DK ENGINEERING
ABOUT US
32
ORGANIZATION CHART - GENERAL
COMERCICALDept.
BUSINESS DEVELOPMENT
Dept.
ENGIEERING Dept.
HSE/QC Dept.
WORKSHOP
Process & R&D Dept.
Mech. Dept.
Piping Dept.
Structure Dpt.
E&I Dept.
DEPUTY DIRECTOR ENGINEERING/QC/ WS
DEPUTY DIRECTOR COMERCIAL/BUSINESS
PROJECT Dept.
H.R Dept. ACCOUNTANT
Dept.
MANAGING DIRECTOR
COMPUTER SOFTWARE CAPABILITIES
4
We have specialized software to use for specific engineeringdisciplines as follows:
Process Engineering Aspen HYSYS: Process Simulation Aspen Exchanger Design & Rating (EDR): Heat Exchanger OLGA: The industry-standard tool for dynamic multiphase flow simulation NEC Acostix: All sound calculations for sound insulation of the enclosure walls, sound attenuators and louvers.
Mechanical Engineering PVElite: Pressure vessel and tank design analysis software MATHCAD: Programming software Microsoft Excel: In-house developed spreadsheets Solidworks Compress: Engineering for pressure vessel, ASME VIII-1 design capabilities
Electrical Engineering CAPTOR: Electrical system design
Structural/Civil Design Analysis Software Staad Pro Staad Offshore SACS: Offshore structural analysis SAP, Version 14: Structural analysis GRLWEAP: Pile driving simulation GEO SLOPE/W: Soil slope stability analysis
Pipeline Analysis Software CAESAR II: Piping stress analysis and design OFFPIPE: Pipeline installation analysis SAGE Profile: Pipeline stability and stress analysis Auto pipe: Pipeline stability and stress analysis
Project Management Microsoft Project Primavera
Drafting AutoCAD 3D Model/Drafting software PDMS: 3D computer aid design software Cadworx Smart plan 3D
5
DK ENGINEERING
CNC Water Jet Cutting
OnshoreProvide complete engineering solutions for onshore included process, mechanical, civil, structure, piping, electrical
and control for oil and gas industry, such as gas distribution, compressor station, metering station, pipeline, cathodic
protection system, oily water treatment system…
Offshore
Provide complete engineering for offshore included topside, jacket, subsea pipeline modification of existing system
included process, mechanical, piping, electrical and control system.
Separation Equipment: 2 Phase Separator, 3 Phase Separator, Filter Separator, Degasser,...
Heat Transfer Equipment: Shell and Tube Heat Exchanger Air Cooled Heat Exchanger Water Bath Heater, Fired Heater,
Electrical Heater, Cooling Tower,...
Measuring Equipment: all type of Gas Metering System Liquid Metering System Multiphase Metering System Metering Control System Sampling and Analysis Brownfield Metering Upgrades,...
Oily Water Treatment for Onshore and Offshore Gas Processing API/CPI Tank Produced Water Treatment System (IGF/CFU),...
Process/Compression Skid: Compressor Station, Gas Dehydration System, Generator/Compressor Enclosure,...
Utility Skid: Fuel Gas Treatment System, Chemical Injection Skid, Pump Skid, CO2/N2 Snuffing System, Pig Launcher, Pig Receiver, ...
Electrical & Instrument System: Electrical Cabinet, PLC Control Cabinet,...
Cathodic Protection System.
Equipment engineering/ fabrication
We provide engineering, procurement, fabrication and testing, installation of equipment as below:
Construction supervision consultant/Project Management
State of the art techniques in project management which requires broad range of knowledge are being applied in DK
Engineering to enable us to meet or exceed our customer's needs and expectations. Our project management
professionals combined detailed technical knowledge of management disciplines such as tendering, contracting, work
break down, cost estimating and control, scheduling and monitoring, project risk and change management, quality
management, stakeholder management with an extensive awareness of industry and customer drivers.
Procurement
“Exactly, quickly & competitive price” is our slogan. Let us to be your partner for an optimized & renovated products.
Familiar with materials and equipment in oil and gas industries compliance with International standards: ASME, ASTM,
BS, API,…
Qualified, experienced personnel in oil and gas projects.
Out source from all over the world as per Client's vendor list inspection companies: ABS, DNV, LR, ASME…
To Protect Onshore/Offshore Pipeline/Equipment
ITEM LIST OF TOOL AND EQUIPMENT SPEC. UNIT Q'TY
BOUGTH
REND
I WELDING EQUIPMENT Ea 15
II LIFTING EQUIPMENT Set 27
III CUTTING AND DRILLING
EQUIPMENT
Ea/Set 48
IV QA/QC EQUIPMENT Ea 11
V HAND TOOL Ea/Set 105
VI OTHER EQUIPMENT
1 Water jet CNC machine Ea 1
2 High pressure pump 37kg/cm3 Ea 1
3 Air compressor machine; 5HP 5 HP 10kg Ea 1
4 Water tanks Ea 1
5 Bolt �ghtening machine Set 2
7
DK ENGINEERING
DK ENGINEERING J.S.C
SOW: Engineering, fabrication Three-phase Separator Skid (No. 01) Project: Hornet Gas Field DevelopmentClient: Rhine Ruhr Pty Ltd - Year Built: 2014Design Pressure: 102 barg - Design Temperature: -10/100 C0
Construction material: SA516 Gr.70NInternal part: Rhine Ruhr/Australia
SOW: Engineering, fabrication Three-phase Separator Skid (No. 02) Project: Hornet Gas Field DevelopmentClient: Rhine Ruhr Pty Ltd - Year Built: 2015Design Pressure: 102 barg - Design Temperature: -10/100 C0
Construction material: SA516 Gr.70NInternal part: Rhine Ruhr/Australia
SOW: Calculation, Detail Design, Internal part procurement HP Separator Skid Project: Diamond Field Development ProjectClient: PVCL - Year Built: 2013Design Pressure: 133 barg - Design Temperature: 0/103 C0
Construction material: SA516 Gr.70N - ASME U stampInternal part: Rhine Ruhr/Australia
SOW: Calculation, Detail Design Allocation SeparatorProject: Su Tu Nau Field Development ProjectClient: Cuu Long JOC - Year Built: 2013Design Pressure: 31 barg - Design Temperature: 0/140 C0
Construction material: SA516 Gr.70NInternal part: Rhine Ruhr/Australia
SOW: Engineering, fabrication LP Separator VesselProject: Thai Binh-Ham Rong Gas Distribution And Gathering System ProjectClient: PVGAS SERVICE - Year Built: 2015Design Pressure: 46 barg - Design Temperature: -46/70 C0
ASME U stamp - Construction material: SA516 Gr.70NInternal part: Rhine Ruhr/Australia
SOW: Engineering, procurement, fabrication CO2 Compress Interstage SeparatorProject: Camau Fertilizer PlantClient: PVCFC - Year built: 2016
0Design Pressure: 90 barg - Design Temperature: -10/80 CConstruction material: SS 304 - ASME U stampInternal part: Rhine Ruhr/Australia
SOW: Provision of mobile 2 Phase Test Separator Skid Project: Bundled Phase 2 EPCI of Wellhead PlatformsClient: TNS/PTT Exploration - Year built: 2017Design Pressure: 35.5-56.3 barg Design Temperature: -29/135 C/ (-12) - 120 C0 0
Construction material: NACE CS +6MM CA+ANODES
SOW: Engineering, Internal part procurement Test Separator MBD-2920 Project: Su Tu Trang Field Development ProjectClient: Cuu Long JOC - Year Built: 2010Design Pressure: 50 barg - Design Temperature: -18.4/150 C0
Construction material: SA516 Gr.70N - ASME U-StampInternal part: FMC Technology
SOW: Engineering, fabrication for HHP SeperatorProject: Dai Hung Phase II DevelopmentClient: PVEP - Year of Completion: 2010Design Pressure: 38 barg - Design Temperature: -29/100 C0
Construction material: SA516 Gr.70NInternal part: Rhine Ruhr/Australia
SOW: Calculation, Detail Design, Internal part procurement PW Degasser SkidProject: Saraswati Oil Field Development Project - Phase 2Client: PETRO6-INDIA - Year Built: 2013
0Design Pressure: 10.34 barg - Design Temperature: 0/120 CConstruction material: SA516 Gr.70NInternal part: Rhine Ruhr/Australia
SOW: Calculation, Detail Design, Internal part procurement for Slug Catcher SkidProject: Dragon & Tortoise Field Development ProjectClient: VSP – PTSC M&C - Year built: 2010
0Design Pressure: 46 barg - Design Temperature: 0/120 CConstruction material: SA516 Gr.70N - ASME U-StampInternal part: Rhine Ruhr/Australia
SOW: Calculation, Detail Design Flare Scrubber SkidProject: Dragon & Tortoise Field Development ProjectClient: VSP – PTSC M&C - Year built: 2010Design Pressure: 50 barg - Design Temperature: -18.4/1500CConstruction material: SA516 Gr.70N - ASME U-StampInternal part: Rhine Ruhr/Australia6
SEPARATION EQUIPMENT
9
DK ENGINEERING
DK ENGINEERING J.S.C
8
SOW: Engineering, procurement & fabrication supporting Utility Gas SkidProject: Pear Field DevelopmentClient: PVCL - Year built: 2008Design Pressure: 0-46 barg
0Design Temperature: AMB-65 C
SOW: Engineering, procurement, fabrication for Filter Separator (F-401A)Project: Phu My GDC Client: PVGAS - Year Built: 2015
0Design Pressure: 60 barg - Design Temperature: -10/65 CASME U stamp - Construction material: SA516 Gr.70NInternal part: Rhine Ruhr/Australia
SOW: Engineering, fabrication FilterProject: Ba Ria GDS Client: - Year Built: 2012PVGAS GPMBDesign Pressure: 40 barg - Design Temperature: -10/80 C0
Construction material: SA516 Gr.70NInternal part: Rhine Ruhr/Australia
SOW: Calculation, detail design Gas Filter Skid Project: Dai Hung Platform, Phase 2Client: PVEP POC - Year Built: 2010Design Pressure: 40 barg - Design Temperature: -10/80 C0
Construction material: SA516 Gr.70N
SOW: Engineering, fabrication & installation FilterProject: Thai Binh - Ham Rong Gas Distribution And Gathering SystemClient: - Year built: 2015PVGASDesign Pressure: 4600 kPag - Design Temperature: -29 C to 65 C 0 0
Construction material: CS +3mm CA + Internal Epoxy Coating
SOW: Calculating and engineering for Diesel Filter SkidProject name: BK3 - Bk10 Client: Vietsovpetro Joint VentureYear of Completion: 2012
FILTER/ FILTER SEPARATOR
SOW: Engineering, procurement and fabrication of Air CoolerProject: CCP PlatformClient: VIETSOVPETRO J.V - Delivery time: 2017Fin-Tube material: Copper Tube/Copper finsFans: 04 Blades, Aluminum, Moore/Motor: 10.5kW, Siemens
SOW: Engineering, procurement and fabrication of Air CoolerProject: Extension of gas compression capacity at Block 09-1Client: VIETSOVPETRO J.V - Delivery time: 2017Fin-Tube material: Carbon Tube/Aluminum finsFans: 06 Blades, Aluminum, Moore - Motor: 35kW, SiemensDesign pressure: 130barg
SOW: Engineering, procurement and fabrication of Tube Bundle for Air CoolerProject: GPP Dinh CoClient: Petrovietnam Gas Corporation - Delivery time: 2017Design pressure: 139 barg (Class 1500#)Fin tube material: SA 213/Aluminum fins - Fin Tube length: 10600mm
SOW: Engineering, procurement and fabrication Tube Bundle for Air coolerProject: Fabrication of Tube bundle for Air Cooler for PVCFCClient: PVCFC - Delivery time: 2017Fin tube material: SS 304/SS 304 finsFin Tube length: 9800mm
SOW: Engineering, procurement, fabrication Air Cooler Project: Diamond Development Project Client: PVCL - Delivery time: 2013Fin-Tube material: SA 179/AluminumFans: 06 Blades, Aluminum, Moore - Motor: 5kW, ABB
SOW: Engineering, procurement, fabrication Air CoolerProject: Dai Hung Gas Gathering ProjectClient: Dai Hung - Delivery time: 2014 Fin-Tube material: SA 269 316L/Aluminum Fans: 06 Blades, Aluminum, Moore - Motor: 15kW, ABB/Siemens
HEAT TRANSFER EQUIPMENT
TYPICAL COMPLETED PROJECTS
10
DK ENGINEERING
DK ENGINEERING J.S.C
SOW: Engineering, fabrication & installation of Suction Heater (HE-101) Project: Bitumen Storage And Distribution Terminal Project Client: Puma - Year built: 2016
0Design Pressure: 136/8 barg - Design Temperature: 0-300 CConstruction material: SA 179, U-Tube type
SOW: Engineering, fabrication & installation of Tube Bundle E-13Project: Heater Bundle Sai Gon PetroClient: Sai Gon Petro - Year built: 2016
0Design Pressure: 136/8 barg - Design Temperature: 0-300 CConstruction material: SA 179, U-Tube type
SOW: Detail Engineering, fabrication supporting for Tube Heat Exchanger Project: Gas Gathering System in Dragon - Tortoise FieldClient: PVGAS – PTSC M&C - Year built: 2013Design Pressure: 1.02-30 barg / Design Temperature: 0-190 0CConstruction material: SA 179M, Straight Tube type
SOW: Engineering, fabrication & installation of Heat ExchangerProject: LPG Thi Vai StorageClient: Petrovietnam Gas Corporation - Year built: 2014
0Design Pressure: 0-17.6 barg - Design Temperature: -45-95 CConstruction material: SS 316, Straight Tube type
SOW: Engineering, fabrication & installation of Heating coilProject: Phu-My Gas Distribution CenterClient: Petrovietnam Gas Corporation - Year built: 2014Design Pressure: 71 barg - Design Temperature: -10-1 000 CConstruction material: SA 106 Gr.B, Pipe
SOW: Engineering, fabrication & installation Heat Exchanger T-102 Project: MKC PlatformClient: - Year built: 2017VSPDesign Pressure: 13/56 barg - Design Temperature: 080-150 CConstruction material: Cu/Ni 90/10, Straight Tube type
SOW: Engineering, fabrication & installation Heat Exchanger T-402 Project: MKC PlatformClient: - Year built: 2015VSPDesign Pressure: 13/56 barg - Design Temperature: 080-150 CConstruction material: Cu/Ni 90/10, Straight Tube type
SOW: Engineering, fabrication & installation Heat Exchanger T-302 Project: MKC PlatformClient: - Year built: 2017VSPDesign Pressure: 13/56 barg - Design Temperature: 080-150 CConstruction material: Cu/Ni 90/10, Straight Tube type
SOW: Closed Drain Tank Electrical heater and HP Flare KO drum heaterProject: Thien Ung Wellhead PlatformClient: VSP - Year built: 2015Design Pressure: 47 barg - Design Temperature: 60-190 C0
Construction material: SS 316L - Heat Duty: 55kW & 75kW
SOW: Heat ExchangerEngineering, fabrication & installation of Project: TB-HR Gas distribution & gathering systemClient: PTSC PPS/PVGAS Corporation - Year built: 2015Design Pressure: 46 barg - Design Temperature: -29-90 0CConstruction material: SA 179, U-Tube type
SOW: Engineering, procurement, fabrication Tube bundle for Heat exchangerProject: FPSO RBII Client: PTSC PPS - Year built: 2015Design Pressure: 133 barg - Design Temperature: 60-177 0CConstruction material: SA 789 S32603, U-Tube type
SOW: Detail Engineering, fabrication supporting of Heat exchangerProject: Su Tu Vang CPP Client: CUU LONG JOC - Year built: 2013Design Pressure: 20.7/FV barg - Design Temperature: 19-232 0CConstruction material: SA 179M, Straight Tube type 11
HEAT TRANSFER EQUIPMENT
1312
DK ENGINEERING
DK ENGINEERING J.S.C
PROCESS/COMPRESSION SKID
SOW: Engineering, procurement, fabrication Ammonia Metering Package Project: Ammonia Plant Revamp Client: PVFCCo/PTSC - Year built: 2017Design Pressure: 0-27 barg / Design Temperature: 0-65 C0
Service: NH3 metering - Flow meter type: Coriolis Flow MeterMetering capacity: 10000000 m3/h - Accuracy: ±0.1 %
SOW: Engineering, procurement, fabrication for Gas Metering skid Project: Provision of Gas Metering Skid Client: PVEP POC/PTSC PPS - Year built: 2015Design Pressure: 0-27 barg - Design Temperature: 0-65 C0
Service: Gas metering - Flow meter type: Orifice Flow MeterMetering capacity: 10000000 m3/h - Accuracy: ±0.055 %
SOW: Engineering, procurement, fabrication for Gas Metering skid Project: Provision of Gas Metering Skid for Tan Phuoc Khanh Client: Tan Phuoc Khanh - Year built: 2011Design Pressure: 0-27 barg - Design Temperature: 0-65 C0
Service: Gas metering - Flow meter type: Turbine Flow MeterMetering capacity: 2200 SCMH - Accuracy: 0.5%
SOW: Engineering, procurement, fabrication for Gas Metering skidProject: Provision of Gas Metering Skid for PominaClient: Pominal Steel Corporation - Year built: 2010Design Pressure: 0-27 barg - Design Temperature: 0-65 C0
Service: Gas metering - Flow meter type: Turbine Flow MeterMetering capacity: 2200 SCMH - Accuracy: 0.5%
SOW: Engineering, procurement, fabrication for Gas Metering skidProject: Provision of Gas Metering Skid for Ton Phuong NamClient: Ton Phuong Nam Cor. - Year built: 2014Design Pressure: 0-17 barg - Design Temperature: 0-65 C0
Service: Gas metering - Flow meter type: Turbine Flow MeterMetering capacity: 2500 SCMH - Accuracy: 0.5%
SOW: Engineering, procurement, fabrication for Nh3 Refrigeration package Project: Ammonia Plant Revamp Project Client: Johnson Control/ PVFCCo - Year built: 2017Design Pressure: 125 bargDesign Temperature: -29/140 C0
Construction material: SA 516 Gr.60 - ASME U stampCompressor: Johnson Control/Singapore
SOW: Engineering, procurement, fabrication for Emergency Generator Enclosure Project: BK-TNG wellhead PlatformClient: Vietsovpetro Joint VentureYear built: 2015Size: max. Length: 12m, max. Wide: 5m, max. High: 4.65m; max. Weight: 63.500 ton.
MEASURING EQUIPMENT/METERING SKID
SOW: Engineering, fabrication for CPI SystemProject: Ca Mau Gas Processing Plant ProjectClient: - Year built: 2016POSCODesign Pressure: 0-6 barg - Design Temperature: 0/70 C0
Construction material: SA 36/SS 304Internal part: K-pack
SOW: Engineering, fabrication for CPI SystemProject: PM3 Ca Mau Booster Compressor StationClient: PVGAS/CAMAU GPMB - Year built: 2013Design Pressure: 0-6 barg - Design Temperature: 0/70 C0
Construction material: SA 36/SS 304Internal part: K-pack
OILY WATER TREATMENT FOR ONSHORE AND OFFSHORE GAS PROCESSING
SOW: Engineering & Provide Equipment and Packages: - Modified Cold Vent - Closed Drain Vessel - Fast stop Valve for gas turbine compressor - Seal gas system for gas turbine compressor - Nitrogen system - Open Drain Tank - Instrument Air Receiver Vessel - Utility Air ReceiveProject: PM3 Ca Mau Booster Compressor StationClient: PVGAS/CAMAU GPMB Year built: 2013
Pm3 Ca Mau Booster Compressor Station
14 15
DK ENGINEERING
DK ENGINEERING J.S.C
SOW: Engineering, procurement, fabrication supporting Chemical Injection SkidProject: Su Tu Trang Field DevelopmentClient: Cuu Long JOC - Year built: 2011Design Pressure: 0-86 barg / Design Temperature: AMB-65 C0
Service: Corrosion Inhibitor /Scale Inhibitor/ Demulsifier injectionPump: Chemical Injection Pump 0-3.8l/hr
SOW: Engineering, procurement, fabrication Chemical Injection SkidProject: Diamond Field DevelopmentClient: PVCL - Year built: 2013Design Pressure: 0-205 barg / Design Temperature: AMB-65 C0
Service: Corrosion Inhibitor/Wax Inhibitor/ Pour Point Depressant injectionPump: Chemical Injection Pump 50 L/hr, 110 L/hr & 70 L/hr
SOW: Engineering, fabrication & installation Chemical Injection SkidProject: Thai Binh - Ham Rong Gas Distribution And Gathering SystemClient: - Year built: 2015PVGASDesign Pressure: 0-46 barg / Design Temperature: AMB-65 C0
Service: Corrosion Inhibitor injectionPump: Chemical Injection Pump 2.0 l/hr
SOW: Engineering, fabrication & installation Phosphate Pump Injection SkidProject: Ammonia Plant Revamp ProjectClient: FVFCCo - Year built: 2017Design Pressure: 0-28 barg / Design Temperature: AMB-65 C0
Service: Phosphate InjectionPump: Phosphate Injection Pump 4 L/hr
SOW: Engineering, procurement, fabrication for Coagulant & Flocculent Injection Skid Project: Ammonia Plant Revamp ProjectClient: - Year built: 2017FVFCCoDesign Pressure: 0-4 barg / Design Temperature: AMB-65 C0
Service: Coagulant & Flocculent InjectionPump: Coagulant Injection Pump 4.63 L/hr, Flocculent Injection Pump: 2.55 L/hr
SOW: Engineering, procurement, fabrication Chemical Injection SkidProject: Su Tu Trang Field DevelopmentClient: JVPC - Year built: 2011Design Pressure: 0-15 barg / Design Temperature: AMB-65 C0
Service: Pour Point Depressant injectionPump: Chemical Injection Pump 40L/hr
SOW: Engineering, procurement, fabrication supporting Chemical Injection Pump skidProject: BKT Wellhead PlatformClient: VSP - Year built: 2010
0Design Pressure: 0-250 barg / Design Temperature: 0-65 CPump type: Dosing Pump, 25L/hr, API 675
SOW: Engineering, procurement, fabrication Chemical Injection Pump Skid Project: Su Tu Vang Platform - Client: PVGAS - Year built: 2015
0Design Pressure: 0-80 barg / Design Temperature: 0-65 CService: Corrosion Inhibitor injectionPump: Chemical Injection Pump 5 L/hr
SOW: Engineering Hypochlorite Injection Skid PK 5002 A/BProject: LPG Refrigerated Storage Thi VaiClient: PVGAS - Year built: 2011
SOW: Engineering, procurement, fabrication supporting Chemical Injection SkidProject: Pearl & Topaz field developmentClient: PVCL - Year built: 2010
0Design Pressure: 0-46 barg / Design Temperature: AMB-65 C
SOW: Engineering, fabrication for Odorant Injection PackageProject: Ca Mau Gas Processing Plant Project (PACKAGE-1)Client: - Year built: 2016POSCODesign Pressure:99.2/11.46 barg / Design Temperature: 0-70 C0
Service: OdorantDesign flowrate (l/hr): Max 10.8 - Min 0.72
UTILITY SKID
SOW: Engineering, fabrication & installation Fuel Gas SkidProject: Sao Vang and Dai Nguyet Development ProjectClient: - Year built: 2019PTSCMCDesign Pressure: 45 barg - Design Temperature: 70/-20 C0
Service: Fuel GasElectrical Heater: 231 kW
DK ENGINEERING
DK ENGINEERING J.S.C
SOW: Engineering, fabrication & installation Fuel Gas SkidProject: Thai Binh - Ham Rong Gas Distribution And Gathering SystemClient: - Year built: 2015PVGASDesign Pressure: 0-46 barg - Design Temperature: 0-90 C0
Service: Fuel GasHeater Bundle: 0.5kW
SOW: Engineering, procurement, fabrication Hot Water SkidProject: BK.TNG Wellhead PlatformClient: - Year built: 2015Vietsovpetro Joint VentureDesign Pressure: 0-14 barg - Design Temperature: 0-80 C0
Service: Hot WaterHeater Bundle: 58kW
SOW: Engineering, procurement & fabrication supporting Fuel Gas SkidProject: HT-MT Field developmentClient: - Year built: 2011Bien Dong POCDesign Pressure: 0-12 barg - Design Temperature: -29-130 C0
Heater: 1.8 Kw - Construction material: Super duplex
SOW: Engineering, procurement & fabrication supporting Fuel Gas Conditioning SkidProject: Te Giac Trang H04 Field DevelopmentClient: - Year built: 2012Hoang Long JOCDesign Pressure: 0-238 barg - Design Temperature: 0-125 C0
Service: Fuel Gas - Heater: 16 kW
16 17
RANG DONG FIELD DEVELOPMENT
MODIFICATION PIPING SYSTEM - RISER - BACH HO
The feasibility study for slot extension of WHP-S1
Engineering New WHP-NE structural feasibility study
Engineering for Additional POB To NULQ Living Quarters Module
OFFSHORE PROJECTUTILITY SKID
SOW: Engineering, procurement and fabrication of Pig SystemProject: Pig Trap For Ba Ria GDS ProjectClient: PVGAS GPMBYear built: 2012
SOW: Engineering, fabrication & installation Chemical Injection SkidProject: BK.TNG Wellhead PlatformClient: - Year built: 2015VSPDesign Pressure: 0-42.2 barg / Design Temperature: AMB-65 C0
Service: Corrosion Inhibitor/Wax Inhibitor/ Reserve Demulsifier injectionPump: Chemical Injection Pump 0.1 L/hr, 0.2 L/hr & 31 L/hr
CATHODIC PROTECTION SYSTEM
18
DK ENGINEERING
DK ENGINEERING J.S.C
19
ELECTRICAL AND INSTRUMENTATION SYSTEM
SOW: Engineering and installation Control Cabinet and Control System; The Purpose of cabinet is used to control the F&G system for rig BK16Project: BK-16 Platform Client: Vietsovpetro Joint Venture - Year: 2015
SOW: Modify HVAC system for FBSO Replace the soft starter 3RW4047 to control the Micro turbine system Replace and modify the logic controller of HVACProject: H01&H04 Well Head Platform, Te Giac Trang Field Development Client: Hoang Long JOC - Year: 2014
SOW: Engineering, fabrication, installation for Cathodic Protection System Project: Phu My Gas DistributionPlace of End user: Phu My, Ba Ria-Vung TauClient: Petrovietnam Gas Corp. - Year: 2014
SOW: Engineering, fabrication, installation for Cathodic Protection System Project: Thai Binh - Ham Rong Gas Distribution And Gathering SystemPlace of End user: Thai Binh, VietnamClient: Petrovietnam Gas Corp. - Year: 2015
SOW: Engineering and assembly Heater Control PanelProject: Thai Binh-Ham Rong Gas SystemPlace of End user: Onshore, Vietnam Client: Petrovietnam Gas Corp. - Year: 2014
SOW: Engineering, installation of UPS systemProject: Gas Distribution Center Project Place of End user: Onshore, Vietnam Client: Petrovietnam Gas Corp. - Year: 2016
SOW: Engineering, procurement & offshore installation Synchronizationn Cabinet.Project: TGT H01 Wellhead PlatformPlace of End user: Onshore, Vietnam Client: Hoang Long JOC - Year: 2015
SOW: Engineering Heater Control Panel; installation Power Control Panel Project: BK.TNG Well Head Platform Place of End user: Onshore, Vietnam Client: Vietsovpetro Joint Venture - Year: 2015
SOW: Engineering, fabrication,installation for Cathodic Protection SystemProject: Provision of ICCP for Nhon Trach 1 and Nhon Trach 2 planPlace of End user: Nhon Trach, Dong Nai Client: Petrovietnam Gas Corp. - Year: 2017
SOW: Provision of control cabinet for PCS, SSD and fire & gas systemProject: Ammonia Plant Revamp Place of End user: Onshore, Vietnam Client: Petrovietnam Fertilizer Chemical Corporation - Year: 2017
SOW: Engineering, fabrication, installation for Power Distribution Cabinet System Project: Power Distribution Cabinet System Of PVC-MSPlace of End user: Onshore, Vietnam Client: PVC-MS - Year: 2016
SOW: Explosion Proof Control Panel for Ammoniac Metering SystemProject: Ammoniac Metering ProjectPlace of End user: Onshore, Vietnam Client: - Year: 2017PVFCCo
20 21
DK ENGINEERING
DK ENGINEERING J.S.C
Rhine Ruhr - Australia
OUR MAJOR CUSTOMERSCERTIFICATE
2322
LIST OF MAIN PROJECTS
No. PROJECT/WORK DESCRIPTION PROJECT NAME CLIENT YEAR
1
Engineering Chemical Injection Skids for Su Tu Trang Project: 1, ZZZ-4200 2, ZZZ-4815 3, ZZZ-4215
Su Tu Trang Field Development
2010
2
Engineering Pressure Vessels for Su Tu Trang Project: 1. Instrument Air Receiver-MBL-64702. Fuel Gas Scrubber-MBF-57303. Flare Scrubber -MBF-43244. Test Separator- MBD-29205. Hazardous Opened Drain Tank -ABJ-62016. Methanol Storage Tank - MBJ-48107. Pipeline Pig Launcher -KAH-30108. Pipeline Pig Receiver -KAQ-2020
Su Tu Trang Field Development
2010
3 Provision of Calculation, engineering for Heat Exchanger
Su Tu Vang Field 2012
4
Engineering for Su Tu Nau Field Development Project: A. Su Tu Nau South Platform 1. Allocation Separation2. Production Pipeline Pig Launcher3. Production Pipeline Pig Receiver4. Fuel Gas Scrubber5. Flare Scrubber6. Instrument Air Receiver7. Hazardous Open Drain TankB. Su Tu Nau North Platform 1. Production Pipeline Pig Launcher2. Fuel Gas Scrubber3. Flare Scrubber4. Instrument Air Receiver5. Hazardous Open Drain TankC. WHP - B Platform 1. Production Pipeline Pig Launcher
Su Tu Nau Field Development
2013
5 Calculation & Engineering for Anode - STN-N & STN-S Caisson Project
Su Tu Nau Field Development
2013
6 Chemical Injection Skid – CIS - Pearl Platform Pearl field
Development 2007
7 Engineering for Close Drain Vessel - Pearl Platform Pearl Platform 2007
8 Engineering for Utility Gas Conditioning Skid (UGS) – Pearl Platform
Pearl Platform 2008
9 Stress analysis piping - Ruby B Ruby B 2008
10 Engineering for Pour Point Depressant (PPD) Tank - PCVL
Ruby B 2008
11 Engineering for Nitrogen Skid - Pearl Project Pearl project 2008
12 Engineering for Chemical Injection Skid - TOPAZ TOPAZ Platform 2008
13 Engineering for LP Test Separator Ruby B 2011
14 Engineering for Utility Gas Scrubber – Ruby B Ruby B 2011
15 Provision, installation of 200A Active Harmonic Filter – Topaz Platform
TOPAZ Platform 2011
16
Diamond Project: Calculation, engineering for: 1. Chemical Injection Skid2. Fuel Gas Skid3. Launcher4. CO2 Vent Snuffing5. LP-HP Separator Skid6. Nitrogen7. Open Drain Pump8. Sample Connection9. Tote Tank
Diamond Development
Project 2013
17
Provision of Designing Materials, Onshore Fabrication and Offshore Installation Off the VRC Pneumatic Starting System At RBDP-B Platform, Block 01&02, Offshore Vietnam
RBDP-B Platform, Block 01&02
2014
No. PROJECT/WORK DESCRIPTION PROJECT NAME CLIENT YEAR
18 Calculation of Life Raft
Rang Dong Field Development
2008
19 Engineering for Chemical Injection Skid - JVPC 2008
20 Provision of Pipe Stress Analysis for Fuel Gas line to FSO
2009
21
Pipe stress analysis for Rang Dong Field Development Project: 1. WHP-S1, S1-8P Production Flow Line2. WHP-N1, N1-5I Flow Line & Extension of N1w1Manifold 3. WHP-N1, N1-6I Flow Line & Line No. 6"-Wi-F-9934. CPC-CLPP, CLPP Closed Drain Discharge Line( ECR-270)
2010
22
Engineering for Rang Dong Field Development Project: 1. Pump Skid RDF-SK-4900 & RDF-SK-49012. Biocide Injection RDF-Skid SK-4915
Rang Dong Field Development
2011
23 Engineering for CLPP Flare Boom 2011 24 Structure Calculation for Basket 2011
25 Engineering for CLPP Barge Bumper – Rang Dong Field Development
Rang Dong Field Development
2012
26 Calculation and engineering for Compression & Water Injection Structure Platform
2012
27 Calculation and Engineering for Boat Landing - JVPC
2012
28 Engineering for C1 Temporary Ladder 2012
29 Provision of Pipe Stress Analysis, Piping Isometric, Piping Arrangement Drawing
2012
30 Pipe Stress Analysis for C1-8P 2012
31 Calculation, engineering for Pipe Stress Analysis for Flow line & Gas lift - WHP-E1A-16P
Rang Dong Field Development
2013
32 Engineering for Injection Compression Suction Scrubber Package
2013
33 Rang Dong Field Development Design, engineering Flare Boom for E1, CLPP
2013
34 Rang Dong Field Development: Structure in-place reanalysis for WHP-S1, N1, CLPP
2014
35 Reviewing the fatigue lives for existing pipelines-JVPC
2014
36 Rang Dong Field Development: Engineering Living Quarters Extension In NULQ
Rang Dong Field Development
2015
37 Pipe stress analysis of E1 -22P ?own line & Gas lift line in WHP-E1 & WHP-S1
Rang Dong Field Development
2015
38 New WHP-NE Structural Feasibility Study - Rang Dong Field Development
2015
39 The Feasibility Study for Slot Extension of WHP -S1 2015
40 Site survey for S1 -8P and 2I-LTPT Gas lift line and modify EOR ?ow line
2015
41 Modify of P1/P2 Pig Launcher & Pig Receiver Rang Dong Field
Development
2016 42 Provision of Engineering Work Service for P5 & P3 2016
43 Provision of Engineering Work Service For E-07I WAG Flow line
2016
44 Design and Installation of P5 Dewatering & Degassing Line
Rang Dong Field Development
2017
45 Provision of design & engineering service for E-23P flowlines Rang Dong Field
Development
2018
46 Provision of engineering service for installation of pig launcher and pig receiver for P5 Pipeline
2018
47 Provision of design & engineering service of High Pressure Gas lift Lines For E1&E1A Producers Rang Dong Field
Development
2019
48 Provision of design & engineering service of High Pressure Gas lift Lines For C1 Producers
2019
2524
Delivering solution, Expanding customer valueLIST OF MAIN PROJECTS
No. PROJECT/WORK DESCRIPTION PROJECT NAME CLIENT YEAR
49 Engineering for modification of process equipment - Dinh Co GPP
Dinh Co GPP project
2008
50 Calculation & Engineering for Chemical Tank 2008
51
Engineering for Dragon Tortoise Gas Utilization Project: 1.Close Drain Drum2.Open Drain Tank3.Slug Catcher4.Flare Scrubber
Dragon tortoise gas utilization
project 2009
52 Design, engineering, cost estimate for construction of bypass pipe for heaters E-401A/B/C at Phu My GDS
Phu My GDS 2010
53 Design, engineering, cost estimate for modification of isolated valves for PSVs - Phu My GDS
Phu My GDS 2010
54 Design, engineering, cost estimate for modification of instrument air system - Phu My GDC
Phu My GDC 2010
55 Examining and verifying of engineering documents for Rang Dong – Bach Ho pipeline improvement to 4 mill cubic meter of Gas/day
Rang Dong – Bach Ho pipeline
2010
56 EPC of instrument air for PVGAS Service workshop PVGAS Service
workshop 2011
57 Design, engineering, cost estimate for mattress covering Phu My – HCM city pipeline
Phu My – HCM city pipeline
2011
58 Installation supervision consultancy of Rang Dong – Bach Ho pipeline improvement to 4 mill cubic meter of Gas/day
Rang Dong – Bach Ho pipeline
2011
59 Design, engineering, cost estimate for mattress covering Bach Ho – Long Hai pipeline
Bach Ho – Long Hai pipeline
2011
60 Engineering for Thi Vai LPG refrigerated storage Thi Vai LPG refrigerated
storage 2011
61 Engineering for Corrosion Inhibitor System 2011
62 Installation of E & I system, civil work - low pressure gas distribution system for Pomina steel project
Pomina steel project
2012
63 Engineering for maintenance of Phu My - HCM pipeline Phu My - HCM
pipeline 2012
64 Examining and verifying of engineering documents for GPP Ca Mau – PM3 Gas Booster Compression Package
GPP Ca Mau – PM3 Gas Booster
Compression 2012
No. PROJECT/WORK DESCRIPTION PROJECT NAME CLIENT YEAR
65 Engineering for pig trap skid – Ba Ria GDS Ba Ria GDS 2012
66 Engineering for gas filter separator skid – Ba Ria GDS Ba Ria GDS 2012
67 Calculation, engineering for LPG Hai Phong storage widening
LPG Hai Phong storage
2012
68 Calculation, engineering for Heat Exchanger 2013
69 Modification for H6, H7, H9 & H11 - Dinh Co - Thi Vai piping
Dinh Co - Thi Vai piping
2013
70
PM3 Ca Mau Booster Compressor Project: 1. Gas turbine Compressor station detail designincluded:
- Civil engineering - Structural engineering - Mechanical engineering - Piping engineering - Process engineering - E & I engineering - Gas turbine fuel gas system - Fire & Gas and firefighting engineering
2. Provide Equipment and Packages: - Modified Cold Vent - Closed Drain Vessel - Fast Stop Valve for Gas Turbine Compressor - Seal Gas System for Gas Turbine Compressor - Nitrogen System - Open Drain Tank - Instrument Air Receiver Vessel - Utility Air Receiver Vessel - Control System
PM3 Ca Mau Booster
Compressor Project
2013
71
Thai Binh - Ham Rong Gas Distribution and Gathering System Project, Block 102&106, Phase 01. Engineering and fabrication for: 1. TBHR-PAC01-Corrosion Inhibitor Skid2. TBHRPAC10-LP Separator/ Filter Separator3. TBHRPAC11-Condensate Preheater-Heater4. TBHRPAC18 Cathodic Protection System
Thai Binh - Ham Rong Gas
Distribution And Gathering System
Project, Block 102&106, Phase
01.
2014
72 Engineering & assembly Heater Control Panel For TB-HR Project
2014
73 Reanalysis for LPG Go Dau storage LPG Compressor
Go Dau 2014
74 Engineering, Provision of Inlet Gas Metering System at Dinh Co Gas Processing Plant (16” class 900; 3” class 600)
Dinh Co GPP Plant 2014
75 Engineering, Provision of Heat Exchangers Thi Vai Thi Vai 2014
2726
Delivering solution, Expanding customer valueLIST OF MAIN PROJECTS
No. PROJECT/WORK DESCRIPTION PROJECT NAME CLIENT YEAR
76 Engineering and fabrication For Gas Pump Injection Skid (Gas Pump Skid ZZZ-4278) STV-RD
STV-RD 2014
77 Engineering, Provision of Gas Chromatograph GC-1601-DVK
GC-1601-DVK 2014
78 Engineering & installation for HVAC-04 system 2014
79 Engineering for SSIV Skid, 16" pipeline Rang Dong-Bach Ho/Riser Block
Rang Dong-Bach Ho/Riser Block
2015
80 Engineering & Procurement & Construction Module ER Probe
Construction Module ER Probe
2015
81 Report on technical evaluation & cost estimation for H1.H2.H4.H8.H13. L1-H3-L4-H5-H12-H14/2015
- 2015
82 Provision of Gas Filter F-401A Phu My Gas
Distribution Project 2015
83 Provision of Heating Coil Water Bath Phu My Gas
Distribution Project 2015
84 Engineering Subsea check valve with spool in Rang Dong Field
Rang Dong Field 2015
85 Report on technical evaluation & cost estimation for PM2.1& PM 4 Pipeline
Rang Dong Field 2015
86 Engineering, fabrication, installation Phu My - Ho Chi Minh Pipeline - Install Pig Station at Nhon Trach GDS
Phu My Gas Distribution Project
2015
87 Modification Of CPP-STV Chemical Injection Package Su Tu Vang
Platform 2015
88 Provision, fabrication, of Filter Separator - GDC Phu My Phu My Gas
Distribution Project 2015
89 Provision of UPS Dinh Co Gas Distribution
2016
90 Provision of Pig Launcher CCP BACH HO
PLATFORM 2016
91 Survey, report on technical evaluation & cost estimation for H1.3.5.8.9.14-2016
-
2016
92 Repairing the damaged points of fiber optic cable lines No. 03 - Liquid product route of PV Gas South East
-
2016
93 Repairing the arisen defects at underground pipe line PM2.1, PM2.2 and PM4 through the line No. 16.
Phu My Gas Distribution Project
2016
94 Surveying, calculating, assessing and suggesting the solutions to solve the shake of device system at GDC - Phu My.
Phu My Gas Distribution Project
2016
95 Surveying, carrying out the Economic and technical report for replacing the technological pipelines on Riser - Bach Ho 5 platform
Bach Ho 5 platform.
2016
No. PROJECT/WORK DESCRIPTION PROJECT NAME CLIENT YEAR
96 Basic Design Package of Improving LPG Recovery Efficiency of Dinh Co Gas Processing Plant
GPP Dinh Co 2016
97 Fabrication for SSIV Skid in Bach Ho Field Bach Ho Field 2016
98
Engineering the Cuu Long compensative gas distribution pipeline for PV Gas D - Nhon Trach Hiep Phuoc zone at GDC-PM in the NCS gas stop progress on September, 2016.
Phu My Gas Distribution Project
2016
99 Surveying, calculating and engineering the gas distribution pipeline for PV Gas D - Nhon Trach Hiep Phuoc zone at GDC-PM.
Phu My Gas Distribution Project
2016
100 Additional installation for valves at C-01 & C-05 tower in GPP Dinh Co
GPP Dinh Co
2016
101 Surveying, calculating, provide equipment, fabrication, installation for the Loading Arm at LPG Dinh Vu
LPG Dinh Vu
2016
102 Surveying, calculating safety assessment for the Go Dau LPG and LPG Dinh Vu
LPG Dinh Vu
2016
103 Design the process and instrument diagram for the air system Cuu Long basin.
Cuu Long basin. 2016
104 Surveying, calculating, assessing and suggesting the cable routes 3 at Tan Thanh, Ba Ria-Vung Tau
-
2016
105 Research project for improving LPG recovery efficiency of LPG Thi Vai
Thi Vai LPG 2017
106 Upgrade the Critical LSHH in GPP To Improve the Reliability
GPP Dinh Co
2017
107 Surveying, engineering upgrade processing piping system and Teflon of the support system on Riser Block - Bach Ho platform and DGCP platform.
Riser Block - Bach Ho Platform
DGCP platform
2017
108 Engineering, replacing of Air Cooler Tube Bundles at Dinh Co GPP
Dinh Co GPP 2017
109 Provision of 02 flange protection cover Flange protection cover
- 2017
Provision of ICCP for Nhon Trach 1 and Nhon Trach 2 plan at Nhon Trach GDS
Nhon Trach GDS
2017
Engineering, additional installing truck scale and loading arm at Thi Vai LPG station
Thi Vai LPG
2017
Engineering consultation, installation management for the gas supply system for SOP Phu My at My Xuan A industrial zone
SOP Phu My at My Xuan A industrial
zone
2017
Engineering consultation, installation management for the gas supply system for Thep Song Than at My Xuan A industrial zone
Thep Song Than at My Xuan A industrial
zone
2017
Repair Lower Column for LPG Go Dau Storage (KU-T101)
LPG Go Dau
2017
110
111
112
113
114
2928
Delivering solution, Expanding customer valueLIST OF MAIN PROJECTS
No. PROJECT/WORK DESCRIPTION PROJECT NAME CLIENT YEAR
115 Engineering consulting for relocation the pipeline system of oil-contaminated at GDC Tien Hai
GDC Tien Hai
2017
116 Provision of 01 Suction Strainer - 2017
117 Additional functions Line monitoring for important signals on CPP platform
CPP Platform
2017
118 Engineering and Fabrication for Tube Bundle K1011A/C Tube Bundle
K1011A/C
2018
119 Modification V1401 at Th? Vai LPG station Thi Vai LPG 2018
120 Engineering and Fabrication for Strainer -E-14A at GPP Dinh Co
GPP Dinh Co
2018
121 Upgrading the metering system for Bach Ho Crossover D?m Phu My line at PM GDC
PM GDC 2018
122 Survey, report on technical evaluation & cost estimation for Condensate piping system from JETTY 1 to JETTY 2 at Thi Vai LPG station
Thi Vai LPG
2018
123 Survey, report on technical evaluation & cost estimation for the repairing defects of gas pipeline coating at NT GDC
Nhon Trach GDC
2018
124 Survey, report on technical evaluation & cost estimation for the checking, replacing the broken fiber cables along DC-BR-KCVT/PM route
-
2018
125 Upgrading, extending the truck scale no.01 at Thi Vai LPG station
Thi Vai LPG 2018
126 Calculating, upgrading AE-1601 to analyze Neo Pentane - 2018
127 Purchasing parts for repairing & maintaining, periodically replacing F1001 vessel of low pressure gas compressor Vom Bac LP4, LP9
Vom Bac LP4, LP9
2018
128 Survey, report on technical evaluation & cost estimation for the repairing, replacing the fire hose after DELUGE VALVE at GDC-PM & GDS-PM
GDC-PM & GDS-PM
2018
129 Replace the Tube Bundle for After Cooler CMP-1101 A/B & CMP-1201 A/B
CMP-1101 A/B & CMP-1201 A/B
2019
130 Survey, report on technical evaluation & cost estimation: “Modification of E-10 to standby operating for E-03”
GPP Dinh Co
2019
Survey, report on technical evaluation & cost estimation: “Modification of suction and discharge line at PSV-1111 to suitable with new capacity”
GPP Dinh Co
2019
Survey, report on technical evaluation & cost estimation “Upgrading, extending the truck scale for GPP Ca Mau”
GPP Ca Mau
2019
133 Provisions of filter F-1440 for input system - Ca Mau Gas Processing Plant Project
GPP Ca Mau
2019
134 Engineering and Replacing the input piping of the Slug Catcher” at GPP Dinh Co
GPP Dinh Co
2019
135 Provision of EJW /AUX Tube Bundle For K1011 A/C/D Compressor
GPP Dinh Co
2019
136 Provision of Tube Bundles K1011-D For Dinh Co GPP GPP Dinh Co
2019
No. PROJECT/WORK DESCRIPTION PROJECT NAME CLIENT YEAR
137 Calculation, engineering for BK3/BK10 process equipment
BK3/BK10 2010
138 Calculation engineering for sprinkler vessel RC1-RC3 Production platform complex
RC1-RC3 2010
139 Calculation and consultancy of DK14-15M installation method statement
DK14 2011
140 Engineering for Offshore Store Containers - 2013
141 Noise survey and remediation Intiarmada TGT1 FPSO TGT1 FPSO 2014
142 EPC of Diesel generator enclosure BK.TNG Wellhead Platform Project
2014
143 BK14/BT7 - Engineering & assembly PCS & DCI system/Marshalling cabinet GA/IA
BK14/BT7 2014
144 Engineering & Fabrication Portable Water Filter - BK.TNG Wellhead Platform project
BK.TNG Wellhead Platform Project
2014
145
Engineering & Fabrication for BK.TNG Wellhead Platform Project: 1. Foam skid2. Hot Water Skid
BK.TNG Wellhead Platform Project
2015
146 Provision of Chemical Injection Skid (68AQ-01) BK.TNG Wellhead Platform Project
2015
147 Provision of Closed Drain Vessel l& HP Flake K.O Drum
BK.TNG Wellhead Platform Project
2015
148 Provision internal part for Thien Ung project BK.TNG Wellhead Platform Project
2015
149 Provision, fabrication, installation for Electrical Cabinets for Hai Su Den rig
Hai Su Den rig 2015
150 Provision of Electrical and Instrument Material RC9/RC5 Wellhead
Platform Project
2015
151 Provision of Piping & Fittings 2015
152 Provision of service design and supply of internal of three phase oil and gas separator - RP1 platform
Block 09-1 2016
153 Modification Works During FPSO Annual Maintenance Campaign In 2016
FPSO 2016
154 Provision of Internal parts - Due to increased production capacity separator
Tho Trang Project 2016
155 Provision of KO Drum Vessel with U-Stamp, third party certificate
CCP Platform 2016
156 Provision of Sea Water/Gas Heat Exchanger T-102 & T-302)
MKC Platform 2017
157 Provision of equipment and material for Metering Unit of Gas-Saturated Crude Oil Production on BK-5 and BK-8/17 Platform (Block 09-1)
BK-5 and BK-8/17 Platform
(Block 09-1) 2017
131
132
3130
Delivering solution, Expanding customer valueLIST OF MAIN PROJECTS
No. PROJECT/WORK DESCRIPTION PROJECT NAME CLIENT YEAR
158 Provision of Spare parts of automation system in compressor center platform for maintenance 4K-8K
- 2017
159 Purchasing Materials for modification pressure vessel from two-phase to three-phase on RP1 platform (Block 09.1)
RP1 platform (Block 09.1)
2017
160 Modification for the control systems and SSD1 & SSD2 emergency stop on the compressor platform center
- 2017
161 Replace Internal Parts for Glycol Contactor T-311A/B in CCP Platform
T-311A/B in CCP Platform
2017
162 Engineering, procurement and fabrication Air Cooler
Extension of gas compression
capacity at Block 09-1
2017
163 Detail Design, Fabrication of Corrosion Inhibitor Skid For MKC.
Thien Ung Field, Dai Hung Field
2018
164 Engineering, Procurement, Construction And Installation, Commissioning (EPCIC) Ph Control Injection Package.
CCP PLATFORM 2018
165 Provision of Internal part for CTC1 CCP PLATFORM 2018
166 Provision of Star up filter-Oil Field Development Ca Tam Oil Field
Development 2018
167 Provision material and equipment for fabrication the Pig Launcher & Pig Receiver VT-563/17-XL
- 2018
168 Modification the HVAC TOPSIDE & SLM system on DGCP platform
DGCP platform 2018
169 Provision of Internal part for Extension of gas compression capacity at Block 09-1. Install train a on MKS
MKS 2018
170 Provisions of Air heater & Chiller, Filter NPK, Ca Mau Air Heater And
Chiller 2018
171 Design, Calculation and Feasibility Study - Phase 2 Su Tu Trang Gas Pipeline Project
2017
172 Engineering, fabrication Chemical Injection Package
Block 6.1 Phong Lan Dai
Development Project
2017
173 Provision of Air Cooler for Air Compressor on CCP Platform
CCP Platform 2017
174 Create pipeline & instrument diagram (P&ID), production engineering flow scheme (PEFS) document for shell GD plant base on existing system
GD plant 2018
No. PROJECT/WORK DESCRIPTION PROJECT NAME CLIENT YEAR
175
Engineering for HST-HSD Project 1. Closed Drain Vessels2. Pig Launcher & Pig Receiver3. Chemical Storage Tanks & Open Drain Tanks
HST-HSD Project 2011
176 Engineering for HST Full Field Development & HSD Early Production System Development: Potable Water Tank, Flush Water Tank
HST-HSD Full Field Development
2012
177
Engineering for HST Full Field Development & HSD Early Production System Development: 1.HST - Diesel Loading Filter (01F-4410)2.HSD - Diesel Loading Filter (02F-4410)3.HST - Diesel Transfer Filter (01F-4420)4.HSD - Diesel Transfer Filter (02F-4420)
HST-HSD Full Field Development
2012
178
Engineering for HST Full Field Development & HSD Early Production System Development: 1.HST - close drain transfer pumps 01P-6010A/B2.HSD - open drain transfer pumps 02P-6110A/B3.HSD - close drain transfer pumps 02P-6010A/B
HST-HSD Full Field Development
2012
179 Calculation, engineering for sand jetting – HST-HSD Project
HST-HSD Full Field Development
2012
180 Engineering for Gas Filter, Gas Scrubber, Flare Scrubber, Test Separator, HHP Separator
Dai Hung 2 2008
181 Engineering for chemical injection skid – Dai Hung 2 (COR & PPD)
Dai Hung 2 2008
182 Provision for open drain tank – Dai Hung 2 Project Dai Hung 2 2010
183 Provision of Pressure Vessel & Provision of Internal Part for Dai Hung 1
Dai Hung 1 2014
184 Engineering and fabrication for Metering Skid (Dai Hung GGP)
Dai Hung 2 2014
185 Engineering for Te Giac Trang H01 project 1.Open & Close Drain Package2.Fuel Gas Conditioning Skid
Te Giac Trang H01 project
2010
186
Engineering for Te Giac Trang - H04 Project 1, Open & Closed Drain Package 2, Fuel Gas Conditioning Skid 3, Diesel Conditioning
Te Giac Trang - H04 Project
2011
187 Provision of H4 EDG-MT Synchronization and Closed Drain Motor Start Circuit Modification
Te Giac Trang - H04 Project
2015
188 Provision of closed Drain Motor A & B and start Circuit Modification
- 2016
189 Modification works during FPSO annual maintenance campaign in 2016
FPSO 2016
190 Engineering, fabrication, installation NH3 Metering Station
Ammonia Plant Revamp Project
2016
191 Provision of Phosphate Dosing Pump Skid & Anti-Scale Dosing Pumps
2016
192 Engineering, fabrication, installation New Ammonia Refrigeration Package
2016
193 Engineering, fabrication, Installation Coagulant – Flocculent Dosing Package
2017
3332
Delivering solution, Expanding customer valueLIST OF MAIN PROJECTS
No. PROJECT/WORK DESCRIPTION PROJECT NAME CLIENT YEAR
194 Design, engineering, cost estimate for construction of PVPIPE sample work shop
PVPIPE sample work shop
2012
195 Supply of Spreader Bar 40T & Plate Clamp for PV PIPE
- 2014
196 Design, engineering, cost estimate for construction of new PVPIPE sample work shop
PVPIPE sample work shop
2018
197 Engineering & Procurement Manual valve & Instrument for 2 phases Mobile Separator skid Bundled Phases 2
EPCI Of Wellhead Platforms, Pipelines
and Tie-Ins
2016
198 Engineering & Procurement Manual valve & Instrument for next 3 MTS packages - 2 phases Mobile Separator skid
2017
199 Provision of vibration processing services for PT04301 piping
PT04301 2015
200 Manufacturing, installation, commissioning of CO2 compress Interstage separator
Camau Fertilizer Plant 2016
201 Provision of E07604 Tube Bundles for PVCFC E07604 2017
202 Engineering, fabrication, installation Suction Heater (HE-101)
(HE-101) 2016
203 Transfer UPS & CP electrical signal to ICSS system at Ham Rong Thai Binh GDC Station
Ham Rong Thai Binh GDC Station
2017
204 Upgrade and renovate Distribution Cabinet - 2017
205 Air Cooler Modification & Exhaust Insulation for Armada TGT
Armada Fpso Exhaust Insulation
2018
206 Provisions of Air Cooler Modification Armada Fpso Lube
Oil Cooler 2018
207 Engineering for CNG Gas Station – Dua A Chau CNG Gas Station -
Dua A Chau 2017
208 Engineering for CNG Gas Station – Thuan Dao Long An Industrial zone
CNG Gas Station - Thuan Dao Long An
2017
209 Engineering Metering gas station at CNG Phu My factory
CNG Phu My factory 2017
210 Engineering for CNG Gas Station - Kolon CNG Gas Station -
Kolon 2017
211 Engineering Zirtec Metering Gas Station at Chau Duc Industrial zone
Zirtec Metering Gas Station
2018
212 Engineering Accredo Metering Gas Station at Binh Duong Province
Accredo Metering Gas Station
2018
213 Survey, report on technical evaluation & cost estimation for 04 CNG compressor/ 2000Sm3/h
CNG compressor 2018
214 consultancy, engineering design and cost estimation for gas supply & Pressure Reducing unit of Le Phan Gia – Binh Duong
Le Phan Gia – Binh Duong
2018
No. PROJECT/WORK DESCRIPTION PROJECT NAME CLIENT YEAR
215 Calculation of Rolling Coil - 2008
216 Engineering for Booster Compressor Suction Scrubber 230-V-2501
- 2011
217 Engineering for Super Gas Heater- Booster Compressor Project
Booster compressor Project
2011
218 Engineering for Pressure Vessels - DANIELI DANIELI 2011
219 Engineering for Fuel Gas Skid - Bien Dong Phase 1 Project Bien Dong Phase 1
Project
2011
220 Engineering for Liquid Trap 2011
221 Injection Water Filter Skid
PETRO 6 - INDIA
2012
222 Supply of Separator and PW Degasser Skid 2012
223
Engineering for Thang Long – Dong Do Project: 1. Compact manifold2. Atmospheric Rectangular Tank3. FWS Pig Launcher (Tag No. L-0921)4. FWS Pig Launcher (Tag No. L-0901)5. Open Drain Pump Skid6. CO2 Vent Snuffing System7. Nitrogen Bottle Rack Skid8. Sand Jetting
Thang Long – Dong Do Project
2012
224 Engineering and fabrication for 3 phase Separator Skid - No.01 Hornet Gas Field
Development Project
2014
225 Engineering and fabrication for 3 phase Separator Skid - No.02
2015
226 Engineering and fabrication for Gas Dryer Cylinder (CDF-823AB)
REG project 2016
227 Provision of CPI Separator
Ca Mau Gas Processing Plant
Project
2016
228 Provision of Odorant Skid 2016
229 Provision of Methanol Tank 2016
230 Consulting, report on technical evaluation & cost estimation for external storage & gas pipeline form Hon La port to Kham Muon
Hon La port 2016
231 Provision of High Pressure Vessel for Sao Vang Dai Nguyet Development Project
Sao Vang Dai Nguyet Development Project
2018
232 Engineering & Fabrication FRP Fresh Water Tank for Sao Vang Dai Nguyet Development Project
2018
233 Engineering & Fabrication Fuel Gas Skid for Sao Vang Dai Nguyet Development Project
2018
234 Engineering & Fabrication Pig Launcher and Receiver Package for Sao Vang Dai Nguyet Development Project
2018
235 Engineering & Fabrication Fire Water Break Tank for Sao Vang Dai Nguyet Development Project
2018
236 Engineering & Fabrication Liquid Seal Pot for Sao Vang Dai Nguyet Development Project
2018
3534
Delivering solution, Expanding customer valueLIST OF MAIN PROJECTS
No. PROJECT/WORK DESCRIPTION PROJECT NAME CLIENT YEAR
256 Engineering for offshore facilities - BP Offshore Facilities BP 2007
257 Engineering for offshore container - Schlumberger Container -
Schlumberger 2008
258 EPC of gas pipeline and Metering skid My Xuan Ceramics
Co., Ltd My Xuan Ceramics
Co., Ltd 2008
259 Engineering for HT Company workshop Heat treatment
company Heat treatment
company 2008
260 Design & Installation and commissioning of the LV & HV Electrical system of the factory
Vietnam Meisheng Textiles
Vietnam Meisheng Textiles
2008
261 Engineering for pressure vessel - LPG 2008
262 Engineering and Installation of 3000 kVA transformers for Meisheng Textiles factory
2009
263 Installation of electrical system 22kV for Meisheng Textiles factory
2009
264 EPC of electrical distribution system after transformers output - Meisheng Textiles Factory
2009
265 Supply of 01 No. MSB & 04 Nos. of SSB 2009
266 Engineering and installation of gas pipeline SSC SSC 2009
267 Engineering of offshore pipeline – Van Phong Project Van Phong Project VAN PHONG 2009
268 Survey, design, engineering, cost estimate for construction of 8” nitrogen pipeline and 2” hydrogen pipeline
Air Liquide Vietnam Air Liquide Vietnam 2010
269 EPC of Tan Phuoc Khanh Gas pipeline and metering skid
Tan Phuoc Khanh TPK Production and Commercial Co., Ltd
2010
270 Engineering for Air Receiver – PV Shipyard Air Receiver PV SHIPYARD 2010
271 Engineering for modification of product input & output system
PMPC PMPC 2010
272 Calculation engineering for life raft platform Life raft platform PVD Training 2010
273 EPC of Dong Xuyen port outdoor lighting system Dong Xuyen Port Dong Xuyen Port
J.S.C 2011
274 Calculation and engineering for offshore containers
Baker Hughes Baker Hughes
2011
275 Calculation, engineering for fixing boxes 2012
276 Engineering for Jack - up Jack - up R&D Co.,Ltd 2012
277 Engineering for Mixed Bed Vessels Mixed bed vessels GE 2012
278 Survey and engineering HVAC system - EPSO - Block 12W Development Project
Block 12W Development Project
PV Tran 2012
279 Calculation, engineering for Degasser Degasser TNK 2012
280 Calculation, engineering River Water Switch Room for Nui Phao Mining Project
Nui Phao Mining Project
ABB 2012
No. PROJECT/WORK DESCRIPTION PROJECT NAME CLIENT YEAR
237 Engineering for Alpha ECC workshop ECC workshop 2008
238 Detailed engineering for Alpha ECC workshop including electrical system.
ECC workshop 2009
239 Re Analysis, engineering for transportation & replacement Inter Stage Cooler
Inter Stage Cooler 2015
240
Sao Vang Dai Nguyet Development Project: 1. Provision of High Pressure Vessel – Part 12. Provision of High Pressure Vessel – Part 23. Provision of Filter Coalescer SVDN-CPP-M-0011
Sao Vang Dai Nguyet Development Project: 2018
241 Engineering & Fabrication for Pig Launcher & Reeceiver
Hai Phong Terminal Project
2018
242 Engineering, fabrication, installation Heat Exchanger Ruby B FPSO 2015
243 Engineering & Fabrication for Central Fresh Water Cooling System - Tam Dao 05 Jack-Up Rig
Tam Dao 05 Jack-Up Rig SONDEX 2015
244 Engineering & Calculation for Duyen Hai 3 Extension Thermal Power Plant Project (1x688MW)
Duyen Hai 3 EVN TPMB3 2016
245 Nghi Son Refinery and Petrochemical Project Plem Valve replacement
Nghi Son Refinery And Petrochemical
JGCS 2016
246 Engineering & Calculation for Hydro Test Pig - ASME Projects
ASME Projects ASME PROJECTS 2016
247 Engineering, fabrication, installation Heat Exchanger Heat Exchanger E-13 SAIGON PETRO 2016
248 Engineering for gas pipeline 10" Nghe An Gas pipeline 10 "
Nghe An HDTDCTX Cua Lo 2013
249 Engineering the Import/Export Gas Pipeline for Processing Factory Condensate
Factory Condensate PV OIL 2013
250 Engineering for modification of DK I/2 & I/9 Platform DK I/2 & I/9 Platform
Ministry of Defense of Vietnam
2007
251 Engineering for modification of DK Platform DK Platform 2008
252 Engineering for Modification of DK I/14 & I/15 Platform
DK I/14 & I/15 Platform
2012
253 Supply of Custody Gas Metering System for Ton Phuong Nam - Nhon Trach Gas Distribution Pipeline Project-Phase 2
Ton Phuong Nam - Nhon Trach Gas
Distribution Pipeline Project
Ton Phuong Nam 2014
254 Crude Oil Pipeline Underground Oil Storage – Binh Son Refinery
Underground Oil Storage Terminal
PV OS 2014
255 Engineering & assembly Control Panel for Yokogawa - Yokogawa 2014