DLC Laboratory Webinar October 29, 2013 Irina Rasputnis NEEP, Program Manager Nicholas Case D&R International, Project Associate ®
Transcript
Page 1: DLC Laboratory Webinar - DesignLights · 2017. 1. 23. · Lighting Facts® Approved Testing Laboratories List under LM-79 sections 9, 10, and 12. Testing must be conducted within

DLC Laboratory Webinar October 29, 2013

Irina Rasputnis NEEP, Program Manager

Nicholas Case D&R International, Project Associate

®

Page 2: DLC Laboratory Webinar - DesignLights · 2017. 1. 23. · Lighting Facts® Approved Testing Laboratories List under LM-79 sections 9, 10, and 12. Testing must be conducted within

Agenda Review of New Testing Laboratory Requirements

Revision Process Review

Test-by-Test Changes

LM-79

ISTMT

LM-80

Transition Information

Questions

Page 3: DLC Laboratory Webinar - DesignLights · 2017. 1. 23. · Lighting Facts® Approved Testing Laboratories List under LM-79 sections 9, 10, and 12. Testing must be conducted within

Testing Laboratory Requirements Effective as of October 22, 2013

Changes to ISTMT and LM-80 requirements

Adoption of Interim Lab Accreditation Policy released

December 17, 2012 for LM-79

Grace period through January 1, 2014

DLC will accept testing from laboratories meeting either

the new or previous requirements

As of January 1, 2014, DLC will only accept testing from

laboratories meeting new requirements based on the date

testing is conducted

Page 4: DLC Laboratory Webinar - DesignLights · 2017. 1. 23. · Lighting Facts® Approved Testing Laboratories List under LM-79 sections 9, 10, and 12. Testing must be conducted within

Effective October 22, 2013

In-situ

Temperature

Measurement

Test

(ISTMT)

DLC will accept ISTMT results from laboratories meeting at least one of

the following requirements:

Approved by OSHA as a National Recognized Testing Laboratory (NRTL).

Approved Through an OSHA NRTL data acceptance program or OSHA

Satellite Notification and Acceptance Program (SNAP).

Accredited for ANSI/UL 1598 or CSA C22.2 No. 250.0-08, including Sections

19.7, 19.10-16, by an accreditation organization that is an ILAC-MRA

Signatory.

LM-79

DLC will accept LM-79 results from laboratories listed in the DOE LED

Lighting Facts® Approved Testing Laboratories List under LM-79 sections

9, 10, and 12. Testing must be conducted within the accreditation

effective and expiration dates detailed for a given laboratory.

LM-80

DLC will accept LM-80 results from laboratories listed as EPA-Recognized Laboratories for LM-80.

Note: DLC refers to ENERGY STAR Program Guidance Regarding LED Package, LED Array and

LED Module Lumen Maintenance Performance Data Supporting Qualification of Lighting

Products when determining applicability of LM-80 data for a submitted product.

Testing Laboratory Requirements

Page 5: DLC Laboratory Webinar - DesignLights · 2017. 1. 23. · Lighting Facts® Approved Testing Laboratories List under LM-79 sections 9, 10, and 12. Testing must be conducted within

Revision Process Overview Need to evaluate policy identified at DLC

Stakeholder Meeting October 2012

Interim LM-79 policy adopted December 17, 2012

Initial review of policy January – June 2013

1st Draft of revised requirements released July 19,

2013

Discussion at 2013 Stakeholder Meeting

Industry comment period through August 8

2nd Draft of revised requirements released

September 27, 2013

Industry comment period through October 4

Page 6: DLC Laboratory Webinar - DesignLights · 2017. 1. 23. · Lighting Facts® Approved Testing Laboratories List under LM-79 sections 9, 10, and 12. Testing must be conducted within

Previous Requirements Review Starting Point

In-situ

Temperature

Measurement

Test

(ISTMT)

Similar to ENERGY STAR requirements from before September 30, 2010,

DLC will accept ISTMT results from laboratories:

Approved by OSHA as a National Recognized Testing Laboratory

(NRTLs).

Accredited by NVLAP for the LM-79-08 test procedure.

Recognized through UL’s Data Acceptance Program. (Referenced in

the Manufacturer’s Guide pg. 7)

LM-79

Testing must be conducted at a laboratory listed in the U.S. Department

of Energy’s (DOE) LED Lighting Facts® Approved Testing Laboratories List

under LM-79 sections 9, 10, and 12. Testing must be conducted within

the accreditation effective and expiration dates detailed for a given

laboratory.

LM-80 DLC will accept LED package in-house testing from the LED

package/array/module manufacturer.

Page 7: DLC Laboratory Webinar - DesignLights · 2017. 1. 23. · Lighting Facts® Approved Testing Laboratories List under LM-79 sections 9, 10, and 12. Testing must be conducted within

Initial Revision Process Needs

Update requirements to reflect industry development

Ensure impartial requirements

Guiding Principles

Stakeholder Needs Data Integrity

Adequate Access to Testing Services

Industry Consistency

Process

Research and Discussion

Industry input

Review Feedback and

Revise

Page 8: DLC Laboratory Webinar - DesignLights · 2017. 1. 23. · Lighting Facts® Approved Testing Laboratories List under LM-79 sections 9, 10, and 12. Testing must be conducted within

Initial Revisions: Announced July 19, 2013 ISTMT

Derived from temperature measurement sections of safety

standards.

Proposal: laboratories approved by OSHA as NRTLs,

including OSHA NRTL data acceptance programs

LM-79

Industry consensus that laboratory proficiency testing is

necessary

LED Lighting Facts laboratory requirements most viable

option

LM-80

Number of accredited laboratories has grown

EPA-Recognized Laboratories for LM-80 most viable option

Page 9: DLC Laboratory Webinar - DesignLights · 2017. 1. 23. · Lighting Facts® Approved Testing Laboratories List under LM-79 sections 9, 10, and 12. Testing must be conducted within

July 19 Proposal

In-situ

Temperature

Measurement

Test

(ISTMT)

Approved by OSHA as a National Recognized Testing

Laboratory (NRTL).

Accredited by NVLAP for the LM-79-08 test procedure.

Approved through an OSHA NRTL data acceptance program

or OSHA Satellite Notification and Acceptance Program

(SNAP).

LM-79

DLC will accept LM-79 results from laboratories listed in the DOE

LED Lighting Facts® Approved Testing Laboratories List under LM-

79 sections 9, 10, and 12. Testing must be conducted within the

accreditation effective and expiration dates detailed for a given

laboratory.

LM-80

DLC will accept LM-80 results from laboratories listed as EPA-

Recognized Laboratories for LM-80.

Note: DLC refers to ENERGY STAR Program Guidance Regarding LED

Package, LED Array and LED Module Lumen Maintenance Performance

Data Supporting Qualification of Lighting Products when determining

applicability of LM-80 data for a submitted product.

Page 10: DLC Laboratory Webinar - DesignLights · 2017. 1. 23. · Lighting Facts® Approved Testing Laboratories List under LM-79 sections 9, 10, and 12. Testing must be conducted within

July 19 Proposal Feedback

LM-79

Supportive of proposed changes as first step

LM-80

Supportive of proposed changes

ISTMT

Supportive of expansion of DAP by and OSHA NRTL

Not supportive of LM-79 accreditation as sufficient

Suggestions to include SCC certification labs, and labs

accredited to SSL Thermal Testing (NVLAP, etc.)

Stakeholders indicated need for proficiency and

verification testing.

Page 11: DLC Laboratory Webinar - DesignLights · 2017. 1. 23. · Lighting Facts® Approved Testing Laboratories List under LM-79 sections 9, 10, and 12. Testing must be conducted within

Revisions Following Feedback

Focus on ISTMT requirements

Clarified labs must meet one of three ISTMT options

Evaluated alternatives to NVLAP accreditation for

LM-79 test procedure

Accreditation to standards with temperature

measurements that are most relevant to ISTMT

Proposed timeline for transition to new requirements

Page 12: DLC Laboratory Webinar - DesignLights · 2017. 1. 23. · Lighting Facts® Approved Testing Laboratories List under LM-79 sections 9, 10, and 12. Testing must be conducted within

September 27 Proposal: Requirements

In-situ

Temperature

Measurement

Test

(ISTMT)

DLC will accept ISTMT results from laboratories meeting at least one of

the following requirements:

Approved by OSHA as a National Recognized Testing Laboratory

(NRTL).

Approved through an OSHA NRTL data acceptance program or OSHA

Satellite Notification and Acceptance Program (SNAP).

Accredited for ANSI/UL 1598 or CSA C22.2 No. 250.0-08, including

Sections 19.7, 19.10-16, by an accreditation organization that is an

ILAC-MRA signatory.

LM-79

DLC will accept LM-79 results from laboratories listed in the DOE LED

Lighting Facts® Approved Testing Laboratories List under LM-79 sections

9, 10, and 12. Testing must be conducted within the accreditation

effective and expiration dates detailed for a given laboratory.

LM-80

DLC will accept LM-80 results from laboratories listed as EPA-Recognized

Laboratories for LM-80.

Note: DLC refers to ENERGY STAR Program Guidance Regarding LED Package, LED

Array and LED Module Lumen Maintenance Performance Data Supporting

Qualification of Lighting Products when determining applicability of LM-80 data

for a submitted product.

Page 13: DLC Laboratory Webinar - DesignLights · 2017. 1. 23. · Lighting Facts® Approved Testing Laboratories List under LM-79 sections 9, 10, and 12. Testing must be conducted within

September 27 Proposal: Transition Timeline

Date Process

September 27, 2013 Revised Laboratory Requirements Proposal distributed for

industry comment

October 4, 2013 Comment Period Closes

October 18, 2013 (Subject to change based on

comments received)

Final Policy Released

October 18, 2013 –

January 1, 2014

Testing accepted from laboratories that meet either the

current or the new Laboratory Requirements.

January 1, 2014

Testing conducted January 1, 2014 or later will only be

accepted from laboratories that meet the new Laboratory

Requirements.

Note: LM-80 testing that has started prior to January 1, 2014

will be accepted from laboratories that meet the current

policy.

Page 14: DLC Laboratory Webinar - DesignLights · 2017. 1. 23. · Lighting Facts® Approved Testing Laboratories List under LM-79 sections 9, 10, and 12. Testing must be conducted within

September 27 Proposal Feedback

Generally supportive of revisions

ISTMT

Suggestion for accreditations to alternative test methods

Determined not as appropriate as ANSI/UL 1598, CSA

C22.2 No. 250.0-08 revision

Determined not necessary as adequate access is achieved

through ANSI/UL 1598, CSA C22.2 No. 250.0-08 revision

Transition Timeline

Suggestion to extend for additional time to obtain

accreditations for ISTMT requirements

Determined adequate access is achieved through ANSI/UL

1598, CSA C22.2 No. 250.0-08 revision

Page 15: DLC Laboratory Webinar - DesignLights · 2017. 1. 23. · Lighting Facts® Approved Testing Laboratories List under LM-79 sections 9, 10, and 12. Testing must be conducted within

Effective October 22, 2013

In-situ

Temperature

Measurement

Test

(ISTMT)

DLC will accept ISTMT results from laboratories meeting at least one of

the following requirements:

Approved by OSHA as a National Recognized Testing Laboratory (NRTL).

Approved Through an OSHA NRTL data acceptance program or OSHA

Satellite Notification and Acceptance Program (SNAP).

Accredited for ANSI/UL 1598 or CSA C22.2 No. 250.0-08, including Sections

19.7, 19.10-16, by an accreditation organization that is an ILAC-MRA

Signatory.

LM-79

DLC will accept LM-79 results from laboratories listed in the DOE LED

Lighting Facts® Approved Testing Laboratories List under LM-79 sections

9, 10, and 12. Testing must be conducted within the accreditation

effective and expiration dates detailed for a given laboratory.

LM-80

DLC will accept LM-80 results from laboratories listed as EPA-Recognized Laboratories for LM-80.

Note: DLC refers to ENERGY STAR Program Guidance Regarding LED Package, LED Array and

LED Module Lumen Maintenance Performance Data Supporting Qualification of Lighting

Products when determining applicability of LM-80 data for a submitted product.

Final Laboratory Requirements

Page 16: DLC Laboratory Webinar - DesignLights · 2017. 1. 23. · Lighting Facts® Approved Testing Laboratories List under LM-79 sections 9, 10, and 12. Testing must be conducted within

Date Process

October 22, 2013 Final Policy Released

October 22, 2013 –

January 1, 2014

Testing accepted from laboratories that meet either the

previous or the new Laboratory Requirements.

January 1, 2014

Testing conducted January 1, 2014 or later will only be

accepted from laboratories that meet the new

Laboratory Requirements.

Note: LM-80 testing that has started prior to January 1,

2014 will be accepted from laboratories that meet the

previous policy.

Final Transition Timeline

Tied to date testing conducted

Page 17: DLC Laboratory Webinar - DesignLights · 2017. 1. 23. · Lighting Facts® Approved Testing Laboratories List under LM-79 sections 9, 10, and 12. Testing must be conducted within

THANK YOU!

Irina Rasputnis

[email protected] 781-860-9177 x133