LOW PERMEABILITYSOIL LINER

APPROX.ELEV. 1444

30" MIN.

0.5' TOPSOIL AND SEED

EMBANKMENT MATERIAL

ELEV. 145014

20.0'

SPILLWAY CROSS SECTION

PROPOSED GRADE

SCALE: 1" = 4'

30" MIN.

25 5

ELEV. 14491

4

NOTE:UNAUTHORIZED ALTERATION OR ADDITIONTO ANY SURVEY, DRAWING, DESIGN,SPECIFICATION, PLAN, OR REPORT IS AVIOLATION OF SECTION 7209 PROVISION 2 OFTHE NEW YORK STATE EDUCATION LAW. REVISION NUMBER - 1

A.J.N.

CHECKED BY:

00-016

SCALE:

DATE:

JOB NO.

FIGURE

DWG. NO.

NEW YORK

5

MARCH 2009

DESIGNED BY:

00016-432a

AS SHOWN

D.R.M.

(716) 834-8932FAX: (716) 834-8934

ERIE COUNTY

BUFFALO, NY 14214

McMahon & MannConsulting Engineers, P.C.

2495 MAIN STREET, SUITE 432

CHAFFEE FACILITY -WEST AREA BASIN PLAN AND

SECTIONS

REV 1

REV 2

REV 3

REV 4

REV 5

7/2/09 - Revised basin planand sections

10.0'

100' WETLAND BUFFER

6 62

6 62

15' AQUATIC BENCH

1447

14451449

1445

1445

1445

1450

1447

1449

1450

EAST AREA SEDIMENTATION BASIN PLAN4 6

1SCALE: 1" = 50'

SCALE: 1" = 50'

0 25 5050

1. Existing site contours are based on aerial photography dated February12, 2001, November 22, 2001 and April 13, 2003 compiled byLockwood Mapping Inc. of Rochester, NY, April 24, 2004 and July 12,2007 compiled by Air Survey of Dulles, Virginia and ground surveysdated November 1, 2007, performed by Wendel Duchscherer Surveyand design subgrade contours from MMCE Cell 5 & 6 ConstructionDrawings, sheet 3 dated February 2007.

2. Property lines are based on surveys performed by Deborah A. Naybor,PLS, P.C. dated June 2001 and by Gary E. Krull dated March 1994.

3. Delineated wetland areas are based on a wetland location mapprepared by Wendel Duchscherer Survey dated September 16, 2008.

SECTION THROUGH FOREBAY AND PERMANENT POOLSCALE: 1" = 5'6 6

3

14

PERMANENT POOLELEV. 1448

ELEV. 1445

FOREBAY WATERSURFACE ELEV. 1448

18.0'FOREBAY SPILLWAY

ANCHOR AS RECOMMENDED BYMANUFACTURER

3.0' TYP.

EROSION PROTECTION MAT

0.5' TOPSOIL AND SEED

PROPOSED GRADE

14

RECLAIMED BORROWAREA GRADES

15' WIDE AQUATIC BENCH

ELEV. 1445

ELEV. 1450

ELEV. 1446.5ELEV. 1448

10.0% SLOPE1

4

SECTION THROUGH OUTLET PIPESCALE: 1" = 5'6 6

4

AQUATIC BENCH

ELEV. 1445

ELEV. 1446.5

ELEV. 1455

MINIMUM 10' BACKFILLAROUND PIPE WITH LOW

PERMEABILITY SOIL LINER MATERIAL

PERMANENT POOLELEV. 1448

A

A

PIPE BEDDING MATERIAL

0.5'(TYP.)

COMPACTED LOW PERMEABILITY SOILLINER MATERIAL

0.5'(TYP.)

12" DIAMETER OUTLET PIPE

SECTION A-A

0.5' TOPSOIL AND SEED

PROPOSED GRADE

3.0' DIAMETER STANDPIPE WITHGRATE - SEE DETAIL

275

ELEV. 1447

SEPARATION GEOTEXTILE

ELEV. 1448

ELEV. 1451

132 LF @ 0.8% SLOPE

EXISTING GROUND SURFACE

OUTLET PIPE CONTROL VALVE WITHCURB BOX AND STEM EXTENSION

31

41

12" DIAMETER OUTLET PIPEPOND OVERFLOW PIPE OUTLET PROTECTION (SEE

OUTLET PROTECTION TABLE ON FIGURE 7)

0.5' TOPSOIL AND SEED

ELEV. 145214

20.0'

SPILLWAY CROSS SECTION

PROPOSED GRADE

SCALE: 1" = 4'

26 6

ELEV. 14511

4

30" MIN.

NOTE:UNAUTHORIZED ALTERATION OR ADDITIONTO ANY SURVEY, DRAWING, DESIGN,SPECIFICATION, PLAN, OR REPORT IS AVIOLATION OF SECTION 7209 PROVISION 2 OFTHE NEW YORK STATE EDUCATION LAW. REVISION NUMBER - 1

A.J.N.

CHECKED BY:

00-016

SCALE:

DATE:

JOB NO.

FIGURE

DWG. NO.

NEW YORK

6

NOVEMBER 2008

DESIGNED BY:

00016-432b

AS SHOWN

D.R.M.

(716) 834-8932FAX: (716) 834-8934

ERIE COUNTY

BUFFALO, NY 14214

McMahon & MannConsulting Engineers, P.C.

2495 MAIN STREET, SUITE 432

CHAFFEE FACILITY -EAST AREA BASIN PLAN AND

SECTIONS

REV 1

REV 2

REV 3

REV 4

REV 5

7/2/09 - Added outlet pipe valve and revised stone protection thickness

D 3D

APRONLENGTH (FT)

APRONWIDTH (FT)

FLOW

4

77

LINING

OUTLET DETAIL7 7

4SCALE: N.T.S.

STANDPIPE DETAIL5 7

2SCALE: N.T.S.

SECTION A-A SECTION B-B

STANDPIPE GRATE DETAIL7 7

3SCALE: N.T.S.

B B

2 - 1" x 8" SLOTS(EQUALLY SPACED)

ELEV. C

4 - 1" x 8" SLOTS(EQUALLY SPACED)

ELEV. B

AA

PROVIDE WATER TIGHTCONNECTION BETWEENSTANDPIPE AND OUTLET PIPE

ELEV. A

ELEV. D

12" DIAMETER OUTLET PIPE

3.0' DIAMETER STANDPIPEWITH GRATE

6" x 6" BAR GRATE- SEE DETAIL

377

ELEV. C

4 - 1" x 8" SLOTS(EQUALLY SPACED)

ELEV. B

3.0' DIAMETER STANDPIPE

2 - 1" x 8" SLOTS(EQUALLY SPACED)

ELEV. C

3.0' DIAMETER STANDPIPECONTRACTOR TO PROVIDE WATER

TIGHT CONNECTION BETWEENSTANDPIPE AND OUTLET PIPE

12" DIAMETER OUTLET PIPE

TACK WELD ALL BARS ATEACH CROSSING

1/2" DIAMETER STEEL BARS SPACEDAT 6" O.C., F.W. FOR GRATING

CONTRACTOR TO PROVIDE REMOVABLECONNECTION BETWEEN STANDPIPEAND GRATING

3.0' DIAMETER STANDPIPE

15' WIDE AQUATIC BENCH

PERMANENT POOLELEV. 1448

30" MIN.5.0'

ELEV. 1445 SEPARATION GEOTEXTILE

SPILLWAY SECTIONSCALE: 1" = 5'6 7

1

ELEV. 1446.5

ELEV. 1451

ELEV. 1448

14

PROPOSED GRADE

0.5' TOPSOIL AND SEED10.0% SLOPE14

HEAVY STONE (SEE OUTLETPROTECTION TABLE ON FIGURE 7)

11

EXISTING GROUNDSURFACE

NOTE:UNAUTHORIZED ALTERATION OR ADDITIONTO ANY SURVEY, DRAWING, DESIGN,SPECIFICATION, PLAN, OR REPORT IS AVIOLATION OF SECTION 7209 PROVISION 2 OFTHE NEW YORK STATE EDUCATION LAW. REVISION NUMBER - 1

A.J.N.

CHECKED BY:

00-016

SCALE:

DATE:

JOB NO.

FIGURE

DWG. NO.

NEW YORK

7

NOVEMBER 2008

DESIGNED BY:

00016-432c

AS SHOWN

D.R.M.

(716) 834-8932FAX: (716) 834-8934

ERIE COUNTY

BUFFALO, NY 14214

McMahon & MannConsulting Engineers, P.C.

2495 MAIN STREET, SUITE 432

CHAFFEE FACILITY -SECTIONS AND DETAILS

CONSTRUCTION SPECIFICATIONS

GENERAL:1. Contractor to verify all dimensions and conditions prior to construction.

2. Any questions regarding these drawings shall be directed to McMahon & Mann Consulting Engineers, P.C.(MMCE) (716 - 834-8932). Modifications will only be made in writing.

3. The Contractor will be responsible for construction layout.

4. The Contractor will be required to comply with all of the applicable Chaffee Facility Permits.

EXCAVATION AND BACKFILL:1. All excavations shall be performed in accordance with OSHA regulations.

2. Excess excavated material shall be disposed of in locations designated by Waste Management of New York(WMNY).

3. Unsuitable materials shall be legally disposed of, coordinate with WMNY for disposal locations.

4. Existing underground utility locations are unknown and must be confirmed with WMNY and utility companies priorto any excavation.

5. Embankment material shall be obtained from the excavation and shall be recompacted to 90% of the ModifiedProctor (ASTM D1557) maximum dry density. Embankment material shall not contain material greater than 10inches in size, organics or other deleterious materials. Embankment material shall be placed in compacted lifts notexceeding 12 inches in thickness.

6. Low permeability soil liner material shall not contain material greater than 3 inches in size, organics, or otherdeleterious material. When placed and compacted, the material must have a permeability less than or equal to1x10 cm/sec.

7. Pipe bedding shall meet the requirements for subbase Type 4 stated in Section 3.04 of the NYSDOT StandardSpecifications. Material shall be compacted to 90% of the Modified Proctor (ASTM D1557) maximum dry density.

STORMWATER DRAINAGE:1. Outlet pipes and standpipes shall be 12 inch and 36 inch diameter as shown on the drawings. Pipe shall be

corrugated exterior polyethylene pipe with a smooth interior wall. Pipe shall meet the requirements stated inAASHTO M294 for type 5 pipe.

2. Light stone rip-rap shall meet the requirements for light stone filling stated in Section 620-2 of NYSDOT StandardSpecifications. Heavy stone rip-rap shall meet the requirements for heavy stone filling stated in Section 620-2 ofNYSDOT Standards and Specifications. Installation shall be in accordance with Section 620-3 of the NYSDOTStandard Specifications.

3. All disturbed areas shall be seeded and mulched, using the following seed mix:Common White Clover 8 lbs. / acreTall Fescue 20 lbs. / acrePerennial Ryegrass 10 lbs. / acre

4. Separation Geotextile shall be a non-woven geotextile with a minimum mass per unit area of 6 oz. meeting therequirements of Geotex 701 or approved equivalent. Installation shall be in accordance with the Manufacturer'srecommendations.

5. Erosion Protection Mat shall consist of a polypropylene fiber mat specially designed for erosion control applicationson steep slopes and vegetated waterways such as C350 permanent turf reinforcement manufactured by NorthAmerican Green (NAG) or Engineer approved. Installation shall be in accordance with the Manufacturer'srecommendation.

6. Valves shall be flanged 12 inch quarter turn ball valves. The valves shall be either thermoplastic, HDPE orapproved equivalent. The valves shall be equipped with valve stems and curb boxes to allow access at theelevations shown on the Contract Drawings. The curb boxes shall be installed with a removable cover capable ofwithstanding AASHTO HS-20 loads.

AQUATIC PLANTINGS:1. Aquatic bench will be planted with a combination of some or all of the following submerged or floating stemmed aquatics:

Submerged Aquatics: Coontail, Pond Weed, Water Weed, Lond-Leaved Pond Weed and Wild Celery.

Floating Stemmed Aquatics: Spatterdock, Duckweed, Watershield, Water Cress, Rice Cutgrass, Bay Forget Me Not, Swamp Smartweed, Water Smartweed, White Water Lily and Pale Mannagrass.

Other plantings may be allowed if the plants are capable of withstanding constant inundation of water to depths of 1 foot.

No one individual species of submerged or floating aquatics may exceed 10 percent of the total proposed for the project.

Spacing of plantings shall be based on Manufacturer's recommendations. The plantings shall have a two year warranty.

Aquatic plants mentioned above are available from Southern Tier Consulting, Inc. and can be contacted at:

Southern Tier Consulting, Inc.2701-A Route 305P.O. Box 30West Clarksville, NY 14786Phone (585) 968-3120Web Site: www.southerntierconsulting.com

These Plants may be available through other suppliers, Southern Tier Consulting, Inc. is listed for reference only.

-5

REV 1

REV 2

REV 3

REV 4

REV 5

detail, stone protection thickness and construction

7/2/09 - Revised standpipe

specifications

ATTACHMENT D

Chaffee Facility – Proposed Borrow Area July 2, 2009 File: 00-016 Page 1

Response to NYSDEC Comments: The NYSDEC comments are presented in italics followed by our response. 1. It is stated on page 2-7 that the west borrow area will be excavated from east to west between elevation 1450 feet to elevation 1440 feet. Location SB8-08 is just east of the boundary of this area, and the base of the till was at 1440.67 feet, so it appears that the excavation could only go down to about 1443 feet in this area. The cross section in Figure 4 does appear to show that the excavation will go only to about 1444 feet in the vicinity of this borehole. However, since the boreholes are offset on the cross sections it would be useful to have a grid map showing the base of till elevations and excavation elevations. Based on the additional clay till information, the reclamation grades shown on Figure 4 in Attachment C are revised resulting in approximately 2.4 to 13.4 feet of clay till remaining across the West Area floor. The borings in the East Area indicate that there will be approximately 4.8 to over 20 feet of clay till remaining. In lieu of a grid map, the remaining clay till thickness, after reaching the reclamation grades, have been plotted on Figure 4. As shown on Figure 4, the West Area Sedimentation Basin will be excavated below the bottom of clay till. Therefore, as shown on the revised figures, the sedimentation basin will be constructed with a 9-inch thick low permeability soil liner, consistent with the design of the site’s existing sedimentation basins. 2. The delineation of the extent of clay till as presented in McMahon and Mann’s Hydrogeologic Report for the Western Expansion Area (February 2005) was reviewed. Figure 14 of Volume I of this report shows the clay till potentially ending in the southernmost portions of the proposed borrow areas, particularly the west borrow area. This information should be incorporated into any excavation plan to make sure the sand and gravel zone is not excavated into in these areas. We refined the lateral clay till extent line considering the additional test pit data, as shown on the Figures in Attachment C. We also revised the West Area reclamation elevations to maintain the borrow operation in the clay till. Additionally, the West Area Sedimentation Basin is raised 3 feet to El. 1443, providing a greater separation to groundwater. Because the sedimentation basin will be excavated into the sand and gravel, the design includes a 9-inch thick low permeability soil liner consistent with the site’s existing sedimentation basins. 3. A plan for properly decommissioning the monitoring wells in the borrow areas should be included with the application materials. Currently Section 2.3.2 indicates that the three monitoring wells will be decommissioned. Monitoring well SB6-08 will be removed during borrow excavation.

Chaffee Facility – Proposed Borrow Area July 2, 2009 File: 00-016 Page 2

The bottom of screen (Elev. 1448.26) is within 4 feet of the reclamation grade, therefore this monitoring well can be completely removed by excavation equipment. Monitoring wells SB4-08 and SB9-08 both extend below the reclamation grades. These wells will be lowered during borrow excavation and will then be decommissioned in accordance with Appendix C of the Environmental Monitoring Plan, Part XI of the February 2005 Western Expansion Landfill 6 NYCRR Part 360 Solid Waste Management Permit Modification Application. 4. See the attached letter regarding the wetland survey map. Please ensure these requirements are met. Earth Dimensions, Inc. submitted revised wetland mapping on June 4, 2009 to the NYSDEC.


Recommended