Integration between PP module and PMmodule
Hi,This document explains integration between PP module and Plant Maintenance (PM) module....
Overview: Integration between PP and PM modules happens during following scenarios...
A) During Capacity Planning for work centers
B) For tracking the usage value of PRT's
Process flow of integration during Capacity Planning for work centers:
When the production work center is overloaded with capacity, if we try to do capacity leveling and want to shift
the capacity to other dates, where already some preventive maintenance activity is planned for the same work
center ( equipment) during that period, then system will not allow to reschedule the production order to those
days. PP Work center is Equipment in PM. In the concerned equipment's master data you can mention the PP
work centers name. This links the PP work center and PM equipment.
Process flow...
Create work center :
http://scn.sap.com/servlet/JiveServlet/showImage/102-55261-3-458120/pastedImage_4.png
8/9/2019 DOC-55261
2/21
Integration between PP module and PM module
Generated by Jive on 2015-05-29+02:00
2
in the capacities header tab maintain the data as per the requirement....
http://scn.sap.com/servlet/JiveServlet/showImage/102-55261-3-458121/pastedImage_5.png
8/9/2019 DOC-55261
3/21
Integration between PP module and PM module
Generated by Jive on 2015-05-29+02:00
3
Now save the work center....
Create Routing : Create the routing for material and assign the work center for operation as shown in the below
screen shots...
http://scn.sap.com/servlet/JiveServlet/showImage/102-55261-3-458122/pastedImage_6.png
8/9/2019 DOC-55261
4/21
Integration between PP module and PM module
Generated by Jive on 2015-05-29+02:00
4
Now save the Routing..
Create BOM : Create the BOM for the material through CS01 for creation of Production orders...
http://scn.sap.com/servlet/JiveServlet/showImage/102-55261-3-458147/pastedImage_0.pnghttp://scn.sap.com/servlet/JiveServlet/showImage/102-55261-3-458147/pastedImage_0.png
8/9/2019 DOC-55261
5/21
Integration between PP module and PM module
Generated by Jive on 2015-05-29+02:00
5
this completes the master data from Production planning module side....
Create Equipment : Create equipment in Plant maintenance module through IE01 and assign the work center
( created in PP module ) in the location tab as shown below. and assign the planning plant as same the work
center plant...
8/9/2019 DOC-55261
6/21
Integration between PP module and PM module
Generated by Jive on 2015-05-29+02:00
6
http://scn.sap.com/servlet/JiveServlet/showImage/102-55261-3-458148/pastedImage_0.png
8/9/2019 DOC-55261
7/21
Integration between PP module and PM module
Generated by Jive on 2015-05-29+02:00
7
http://scn.sap.com/servlet/JiveServlet/showImage/102-55261-3-458149/pastedImage_2.png
8/9/2019 DOC-55261
8/21
Integration between PP module and PM module
Generated by Jive on 2015-05-29+02:00
8
Save the equipment.....
Now create Preventive Maintenance order for the above equipment through IW31...
http://scn.sap.com/servlet/JiveServlet/showImage/102-55261-3-458152/pastedImage_3.png
8/9/2019 DOC-55261
9/21
Integration between PP module and PM module
Generated by Jive on 2015-05-29+02:00
9
Now give the order start date as 26.05.2014 and end date as 30.05.2014 as shown below...
8/9/2019 DOC-55261
10/21
Integration between PP module and PM module
Generated by Jive on 2015-05-29+02:00
10
maintain system condition as not in operation as shown below....
http://scn.sap.com/servlet/JiveServlet/showImage/102-55261-3-458185/pastedImage_5.png
8/9/2019 DOC-55261
11/21
Integration between PP module and PM module
Generated by Jive on 2015-05-29+02:00
11
Finally save the Preventive Maintenance order...
Now create production order for material 2570 through CO01...
http://scn.sap.com/servlet/JiveServlet/showImage/102-55261-3-458217/pastedImage_0.png
8/9/2019 DOC-55261
12/21
Integration between PP module and PM module
Generated by Jive on 2015-05-29+02:00
12
Now give the start date as 22.05.2014 and end date as 27.05.2014 as shown below..and release the order and
save the production order...
8/9/2019 DOC-55261
13/21
Integration between PP module and PM module
Generated by Jive on 2015-05-29+02:00
13
Now create one more production order for the same material with same start and end dates as shown below...
this is for creating the capacity overload for the period....
http://scn.sap.com/servlet/JiveServlet/showImage/102-55261-3-458228/pastedImage_3.pnghttp://scn.sap.com/servlet/JiveServlet/showImage/102-55261-3-458223/pastedImage_2.png
8/9/2019 DOC-55261
14/21
Integration between PP module and PM module
Generated by Jive on 2015-05-29+02:00
14
then save the order...
Now check the capacity situation of the work center in the CM50 transaction...
http://scn.sap.com/servlet/JiveServlet/showImage/102-55261-3-458230/pastedImage_0.png
8/9/2019 DOC-55261
15/21
Integration between PP module and PM module
Generated by Jive on 2015-05-29+02:00
15
http://scn.sap.com/servlet/JiveServlet/showImage/102-55261-3-458236/pastedImage_3.png
8/9/2019 DOC-55261
16/21
Integration between PP module and PM module
Generated by Jive on 2015-05-29+02:00
16
above you can observe that there is a capacity overload on dates 23.05.2014, 26.05.2014 and
27.05.2014....now as there is a overload we will try reschedule the one of the production order to other dates
on the capacity planning table with function capacity leveling...
http://scn.sap.com/servlet/JiveServlet/showImage/102-55261-3-458246/pastedImage_0.png
8/9/2019 DOC-55261
17/21
Integration between PP module and PM module
Generated by Jive on 2015-05-29+02:00
17
in the next selection screen give work center, plant, capacity category and Capacity planner grp
Now execute
http://scn.sap.com/servlet/JiveServlet/showImage/102-55261-3-458247/pastedImage_1.png
8/9/2019 DOC-55261
18/21
Integration between PP module and PM module
Generated by Jive on 2015-05-29+02:00
18
Now take the second production order ( 60004673) and try dispatch it on the dates 28.05.2014 to 30.05.2014
where already preventive maintenance order is present which is shown in black color..
8/9/2019 DOC-55261
19/21
Integration between PP module and PM module
Generated by Jive on 2015-05-29+02:00
19
Now when you try to dispatch the second production order system will not allow you to do on the dates of
preventive maintenance dates and it will rescheduled (dispatched) to subsequent dates as shown below...
8/9/2019 DOC-55261
20/21
Integration between PP module and PM module
Generated by Jive on 2015-05-29+02:00
20
Now save the planning table and observe the change in dates in second production order..
8/9/2019 DOC-55261
21/21
Integration between PP module and PM module
Process flow of integration for tracking the usage value of PRT's :
Tracking of usage of a tool in production, every time a tool is used there should be a count of that usage...This
requires PP-PM integration. A production resource tool as equipment is created with the measuring points. The
PRT will then be assigned to the operation that requires usage. During confirmation of the production order, the
system will automatically record the usage as measuring documents. In this way, the count of the tool usage is
monitored...
Thanks
Kumar