REPUBLIC OF SOUTH AFRICA DIVISION OF REVENUE SECOND AMENDMENT BILL (As introduced in the National Assembly (proposed section 76); explanatory summary of Bill and prior notice of its introduction published in Government Gazette No. 43824 of 21 October 2020) (The English text is the offıcial text of the Bill) (MINISTER OF FINANCE) [B 24—2020] ISBN 978-1-4850-0667-1 No. of copies printed .........................................350
Transcript

REPUBLIC OF SOUTH AFRICA

DIVISION OF REVENUE SECONDAMENDMENT BILL

(As introduced in the National Assembly (proposed section 76); explanatory summary of Bill and prior noticeof its introduction published in Government Gazette No. 43824 of 21 October 2020)

(The English text is the offıcial text of the Bill)

(MINISTER OF FINANCE)

[B 24—2020] ISBN 978-1-4850-0667-1

No. of copies printed .........................................350

BILLTo amend the Division of Revenue Act, 2020, as amended by the Division ofRevenue Amendment Act, 2020, in accordance with the Money Bills and RelatedMatters Act, 2009; and to provide for matters connected therewith.

PREAMBLE

WHEREAS section 214(1) of the Constitution of the Republic of South Africa, 1996,requires an Act of Parliament to provide for—

(a) the equitable division of revenue raised nationally among the national,provincial and local spheres of government;

(b) the determination of each province’s equitable share of the provincial share ofthat revenue; and

(c) any other allocations to provinces, local government or municipalities fromthe national government’s share of that revenue, and any conditions on whichthose allocations may be made;

WHEREAS the Division of Revenue Act, 2020 (Act No. 4 of 2020), as amended by theDivision of Revenue Amendment Act, 2020 (Act No. 10 of 2020), gives effect to section214(1) of the Constitution in respect of the 2020/21 financial year;

AND WHEREAS section 12(4) of the Money Bills and Related Matters Act, 2009 (ActNo. 9 of 2009), requires the Minister of Finance to table a Division of RevenueAmendment Bill with a revised fiscal framework if the adjustments budget effectschanges to the Division of Revenue Act for the relevant year,

B E IT THEREFORE ENACTED by the Parliament of the Republic of South Africa,as follows:—

Substitution of Column A of Schedules 1 and 2, Parts A and B of Schedule 4, PartsA and B of Schedule 5, Parts A and B of Schedule 6 and Part A of Schedule 7 to Act4 of 2020, as amended by section 2 of Act 10 of 2020

1. (1) Column A of Schedule 1 to this Act is hereby substituted for Column A ofSchedule 1 to the Division of Revenue Act, 2020 (hereinafter referred to as the principalAct), setting out the equitable division of revenue raised nationally among the national,provincial and local spheres of government for the 2020/21 financial year.

(2) Column A of Schedule 2 to this Act is hereby substituted for Column A ofSchedule 2 to the principal Act, setting out the determination of each provincial sphere’sequitable share of the provincial sphere’s share of revenue raised nationally for the2020/21 financial year.

(3) Column A of Part A of Schedule 4 to this Act is hereby substituted for Column Aof Part A of Schedule 4 to the principal Act, specifying allocations to provinces tosupplement the funding of programmes or functions from provincial budgets for the2020/21 financial year.

5

10

15

(4) Column A of Part B of Schedule 4 to this Act is hereby substituted for Column Aof Part B of Schedule 4 to the principal Act, specifying allocations to municipalities tosupplement the funding of programmes or functions from municipal budgets for the2020/21 financial year.

(5) Column A of Part A of Schedule 5 to this Act is hereby substituted for Column Aof Part A of Schedule 5 to the principal Act, specifying the specific-purpose allocationsto provinces for the 2020/21 financial year.

(6) Column A of Part B of Schedule 5 to this Act is hereby substituted for Column Aof Part B of Schedule 5 to the principal Act, specifying the specific-purpose allocationsto municipalities for the 2020/21 financial year.

(7) Column A of Part A of Schedule 6 to this Act is hereby substituted for Column Aof Part A of Schedule 6 to the principal Act, specifying the allocations-in-kind toprovinces for designated special programmes for the 2020/21 financial year.

(8) Column A of Part B of Schedule 6 to this Act is hereby substituted for Column Aof Part B of Schedule 6 to the principal Act, specifying the allocations-in-kind tomunicipalities for designated special programmes for the 2020/21 financial year.

(9) Column A of Part A of Schedule 7 to this Act is hereby substituted for Column Aof Part A of Schedule 7 to the principal Act, specifying the unallocated provisions forprovinces for disaster response for the 2020/21 financial year.

Short title

2. This Act is called the Division of Revenue Second Amendment Act, 2020.

3

5

10

15

20

SCHEDULE 1

R'000 R'000 R'000 R'000National1,2 1 152 839 556 32 180 670 14 337 867 1 199 358 093 Provincial 538 471 528 - ( 17 754 507) 520 717 021 Local 74 683 326 11 000 000 - 85 683 326 TOTAL 1 765 994 410 43 180 670 ( 3 416 640) 1 805 758 440 1. National share includes conditional allocations to provincial and local spheres, general fuel1. levy sharing with metropolitan municipalities, debt-service costs, the contingency reserve1. and provisional allocations2. The direct charges for the provincial equitable share are netted out

SCHEDULE 2

R'000 R'000 R'000 R'000Eastern Cape 71 415 216 - ( 2 219 963) 69 195 253 Free State 30 017 344 - ( 1 083 268) 28 934 076 Gauteng 112 117 907 - ( 3 807 791) 108 310 116 KwaZulu-Natal 111 441 977 - ( 3 834 410) 107 607 567 Limpopo 62 328 931 - ( 2 029 942) 60 298 989 Mpumalanga 44 104 988 - ( 1 467 683) 42 637 305 Northern Cape 14 289 699 - ( 540 495) 13 749 204 North West 37 547 835 - ( 1 240 424) 36 307 411 Western Cape 55 207 631 - ( 1 530 531) 53 677 100 Unallocated - TOTAL 538 471 528 - ( 17 754 507) 520 717 021

EQUITABLE DIVISION OF REVENUE RAISED NATIONALLY AMONG THE THREE SPHERES OF GOVERNMENT

DETERMINATION OF EACH PROVINCE'S EQUITABLE SHARE OF THE PROVINCIAL SPHERE'S SHARE OF REVENUE RAISED NATIONALLY

(as a direct charge against the National Revenue Fund)

Province

Spheres of Government 2020/21Main

Allocation

2020/21Main Allocation

Column A

1st Adjustment2020/21

Adjusted Allocation

Column A

1st Adjustment2020/21

Adjusted Allocation

2nd Adjustment

2nd Adjustment

4

SCH

ED

UL

E 4

, PA

RT

A

AL

LO

CA

TIO

NS

TO

PR

OV

INC

ES

TO

SU

PPL

EM

EN

T T

HE

FU

ND

ING

OF

PRO

GR

AM

MES

OR

FU

NC

TIO

NS

FUN

DE

D F

RO

M P

RO

VIN

CIA

L B

UD

GE

TS

R'0

00R

'000

R'0

00R

'000

East

ern

Cap

e 1

544

114

(

377

399)

-

1

166

715

Fr

ee S

tate

840

429

(

140

163)

-

7

00 2

66

Gau

teng

1 4

97 7

57

( 22

3 13

7)

-

1 2

74 6

20

Kw

aZul

u-N

atal

1 9

96 1

82

( 49

7 21

8)

-

1 4

98 9

64

Lim

popo

1 2

56 3

64

( 28

0 32

1)

-

976

043

M

pum

alan

ga 1

094

681

(

263

992)

-

8

30 6

89

Nor

ther

n C

ape

597

268

(

82 0

69)

-

515

199

N

orth

Wes

t 1

090

010

(

197

260)

-

8

92 7

50

Wes

tern

Cap

e 1

091

162

(

159

441)

-

9

31 7

21

Una

lloca

ted

-

-

-

-

TOTA

L 1

1 00

7 96

7

( 2 2

21 0

00)

-

8 7

86 9

67

Nat

iona

l Ter

tiary

Ser

vice

s Gra

ntEa

ster

n C

ape

1 0

80 8

46

-

-

1 0

80 8

46

Free

Sta

te 1

209

781

-

-

1

209

781

G

aute

ng 5

025

579

-

(

25 7

00)

4 9

99 8

79

Kw

aZul

u-N

atal

2 0

15 7

75

-

-

2 0

15 7

75

Lim

popo

445

200

-

-

4

45 2

00

Mpu

mal

anga

135

793

-

-

1

35 7

93

Nor

ther

n C

ape

402

404

-

-

4

02 4

04

Nor

th W

est

326

867

-

-

3

26 8

67

Wes

tern

Cap

e 3

426

618

-

(

30 0

10)

3 3

96 6

08

Una

lloca

ted

-

-

-

-

TOTA

L 1

4 06

8 86

3

-

( 55

710

) 1

4 01

3 15

3

(a) P

rovi

ncia

l Roa

ds M

aint

enan

ce G

rant

East

ern

Cap

e 1

629

401

(

246

780)

8

6 18

6

1 4

68 8

07

Free

Sta

te 1

447

285

(

219

198)

7

4 49

1

1 3

02 5

78

Gau

teng

745

007

(

112

835)

4

5 49

1

677

663

K

waZ

ulu-

Nat

al 2

076

547

(

314

503)

8

1 28

1

1 8

43 3

25

Lim

popo

1 2

94 7

56

( 19

6 09

7)

70

578

1

169

237

M

pum

alan

ga 1

042

917

(

157

955)

7

2 89

7

957

859

N

orth

ern

Cap

e 1

230

754

(

186

403)

6

6 87

1

1 1

11 2

22

Nor

th W

est

1 0

59 1

63

( 16

0 41

5)

70

889

9

69 6

37

Wes

tern

Cap

e 1

067

344

(

161

654)

6

1 31

6

967

006

U

nallo

cate

d-

-

-

TO

TAL

11

593

174

( 1

755

840

) 6

30 0

00

10

467

334

Ea

ster

n C

ape

269

007

-

-

2

69 0

07

Free

Sta

te 2

97 4

10

-

-

297

410

G

aute

ng 2

599

291

-

-

2

599

291

K

waZ

ulu-

Nat

al 1

246

362

-

-

1

246

362

Li

mpo

po 4

02 0

35

-

-

402

035

M

pum

alan

ga 6

76 9

41

-

-

676

941

N

orth

ern

Cap

e 6

0 52

4

-

-

60

524

N

orth

Wes

t 1

24 4

15

-

-

124

415

W

este

rn C

ape

1 0

73 5

96

-

-

1 0

73 5

96

TOTA

L 6

749

581

-

-

6

749

581

Col

umn

A

1st A

djus

tmen

t20

20/2

1A

djus

ted

Allo

catio

n

Ensu

re th

e pr

ovis

ion

of te

rtiar

y he

alth

serv

ices

in S

outh

Afr

ica;

to

com

pens

ate

terti

ary

faci

litie

s for

the

addi

tiona

l cos

ts a

ssoc

iate

d w

ith th

e pr

ovis

ion

of th

ese

serv

ices

.

Gen

eral

con

ditio

nal a

lloca

tion

to p

rovi

nces

To su

pple

men

t pro

vinc

ial i

nves

tmen

ts fo

r roa

d in

fras

truct

ure

mai

nten

ance

(rou

tine,

per

iodi

c an

d sp

ecia

l mai

nten

ance

); to

ens

ure

that

al

l roa

ds a

re c

lass

ified

as p

er th

e R

oad

Infr

astru

ctur

e St

rate

gic

Fram

ewor

k fo

r Sou

th A

fric

a an

d th

e te

chni

cal r

ecom

men

datio

ns fo

r hi

ghw

ays,

and

the

Roa

d C

lass

ifica

tion

and

Acc

ess M

anag

emen

t gu

idel

ines

; to

impl

emen

t and

mai

ntai

n ro

ad a

sset

man

agem

ent s

yste

ms;

to

supp

lem

ent p

rovi

ncia

l pro

ject

s for

the

repa

ir of

road

s and

brid

ges

dam

aged

by

unfo

rese

en in

cide

nts i

nclu

ding

nat

ural

dis

aste

rs; t

o im

prov

e ro

ad sa

fety

with

a sp

ecia

l foc

us o

n pe

dest

rian

safe

ty in

rura

l are

as.

Gen

eral

con

ditio

nal a

lloca

tion

to p

rovi

nces

(b) P

ublic

Tra

nspo

rt O

pera

tions

Gra

ntTo

pro

vide

supp

lem

enta

ry fu

ndin

g to

war

ds p

ublic

tran

spor

t ser

vice

s pr

ovid

ed b

y pr

ovin

cial

dep

artm

ents

of t

rans

port.

2nd

Adj

ustm

ent

Prov

ince

2020

/21

Mai

nA

lloca

tion

Nat

iona

lly a

ssig

ned

func

tion

to p

rovi

nces

Vot

eN

ame

of a

lloca

tion

Purp

ose

Type

of a

lloca

tion

To h

elp

acce

lera

te c

onst

ruct

ion,

mai

nten

ance

, upg

radi

ng a

nd

reha

bilit

atio

n of

new

and

exi

stin

g in

fras

truct

ure

in e

duca

tion

incl

udin

g di

stric

t and

circ

uit a

ccom

mod

atio

n; to

enh

ance

cap

acity

to d

eliv

er

infr

astru

ctur

e in

edu

catio

n; to

add

ress

dam

ages

to in

fras

truct

ure;

to

addr

ess a

chie

vem

ent o

f the

targ

ets s

et o

ut in

the

min

imum

nor

ms a

nd

stan

dard

s for

scho

ol in

fras

truct

ure.

Gen

eral

con

ditio

nal a

lloca

tion

to p

rovi

nces

Educ

atio

n In

fras

truct

ure

Gra

ntB

asic

Edu

catio

n(V

ote

16)

Hea

lth(V

ote

18)

Tran

spor

t(V

ote

40)

Tran

spor

t(V

ote

40)

5

SCH

ED

UL

E 4

, PA

RT

B

AL

LO

CA

TIO

NS

TO

MU

NIC

IPA

LIT

IES

TO

SU

PPL

EM

EN

T T

HE

FU

ND

ING

OF

FUN

CT

ION

S FU

ND

ED

FR

OM

MU

NIC

IPA

L B

UD

GE

TS

1R

'000

R'0

00R

'000

R'0

00B

uffa

lo C

ity 7

61 3

54

( 74

233

) -

6

87 1

21

City

of C

ape

Tow

n 1

481

604

(

144

459)

-

1

337

145

C

ity o

f Eku

rhul

eni

1 9

67 5

05

( 19

1 83

5)

-

1 7

75 6

70

City

of J

ohan

nesb

urg

1 8

48 2

87

( 18

0 21

1)

-

1 6

68 0

76

City

of T

shw

ane

1 6

02 1

61

( 15

6 21

3)

-

1 4

45 9

48

eThe

kwin

i 1

962

647

(

191

361)

-

1

771

286

M

anga

ung

754

593

(

73 5

74)

-

681

019

N

elso

n M

ande

la B

ay 9

03 7

20

( 88

114

) 3

90 2

74

1 2

05 8

80

TOTA

L 1

1 28

1 87

1

( 1 1

00 0

00)

390

274

1

0 57

2 14

5

Buf

falo

City

8 3

17

-

( 9

9)

8 2

18

City

of C

ape

Tow

n 6

5 94

4

-

( 7

84)

65

160

C

ity o

f Eku

rhul

eni

53

577

-

(

637

) 5

2 94

0

City

of J

ohan

nesb

urg

74

754

-

(

889

) 7

3 86

5

City

of T

shw

ane

51

512

-

(

613

) 5

0 89

9

eThe

kwin

i 4

6 46

4

-

( 5

53)

45

911

M

anga

ung

6 4

50

-

( 7

7)

6 3

73

Nel

son

Man

dela

Bay

10

481

-

(

125

) 1

0 35

6

TOTA

L 3

17 4

99

-

( 3

777)

3

13 7

22

Inte

grat

ed C

ity D

evel

opm

ent G

rant

To p

rovi

de a

fina

ncia

l inc

entiv

e fo

r met

ropo

litan

mun

icip

aliti

es to

ach

ieve

a m

ore

com

pact

urb

an sp

atia

l for

m

thro

ugh

inte

grat

ing

and

focu

ssin

g th

eir u

se o

f ava

ilabl

e in

fras

truct

ure

inve

stm

ent a

nd re

gula

tory

inst

rum

ents

; to

supp

ort m

etro

polit

an m

unic

ipal

ities

to d

evel

op a

pip

elin

e of

inve

stm

ent r

eady

cap

ital p

rogr

amm

es a

nd

proj

ects

thro

ugh

esta

blis

hing

and

inst

itutio

nalis

ing

an e

ffect

ive

and

effic

ient

syst

em o

f pro

gram

me

and

proj

ect

prep

arat

ion.

2020

/21

Mai

nA

lloca

tion

Hum

an S

ettle

men

ts(V

ote

33)

Nat

iona

l Tre

asur

y(V

ote

8)

Urb

an S

ettle

men

ts D

evel

opm

ent G

rant

Purp

ose

To su

pple

men

t the

cap

ital r

even

ues o

f met

ropo

litan

mun

icip

aliti

es in

ord

er to

impl

emen

t inf

rast

ruct

ure

proj

ects

that

pro

mot

e eq

uita

ble,

inte

grat

ed, p

rodu

ctiv

e, in

clus

ive

and

sust

aina

ble

urba

n de

velo

pmen

t; to

pr

ovid

e fu

ndin

g to

faci

litat

e a

prog

ram

mat

ic, i

nclu

sive

and

mun

icip

ality

-wid

e ap

proa

ch to

upg

radi

ng in

form

al

settl

emen

ts.

Vot

eN

ame

of a

lloca

tion

City

Col

umn

A

1st A

djus

tmen

t20

20/2

1A

djus

ted

Allo

catio

n2n

d A

djus

tmen

t

6

SCH

ED

UL

E 5

, PA

RT

A

SPE

CIF

IC-P

UR

POSE

AL

LO

CA

TIO

NS

TO

PR

OV

INC

ES

R'0

00R

'000

R'0

00R

'000

East

ern

Cap

e 2

39 8

38

( 59

696

) (

2 30

6)

177

836

Fr

ee S

tate

176

167

(

32 7

93)

( 1

629)

1

41 7

45

Gau

teng

100

108

(

17 4

62)

( 9

11)

81

735

K

waZ

ulu-

Nat

al 2

06 4

46

( 43

351

) (

2 00

9)

161

086

Li

mpo

po 2

33 5

58

( 59

060

) (

2 24

4)

172

254

M

pum

alan

ga 1

57 3

03

( 24

904

) (

1 41

7)

130

982

N

orth

ern

Cap

e 1

22 9

44

( 22

664

) (

1 14

0)

99

140

N

orth

Wes

t 1

74 2

71

( 36

019

) (

1 63

6)

136

616

W

este

rn C

ape

111

555

(

21 2

12)

( 1

042)

8

9 30

1

TOT

AL

1 5

22 1

90

( 31

7 16

1)

( 14

334

) 1

190

695

Ea

ster

n C

ape

67

955

(

16 9

89)

( 6

06)

50

360

Fr

ee S

tate

68

442

(

17 1

11)

( 6

11)

50

720

G

aute

ng 3

0 92

8

( 5

219)

(

306

) 2

5 40

3

Kw

aZul

u-N

atal

73

233

(

18 3

07)

( 6

53)

54

273

Li

mpo

po 7

0 48

0

( 17

620

) (

629

) 5

2 23

1

Mpu

mal

anga

57

374

(

10 3

27)

( 5

60)

46

487

N

orth

ern

Cap

e 6

2 61

5

( 11

271

) (

611

) 5

0 73

3

Nor

th W

est

67

324

(

14 8

11)

( 6

25)

51

888

W

este

rn C

ape

50

464

(

9 08

4)

( 4

92)

40

888

TO

TA

L 5

48 8

15

( 12

0 73

9)

( 5

093)

4

22 9

83

East

ern

Cap

e 1

2 37

1

-

(

147

) 1

2 22

4

Free

Sta

te 8

378

-

( 1

00)

8 2

78

Gau

teng

4 7

87

-

(

57)

4

730

K

waZ

ulu-

Nat

al 1

2 70

1

-

(

151

) 1

2 55

0

Lim

popo

12

970

-

( 1

54)

12

816

M

pum

alan

ga 1

0 04

4

-

(

119

) 9

925

N

orth

ern

Cap

e 7

615

-

( 9

1)

7 5

24

Nor

th W

est

8 5

08

-

(

101

) 8

407

W

este

rn C

ape

5 0

45

-

(

60)

4

985

TO

TA

L 8

2 41

9

-

(

980

) 8

1 43

9

2nd

Adj

ustm

ent

Col

umn

A

1st A

djus

tmen

t20

20/2

1A

djus

ted

Allo

catio

n

(a) C

ompr

ehen

sive

Agr

icul

tura

l Sup

port

Prog

ram

me

Gra

ntTo

pro

vide

effe

ctiv

e ag

ricul

tura

l sup

port

serv

ices

, pro

mot

e an

d fa

cilit

ate

agric

ultu

ral

deve

lopm

ent b

y ta

rget

ing

bene

ficia

ries o

f lan

d re

form

, res

titut

ion

and

redi

strib

utio

n, a

nd

othe

r bla

ck p

rodu

cers

who

hav

e ac

quire

d la

nd th

roug

h pr

ivat

e m

eans

and

are

eng

aged

in

valu

e-ad

ding

ent

erpr

ises

dom

estic

ally

, or i

nvol

ved

in e

xpor

t; to

revi

talis

e ag

ricul

tura

l co

llege

s int

o ce

ntre

s of e

xcel

lenc

e.

Con

ditio

nal a

lloca

tion

(b) I

lima/

Letse

ma

Proj

ects

Gra

ntTo

ass

ist v

ulne

rabl

e So

uth

Afri

can

farm

ing

com

mun

ities

to a

chie

ve a

n in

crea

se in

ag

ricul

tura

l pro

duct

ion

and

inve

st in

infra

struc

ture

that

unl

ocks

agr

icul

tura

l pro

duct

ion

with

in st

rate

gica

lly id

entif

ied

grai

n, li

vesto

ck, h

ortic

ultu

re a

nd a

quac

ultu

re p

rodu

ctio

n ar

eas.

Con

ditio

nal a

lloca

tion

(c) L

and

Care

Pro

gram

me

Gra

nt: P

over

ty

Relie

f and

Infra

struc

ture

Dev

elop

men

tTo

pro

mot

e su

stai

nabl

e us

e an

d m

anag

emen

t of n

atur

al re

sour

ces b

y en

gagi

ng in

co

mm

unity

bas

ed in

itiat

ives

that

supp

ort t

he p

illar

s of s

usta

inab

ility

(soc

ial,

econ

omic

and

en

viro

nmen

tal),

lead

ing

to g

reat

er p

rodu

ctiv

ity, f

ood

secu

rity,

job

crea

tion

and

bette

r wel

l-be

ing

for a

ll.

Con

ditio

nal a

lloca

tion

Vot

eN

ame

of a

lloca

tion

Purp

ose

Type

of a

lloca

tion

Prov

ince

2020

/21

Mai

nA

lloca

tion

Agr

icul

ture

, Lan

d R

efor

m

and

Rur

al D

evel

opm

ent

(Vot

e 29

)

Agr

icul

ture

, Lan

d R

efor

m

and

Rur

al D

evel

opm

ent

(Vot

e 29

)

Agr

icul

ture

, Lan

d R

efor

m

and

Rur

al D

evel

opm

ent

(Vot

e 29

)

7

SCH

ED

UL

E 5

, PA

RT

A

SPE

CIF

IC-P

UR

POSE

AL

LO

CA

TIO

NS

TO

PR

OV

INC

ES

R'0

00R

'000

R'0

00R

'000

2nd

Adj

ustm

ent

Col

umn

A

1st A

djus

tmen

t20

20/2

1A

djus

ted

Allo

catio

n

Vot

eN

ame

of a

lloca

tion

Purp

ose

Type

of a

lloca

tion

Prov

ince

2020

/21

Mai

nA

lloca

tion

East

ern

Cap

e 4

4 87

8

( 10

843

) -

34

035

Fr

ee S

tate

11

853

(

2 86

4)

-

8

989

G

aute

ng 3

6 86

9

( 8

908)

-

27

961

K

waZ

ulu-

Nat

al 6

2 45

0

( 15

088

) -

47

362

Li

mpo

po 2

8 13

7

( 6

798)

-

21

339

M

pum

alan

ga 1

9 99

4

( 4

831)

-

15

163

N

orth

ern

Cap

e 5

849

(

1 41

3)

-

4

436

N

orth

Wes

t 1

6 79

1

( 4

057)

-

12

734

W

este

rn C

ape

19

878

(

4 80

2)

-

1

5 07

6

TOTA

L 2

46 6

99

( 59

604

) -

187

095

Ea

ster

n C

ape

27

768

-

-

2

7 76

8

Free

Sta

te 2

6 67

0

-

-

26

670

G

aute

ng 3

3 71

5

-

-

33

715

K

waZ

ulu-

Nat

al 3

2 58

6

-

-

32

586

Li

mpo

po 3

2 43

2

-

-

32

432

M

pum

alan

ga 2

9 02

0

-

-

29

020

N

orth

ern

Cap

e 1

3 76

0

-

-

13

760

N

orth

Wes

t 1

8 41

4

-

-

18

414

W

este

rn C

ape

28

499

-

-

2

8 49

9

TOTA

L 2

42 8

64

-

-

242

864

Ea

ster

n C

ape

50

497

(

16 9

36)

-

3

3 56

1

Free

Sta

te 3

7 33

7

( 5

069)

-

32

268

G

aute

ng 5

7 10

6

( 9

452)

-

47

654

K

waZ

ulu-

Nat

al 6

5 70

1

( 5

069)

-

60

632

Li

mpo

po 4

6 86

0

( 8

720)

-

38

140

M

pum

alan

ga 4

1 41

7

( 5

069)

-

36

348

N

orth

ern

Cap

e 2

7 01

2

( 6

724)

-

20

288

N

orth

Wes

t 3

9 45

3

( 5

892)

-

33

561

W

este

rn C

ape

35

479

(

5 06

9)

-

3

0 41

0

TOTA

L 4

00 8

62

( 68

000

) -

332

862

Ea

ster

n C

ape

1 3

76 3

43

-

-

1 3

76 3

43

Free

Sta

te 4

31 8

51

-

-

431

851

G

aute

ng 9

05 0

06

-

-

905

006

K

waZ

ulu-

Nat

al 1

717

512

-

-

1

717

512

Li

mpo

po 1

369

485

-

-

1

369

485

M

pum

alan

ga 7

34 4

14

-

-

734

414

N

orth

ern

Cap

e 2

02 6

14

-

-

202

614

N

orth

Wes

t 5

16 1

14

-

-

516

114

W

este

rn C

ape

412

548

-

-

4

12 5

48

Una

lloca

ted

-

-

-

-

TOTA

L 7

665

887

-

-

7

665

887

(a) H

IV a

nd A

IDS

(Life

Ski

lls E

duca

tion)

G

rant

To su

ppor

t Sou

th A

frica

’s H

IV p

reve

ntio

n str

ateg

y by

: pro

vidi

ng c

ompr

ehen

sive

sexu

ality

edu

catio

n an

d ac

cess

to se

xual

and

repr

oduc

tive

heal

th se

rvic

es to

lear

ners

; su

ppor

ting

the

prov

ision

of e

mpl

oyee

hea

lth a

nd w

elln

ess p

rogr

amm

es fo

r edu

cato

rs; t

o m

itiga

te th

e im

pact

of H

IV a

nd T

B by

pro

vidi

ng a

car

ing,

supp

ortiv

e an

d en

ablin

g en

viro

nmen

t for

lear

ners

and

edu

cato

rs; t

o re

duce

the

vuln

erab

ility

of c

hild

ren

to H

IV, T

B an

d se

xual

ly tr

ansm

itted

infe

ctio

ns, w

ith a

par

ticul

ar fo

cus o

n or

phan

ed c

hild

ren

and

girls

.

Con

ditio

nal a

lloca

tion

(b) L

earn

ers W

ith P

rofo

und

Inte

llect

ual

Disa

bilit

ies G

rant

To p

rovi

de th

e ne

cess

ary

supp

ort,

reso

urce

s and

equ

ipm

ent t

o id

entif

ied

care

cen

tres a

nd

scho

ols f

or th

e pr

ovisi

on o

f edu

catio

n to

chi

ldre

n w

ith se

vere

to p

rofo

und

inte

llect

ual

disa

bilit

ies.

Con

ditio

nal a

lloca

tion

(c) M

aths

, Sci

ence

and

Tec

hnol

ogy

Gra

ntTo

pro

vide

supp

ort a

nd re

sour

ces t

o sc

hool

s, te

ache

rs a

nd le

arne

rs in

line

with

the

Cur

ricul

um A

sses

smen

t Pol

icy

Stat

emen

ts fo

r the

impr

ovem

ent o

f mat

hem

atic

s, sc

ienc

e an

d te

chno

logy

teac

hing

and

lear

ning

at s

elec

ted

publ

ic sc

hool

s.

Con

ditio

nal a

lloca

tion

(d) N

atio

nal S

choo

l Nut

ritio

n Pr

ogra

mm

e G

rant

To p

rovi

de n

utrit

ious

mea

ls to

targ

eted

scho

ols.

Con

ditio

nal a

lloca

tion

Bas

ic E

duca

tion

(Vot

e 16

)

Bas

ic E

duca

tion

(Vot

e 16

)

Bas

ic E

duca

tion

(Vot

e 16

)

Bas

ic E

duca

tion

(Vot

e 16

)

8

SCH

ED

UL

E 5

, PA

RT

A

SPE

CIF

IC-P

UR

POSE

AL

LO

CA

TIO

NS

TO

PR

OV

INC

ES

R'0

00R

'000

R'0

00R

'000

2nd

Adj

ustm

ent

Col

umn

A

1st A

djus

tmen

t20

20/2

1A

djus

ted

Allo

catio

n

Vot

eN

ame

of a

lloca

tion

Purp

ose

Type

of a

lloca

tion

Prov

ince

2020

/21

Mai

nA

lloca

tion

East

ern

Cap

e 2

667

462

4

81 0

76

8 7

61

3 1

57 2

99

Free

Sta

te 1

472

363

1

25 1

59

72

5

1 5

98 2

47

Gau

teng

5 2

56 2

34

607

442

(

47 9

77)

5 8

15 6

99

Kw

aZul

u-N

atal

6 4

53 9

23

446

764

(

1 79

8)

6 8

98 8

89

Lim

popo

2 1

79 0

20

223

429

1

1 33

5

2 4

13 7

84

Mpu

mal

anga

2 2

05 7

14

173

061

3

656

2

382

431

Nor

ther

n C

ape

656

487

6

1 57

5

16

8

718

230

Nor

th W

est

1 6

28 5

27

175

100

5

095

1

808

722

Wes

tern

Cap

e 1

867

472

5

52 2

20

9 4

26

2 4

29 1

18

Una

lloca

ted

-

-

-

-

TOTA

L 2

4 38

7 20

2

2 8

45 8

26

( 10

609

) 2

7 22

2 41

9

East

ern

Cap

e 6

69 5

33

-

-

669

533

Free

Sta

te 5

86 7

45

-

-

586

745

G

aute

ng 9

68 2

10

-

-

968

210

K

waZ

ulu-

Nat

al 1

271

414

-

-

1

271

414

Li

mpo

po 7

42 4

73

-

-

742

473

M

pum

alan

ga 4

23 9

22

-

-

423

922

N

orth

ern

Cap

e 4

09 4

04

-

(

52 3

71)

357

033

N

orth

Wes

t 5

97 1

58

-

-

597

158

W

este

rn C

ape

698

793

-

-

6

98 7

93

Una

lloca

ted

-

-

-

TO

TAL

6 3

67 6

52

-

(

52 3

71)

6 3

15 2

81

East

ern

Cap

e 4

5 26

2

-

(

20 0

00)

25

262

Fr

ee S

tate

21

496

-

( 5

500)

1

5 99

6

Gau

teng

53

674

-

-

5

3 67

4

Kw

aZul

u-N

atal

55

290

-

5 0

00

60

290

Li

mpo

po 3

2 06

6

-

-

32

066

M

pum

alan

ga 2

1 10

4

-

(

5 00

0)

16

104

N

orth

ern

Cap

e 1

9 27

6

-

(

5 87

6)

13

400

N

orth

Wes

t 2

1 19

2

-

(

11 0

00)

10

192

W

este

rn C

ape

19

480

-

-

1

9 48

0

TOTA

L 2

88 8

40

-

(

42 3

76)

246

464

Ea

ster

n C

ape

366

523

-

24

770

3

91 2

93

Free

Sta

te 2

37 0

19

-

9

921

2

46 9

40

Gau

teng

1 3

36 0

08

-

3

3 35

4

1 3

69 3

62

Kw

aZul

u-N

atal

593

830

-

40

548

6

34 3

78

Lim

popo

232

171

-

22

519

2

54 6

90

Mpu

mal

anga

189

495

-

16

457

2

05 9

52

Nor

ther

n C

ape

125

465

-

4 3

48

129

813

N

orth

Wes

t 1

92 7

23

-

1

4 28

3

207

006

W

este

rn C

ape

881

370

-

( 11

514

) 8

69 8

56

Una

lloca

ted

-

-

-

-

TOTA

L 4

154

604

-

154

686

4

309

290

(a) H

IV, T

B, M

alar

ia a

nd C

omm

unity

O

utre

ach

Gra

ntTo

ena

ble

the

heal

th se

ctor

to d

evel

op a

nd im

plem

ent a

n ef

fect

ive

resp

onse

to H

IV a

nd

AID

S; to

ena

ble

the

heal

th se

ctor

to d

evel

op a

nd im

plem

ent a

n ef

fect

ive

resp

onse

to T

B;

to e

nsur

e pr

ovis

ion

of q

ualit

y co

mm

unity

out

reac

h se

rvic

es th

roug

h W

ard

Bas

ed P

rimar

y H

ealth

Car

e O

utre

ach

Team

s; to

impr

ove

effic

ienc

ies o

f the

War

d B

ased

Prim

ary

Hea

lth

Car

e O

utre

ach

Team

s pro

gram

me

by h

arm

onisi

ng a

nd st

anda

rdis

ing

serv

ices

and

st

reng

then

ing

perfo

rman

ce m

onito

ring;

pre

vent

ion

and

prot

ectio

n of

hea

lth w

orke

rs fr

om

expo

sure

to h

azar

ds in

the

wor

k pl

ace;

to e

nabl

e th

e he

alth

sect

or to

dev

elop

and

im

plem

ent a

n ef

fect

ive

resp

onse

to su

ppor

t the

effe

ctiv

e im

plem

enta

tion

of th

e N

atio

nal

Stra

tegi

c Pl

an o

n M

alar

ia E

limin

atio

n 20

19 –

202

3; to

ena

ble

the

heal

th se

ctor

to p

reve

nt

cerv

ical

can

cer b

y m

akin

g av

aila

ble

Hum

an P

apill

omav

irus v

acci

natio

ns fo

r gr

ade

five

scho

ol g

irls i

n al

l pub

lic a

nd sp

ecia

l sch

ools

and

prog

ress

ive

inte

grat

ion

of

Hum

an P

apill

omav

irus i

nto

the

inte

grat

ed sc

hool

hea

lth p

rogr

amm

e.

Con

ditio

nal a

lloca

tion

(b) H

ealth

Fac

ility

Rev

italis

atio

n G

rant

To h

elp

acce

lera

te c

onst

ruct

ion,

mai

nten

ance

, upg

radi

ng a

nd re

habi

litat

ion

of n

ew a

nd

exist

ing

infra

struc

ture

in h

ealth

incl

udin

g, h

ealth

tech

nolo

gy, o

rgan

isatio

nal d

evel

opm

ent

syst

ems a

nd q

ualit

y as

sura

nce;

to e

nhan

ce c

apac

ity to

del

iver

hea

lth in

frast

ruct

ure;

to

acce

lera

te th

e fu

lfilm

ent o

f the

requ

irem

ents

of o

ccup

atio

nal h

ealth

and

safe

ty.

Con

ditio

nal a

lloca

tion

(c) N

atio

nal H

ealth

Insu

ranc

e G

rant

To e

xpan

d th

e he

alth

care

serv

ice

bene

fits t

hrou

gh th

e st

rate

gic

purc

hasi

ng o

f ser

vice

s fro

m h

ealth

care

pro

vide

rs.

Nat

iona

lly a

ssig

ned

func

tion

to p

rovi

nces

(d) S

tatu

tory

Hum

an R

esou

rces

, Tra

inin

g an

d D

evel

opm

ent G

rant

To a

ppoi

nt st

atut

ory

posi

tions

in th

e he

alth

sect

or fo

r sys

tem

atic

real

isat

ion

of th

e hu

man

re

sour

ces f

or h

ealth

stra

tegy

and

the

phas

e-in

of N

atio

nal H

ealth

Insu

ranc

e; su

ppor

t pr

ovin

ces t

o fu

nd se

rvic

e co

sts a

ssoc

iate

d w

ith c

linic

al tr

aini

ng a

nd su

perv

ision

of h

ealth

sc

ienc

e tra

inee

s on

the

publ

ic se

rvic

e pl

atfo

rm.

Con

ditio

nal a

lloca

tion

Hea

lth(V

ote

18)

Hea

lth(V

ote

18)

Hea

lth(V

ote

18)

Hea

lth(V

ote

18)

9

SCH

ED

UL

E 5

, PA

RT

A

SPE

CIF

IC-P

UR

POSE

AL

LO

CA

TIO

NS

TO

PR

OV

INC

ES

R'0

00R

'000

R'0

00R

'000

2nd

Adj

ustm

ent

Col

umn

A

1st A

djus

tmen

t20

20/2

1A

djus

ted

Allo

catio

n

Vot

eN

ame

of a

lloca

tion

Purp

ose

Type

of a

lloca

tion

Prov

ince

2020

/21

Mai

nA

lloca

tion

East

ern

Cap

e 1

803

294

(

191

210)

-

1 6

12 0

84

Free

Sta

te 9

50 7

98

( 10

0 81

7)

-

8

49 9

81

Gau

teng

4 6

25 4

47

( 49

0 45

4)

-

4

134

993

K

waZ

ulu-

Nat

al 3

379

057

(

358

294)

-

3 0

20 7

63

Lim

popo

1 0

60 6

22

( 11

2 46

1)

-

9

48 1

61

Mpu

mal

anga

1 0

81 0

44

( 11

4 62

7)

-

9

66 4

17

Nor

ther

n C

ape

319

888

-

-

3

19 8

88

Nor

th W

est

1 4

93 0

31

( 15

8 31

1)

-

1

334

720

W

este

rn C

ape

1 9

07 5

51

( 20

2 26

5)

-

1

705

286

TO

TAL

16

620

732

( 1

728

439

) -

14

892

293

Ea

ster

n C

ape

-

-

-

-

Free

Sta

te-

-

-

-

G

aute

ng-

-

-

-

K

waZ

ulu-

Nat

al-

-

-

-

Li

mpo

po-

-

-

-

M

pum

alan

ga-

-

-

-

N

orth

ern

Cap

e-

-

-

-

N

orth

Wes

t-

-

-

-

W

este

rn C

ape

-

-

-

-

TOTA

L-

-

-

-

Ea

ster

n C

ape

64

254

(

42 0

14)

-

2

2 24

0

Free

Sta

te 3

3 86

0

( 22

140

) (

596

) 1

1 12

4

Gau

teng

164

795

(

107

755)

-

57

040

K

waZ

ulu-

Nat

al 1

06 1

46

( 69

406

) -

36

740

Li

mpo

po 3

7 79

0

( 24

710

) -

13

080

M

pum

alan

ga 3

8 48

3

( 25

163

) (

3 67

0)

9 6

50

Nor

ther

n C

ape

11

383

(

7 44

3)

-

3

940

N

orth

Wes

t 5

3 16

0

( 34

760

) (

9 85

5)

8 5

45

Wes

tern

Cap

e 6

7 95

2

( 44

432

) (

23 3

20)

20

0

TOTA

L 5

77 8

23

( 37

7 82

3)

( 37

441

) 1

62 5

59

(c) T

itle

Dee

ds R

esto

ratio

n G

rant

To p

rovi

de fu

ndin

g fo

r the

era

dica

tion

of th

e pr

e-20

14 ti

tle d

eeds

regi

stra

tion

back

log.

Con

ditio

nal a

lloca

tion

(a) H

uman

Set

tlem

ents

Dev

elop

men

t Gra

ntTo

pro

vide

fund

ing

for t

he p

rogr

essi

ve re

alisa

tion

of a

cces

s to

adeq

uate

hou

sing

thro

ugh

the

crea

tion

of su

stai

nabl

e an

d in

tegr

ated

hum

an se

ttlem

ents;

to p

rovi

de fu

ndin

g to

fa

cilit

ate

a pr

ogra

mm

atic

and

incl

usiv

e ap

proa

ch to

upg

radi

ng in

form

al se

ttlem

ents.

Con

ditio

nal a

lloca

tion

(b) I

nfor

mal

Set

tlem

ents

Upg

radi

ng

Partn

ersh

ip G

rant

for P

rovi

nces

To p

rovi

de fu

ndin

g to

faci

litat

e a

prog

ram

mat

ic a

nd in

clus

ive

appr

oach

to u

pgra

ding

in

form

al se

ttlem

ents

.C

ondi

tiona

l allo

catio

n

Hum

an S

ettle

men

ts(V

ote

33)

Hum

an S

ettle

men

ts(V

ote

33)

Hum

an S

ettle

men

ts(V

ote

33)

10

SCH

ED

UL

E 5

, PA

RT

A

SPE

CIF

IC-P

UR

POSE

AL

LO

CA

TIO

NS

TO

PR

OV

INC

ES

R'0

00R

'000

R'0

00R

'000

2nd

Adj

ustm

ent

Col

umn

A

1st A

djus

tmen

t20

20/2

1A

djus

ted

Allo

catio

n

Vot

eN

ame

of a

lloca

tion

Purp

ose

Type

of a

lloca

tion

Prov

ince

2020

/21

Mai

nA

lloca

tion

East

ern

Cap

e 1

07 7

89

-

-

107

789

Fr

ee S

tate

24

085

-

-

2

4 08

5

Gau

teng

53

887

-

-

5

3 88

7

Kw

aZul

u-N

atal

104

494

-

-

1

04 4

94

Lim

popo

25

379

-

-

2

5 37

9

Mpu

mal

anga

27

907

-

-

2

7 90

7

Nor

ther

n C

ape

21

634

-

-

2

1 63

4

Nor

th W

est

29

604

-

-

2

9 60

4

Wes

tern

Cap

e 2

5 98

3

-

-

25

983

U

nallo

cate

d-

-

-

-

TO

TA

L 4

20 7

62

-

-

420

762

Ea

ster

n C

ape

55

202

-

-

5

5 20

2

Free

Sta

te 3

9 57

2

-

-

39

572

G

aute

ng 5

1 08

7

-

-

51

087

K

waZ

ulu-

Nat

al 7

8 88

1

-

-

78

881

Li

mpo

po 5

9 07

3

-

-

59

073

M

pum

alan

ga 3

4 93

4

-

-

34

934

N

orth

ern

Cap

e 2

2 63

8

-

-

22

638

N

orth

Wes

t 2

9 24

6

-

-

29

246

W

este

rn C

ape

42

950

-

-

4

2 95

0

Una

lloca

ted

-

-

-

-

TOTA

L 4

13 5

83

-

-

413

583

Ea

ster

n C

ape

134

142

-

59

792

1

93 9

34

Free

Sta

te 5

5 76

8

-

3

8 88

0

94

648

G

aute

ng 1

35 2

29

-

7

7 76

3

212

992

K

waZ

ulu-

Nat

al 1

93 4

37

-

8

9 89

8

283

335

Li

mpo

po 1

27 7

24

-

5

8 24

1

185

965

M

pum

alan

ga 8

0 87

2

-

4

2 37

2

123

244

N

orth

ern

Cap

e 2

4 08

5

-

4

2 37

2

66

457

N

orth

Wes

t 7

6 74

0

-

3

3 86

5

110

605

W

este

rn C

ape

87

152

-

53

067

1

40 2

19

Una

lloca

ted

-

-

-

-

TOTA

L 9

15 1

49

-

4

96 2

50

1 4

11 3

99

Early

Chi

ldho

od D

evel

opm

ent G

rant

To in

crea

se th

e nu

mbe

r of p

oor c

hild

ren

acce

ssin

g su

bsid

ised

ear

ly c

hild

hood

de

velo

pmen

t ser

vice

s thr

ough

par

tial c

are

faci

litie

s; to

supp

ort e

arly

chi

ldho

od

deve

lopm

ent p

rovi

ders

del

iver

ing

an e

arly

chi

ldho

od d

evel

opm

ent p

rogr

amm

e to

mee

t ba

sic h

ealth

and

safe

ty re

quire

men

ts fo

r reg

istra

tion;

to p

ilot t

he c

onstr

uctio

n of

new

low

-co

st e

arly

chi

ldho

od d

evel

opm

ent c

entre

s.

Con

ditio

nal a

lloca

tion

(b) S

ocia

l Sec

tor E

xpan

ded

Publ

ic W

orks

Pr

ogra

mm

e In

cent

ive

Gra

nt fo

r Pro

vinc

esTo

ince

ntiv

ise

prov

inci

al so

cial

sect

or d

epar

tmen

ts, i

dent

ified

in th

e so

cial

sect

or

Expa

nded

Pub

lic W

orks

Pro

gram

me

log-

fram

e, to

incr

ease

job

crea

tion

by fo

cusi

ng o

n th

e st

reng

then

ing

and

expa

nsio

n of

soci

al se

ctor

pro

gram

mes

that

hav

e em

ploy

men

t po

tent

ial.

Con

ditio

nal a

lloca

tion

(a) E

xpan

ded

Publ

ic W

orks

Pro

gram

me

Inte

grat

ed G

rant

for P

rovi

nces

To in

cent

ivise

pro

vinc

ial d

epar

tmen

ts to

exp

and

wor

k cr

eatio

n ef

forts

thro

ugh

the

use

of

labo

ur in

tens

ive

deliv

ery

met

hods

in th

e fo

llow

ing

iden

tifie

d fo

cus a

reas

, in

com

plia

nce

with

the

Expa

nded

Pub

lic W

orks

Pro

gram

me

guid

elin

es: r

oad

mai

nten

ance

and

the

mai

nten

ance

of b

uild

ings

; low

traf

fic v

olum

e ro

ads a

nd ru

ral r

oads

; oth

er e

cono

mic

and

so

cial

infra

struc

ture

; tou

rism

and

cul

tura

l ind

ustri

es; s

usta

inab

le la

nd b

ased

live

lihoo

ds;

was

te m

anag

emen

t.

Con

ditio

nal a

lloca

tion

Publ

ic W

orks

and

In

fras

truc

ture

(Vot

e 13

)

Publ

ic W

orks

and

In

fras

truc

ture

(Vot

e 13

)

Soci

al D

evel

opm

ent

(Vot

e 19

)

11

SCH

ED

UL

E 5

, PA

RT

A

SPE

CIF

IC-P

UR

POSE

AL

LO

CA

TIO

NS

TO

PR

OV

INC

ES

R'0

00R

'000

R'0

00R

'000

2nd

Adj

ustm

ent

Col

umn

A

1st A

djus

tmen

t20

20/2

1A

djus

ted

Allo

catio

n

Vot

eN

ame

of a

lloca

tion

Purp

ose

Type

of a

lloca

tion

Prov

ince

2020

/21

Mai

nA

lloca

tion

East

ern

Cap

e 1

66 5

06

( 34

700

) (

1 54

2)

130

264

Fr

ee S

tate

167

082

(

34 7

00)

( 1

542)

1

30 8

40

Gau

teng

166

781

(

34 7

00)

( 1

542)

1

30 5

39

Kw

aZul

u-N

atal

181

072

(

34 7

00)

( 3

084)

1

43 2

88

Lim

popo

143

221

(

34 7

91)

( 1

542)

1

06 8

88

Mpu

mal

anga

162

410

(

34 7

00)

( 1

542)

1

26 1

68

Nor

ther

n C

ape

167

162

(

34 7

00)

( 1

542)

1

30 9

20

Nor

th W

est

138

733

(

34 8

00)

( 1

542)

1

02 3

91

Wes

tern

Cap

e 1

86 1

26

( 34

700

) -

151

426

TO

TAL

1 4

79 0

93

( 31

2 49

1)

( 13

878

) 1

152

724

Ea

ster

n C

ape

64

626

(

30 4

28)

( 5

94)

33

604

Fr

ee S

tate

94

147

(

11 5

52)

( 2

48)

82

347

G

aute

ng 8

7 87

9

( 48

052

) (

913

) 3

8 91

4

Kw

aZul

u-N

atal

88

023

(

48 8

78)

( 9

26)

38

219

Li

mpo

po 5

8 36

3

( 26

072

) (

514

) 3

1 77

7

Mpu

mal

anga

46

532

(

17 8

44)

( 3

64)

28

324

N

orth

ern

Cap

e 3

1 54

7

( 3

792)

(

115

) 2

7 64

0

Nor

th W

est

42

009

(

14 6

98)

( 3

06)

27

005

W

este

rn C

ape

83

491

(

22 6

84)

( 4

53)

60

354

TO

TAL

596

617

(

224

000)

(

4 43

3)

368

184

(b) M

ass P

artic

ipat

ion

and

Spor

t D

evel

opm

ent G

rant

To fa

cilit

ate

spor

t and

act

ive

recr

eatio

n pa

rtici

patio

n an

d em

pow

erm

ent i

n pa

rtner

ship

w

ith re

leva

nt st

akeh

olde

rs.

Con

ditio

nal a

lloca

tion

(a) C

omm

unity

Lib

rary

Ser

vice

s Gra

ntTo

tran

sfor

m u

rban

and

rura

l com

mun

ity li

brar

y in

frast

ruct

ure,

faci

litie

s and

serv

ices

(p

rimar

ily ta

rget

ing

prev

ious

ly d

isadv

anta

ged

com

mun

ities

) thr

ough

a re

capi

talis

ed

prog

ram

me

at p

rovi

ncia

l lev

el in

supp

ort o

f loc

al g

over

nmen

t and

nat

iona

l ini

tiativ

es.

Con

ditio

nal a

lloca

tion

Spor

ts, A

rts a

nd C

ultu

re(V

ote

37)

Spor

ts, A

rts a

nd C

ultu

re(V

ote

37)

12

SCH

ED

UL

E 5

, PA

RT

B

SPE

CIF

IC-P

UR

POSE

AL

LO

CA

TIO

NS

TO

MU

NIC

IPA

LIT

IES

R'0

00R

'000

R'0

00R

'000

RE

CU

RR

EN

T G

RA

NT

SC

oope

rativ

e G

over

nanc

e(V

ote

3)M

unic

ipal

Sys

tem

s Im

prov

emen

t Gra

nt

-

-

-

-

Nat

iona

l Tre

asur

y(V

ote

8)(a

) Inf

rast

ruct

ure

Skill

s Dev

elop

men

t Gra

nt 1

53 1

92

( 7

600)

(

1 73

2)

143

860

Nat

iona

l Tre

asur

y(V

ote

8)(b

) Loc

al G

over

nmen

t Fin

anci

al

Man

agem

ent G

rant

544

862

-

-

5

44 8

62

Publ

ic W

orks

and

In

fras

truc

ture

(Vot

e 13

)

Expa

nded

Pub

lic W

orks

Pro

gram

me

Inte

grat

ed G

rant

for M

unic

ipal

ities

748

039

-

-

7

48 0

39

TO

TA

L 1

446

093

(

7 60

0)

( 1

732)

1

436

761

2nd

Adj

ustm

ent

Col

umn

A

1st A

djus

tmen

t20

20/2

1A

djus

ted

Allo

catio

n

Purp

ose

To a

ssis

t mun

icip

aliti

es to

per

form

thei

r fun

ctio

ns a

nd st

abili

se in

stitu

tiona

l and

gov

erna

nce

syst

ems a

s req

uire

d in

the

Mun

icipa

l Sy

stem

s Act

and

rela

ted

loca

l gov

ernm

ent l

egis

latio

n.

To re

crui

t une

mpl

oyed

gra

duat

es in

to m

unic

ipal

ities

to b

e tra

ined

and

pro

fess

iona

lly re

gist

ered

, as p

er th

e re

quire

men

ts o

f the

re

leva

nt st

atut

ory

coun

cils

with

in th

e bu

ilt e

nviro

nmen

t.

To p

rom

ote

and

supp

ort r

efor

ms i

n fin

anci

al m

anag

emen

t by

build

ing

capa

city

in m

unic

ipal

ities

to im

plem

ent t

he M

unic

ipal

Fin

ance

M

anag

emen

t Act

.

To in

cent

ivis

e m

unic

ipal

ities

to e

xpan

d w

ork

crea

tion

effo

rts th

roug

h th

e us

e of

labo

ur in

tens

ive

deliv

ery

met

hods

in th

e fo

llow

ing

iden

tifie

d fo

cus a

reas

, in

com

plia

nce

with

the

Expa

nded

Pub

lic W

orks

Pro

gram

me

guid

elin

es: r

oad

mai

nten

ance

and

the

mai

nten

ance

of

bui

ldin

gs; l

ow tr

affic

vol

ume

road

s and

rura

l roa

ds; b

asic

serv

ices

infr

astru

ctur

e, in

clud

ing

wat

er a

nd sa

nita

tion

retic

ulat

ion

(exc

ludi

ng b

ulk

infr

astru

ctur

e); o

ther

eco

nom

ic a

nd so

cial

infr

astru

ctur

e; to

uris

m a

nd c

ultu

ral i

ndus

tries

; was

te m

anag

emen

t; pa

rks

and

beau

tific

atio

n; su

stai

nabl

e la

nd-b

ased

live

lihoo

ds; s

ocia

l ser

vice

s pro

gram

mes

; com

mun

ity sa

fety

pro

gram

mes

.

Vot

eN

ame

of a

lloca

tion

2020

/21

Mai

nA

lloca

tion

13

SCH

ED

UL

E 5

, PA

RT

B

SPE

CIF

IC-P

UR

POSE

AL

LO

CA

TIO

NS

TO

MU

NIC

IPA

LIT

IES

R'0

00R

'000

R'0

00R

'000

2nd

Adj

ustm

ent

Col

umn

A

1st A

djus

tmen

t20

20/2

1A

djus

ted

Allo

catio

n

Purp

ose

Vot

eN

ame

of a

lloca

tion

2020

/21

Mai

nA

lloca

tion

INFR

AST

RU

CT

UR

E G

RA

NT

SC

oope

rativ

e G

over

nanc

e(V

ote

3)(a

) Int

egra

ted

Urb

an D

evel

opm

ent G

rant

948

031

-

( 11

663

) 9

36 3

68

Coo

pera

tive

Gov

erna

nce

(Vot

e 3)

(b) M

unic

ipal

Infr

astru

ctur

e G

rant

14

671

101

-

( 18

0 03

6)

14

491

065

Hum

an S

ettle

men

ts(V

ote

33)

Info

rmal

Set

tlem

ents

Upg

radi

ng P

artn

ersh

ip

Gra

nt fo

r Mun

icip

aliti

es-

-

-

-

Min

eral

Res

ourc

es a

nd

Ene

rgy

(Vot

e 34

)

(a) E

nerg

y Ef

ficie

ncy

and

Dem

and

Side

M

anag

emen

t Gra

nt 2

17 9

94

( 21

799

) -

196

195

Min

eral

Res

ourc

es a

nd

Ene

rgy

(Vot

e 34

)

(b) I

nteg

rate

d N

atio

nal E

lect

rific

atio

n Pr

ogra

mm

e (M

unic

ipal

) Gra

nt 1

858

752

(

500

000)

-

1 3

58 7

52

Nat

iona

l Tre

asur

y(V

ote

8)N

eigh

bour

hood

Dev

elop

men

t Par

tner

ship

G

rant

(Cap

ital)

559

442

(

67 6

93)

( 12

332

) 4

79 4

17

Tra

nspo

rt(V

ote

40)

(a) P

ublic

Tra

nspo

rt N

etw

ork

Gra

nt 6

445

848

( 1

902

275

) (

154

503)

4

389

070

Tra

nspo

rt(V

ote

40)

(b) R

ural

Roa

ds A

sset

Man

agem

ent

Syst

ems G

rant

108

436

-

-

1

08 4

36

Wat

er a

nd S

anita

tion

(Vot

e 41

)(a

) Reg

iona

l Bul

k In

fras

truct

ure

Gra

nt

2 0

05 6

05

-

-

2 0

05 6

05

Wat

er a

nd S

anita

tion

(Vot

e 41

)(b

) Wat

er S

ervi

ces I

nfra

stru

ctur

e G

rant

3 4

45 1

65

-

(

77 6

08)

3 3

67 5

57

TO

TA

L 3

0 26

0 37

4

( 2 4

91 7

67)

( 43

6 14

2)

27

332

465

To im

plem

ent t

he In

tegr

ated

Nat

iona

l Ele

ctrif

icat

ion

Prog

ram

me

by p

rovi

ding

cap

ital s

ubsi

dies

to m

unic

ipal

ities

to a

ddre

ss th

e el

ectri

ficat

ion

back

log

of a

ll ex

istin

g an

d pl

anne

d re

side

ntia

l dw

ellin

gs (i

nclu

ding

info

rmal

settl

emen

ts, f

arm

dw

elle

rs, n

ew a

nd

exis

ting

dwel

lings

) and

the

inst

alla

tion

of re

leva

nt b

ulk

infr

astru

ctur

e.

To p

lan,

cat

alys

e, a

nd in

vest

in ta

rget

ed lo

catio

ns in

ord

er to

attr

act a

nd su

stai

n th

ird p

arty

cap

ital i

nves

tmen

ts a

imed

at s

patia

l tra

nsfo

rmat

ion,

that

will

impr

ove t

he q

ualit

y of

life

, and

acc

ess t

o op

portu

nitie

s for

resid

ents

in S

outh

Afri

ca’s

und

er-s

erve

d ne

ighb

ourh

oods

, gen

eral

ly to

wns

hips

and

rura

l tow

ns.

To p

rovi

de fu

ndin

g fo

r acc

eler

ated

con

stru

ctio

n an

d im

prov

emen

t of p

ublic

and

non

-mot

oris

ed tr

ansp

ort i

nfra

stru

ctur

e th

at fo

rm p

art

of a

mun

icip

al in

tegr

ated

pub

lic tr

ansp

ort n

etw

ork

and

to su

ppor

t the

pla

nnin

g, re

gula

tion,

con

trol,

man

agem

ent a

nd o

pera

tions

of

fisca

lly a

nd fi

nanc

ially

sust

aina

ble

mun

icip

al p

ublic

tran

spor

t net

wor

k se

rvic

es.

To a

ssis

t dis

trict

mun

icip

aliti

es to

set u

p R

oad

Ass

et M

anag

emen

t Sys

tem

s, an

d co

llect

road

, brid

ge a

nd tr

affic

dat

a on

mun

icip

al

road

net

wor

ks in

line

with

the

Roa

d In

fras

truct

ure

Stra

tegi

c Fr

amew

ork

for S

outh

Afr

ica.

To d

evel

op n

ew, r

efur

bish

, upg

rade

and

repl

ace

agei

ng b

ulk

wat

er a

nd sa

nita

tion

infr

astru

ctur

e of

regi

onal

sign

ifica

nce

that

con

nect

s w

ater

reso

urce

s to

infr

astru

ctur

e se

rvin

g ex

tens

ive

area

s acr

oss m

unic

ipal

bou

ndar

ies o

r lar

ge re

gion

al b

ulk

infr

astru

ctur

e se

rvin

g nu

mer

ous c

omm

uniti

es o

ver a

larg

e ar

ea w

ithin

a m

unic

ipal

ity; t

o im

plem

ent b

ulk

infr

astru

ctur

e w

ith a

pot

entia

l of a

ddre

ssin

g wa

ter

cons

erva

tion

and

wat

er d

eman

d m

anag

emen

t pro

ject

s or f

acili

tate

and

con

tribu

te to

the

impl

emen

tatio

n of

loca

l wat

er c

onse

rvat

ion

and

wat

er d

eman

d m

anag

emen

t pro

ject

s tha

t will

dire

ctly

impa

ct o

n bu

lk in

fras

truct

ure

requ

irem

ents

.

Faci

litat

e th

e pl

anni

ng a

nd im

plem

enta

tion

of v

ario

us w

ater

and

sani

tatio

n pr

ojec

ts to

acc

eler

ate

back

log

redu

ctio

n an

d en

hanc

e th

e su

stai

nabi

lity

of se

rvic

es e

spec

ially

in ru

ral m

unic

ipal

ities

; pro

vide

bas

ic a

nd in

term

itten

t wat

er a

nd sa

nita

tion

supp

ly th

at en

sure

s pr

ovis

ion

of se

rvic

es to

iden

tifie

d an

d pr

iorit

ised

com

mun

ities

, inc

ludi

ng sp

ring

prot

ectio

n an

d gr

ound

wat

er d

evel

opm

ent;

supp

ort

mun

icip

aliti

es in

impl

emen

ting

wat

er c

onse

rvat

ion

and

wat

er d

eman

d m

anag

emen

t pro

ject

s; su

ppor

t the

clo

se-o

ut o

f the

exi

stin

g B

ucke

t Era

dica

tion

Prog

ram

me

inte

rven

tion

in fo

rmal

resi

dent

ial a

reas

; sup

port

drou

ght r

elie

f pro

ject

s in

affe

cted

mun

icip

aliti

es.

To p

rovi

de fu

ndin

g fo

r pub

lic in

vest

men

t in

infr

astru

ctur

e fo

r the

poo

r and

to p

rom

ote

incr

ease

d ac

cess

to m

unic

ipal

ow

n so

urce

s of

capi

tal f

inan

ce in

ord

er to

incr

ease

fund

ing

for p

ublic

inve

stm

ent i

n ec

onom

ic in

fras

truct

ure;

to e

nsur

e th

at p

ublic

inve

stm

ents

are

spat

ially

alig

ned

and

to p

rom

ote

the

soun

d m

anag

emen

t of t

he a

sset

s del

iver

ed.

To p

rovi

de sp

ecifi

c ca

pita

l fin

ance

for e

radi

catin

g ba

sic

mun

icip

al in

fras

truct

ure

back

logs

for p

oor h

ouse

hold

s, m

icro

ente

rpris

es a

nd

soci

al in

stitu

tions

serv

icin

g po

or c

omm

uniti

es.

To p

rovi

de fu

ndin

g to

faci

litat

e a

prog

ram

mat

ic, i

nclu

sive

and

mun

icip

ality

-wid

e ap

proa

ch to

upg

radi

ng o

f inf

orm

al se

ttlem

ents

.

To p

rovi

de su

bsid

ies t

o m

unic

ipal

ities

to im

plem

ent e

nerg

y ef

ficie

ncy

and

dem

and

side

man

agem

ent i

nitia

tives

with

in m

unic

ipal

in

fras

truct

ure

in o

rder

to re

duce

ele

ctric

ity c

onsu

mpt

ion

and

impr

ove

ener

gy e

ffic

ienc

y.

14

SCH

ED

UL

E 6

, PA

RT

A

AL

LO

CA

TIO

NS-

IN-K

IND

TO

PR

OV

INC

ES

FOR

DE

SIG

NA

TE

D S

PEC

IAL

PR

OG

RA

MM

ES

R'0

00R

'000

R'0

00R

'000

Agr

icul

ture

, Lan

d R

efor

m

and

Rur

al D

evel

opm

ent

(Vot

e 29

)Ili

ma/

Lets

ema

Indi

rect

Gra

nt

35

857

-

-

3

5 85

7

Bas

ic E

duca

tion

(Vot

e 16

)Sc

hool

Infr

astru

ctur

e B

ackl

ogs G

rant

1 7

36 4

13

540

000

1

38 5

42

2 4

14 9

55

Hea

lth(V

ote

18)

Nat

iona

l Hea

lth In

sura

nce

Indi

rect

Gra

nt

2 2

87 8

64

( 33

8 46

8)

( 23

9 78

3)

1 7

09 6

13

TOTA

L 4

060

134

2

01 5

32

( 10

1 24

1)

4 1

60 4

25

Col

umn

A

1st A

djus

tmen

t20

20/2

1A

djus

ted

Allo

catio

n

2020

/21

Mai

nA

lloca

tion

To a

ssis

t vul

nera

ble

Sout

h A

fric

an fa

rmin

g co

mm

uniti

es to

ach

ieve

an

incr

ease

in a

gric

ultu

ral p

rodu

ctio

n an

d in

vest

in in

fras

truct

ure

that

unl

ocks

agr

icul

tura

l pro

duct

ion

with

in st

rate

gica

lly id

entif

ied

grai

n, li

vest

ock,

hor

ticul

ture

and

aqu

acul

ture

pro

duct

ion

area

s.

Erad

icat

ion

of a

ll in

appr

opria

te sc

hool

infr

astru

ctur

e; p

rovi

sion

of w

ater

, san

itatio

n an

d el

ectri

city

to sc

hool

s.

To c

reat

e an

alte

rnat

ive

track

to im

prov

e sp

endi

ng, p

erfo

rman

ce a

s wel

l as m

onito

ring

and

eval

uatio

n on

infr

astru

ctur

e in

pre

para

tion

for N

atio

nal H

ealth

Insu

ranc

e; to

enh

ance

cap

acity

and

cap

abili

ty to

del

iver

infr

astru

ctur

e fo

r Nat

iona

l Hea

lth In

sura

nce;

to a

ccel

erat

e th

e fu

lfilm

ent o

f the

requ

irem

ents

of o

ccup

atio

nal h

ealth

and

safe

ty; e

xpan

d th

e al

tern

ativ

e m

odel

s for

the

disp

ensi

ng a

nd d

istri

butio

n of

chr

onic

med

icat

ion;

dev

elop

and

roll-

out n

ew h

ealth

info

rmat

ion

syst

ems i

n pr

epar

atio

n fo

r Nat

iona

l Hea

lth In

sura

nce;

ena

ble

the

heal

th se

ctor

to a

ddre

ss th

e de

ficie

ncie

s in

the

prim

ary

heal

thca

re fa

cilit

ies s

yste

mat

ical

ly to

yie

ld fa

st re

sults

thro

ugh

the

impl

emen

tatio

n of

the

Idea

l Clin

ic p

rogr

amm

e; to

exp

and

the

heal

thca

re se

rvic

e be

nefit

s thr

ough

the

stra

tegi

c pu

rcha

sing

of s

ervi

ces

from

hea

lthca

re p

rovi

ders

.

2nd

Adj

ustm

ent

Vot

eN

ame

of a

lloca

tion

Purp

ose

15

SCH

ED

UL

E 6

, PA

RT

B

AL

LO

CA

TIO

NS-

IN-K

IND

TO

MU

NIC

IPA

LIT

IES

FOR

DE

SIG

NA

TE

D S

PEC

IAL

PR

OG

RA

MM

ES

R'0

00R

'000

R'0

00R

'000

Coo

pera

tive

Gov

erna

nce

(Vot

e 3)

Mun

icip

al S

yste

ms I

mpr

ovem

ent G

rant

128

248

(

8 47

4)

-

119

774

Min

eral

Res

ourc

es a

nd

Ener

gy(V

ote

34)

Inte

grat

ed N

atio

nal E

lect

rific

atio

n Pr

ogra

mm

e (E

skom

) Gra

nt 3

001

483

( 1

000

000

) (

18 4

98)

1 9

82 9

85

Nat

iona

l Tre

asur

y(V

ote

8)N

eigh

bour

hood

Dev

elop

men

t Par

tner

ship

G

rant

(Tec

hnic

al A

ssis

tanc

e) 6

2 70

2

-

-

62

702

Wat

er a

nd S

anita

tion

(Vot

e 41

)(a

) Reg

iona

l Bul

k In

fras

truct

ure

Gra

nt

3 8

56 8

33

-

251

652

4

108

485

Wat

er a

nd S

anita

tion

(Vot

e 41

)(b

) Wat

er S

ervi

ces I

nfra

stru

ctur

e G

rant

578

806

-

1

2 25

8

591

064

TOTA

L 7

628

072

( 1

008

474

) 2

45 4

12

6 8

65 0

10

2020

/21

Mai

nA

lloca

tion

Vot

eN

ame

of a

lloca

tion

Purp

ose

To a

ssis

t mun

icip

aliti

es to

per

form

thei

r fun

ctio

ns a

nd st

abili

se in

stitu

tiona

l and

gov

erna

nce

syst

ems a

s req

uire

d in

the

Mun

icip

al

Syst

ems A

ct a

nd re

late

d lo

cal g

over

nmen

t leg

isla

tion.

To im

plem

ent t

he In

tegr

ated

Nat

iona

l Ele

ctrif

icat

ion

Prog

ram

me

by p

rovi

ding

cap

ital s

ubsi

dies

to E

skom

to a

ddre

ss th

e el

ectri

ficat

ion

back

log

of a

ll ex

istin

g an

d pl

anne

d re

side

ntia

l dw

ellin

gs (i

nclu

ding

info

rmal

settl

emen

ts, f

arm

dw

elle

rs, n

ew a

nd e

xist

ing

dwel

lings

) an

d th

e in

stal

latio

n of

rele

vant

bul

k in

fras

truct

ure

in E

skom

lice

nced

are

as.

Col

umn

A

1st A

djus

tmen

t20

20/2

1A

djus

ted

Allo

catio

n2n

d A

djus

tmen

t

To p

lan,

cat

alys

e, a

nd in

vest

in ta

rget

ed lo

catio

ns in

ord

er to

attr

act a

nd su

stai

n th

ird p

arty

cap

ital i

nves

tmen

ts a

imed

at s

patia

l tra

nsfo

rmat

ion,

that

will

impr

ove

the

qual

ity o

f life

, and

acc

ess t

o op

portu

nitie

s for

resid

ents

in S

outh

Afri

ca’s

und

er-s

erve

d ne

ighb

ourh

oods

, gen

eral

ly to

wns

hips

and

rura

l tow

ns.

To d

evel

op n

ew, r

efur

bish

, upg

rade

and

repl

ace

agei

ng b

ulk

wat

er a

nd sa

nita

tion

infr

astru

ctur

e of

regi

onal

sign

ifica

nce

that

con

nect

s w

ater

reso

urce

s to

infr

astru

ctur

e se

rvin

g ex

tens

ive

area

s acr

oss m

unic

ipal

bou

ndar

ies o

r lar

ge re

gion

al b

ulk

infr

astru

ctur

e se

rvin

g nu

mer

ous c

omm

uniti

es o

ver a

larg

e ar

ea w

ithin

a m

unic

ipal

ity; t

o im

plem

ent b

ulk

infr

astru

ctur

e w

ith a

pot

entia

l of a

ddre

ssin

g w

ater

co

nser

vatio

n an

d w

ater

dem

and

man

agem

ent p

roje

cts o

r fac

ilita

te a

nd c

ontri

bute

to th

e im

plem

enta

tion

of lo

cal w

ater

con

serv

atio

n an

d w

ater

dem

and

man

agem

ent p

roje

cts t

hat w

ill d

irect

ly im

pact

on

bulk

infr

astru

ctur

e re

quire

men

ts.

Faci

litat

e th

e pl

anni

ng a

nd im

plem

enta

tion

of v

ario

us w

ater

and

sani

tatio

n pr

ojec

ts to

acc

eler

ate

back

log

redu

ctio

n an

d en

hanc

e th

e su

stai

nabi

lity

of se

rvic

es e

spec

ially

in ru

ral m

unic

ipal

ities

; pro

vide

bas

ic a

nd in

term

itten

t wat

er a

nd sa

nita

tion

supp

ly th

at en

sure

s pr

ovis

ion

of se

rvic

es to

iden

tifie

d an

d pr

iorit

ised

com

mun

ities

, inc

ludi

ng sp

ring

prot

ectio

n an

d gr

ound

wat

er d

evel

opm

ent;

supp

ort

mun

icip

aliti

es in

impl

emen

ting

wat

er c

onse

rvat

ion

and

wat

er d

eman

d m

anag

emen

t pro

ject

s; su

ppor

t the

clo

se-o

ut o

f the

exi

stin

g B

ucke

t Era

dica

tion

Prog

ram

me

inte

rven

tion

in fo

rmal

resi

dent

ial a

reas

; sup

port

drou

ght r

elie

f pro

ject

s in

affe

cted

mun

icip

aliti

es.

16

SCH

ED

UL

E 7

, PA

RT

A

UN

AL

LO

CA

TE

D P

RO

VIS

ION

S FO

R P

RO

VIN

CE

S FO

R D

ISA

STE

R R

ESP

ON

SE

R'0

00R

'000

R'0

00R

'000

Coo

pera

tive

Gov

erna

nce

(Vot

e 3)

Prov

inci

al D

isas

ter R

elie

f Gra

nt 1

38 4

89

-

-

138

489

Hum

an S

ettle

men

ts(V

ote

33)

Prov

inci

al E

mer

genc

y H

ousi

ng G

rant

294

899

3

77 8

23

( 27

3 12

0)

399

602

TOTA

L 4

33 3

88

377

823

(

273

120)

5

38 0

91

Col

umn

A

1st A

djus

tmen

t20

20/2

1A

djus

ted

Allo

catio

n2n

d A

djus

tmen

t20

20/2

1M

ain

Allo

catio

n

Vot

eN

ame

of a

lloca

tion

Purp

ose

To p

rovi

de fo

r the

imm

edia

te re

leas

e of

fund

s for

dis

aste

r res

pons

e.

To p

rovi

de fu

ndin

g to

pro

vinc

es fo

r pro

visi

on o

f tem

pora

ry sh

elte

r ass

ista

nce

to h

ouse

hold

s affe

cted

by

disa

ster

s or a

hou

sing

em

erge

ncy;

to p

rovi

de fu

ndin

g to

pro

vinc

es to

repa

ir th

e da

mag

e to

hou

sing

for l

ow-in

com

e ho

useh

olds

follo

win

g a

disa

ster

or h

ousi

ng

emer

genc

y if

the

cost

s of r

epai

rs a

re le

ss th

an th

e co

st o

f rel

ocat

ion

and

prov

isio

n of

tem

pora

ry sh

elte

r.

17

MEMORANDUM ON THE OBJECTS OF THE DIVISION OFREVENUE SECOND AMENDMENT BILL, 2020

1. BACKGROUND

1.1 Section 214(1) of the Constitution of the Republic of South Africa, 1996 (‘‘theConstitution’’), requires that an Act of Parliament be enacted to provide for—(a) the equitable division of revenue raised nationally among the national,

provincial and local spheres of government;(b) the determination of each province’s equitable share of the provincial

share of that revenue; and(c) any other allocations to provinces, local government or municipalities

from the national government’s share of that revenue, and any conditionson which those allocations may be made.

1.2 Section 12(4) of the Money Bills and Related Matters Act, 2009 (Act No. 9 of2009), requires the Minister of Finance to table a division of revenueamendment Bill with a revised fiscal framework if the adjustments budgeteffects changes to the Division of Revenue Act, 2020 (Act No. 4 of 2020)(‘‘the DoRA’’), as amended by the Division of Revenue Amendment Act,2020 (Act No. 10 of 2020), for the relevant financial year. As the adjustmentsbudget for 2020/21 effects changes to the DoRA, it is necessary for theDivision of Revenue Second Amendment Bill, 2020 (‘‘the Bill’’) to be tabledwith the revised fiscal framework.

1.3 The Bill is thus introduced in compliance with the requirements of theConstitution and the Money Bills and Related Matters Act, 2009.

2. SUMMARY OF BILL

2.1 Clause 1 of the Bill proposes the replacement in the DoRA of—(a) Column A of Schedule 1;(b) Column A of Schedule 2;(c) Column A of Part A of Schedule 4;(d) Column A of Part B of Schedule 4;(e) Column A of Part A of Schedule 5;(f) Column A of Part B of Schedule 5;(g) Column A of Part A of Schedule 6;(h) Column A of Part B of Schedule 6; and(i) Column A of Part A of Schedule 7.

2.2 Column A specifies the allocations for the 2020/21 financial year. Amend-ments to allocations are indicated in Column A by indicating the adjustmentand the adjusted amount. The Schedules to the Bill address the followingmatters:(a) Adjusting the equitable share among the three spheres of government;(b) changes to equitable share to provinces;(c) changes to supplementary allocations to provinces and municipalities;(d) changes to specific-purpose allocations to provinces and municipalities

for the 2020/21 financial year;(e) changes to allocations-in-kind to provinces and municipalities for

designated special programmes for the 2020/21 financial year; and(f) changes to the unallocated provisions for provinces for disaster response.

2.3 Clause 2 of the Bill contains the short title.

3. ORGANISATIONS AND INSTITUTIONS CONSULTED

The following institutions were consulted on the adjustments proposed in the Bill:

• Financial and Fiscal Commission;

• South African Local Government Association; and

• National and provincial departments.

4. FINANCIAL IMPLICATIONS TO THE STATE

This Bill is necessitated by the proposed national adjustment budget for the2020/21 financial year which affects the division of revenue between the threespheres of government. Financial implications to government are limited to thetotal transfers to provinces and local government as indicated in the Schedules tothe Bill.

5. CONSTITUTIONAL IMPLICATIONS

The Bill, in conjunction with the DoRA, seeks to give effect to section 214 of theConstitution.

6. PARLIAMENTARY PROCEDURE

6.1 The Constitution prescribes the classification of Bills. Therefore, a Bill mustbe correctly classified otherwise it will be constitutionally out of order.

6.2 The State Law Advisers and the National Treasury have considered the Billagainst the provisions of the Constitution relating to the tagging of Bills, andagainst the functional areas listed in Schedule 4 (functional areas ofconcurrent national and provincial legislative competence) and Schedule 5(functional areas of exclusive provincial legislative competence) to theConstitution.

6.3 For the purposes of tagging, the constitutional court case of Tongoane andOthers v Minister for Agriculture and Land Affairs and Others CCT 100/09[2010] Z4CC 10, confirmed the ‘‘substantial measure’’ test indicated in ExParte President of the Republic of South Africa: In re Constitutionality of theLiquor Bill. The test entailed that ‘‘any Bill whose provisions in substantialmeasure’’ fall within a specific Schedule must be classified in terms of thatSchedule.

6.4 In terms of section 76(3) of the Constitution, a Bill must be dealt with inaccordance with the procedure established by either subsection (1) orsubsection (2) if it falls within a functional area listed in Schedule 4 to theConstitution. Furthermore, in terms of section 76(4)(b) of the Constitution, aBill must be dealt with in accordance with the procedure established bysection 76(1) of the Constitution, if it provides for legislation envisaged inChapter 13 of the Constitution and includes provisions affecting the financialinterests of the provincial sphere of government.

6.5 The issue that needs to be determined is whether the proposed amendments ascontained in the Bill, in substantial measure, fall within a functional area listedin Schedule 4 to the Constitution, or whether the proposed amendments fallunder section 76(4)(b) of the Constitution.

6.6 The Bill seeks to amend the DoRA in accordance with section 12(4) of theMoney Bills and Related Matters Act, 2009, which provides that the Ministermust table a division of revenue amendment Bill with the revised fiscalframework if the adjustments budget effects changes to the Division ofRevenue Act for the relevant year.

6.7 The provisions of the Bill have been carefully examined, and in our view, theyamount to legislation envisaged in Chapter 13 of the Constitution. Further-more, the Bill includes provisions affecting the financial interests of theprovincial sphere of government as contemplated in section 76(4)(b) of theConstitution. We are therefore of the opinion that the Bill must be dealt within accordance with the procedure envisaged by section 76(1) of theConstitution.

19

6.8 The State Law Advisers and the National Treasury are of the opinion that it isnot necessary to refer the Bill to the National House of Traditional Leaders interms of section 18(1)(a) of the Traditional Leadership and GovernanceFramework Act, 2003 (Act No. 41 of 2003), since it does not containprovisions pertaining to customary law or customs of traditional communities.

20

DIVISION OF REVENUESECOND AMENDMENT BILL

ATTACHMENTSPage

1. Annexure A: Explanatory Memorandum to the Divisionof Revenue Second Amendment Bill .............................................. 22

2. Annexure B: Frameworks for Conditional Grants to Provinces..... 28

3. Annexure C: Frameworks for Conditional Grants toMunicipalities .................................................................................. 41

4. Annexure D: Specific-Purpose Allocations to Municipalities(Schedule 5, Part B): Current Grants .............................................. 44

5. Annexure E: Infrastructure Grant Allocations to Municipalities(Schedule 4, Part B and Schedule 5, Part B) .................................. 51

6. Annexure F: Allocations-In-Kind to Municipalities(Schedule 6, Part B)......................................................................... 58

7. Appendix A to Schedule 5, Part B: Municipal InfrastructureGrant and Integrated Urban Development Grant Ring-Fenced Funding for Sports Infrastructure-Breakdown perMunicipality .................................................................................... 65

8. Appendix B to Schedule 5, Part A: Breakdown of the EarlyChildhood Development Grant: Allocations per GrantComponent per Province ................................................................. 68

9. Appendix C to Schedule 5, Part A: Breakdown of the HIV, TB,Malaria and Community Outreach Grant: Allocations per GrantComponent per Province ................................................................. 70

10. Appendix D to Schedule 5, Part A: Breakdown of StatutoryHuman Resources, Training and Development Grant:Allocations per Grant Component per Province ............................. 72

11. Appendix E to Schedule 6, Part A: Breakdown of the SchoolInfrastructure Backlogs Grant: Allocations per Province ............... 74

12. Appendix F to Schedule 6, Part A: Breakdown of the NationalHealth Insurance Indirect Grant: Allocations per GrantComponent per Province ................................................................. 76

21

A

Explanatory memorandum to the Division of Revenue Second Amendment Bill

Background The allocation of resources to the three spheres of government is a critical step in the budget process, required before national government, the nine provinces and 257 municipalities can determine their own budgets. The allocation process takes into account the powers and functions assigned to the three spheres of government. The process for making this decision is at the heart of cooperative governance as envisaged in the Constitution. To foster transparency and ensure smooth intergovernmental relations, section 214(1) of the Constitution requires that every year a Division of Revenue Act determine the equitable division of nationally-raised revenue between the three spheres of government. The Intergovernmental Fiscal Relations Act, 1997, prescribes the process for determining the equitable sharing and allocation of revenue raised nationally.

This Division of Revenue Second Amendment Bill, 2020, (“the Bill”) fulfils the requirement set out in section 12(4) of the Money Bills and Related Matters Act, 2009 (Act 9 of 2009), that the Minister of Finance must table a division of revenue amendment Bill with the revised fiscal framework if the adjustments budget effects changes to the Division of Revenue Act for the relevant year. Section 10(5) of the Intergovernmental Fiscal Relations Act requires that the Division of Revenue Bill must be accompanied by an explanatory memorandum detailing how the Bill takes account of the matters listed in sections 214(2)(a) to (j) of the Constitution; government’s response to the recommendations of the Financial and Fiscal Commission (FFC); and any assumptions and formulae used in arriving at the respective divisions among provinces and municipalities. As the FFC’s recommendations are specific to the main budget and none of the formulae used in the Division of Revenue Act, 2020, (Act 4 of 2020) have been changed, this explanatory memorandum only contains three parts:

Part 1 describes the factors that inform the division of resources between the three spheres of government.

Part 2 describes the proposed amendments to the Division of Revenue Act, 2020, as amended by the Division of Revenue Amendment Act (Act 10 of 2020) and their impact on the different spheres of government.

Part 3 describes changes to the frameworks and detailed allocations per province and municipality that have been gazetted in terms of section 16(1) of the Division of Revenue Act, 2020, as amended by the Division of Revenue Amendment Act (Act 10 of 2020). The changes are submitted to parliament for consideration as envisaged in sections 16(2) and 16(4) of the Division of Revenue Act, 2020.

The Division of Revenue Second Amendment Bill, 2020, and its underlying allocations are the culmination of extensive consultation processes between national, provincial and local government. The Budget Council and Local Government Budget Forum deliberated on the matters discussed in this memorandum. The approach to local government allocations has been discussed with organised local government

22

(South African Local Government Association) at technical meetings, culminating in a meeting of the Local Government Budget Forum.

Part 1: Constitutional considerations Section 214 of the Constitution requires that the annual Division of Revenue Act be enacted only after taking account of factors in sub-sections (2)(a) to (j) of the Constitution. These include the national interest; provision for debt; the needs of national government and emergencies; the allocation of resources to provide basic services and meet developmental needs; fiscal capacity and efficiency of the provincial and local spheres; the reduction of economic disparities; and the promotion of stability and predictability. Annexure W1 to the 2020 Division of Revenue Bill outlined in detail how these considerations were taken into account in the 2020 Division of Revenue. None of the adjustments in this Bill alter the constitutional considerations that informed the 2020 Division of Revenue.

Part 2: Summary of changes in the Division of Revenue Second Amendment Bill, 2020

An adjustments budget provides for unforeseen and unavoidable expenditure; appropriation of monies already announced during the tabling of the annual budget (but not allocated at that stage); the shifting of funds between and within votes where a function is transferred; the utilisation of savings; and the roll-over of unspent funds from the preceding financial year. If the adjustments budget effects changes to the division of revenue as contained in the Division of Revenue Act for the relevant year, the Minister of Finance must table a Division of Revenue Amendment Bill with the revised framework. There are amendments to the 2020 Budget as amended that affect the Division of Revenue Act, 2020 as amended which will be effected through the Division of Revenue Second Amendment Act, 2020, once enacted. The amendments as they impact on provinces and municipalities are discussed in detail below.

Changes to provincial allocations

Additional allocations to support presidential employment initiative

In response to job losses resulting from the COVID-19 pandemic, additional funds have been added as part of the stimulus package to create jobs through labour intensive projects. These funds were provisionally set aside when the Special Adjustment Budget was tabled. The funding includes allocations that are made through conditional grants and provincial equitable share. R213 million is added to the HIV, tuberculosis, malaria and community outreach grant: community outreach services component for recruitment, training and procurement of personal protective equipment for 1 250 community health workers and 2 000 outreach team leaders and the procurement of backpack kits for existing and recruited community health workers and outreach team leaders. R180 million is added to the statutory human resources, training and development grant for the appointment of 1 045 enrolled nurses and 1 236 assistant/auxiliary nurses. R496 million is added to the early childhood development grant to provide unemployment risk support to 83 333 early childhood development related workers for six months and top-up payments to 25 500 already employed early childhood development workers to take on compliance support duties. R630 million is added to the provincial roads maintenance grant for the creation of 50 000 jobs through maintenance of provincial roads using the S’hamba Sonke Programme. R7 billion is added to the provincial equitable share to employ education assistants at schools and to save school governing body posts at fee paying schools and government-subsidised independent schools where employees have been furloughed or had salaries cut due to reduced income from school fees and fund raising initiatives that have been curtailed due to COVID-19 related precautionary measures. School governing bodies will appoint education assistants and decide on the specific duties of these assistants (e.g. reading assistants, classroom assistants, after school assistants, screeners, cleaners) depending on the needs of the school. These changes are shown in Schedule 2, Part A; Schedule 4, Part A and Schedule 5, Part A of this Bill.

23

Addition for assistance with food relief

R500 million is added to the provincial equitable share for providing food relief in response to the impact of COVID-19 to mitigate the adverse effects of hunger. This change is shown in Schedule 2, Part A of this Bill.

Roll-over for school infrastructure backlogs grant

R475 million is rolled over for the school infrastructure backlogs grant for the completion of projects that are part of the Sanitation Appropriate for Education (SAFE) initiative, which deals with the replacement and removal of inappropriate and unsuitable sanitation, including pit toilets, at schools. The funds are for schools in Eastern Cape, KwaZulu-Natal and Limpopo. This change is shown in Schedule 6, Part A of this Bill.

Reductions to provincial conditional grants

In terms of the rescue plan for South African Airways, R10.5 billion is required for this purpose. The reductions are made uniformly across programmes falling within national departments, these include provincial conditional grants. There will be no reductions made to the provincial equitable share for this purpose. With respect to the reductions to conditional grants, these are made proportionately across provinces as much as possible. Provincial conditional grants are reduced by R1.3 billion, made up of:

R56 million is reduced from the national tertiary services grant. This change is shown in Schedule 4, Part A of this Bill.

R14 million is reduced from community library services grant. R14 million is reduced from the comprehensive agricultural support programme grant. R52 million is reduced from the health facility revitalisation grant. R224 million is reduced from the HIV, TB, malaria and community outreach grant. R5 million is reduced from the ilima/letsema projects grant. R980 000 is reduced from the land care programme grant. R4 million is reduced from the mass participation and sport development grant. R42 million is reduced from the national health insurance grant. R26 million is reduced from the statutory human resources, training and development grant. R37 million is reduced from the title deeds restoration grant. These changes are shown in Schedule 5, Part A of this Bill.

R336 million is reduced from the school infrastructure backlogs grant. R240 million is reduced from the national health insurance: indirect grant. These changes are shown in Schedule 6, Part A of this Bill.

R273 million is reduced from the provincial emergency housing grant. This change is shown in Schedule 7, Part A of this Bill.

Reduction to the provincial equitable share

R25.3 billion is reduced from the provincial equitable share. This is because reductions were not included in the calculations of the allocations to provincial government at the time the budget was tabled. This is part of the reduction of R160 billion to the growth of the public-service wage bill that was announced in the Budget tabled in February 2020. This change is shown in Schedule 2, Part A of the Bill.

24

R thousands

Eastern Cape 1 190 680 66 279 -3 476 922 -2 219 963Free State 411 622 27 853 -1 522 743 -1 083 268Gauteng 1 085 722 104 216 -4 997 729 -3 807 790KwaZulu-Natal 1 424 238 103 506 -5 362 154 -3 834 410Limpopo 987 826 57 848 -3 075 616 -2 029 942Mpumalanga 490 893 40 943 -1 999 519 -1 467 683Northern Cape 148 277 13 228 -702 001 -540 496North West 445 251 34 846 -1 720 521 -1 240 424Western Cape 814 291 51 281 -2 396 103 -1 530 532

Total 6 998 800 500 000 -25 253 307 -17 754 507

Source: National Treasury

Presidential Employment

Initiative

Total change Food relief Public service wage bill

Table A.1 Breakdown of provincial equitable share changes, 2020/21

Additional allocations to provinces for the Presidential Employment Initiative for the education sector are determined in terms of the applications received, food relief is determined in line with the provincial equitable share formula, while the provincial reductions for public service wage bill are determined in line with the individual personnel expenditure in the provinces.

Changes to local government allocations

Roll-over of funds

R390 million is rolled over in the urban settlements development grant to fund commitments for bulk infrastructure related projects in Nelson Mandela Bay Metropolitan Municipality. R98 million is rolled over in the public transport network grant to continue with the rollout of the integrated public transport network (IPTN) for public and non-motorised infrastructure in Nelson Mandela Bay Metropolitan Municipality. R307 million is rolled over in the regional bulk infrastructure grant for drought and COVID-19 water and sanitation interventions nation-wide. These changes are shown in Schedule 4, Part B; Schedule 5, Part B and Schedule 6, Part B of this Bill.

Additional allocation for the water services infrastructure grant

R12 million has been reprioritised from the department’s budget into the indirect component of the water services infrastructure grant for implementation of various water services interventions. This change is shown in Schedule 6, Part B of this Bill.

Reductions to municipal conditional grants

In terms of the rescue plan for South African Airways, R10.5 billion is required for this purpose. The reductions are made uniformly across programmes falling within national departments, these include local government conditional grants. There will be no reductions made to the local government equitable share for this purpose. With respect to the reductions to conditional grants, these are made proportionately across municipalities as much as possible. Local government conditional grants are reduced by R613 million, made up of:

R4 million is reduced from the integrated city development grant. This change is shown in Schedule 4, Part B of this Bill.

R2 million is reduced from the infrastructure skills development grant. R12 million is reduced from the integrated urban development grant. R180 million is reduced from the municipal infrastructure grant. R12 million is reduced from the neighbourhood development partnership grant. R253 million is reduced from the public transport network grant. R78 million is reduced from water services infrastructure grant. These changes are shown in Schedule 5, Part B of this Bill.

25

R18 million is reduced from the integrated national electrification programme (Eskom) grant. R55 million is reduced from regional bulk infrastructure grant. These changes are shown in Schedule 6, Part B of this Bill.

Part 3: Changes to gazetted frameworks and allocations Together with the tabling of the Division of Revenue Second Amendment Bill, 2020, National Treasury also submits to Parliament proposed changes to gazetted conditional grant frameworks and allocations. Section 16(4) of the Division of Revenue Act, 2020, requires National Treasury to consult Parliament on any proposed changes to a conditional grant framework for the purposes of correcting an error or omission, as envisaged in Section 16(2) of the Division of Revenue Act, 2020.

The proposed changes to conditional grant frameworks are described below and the revised frameworks and detailed allocations are included in the annexures and appendices to the Division of Revenue Second Amendment Bill, 2020. While these changes do not form part of the Bill, Parliament is requested to consider them in terms of the process set out in Section 16(4) of the Division of Revenue Act, 2020. Proposed changes to gazetted allocation appendixes that provide further details of grant allocations are also included here.

Additional conditions attached to the approval of Presidential Employment Initiative

The grant frameworks for the HIV, tuberculosis, malaria and community outreach grant, statutory human resources, training and development grant, early childhood development grant and provincial roads maintenance grant are amended to include the conditions attached to the approval of the Presidential Employment Initiative. The conditions include:

Transferring officers to monitor the progress in the implementation of the interventions, considering the progress reports submitted by the receiving officers on a monthly basis.

Transferring officers to report monthly on progress to the Presidency.

One month after the receipt of the allocations, receiving officers to provide a detailed breakdown to the relevant transferring officer, Presidency and National Treasury of the components funded through the allocation.

Receiving officers to report on the expenditure of the funds in line with the requirements in section 11 and section 12 of the Division of Revenue Act (DoRA), 2020, and the gazetted frameworks for the relevant grant.

HIV, tuberculosis, malaria and community outreach grant

The grant framework for the HIV, tuberculosis, malaria and community outreach grant: community outreach services component is amended to ring-fence the additional funds allocated for the Presidential Employment Initiative.

Statutory human resources, training and development grant

The grant framework for the statutory human resources, training and development grant is amended to make provision for the appointment of enrolled nurses and auxiliary nurses as part of the presidential employment programme. The conditional grant framework currently caters for the training of health science professionals and the hiring of community service posts and does not cater for the hiring of other positions. The grant framework is further amended to make corrections for allocations earmarked in the training and developmental component. The allocations were incorrectly captured due to a rounding error for Mpumalanga and North West.

Early childhood development grant

The framework for the early childhood development grant is amended to include conditions to allow for spending of the ring-fenced additional funds allocated for the Presidential Employment Initiative.

26

Provincial roads maintenance grant

The grant framework for the provincial roads maintenance grant is amended to ring-fence the additional funds allocated for the Presidential Employment Initiative.

National health insurance indirect grants

The grant framework for the national health indirect grant: health facility revitalisation component is amended to correct for an allocation earmarked for Limpopo Academic Hospital. The allocation is being corrected from R653 million to R454 million, as R198 million was shifted to the health facility revitalisation grant during the February 2020 Budget.

Rural roads asset management systems grant

The grant framework for the rural roads asset management systems grant is amended to correct for the due date of the submission of road condition data that was erroneously captured as 31 September 2020 instead of 30 September 2020. This correction is needed as 31 September 2020 does not exist in the calendar.

Changes to gazetted allocations

To correct allocations for ring-fenced sport projects in the municipal infrastructure grant, R25 million is proposed to be shifted to Polokwane Local Municipality from Musina Local Municipality and R9 million is proposed to be shifted to Swellendam Local Municipality from Mossel Bay Local Municipality. The amounts for each project are corrected in the gazetted list of the municipal infrastructure grant ring-fenced funding for sport infrastructure and allocations in the municipal infrastructure grant. This correction will ensure that sufficient funds are made available to complete planned sport infrastructure projects in all the affected municipalities.

Details per municipality of the changes to allocations for the integrated city development grant, urban settlements development grant, integrated urban development grant, municipal infrastructure grant, neighbourhood development partnership grant, public transport network grant, water services infrastructure grant, integrated national electrification programme (Eskom) grant and regional bulk infrastructure grant that have been described in parts 2 and 3 of this memorandum will be gazetted. These changes per municipality are shown in annexures D, E and F.

Details of the changes per provincial department for allocations for the early childhood development grant, HIV, TB, malaria and community outreach grant, statutory human resources, training and development grant, national health insurance indirect grant and school infrastructure backlogs grant are shown in Appendices B, C, D, E and F.

27

Annexure B: Frameworks for Conditional Grants

to Provinces Detailed frameworks on Schedule 4, Part A; Schedule 5, Part A; and Schedule 6, Part A grants to provinces Introduction This annexure provides the revised frameworks for the grants set out in Part A of Schedule 4, 5, and 6 of the 2020 Division of Revenue Second Amendment Bill. The following are key areas considered for each grant:

Strategic goal and purpose of the grant Outcome statements and outputs of the grant Priority outcome(s) of government that the grant primarily contributes to Conditions of the grant (additional to what is required in the Bill) Criteria for allocation between provinces Rationale for funding through a conditional grant Past performance The projected life of the grant 2020 MTEF allocations The payment schedule Responsibilities of transferring national department and receiving provincial departments Process for approval of business plans for 2021/22

The attached frameworks are not part of the Division of Revenue Second Amendment Bill, but are published in order to provide more information on each grant to parliament, legislatures, municipal councils, officials in all three spheres of government and the public. Once the 2020 Division of Revenue Second Amendment Bill is enacted, these frameworks will be gazetted.

The financial statements and annual reports for 2020/21 will report against the Division of Revenue Act, Division of Revenue Amendment Act, Division of Revenue Second Amendment Act and their schedules, and the grant frameworks as gazetted in terms of the Act. Such reports must cover both financial and non-financial performance, focusing on the outputs achieved.

28

HEALTH GRANTS HIV, TB, Malaria and Community Outreach Grant: Community Outreach Services Component

Transferring department Health (Vote 18) Grant schedule Schedule 5, Part A Strategic goal To improve access to community based primary care services through Ward Based Primary Health Care

Outreach Teams (WBPHCOTs) Grant purpose To ensure provision of quality community outreach services through WBPHCOTs by ensuring Community

Health Workers (CHWs) receive remuneration, tools of trade and training To improve efficiencies of the WBPHCOT programme by harmonising and standardising services and

strengthening performance monitoring Outcome statements Improved access to quality primary care services at community level with a focus on preventive and

promotive care, screening for health conditions and referral for relevant services Outputs Number of community health workers receiving a stipend

Number of community health workers trained Number of outreach team leaders trained Number of HIV defaulters traced Number of TB defaulters traced

Priority of government that this grant primarily contributes to

Priority 2: Education, skills and health

Details contained in the business plan

Output indicators Milestones with projected dates when these will be achieved Description of how the project will be managed including roles and responsibilities of national and provincial

departments Key activities and resource schedule Cash flow projections

Conditions The grant must be used for the implementation of the WBPHCOTs Policy Framework and Strategy A business plan must be completed and signed-off by the receiving officer and submitted to the transferring

officer by 28 February 2020 and signed by the transferring officer and submitted to the National Treasury by 30 March 2020

All contracted non-governmental organisations receiving funding from this grant must have a service level agreement with the relevant provincial department of health including performance indicators

Provinces that have contracted non-governmental organisations for the programme should make transfer payments as per the stipulations of section 8.4 of the Treasury Regulations and section 38(1)(j) of the Public Finance Management Act

To respond to the COVID-19 pandemic, funds may be used for COVID-19 screening and contact tracing Provinces must report separately on COVID-19 expenditure in their reports submitted in terms of the

requirements of section 12 of the Division of Revenue Act Presidential Employment Initiative No administration costs may be funded from this component Transferring officers to report monthly on progress to the Presidency in line with reporting requirements

established by the Presidency R213 million in 2020/21 is earmarked for the activities planned under the Presidential Employment

Initiative. The allocations are as follows: o Eastern Cape: R34 million o Free State: R14 million o KwaZulu-Natal: R56 million o Limpopo: R31 million o Mpumalanga: R23 million o Northern Cape: R6 million o North West: R20 million o Western Cape: R29 million

Allocation criteria Allocations are based on the existing number of CHWs providing community-based services in all provinces Reasons not incorporated in equitable share

Community outreach services are a national priority that require systematic, focused implementation and monitoring in order to achieve the desired outputs, outcomes and impact on defined health indicators

Past performance 2018/19 audited financial outcome Of the R1.5 billion made available, R1.5 billion was transferred to provinces (100 per cent), of which

R1.5 billion (100 per cent) was spent by provinces 2018/19 service delivery performance 2855 functional WBPHCOTs 46328 CHWs receiving stipends 1154 outreach team leaders employed 12514 TB defaulters traced 40422 HIV defaulters traced

Projected life Subject to policy developments that will be finalised as part of the implementation of National Health Insurance

MTEF allocations 2020/21: R2.6 billion; 2021/22: R2.6 billion and 2022/23: R2.7 billion Payment schedule Monthly instalments based on the approved payment schedule

29

HIV, TB, Malaria and Community Outreach Grant: Community Outreach Services Component Responsibilities of the transferring officer and receiving officer

Responsibilities of the national department Manage, monitor and support community outreach services planning and implementation Visit provinces twice a year to monitor implementation and provide support Report to the National Treasury on indicators agreed upon between the two departments Meet with National Treasury to review grant performance on a quarterly basis DoH must report separately on COVID-19 expenditure, in its reports submitted in terms of the requirements

of section 10 of the Division of Revenue Act and must share these reports with the National Disaster Management Centre

Responsibilities of provincial departments Completion of the business plan, in the prescribed format, signed by each receiving officer (provincial

department) by 28 February 2020 Quarterly performance output reports to be submitted within 30 days following the reporting period using

standard formats as determined by the national Department of Health. Submit an electronic version, which will be followed by a hard copy signed by the provincial grant receiving manager

Clearly indicate measurable objectives and performance targets as agreed to between the national department and provincial departments, in the provincial departmental business plan for 2020/21 and over the medium-term expenditure framework

Provide a list of contracted non-governmental organisations that will provide services Provincial departments must provide the national Department of Health with full and unrestricted access to

all records and data related to the programme and must facilitate the achievement of grant outputs Include the indicators in the provincial annual performance plans and ensure compliance with the Division

of Revenue Act Ensure that all national indicator data set indicators related to CHWs are entered into the district health

information system and that there is accordance between the metrics in the district health information system and the Division of Revenue Act reporting for COS

COS component to be managed as part of the HIV TB, Community Outreach Services and Malaria Grant by the provincial grant manager; however, each province must assign an official to manage the Community Outreach Services component to ensure accountability and reporting on COS financial and non-financial output indicators

Record and report COS component expenditure separately from the HIV, TB, Community Outreach Services and Malaria grant (create an appropriate category in the fund segment on the Basic Accounting System)

Process for approval of 2021/22 business plans

Submission of draft business plans to the national Department of Health by 30 October 2020 Submission of final business plans to the national Department of Health by 26 February 2021 Submission of final business plans to the National Treasury by 31 March 2021

30

National Health Insurance Indirect Grant: Health Facility Revitalisation Component Transferring department Health (Vote 18) Grant schedule Schedule 6, Part A Strategic goal To ensure appropriate health infrastructure that is in line with national and provincial policy objectives Grant purpose To create an alternative track to improve spending, performance as well as monitoring and evaluation on

infrastructure in preparation for National Health Insurance (NHI) To enhance capacity and capability to deliver infrastructure for NHI To accelerate the fulfilment of the requirements of occupational health and safety

Outcome statements Appropriate procurement of service providers for infrastructure delivery for NHI Improved spending, performance, monitoring and evaluation of infrastructure projects for NHI Improved employment and skills development in the delivery of infrastructure for NHI Value for money and cost-effectively designed facilities in line with the Framework for Infrastructure

Delivery and Procurement Management (FIDPM) Improved patient experience of care

Outputs Number of PHC facilities constructed or revitalised Number of hospitals constructed or revitalised Number of facilities maintained, repaired and/or refurbished

Priority of government that this grant primarily contributes to

Priority 2: Education, skills and health

Details contained in the business plan

The infrastructure programme management plan (IPMP) for the 2019 medium term expenditure framework (MTEF) aligned to the infrastructure delivery management system and FIDPM will be submitted on 28 May 2020 and will include the following: o costed project lists with annual cash flow projections per project for the full duration of the projects on

the programme o projected milestones per project for FIDPM control framework stages indicating current stage of the

project Conditions

The national Department of Health (DoH) must, in consultation with the provinces, have in place an intergovernmental protocol framework covering the 2019 MTEF and outlining how the grant will operate as well as the responsibility and functions of each sphere. Project sheets will form part of the agreement

Should there be an amendment to an existing protocol agreement, the amended agreement should be submitted to the National Treasury by 29 June 2020

Prior to submitting the IPMP, each provincial department must have signed-off a project sheet for all projects funded from the grant which lists scope of work, current stage and anticipated target dates for achieving stages of the control framework, operational budgets (i.e. personnel, equipment, etc.) and maintenance budgets

With all new projects, DoH must comply with FIDPM processes For projects with a total project cost exceeding R500 million, DoH must notify National Treasury when

FIDPM stage 3 is reached The grant component must only be spent on projects included in the business plan and project lists signed

by provinces. Projects can only be added to the business plan as part of the adjustment budget process, subject to National Treasury approval

Appropriately qualified built environment representatives from the national department must assist in the procurement of professional service providers and contractors by its implementing agent

DoH may utilise a portion of grant funding for the appointment of public servants on 36 month contracts to their infrastructure units. The amount that can be used for this is determined in terms of the conditions set in terms of the 2020 Appropriation Act

All completed projects must have a close-out report with a documented maintenance plan New facilities will only be funded from the grant if proof of operational budget that includes the approved

organisational structure (staff structure) is submitted prior to the approval of the clinical brief. Endorsement of the operational budget by the provincial treasury must be acquired as part of the approval

The amounts earmarked for Limpopo Academic Hospital may only be used for this project and are subject to the conditions set out in Annexure B of the 2019 MTEF allocation letter of the Department of Health

Allocation criteria Allocations for 2020/21 are project based Reasons not incorporated in equitable share

Funding infrastructure through an indirect conditional grant enables the national department to ensure the delivery and maintenance of health infrastructure in a coordinated and efficient manner that is consistent with national norms, standards and guidelines for health facilities

Past performance 2018/19 audited financial outcomes Allocated R836 million of which R706 million (84 per cent) was spent by the end of the financial year

2018/19 service delivery performance 0 new facilities completed 97 facilities maintained 0 (completed) facilities upgraded, extended, renovated and refurbished

Projected life NHI is a key government priority and given the need to continually maintain health infrastructure and ensure that norms and standards are maintained, the grant will continue over the 2020 MTEF, subject to review

MTEF allocations 2020/21: R853 million, 2021/22 R1.5 billion and 2022/23: R1.6 billion, of which the following amounts are earmarked for the Limpopo Academic Hospital (LAH) project: o 2020/21: R454 million, 2021/22: R488 million and 2022/23: R511 million

Payment schedule Monthly payments made according to verified and approved invoices from the services providers

31

National Health Insurance Indirect Grant: Health Facility Revitalisation Component Responsibilities of the transferring officer and receiving officer

Responsibilities of the national department Build and demonstrate the capacity necessary to manage this grant Ensure alignment between the IPMP and the annual performance plan Undertake the infrastructure development cycle to the extent agreed with the provinces in the implementation

protocol agreements Convene progress review committees with appropriate reporting and invite National Treasury and Provinces DoH must maintain an up-to-date database (project management information system), infrastructure

reporting model (IRM) with all contracts that are fully or partially funded by this grant and provide the IRM report on a monthly basis

Meet with National Treasury to review grant performance on a quarterly basis Collaboration and coordination with provincial departments of health for the full development cycle of

infrastructure development in respect of projects funded by this grant In instances where the capacity of the DoH and the provincial department are deemed insufficient, DoH is

entitled to engage alternative implementing agents, provided that supply chain management processes as prescribed in the Treasury Regulations for the appointment of service providers are followed. In those cases, service level agreements between DoH and the implementing agent must be in place

DoH must convene quarterly progress review committee meetings with all project managers, implementing agents and National Treasury for monitoring and oversight of the performance of all funded projects

Provide provincial departments of health with progress of the projects under this grant for inclusion in provincial annual reports

DoH must submit quarterly infrastructure reports to National Treasury, according to the agreed template between National Treasury and DoH, within 45 days after the end of each quarter

Responsibilities of provincial departments Provinces must ensure that the completed projects are included in the asset registers of the provincial

departments of public works Provinces should undertake life cycle maintenance as well as the full operation, staffing and management of

the projects in facilities completed under this grant by the DoH All immovable asset management and maintenance responsibilities of the completed projects under this

grant as prescribed by the Government Immovable Asset Management Act of 2007 rests with the provinces Provinces should report on progress of the projects under this grant in their annual reports and describe how

these facilities have been considered in their future planning and budgeting. The projects must be included in the provincial user-asset management plans

Process for approval of 2021/22 business plans

Submission of a draft IPMP to the National Treasury by 31 August 2020 Submission of the final IPMP to the National Treasury by 31 March 2021 Submission of signed implementation protocol by 25 June 2021

32

Statutory Human Resources, Training and Development Grant Transferring department Health (Vote 18) Grant schedule Schedule 5, Part A Strategic goal To contribute to the implementation of the national human resource plan for health through the clinical

training and supervision of health science trainees in designated public health facilities in South Africa Effective implementation of the human resources for health strategy, and health workforce capacity

development for sustainable service delivery Grant purpose To appoint statutory positions in the health sector for systematic realisation of the human resources for health

strategy and the phase-in of National Health Insurance Support provinces to fund service costs associated with clinical training and supervision of health science

trainees on the public service platform Outcome statements Progressive realisation of the national human resource plan for health

Clinical training and supervision capacity established in designated developmental provinces (Northern Cape, North West, Limpopo, Mpumalanga and Eastern Cape)

Enhanced access to healthcare services, by addressing critical skills shortages in underserved communities Outputs Number and percentage of statutory posts funded from this grant (per category and discipline) and other

funding sources Number and percentage of registrars posts funded from this grant (per discipline) and other funding sources Number and percentage of specialists posts funded from this grant (per discipline) and other funding sources Number of posts needed per funded category Number of nursing cadres funded from the grant as part of Presidential Employment Initiative

Priority of government that this grant primarily contributes to

Priority 2: Education, skills and health

Details contained in the business plan

Non-financial business plan – number of specialists, registrars, medical officers, clinical supervisors/tutors per category in nursing, emergency medical services, allied health, pharmacy and grant administration staff funded from the grant

Financial business plan – allocation by economic classification to each category of clinical trainer/supervisor Conditions Submission of an approved business plan in the prescribed format signed by the provincial Head of

Department to the national Department of Health by 28 February 2020, and to the National Treasury by 31 March 2020

Cost of administration of the grant must not exceed 1 per cent of the total grant allocation This grant has two components

Statutory Human Resources Component The statutory human resources component must only be utilised for funding of statutory posts, except for an

amount of R180.2 million which is allocated for appointment of nurses as part of Presidential Employment Initiative

Training and Development Component The training and development component must prioritise all registrar posts and the balance of the allocation

may be utilised for specialist (supervisors) and other approved categories A total of R16 million has been allocated for the developmental portion and the breakdown per province is

as follows: o Eastern Cape: R5 million o Limpopo: R3 million o Mpumalanga: R3 million o Northern Cape: R2 million o North West: R3 million

The developmental allocation will be withheld and transferred to other developmental provinces if a province fails to spend these funds. Developmental allocations are only applicable to the training and development component

Funds for the Presidential Employment Initiative have been allocated as follows: o Eastern Cape: R25 million o Free State: R10 million o Gauteng: R47 million o KwaZulu-Natal: R41 million o Limpopo: R23 million o Mpumalanga: R16 million o Northern Cape: R4 million o North West: R14 million

Transferring officers to report monthly on progress to the Presidency in line with reporting requirements established by the Presidency

Allocation criteria Training and development component is based on historical allocations and spending patterns Statutory Human Resources component allocations are based on the following criteria: o provinces with greatest needs have been prioritised o number of statutory posts o future projections of professional production versus need

Reasons not incorporated in equitable share

Provinces give effect to the national human resource strategy through the clinical training and supervision of health science trainees on the public health service platform

33

Statutory Human Resources, Training and Development Grant National coordination is needed for health science training To ensure that the additional human resources funded through this component address unmet health needs

as opposed to perpetuating historical allocation patterns Past performance 2018/19 audited financial outcomes

Statutory Human Resources Component: New Grant Training and Development Component: Allocated and transferred R2.8 billion to provinces, of which

R2.8 billion (100 per cent) was spent by the end of the national financial year 2018/19 service delivery performance Statutory Human Resources Component: o New Grant

Training and Development Component: o 380 specialists o 1287 registrars o 230 medical officers o 990 clinical supervisors/trainers per category in nursing, emergency medical services and allied health

and pharmacy o 13 grant administration staff employed

Projected life The grant is subject to review at the end of the 2020 MTEF. Its projected life will be guided by the need for health science trainees to be trained and supervised on the public health service platform

MTEF allocations Total Allocation is 2020/21: R4.3 billion; 2021/22: R4.3 billion and 2022/23: R4.5 billion of which o Training and Development Component - 2020/21: R3.1 billion; 2021/22: R3.2 billion and 2022/23:

R3.4 billion o Statutory Human Resources Component - 2020/21: R1.2 billion; 2021/22: R1.1 billion and 2022/23:

R1.1 billion Payment schedule Monthly instalments as per approved payment schedule Responsibilities of the transferring officer and receiving officer

Responsibilities of the national department Convene at least one annual meeting of national, provincial and facility programme managers Monitor the number of health science trainers/clinical supervisors that are responsible for health science

training on the public health service delivery platform Conduct a minimum of one site visits to provinces and site visits to selected facilities on a rotational basis Submission of quarterly financial and non-financial performance reports to the National Treasury Meet with National Treasury to review the performance of the grant

Responsibilities of provincial departments Provinces are encouraged to maintain a separate budget for each benefiting facility/cluster Monitor the implementation of the grant and report quarterly to national DoH Provincial health departments must provide DoH with full and unrestricted access to all records and data

related to the programme and to facilities to implement systems All developmental provinces must ring-fence the developmental allocation and report on the implementation

progress To report on the number of clinical supervisors associated with clinical training and supervision of students,

funded on the public health service delivery platform: o number of specialists o number of registrars o number of medical officers o number of clinical associates o number of postgraduates o number of clinical supervisors/trainers per category in nursing, emergency medical services (EMS) and

allied health and pharmacy o number of grant administration staff

Process for approval of 2021/22 business plans

Draft business plans for 2020/21 must be submitted in the approved format by 31 October 2020 Completion of an approved business plans, in the prescribed format, signed by each receiving officer by

29 January 2021 and the transferring officer by 31 March 2021

34

Early Childhood Development Grant: Subsidy Component Transferring department Social Development (Vote 19) Grant schedule Schedule 5, Part A Strategic goal To increase access to quality early childhood development (ECD) services for poor children Grant purpose To increase the number of poor children accessing subsidised ECD services through centre and non-centre

based modalities Outcome statements The provision of ECD services to poor children Outputs Number of eligible children subsidised, as agreed in the service level agreements (SLA)

Number of all children attending registered ECD services in fully registered centres Number of all children attending ECD services in conditionally registered centres Number of children that benefit from the subsidy component of the conditional grant in fully registered

centres Number of children that benefit from the subsidy component of the conditional grant in conditionally

registered centres Number of days subsidised for centre based programmes Number of children benefiting from the subsidy in registered non-centre based ECD programmes Number of ECD practitioners and other staff employed in in registered ECD centres benefiting from the

conditional grant Number of ECD services work force (per sub-category, per ECD programme, per registration status)

benefitting from the unemployment risk support as part of the Presidential Employment Initiative Number of ECD services work force (per sub-category, per ECD programme, per registration status)

receiving a top-up payment to take on additional duties as compliance support officers Number of registered early childhood development programmes per category participating in the

employment stimulus package Number of unregistered early childhood development programmes per category participating in the

employment stimulus package Priority of government that this grant primarily contributes to

Priority 2: Education, skills and health

Details contained in the business plan

The provincial departments will use a single business plan issued by the national Department of Social Development (DSD) for the two grant components (i.e. subsidy and infrastructure) which contains the following: o project background o project objectives o scope of the work o deliverables and outputs to be achieved o risk assessment with mitigation plan

An addendum to the existing Business Plan on the he Presidential Employment Initiative in line with the above requirements

Conditions Fully registered and conditionally registered ECD programmes will be eligible for the subsidy in both centre and non-centre based modalities

The subsidy is targeted for children in ECD services from birth until six years of age The provincial DSD and ECD service providers will enter into SLAs which stipulate the purpose of the

subsidy, the amount of the subsidy, conditions of the subsidy and obligations of both provincial DSD and ECD service providers with regards to the payment of the subsidy and reporting requirements

The value of the subsidy paid to each ECD centre will be calculated as follows: o R17.00 multiplied by the number of days (264), multiplied by the number of qualifying children

attending the ECD centre as agreed to in the SLA The value of the subsidy paid to each registered non-centre based ECD programme will be calculated as

follows: o R6.00 multiplied by the number of sessions, multiplied by the number of qualifying children attending

as agreed to in the SLA The full value of the subsidy will be paid in equal parts in line with the SLA and any changes to the

payment schedule must be aligned to a determination of non-compliance as defined in the SLA Once funds are transferred to ECD service providers the department may not pre-approve how the funds

are to be utilised other than what is stipulated in the SLA All allocations must be aligned to the number of children registered and eligible for the subsidy as per the

SLA and can only be reduced as per the process outlined in the SLA. Allocations may not be changed in-year, based on attendance

The subsidy must target ECD centres and non-centre based programmes or qualifying children in line with the process set out below: o an ECD centre and non-centre based programme is eligible to be subsidised if it is located in a

designated municipal ward that has been identified for universal targeting of subsidies o children attending these ECD centres and non-centre based programmes will not be subject to an

individual means test and all children in these centres must be taken into account when calculating the subsidy for the ECD centre or non-centre based programme

35

Early Childhood Development Grant: Subsidy Component o if the child is attending an ECD centre or non-centre based programme falling outside of those

municipal wards that have been identified for universal targeting of the subsidy, the subsidy will be targeted to an individual child using the means test criteria outlined below

Income based means test: Income of parents or caregivers may not exceed the means test values applied for receipt of the child support

grant for a single parent and married parents as gazetted by national DSD in 2020. This is updated each year with the increase in the grant value

In the case of children receiving a child related social assistance grant the original, reprinted or certified copies of proof of receipt of the child related grant (child support grant or the foster care grant) as issued by South African Social Security Agency must be submitted

In the case of children who are not beneficiaries of a child related grant the following must be submitted: o proof of income of parents (or caregivers) o three months’ bank statement of parents or guardians affidavit declaring status of income

Unemployment Risk Support ECD centres and non-centre based programmes that meet the qualifying criteria as per national DSD

guideline will be eligible for employment risk support Each province may use a maximum of two per cent of their total allocation received under the

unemployment risk support for administration which includes capacity to manage this initiative The Presidential Employment Initiative funds are allocated as follows:

o Eastern Cape: R60 million o Free State: R39 million o Gauteng: R78 million o KwaZulu-Natal: R90 million o Limpopo: R58 million o Mpumalanga: R42 million o Northern Cape: R42 million o North West: R34 million o Western Cape: R53 million

Transferring officers to report monthly on progress to the Presidency in line with reporting requirements established by the Presidency

Allocation criteria The provincial subsidy allocations are determined based on the following: o increasing the conditional grant funded subsidy rate from R15.00 to R17.00, multiplied by the number

of children targeted using the 2019/20 subsidy budget for the conditional grant o topping-up the equitable share funded subsidies to R17.00 using the actual number of children subsidised

through equitable share as at end of March 2019 For the 2020/21 expansion, the targeted number of children is based on the 2019/20 subsidy budget for the

conditional grant The provincial subsidy allocations for the Presidential Employment Initiative are determined based on

2020/21 equitable share allocations for ECD and partial care to ensure a fair and just distribution of the funding towards target groups.

Reasons not incorporated in equitable share

To allow DSD to better facilitate expansion of ECD in the country ECD is a national priority and requires uniform implementation in order to achieve the minimum coverage

of 60 per cent of all poor children and to have the desired impact of achieving universal access by 2030 To allow DSD to better ring-fence this allocation as part of ECD employment stimulus intervention and to

facilitate employment protection in the ECD sector and work exposure, containing the spread of COVID-19

Past performance 2018/19 audited financial outcomes Of the subsidy expansion grant allocation of R400 million, 100 per cent was transferred to provinces and

R375 million (94 per cent) was spent by the end of the financial year 2018/19 service delivery performance 107 153 children benefitted from the subsidy

Projected life The grant will be allocated over the 2020 medium term expenditure framework period, subject to review The amount for the Presidential Employment Initiative will cover the period from 1 October 2020 to 31

March 2021 MTEF allocations 2020/21: R1.4 billion; 2021/22: R963 million and 2022/23 R1.1 billion Payment schedule Instalments according to approved payment schedule

36

Early Childhood Development Grant: Subsidy Component Responsibilities of the transferring officer and receiving officer

Responsibilities of the national department Review standardised SLAs to be entered into between provincial DSDs and ECD service providers Review and update the subsidy guidelines that must be issued to provinces by 27 March 2020 in consultation

with the National Treasury For the purpose of the Presidential Employment Initiative, the DSD is responsible for engagement with

provincial departments on submission of an addendum to existing business plans in October 2020 and the approval of addendums to provincial business plans by 26 October 2020

For the purpose of the Presidential Employment Initiative, the DSD is responsible for issuing a guideline to provincial DSDs on the implementation of the employment risk support and compliance support initiative by 30 October 2020, in consultation with National Treasury. Such a guideline will stipulate the following at a minimum: o the qualifying criteria that needs to be applied across all provinces for ECD programmes and

beneficiaries o The formula and amount payable to each programme and per ECD worker o reporting and accountability requirements o standardised application procedures o a standardised template for an addendum to the SLA to be entered into between provincial DSDs and

existing ECD service providers o a standardised template for the new simplified SLA to be entered into between provincial DSDs and

new ECD providers o a standardised template for capturing details of practitioners supported

Responsibilities of provincial departments Conclude SLAs with ECD service providers in a format prescribed by the DSD Ensure that payments are made in line with the payment schedule as per the SLAs with ECD service

providers Subsidies must be made into the ECD service providers designated bank accounts, which must be with a

registered deposit taking institution in the Republic of South Africa Subsidies may only be reduced in cases of non-compliance as outlined in the prescribed SLA Use the information reported in the quarterly reports from ECD service providers to develop and maintain

a master list of all children benefitting from the ECD subsidy Maintain a database on the status of full and conditional registration of all ECD centres and non-centre

based programmes in the province that includes the following basic information: o registration status o capacity of the centre o number of children in attendance o number of children subsidised o number of children with disabilities subsidised o number of children with disabilities in attendance

Maintain a database of all ECD staff in centres benefiting from the equitable share and conditional grant For the purpose of the Presidential Employment Initiative Provincial Departments of Social Development

will be responsible for: o submission of an addendum to the provincial business plan, including cash flow projections signed-off

by Heads of Departments by 22 October 2020. o implementation of this component in line with guidelines from National DSD; o the identification of qualifying early childhood development programmes to benefit from this

component; o utilising existing mechanism and infrastructure (including NGOs or current and temporary social

workers) to facilitate the implementation of this component, utilising the funding allocated for administration for this purpose.

o monitoring the implementation of this component, which also includes providing reports to the national Department of Social Development.

o facilitate the process for applications and approvals Process for approval of 2021/22 business plans

Engagement with provincial departments on submission of business plans between September 2020 and February 2021

Submit final provincial business plans for 2020/21, including cash flow projections and compliance certificates signed-off by Heads of Departments to the DSD by 15 February 2021

The transferring officer must approve provincial business plans by 1 April 2021

37

TRANSPORT GRANTS

Provincial Roads Maintenance Grant Transferring department Transport (Vote 40) Grant schedule Schedule 4, Part A Strategic goal To ensure efficient and effective investment in provincial roads to implement the Road Infrastructure

Strategic Framework for South Africa in line with the S’hamba Sonke road programme and other related road infrastructure asset management programmes

Grant purpose To supplement provincial investments for road infrastructure maintenance (routine, periodic and special maintenance)

To ensure that all roads are classified as per the Road Infrastructure Strategic Framework for South Africa (RISFSA) and the technical recommendations for highways, and the Road Classification and Access Management guidelines

To implement and maintain road asset management systems (RAMS) To supplement provincial projects for the repair of roads and bridges damaged by unforeseen incidents

including natural disasters To improve road safety with a special focus on pedestrian safety in rural areas

Outcome statements Improve the condition and lifespan of provincial roads and level of service backed by a periodic five year review of the road network condtions

Improved rates of employment and community participation through labour-intensive construction methodologies and skills development through the delivery of roads infrastructure projects

Outputs Final road asset management plan (RAMP) and tabled project list for the 2020 medium term expenditure framework (MTEF) in a table B5 format finalised by 30 March 2020

Network condition assessment and determination of priority projects list from the road asset management systems (RAMS)

The following actual delivery related measures against 2020/21 targets defined in the final road asset management plan (RAMP) and annual perfomance plan (APP) for each province: o number of m² of surfaced roads rehabilitated (quarterly) o number of m² of surfaced roads resurfaced (overlay or reseal) o number of m² of blacktop patching (including pothole repairs) o number of kilometres of gravel roads re-gravelled o number of kilometres of gravel roads bladed o number of kilometres of gravel roads upgraded (funded from provincial equitable share)

The following performance, based on national job creation indicators: o number of jobs created o number of full time equivalents created o number of youths employed (age 18 – 35) o number of women employed o number of people living with disabilities employed

Number of small, medium micro enterprises contracted on the provinces’ contractor development programme

Updated road condition data (paved and unpaved) including instrumental/automated road survey data, traffic data, safety audit report and bridge conditions

Priority of government that this grant primarily contributes to

Priority 1: Economic transformation and job creation

Details contained in the business plan

This grant uses a road asset management plan (RAMP), which contains the following details: o network hierarchy o performance management framework o gap analysis o information and systems, and lifecycle planning o current and future demand o financial plan o monitoring, reviewing and continual improvements

Conditions This grant funds routine, periodic and special maintenance Provinces must show commitment by budgeting from the provincial equitable share to match or exceed grant

allocations Improvements, upgrading from gravel to surface roads and new facilities must be funded from the provincial

equitable share Provinces may use a maximum of 25 per cent of the allocation for rehabilitation activities The framework must be read in conjunction with the practice note as agreed with National Treasury The payment of the first instalment is dependent upon submission to the national Department of Transport

(DoT) and the relevant provincial treasury of the following: o planning for the infrastructure reporting model (IRM) for 2020 MTEF by 23 April 2020 o final road asset management plan (RAMP) and tabled project list for the 2020 MTEF in a table B5 format

by 30 March 2020 o submission to DoT of the third quarter performance report for the 2020/21 financial year

Payment of subsequent instalments is dependant upon the submission of monthly infrastructure reporting model (IRM) and qaurterly performance reports

38

Provincial Roads Maintenance Grant

In order to ensure effecient usage of grant funds, the Department of Transport in consultantion with National Treasury can instruct that provinces utilise national transversal appointments for project implementation

For RISFSA Class R1, R2 and R3 roads, data collection requirements are: o visual condition data according to technical methods for highway (TMH) 9 for pavements no older than

two years, and TMH 19 for bridges no older than five years o instrumental pavement data for roughness, rut depth and macro texture according to TMH 13 no older

than two years o instrumental pavement data for deflections according to TMH 13 no older than five year o traffic data according to TMH 3, TMH 8 and TMH 14 no older than three years

Provinces must submit into a central repository, updated road condition data, (for paved and unpaved) including instrumental/ automated road survey data, traffic data, safety audit report and bridge conditions by 30 September 2020

The Provincial Road Maintenance Grant (PRMG) allocation can be allocated to the following projects as identified and prioritised through the provincial road asset management systems (RAMS): o routine maintenance (opex): includes day-to-day routine activities such as cleaning drains and culverts,

vegetation control, line marking, guard rail repair, road sign repair, crack sealing, patching, edge repair, spot regraveling, and blading

o periodic maintenance (opex): includes periodically scheduled activities such as fog sprays/diluted emulsions/rejuvenators, surface seals and functional asphalt overlays < 50 mm in thickness. For gravel roads it includes re-gravelling up to 100 mm thick

o special maintenance (opex): includes the repair of selected pavement areas up to maximum of 25 per cent of project length followed by application of surface seal or functional asphalt overlay < 50 mm. Also includes reinstatement of slope stability, repairs to existing structures and the repair of damage caused by floods or accidents

o rehabilitation (capex): includes increasing the structural capacity of an existing pavement through the recycling of existing layers and/or addition of new granular layers or structural asphalt overlays > 80mm thick and upgrading or block paving of gravel roads with more than 300 vehicles per day. These rehabilitation activities are however limited to a maximum of 25 per cent of the PRMG allocation

The PRMG allocation cannot be allocated to the following projects: o improvements (capex): this comprises works that aim to improve the quality of service on roads with an

unacceptable quality of service. These include measures of improving quality of service on existing roads such as increases to the width in selected areas (i.e. addition of climbing/passing lanes), increases in the width over the total length of the project i.e. addition of paved shoulder and localised geometric and intersection improvements. These activities could in some instances include complete rehabilitation of the existing pavement structure

o the upgrading of gravel roads to surface roads, the construction of new roads and new interchanges do not qualify for funding under this grant

o new facilities (capex): this comprises works that aim to improve network capacity and includes the upgrading of earth (dirt) road to an engineered gravel road, the upgrading of a gravel road to a surfaced road and upgrading of single carriageway road to four-lane or dual carriageway road. The construction of new gravel or surfaced road where previously no road existed (brown/green fields construction). The construction of new bridge to replace existing bridge or new interchange to replace intersection

Presidentation Employment Initiative R630 million has been added as part of the Presidential Employment Initiative. These funds, will be

monitored differently to rest of the grants given its specific purpose. Reporting against spending for the Presidential Employment Initiative will be submitted to the Project Management Office of the Presidency on a monthly basis in line with reporting requirements established by the Presidency

Reporting on Presidential Employment Initiative funds will cover the following: o participants and beneficiaries ( number, age, gender, geography, and household size ) o budget expenditure (expenditure against defined categories like wage costs, tools and equipment,

administration costs) o public goods and services (km of road maintaince, refurbished) o social evaluation and attitudes (perception of programmes by participants)

Presidential Employment Initiative for provinces are allocated as follows: o Eastern Cape: R86 million o Free State: R75 million o Gauteng: R45 million o KwaZulu-Natal: R81 million o Limpopo: R71 million o Mpumalanga: R73 million o Northern Cape: R67 million o North West: R71 million o Western Cape: R61 million

Allocation criteria Allocations are based on the Provincial Roads Maintenance Grant formula, which takes into account the extent of the provincial road network (gravel/paved), the traffic volumes, the visual condition indices on the network and geo-climatic and topographic factors

Unallocated amounts in 2021/22 and 2022/23 will be allocated as an incentive based on the level of service efficiency achieved in road project investments undertaken

39

Provincial Roads Maintenance Grant

Reasons not incorporated in equitable share

This grant is intended to ensure that provinces give priority to road infrastructure and promote efficiency in road investment

Past performance 2018/19 audited financial outcomes Of the R10.8 billion allocated, R10.8 billion, (100 per cent) was spent by provinces by the end of the national

financial year 2018/19 service delivery performance

8 723 692.91 m² of roads re-sealed 4 165 km of roads re-gravelled 2 031 045 m² of roads patched 437 169.7 km bladed 4 388 843.9 km rehabilitated

Projected life The grant is ongoing, but will be subject to periodic review MTEF allocations 2020/21: R10.5 billion; 2021/22: R12 billion and 2022/23 R12.5 billion Payment schedule Payment will be made in accordance with a payment schedule agreed to with provinces and approved by

National Treasury Responsibilities of the transferring officer and receiving officer

Responsibilities of the national department Submit quarterly performance reports to National Treasury 45 days after the end of each quarter Submit a grant evaluation report to National Treasury four months after the end of the financial year Review the performance based allocation mechanism for use in determining future allocations Confim the correctness of data submitted by provinces by assessing a representative sample Ensure that road asset management plan (RAMP), project list and infrastructure reporting model (IRM) are

aligned Implement internal mechanisms to monitor adherence to grant conditions and manage the disbursements of

the grant where there is non-compliance. Measures to address non-compliance include withholding transfers, as provided for in section 18 of the DoRA. If matters are still unresolved, this may result in the stopping and reallocation of tranche payments in terms of sections 19 and 20 of DoRA

Upload sumitted road condition data into a central repository Responsibilities of provincial departments

Provincial departments must submit monthly infrastructure reports that comply with the IRM to DoT and the relevant provincial treasury

Provinces must align the RAMP, project list and IRM Submit completed quarterly performance report templates 30 days after the end of each quarter Provincial departments must implement their projects in line with the S’hamba Sonke and the Expanded

Public Works Programme guidelines Ensure that approved grant funded projects are published as part of the Estimates of Provincial Revenue and

Expenditure through the provincial legislative processes Ensure projects are selected using RAMS as the primary source of information Design and implement projects in compliance with the S’hamba Sonke Principles and Expanded Public

Works Programme guidelines Submit updated road condition data (for paved and unpaved roads) including instrumental/ automated road

survey data, traffic data, safety audit report and bridge condition data by 30 September 2020 Process for approval of 2021/22 business plans

Provinces must submit a draft 2021/22 RAMP with a minimum of five years of planned projects selected using RAMS as the primary source, by 28 September 2020

RAMPs, including 2021 MTEF prioritised project lists, must be reviewed by DoT and feedback provided by 29 January 2021

Provinces to submit final 2021/22 RAMP to DoT, relevant provincial treasury and National Treasury by 30 March 2021

40

Annexure C: Frameworks for Conditional Grants to Municipalities

Detailed frameworks on Schedule 5, Part B grants to municipalities Introduction This annexure provides the revised frameworks for the grants set out in Part B of Schedule 5 of the 2020 Division of Revenue Second Amendment Bill. The following are key areas considered for each grant:

Strategic goal and purpose of the grant Outcome statements and outputs of the grant Priority outcome(s) of government that the grant primarily contributes to Conditions of the grant (additional to what is required in the Bill) Criteria for allocation between municipalities Rationale for funding through a conditional grant Past performance The projected life of the grant 2020 MTEF allocations The payment schedule Responsibilities of transferring national department and receiving municipalities Process for approval of business plans for 2021/22

The attached frameworks are not part of the Division of Revenue Second Amendment Bill, but are published in order to provide more information on each grant to parliament, legislatures, municipal councils, officials in all three spheres of government and the public. Once the 2020 Division of Revenue Second Amendment Bill is enacted, these frameworks will be gazetted.

The financial statements and annual reports for 2020/21 will report against the Division of Revenue Act, Division of Revenue Amendment Act, Division of Revenue Second Amendment Act and their schedules, and the grant frameworks as gazetted in terms of the Act. Such reports must cover both financial and non-financial performance, focusing on the outputs achieved.

41

TRANSPORT GRANTS

Rural Roads Asset Management Systems Grant Transferring department Transport (Vote 40) Grant schedule Schedule 5, Part B Strategic goal Ensure efficient and effective investment in municipal roads through development of road asset

management systems (RAMS), collection and analysis of data Grant purpose To assist district municipalities to set up road asset management systems, and collect road, bridge and

traffic data on municipal road networks in line with the Road Infrastructure Strategic Framework for South Africa

Outcome statements Improved data on municipal roads to guide infrastructure maintenance and investments Reduced vehicle operating costs

Outputs

Road condition data (paved and unpaved) as per prescribed Technical Methods for Highways (TMH-series)

Traffic data Data on condition of structures (including bridges and culverts) as per prescribed Technical Methods for

Highways (TMH 19 series) Safety Assessments Data Prioritised project list for roads to inform Municipal Infrastructure Grant project selection

Priority of government that this grant primarily contributes to

Priority 4: Spatial integration, human settlements and local government

Details contained in the business plan

This grant uses Road Asset Management Business Plans which contain the following details: network hierarchy, performance management framework, gap analysis, information systems, lifecycle planning, current and future demand, financial plan, monitoring, reviewing and plans for continual improvements including sharing data with local municipalities

Conditions Transfer of the first tranche is conditional on submission of an approved business plan by 29 May 2020 Transfer of the second tranche is conditional on submission of evidence of engagements and sharing of

data with local municipalities and compliance with monthly and quarterly signed report submissions to the national Department of Transport (DoT), and the relevant Provincial Roads Authorities

Road authorities must conduct regular condition assessments for paved and unpaved roads, structure, traffic data and any other road inventory data

District municipalities must provide local municipalities with validated information from the condition data collected to enable municipalities to identify and prioritise road maintenance requirements within their own budgets, to improve the condition and extend the lifespan of road infrastructure

District municipalities must submit the above data to the national repository by 30 September 2020 For Road Infrastructure Strategic Framework for South Africa (RISFSA) Class R1, R2 and R3 roads,

data collection requirements are: o visual condition data not older than two years for pavements and five years for bridges o instrumental pavement data for roughness, rut depth and macro texture not older than two years o instrumental pavement data for structural strength not older than five years o traffic data not older than three years

For RISFSA Class R4 and R5 roads, data requirements are: o visual condition data not older than three years for pavements and five years for bridges o instrumental pavement data for roughness, rut depth and macro texture not older than four years on

paved roads only o traffic data not older than five years

All road condition reports and data collected must be submitted to the National DoT, and the relevant provincial roads authorities

This framework must be read in conjunction with the practice note as agreed with National Treasury Systems developed to record data must be compatible with DoT specifications District municipalities must participate in grant management structures, including attending monthly

and/or quarterly RRAMS progress as well as National meetings A maximum of 5 per cent may be used for municipal costs incurred as part of coordination, project

management and reporting by the district In order to ensure efficient usage of grant funds, the DoT can instruct that municipalities utilise national

transversal appointments for project implementation where these contracts exist District municipalities must appoint an independent assessor to assess a representative sample of all roads

assessed (which is about 10 per cent of their assessed network) to confirm the correctness of the assessments made by the municipality

Allocation criteria Allocations are based on the extent of the road network and number of local municipalities within a district municipality

42

Rural Roads Asset Management Systems Grant Reasons not incorporated in equitable share

This is a specific purpose grant mainly for the provision of systems to collect data on traffic and conditions of municipal roads and structures

Past performance 2018/19 audited financial outcomes Of the R107 million that was allocated, R107 million (100 per cent) was transferred to municipalities

2018/19 service delivery performance 18 873 kilometres of paved road network and 44 836 kilometres of unpaved road network was assessed

and 13 943 structures were identified in the district municipalities receiving the grant 160 graduates were recruited into the programme

Projected life Grant continues until 2022/23, subject to review MTEF allocations 2020/21: R108 million; 2021/22: R114 million and 2022/23: R121 million Payment schedule Transfers are made in accordance with an agreed payment schedule approved by the National Treasury Responsibilities of the transferring officer and receiving officer

Responsibilities of the national department Monitoring implementation of RAMS together with provincial road authorities Data integrity will be checked by DoT and provincial road authorities Provide guidance on sustainable RAMS operations and standards Facilitate interaction between local municipalities and district municipalities in using RAMS outputs to

guide municipal road infrastructure management Check the quality of data captured on municipalities’ RAMS in collaboration with provincial road

authorities Management, monitoring and reporting of the programme Agree on RAMP with participating municipalities Ensure that the Transversal Contract which district municipalities are involved in is up to date Implement internal mechanisms to monitor adherence to grant conditions and manage the disbursements

of the grant where there is non-compliance. Measures to address non-compliance include withholding transfers, as provided for in section 18 of the Division of Revenue Act (DoRA). If matters are still unresolved, this may result in the stopping and reallocation of tranche payments in terms of sections 19 and 20 of DoRA

Support municipalities with planning and implementation of municipal roads projects in terms of the conditions, standards and specifications applicable to this sector

Ensure that municipal road authorities conduct regular condition assessments for paved and unpaved roads, structure, traffic data and any other road inventory data

Responsibilities of municipalities Municipalities must make provision to maintain RAMS after the lifespan of the grant Data for all rural roads to be updated within two years Recruit unemployed youth, S3 experiential training students and young graduates Ensure human capacity at municipalities for the operation of RAMS is built Municipalities investing in roads infrastructure must utilise data from the Rural Road Asset Management

System (RRAMS), where available, to identify and prioritise their investment on roads projects; including maintenance

Identify municipal officials that will be recipients of skills transfer Ensure that municipal officials participate actively in all activities funded through this grant Ensure systems and practices developed through this grant are sustained as part of the operations of the

municipality Submit of updated RAMS data in TMH 18 format by 29 May 2020

Process for approval of 2021/22 business plans

District municipalities must submit a signed and council approved Road Asset Management Plan (RAMP)/business plan to DoT by 28 May 2021

RAMP must contain the following: o the extent of the road network in the municipality o the proportion of municipal roads with updated data captured on its RAMS o the condition of the network in the municipality o the maintenance and rehabilitation needs of the municipal road network o the status of the municipality’s RAMS o status of institutionalisation of RAMS in the district municipality

TMH 22 RAMP guideline can be used as template DoT together with provincial roads authorities will evaluate and approve the business plans and progress

reports by 30 June 2021

43

AN

NE

XU

RE

D

SPE

CIF

IC-P

UR

POSE

AL

LO

CA

TIO

NS

TO

MU

NIC

IPA

LIT

IES

( SC

HE

DU

LE

5, P

AR

T B

): C

UR

RE

NT

GR

AN

TS

(Nat

iona

l and

Mun

icip

al F

inan

cial

Yea

rs)

44

EASTERN CAPE

A BUF Buffalo City 11 514 ( 576) ( 130) 10 808 A NMA Nelson Mandela Bay 10 500 ( 576) ( 118) 9 806

B EC101 Dr Beyers Naude - - - - B EC102 Blue Crane Route - - - - B EC104 Makana - - - - B EC105 Ndlambe - - - - B EC106 Sundays River Valley - - - - B EC108 Kouga - - - - B EC109 Kou-Kamma - - - - C DC10 Sarah Baartman District Municipality - - - - Total: Sarah Baartman Municipalities - - - -

B EC121 Mbhashe - - - - B EC122 Mnquma - - - - B EC123 Great Kei - - - - B EC124 Amahlathi - - - - B EC126 Ngqushwa - - - - B EC129 Raymond Mhlaba - - - - C DC12 Amathole District Municipality - - - - Total: Amathole Municipalities - - - -

B EC131 Inxuba Yethemba - - - - B EC135 Intsika Yethu - - - - B EC136 Emalahleni - - - - B EC137 Engcobo - - - - B EC138 Sakhisizwe - - - - B EC139 Enoch Mgijima - - - - C DC13 Chris Hani District Municipality - - - - Total: Chris Hani Municipalities - - - -

B EC141 Elundini - - - - B EC142 Senqu - - - - B EC145 Walter Sisulu - - - - C DC14 Joe Gqabi District Municipality - - - - Total: Joe Gqabi Municipalities - - - -

B EC153 Ngquza Hill - - - - B EC154 Port St Johns - - - - B EC155 Nyandeni - - - - B EC156 Mhlontlo - - - - B EC157 King Sabata Dalindyebo 5 500 - ( 65) 5 435 C DC15 O.R. Tambo District Municipality - - - - Total: O.R. Tambo Municipalities 5 500 - ( 65) 5 435

B EC441 Matatiele - - - - B EC442 Umzimvubu - - - - B EC443 Mbizana - - - - B EC444 Ntabankulu - - - - C DC44 Alfred Nzo District Municipality 5 500 - ( 65) 5 435 Total: Alfred Nzo Municipalities 5 500 - ( 65) 5 435

Total: Eastern Cape Municipalities 33 014 ( 1 152) ( 378) 31 484

National and Municipal Financial Years

Category Municipality2020/21

MainAllocation

1st Adjustment2020/21Adjusted

Allocation2nd Adjustment

ANNEXURE D

SPECIFIC-PURPOSE ALLOCATIONS TO MUNICIPALITIES( SCHEDULE 5, PART B): CURRENT GRANTS

Infrastructure Skills Development Grant

45

National and Municipal Financial Years

Category Municipality2020/21

MainAllocation

1st Adjustment2020/21Adjusted

Allocation2nd Adjustment

ANNEXURE D

SPECIFIC-PURPOSE ALLOCATIONS TO MUNICIPALITIES( SCHEDULE 5, PART B): CURRENT GRANTS

Infrastructure Skills Development Grant

FREE STATE

A MAN Mangaung 2 500 ( 2 500) - -

B FS161 Letsemeng - - - - B FS162 Kopanong - - - - B FS163 Mohokare - - - - C DC16 Xhariep District Municipality - - - - Total: Xhariep Municipalities - - - -

B FS181 Masilonyana - - - - B FS182 Tokologo - - - - B FS183 Tswelopele - - - - B FS184 Matjhabeng - - - - B FS185 Nala - - - - C DC18 Lejweleputswa District Municipality - - - - Total: Lejweleputswa Municipalities - - - -

B FS191 Setsoto - - - - B FS192 Dihlabeng - - - - B FS193 Nketoana - - - - B FS194 Maluti-a-Phofung - - - - B FS195 Phumelela - - - - B FS196 Mantsopa - - - - C DC19 Thabo Mofutsanyana District Municipality - - - - Total: Thabo Mofutsanyana Municipalities - - - -

B FS201 Moqhaka - - - - B FS203 Ngwathe - - - - B FS204 Metsimaholo - - - - B FS205 Mafube - - - - C DC20 Fezile Dabi District Municipality - - - - Total: Fezile Dabi Municipalities - - - -

Total: Free State Municipalities 2 500 ( 2 500) - -

GAUTENG

A EKU City of Ekurhuleni - - - - A JHB City of Johannesburg 7 000 - ( 83) 6 917 A TSH City of Tshwane - - - -

B GT421 Emfuleni - - - - B GT422 Midvaal - - - - B GT423 Lesedi - - - - C DC42 Sedibeng District Municipality - - - - Total: Sedibeng Municipalities - - - -

B GT481 Mogale City - - - - B GT484 Merafong City - - - - B GT485 Rand West City - - - - C DC48 West Rand District Municipality - - - - Total: West Rand Municipalities - - - -

Total: Gauteng Municipalities 7 000 - ( 83) 6 917

46

National and Municipal Financial Years

Category Municipality2020/21

MainAllocation

1st Adjustment2020/21Adjusted

Allocation2nd Adjustment

ANNEXURE D

SPECIFIC-PURPOSE ALLOCATIONS TO MUNICIPALITIES( SCHEDULE 5, PART B): CURRENT GRANTS

Infrastructure Skills Development Grant

KWAZULU-NATAL

A ETH eThekwini 35 000 ( 2 673) ( 385) 31 942

B KZN212 uMdoni - - - - B KZN213 uMzumbe - - - - B KZN214 uMuziwabantu - - - - B KZN216 Ray Nkonyeni - - - - C DC21 Ugu District Municipality - - - - Total: Ugu Municipalities - - - -

B KZN221 uMshwathi - - - - B KZN222 uMngeni - - - - B KZN223 Mpofana - - - - B KZN224 iMpendle - - - - B KZN225 Msunduzi - - - - B KZN226 Mkhambathini - - - - B KZN227 Richmond - - - - C DC22 uMgungundlovu District Municipality - - - - Total: uMgungundlovu Municipalities - - - -

B KZN235 Okhahlamba - - - - B KZN237 iNkosi Langalibalele - - - - B KZN238 Alfred Duma 3 500 - ( 42) 3 458 C DC23 uThukela District Municipality - - - - Total: uThukela Municipalities 3 500 - ( 42) 3 458

B KZN241 eNdumeni - - - - B KZN242 Nquthu - - - - B KZN244 uMsinga - - - - B KZN245 uMvoti - - - - C DC24 uMzinyathi District Municipality - - - - Total: uMzinyathi Municipalities - - - -

B KZN252 Newcastle - - - - B KZN253 eMadlangeni - - - - B KZN254 Dannhauser - - - - C DC25 Amajuba District Municipality - - - - Total: Amajuba Municipalities - - - -

B KZN261 eDumbe - - - - B KZN262 uPhongolo - - - - B KZN263 AbaQulusi - - - - B KZN265 Nongoma - - - - B KZN266 Ulundi - - - - C DC26 Zululand District Municipality - - - - Total: Zululand Municipalities - - - -

B KZN271 uMhlabuyalingana - - - - B KZN272 Jozini - - - - B KZN275 Mtubatuba - - - - B KZN276 Big Five Hlabisa - - - - C DC27 uMkhanyakude District Municipality - - - - Total: uMkhanyakude Municipalities - - - -

B KZN281 uMfolozi - - - - B KZN282 uMhlathuze - - - - B KZN284 uMlalazi - - - - B KZN285 Mthonjaneni - - - - B KZN286 Nkandla - - - - C DC28 King Cetshwayo District Municipality - - - - Total: King Cetshwayo Municipalities - - - -

B KZN291 Mandeni - - - - B KZN292 KwaDukuza - - - - B KZN293 Ndwedwe - - - - B KZN294 Maphumulo - - - - C DC29 iLembe District Municipality - - - - Total: iLembe Municipalities - - - -

B KZN433 Greater Kokstad - - - - B KZN434 uBuhlebezwe - - - - B KZN435 uMzimkhulu - - - - B KZN436 Dr Nkosazana Dlamini Zuma - - - - C DC43 Harry Gwala District Municipality - - - - Total: Harry Gwala Municipalities - - - -

Total: KwaZulu-Natal Municipalities 38 500 ( 2 673) ( 427) 35 400

47

National and Municipal Financial Years

Category Municipality2020/21

MainAllocation

1st Adjustment2020/21Adjusted

Allocation2nd Adjustment

ANNEXURE D

SPECIFIC-PURPOSE ALLOCATIONS TO MUNICIPALITIES( SCHEDULE 5, PART B): CURRENT GRANTS

Infrastructure Skills Development Grant

LIMPOPO

B LIM331 Greater Giyani - - - - B LIM332 Greater Letaba - - - - B LIM333 Greater Tzaneen - - - - B LIM334 Ba-Phalaborwa - - - - B LIM335 Maruleng - - - - C DC33 Mopani District Municipality - - - - Total: Mopani Municipalities - - - -

B LIM341 Musina - - - - B LIM343 Thulamela 4 000 - ( 48) 3 952 B LIM344 Makhado - - - - B LIM345 Collins Chabane - - - - C DC34 Vhembe District Municipality - - - - Total: Vhembe Municipalities 4 000 - ( 48) 3 952

B LIM351 Blouberg - - - - B LIM353 Molemole - - - - B LIM354 Polokwane 6 278 - ( 75) 6 203 B LIM355 Lepele-Nkumpi - - - - C DC35 Capricorn District Municipality - - - - Total: Capricorn Municipalities 6 278 - ( 75) 6 203

B LIM361 Thabazimbi - - - - B LIM362 Lephalale - - - - B LIM366 Bela-Bela - - - - B LIM367 Mogalakwena - - - - B LIM368 Modimolle-Mookgophong - - - - C DC36 Waterberg District Municipality - - - - Total: Waterberg Municipalities - - - -

B LIM471 Ephraim Mogale - - - - B LIM472 Elias Motsoaledi - - - - B LIM473 Makhuduthamaga - - - - B LIM476 Fetakgomo Tubatse - - - - C DC47 Sekhukhune District Municipality - - - - Total: Sekhukhune Municipalities - - - -

Total: Limpopo Municipalities 10 278 - ( 123) 10 155

MPUMALANGA

B MP301 Chief Albert Luthuli - - - - B MP302 Msukaligwa - - - - B MP303 Mkhondo - - - - B MP304 Dr Pixley ka Isaka Seme - - - - B MP305 Lekwa - - - - B MP306 Dipaleseng - - - - B MP307 Govan Mbeki 25 500 ( 1 275) ( 288) 23 937 C DC30 Gert Sibande District Municipality 10 000 - ( 119) 9 881 Total: Gert Sibande Municipalities 35 500 ( 1 275) ( 407) 33 818

B MP311 Victor Khanye - - - - B MP312 Emalahleni - - - - B MP313 Steve Tshwete - - - - B MP314 Emakhazeni - - - - B MP315 Thembisile Hani - - - - B MP316 Dr JS Moroka - - - - C DC31 Nkangala District Municipality - - - - Total: Nkangala Municipalities - - - -

B MP321 Thaba Chweu - - - - B MP324 Nkomazi - - - - B MP325 Bushbuckridge - - - - B MP326 City of Mbombela - - - - C DC32 Ehlanzeni District Municipality - - - - Total: Ehlanzeni Municipalities - - - -

Total: Mpumalanga Municipalities 35 500 ( 1 275) ( 407) 33 818

48

National and Municipal Financial Years

Category Municipality2020/21

MainAllocation

1st Adjustment2020/21Adjusted

Allocation2nd Adjustment

ANNEXURE D

SPECIFIC-PURPOSE ALLOCATIONS TO MUNICIPALITIES( SCHEDULE 5, PART B): CURRENT GRANTS

Infrastructure Skills Development Grant

NORTHERN CAPE

B NC061 Richtersveld - - - - B NC062 Nama Khoi - - - - B NC064 Kamiesberg - - - - B NC065 Hantam - - - - B NC066 Karoo Hoogland - - - - B NC067 Khâi-Ma - - - - C DC6 Namakwa District Municipality - - - - Total: Namakwa Municipalities - - - -

B NC071 Ubuntu - - - - B NC072 Umsobomvu - - - - B NC073 Emthanjeni - - - - B NC074 Kareeberg - - - - B NC075 Renosterberg - - - - B NC076 Thembelihle - - - - B NC077 Siyathemba - - - - B NC078 Siyancuma - - - - C DC7 Pixley Ka Seme District Municipality - - - - Total: Pixley Ka Seme Municipalities - - - -

B NC082 !Kai !Garib - - - - B NC084 !Kheis - - - - B NC085 Tsantsabane - - - - B NC086 Kgatelopele - - - - B NC087 Dawid Kruiper - - - - C DC8 Z.F. Mgcawu District Municipality - - - - Total: Z.F. Mgcawu Municipalities - - - -

B NC091 Sol Plaatjie 5 000 - ( 59) 4 941 B NC092 Dikgatlong - - - - B NC093 Magareng - - - - B NC094 Phokwane - - - - C DC9 Frances Baard District Municipality - - - - Total: Frances Baard Municipalities 5 000 - ( 59) 4 941

B NC451 Joe Morolong - - - - B NC452 Ga-Segonyana - - - - B NC453 Gamagara - - - - C DC45 John Taolo Gaetsewe District Municipality 4 200 - ( 50) 4 150 Total: John Taolo Gaetsewe Municipalities 4 200 - ( 50) 4 150

Total: Northern Cape Municipalities 9 200 - ( 109) 9 091

NORTH WEST

B NW371 Moretele - - - - B NW372 Madibeng - - - - B NW373 Rustenburg - - - - B NW374 Kgetlengrivier - - - - B NW375 Moses Kotane - - - - C DC37 Bojanala Platinum District Municipality - - - - Total: Bojanala Platinum Municipalities - - - -

B NW381 Ratlou - - - - B NW382 Tswaing - - - - B NW383 Mafikeng - - - - B NW384 Ditsobotla - - - - B NW385 Ramotshere Moiloa - - - - C DC38 Ngaka Modiri Molema District Municipality - - - - Total: Ngaka Modiri Molema Municipalities - - - -

B NW392 Naledi - - - - B NW393 Mamusa - - - - B NW394 Greater Taung - - - - B NW396 Lekwa-Teemane - - - - B NW397 Kagisano-Molopo - - - - C DC39 Dr Ruth Segomotsi Mompati District Municipality - - - - Total: Dr Ruth Segomotsi Mompati Municipalities - - - -

B NW403 City of Matlosana - - - - B NW404 Maquassi Hills - - - - B NW405 JB Marks - - - - C DC40 Dr Kenneth Kaunda District Municipality - - - - Total: Dr Kenneth Kaunda Municipalities - - - -

Total: North West Municipalities - - - -

49

National and Municipal Financial Years

Category Municipality2020/21

MainAllocation

1st Adjustment2020/21Adjusted

Allocation2nd Adjustment

ANNEXURE D

SPECIFIC-PURPOSE ALLOCATIONS TO MUNICIPALITIES( SCHEDULE 5, PART B): CURRENT GRANTS

Infrastructure Skills Development Grant

WESTERN CAPE

A CPT City of Cape Town 11 000 - ( 131) 10 869

B WC011 Matzikama - - - - B WC012 Cederberg - - - - B WC013 Bergrivier - - - - B WC014 Saldanha Bay - - - - B WC015 Swartland - - - - C DC1 West Coast District Municipality - - - - Total: West Coast Municipalities - - - -

B WC022 Witzenberg - - - - B WC023 Drakenstein - - - - B WC024 Stellenbosch - - - - B WC025 Breede Valley - - - - B WC026 Langeberg - - - - C DC2 Cape Winelands District Municipality - - - - Total: Cape Winelands Municipalities - - - -

B WC031 Theewaterskloof - - - - B WC032 Overstrand - - - - B WC033 Cape Agulhas - - - - B WC034 Swellendam - - - - C DC3 Overberg District Municipality - - - - Total: Overberg Municipalities - - - -

B WC041 Kannaland - - - - B WC042 Hessequa - - - - B WC043 Mossel Bay - - - - B WC044 George 6 200 - ( 74) 6 126 B WC045 Oudtshoorn - - - - B WC047 Bitou - - - - B WC048 Knysna - - - - C DC4 Garden Route District Municipality - - - - Total: Garden Route Municipalities 6 200 - ( 74) 6 126

B WC051 Laingsburg - - - - B WC052 Prince Albert - - - - B WC053 Beaufort West - - - - C DC5 Central Karoo District Municipality - - - - Total: Central Karoo Municipalities - - - -

Total: Western Cape Municipalities 17 200 - ( 205) 16 995

National Total 153 192 ( 7 600) ( 1 732) 143 860

50

AN

NE

XU

RE

E

INFR

AST

RU

CT

UR

E G

RA

NT

AL

LO

CA

TIO

NS

TO

MU

NIC

IPA

LIT

IES

(SC

HE

DU

LE

4, P

AR

T B

AN

D S

CH

ED

UL

E 5

, PA

RT

B)

(Nat

iona

l and

Mun

icip

al F

inan

cial

Yea

rs)

51

EA

STE

RN

CA

PE

AB

UF

Buf

falo

City

-

-

-

-

-

-

-

-

-

-

-

-

761

354

(

74 2

33)

-

687

121

8

317

-

(

99)

8

218

1

8 00

0

-

-

18

000

-

-

-

-

A

NM

AN

elso

n M

ande

la B

ay-

-

-

-

-

-

-

-

-

-

-

-

9

03 7

20

( 88

114

) 3

90 2

74

1 2

05 8

80

10

481

-

(

125

) 1

0 35

6

35

000

(

9 45

0)

-

25

550

3

16 2

07

( 50

191

) 8

3 37

0

349

386

BEC

101

Dr B

eyer

s Nau

de 2

0 49

5

-

( 2

52)

20

243

7

000

-

-

7

000

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

EC10

2B

lue

Cra

ne R

oute

14

253

-

(

175

) 1

4 07

8

15

000

-

-

1

5 00

0

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BEC

104

Mak

ana

24

260

-

(

298

) 2

3 96

2

20

000

-

-

2

0 00

0

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BEC

105

Ndl

ambe

36

535

-

(

448

) 3

6 08

7

15

000

-

-

1

5 00

0

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BEC

106

Sund

ays R

iver

Val

ley

25

464

-

(

312

) 2

5 15

2

10

000

-

-

1

0 00

0

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BEC

108

Kou

ga 3

1 57

8

-

( 3

88)

31

190

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

EC10

9K

ou-K

amm

a 1

5 32

2

-

( 1

88)

15

134

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

C

DC

10Sa

rah

Baa

rtman

Dist

rict M

unic

ipal

ity-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

To

tal:

Sara

h B

aart

man

Mun

icip

aliti

es 1

67 9

07

-

( 2

061)

1

65 8

46

67

000

-

-

6

7 00

0

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BEC

121

Mbh

ashe

59

595

-

(

731

) 5

8 86

4

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BEC

122

Mnq

uma

62

194

-

(

763

) 6

1 43

1

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BEC

123

Gre

at K

ei 1

1 20

8

-

( 1

38)

11

070

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

EC12

4A

mah

lath

i 2

7 97

2

-

( 3

43)

27

629

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

EC12

6N

gqus

hwa

22

378

-

(

275

) 2

2 10

3

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BEC

129

Ray

mon

d M

hlab

a 3

8 98

6

-

( 4

78)

38

508

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

C

DC

12A

mat

hole

Dist

rict M

unic

ipal

ity 4

25 4

18

-

( 5

221)

4

20 1

97

80

000

-

-

8

0 00

0

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Tota

l: A

mat

hole

Mun

icip

aliti

es 6

47 7

51

-

( 7

949)

6

39 8

02

80

000

-

-

8

0 00

0

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BEC

131

Inxu

ba Y

ethe

mba

16

024

-

(

197

) 1

5 82

7

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BEC

135

Ints

ika

Yet

hu 5

2 74

6

-

( 6

47)

52

099

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

EC13

6Em

alah

leni

3

3 31

9

-

( 4

09)

32

910

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

EC13

7En

gcob

o 3

8 28

4

-

( 4

70)

37

814

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

EC13

8Sa

khisi

zwe

18

104

-

(

222

) 1

7 88

2

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BEC

139

Enoc

h M

gijim

a 5

3 75

8

-

( 6

60)

53

098

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

C

DC

13C

hris

Han

i Dist

rict M

unic

ipal

ity 2

85 0

00

-

( 3

497)

2

81 5

03

85

000

-

(

15 0

00)

70

000

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

To

tal:

Chr

is H

ani M

unic

ipal

ities

497

235

-

(

6 10

2)

491

133

8

5 00

0

-

( 15

000

) 7

0 00

0

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BEC

141

Elun

dini

38

703

-

(

475

) 3

8 22

8

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BEC

142

Senq

u 3

8 24

4

-

( 4

69)

37

775

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

EC14

5W

alte

r Sisu

lu 1

8 77

2

-

( 2

30)

18

542

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

C

DC

14Jo

e G

qabi

Dist

rict M

unic

ipal

ity 1

55 7

73

-

( 1

912)

1

53 8

61

70

000

-

-

7

0 00

0

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Tota

l: Jo

e G

qabi

Mun

icip

aliti

es 2

51 4

92

-

( 3

086)

2

48 4

06

70

000

-

-

7

0 00

0

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BEC

153

Ngq

uza

Hill

54

149

-

(

664

) 5

3 48

5

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BEC

154

Port

St Jo

hns

34

134

-

(

419

) 3

3 71

5

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BEC

155

Nya

nden

i 6

0 44

1

-

( 7

42)

59

699

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

EC15

6M

hlon

tlo 4

3 96

7

-

( 5

40)

43

427

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

EC15

7K

ing

Saba

ta D

alin

dyeb

o 8

5 69

3

-

( 1

052)

8

4 64

1

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

CD

C15

O.R

. Tam

bo D

istric

t Mun

icip

ality

628

864

-

(

7 71

7)

621

147

9

0 00

0

-

( 10

000

) 8

0 00

0

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Tota

l: O

.R. T

ambo

Mun

icip

aliti

es 9

07 2

48

-

( 11

134

) 8

96 1

14

90

000

-

(

10 0

00)

80

000

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BEC

441

Mat

atie

le 4

8 93

6

-

( 6

01)

48

335

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

EC44

2U

mzi

mvu

bu 5

6 11

2

-

( 6

89)

55

423

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

EC44

3M

biza

na 4

8 04

9

-

( 5

90)

47

459

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

EC44

4N

taba

nkul

u 2

7 00

5

-

( 3

31)

26

674

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

C

DC

44A

lfred

Nzo

Dist

rict M

unic

ipal

ity 3

73 3

34

-

( 4

581)

3

68 7

53

94

950

-

-

9

4 95

0

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Tota

l: A

lfred

Nzo

Mun

icip

aliti

es 5

53 4

36

-

( 6

792)

5

46 6

44

94

950

-

-

9

4 95

0

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Tota

l: E

aste

rn C

ape

Mun

icip

aliti

es 3

025

069

-

(

37 1

24)

2 9

87 9

45

486

950

-

(

25 0

00)

461

950

-

-

-

-

1

665

074

(

162

347)

3

90 2

74

1 8

93 0

01

18

798

-

(

224

) 1

8 57

4

53

000

(

9 45

0)

-

43

550

3

16 2

07

( 50

191

) 8

3 37

0

349

386

1st A

djus

tmen

tC

ateg

ory

Mun

icip

ality

Inte

grat

ed C

ity D

evel

opm

ent G

rant

M

unic

ipal

Infr

astr

uctu

re G

rant

2020

/21

Mai

nAl

loca

tion

Wat

er S

ervi

ces I

nfra

stru

ctur

e G

rant

2020

/21

Adju

sted

Al

loca

tion

Nei

ghbo

urho

od D

evel

opm

ent P

artn

ersh

ip G

rant

(Cap

ital)

Publ

ic T

rans

port

Net

wor

k G

rant

1st A

djus

tmen

t20

20/2

1Ad

just

ed

Allo

catio

n2n

d Ad

just

men

t20

20/2

1Ad

just

ed

Allo

catio

n

2020

/21

Mai

nAl

loca

tion

1st A

djus

tmen

t1s

t Adj

ustm

ent

Nat

iona

l and

Mun

icip

al F

inan

cial

Yea

rs

1st A

djus

tmen

t20

20/2

1Ad

just

ed

Allo

catio

n

Nat

iona

l and

Mun

icip

al F

inan

cial

Yea

rs

2020

/21

Mai

nAl

loca

tion

2020

/21

Adju

sted

Al

loca

tion

2020

/21

Mai

nAl

loca

tion

2020

/21

Adju

sted

Al

loca

tion

2020

/21

Mai

nAl

loca

tion

Nat

iona

l and

Mun

icip

al F

inan

cial

Yea

rs

AN

NEX

UR

E E

INFR

AST

RU

CTU

RE

GR

AN

T A

LLO

CA

TIO

NS

TO M

UN

ICIP

ALI

TIES

(SC

HED

ULE

4, P

AR

T B

AN

D S

CH

EDU

LE 5

, PA

RT

B)

Urb

an S

ettle

men

ts D

evel

opm

ent G

rant

Nat

iona

l and

Mun

icip

al F

inan

cial

Yea

rsN

atio

nal a

nd M

unic

ipal

Fin

anci

al Y

ears

Inte

grat

ed U

rban

Dev

elop

men

t Gra

nt

Nat

iona

l and

Mun

icip

al F

inan

cial

Yea

rsN

atio

nal a

nd M

unic

ipal

Fin

anci

al Y

ears

2nd

Adju

stm

ent

2nd

Adju

stm

ent

2nd

Adju

stm

ent

2nd

Adju

stm

ent

2nd

Adju

stm

ent

2nd

Adju

stm

ent

2020

/21

Mai

nAl

loca

tion

1st A

djus

tmen

t20

20/2

1Ad

just

ed

Allo

catio

n

2020

/21

Mai

nAl

loca

tion

1st A

djus

tmen

t

52

1st A

djus

tmen

tC

ateg

ory

Mun

icip

ality

Inte

grat

ed C

ity D

evel

opm

ent G

rant

M

unic

ipal

Infr

astr

uctu

re G

rant

2020

/21

Mai

nAl

loca

tion

Wat

er S

ervi

ces I

nfra

stru

ctur

e G

rant

2020

/21

Adju

sted

Al

loca

tion

Nei

ghbo

urho

od D

evel

opm

ent P

artn

ersh

ip G

rant

(Cap

ital)

Publ

ic T

rans

port

Net

wor

k G

rant

1st A

djus

tmen

t20

20/2

1Ad

just

ed

Allo

catio

n2n

d Ad

just

men

t20

20/2

1Ad

just

ed

Allo

catio

n

2020

/21

Mai

nAl

loca

tion

1st A

djus

tmen

t1s

t Adj

ustm

ent

Nat

iona

l and

Mun

icip

al F

inan

cial

Yea

rs

1st A

djus

tmen

t20

20/2

1Ad

just

ed

Allo

catio

n

Nat

iona

l and

Mun

icip

al F

inan

cial

Yea

rs

2020

/21

Mai

nAl

loca

tion

2020

/21

Adju

sted

Al

loca

tion

2020

/21

Mai

nAl

loca

tion

2020

/21

Adju

sted

Al

loca

tion

2020

/21

Mai

nAl

loca

tion

Nat

iona

l and

Mun

icip

al F

inan

cial

Yea

rs

AN

NEX

UR

E E

INFR

AST

RU

CTU

RE

GR

AN

T A

LLO

CA

TIO

NS

TO M

UN

ICIP

ALI

TIES

(SC

HED

ULE

4, P

AR

T B

AN

D S

CH

EDU

LE 5

, PA

RT

B)

Urb

an S

ettle

men

ts D

evel

opm

ent G

rant

Nat

iona

l and

Mun

icip

al F

inan

cial

Yea

rsN

atio

nal a

nd M

unic

ipal

Fin

anci

al Y

ears

Inte

grat

ed U

rban

Dev

elop

men

t Gra

nt

Nat

iona

l and

Mun

icip

al F

inan

cial

Yea

rsN

atio

nal a

nd M

unic

ipal

Fin

anci

al Y

ears

2nd

Adju

stm

ent

2nd

Adju

stm

ent

2nd

Adju

stm

ent

2nd

Adju

stm

ent

2nd

Adju

stm

ent

2nd

Adju

stm

ent

2020

/21

Mai

nAl

loca

tion

1st A

djus

tmen

t20

20/2

1Ad

just

ed

Allo

catio

n

2020

/21

Mai

nAl

loca

tion

1st A

djus

tmen

t

FRE

E S

TATE

AM

AN

Man

gaun

g-

-

-

-

-

-

-

-

-

-

-

-

7

54 5

93

( 73

574

) -

6

81 0

19

6 4

50

-

( 7

7)

6 3

73

10

000

-

-

1

0 00

0

242

210

(

38 4

46)

( 11

331

) 1

92 4

33

BFS

161

Lets

emen

g 1

7 06

1

-

( 2

09)

16

852

2

4 20

1

-

-

24

201

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

FS16

2K

opan

ong

20

428

-

(

251

) 2

0 17

7

30

000

-

(

8 00

0)

22

000

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

FS16

3M

ohok

are

17

898

-

(

220

) 1

7 67

8

28

025

-

-

2

8 02

5

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

CD

C16

Xha

riep

Dist

rict M

unic

ipal

ity-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

To

tal:

Xha

riep

Mun

icip

aliti

es 5

5 38

7

-

( 6

80)

54

707

8

2 22

6

-

( 8

000)

7

4 22

6

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BFS

181

Mas

ilony

ana

30

017

-

(

368

) 2

9 64

9

11

000

-

6

000

1

7 00

0

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BFS

182

Toko

logo

16

470

-

(

202

) 1

6 26

8

12

000

-

-

1

2 00

0

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BFS

183

Tsw

elop

ele

16

405

-

(

201

) 1

6 20

4

10

000

-

-

1

0 00

0

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BFS

184

Mat

jhab

eng

118

247

-

(

1 45

1)

116

796

3

5 00

0

-

-

35

000

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

FS18

5N

ala

29

468

-

(

362

) 2

9 10

6

10

000

-

-

1

0 00

0

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

CD

C18

Lejw

elep

utsw

a D

istric

t Mun

icip

ality

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Tota

l: L

ejw

elep

utsw

a M

unic

ipal

ities

210

607

-

(

2 58

4)

208

023

7

8 00

0

-

6 0

00

84

000

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BFS

191

Sets

oto

46

899

-

(

576

) 4

6 32

3

26

375

-

-

2

6 37

5

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BFS

192

Dih

labe

ng 4

7 40

5

-

( 5

82)

46

823

1

5 11

0

-

-

15

110

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

FS19

3N

keto

ana

25

225

-

(

310

) 2

4 91

5

15

000

-

1

5 50

0

30

500

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

FS19

4M

alut

i-a-P

hofu

ng 1

61 6

26

-

( 1

983)

1

59 6

43

50

000

-

-

5

0 00

0

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BFS

195

Phum

elel

a 2

0 93

3

-

( 2

57)

20

676

2

1 10

0

-

-

21

100

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

FS19

6M

ants

opa

19

863

-

(

244

) 1

9 61

9

47

000

-

(

17 0

00)

30

000

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

C

DC

19Th

abo

Mof

utsa

nyan

a D

istric

t Mun

icip

ality

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Tota

l: Th

abo

Mof

utsa

nyan

a M

unic

ipal

ities

321

951

-

(

3 95

2)

317

999

1

74 5

85

-

( 1

500)

1

73 0

85

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BFS

201

Moq

haka

49

924

-

(

613

) 4

9 31

1

15

825

-

3

500

1

9 32

5

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BFS

203

Ngw

athe

41

704

-

(

512

) 4

1 19

2

25

000

-

-

2

5 00

0

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BFS

204

Met

simah

olo

44

366

-

(

544

) 4

3 82

2

25

000

-

-

2

5 00

0

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BFS

205

Maf

ube

22

318

-

(

274

) 2

2 04

4

15

000

-

-

1

5 00

0

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

CD

C20

Fezi

le D

abi D

istric

t Mun

icip

ality

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Tota

l: Fe

zile

Dab

i Mun

icip

aliti

es 1

58 3

12

-

( 1

943)

1

56 3

69

80

825

-

3

500

8

4 32

5

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Tota

l: Fr

ee S

tate

Mun

icip

aliti

es 7

46 2

57

-

( 9

159)

7

37 0

98

415

636

-

-

4

15 6

36

-

-

-

-

754

593

(

73 5

74)

-

681

019

6

450

-

(

77)

6

373

1

0 00

0

-

-

10

000

2

42 2

10

( 38

446

) (

11 3

31)

192

433

GA

UTE

NG

AEK

UC

ity o

f Eku

rhul

eni

-

-

-

-

-

-

-

-

-

-

-

-

1 9

67 5

05

( 19

1 83

5)

-

1 7

75 6

70

53

577

-

(

637

) 5

2 94

0

75

000

-

-

7

5 00

0

716

466

(

113

724)

(

33 5

18)

569

224

A

JHB

City

of J

ohan

nesb

urg

-

-

-

-

-

-

-

-

-

-

-

-

1 8

48 2

87

( 18

0 21

1)

-

1 6

68 0

76

74

754

-

(

889

) 7

3 86

5

62

406

-

-

6

2 40

6

1 0

51 5

18

( 16

6 90

9)

( 49

193

) 8

35 4

16

ATS

HC

ity o

f Tsh

wan

e-

-

-

-

-

-

-

-

-

-

-

-

1

602

161

(

156

213)

-

1

445

948

5

1 51

2

-

( 6

13)

50

899

5

000

-

-

5

000

7

71 9

54

( 12

2 53

2)

( 36

114

) 6

13 3

08

BG

T421

Emfu

leni

167

785

-

(

2 05

9)

165

726

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

GT4

22M

idva

al 3

1 59

2

-

( 3

88)

31

204

1

5 82

5

-

-

15

825

-

-

-

-

-

-

-

-

-

-

-

-

1

500

-

-

1

500

-

-

-

-

B

GT4

23Le

sedi

26

249

-

(

322

) 2

5 92

7

15

825

-

-

1

5 82

5

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

CD

C42

Sedi

beng

Dist

rict M

unic

ipal

ity-

-

-

-

1

5 82

5

-

-

15

825

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

To

tal:

Sedi

beng

Mun

icip

aliti

es 2

25 6

26

-

( 2

769)

2

22 8

57

47

475

-

-

4

7 47

5

-

-

-

-

-

-

-

-

-

-

-

-

1 5

00

-

-

1 5

00

-

-

-

-

BG

T481

Mog

ale

City

-

-

-

-

42

200

-

-

4

2 20

0

119

766

-

(

1 47

3)

118

293

-

-

-

-

-

-

-

-

1

0 00

0

-

-

10

000

-

-

-

-

B

GT4

84M

eraf

ong

City

65

834

-

(

808

) 6

5 02

6

36

925

-

-

3

6 92

5

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BG

T485

Ran

d W

est C

ity 9

0 53

4

-

( 1

111)

8

9 42

3

38

460

-

-

3

8 46

0

-

-

-

-

-

-

-

-

-

-

-

-

1 5

00

-

-

1 5

00

-

-

-

-

CD

C48

Wes

t Ran

d D

istric

t Mun

icip

ality

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Tota

l: W

est R

and

Mun

icip

aliti

es 1

56 3

68

-

( 1

919)

1

54 4

49

117

585

-

-

1

17 5

85

119

766

-

(

1 47

3)

118

293

-

-

-

-

-

-

-

-

1

1 50

0

-

-

11

500

-

-

-

-

Tota

l: G

aute

ng M

unic

ipal

ities

381

994

-

(

4 68

8)

377

306

1

65 0

60

-

-

165

060

1

19 7

66

-

( 1

473)

1

18 2

93

5 4

17 9

53

( 52

8 25

9)

-

4 8

89 6

94

179

843

-

(

2 13

9)

177

704

1

55 4

06

-

-

155

406

2

539

938

(

403

165)

(

118

825)

2

017

948

53

1st A

djus

tmen

tC

ateg

ory

Mun

icip

ality

Inte

grat

ed C

ity D

evel

opm

ent G

rant

M

unic

ipal

Infr

astr

uctu

re G

rant

2020

/21

Mai

nAl

loca

tion

Wat

er S

ervi

ces I

nfra

stru

ctur

e G

rant

2020

/21

Adju

sted

Al

loca

tion

Nei

ghbo

urho

od D

evel

opm

ent P

artn

ersh

ip G

rant

(Cap

ital)

Publ

ic T

rans

port

Net

wor

k G

rant

1st A

djus

tmen

t20

20/2

1Ad

just

ed

Allo

catio

n2n

d Ad

just

men

t20

20/2

1Ad

just

ed

Allo

catio

n

2020

/21

Mai

nAl

loca

tion

1st A

djus

tmen

t1s

t Adj

ustm

ent

Nat

iona

l and

Mun

icip

al F

inan

cial

Yea

rs

1st A

djus

tmen

t20

20/2

1Ad

just

ed

Allo

catio

n

Nat

iona

l and

Mun

icip

al F

inan

cial

Yea

rs

2020

/21

Mai

nAl

loca

tion

2020

/21

Adju

sted

Al

loca

tion

2020

/21

Mai

nAl

loca

tion

2020

/21

Adju

sted

Al

loca

tion

2020

/21

Mai

nAl

loca

tion

Nat

iona

l and

Mun

icip

al F

inan

cial

Yea

rs

AN

NEX

UR

E E

INFR

AST

RU

CTU

RE

GR

AN

T A

LLO

CA

TIO

NS

TO M

UN

ICIP

ALI

TIES

(SC

HED

ULE

4, P

AR

T B

AN

D S

CH

EDU

LE 5

, PA

RT

B)

Urb

an S

ettle

men

ts D

evel

opm

ent G

rant

Nat

iona

l and

Mun

icip

al F

inan

cial

Yea

rsN

atio

nal a

nd M

unic

ipal

Fin

anci

al Y

ears

Inte

grat

ed U

rban

Dev

elop

men

t Gra

nt

Nat

iona

l and

Mun

icip

al F

inan

cial

Yea

rsN

atio

nal a

nd M

unic

ipal

Fin

anci

al Y

ears

2nd

Adju

stm

ent

2nd

Adju

stm

ent

2nd

Adju

stm

ent

2nd

Adju

stm

ent

2nd

Adju

stm

ent

2nd

Adju

stm

ent

2020

/21

Mai

nAl

loca

tion

1st A

djus

tmen

t20

20/2

1Ad

just

ed

Allo

catio

n

2020

/21

Mai

nAl

loca

tion

1st A

djus

tmen

t

KW

AZU

LU

-NA

TAL

AET

HeT

hekw

ini

-

-

-

-

-

-

-

-

-

-

-

-

1 9

62 6

47

( 19

1 36

1)

-

1 7

71 2

86

46

464

-

(

553

) 4

5 91

1

70

000

(

13 3

00)

-

56

700

7

83 6

43

( 12

4 38

7)

( 36

661

) 6

22 5

95

BK

ZN21

2uM

doni

30

493

-

(

374

) 3

0 11

9

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BK

ZN21

3uM

zum

be 3

3 86

7

-

( 4

16)

33

451

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

KZN

214

uMuz

iwab

antu

23

207

-

(

285

) 2

2 92

2

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BK

ZN21

6R

ay N

kony

eni

-

-

-

-

-

-

-

-

65

313

-

(

804

) 6

4 50

9

-

-

-

-

-

-

-

-

5 0

00

-

-

5 0

00

-

-

-

-

CD

C21

Ugu

Dist

rict M

unic

ipal

ity 2

39 3

36

-

( 2

937)

2

36 3

99

50

000

-

-

5

0 00

0

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Tota

l: U

gu M

unic

ipal

ities

326

903

-

(

4 01

2)

322

891

5

0 00

0

-

-

50

000

6

5 31

3

-

( 8

04)

64

509

-

-

-

-

-

-

-

-

5

000

-

-

5

000

-

-

-

-

BK

ZN22

1uM

shw

athi

27

428

-

(

337

) 2

7 09

1

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BK

ZN22

2uM

ngen

i 2

2 90

9

-

( 2

81)

22

628

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

KZN

223

Mpo

fana

11

981

-

(

147

) 1

1 83

4

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BK

ZN22

4iM

pend

le 1

1 67

0

-

( 1

43)

11

527

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

KZN

225

Msu

nduz

i 1

96 1

28

-

( 2

407)

1

93 7

21

33

255

-

-

3

3 25

5

-

-

-

-

-

-

-

-

-

-

-

-

35

000

-

-

3

5 00

0

-

-

-

-

BK

ZN22

6M

kham

bath

ini

15

996

-

(

196

) 1

5 80

0

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BK

ZN22

7R

ichm

ond

18

345

-

(

225

) 1

8 12

0

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

CD

C22

uMgu

ngun

dlov

u D

istric

t Mun

icip

ality

101

245

-

(

1 24

2)

100

003

8

0 00

0

-

-

80

000

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

To

tal:

uMgu

ngun

dlov

u M

unic

ipal

ities

405

702

-

(

4 97

8)

400

724

1

13 2

55

-

-

113

255

-

-

-

-

-

-

-

-

-

-

-

-

3

5 00

0

-

-

35

000

-

-

-

-

BK

ZN23

5O

khah

lam

ba 3

8 13

6

-

( 4

68)

37

668

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

KZN

237

iNko

si La

ngal

ibal

ele

47

426

-

(

582

) 4

6 84

4

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BK

ZN23

8A

lfred

Dum

a 6

1 27

4

-

( 7

52)

60

522

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

C

DC

23uT

huke

la D

istric

t Mun

icip

ality

182

647

-

(

2 24

1)

180

406

9

0 00

0

-

-

90

000

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

To

tal:

uThu

kela

Mun

icip

aliti

es 3

29 4

83

-

( 4

043)

3

25 4

40

90

000

-

-

9

0 00

0

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BK

ZN24

1eN

dum

eni

15

137

-

(

186

) 1

4 95

1

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BK

ZN24

2N

quth

u 3

1 00

9

-

( 3

81)

30

628

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

KZN

244

uMsin

ga 3

7 18

9

-

( 4

56)

36

733

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

KZN

245

uMvo

ti 2

9 62

3

-

( 3

64)

29

259

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

C

DC

24uM

ziny

athi

Dist

rict M

unic

ipal

ity 1

87 1

65

-

( 2

297)

1

84 8

68

78

235

-

-

7

8 23

5

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Tota

l: uM

ziny

athi

Mun

icip

aliti

es 3

00 1

23

-

( 3

684)

2

96 4

39

78

235

-

-

7

8 23

5

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BK

ZN25

2N

ewca

stle

111

804

-

(

1 37

2)

110

432

3

5 00

0

-

-

35

000

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

KZN

253

eMad

lang

eni

9 3

10

-

( 1

14)

9 1

96

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BK

ZN25

4D

annh

ause

r 2

1 64

5

-

( 2

66)

21

379

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

C

DC

25A

maj

uba

Dist

rict M

unic

ipal

ity 4

0 77

9

-

( 5

00)

40

279

5

0 00

0

-

-

50

000

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

To

tal:

Am

ajub

a M

unic

ipal

ities

183

538

-

(

2 25

2)

181

286

8

5 00

0

-

-

85

000

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BK

ZN26

1eD

umbe

17

952

-

(

220

) 1

7 73

2

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BK

ZN26

2uP

hong

olo

28

134

-

(

345

) 2

7 78

9

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BK

ZN26

3A

baQ

ulus

i 3

6 90

4

-

( 4

53)

36

451

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

KZN

265

Non

gom

a 3

1 67

9

-

( 3

89)

31

290

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

KZN

266

Ulu

ndi

30

713

-

(

377

) 3

0 33

6

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

CD

C26

Zulu

land

Dist

rict M

unic

ipal

ity 2

23 9

84

-

( 2

749)

2

21 2

35

105

500

-

-

1

05 5

00

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Tota

l: Zu

lula

nd M

unic

ipal

ities

369

366

-

(

4 53

3)

364

833

1

05 5

00

-

-

105

500

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BK

ZN27

1uM

hlab

uyal

inga

na 3

4 70

2

-

( 4

26)

34

276

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

KZN

272

Jozi

ni 4

6 76

0

-

( 5

74)

46

186

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

KZN

275

Mtu

batu

ba 3

1 55

7

-

( 3

87)

31

170

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

KZN

276

Big

Fiv

e H

labi

sa 2

1 23

9

-

( 2

61)

20

978

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

C

DC

27uM

khan

yaku

de D

istric

t Mun

icip

ality

213

445

-

(

2 61

9)

210

826

8

4 40

0

-

( 16

630

) 6

7 77

0

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Tota

l: uM

khan

yaku

de M

unic

ipal

ities

347

703

-

(

4 26

7)

343

436

8

4 40

0

-

( 16

630

) 6

7 77

0

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BK

ZN28

1uM

folo

zi 3

9 07

1

-

( 4

79)

38

592

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

KZN

282

uMhl

athu

ze-

-

-

-

2

5 00

0

-

-

25

000

1

61 9

55

-

( 1

992)

1

59 9

63

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BK

ZN28

4uM

lala

zi 4

0 12

5

-

( 4

92)

39

633

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

KZN

285

Mth

onja

neni

17

939

-

(

220

) 1

7 71

9

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BK

ZN28

6N

kand

la 2

2 70

6

-

( 2

79)

22

427

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

C

DC

28K

ing

Cet

shw

ayo

Dist

rict M

unic

ipal

ity 1

69 6

23

-

( 2

082)

1

67 5

41

75

000

-

(

15 0

00)

60

000

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

To

tal:

Kin

g C

etsh

way

o M

unic

ipal

ities

289

464

-

(

3 55

2)

285

912

1

00 0

00

-

( 15

000

) 8

5 00

0

161

955

-

(

1 99

2)

159

963

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BK

ZN29

1M

ande

ni 3

5 15

0

-

( 4

31)

34

719

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

KZN

292

Kw

aDuk

uza

51

347

-

(

630

) 5

0 71

7

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BK

ZN29

3N

dwed

we

29

630

-

(

364

) 2

9 26

6

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BK

ZN29

4M

aphu

mul

o 2

2 19

5

-

( 2

72)

21

923

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

C

DC

29iL

embe

Dist

rict M

unic

ipal

ity 1

91 2

43

-

( 2

347)

1

88 8

96

65

000

-

-

6

5 00

0

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Tota

l: iL

embe

Mun

icip

aliti

es 3

29 5

65

-

( 4

044)

3

25 5

21

65

000

-

-

6

5 00

0

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BK

ZN43

3G

reat

er K

okst

ad 1

7 22

9

-

( 2

11)

17

018

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

KZN

434

uBuh

lebe

zwe

26

759

-

(

328

) 2

6 43

1

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BK

ZN43

5uM

zim

khul

u 4

3 09

7

-

( 5

29)

42

568

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

KZN

436

Dr N

kosa

zana

Dla

min

i Zum

a 2

6 98

9

-

( 3

31)

26

658

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

C

DC

43H

arry

Gw

ala

Dist

rict M

unic

ipal

ity 1

99 4

48

-

( 2

448)

1

97 0

00

60

000

-

-

6

0 00

0

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Tota

l: H

arry

Gw

ala

Mun

icip

aliti

es 3

13 5

22

-

( 3

847)

3

09 6

75

60

000

-

-

6

0 00

0

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Tota

l: K

waZ

ulu-

Nat

al M

unic

ipal

ities

3 1

95 3

69

-

( 39

212

) 3

156

157

8

31 3

90

-

( 31

630

) 7

99 7

60

227

268

-

(

2 79

6)

224

472

1

962

647

(

191

361)

-

1

771

286

4

6 46

4

-

( 5

53)

45

911

1

10 0

00

( 13

300

) -

9

6 70

0

783

643

(

124

387)

(

36 6

61)

622

595

54

1st A

djus

tmen

tC

ateg

ory

Mun

icip

ality

Inte

grat

ed C

ity D

evel

opm

ent G

rant

M

unic

ipal

Infr

astr

uctu

re G

rant

2020

/21

Mai

nAl

loca

tion

Wat

er S

ervi

ces I

nfra

stru

ctur

e G

rant

2020

/21

Adju

sted

Al

loca

tion

Nei

ghbo

urho

od D

evel

opm

ent P

artn

ersh

ip G

rant

(Cap

ital)

Publ

ic T

rans

port

Net

wor

k G

rant

1st A

djus

tmen

t20

20/2

1Ad

just

ed

Allo

catio

n2n

d Ad

just

men

t20

20/2

1Ad

just

ed

Allo

catio

n

2020

/21

Mai

nAl

loca

tion

1st A

djus

tmen

t1s

t Adj

ustm

ent

Nat

iona

l and

Mun

icip

al F

inan

cial

Yea

rs

1st A

djus

tmen

t20

20/2

1Ad

just

ed

Allo

catio

n

Nat

iona

l and

Mun

icip

al F

inan

cial

Yea

rs

2020

/21

Mai

nAl

loca

tion

2020

/21

Adju

sted

Al

loca

tion

2020

/21

Mai

nAl

loca

tion

2020

/21

Adju

sted

Al

loca

tion

2020

/21

Mai

nAl

loca

tion

Nat

iona

l and

Mun

icip

al F

inan

cial

Yea

rs

AN

NEX

UR

E E

INFR

AST

RU

CTU

RE

GR

AN

T A

LLO

CA

TIO

NS

TO M

UN

ICIP

ALI

TIES

(SC

HED

ULE

4, P

AR

T B

AN

D S

CH

EDU

LE 5

, PA

RT

B)

Urb

an S

ettle

men

ts D

evel

opm

ent G

rant

Nat

iona

l and

Mun

icip

al F

inan

cial

Yea

rsN

atio

nal a

nd M

unic

ipal

Fin

anci

al Y

ears

Inte

grat

ed U

rban

Dev

elop

men

t Gra

nt

Nat

iona

l and

Mun

icip

al F

inan

cial

Yea

rsN

atio

nal a

nd M

unic

ipal

Fin

anci

al Y

ears

2nd

Adju

stm

ent

2nd

Adju

stm

ent

2nd

Adju

stm

ent

2nd

Adju

stm

ent

2nd

Adju

stm

ent

2nd

Adju

stm

ent

2020

/21

Mai

nAl

loca

tion

1st A

djus

tmen

t20

20/2

1Ad

just

ed

Allo

catio

n

2020

/21

Mai

nAl

loca

tion

1st A

djus

tmen

t

LIM

POPO

BLI

M33

1G

reat

er G

iyan

i 6

0 28

6

-

( 7

40)

59

546

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

LIM

332

Gre

ater

Let

aba

57

229

-

(

702

) 5

6 52

7

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BLI

M33

3G

reat

er T

zane

en 9

3 61

9

-

( 1

149)

9

2 47

0

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BLI

M33

4B

a-Ph

alab

orw

a 3

1 83

1

-

( 3

91)

31

440

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

LIM

335

Mar

ulen

g 2

6 65

5

-

( 3

27)

26

328

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

C

DC

33M

opan

i Dist

rict M

unic

ipal

ity 4

51 0

56

-

( 5

535)

4

45 5

21

45

000

-

-

4

5 00

0

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Tota

l: M

opan

i Mun

icip

aliti

es 7

20 6

76

-

( 8

844)

7

11 8

32

45

000

-

-

4

5 00

0

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BLI

M34

1M

usin

a 5

8 84

3

-

( 25

422

) 3

3 42

1

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BLI

M34

3Th

ulam

ela

98

702

-

(

1 21

1)

97

491

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

LIM

344

Mak

hado

88

968

-

(

1 09

2)

87

876

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

LIM

345

Col

lins C

haba

ne 8

1 47

5

-

( 1

000)

8

0 47

5

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

CD

C34

Vhe

mbe

Dist

rict M

unic

ipal

ity 5

11 0

93

-

( 6

272)

5

04 8

21

52

750

-

-

5

2 75

0

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Tota

l: V

hem

be M

unic

ipal

ities

839

081

-

(

34 9

97)

804

084

5

2 75

0

-

-

52

750

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BLI

M35

1B

loub

erg

44

066

-

(

541

) 4

3 52

5

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BLI

M35

3M

olem

ole

34

933

-

(

429

) 3

4 50

4

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BLI

M35

4Po

lokw

ane

-

-

24

700

2

4 70

0

50

000

-

-

5

0 00

0

350

966

-

(

4 31

8)

346

648

-

-

-

-

-

-

-

-

3

5 00

0

( 3

500)

-

3

1 50

0

189

292

(

30 0

46)

( 8

856)

1

50 3

90

BLI

M35

5Le

pele

-Nku

mpi

53

720

-

(

659

) 5

3 06

1

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

CD

C35

Cap

ricor

n D

istric

t Mun

icip

ality

229

161

-

(

2 81

2)

226

349

8

0 00

0

-

-

80

000

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

To

tal:

Cap

rico

rn M

unic

ipal

ities

361

880

-

2

0 25

9

382

139

1

30 0

00

-

-

130

000

3

50 9

66

-

( 4

318)

3

46 6

48

-

-

-

-

-

-

-

-

35

000

(

3 50

0)

-

31

500

1

89 2

92

( 30

046

) (

8 85

6)

150

390

BLI

M36

1Th

abaz

imbi

44

024

-

(

540

) 4

3 48

4

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BLI

M36

2Le

phal

ale

43

364

-

(

532

) 4

2 83

2

35

200

-

-

3

5 20

0

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BLI

M36

6B

ela-

Bel

a 2

5 76

0

-

( 3

16)

25

444

3

7 47

5

-

-

37

475

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

LIM

367

Mog

alak

wen

a 1

55 3

26

-

( 1

906)

1

53 4

20

43

850

-

-

4

3 85

0

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BLI

M36

8M

odim

olle

-Moo

kgop

hong

38

317

-

(

470

) 3

7 84

7

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

CD

C36

Wat

erbe

rg D

istric

t Mun

icip

ality

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Tota

l: W

ater

berg

Mun

icip

aliti

es 3

06 7

91

-

( 3

764)

3

03 0

27

116

525

-

-

1

16 5

25

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BLI

M47

1Ep

hrai

m M

ogal

e 3

3 23

8

-

( 4

08)

32

830

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

LIM

472

Elia

s Mot

soal

edi

54

561

-

(

670

) 5

3 89

1

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BLI

M47

3M

akhu

duth

amag

a 6

1 71

0

-

( 7

57)

60

953

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

LIM

476

Feta

kgom

o Tu

bats

e 8

3 79

7

-

( 1

028)

8

2 76

9

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

CD

C47

Sekh

ukhu

ne D

istric

t Mun

icip

ality

471

805

-

(

5 79

0)

466

015

5

3 47

1

-

-

53

471

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

To

tal:

Sekh

ukhu

ne M

unic

ipal

ities

705

111

-

(

8 65

3)

696

458

5

3 47

1

-

-

53

471

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Tota

l: L

impo

po M

unic

ipal

ities

2 9

33 5

39

-

( 35

999

) 2

897

540

3

97 7

46

-

-

397

746

3

50 9

66

-

( 4

318)

3

46 6

48

-

-

-

-

-

-

-

-

35

000

(

3 50

0)

-

31

500

1

89 2

92

( 30

046

) (

8 85

6)

150

390

MPU

MA

LA

NG

A

BM

P301

Chi

ef A

lber

t Lut

huli

86

480

-

(

1 06

1)

85

419

2

6 37

5

-

-

26

375

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

MP3

02M

suka

ligw

a 5

2 36

6

-

( 6

43)

51

723

2

0 00

0

-

-

20

000

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

MP3

03M

khon

do 7

7 80

7

-

( 9

55)

76

852

2

6 00

0

-

30

000

5

6 00

0

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BM

P304

Dr P

ixle

y ka

Isak

a Se

me

26

269

-

(

322

) 2

5 94

7

30

000

-

-

3

0 00

0

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BM

P305

Lekw

a 2

8 67

2

-

( 3

52)

28

320

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

MP3

06D

ipal

esen

g 1

8 71

7

-

( 2

30)

18

487

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

MP3

07G

ovan

Mbe

ki 5

7 42

2

-

( 7

05)

56

717

3

0 00

0

-

-

30

000

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

C

DC

30G

ert S

iban

de D

istric

t Mun

icip

ality

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Tota

l: G

ert S

iban

de M

unic

ipal

ities

347

733

-

(

4 26

8)

343

465

1

32 3

75

-

30

000

1

62 3

75

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BM

P311

Vic

tor K

hany

e 2

4 76

8

-

( 3

04)

24

464

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

MP3

12Em

alah

leni

119

146

-

(

1 46

2)

117

684

3

0 00

0

-

( 30

000

) -

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

MP3

13St

eve

Tshw

ete

-

-

-

-

25

000

-

-

2

5 00

0

92

937

-

(

1 14

3)

91

794

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

MP3

14Em

akha

zeni

18

139

-

(

223

) 1

7 91

6

30

000

-

-

3

0 00

0

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BM

P315

Them

bisil

e H

ani

122

575

-

(

1 50

4)

121

071

5

0 00

0

-

-

50

000

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

MP3

16D

r JS

Mor

oka

124

245

-

(

1 52

5)

122

720

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

C

DC

31N

kang

ala

Dist

rict M

unic

ipal

ity-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

To

tal:

Nka

ngal

a M

unic

ipal

ities

408

873

-

(

5 01

8)

403

855

1

35 0

00

-

( 30

000

) 1

05 0

00

92

937

-

(

1 14

3)

91

794

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BM

P321

Thab

a C

hweu

47

076

-

(

578

) 4

6 49

8

15

000

-

-

1

5 00

0

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BM

P324

Nko

maz

i 2

23 4

76

-

( 2

742)

2

20 7

34

40

000

-

-

4

0 00

0

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BM

P325

Bus

hbuc

krid

ge 3

71 3

79

-

( 4

557)

3

66 8

22

80

000

-

-

8

0 00

0

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BM

P326

City

of M

bom

bela

331

383

-

(

4 06

7)

327

316

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

2

500

-

-

2

500

-

-

-

-

C

DC

32Eh

lanz

eni D

istric

t Mun

icip

ality

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Tota

l: E

hlan

zeni

Mun

icip

aliti

es 9

73 3

14

-

( 11

944

) 9

61 3

70

135

000

-

-

1

35 0

00

-

-

-

-

-

-

-

-

-

-

-

-

2 5

00

-

-

2 5

00

-

-

-

-

Tota

l: M

pum

alan

ga M

unic

ipal

ities

1 7

29 9

20

-

( 21

230

) 1

708

690

4

02 3

75

-

-

402

375

9

2 93

7

-

( 1

143)

9

1 79

4

-

-

-

-

-

-

-

-

2 5

00

-

-

2 5

00

-

-

-

-

55

1st A

djus

tmen

tC

ateg

ory

Mun

icip

ality

Inte

grat

ed C

ity D

evel

opm

ent G

rant

M

unic

ipal

Infr

astr

uctu

re G

rant

2020

/21

Mai

nAl

loca

tion

Wat

er S

ervi

ces I

nfra

stru

ctur

e G

rant

2020

/21

Adju

sted

Al

loca

tion

Nei

ghbo

urho

od D

evel

opm

ent P

artn

ersh

ip G

rant

(Cap

ital)

Publ

ic T

rans

port

Net

wor

k G

rant

1st A

djus

tmen

t20

20/2

1Ad

just

ed

Allo

catio

n2n

d Ad

just

men

t20

20/2

1Ad

just

ed

Allo

catio

n

2020

/21

Mai

nAl

loca

tion

1st A

djus

tmen

t1s

t Adj

ustm

ent

Nat

iona

l and

Mun

icip

al F

inan

cial

Yea

rs

1st A

djus

tmen

t20

20/2

1Ad

just

ed

Allo

catio

n

Nat

iona

l and

Mun

icip

al F

inan

cial

Yea

rs

2020

/21

Mai

nAl

loca

tion

2020

/21

Adju

sted

Al

loca

tion

2020

/21

Mai

nAl

loca

tion

2020

/21

Adju

sted

Al

loca

tion

2020

/21

Mai

nAl

loca

tion

Nat

iona

l and

Mun

icip

al F

inan

cial

Yea

rs

AN

NEX

UR

E E

INFR

AST

RU

CTU

RE

GR

AN

T A

LLO

CA

TIO

NS

TO M

UN

ICIP

ALI

TIES

(SC

HED

ULE

4, P

AR

T B

AN

D S

CH

EDU

LE 5

, PA

RT

B)

Urb

an S

ettle

men

ts D

evel

opm

ent G

rant

Nat

iona

l and

Mun

icip

al F

inan

cial

Yea

rsN

atio

nal a

nd M

unic

ipal

Fin

anci

al Y

ears

Inte

grat

ed U

rban

Dev

elop

men

t Gra

nt

Nat

iona

l and

Mun

icip

al F

inan

cial

Yea

rsN

atio

nal a

nd M

unic

ipal

Fin

anci

al Y

ears

2nd

Adju

stm

ent

2nd

Adju

stm

ent

2nd

Adju

stm

ent

2nd

Adju

stm

ent

2nd

Adju

stm

ent

2nd

Adju

stm

ent

2020

/21

Mai

nAl

loca

tion

1st A

djus

tmen

t20

20/2

1Ad

just

ed

Allo

catio

n

2020

/21

Mai

nAl

loca

tion

1st A

djus

tmen

t

NO

RTH

ER

N C

APE

BN

C06

1R

icht

ersv

eld

7 3

21

-

( 9

0)

7 2

31

10

000

-

-

1

0 00

0

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BN

C06

2N

ama

Kho

i 2

2 02

4

-

( 2

70)

21

754

1

6 70

0

-

-

16

700

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

NC

064

Kam

iesb

erg

7 5

34

-

( 9

2)

7 4

42

12

000

-

-

1

2 00

0

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BN

C06

5H

anta

m 9

726

-

(

119

) 9

607

2

4 00

0

-

-

24

000

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

NC

066

Kar

oo H

oogl

and

8 0

65

-

( 9

9)

7 9

66

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BN

C06

7K

hâi-M

a 7

753

-

(

95)

7

658

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

C

DC

6N

amak

wa

Dist

rict M

unic

ipal

ity-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

To

tal:

Nam

akw

a M

unic

ipal

ities

62

423

-

(

765

) 6

1 65

8

62

700

-

-

6

2 70

0

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BN

C07

1U

bunt

u 9

934

-

(

122

) 9

812

7

500

-

-

7

500

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

NC

072

Um

sobo

mvu

11

443

-

(

140

) 1

1 30

3

-

-

3 3

00

3 3

00

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BN

C07

3Em

than

jeni

12

106

-

(

149

) 1

1 95

7

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BN

C07

4K

aree

berg

8 0

16

-

( 9

8)

7 9

18

15

000

-

-

1

5 00

0

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BN

C07

5R

enos

terb

erg

18

962

-

(

233

) 1

8 72

9

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BN

C07

6Th

embe

lihle

20

917

-

(

257

) 2

0 66

0

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BN

C07

7Si

yath

emba

9 7

94

-

( 1

20)

9 6

74

16

600

-

9

671

2

6 27

1

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BN

C07

8Si

yanc

uma

16

524

-

(

203

) 1

6 32

1

15

000

-

-

1

5 00

0

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

CD

C7

Pixl

ey K

a Se

me

Dist

rict M

unic

ipal

ity-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

To

tal:

Pixl

ey K

a Se

me

Mun

icip

aliti

es 1

07 6

96

-

( 1

322)

1

06 3

74

54

100

-

1

2 97

1

67

071

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BN

C08

2!K

ai !G

arib

22

290

-

(

274

) 2

2 01

6

2 0

00

-

-

2 0

00

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BN

C08

4!K

heis

19

980

-

(

245

) 1

9 73

5

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BN

C08

5Ts

ants

aban

e 1

5 46

6

-

( 1

90)

15

276

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

NC

086

Kga

telo

pele

8 0

20

-

( 9

8)

7 9

22

8 0

00

-

-

8 0

00

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BN

C08

7D

awid

Kru

iper

24

946

-

(

306

) 2

4 64

0

15

000

-

-

1

5 00

0

-

-

-

-

-

-

-

-

-

-

-

-

20

000

-

-

2

0 00

0

-

-

-

-

CD

C8

Z.F.

Mgc

awu

Dist

rict M

unic

ipal

ity-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

To

tal:

Z.F.

Mgc

awu

Mun

icip

aliti

es 9

0 70

2

-

( 1

113)

8

9 58

9

25

000

-

-

2

5 00

0

-

-

-

-

-

-

-

-

-

-

-

-

20

000

-

-

2

0 00

0

-

-

-

-

BN

C09

1So

l Pla

atjie

-

-

-

-

25

943

-

(

12 9

71)

12

972

5

0 95

5

-

( 6

27)

50

328

-

-

-

-

-

-

-

-

2

0 00

0

-

-

20

000

-

-

-

-

B

NC

092

Dik

gatlo

ng 1

9 42

2

-

( 2

38)

19

184

7

000

-

-

7

000

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

NC

093

Mag

aren

g 1

1 11

9

-

( 1

36)

10

983

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

NC

094

Phok

wan

e 2

6 11

2

-

( 3

20)

25

792

2

1 00

0

-

-

21

000

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

C

DC

9Fr

ance

s Baa

rd D

istric

t Mun

icip

ality

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Tota

l: Fr

ance

s Baa

rd M

unic

ipal

ities

56

653

-

(

694

) 5

5 95

9

53

943

-

(

12 9

71)

40

972

5

0 95

5

-

( 6

27)

50

328

-

-

-

-

-

-

-

-

2

0 00

0

-

-

20

000

-

-

-

-

BN

C45

1Jo

e M

orol

ong

59

628

-

(

732

) 5

8 89

6

50

000

-

-

5

0 00

0

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BN

C45

2G

a-Se

gony

ana

52

954

-

(

650

) 5

2 30

4

40

000

-

-

4

0 00

0

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BN

C45

3G

amag

ara

11

803

-

(

145

) 1

1 65

8

15

000

-

-

1

5 00

0

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

CD

C45

John

Tao

lo G

aets

ewe

Dist

rict M

unic

ipal

ity-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

To

tal:

John

Tao

lo G

aets

ewe

Mun

icip

aliti

es 1

24 3

85

-

( 1

527)

1

22 8

58

105

000

-

-

1

05 0

00

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Tota

l: N

orth

ern

Cap

e M

unic

ipal

ities

441

859

-

(

5 42

1)

436

438

3

00 7

43

-

-

300

743

5

0 95

5

-

( 6

27)

50

328

-

-

-

-

-

-

-

-

4

0 00

0

-

-

40

000

-

-

-

-

NO

RTH

WE

ST

BN

W37

1M

oret

ele

113

988

-

(

1 39

9)

112

589

8

4 40

0

-

-

84

400

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

NW

372

Mad

iben

g 2

79 8

01

-

( 3

434)

2

76 3

67

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BN

W37

3R

uste

nbur

g 2

33 4

48

-

( 2

865)

2

30 5

83

72

840

-

-

7

2 84

0

-

-

-

-

-

-

-

-

-

-

-

-

10

000

-

-

1

0 00

0

230

939

(

36 6

57)

( 10

804

) 1

83 4

78

BN

W37

4K

getle

ngriv

ier

35

697

-

(

438

) 3

5 25

9

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BN

W37

5M

oses

Kot

ane

148

649

-

(

1 82

4)

146

825

5

8 02

5

-

-

58

025

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

C

DC

37B

ojan

ala

Plat

inum

Dist

rict M

unic

ipal

ity-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

To

tal:

Boj

anal

a Pl

atin

um M

unic

ipal

ities

811

583

-

(

9 96

0)

801

623

2

15 2

65

-

-

215

265

-

-

-

-

-

-

-

-

-

-

-

-

1

0 00

0

-

-

10

000

2

30 9

39

( 36

657

) (

10 8

04)

183

478

BN

W38

1R

atlo

u 2

9 22

4

-

( 3

59)

28

865

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

NW

382

Tsw

aing

29

099

-

(

357

) 2

8 74

2

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BN

W38

3M

afik

eng

80

825

-

(

992

) 7

9 83

3

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BN

W38

4D

itsob

otla

46

612

-

(

572

) 4

6 04

0

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BN

W38

5R

amot

sher

e M

oilo

a 3

6 92

3

-

( 4

53)

36

470

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

C

DC

38N

gaka

Mod

iri M

olem

a D

istric

t Mun

icip

ality

297

376

-

(

3 64

9)

293

727

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

To

tal:

Nga

ka M

odir

i Mol

ema

Mun

icip

aliti

es 5

20 0

59

-

( 6

382)

5

13 6

77

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BN

W39

2N

aled

i 1

6 89

3

-

( 2

07)

16

686

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

NW

393

Mam

usa

15

618

-

(

192

) 1

5 42

6

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BN

W39

4G

reat

er T

aung

47

297

-

(

580

) 4

6 71

7

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BN

W39

6Le

kwa-

Teem

ane

14

722

-

(

181

) 1

4 54

1

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BN

W39

7K

agisa

no-M

olop

o 2

9 88

7

-

( 3

67)

29

520

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

C

DC

39D

r Rut

h Se

gom

otsi

Mom

pati

Dist

rict M

unic

ipal

ity 1

37 4

31

-

( 1

686)

1

35 7

45

32

000

-

-

3

2 00

0

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Tota

l: D

r R

uth

Sego

mot

si M

ompa

ti M

unic

ipal

ities

261

848

-

(

3 21

3)

258

635

3

2 00

0

-

-

32

000

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BN

W40

3C

ity o

f Mat

losa

na 8

6 89

4

-

( 1

066)

8

5 82

8

16

000

-

-

1

6 00

0

-

-

-

-

-

-

-

-

-

-

-

-

40

000

(

6 84

3)

-

33

157

-

-

-

-

B

NW

404

Maq

uass

i Hill

s 2

8 04

2

-

( 3

44)

27

698

3

0 00

0

-

-

30

000

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

NW

405

JB M

arks

66

245

-

(

813

) 6

5 43

2

15

000

-

-

1

5 00

0

-

-

-

-

-

-

-

-

-

-

-

-

2 0

00

-

-

2 0

00

-

-

-

-

CD

C40

Dr K

enne

th K

aund

a D

istric

t Mun

icip

ality

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Tota

l: D

r K

enne

th K

aund

a M

unic

ipal

ities

181

181

-

(

2 22

3)

178

958

6

1 00

0

-

-

61

000

-

-

-

-

-

-

-

-

-

-

-

-

4

2 00

0

( 6

843)

-

3

5 15

7

-

-

-

-

Tota

l: N

orth

Wes

t Mun

icip

aliti

es 1

774

671

-

(

21 7

78)

1 7

52 8

93

308

265

-

-

3

08 2

65

-

-

-

-

-

-

-

-

-

-

-

-

52

000

(

6 84

3)

-

45

157

2

30 9

39

( 36

657

) (

10 8

04)

183

478

56

1st A

djus

tmen

tC

ateg

ory

Mun

icip

ality

Inte

grat

ed C

ity D

evel

opm

ent G

rant

M

unic

ipal

Infr

astr

uctu

re G

rant

2020

/21

Mai

nAl

loca

tion

Wat

er S

ervi

ces I

nfra

stru

ctur

e G

rant

2020

/21

Adju

sted

Al

loca

tion

Nei

ghbo

urho

od D

evel

opm

ent P

artn

ersh

ip G

rant

(Cap

ital)

Publ

ic T

rans

port

Net

wor

k G

rant

1st A

djus

tmen

t20

20/2

1Ad

just

ed

Allo

catio

n2n

d Ad

just

men

t20

20/2

1Ad

just

ed

Allo

catio

n

2020

/21

Mai

nAl

loca

tion

1st A

djus

tmen

t1s

t Adj

ustm

ent

Nat

iona

l and

Mun

icip

al F

inan

cial

Yea

rs

1st A

djus

tmen

t20

20/2

1Ad

just

ed

Allo

catio

n

Nat

iona

l and

Mun

icip

al F

inan

cial

Yea

rs

2020

/21

Mai

nAl

loca

tion

2020

/21

Adju

sted

Al

loca

tion

2020

/21

Mai

nAl

loca

tion

2020

/21

Adju

sted

Al

loca

tion

2020

/21

Mai

nAl

loca

tion

Nat

iona

l and

Mun

icip

al F

inan

cial

Yea

rs

AN

NEX

UR

E E

INFR

AST

RU

CTU

RE

GR

AN

T A

LLO

CA

TIO

NS

TO M

UN

ICIP

ALI

TIES

(SC

HED

ULE

4, P

AR

T B

AN

D S

CH

EDU

LE 5

, PA

RT

B)

Urb

an S

ettle

men

ts D

evel

opm

ent G

rant

Nat

iona

l and

Mun

icip

al F

inan

cial

Yea

rsN

atio

nal a

nd M

unic

ipal

Fin

anci

al Y

ears

Inte

grat

ed U

rban

Dev

elop

men

t Gra

nt

Nat

iona

l and

Mun

icip

al F

inan

cial

Yea

rsN

atio

nal a

nd M

unic

ipal

Fin

anci

al Y

ears

2nd

Adju

stm

ent

2nd

Adju

stm

ent

2nd

Adju

stm

ent

2nd

Adju

stm

ent

2nd

Adju

stm

ent

2nd

Adju

stm

ent

2020

/21

Mai

nAl

loca

tion

1st A

djus

tmen

t20

20/2

1Ad

just

ed

Allo

catio

n

2020

/21

Mai

nAl

loca

tion

1st A

djus

tmen

t

WE

STE

RN

CA

PE

AC

PTC

ity o

f Cap

e To

wn

-

-

-

-

-

-

-

-

-

-

-

-

1 4

81 6

04

( 14

4 45

9)

-

1 3

37 1

45

65

944

-

(

784

) 6

5 16

0

66

536

(

34 6

00)

( 12

332

) 1

9 60

4

1 9

89 9

74

( 1 1

94 9

95)

( 44

208

) 7

50 7

71

BW

C01

1M

atzi

kam

a 3

1 19

0

-

( 3

83)

30

807

4

7 00

0

-

( 17

000

) 3

0 00

0

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BW

C01

2C

eder

berg

15

590

-

(

191

) 1

5 39

9

30

000

-

(

30 0

00)

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BW

C01

3B

ergr

ivie

r 1

4 47

9

-

( 1

78)

14

301

-

-

6

596

6

596

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

WC

014

Sald

anha

Bay

19

311

-

(

237

) 1

9 07

4

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BW

C01

5Sw

artla

nd 2

1 18

3

-

( 2

60)

20

923

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

C

DC

1W

est C

oast

Dist

rict M

unic

ipal

ity-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

To

tal:

Wes

t Coa

st M

unic

ipal

ities

101

753

-

(

1 24

9)

100

504

7

7 00

0

-

( 40

404

) 3

6 59

6

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BW

C02

2W

itzen

berg

22

286

-

(

273

) 2

2 01

3

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BW

C02

3D

rake

nste

in-

-

-

-

-

-

4

095

4

095

5

8 64

9

-

( 7

22)

57

927

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

WC

024

Stel

lenb

osch

-

-

-

-

-

-

-

-

47

490

-

(

584

) 4

6 90

6

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BW

C02

5B

reed

e V

alle

y 3

4 24

0

-

( 4

20)

33

820

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

WC

026

Lang

eber

g 2

1 86

0

-

( 2

68)

21

592

-

-

2

1 09

3

21

093

-

-

-

-

-

-

-

-

-

-

-

-

2

0 00

0

-

-

20

000

-

-

-

-

C

DC

2C

ape

Win

elan

ds D

istric

t Mun

icip

ality

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Tota

l: C

ape

Win

elan

ds M

unic

ipal

ities

78

386

-

(

961

) 7

7 42

5

-

-

25

188

2

5 18

8

106

139

-

(

1 30

6)

104

833

-

-

-

-

-

-

-

-

2

0 00

0

-

-

20

000

-

-

-

-

BW

C03

1Th

eew

ater

sklo

of 2

6 27

5

-

( 3

22)

25

953

-

-

2

500

2

500

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

WC

032

Ove

rstra

nd 2

1 88

7

-

( 2

69)

21

618

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

WC

033

Cap

e A

gulh

as 1

0 96

1

-

( 1

35)

10

826

-

-

7

700

7

700

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

WC

034

Swel

lend

am 2

0 88

7

-

( 9

148)

1

1 73

9

-

-

10

707

1

0 70

7

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

CD

C3

Ove

rber

g D

istric

t Mun

icip

ality

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Tota

l: O

verb

erg

Mun

icip

aliti

es 8

0 01

0

-

( 9

874)

7

0 13

6

-

-

20

907

2

0 90

7

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BW

C04

1K

anna

land

10

233

-

(

126

) 1

0 10

7

20

000

-

(

10 0

00)

10

000

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

WC

042

Hes

sequ

a 1

3 58

8

-

( 1

67)

13

421

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

WC

043

Mos

sel B

ay 2

3 96

7

-

8 5

98

32

565

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

WC

044

Geo

rge

39

851

-

(

485

) 3

9 36

6

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

153

645

(

24 3

88)

( 7

188)

1

22 0

69

BW

C04

5O

udts

hoor

n 2

1 62

7

-

( 2

65)

21

362

4

0 00

0

-

( 30

000

) 1

0 00

0

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BW

C04

7B

itou

20

063

-

(

246

) 1

9 81

7

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BW

C04

8K

nysn

a 2

4 88

7

-

( 3

05)

24

582

-

-

5

835

5

835

-

-

-

-

-

-

-

-

-

-

-

-

1

5 00

0

-

-

15

000

-

-

-

-

C

DC

4G

arde

n R

oute

Dist

rict M

unic

ipal

ity-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

To

tal:

Gar

den

Rou

te M

unic

ipal

ities

154

216

-

7

004

1

61 2

20

60

000

-

(

34 1

65)

25

835

-

-

-

-

-

-

-

-

-

-

-

-

1

5 00

0

-

-

15

000

1

53 6

45

( 24

388

) (

7 18

8)

122

069

BW

C05

1La

ings

burg

6 6

09

-

( 8

0)

6 5

29

-

-

7 4

96

7 4

96

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BW

C05

2Pr

ince

Alb

ert

7 5

43

-

( 9

3)

7 4

50

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

BW

C05

3B

eauf

ort W

est

13

906

-

(

172

) 1

3 73

4

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

CD

C5

Cen

tral K

aroo

Dist

rict M

unic

ipal

ity-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

To

tal:

Cen

tral

Kar

oo M

unic

ipal

ities

28

058

-

(

345

) 2

7 71

3

-

-

7 4

96

7 4

96

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Tota

l: W

este

rn C

ape

Mun

icip

aliti

es 4

42 4

23

-

( 5

425)

4

36 9

98

137

000

-

(

20 9

78)

116

022

1

06 1

39

-

( 1

306)

1

04 8

33

1 4

81 6

04

( 14

4 45

9)

-

1 3

37 1

45

65

944

-

(

784

) 6

5 16

0

101

536

(

34 6

00)

( 12

332

) 5

4 60

4

2 1

43 6

19

( 1 2

19 3

83)

( 51

396

) 8

72 8

40

Nat

iona

l Tot

al 1

4 67

1 10

1

-

( 18

0 03

6)

14

491

065

3

445

165

-

(

77 6

08)

3 3

67 5

57

948

031

-

(

11 6

63)

936

368

1

1 28

1 87

1

( 1 1

00 0

00)

390

274

1

0 57

2 14

5

317

499

-

(

3 77

7)

313

722

5

59 4

42

( 67

693

) (

12 3

32)

479

417

6

445

848

( 1

902

275

) (

154

503)

4

389

070

57

AN

NE

XU

RE

F

AL

LO

CA

TIO

NS-

IN-K

IND

TO

MU

NIC

IPA

LIT

IES

(SC

HE

DU

LE

6, P

AR

T B

)

(Nat

iona

l and

Mun

icip

al F

inan

cial

Yea

rs)

58

EASTERN CAPE

A BUF Buffalo City 42 592 ( 20 441) - 22 151 - - - - - - - - A NMA Nelson Mandela Bay - - - - - - - - - - - -

B EC101 Dr Beyers Naude 966 ( 776) - 190 37 000 ( 10 000) 7 675 34 675 - - - - B EC102 Blue Crane Route - - - - - - - - - - - - B EC104 Makana 1 662 ( 1 403) - 259 86 000 ( 40 000) - 46 000 - - - - B EC105 Ndlambe 2 000 ( 1 817) - 183 60 000 45 000 - 105 000 - - - - B EC106 Sundays River Valley 4 539 ( 3 920) - 619 3 000 - - 3 000 - - - - B EC108 Kouga 9 421 ( 8 761) - 660 - - - - - - - - B EC109 Kou-Kamma 1 413 ( 1 277) - 136 - 10 000 - 10 000 6 000 - - 6 000 C DC10 Sarah Baartman District Municipality - - - - - - 23 903 23 903 - - - - Total: Sarah Baartman Municipalities 20 001 ( 17 954) - 2 047 186 000 5 000 31 578 222 578 6 000 - - 6 000

B EC121 Mbhashe 116 273 ( 18 521) - 97 752 - - - - - - - - B EC122 Mnquma 33 444 ( 19 566) - 13 878 - - - - - - - - B EC123 Great Kei 9 573 ( 1 903) - 7 670 - - - - - - - - B EC124 Amahlathi 10 564 ( 9 235) - 1 329 - - - - - - - - B EC126 Ngqushwa 7 965 ( 6 181) - 1 784 - - - - - - - - B EC129 Raymond Mhlaba 23 032 ( 10 758) - 12 274 - - - - - - - - C DC12 Amathole District Municipality - - - - 86 366 20 000 109 022 215 388 20 000 - - 20 000 Total: Amathole Municipalities 200 851 ( 66 164) - 134 687 86 366 20 000 109 022 215 388 20 000 - - 20 000

B EC131 Inxuba Yethemba 329 ( 156) - 173 - - - - - - - - B EC135 Intsika Yethu 15 833 ( 4 783) - 11 050 - - - - - - - - B EC136 Emalahleni 8 780 ( 6 633) - 2 147 - - - - - - - - B EC137 Engcobo 11 344 ( 2 671) - 8 673 - - - - - - - - B EC138 Sakhisizwe 10 948 ( 3 556) - 7 392 - - - - - - - - B EC139 Enoch Mgijima 10 656 ( 1 357) - 9 299 - - - - - - - - C DC13 Chris Hani District Municipality - - - - - - 45 725 45 725 - - - - Total: Chris Hani Municipalities 57 890 ( 19 156) - 38 734 - - 45 725 45 725 - - - -

B EC141 Elundini 51 823 ( 13 310) - 38 513 - - - - - - - - B EC142 Senqu 12 114 ( 10 056) - 2 058 - - - - - - - - B EC145 Walter Sisulu 2 851 - - 2 851 - - - - - - - - C DC14 Joe Gqabi District Municipality - - - - - - 28 775 28 775 - - - - Total: Joe Gqabi Municipalities 66 788 ( 23 366) - 43 422 - - 28 775 28 775 - - - -

B EC153 Ngquza Hill 33 466 ( 14 433) - 19 033 - - - - - - - - B EC154 Port St Johns 21 491 ( 4 627) - 16 864 - - - - - - - - B EC155 Nyandeni 17 578 ( 7 645) - 9 933 - - - - - - - - B EC156 Mhlontlo 9 278 ( 1 290) - 7 988 - - - - - - - - B EC157 King Sabata Dalindyebo 47 346 ( 3 631) - 43 715 - - - - - - - - C DC15 O.R. Tambo District Municipality - - - - - - 35 475 35 475 - - - - Total: O.R. Tambo Municipalities 129 159 ( 31 626) - 97 533 - - 35 475 35 475 - - - -

B EC441 Matatiele 51 832 ( 6 932) - 44 900 - - - - - - - - B EC442 Umzimvubu 53 584 ( 6 535) - 47 049 - - - - - - - - B EC443 Mbizana 43 477 ( 22 059) - 21 418 - - - - - - - - B EC444 Ntabankulu 20 826 ( 14 654) - 6 172 - - - - - - - - C DC44 Alfred Nzo District Municipality - - - - 105 000 ( 25 000) 38 075 118 075 24 000 - - 24 000 Total: Alfred Nzo Municipalities 169 719 ( 50 180) - 119 539 105 000 ( 25 000) 38 075 118 075 24 000 - - 24 000

Total: Eastern Cape Municipalities 687 000 ( 228 887) - 458 113 377 366 - 288 650 666 016 50 000 - - 50 000

Category2020/21

MainAllocation

2020/21Adjusted

Allocation2nd Adjustment

2020/21Main

Allocation1st AdjustmentMunicipality

2020/21Adjusted

Allocation

ANNEXURE F

ALLOCATIONS-IN-KIND TO MUNICIPALITIES(SCHEDULE 6, PART B)

Integrated National Electrification Programme (Eskom) Grant Regional Bulk Infrastructure Grant Water Services Infrastructure Grant

2nd Adjustment 2nd Adjustment1st Adjustment 1st Adjustment

National and Municipal Financial Years National and Municipal Financial Years

2020/21Adjusted

Allocation

2020/21Main

Allocation

National and Municipal Financial Years

59

Category2020/21

MainAllocation

2020/21Adjusted

Allocation2nd Adjustment

2020/21Main

Allocation1st AdjustmentMunicipality

2020/21Adjusted

Allocation

ANNEXURE F

ALLOCATIONS-IN-KIND TO MUNICIPALITIES(SCHEDULE 6, PART B)

Integrated National Electrification Programme (Eskom) Grant Regional Bulk Infrastructure Grant Water Services Infrastructure Grant

2nd Adjustment 2nd Adjustment1st Adjustment 1st Adjustment

National and Municipal Financial Years National and Municipal Financial Years

2020/21Adjusted

Allocation

2020/21Main

Allocation

National and Municipal Financial Years

FREE STATE

A MAN Mangaung 4 108 ( 2 996) - 1 112 - 80 000 - 80 000 - - - -

B FS161 Letsemeng 72 ( 38) - 34 - - - - 10 000 - - 10 000 B FS162 Kopanong 75 ( 58) - 17 4 000 - - 4 000 20 000 - - 20 000 B FS163 Mohokare 136 ( 119) - 17 - - - - 6 763 - - 6 763 C DC16 Xhariep District Municipality - - - - - - - - - - - - Total: Xhariep Municipalities 283 ( 215) - 68 4 000 - - 4 000 36 763 - - 36 763

B FS181 Masilonyana 36 ( 19) - 17 153 064 ( 81 597) ( 18 070) 53 397 10 000 - - 10 000 B FS182 Tokologo 36 ( 19) - 17 75 000 ( 5 000) - 70 000 49 381 - - 49 381 B FS183 Tswelopele 9 852 472 - 10 324 20 000 ( 6 000) ( 4 000) 10 000 - - - - B FS184 Matjhabeng 25 359 ( 1 619) - 23 740 - - - - - - - - B FS185 Nala 159 ( 117) - 42 - - - - - - - - C DC18 Lejweleputswa District Municipality - - - - - - - - - - - - Total: Lejweleputswa Municipalities 35 442 ( 1 302) - 34 140 248 064 ( 92 597) ( 22 070) 133 397 59 381 - - 59 381

B FS191 Setsoto 96 ( 37) - 59 127 080 ( 20 000) ( 35 000) 72 080 22 698 - - 22 698 B FS192 Dihlabeng 155 ( 96) - 59 30 000 ( 20 000) ( 5 000) 5 000 7 000 - - 7 000 B FS193 Nketoana 80 ( 37) - 43 157 572 14 968 ( 79 968) 92 572 40 678 - - 40 678 B FS194 Maluti-a-Phofung 5 004 ( 4 343) - 661 66 000 34 284 41 347 141 631 13 128 - - 13 128 B FS195 Phumelela 3 681 813 - 4 494 - - - - 5 000 - - 5 000 B FS196 Mantsopa 4 173 ( 4 131) - 42 10 000 8 660 ( 8 660) 10 000 14 220 - - 14 220 C DC19 Thabo Mofutsanyana District Municipality - - - - - - 41 761 41 761 - - - - Total: Thabo Mofutsanyana Municipalities 13 189 ( 7 831) - 5 358 390 652 17 912 ( 45 520) 363 044 102 724 - - 102 724

B FS201 Moqhaka 17 082 ( 10 962) - 6 120 10 000 ( 10 000) 10 000 10 000 4 010 - - 4 010 B FS203 Ngwathe 40 ( 40) - - 20 000 ( 20 000) - - - - - - B FS204 Metsimaholo 8 - - 8 25 000 24 685 ( 19 946) 29 739 - - - - B FS205 Mafube 40 ( 40) - - 40 000 - 5 000 45 000 10 000 - - 10 000 C DC20 Fezile Dabi District Municipality - - - - - - 72 536 72 536 - - - - Total: Fezile Dabi Municipalities 17 170 ( 11 042) - 6 128 95 000 ( 5 315) 67 590 157 275 14 010 - - 14 010

Total: Free State Municipalities 70 192 ( 23 386) - 46 806 737 716 - - 737 716 212 878 - - 212 878

GAUTENG

A EKU City of Ekurhuleni 85 319 ( 65 654) - 19 665 - - - - - - - - A JHB City of Johannesburg 29 547 ( 8 233) - 21 314 - - - - - - - - A TSH City of Tshwane 2 616 ( 316) - 2 300 - - - - - - - -

B GT421 Emfuleni 3 292 1 321 - 4 613 1 113 000 136 000 ( 743 293) 505 707 40 000 - - 40 000 B GT422 Midvaal - - - - 130 000 ( 80 000) 10 000 60 000 - - - - B GT423 Lesedi - - - - - - - - - - - - C DC42 Sedibeng District Municipality - - - - - - 26 560 26 560 - - - - Total: Sedibeng Municipalities 3 292 1 321 - 4 613 1 243 000 56 000 ( 706 733) 592 267 40 000 - - 40 000

B GT481 Mogale City 21 782 7 013 - 28 795 - - - - - - - - B GT484 Merafong City 144 8 - 152 - - - - - - - - B GT485 Rand West City 49 256 1 907 - 51 163 57 747 ( 56 000) 28 253 30 000 - - - - C DC48 West Rand District Municipality - - - - - - 8 574 8 574 - - - - Total: West Rand Municipalities 71 182 8 928 - 80 110 57 747 ( 56 000) 36 827 38 574 - - - -

Total: Gauteng Municipalities 191 956 ( 63 954) - 128 002 1 300 747 - ( 669 906) 630 841 40 000 - - 40 000

60

Category2020/21

MainAllocation

2020/21Adjusted

Allocation2nd Adjustment

2020/21Main

Allocation1st AdjustmentMunicipality

2020/21Adjusted

Allocation

ANNEXURE F

ALLOCATIONS-IN-KIND TO MUNICIPALITIES(SCHEDULE 6, PART B)

Integrated National Electrification Programme (Eskom) Grant Regional Bulk Infrastructure Grant Water Services Infrastructure Grant

2nd Adjustment 2nd Adjustment1st Adjustment 1st Adjustment

National and Municipal Financial Years National and Municipal Financial Years

2020/21Adjusted

Allocation

2020/21Main

Allocation

National and Municipal Financial Years

KWAZULU-NATAL

A ETH eThekwini 10 142 ( 9 488) - 654 - - - - - - - -

B KZN212 uMdoni 27 756 ( 1 670) - 26 086 - - - - - - - - B KZN213 uMzumbe 39 860 ( 39 129) - 731 - - - - - - - - B KZN214 uMuziwabantu 11 913 ( 11 875) - 38 - - - - - - - - B KZN216 Ray Nkonyeni 9 191 ( 8 229) - 962 - - - - - - - - C DC21 Ugu District Municipality - - - - - - - - - - - - Total: Ugu Municipalities 88 720 ( 60 903) - 27 817 - - - - - - - -

B KZN221 uMshwathi 8 263 ( 1 587) - 6 676 - - - - - - - - B KZN222 uMngeni - - - - - - - - - - - - B KZN223 Mpofana - - - - - - - - - - - - B KZN224 iMpendle - - - - - - - - - - - - B KZN225 Msunduzi 15 864 ( 3 487) - 12 377 - - - - - - - - B KZN226 Mkhambathini - - - - - - - - - - - - B KZN227 Richmond - - - - - - - - - - - - C DC22 uMgungundlovu District Municipality - - - - - - 34 296 34 296 - - - - Total: uMgungundlovu Municipalities 24 127 ( 5 074) - 19 053 - - 34 296 34 296 - - - -

B KZN235 Okhahlamba - - - - - - - - - - - - B KZN237 iNkosi Langalibalele 1 750 ( 1 102) - 648 - - - - - - - - B KZN238 Alfred Duma 37 493 10 114 - 47 607 - - - - - - - - C DC23 uThukela District Municipality - - - - - - - - - - - - Total: uThukela Municipalities 39 243 9 012 - 48 255 - - - - - - - -

B KZN241 eNdumeni 14 350 ( 12 577) - 1 773 - - - - - - - - B KZN242 Nquthu 22 803 ( 22 155) - 648 - - - - - - - - B KZN244 uMsinga 75 822 ( 3 037) - 72 785 - - - - - - - - B KZN245 uMvoti 3 888 2 587 - 6 475 - - - - - - - - C DC24 uMzinyathi District Municipality - - - - - - - - - - - - Total: uMzinyathi Municipalities 116 863 ( 35 182) - 81 681 - - - - - - - -

B KZN252 Newcastle 14 163 ( 10 690) - 3 473 - - - - - - - - B KZN253 eMadlangeni 1 475 ( 827) - 648 - - - - - - - - B KZN254 Dannhauser 8 830 ( 22) - 8 808 - - - - - - - - C DC25 Amajuba District Municipality - - - - - - - - - - - - Total: Amajuba Municipalities 24 468 ( 11 539) - 12 929 - - - - - - - -

B KZN261 eDumbe 7 963 ( 7 200) - 763 - - - - - - - - B KZN262 uPhongolo 3 125 ( 2 383) - 742 - - - - - - - - B KZN263 AbaQulusi 15 753 ( 13 466) - 2 287 - - - - - - - - B KZN265 Nongoma 1 100 ( 1 100) - - - - - - - - - - B KZN266 Ulundi 13 593 ( 1 837) - 11 756 - - - - - - - - C DC26 Zululand District Municipality - - - - - - 19 638 19 638 - - - - Total: Zululand Municipalities 41 534 ( 25 986) - 15 548 - - 19 638 19 638 - - - -

B KZN271 uMhlabuyalingana 182 070 ( 57 733) - 124 337 - - - - - - - - B KZN272 Jozini 74 722 ( 12 490) - 62 232 - - - - - - - - B KZN275 Mtubatuba 38 482 ( 10 052) - 28 430 - - - - - - - - B KZN276 Big Five Hlabisa 1 925 ( 1 925) - - - - - - - - - - C DC27 uMkhanyakude District Municipality - - - - 591 - - 591 - - - - Total: uMkhanyakude Municipalities 297 199 ( 82 200) - 214 999 591 - - 591 - - - -

B KZN281 uMfolozi 550 ( 550) - - - - - - - - - - B KZN282 uMhlathuze 11 110 ( 2 222) - 8 888 - - - - - - - - B KZN284 uMlalazi 12 874 ( 1 282) - 11 592 - - - - - - - - B KZN285 Mthonjaneni 1 200 ( 552) - 648 - - - - - - - - B KZN286 Nkandla 1 650 ( 1 650) - - - - - - - - - - C DC28 King Cetshwayo District Municipality - - - - - - - - - - - - Total: King Cetshwayo Municipalities 27 384 ( 6 256) - 21 128 - - - - - - - -

B KZN291 Mandeni 825 ( 825) - - - - - - - - - - B KZN292 KwaDukuza 650 ( 2) - 648 - - - - - - - - B KZN293 Ndwedwe 30 968 ( 6 477) - 24 491 - - - - - - - - B KZN294 Maphumulo 2 475 ( 829) - 1 646 - - - - - - - - C DC29 iLembe District Municipality - - - - - - - - - - - - Total: iLembe Municipalities 34 918 ( 8 133) - 26 785 - - - - - - - -

B KZN433 Greater Kokstad 275 ( 275) - - - - - - - - - - B KZN434 uBuhlebezwe 7 652 ( 1 362) - 6 290 - - - - - - - - B KZN435 uMzimkhulu 2 475 ( 829) - 1 646 - - - - - - - - B KZN436 Dr Nkosazana Dlamini Zuma - - - - - - - - - - - - C DC43 Harry Gwala District Municipality - - - - - - - - - - - - Total: Harry Gwala Municipalities 10 402 ( 2 466) - 7 936 - - - - - - - -

Total: KwaZulu-Natal Municipalities 715 000 ( 238 215) - 476 785 591 - 53 934 54 525 - - - -

61

Category2020/21

MainAllocation

2020/21Adjusted

Allocation2nd Adjustment

2020/21Main

Allocation1st AdjustmentMunicipality

2020/21Adjusted

Allocation

ANNEXURE F

ALLOCATIONS-IN-KIND TO MUNICIPALITIES(SCHEDULE 6, PART B)

Integrated National Electrification Programme (Eskom) Grant Regional Bulk Infrastructure Grant Water Services Infrastructure Grant

2nd Adjustment 2nd Adjustment1st Adjustment 1st Adjustment

National and Municipal Financial Years National and Municipal Financial Years

2020/21Adjusted

Allocation

2020/21Main

Allocation

National and Municipal Financial Years

LIMPOPO

B LIM331 Greater Giyani 17 796 ( 9 281) - 8 515 - - - - - - - - B LIM332 Greater Letaba 19 628 ( 1 127) - 18 501 - - - - - - - - B LIM333 Greater Tzaneen 9 041 ( 5 937) - 3 104 - - - - - - - - B LIM334 Ba-Phalaborwa 11 533 ( 1 323) - 10 210 - - - - - - - - B LIM335 Maruleng 9 183 ( 4 313) - 4 870 - - - - - - - - C DC33 Mopani District Municipality - - - - 408 354 44 344 60 600 513 298 60 600 - - 60 600 Total: Mopani Municipalities 67 181 ( 21 981) - 45 200 408 354 44 344 60 600 513 298 60 600 - - 60 600

B LIM341 Musina 13 328 ( 5 689) - 7 639 - - - - - - - - B LIM343 Thulamela 34 780 438 ( 15 000) 20 218 - - - - - - - - B LIM344 Makhado 10 576 ( 1 455) - 9 121 - - - - - - - - B LIM345 Collins Chabane 27 470 ( 794) - 26 676 - - - - - - - - C DC34 Vhembe District Municipality - - - - 115 332 ( 30 000) - 85 332 - - - - Total: Vhembe Municipalities 86 154 ( 7 500) ( 15 000) 63 654 115 332 ( 30 000) - 85 332 - - - -

B LIM351 Blouberg 8 705 ( 4 411) - 4 294 - - - - - - - - B LIM353 Molemole 5 277 ( 3 983) - 1 294 - - - - - - - - B LIM354 Polokwane 52 108 ( 28 414) ( 3 498) 20 196 - - - - - - - - B LIM355 Lepele-Nkumpi 5 934 ( 1 001) - 4 933 - - - - - - - - C DC35 Capricorn District Municipality - - - - - - 54 085 54 085 - - - - Total: Capricorn Municipalities 72 024 ( 37 809) ( 3 498) 30 717 - - 54 085 54 085 - - - -

B LIM361 Thabazimbi 15 048 ( 14 789) - 259 - - - - 45 000 - - 45 000 B LIM362 Lephalale 26 706 ( 5 059) - 21 647 - - - - - - - - B LIM366 Bela-Bela 12 167 ( 11 650) - 517 - - - - - - - - B LIM367 Mogalakwena 26 911 ( 8 384) - 18 527 74 434 ( 30 000) - 44 434 - - - - B LIM368 Modimolle-Mookgophong 1 443 ( 1 184) - 259 - - - - 39 152 - - 39 152 C DC36 Waterberg District Municipality - - - - - - - - - - - - Total: Waterberg Municipalities 82 275 ( 41 066) - 41 209 74 434 ( 30 000) - 44 434 84 152 - - 84 152

B LIM471 Ephraim Mogale 11 465 ( 768) - 10 697 - - - - - - - - B LIM472 Elias Motsoaledi 9 441 ( 7 100) - 2 341 - - - - - - - - B LIM473 Makhuduthamaga 24 998 ( 13 944) - 11 054 - - - - - - - - B LIM476 Fetakgomo Tubatse 61 461 ( 8 097) - 53 364 - - - - - - - - C DC47 Sekhukhune District Municipality - - - - 135 000 15 656 - 150 656 - - - - Total: Sekhukhune Municipalities 107 365 ( 29 909) - 77 456 135 000 15 656 - 150 656 - - - -

Total: Limpopo Municipalities 414 999 ( 138 265) ( 18 498) 258 236 733 120 - 114 685 847 805 144 752 - - 144 752

MPUMALANGA

B MP301 Chief Albert Luthuli 12 760 ( 881) - 11 879 - - - - - - - - B MP302 Msukaligwa 15 915 ( 436) - 15 479 - - - - - - - - B MP303 Mkhondo 16 062 ( 102) - 15 960 - - - - - - - - B MP304 Dr Pixley ka Isaka Seme 2 350 ( 508) - 1 842 - - - - - - - - B MP305 Lekwa 7 026 370 - 7 396 - 51 040 - 51 040 50 650 - 12 258 62 908 B MP306 Dipaleseng 2 275 120 - 2 395 74 868 - ( 8 061) 66 807 - - - - B MP307 Govan Mbeki 1 700 89 - 1 789 - - - - - - - - C DC30 Gert Sibande District Municipality - - - - - - - - - - - - Total: Gert Sibande Municipalities 58 088 ( 1 348) - 56 740 74 868 51 040 ( 8 061) 117 847 50 650 - 12 258 62 908

B MP311 Victor Khanye 4 098 ( 3 420) - 678 - - - - - - - - B MP312 Emalahleni - - - - - - - - - - - - B MP313 Steve Tshwete 902 48 - 950 - - - - - - - - B MP314 Emakhazeni 3 708 195 - 3 903 - - - - - - - - B MP315 Thembisile Hani 93 524 ( 53 260) - 40 264 32 498 ( 10 000) - 22 498 - - - - B MP316 Dr JS Moroka 26 795 ( 9 505) - 17 290 5 000 ( 4 000) - 1 000 - - - - C DC31 Nkangala District Municipality - - - - - - 28 061 28 061 - - - - Total: Nkangala Municipalities 129 027 ( 65 942) - 63 085 37 498 ( 14 000) 28 061 51 559 - - - -

B MP321 Thaba Chweu 920 48 - 968 - - - - - - - - B MP324 Nkomazi 8 000 421 - 8 421 130 000 ( 5 040) ( 1 060) 123 900 - - - - B MP325 Bushbuckridge 71 092 ( 26 408) - 44 684 - - - - - - - - B MP326 City of Mbombela 36 193 ( 7 828) - 28 365 25 000 ( 24 000) - 1 000 - - - - C DC32 Ehlanzeni District Municipality - - - - - - 68 592 68 592 - - - - Total: Ehlanzeni Municipalities 116 205 ( 33 767) - 82 438 155 000 ( 29 040) 67 532 193 492 - - - -

Total: Mpumalanga Municipalities 303 320 ( 101 057) - 202 263 267 366 8 000 87 532 362 898 50 650 - 12 258 62 908

62

Category2020/21

MainAllocation

2020/21Adjusted

Allocation2nd Adjustment

2020/21Main

Allocation1st AdjustmentMunicipality

2020/21Adjusted

Allocation

ANNEXURE F

ALLOCATIONS-IN-KIND TO MUNICIPALITIES(SCHEDULE 6, PART B)

Integrated National Electrification Programme (Eskom) Grant Regional Bulk Infrastructure Grant Water Services Infrastructure Grant

2nd Adjustment 2nd Adjustment1st Adjustment 1st Adjustment

National and Municipal Financial Years National and Municipal Financial Years

2020/21Adjusted

Allocation

2020/21Main

Allocation

National and Municipal Financial Years

NORTHERN CAPE

B NC061 Richtersveld - - - - - - 34 963 34 963 - - - - B NC062 Nama Khoi 2 346 - - 2 346 - - 751 751 - - - - B NC064 Kamiesberg - - - - - - 84 714 84 714 - - - - B NC065 Hantam - - - - - - 59 423 59 423 - - - - B NC066 Karoo Hoogland - - - - - - 188 188 - - - - B NC067 Khâi-Ma - - - - - - 188 188 - - - - C DC6 Namakwa District Municipality - - - - - - - - - - - - Total: Namakwa Municipalities 2 346 - - 2 346 - - 180 227 180 227 - - - -

B NC071 Ubuntu - - - - - - 248 248 - - - - B NC072 Umsobomvu 302 - - 302 - - 188 188 - - - - B NC073 Emthanjeni - - - - - - 1 500 1 500 - - - - B NC074 Kareeberg - - - - - - 11 483 11 483 - - - - B NC075 Renosterberg - - - - - - 751 751 - - - - B NC076 Thembelihle - - - - - - 21 515 21 515 - - - - B NC077 Siyathemba 2 875 - - 2 875 - - 6 963 6 963 - - - - B NC078 Siyancuma - - - - 36 840 - 5 425 42 265 7 603 - - 7 603 C DC7 Pixley Ka Seme District Municipality - - - - - - - - - - - - Total: Pixley Ka Seme Municipalities 3 177 - - 3 177 36 840 - 48 073 84 913 7 603 - - 7 603

B NC082 !Kai !Garib 3 105 - - 3 105 - - 3 984 3 984 - - - - B NC084 !Kheis - - - - - - 791 791 - - - - B NC085 Tsantsabane 9 247 - - 9 247 - - 3 001 3 001 16 211 - - 16 211 B NC086 Kgatelopele - - - - - - 751 751 - - - - B NC087 Dawid Kruiper 240 - - 240 57 904 ( 21 000) ( 30 249) 6 655 - - - - C DC8 Z.F. Mgcawu District Municipality - - - - - - - - - - - - Total: Z.F. Mgcawu Municipalities 12 592 - - 12 592 57 904 ( 21 000) ( 21 722) 15 182 16 211 - - 16 211

B NC091 Sol Plaatjie 145 - - 145 - - 16 675 16 675 162 - - 162 B NC092 Dikgatlong 4 450 - - 4 450 - - 5 251 5 251 - - - - B NC093 Magareng - - - - 21 221 28 000 34 000 83 221 - - - - B NC094 Phokwane 3 335 - - 3 335 - - 3 000 3 000 - - - - C DC9 Frances Baard District Municipality - - - - - - - - - - - - Total: Frances Baard Municipalities 7 930 - - 7 930 21 221 28 000 58 926 108 147 162 - - 162

B NC451 Joe Morolong 31 597 - - 31 597 - - 54 229 54 229 - - - - B NC452 Ga-Segonyana 116 934 ( 58 163) - 58 771 - - 18 718 18 718 - - - - B NC453 Gamagara - - - - - - 3 751 3 751 - - - - C DC45 John Taolo Gaetsewe District Municipality - - - - - - - - - - - - Total: John Taolo Gaetsewe Municipalities 148 531 ( 58 163) - 90 368 - - 76 698 76 698 - - - -

Total: Northern Cape Municipalities 174 576 ( 58 163) - 116 413 115 965 7 000 342 202 465 167 23 976 - - 23 976

NORTH WEST

B NW371 Moretele 37 782 ( 14 417) - 23 365 35 000 ( 5 000) - 30 000 - - - - B NW372 Madibeng 21 844 ( 11 640) - 10 204 120 000 - ( 20 559) 99 441 14 008 - - 14 008 B NW373 Rustenburg 44 620 ( 11 899) - 32 721 - - - - - - - - B NW374 Kgetlengrivier 1 500 227 - 1 727 3 000 5 000 34 000 42 000 22 542 - - 22 542 B NW375 Moses Kotane 45 977 ( 10 762) - 35 215 - - - - - - - - C DC37 Bojanala Platinum District Municipality - - - - - - - - - - - - Total: Bojanala Platinum Municipalities 151 723 ( 48 491) - 103 232 158 000 - 13 441 171 441 36 550 - - 36 550

B NW381 Ratlou 4 360 ( 1 374) - 2 986 - - - - - - - - B NW382 Tswaing 19 910 ( 7 435) - 12 475 - - - - - - - - B NW383 Mafikeng 48 550 ( 8 655) - 39 895 - - - - - - - - B NW384 Ditsobotla 7 210 2 410 - 9 620 - - - - - - - - B NW385 Ramotshere Moiloa 10 445 ( 3 253) - 7 192 - - - - - - - - C DC38 Ngaka Modiri Molema District Municipality - - - - 73 000 - ( 27 629) 45 371 20 000 - - 20 000 Total: Ngaka Modiri Molema Municipalities 90 475 ( 18 307) - 72 168 73 000 - ( 27 629) 45 371 20 000 - - 20 000

B NW392 Naledi 610 ( 535) - 75 - - - - - - - - B NW393 Mamusa 10 845 ( 2 187) - 8 658 - - - - - - - - B NW394 Greater Taung 43 449 ( 23 502) - 19 947 - - - - - - - - B NW396 Lekwa-Teemane 12 359 ( 11 638) - 721 - - - - - - - - B NW397 Kagisano-Molopo 17 656 ( 3 041) - 14 615 - - - - - - - - C DC39 Dr Ruth Segomotsi Mompati District Municipality - - - - - - 8 005 8 005 - - - - Total: Dr Ruth Segomotsi Mompati Municipalities 84 919 ( 40 903) - 44 016 - - 8 005 8 005 - - - -

B NW403 City of Matlosana 3 640 ( 563) - 3 077 - - - - - - - - B NW404 Maquassi Hills 650 ( 575) - 75 - - - - - - - - B NW405 JB Marks 3 033 ( 2 586) - 447 20 375 - - 20 375 - - - - C DC40 Dr Kenneth Kaunda District Municipality - - - - - - 28 904 28 904 - - - - Total: Dr Kenneth Kaunda Municipalities 7 323 ( 3 724) - 3 599 20 375 - 28 904 49 279 - - - -

Total: North West Municipalities 334 440 ( 111 425) - 223 015 251 375 - 22 721 274 096 56 550 - - 56 550

63

Category2020/21

MainAllocation

2020/21Adjusted

Allocation2nd Adjustment

2020/21Main

Allocation1st AdjustmentMunicipality

2020/21Adjusted

Allocation

ANNEXURE F

ALLOCATIONS-IN-KIND TO MUNICIPALITIES(SCHEDULE 6, PART B)

Integrated National Electrification Programme (Eskom) Grant Regional Bulk Infrastructure Grant Water Services Infrastructure Grant

2nd Adjustment 2nd Adjustment1st Adjustment 1st Adjustment

National and Municipal Financial Years National and Municipal Financial Years

2020/21Adjusted

Allocation

2020/21Main

Allocation

National and Municipal Financial Years

WESTERN CAPE

A CPT City of Cape Town 76 547 ( 27 411) - 49 136 - - - - - - - -

B WC011 Matzikama - - - - 6 000 - ( 6 000) - - - - - B WC012 Cederberg - - - - 36 587 15 000 ( 15 326) 36 261 - - - - B WC013 Bergrivier - - - - - - - - - - - - B WC014 Saldanha Bay 3 892 ( 3 892) - - - - - - - - - - B WC015 Swartland 885 ( 2) - 883 - - - - - - - - C DC1 West Coast District Municipality - - - - - - 15 326 15 326 - - - - Total: West Coast Municipalities 4 777 ( 3 894) - 883 42 587 15 000 ( 6 000) 51 587 - - - -

B WC022 Witzenberg - - - - - - - - - - - - B WC023 Drakenstein - - - - - - - - - - - - B WC024 Stellenbosch 2 548 ( 6) - 2 542 - - - - - - - - B WC025 Breede Valley 15 203 ( 5 410) - 9 793 - - - - - - - - B WC026 Langeberg - - - - - - - - - - - - C DC2 Cape Winelands District Municipality - - - - - - 17 834 17 834 - - - - Total: Cape Winelands Municipalities 17 751 ( 5 416) - 12 335 - - 17 834 17 834 - - - -

B WC031 Theewaterskloof 8 073 780 - 8 853 - - - - - - - - B WC032 Overstrand - - - - - - - - - - - - B WC033 Cape Agulhas - - - - - - - - - - - - B WC034 Swellendam - - - - - - - - - - - - C DC3 Overberg District Municipality - - - - - - - - - - - - Total: Overberg Municipalities 8 073 780 - 8 853 - - - - - - - -

B WC041 Kannaland - - - - 30 000 ( 30 000) - - - - - - B WC042 Hessequa - - - - - - - - - - - - B WC043 Mossel Bay - - - - - - - - - - - - B WC044 George 2 852 ( 707) - 2 145 - - - - - - - - B WC045 Oudtshoorn - - - - - - - - - - - - B WC047 Bitou - - - - - - - - - - - - B WC048 Knysna - - - - - - - - - - - - C DC4 Garden Route District Municipality - - - - - - - - - - - - Total: Garden Route Municipalities 2 852 ( 707) - 2 145 30 000 ( 30 000) - - - - - -

B WC051 Laingsburg - - - - - - - - - - - - B WC052 Prince Albert - - - - - - - - - - - - B WC053 Beaufort West - - - - - - - - - - - - C DC5 Central Karoo District Municipality - - - - - - - - - - - - Total: Central Karoo Municipalities - - - - - - - - - - - -

Total: Western Cape Municipalities 110 000 ( 36 648) - 73 352 72 587 ( 15 000) 11 834 69 421 - - - -

National Total 3 001 483 ( 1 000 000) ( 18 498) 1 982 985 3 856 833 - 251 652 4 108 485 578 806 - 12 258 591 064

Unallocated

64

APP

EN

DIX

A

APP

EN

DIX

TO

SC

HE

DU

LE

5, P

AR

T B

: MU

NIC

IPA

L IN

FRA

STR

UC

TU

RE

GR

AN

T (M

IG) A

ND

INT

EG

RA

TE

D U

RB

AN

D

EV

EL

OPM

EN

T G

RA

NT

(IU

DG

)

(Nat

iona

l and

Mun

icip

al F

inan

cial

Yea

rs)

RIN

G-F

EN

CE

D F

UN

DIN

G F

OR

SPO

RT

S IN

FRA

STR

UC

TU

RE

- B

RE

AK

DO

WN

PE

R M

UN

ICIP

AL

ITY

65

EASTERN CAPE

B EC105 Ndlambe MIG 9 400 ( 113) 9 287 Total: Sarah Baartman Municipalities 9 400 - ( 113) 9 287 B EC135 Intsika Yethu MIG 10 000 ( 120) 9 880 Total: Chris Hani Municipalities 10 000 - ( 120) 9 880 B EC442 Umzimvubu MIG 10 000 ( 120) 9 880 Total: Alfred Nzo Municipalities 10 000 - ( 120) 9 880

Total: Eastern Cape Municipalities 29 400 - ( 353) 29 047

FREE STATE

B FS181 Masilonyana MIG 6 728 ( 81) 6 647 Total: Lejweleputswa Municipalities 6 728 - ( 81) 6 647 B FS192 Dihlabeng MIG 9 000 ( 108) 8 892 Total: Thabo Mofutsanyana Municipalities 9 000 - ( 108) 8 892 B FS201 Moqhaka MIG 10 000 ( 120) 9 880 Total: Fezile Dabi Municipalities 10 000 - ( 120) 9 880

Total: Free State Municipalities 25 728 - ( 309) 25 419

KWAZULU-NATAL

B KZN235 Okhahlamba MIG 10 000 ( 120) 9 880 B KZN237 iNkosi Langalibalele MIG 10 000 ( 120) 9 880 Total: uThukela Municipalities 20 000 - ( 240) 19 760 B KZN272 Jozini MIG 9 600 ( 115) 9 485 Total: uMkhanyakude Municipalities 9 600 - ( 115) 9 485 B KZN281 uMfolozi MIG 13 000 ( 156) 12 844 Total: King Cetshwayo Municipalities 13 000 - ( 156) 12 844

Total: KwaZulu-Natal Municipalities 42 600 - ( 511) 42 089

LIMPOPO

B LIM341 MusinaMIG 30 000 ( 25 053) 4 947

Total: Vhembe Municipalities 30 000 - ( 25 053) 4 947

B LIM354 PolokwaneMIG 5 000 24 633 29 633

Total: Capricorn Municipalities 5 000 - 24 633 29 633 B LIM361 Thabazimbi MIG 11 000 ( 132) 10 868 Total: Waterberg Municipalities 11 000 - ( 132) 10 868

Total: Limpopo Municipalities 46 000 - ( 552) 45 448

MPUMALANGA

B MP313 Steve Tshwete IUDG 10 000 ( 120) 9 880 Total: Nkangala Municipalities 10 000 - ( 120) 9 880

Total: Mpumalanga Municipalities 10 000 - ( 120) 9 880

NORTHERN CAPE

B NC062 Nama Khoi MIG 7 500 ( 90) 7 410 Total: Namakwa Municipalities 7 500 - ( 90) 7 410 B NC075 Renosterberg MIG 11 500 ( 138) 11 362 B NC076 Thembelihle MIG 11 500 ( 138) 11 362 Total: Pixley Ka Seme Municipalities 23 000 - ( 276) 22 724 B NC084 !Kheis MIG 9 330 ( 112) 9 218 Total: Z.F. Mgcawu Municipalities 9 330 - ( 112) 9 218

Total: Northern Cape Municipalities 39 830 - ( 478) 39 352

APPENDIX A

RING-FENCED FUNDING FOR SPORTS INFRASTRUCTURE - BREAKDOWN PER MUNICIPALITY

Ring-fenced Municipal Infrastructure Grant and Integrated Urban Development Grant allocations for sports infrastructure

APPENDIX TO SCHEDULE 5, PART B: MUNICIPAL INFRASTRUCTURE GRANT (MIG) AND INTEGRATED URBAN DEVELOPMENT GRANT (IUDG)

ProjectCategory Municipality

National and Municipal Financial Years

Upgrading of Magwala sports facility

Upgrading of Marselle sports field Kenton-on-Sea phase 2

2020/21Main

Allocation1st Adjustment 2nd Adjustment

2020/21Adjusted

Allocation

Construction of Pepeni sports facility

Upgrading of Winnie Mandela Museum and Recreation Precinct

Construction of KoeKoe village sports facility

Construction of Fateng-Tse-Ntso sports facility

Construction of Khethani sports field - ward 01Upgrade of Wembezi sports field ward 9

Construction of Ndumo sports complex phase 4

Construction of the Dondotha sports field

Construction of Moletjie field and softball field (Updated project name: Completion of Harper sport facility)

Completion of Harper sports facility (Updated project name: Construction of Polokwane softball field)

Upgrading of sports and recreation facilities in Raphuti (ward 4)

Construction of Kwazamokuhle stadium

Upgrading of Vanderkloof sports facility Development of Steynville sports facility

Buffelsrivier sports facility

Development of Grootdrink sports facility

Grant

66

APPENDIX A

RING-FENCED FUNDING FOR SPORTS INFRASTRUCTURE - BREAKDOWN PER MUNICIPALITY

Ring-fenced Municipal Infrastructure Grant and Integrated Urban Development Grant allocations for sports infrastructure

APPENDIX TO SCHEDULE 5, PART B: MUNICIPAL INFRASTRUCTURE GRANT (MIG) AND INTEGRATED URBAN DEVELOPMENT GRANT (IUDG)

ProjectCategory Municipality

National and Municipal Financial Years2020/21

MainAllocation

1st Adjustment 2nd Adjustment2020/21Adjusted

AllocationGrant

NORTH WEST

B NW374 Kgetlengrivier MIG 10 000 ( 120) 9 880 Total: Bojanala Platinum Municipalities 10 000 - ( 120) 9 880 B NW383 Mafikeng MIG 20 000 ( 240) 19 760 B NW384 Ditsobotla MIG 10 300 ( 121) 10 179 Total: Ngaka Modiri Molema Municipalities 30 300 - ( 361) 29 939

Total: North West Municipalities 40 300 - ( 481) 39 819

WESTERN CAPE

B WC011 Matzikama MIG 10 000 ( 120) 9 880 Total: West Coast Municipalities 10 000 - ( 120) 9 880 B WC034 Swellendam MIG 9 000 ( 9 000) - Total: Overberg Municipalities 9 000 - ( 9 000) - B WC043 Mossel Bay MIG - - 8 890 8 890

Total: Western Cape Municipalities 19 000 - ( 230) 18 770

MIG

National Total 252 858 - ( 3 034) 249 824

Unallocated

Construction of Reagile sports ground

Construction of tennis courts at Mmabatho stadiumRefurbishment of Iketleng sports facility

Upgrading of existing and construction of new sports facilities in Klawer (ward 6)

New soccer facility for Wolwedans

New soccer facility for Wolwedans

67

APP

EN

DIX

B

(Nat

iona

l Fin

anci

al Y

ears

)

APP

EN

DIX

TO

SC

HE

DU

LE

5, P

AR

T A

: BR

EA

KD

OW

N O

F T

HE

EA

RL

Y C

HIL

DH

OO

D D

EV

EL

OPM

EN

T G

RA

NT

: AL

LO

CA

TIO

NS

PER

GR

AN

T C

OM

PON

EN

T P

ER

PR

OV

INC

E

68

Social Development (Vote 19)

Early Childhood Development GrantEastern Cape 134 142 - 59 792 193 934 Free State 55 768 - 38 880 94 648 Gauteng 135 229 - 77 763 212 992 KwaZulu-Natal 193 437 - 89 898 283 335 Limpopo 127 724 - 58 241 185 965 Mpumalanga 80 872 - 42 372 123 244 Northern Cape 24 085 - 42 372 66 457 North West 76 740 - 33 865 110 605 Western Cape 87 152 - 53 067 140 219 Unallocated - - - -

Total 915 149 - 496 250 1 411 399 of which:Maintenance Component

Eastern Cape 9 181 9 181 Free State 9 579 9 579 Gauteng 7 582 7 582 KwaZulu-Natal 14 047 14 047 Limpopo 17 492 17 492 Mpumalanga 9 181 9 181 Northern Cape 6 508 6 508 North West 6 797 6 797 Western Cape 8 350 8 350 Unallocated - -

Total: Maintenance Component 88 717 - - 88 717 Subsidy Component -

Eastern Cape 124 961 59 792 184 753 Free State 46 189 38 880 85 069 Gauteng 127 647 77 763 205 410 KwaZulu-Natal 179 390 89 898 269 288 Limpopo 110 232 58 241 168 473 Mpumalanga 71 691 42 372 114 063 Northern Cape 17 577 42 372 59 949 North West 69 943 33 865 103 808 Western Cape 78 802 53 067 131 869 Unallocated - -

Total: Subsidy Component 826 432 - 496 250 1 322 682

APPENDIX B

APPENDIX TO SCHEDULE 5, PART A: BREAKDOWN OF THE EARLY CHILDHOOD DEVELOPMENT GRANT: ALLOCATIONS PER GRANT COMPONENT PER PROVINCE

Early Childhood Development GrantNational Financial Year

Province /Components2020/21

MainAllocation

1st Adjustment 2nd Adjustment2020/21Adjusted

Allocation

69

APP

EN

DIX

C

(Nat

iona

l Fin

anci

al Y

ear)

APP

EN

DIX

TO

SC

HE

DU

LE

5, P

AR

T A

: BR

EA

KD

OW

N O

F T

HE

HIV

, TB

, MA

LA

RIA

AN

D C

OM

MU

NIT

Y O

UT

RE

AC

H G

RA

NT

: A

LL

OC

AT

ION

S PE

R G

RA

NT

CO

MPO

NE

NT

PE

R P

RO

VIN

CE

70

Health (Vote 18)

HIV, TB, Malaria and Community Outreach GrantEastern Cape 2 667 462 481 076 8 761 3 157 299 Free State 1 472 363 125 159 725 1 598 247 Gauteng 5 256 234 607 442 ( 47 977) 5 815 699 KwaZulu-Natal 6 453 923 446 764 ( 1 798) 6 898 889 Limpopo 2 179 020 223 429 11 335 2 413 784 Mpumalanga 2 205 714 173 061 3 656 2 382 431 Northern Cape 656 487 61 575 168 718 230 North West 1 628 527 175 100 5 095 1 808 722 Western Cape 1 867 472 552 220 9 426 2 429 118 Unallocated - - - -

Total 24 387 202 2 845 826 ( 10 609) 27 222 419 of which:HIV and AIDS Component

Eastern Cape 2 334 101 - ( 19 197) 2 314 904 Free State 1 278 805 - ( 10 518) 1 268 287 Gauteng 4 530 092 - ( 37 259) 4 492 833 KwaZulu-Natal 5 660 394 - ( 46 554) 5 613 840 Limpopo 1 555 254 - ( 12 791) 1 542 463 Mpumalanga 1 813 880 - ( 14 918) 1 798 962 Northern Cape 488 778 - ( 4 020) 484 758 North West 1 322 296 - ( 10 875) 1 311 421 Western Cape 1 562 888 - ( 12 854) 1 550 034

Total 20 546 488 - ( 168 986) 20 377 502 TB Component

Eastern Cape 73 566 - ( 605) 72 961 Free State 31 079 - ( 256) 30 823 Gauteng 89 801 - ( 739) 89 062 KwaZulu-Natal 112 869 - ( 928) 111 941 Limpopo 47 314 - ( 389) 46 925 Mpumalanga 35 799 - ( 294) 35 505 Northern Cape 33 358 - ( 274) 33 084 North West 21 745 - ( 179) 21 566 Western Cape 66 458 - ( 547) 65 911

Total 511 989 - ( 4 211) 507 778 Malaria Component

Eastern Cape - - - - Free State - - - - Gauteng - - - - KwaZulu-Natal 18 033 - - 18 033 Limpopo 70 370 - ( 964) 69 406 Mpumalanga 28 795 - - 28 795 Northern Cape - - - - North West - - - - Western Cape - - - -

Total 117 198 - ( 964) 116 234 Community Outreach Services Component

Eastern Cape 167 506 - 32 972 200 478 Free State 123 365 - 12 744 136 109 Gauteng 462 701 - ( 3 805) 458 896 KwaZulu-Natal 525 672 - 51 906 577 578 Limpopo 337 473 - 28 452 365 925 Mpumalanga 260 315 - 20 680 280 995 Northern Cape 90 661 - 5 284 95 945 North West 236 724 - 17 860 254 584 Western Cape 179 583 - 27 671 207 254

Total 2 384 000 - 193 764 2 577 764 HPV Component

Eastern Cape 37 289 - - 37 289 Free State 12 932 - - 12 932 Gauteng 30 427 - - 30 427 KwaZulu-Natal 50 108 - ( 1 833) 48 275 Limpopo 30 604 - - 30 604 Mpumalanga 19 680 - - 19 680 Northern Cape 5 164 - - 5 164 North West 14 777 - - 14 777 Western Cape 21 835 - - 21 835

Total 222 816 - ( 1 833) 220 983 COVID-19 component

Eastern Cape 55 000 481 076 ( 4 409) 531 667 Free State 26 182 125 159 ( 1 245) 150 096 Gauteng 143 213 607 442 ( 6 174) 744 481 KwaZulu-Natal 86 847 446 764 ( 4 389) 529 222 Limpopo 138 005 223 429 ( 2 973) 358 461 Mpumalanga 47 245 173 061 ( 1 812) 218 494 Northern Cape 38 526 61 575 ( 822) 99 279 North West 32 985 175 100 ( 1 711) 206 374 Western Cape 36 708 552 220 ( 4 844) 584 084

Total 604 711 2 845 826 ( 28 379) 3 422 158 Mental Health Component

Unallocated - - - - Total - - - - Oncology Component

Unallocated - - - - Total - - - -

APPENDIX C

APPENDIX TO SCHEDULE 5, PART A: BREAKDOWN OF THE HIV, TB, MALARIA AND COMMUNITY OUTREACH GRANT: ALLOCATIONS PER GRANT COMPONENT PER PROVINCE

HIV, TB, Malaria and Community Outreach Grant

National Financial Year

Province /Components2020/21

MainAllocation

1st Adjustment2020/21Adjusted

Allocation2nd Adjustment

71

APP

EN

DIX

D

(Nat

iona

l Fin

anci

al Y

ear)

APP

EN

DIX

TO

SC

HE

DU

LE

5, P

AR

T A

: BR

EA

KD

OW

N O

F ST

AT

UT

OR

Y H

UM

AN

RE

SOU

RC

ES,

TR

AIN

ING

AN

D

DE

VE

LO

PME

NT

GR

AN

T: A

LL

OC

AT

ION

S PE

R G

RA

NT

CO

MPO

NE

NT

PE

R P

RO

VIN

CE

72

Health (Vote 18)

Statutory Human Resources, Training and Development GrantEastern Cape 366 523 - 24 770 391 293 Free State 237 019 - 9 921 246 940 Gauteng 1 336 008 - 33 354 1 369 362 KwaZulu-Natal 593 830 - 40 548 634 378 Limpopo 232 171 - 22 519 254 690 Mpumalanga 189 495 - 16 457 205 952 Northern Cape 125 465 - 4 348 129 813 North West 192 723 - 14 283 207 006 Western Cape 881 370 - ( 11 514) 869 856 Unallocated - - - -

Total 4 154 604 - 154 686 4 309 290 of which:Statutory Human Resources Component

Eastern Cape 95 408 - 24 770 120 178 Free State 42 410 - 9 921 52 331 Gauteng 257 920 - 47 354 305 274 KwaZulu-Natal 204 610 - 40 548 245 158 Limpopo 74 547 - 22 519 97 066 Mpumalanga 60 243 - 16 457 76 700 Northern Cape 21 431 - 4 348 25 779 North West 50 860 - 14 283 65 143 Western Cape 245 023 - - 245 023 Unallocated - - -

Total 1 052 452 - 180 200 1 232 652 Training and Development Component

Eastern Cape 271 115 - - 271 115 Free State 194 609 - - 194 609 Gauteng 1 078 088 - ( 14 000) 1 064 088 KwaZulu-Natal 389 220 - - 389 220 Limpopo 157 624 - - 157 624 Mpumalanga 129 252 - - 129 252 Northern Cape 104 034 - - 104 034 North West 141 863 - - 141 863 Western Cape 636 347 - ( 11 514) 624 833 Unallocated - - -

Total 3 102 152 - ( 25 514) 3 076 638

APPENDIX D

APPENDIX TO SCHEDULE 5, PART A: BREAKDOWN OF STATUTORY HUMAN RESOURCES, TRAINING AND DEVELOPMENT GRANT: ALLOCATIONS PER GRANT COMPONENT PER PROVINCE

Statutory Human Resources, Training and Development Grant

National Financial Year

Province /Components2020/21

MainAllocation

1st Adjustment 2nd Adjustment2020/21Adjusted

Allocation

73

{

APP

EN

DIX

E

(Nat

iona

l Fin

anci

al Y

ear)

APP

EN

DIX

TO

SC

HE

DU

LE

6, P

AR

T A

: BR

EA

KD

OW

N O

F T

HE

SC

HO

OL

INFR

AST

RU

CT

UR

E B

AC

KL

OG

S G

RA

NT

: A

LL

OC

AT

ION

S PE

R P

RO

VIN

CE

74

Basic Education (Vote 16)

Schools Infrastructure Backlogs GrantEastern Cape 1 010 968 147 000 ( 63 979) 1 093 989 Free State 32 000 20 000 - 52 000 Gauteng - - - - KwaZulu-Natal 280 000 196 000 313 938 789 938 Limpopo 104 000 95 000 134 461 333 461 Mpumalanga 32 000 104 000 - 136 000 Northern Cape - - - - North West 32 000 38 000 - 70 000 Western Cape - - - - Unallocated 245 445 ( 60 000) ( 245 878) ( 60 433)

Total 1 736 413 540 000 138 542 2 414 955

APPENDIX E

APPENDIX TO SCHEDULE 6, PART A: BREAKDOWN OF THE SCHOOL INFRASTRUCTURE BACKLOGS GRANT: ALLOCATIONS PER PROVINCE

School Infrastructure Backlogs GrantNational Financial Year

Province2020/21

MainAllocation

1st Adjustment2020/21Adjusted

Allocation2nd Adjustment

75

APP

EN

DIX

F

(Nat

iona

l Fin

anci

al Y

ear)

APP

EN

DIX

TO

SC

HE

DU

LE

6, P

AR

T A

: BR

EA

KD

OW

N O

F T

HE

NA

TIO

NA

L H

EA

LT

H IN

SUR

AN

CE

IND

IRE

CT

GR

AN

T:

AL

LO

CA

TIO

NS

PER

GR

AN

T C

OM

PON

EN

T P

ER

PR

OV

INC

E

76

Health (Vote 18)

National Health Insurance Indirect GrantEastern Cape 360 339 - ( 60 000) 300 339 Free State 300 702 - ( 79 166) 221 536 Gauteng 50 676 - - 50 676 KwaZulu-Natal 2 778 - - 2 778 Limpopo 310 317 ( 20 000) ( 60 000) 230 317 Mpumalanga 79 416 - ( 15 417) 63 999 Northern Cape 2 778 - - 2 778 North West 2 778 - - 2 778 Western Cape 2 777 - - 2 777 Unallocated 1 175 303 ( 318 468) ( 25 200) 831 635

Total 2 287 864 ( 338 468) ( 239 783) 1 709 613 of which:Health Facility Revitalisation Component

Eastern Cape 357 561 - ( 60 000) 297 561 Free State 297 924 - ( 79 166) 218 758 Gauteng 47 899 - - 47 899 KwaZulu-Natal - - - - Limpopo 307 539 ( 20 000) ( 60 000) 227 539 Mpumalanga 76 638 - ( 15 417) 61 221 Northern Cape - - - - North West - - - - Western Cape - - - - Unallocated 204 583 ( 200 000) ( 4 583) -

Total 1 292 144 ( 220 000) ( 219 166) 852 978 Personal Services Component

Eastern Cape - - - - Free State - - - - Gauteng - - - - KwaZulu-Natal - - - - Limpopo - - - - Mpumalanga - - - - Northern Cape - - - - North West - - - - Western Cape - - - - Unallocated 255 320 ( 80 000) ( 4 133) 171 187

Total 255 320 ( 80 000) ( 4 133) 171 187 Non-Personal Services Component

Eastern Cape 2 778 - - 2 778 Free State 2 778 - - 2 778 Gauteng 2 777 - - 2 777 KwaZulu-Natal 2 778 - - 2 778 Limpopo 2 778 - - 2 778 Mpumalanga 2 778 - - 2 778 Northern Cape 2 778 - - 2 778 North West 2 778 - - 2 778 Western Cape 2 777 - - 2 777 Unallocated 715 400 ( 38 468) ( 16 484) 660 448

Total 740 400 ( 38 468) ( 16 484) 685 448

APPENDIX TO SCHEDULE 6, PART A: BREAKDOWN OF THE NATIONAL HEALTH INSURANCE INDIRECT GRANT: ALLOCATIONS PER GRANT COMPONENT PER PROVINCE

National Health Insurance Indirect GrantNational Financial Year

Province /Components

APPENDIX F

2020/21Main

Allocation1st Adjustment

2020/21Adjusted

Allocation2nd Adjustment

77

Printed by Creda Communications

ISBN 978-1-4850-0667-1


Recommended