DMRC ROLLING STOCK LEASING PROJECT Introductory meeting August 18 th , 2017
Transcript
Page 1: DMRC Project RSL1 - Delhi Metrodelhimetrorail.com/otherdocuments/922/Presentation_EOI... · 2017-08-21 · Proposed Rolling Stock Standard Gauge trains of 6-car configuration, 2.9m

DMRC ROLLING STOCK

LEASING PROJECT

Introductory meeting

August 18th, 2017

Page 2: DMRC Project RSL1 - Delhi Metrodelhimetrorail.com/otherdocuments/922/Presentation_EOI... · 2017-08-21 · Proposed Rolling Stock Standard Gauge trains of 6-car configuration, 2.9m

Overview

50:50 Joint venture between GOI & Govt. of

Delhi

Network of 218 kms164 stations

235 trainsets100+ six car trainsets60+ eight car trainsets

NEED FOR ADDITIONAL ROLLING STOCK

Despite minimum headway of 3 minutes, trains overcrowded

Page 3: DMRC Project RSL1 - Delhi Metrodelhimetrorail.com/otherdocuments/922/Presentation_EOI... · 2017-08-21 · Proposed Rolling Stock Standard Gauge trains of 6-car configuration, 2.9m

Project Objective

Procurement and Maintenance Lease of Rolling Stock for Line 5

To reduce

capital

expenditure

Access to

advanced

maintenance

practices

Enabling smaller

metro systems

across India to

adopt this model

Page 4: DMRC Project RSL1 - Delhi Metrodelhimetrorail.com/otherdocuments/922/Presentation_EOI... · 2017-08-21 · Proposed Rolling Stock Standard Gauge trains of 6-car configuration, 2.9m

Design Supply Test CommissionLifelong Operation ( 35 years) and

maintenance

Expression of Interest (EOI)

Procurement cum maintenance Lease of 150 cars (25 trainsets of 6 car each) on Line 5 along with operation & maintenance of existing depot facilities at Mundka and Bahadurgarh

Lease period – 35 years

Train operators to be provided by Lessor

Payment to Lessor based on hourly availability of Trains

Increase in quantity up to 252 cars within 5 years of last train induction

Lessor to decide the traffic & maintenance reserves over & above DMRC requirement of 150 cars on the mainline

Page 5: DMRC Project RSL1 - Delhi Metrodelhimetrorail.com/otherdocuments/922/Presentation_EOI... · 2017-08-21 · Proposed Rolling Stock Standard Gauge trains of 6-car configuration, 2.9m

Line-5 or ‘The Green Line’ of DMRC

Planned under Phase-III; 11.18km, Expected to complete by early 2018 Currently under operation: Inderlok - Mundka: 15.1km, Kirti Nagar - Ashok Park Main :3.31km

Page 6: DMRC Project RSL1 - Delhi Metrodelhimetrorail.com/otherdocuments/922/Presentation_EOI... · 2017-08-21 · Proposed Rolling Stock Standard Gauge trains of 6-car configuration, 2.9m

Tentative train Operation on Line-5

Peak Hours Morning peak Evening peak

Timing 0800 Hrs – 1100 Hrs 1700 Hrs – 2000 Hrs

Requirements of trains 25 trains per hour 25 trains per hour

Trains do not operate during 0000 hours to 0500 hours

Further details indicating hourly train requirement shall be provided in RFP documents

Page 7: DMRC Project RSL1 - Delhi Metrodelhimetrorail.com/otherdocuments/922/Presentation_EOI... · 2017-08-21 · Proposed Rolling Stock Standard Gauge trains of 6-car configuration, 2.9m

Depot Layout Bahadurgarh Mundka

Workshop Lines 2 4

Inspection Bay Lines 2 3

Stabling Bay Lines 9 15

Test Track 1 1

Unloading Track - 1

M&P Depots

Mundka depot – working depot at present – fully functional

Bahadurgarh – new depot – shall be fully functional by mid 2018

Page 8: DMRC Project RSL1 - Delhi Metrodelhimetrorail.com/otherdocuments/922/Presentation_EOI... · 2017-08-21 · Proposed Rolling Stock Standard Gauge trains of 6-car configuration, 2.9m

Equipment BahadurgarhDepot

Mundka Depot

Auto Wash Plant * 1

Pit Jack - 1 (2 car)

Mobile Jack 2 sets for 2 car each

2 sets for 2 car each

Re-Railing Equipment 1 1

Bogie Turn Table 2 4

Rail Cum Road mover (RRM)

1 1

Rail cum Road Vehicle (RRV)

1 1

Pit Wheel Lathe Machine

* 1

* Presently not planned but space is available

Details of major M&P Depots

Page 9: DMRC Project RSL1 - Delhi Metrodelhimetrorail.com/otherdocuments/922/Presentation_EOI... · 2017-08-21 · Proposed Rolling Stock Standard Gauge trains of 6-car configuration, 2.9m

Proposed Rolling Stock

Standard Gauge trains of 6-car configuration, 2.9m wide, 3.9m high

Operate on 25kV, 50Hz AC overhead supply

67% motoring

Energy Efficient with Maximum Regeneration

Compatible to existing Way-Side Signalling

State of the art Train Control & Management system, Passenger Information System and Display monitors.

Page 10: DMRC Project RSL1 - Delhi Metrodelhimetrorail.com/otherdocuments/922/Presentation_EOI... · 2017-08-21 · Proposed Rolling Stock Standard Gauge trains of 6-car configuration, 2.9m

Project Stages (1/3)

EOI RFP Finalization of Lease agreement

Delivery of trainsets

End of Lease period

EOI

• Participation at RFP stage would be allowed to only those applicants who qualify at EOI stage• EOI opening - October 2017• The evaluation process will be completed within 90 days of submission of the compliant EOIs

i.e. around January 2018.• Change in any consortium partner(s) except the Technology partner (manufacturer of Rolling

Stock) may be allowed prior to submission of RFP, subject to his qualification under EOI req.

Page 11: DMRC Project RSL1 - Delhi Metrodelhimetrorail.com/otherdocuments/922/Presentation_EOI... · 2017-08-21 · Proposed Rolling Stock Standard Gauge trains of 6-car configuration, 2.9m

Project Stages (2/3)

RFP

• Issue of RFP : February 2018• RFP Submission : June 2018• Evaluation of Bids

Technical Package evaluation Financial Package evaluation

• The evaluation process will be completed within 180 days of submission of the compliant RFP documents i.e. End of 2018.

Finalization of the Lease Agreement

• January 2019

Delivery of Trainsets

• Gradual relocation of Existing Stock owned by DMRC with introduction of New Stock by the Lessor on Line-5.

• Depot at Bahadurgarh shall be handed over first• Depot at Mundka shall be handed over only after the last trainset of New Stock is

commissioned on the line by the Lessor, and all the Existing Stock owned by DMRC have been shifted.

• The timelines shall be detailed in the RFP documents.

Page 12: DMRC Project RSL1 - Delhi Metrodelhimetrorail.com/otherdocuments/922/Presentation_EOI... · 2017-08-21 · Proposed Rolling Stock Standard Gauge trains of 6-car configuration, 2.9m

Project Stages (3/3)

Manpower for Lessor

• Train Operators required for testing, commissioning, service trials as well as driving the New Stock on mainline

• Staff required for Supply, Testing, Commissioning, Training and Maintenance of the New Stock• Staff required for Management & security of the handed over Depots.

End of Lease Period

• The Lessor shall provide DMRC with an option to acquire the leased trainsets at a nominal fee at the end of lease period

• The Depots shall be handed over to DMRC at the end of lease period with a balance life of M & P of at least 5 years

Page 13: DMRC Project RSL1 - Delhi Metrodelhimetrorail.com/otherdocuments/922/Presentation_EOI... · 2017-08-21 · Proposed Rolling Stock Standard Gauge trains of 6-car configuration, 2.9m

The Lessor is expected to form an SPV comprising of:

1. Rolling Stock Manufacturer 2. Rolling Stock Maintenance Co. 3. Rolling Stock financing Co.

Expected Model of Lessor

The decision on percentage equity participation among members of the SPV/JV/Consortium shall be finalized on receipt of response from the prospective applicants

Models Proposed

Page 14: DMRC Project RSL1 - Delhi Metrodelhimetrorail.com/otherdocuments/922/Presentation_EOI... · 2017-08-21 · Proposed Rolling Stock Standard Gauge trains of 6-car configuration, 2.9m

Responsibilities of the Lessor

Maintain Depot facilities such as E&M infrastructure, Depot Control Centre, all M&P

Ensure that 75% of the stock supplied is manufactured in India only

Source maximum number of equipment, materials and spares from India

Interfacing with other designated contractors

Address safety and environmental concerns

Payment of Energy consumption charges of Depots including traction energy within the

Depot

Submission of Performance Security against Performance Criteria to be specified in the

RFP document

Page 15: DMRC Project RSL1 - Delhi Metrodelhimetrorail.com/otherdocuments/922/Presentation_EOI... · 2017-08-21 · Proposed Rolling Stock Standard Gauge trains of 6-car configuration, 2.9m

Responsibilities of DMRC

Payment of lease charges on monthly basis

Maintenance of Traction distribution, Civil Tracks, Signalling and Telecommunication

Systems for the Depots

Management of train operation on mainline

O&M of DMRC owned existing stock until complete transfer of trains takes place.

Mundka depot till handing over to Lessor

Page 16: DMRC Project RSL1 - Delhi Metrodelhimetrorail.com/otherdocuments/922/Presentation_EOI... · 2017-08-21 · Proposed Rolling Stock Standard Gauge trains of 6-car configuration, 2.9m

Availability Based Payment

Daily service of 19 hours shall

be divided into specified time

slots

DMRC shall specify to the

Lessor, the number of

trains required for each time

slot

Upon meeting the requirement in

totality, DMRC shall release the monthly payment at hourly availability basis

Penalties shall be imposed for

the non-availability of trains, to be

detailed in RFP documents

Page 17: DMRC Project RSL1 - Delhi Metrodelhimetrorail.com/otherdocuments/922/Presentation_EOI... · 2017-08-21 · Proposed Rolling Stock Standard Gauge trains of 6-car configuration, 2.9m