Date post: | 21-Dec-2015 |
Category: |
Documents |
Upload: | arabella-sutton |
View: | 219 times |
Download: | 2 times |
doc.: IEEE 802.11-14/1546r0
Submission
November 2014
Clint Chaplin, Samsung ElectronicsSlide 1
802.15 Liaison ReportDate: 2014-11-07
Name Affiliations Address Phone email Clint Chaplin Samsung 75 W. Plumeria
Drive, San Jose, Ca 95134
+1-408-768-0827 firstname dot lastname at gmail dot com
Authors:
doc.: IEEE 802.11-14/1546r0
Submission
November 2014
Clint Chaplin, Samsung ElectronicsSlide 2
Abstract
Liaison report on 802.15 as presented to 802.11
doc.: IEEE 802.11-14/1546r0
Submission
November 2014
Clint Chaplin, Samsung ElectronicsSlide 3Slide 3
802.15.3d100 Gb/s
• Worked on – Applications Requirements Document (ARD) (Document 15-14-0304-
07-003d)
– Channel Modeling Document (CMD) (Document 15-14-0310-04-003d)
– Technical Requirements Document (TRD) (Document 15-14-0309-03-003d)
Clint Chaplin, Samsung ElectronicsSlide 3
doc.: IEEE 802.11-14/1546r0
Submission
November 2014
Clint Chaplin, Samsung ElectronicsSlide 4Slide 4
802.15.4nChinese Medical Band
Letter Ballot (LB-96) Results:
– Yes 94, No 5, Abstain 8
• LB-96 Passed with 44 comments
• No new “No” voters, all comments editorial
• Addressed all of the comments
• Going out for last recirculation WG ballot after meeting
• Setting up sponsor ballot pool
Clint Chaplin, Samsung ElectronicsSlide 4
doc.: IEEE 802.11-14/1546r0
Submission
November 2014
Clint Chaplin, Samsung ElectronicsSlide 5Slide 5
802.15.4qUltra Low Power
• First Initial WG Ballot LB95 on draft 1.0 closed October 10, 2014. Results 68/12/6 85.00% Passed!
• Received 300 comments; 200 resolved.• Set up BRC to finish addressing comments and send
updated draft out for recirculation• Hope to get recirculation done by next meeting
Clint Chaplin, Samsung ElectronicsSlide 5
doc.: IEEE 802.11-14/1546r0
Submission
November 2014
Clint Chaplin, Samsung ElectronicsSlide 6Slide 6
802.15.4rDistance Measurement Techniques
• Completed Technical Guidelines document• Revised timeline for call for proposals
– Call for for preliminary proposals now January 2015
Clint Chaplin, Samsung ElectronicsSlide 6
doc.: IEEE 802.11-14/1546r0
Submission
November 2014
Clint Chaplin, Samsung ElectronicsSlide 7Slide 7
802.15.4sSpectrum Resources Usage
• Issued a call for proposals for the Technical Guidance Document
Clint Chaplin, Samsung ElectronicsSlide 7
doc.: IEEE 802.11-14/1546r0
Submission
November 2014
Clint Chaplin, Samsung ElectronicsSlide 8Slide 8
802.15.8 Peer Aware Communications
• PHY draft completed
• Progress made on MAC components
• Presentations for harmonization and drafting– 662r1,679r0: Frequency Channel Selection (Huan-Bang Li)– 678r2: Fully distributed synchronization (Byungjae Kwak)
– 654r0, 663r0: Text for UWB PHY (Billy Verso, Igo Dotlic, etc.)
– 646r1: Frame structure (Byungjae Kwak)
– 635r1: PHY merged proposed Text (Marco Hernandez,Kapseok Chang,)
– 636r0: Motions on TBD items (Shannon Park)
– 677r0: PAC Security Consideration (Robert Moskowitz)
– 678r0: Adaptive Random Access for PAC (Byungjae Kwak)
– 689r0: Motion Document (Marco Hernandez)
• Letter Ballot: May 2015
Clint Chaplin, Samsung ElectronicsSlide 8
doc.: IEEE 802.11-14/1546r0
Submission
November 2014
Clint Chaplin, Samsung ElectronicsSlide 9Slide 9
802.15.9 Key Management Protocol
Draft ready for WG letter ballot; ballot issued soon
Clint Chaplin, Samsung ElectronicsSlide 9
doc.: IEEE 802.11-14/1546r0
Submission
November 2014
Clint Chaplin, Samsung ElectronicsSlide 10Slide 10
802.15.10 Layer 2/Mesh Under Routing (L2R)Recapped Sept. 802.15 Interim and Current StatusPresented TG10 Status Summary at Joint
802.1/802.15Merging of Proposals ContinuedBaseline Proposal AdoptedReviewed TG10 Timeline and Next StepsHoping for letter ballot after January 2015
meeting
Clint Chaplin, Samsung ElectronicsSlide 10
doc.: IEEE 802.11-14/1546r0
Submission
November 2014
Clint Chaplin, Samsung ElectronicsSlide 11Slide 11
802.15.7a Optical Camera Communication SG
• PAR and CSD up for approval by EC this week• Addressed comments on PAR and CSD• Updated PAR and CSD based on resolution of comments• Submitted revised PAR and CSD to EC for approval
Clint Chaplin, Samsung ElectronicsSlide 11
doc.: IEEE 802.11-14/1546r0
Submission
November 2014
Clint Chaplin, Samsung ElectronicsSlide 12Slide 12
6TiSCH IGReviewed 6TiSCH aspects of IEEE 802.15.4
revision (15-14-0423-25): TSCH, TSCH default timing values, Enh-Ack, CCA, and CSMA-CA
Clint Chaplin, Samsung ElectronicsSlide 12
doc.: IEEE 802.11-14/1546r0
Submission
November 2014
Clint Chaplin, Samsung ElectronicsSlide 13Slide 13
Dependable IG Review and Revision on Call for Interest
1. Reviewing Call for Interest at 1st stage by Ryuji Kohno doc. 15-14-0449-04
2. Reviewing Time Line and Project Plan by Jussi Haapola doc. 15-14-0340-01
3. Reviewing Application and Dependability Matrix of TG8 by Ryuji Kohno
4. Revision of Call for Interest at 1st stage by Robert Heile and Ben Rolfe doc. 15-14-0449-06
5. Revision of Time Line and Project Plan by Jussi Haapola doc. 15-14-0340-02
6. Discussion on PAR and CSD Necessary Process and Possible Timeline to SG and higher steps
1. Call for Interest(CFI): RELEASE DATE: November 4, 2014, CLOSE DATE: March 13, 2015 (802 Plenary Session in Berlin, Germany)
2. Inviting potential persons in any related fields to present their interest with prospective applications at the IEEE 802 meeting in Atlanta, GA (January 11-14) or at Berlin, Germany (March 8-13, 2015).
3. Time Line; SG application in May or July 2015 with PAR and CSD.
Clint Chaplin, Samsung ElectronicsSlide 13
doc.: IEEE 802.11-14/1546r0
Submission
November 2014
Clint Chaplin, Samsung ElectronicsSlide 14Slide 14
THz IG• Response to ITU-R liaison
– Discussion on the response to the Liaison statement from ITU-R (Doc. 18-14-0042-00-0000) requesting comments on the ITU-R preliminary draft new report on "Technology trends of active services in the band above 275 GHz" (Doc. 18-14-0043-00-0000).
– An answer has been finalized (Doc. 15-14-0539-04-0000) .
Clint Chaplin, Samsung ElectronicsSlide 14
doc.: IEEE 802.11-14/1546r0
Submission
November 2014
Clint Chaplin, Samsung ElectronicsSlide 15Slide 15
WNG SC
802.16.3 measurement project by R Marks Should 802.15 take over this project? Resolve by March 2015
Proposal for railroad communication by J Kim – In 802.16, ETRI proposed to standardize a high speed (1 Gb/s) rail communications– Mobile Wireless Backhaul for Fast Moving Cells (15-14-0671-00-wng0) by Junhyeong Kim
• How do you propose to resolve the problem of narrow beam width, high gain antennae with a moving train? Shadowing is not a critical problem, only need a fixed beam to the train which will be translated to individual callers
• placement of base station every several hundred meters? shouldn’t need so many• have you looked into a mechanism of using distributed medium like a lossy coax?
Yes, similar to propagation in tunnels, some issues and some advantages– Straw poll for interest resulted in 14 individuals (60 present), with 7 wishing to participate in an Interest
Group on High Speed Rail Communication, i.e. IG HSRC. Junhyeong Kim volunteered to lead this IG HSRC.
Proposal to Create a New Task Group (15.3e) by A Estrada Description of the need for a very high data rate, very low range MAC standard as described
in 15-14-0612-04 Working towards a study group
Clint Chaplin, Samsung ElectronicsSlide 15
doc.: IEEE 802.11-14/1546r0
Submission
November 2014
Clint Chaplin, Samsung ElectronicsSlide 16Slide 16
Maintenance SC
• First Recirculation WG Ballot LB97 on draft 2.0 closed November 4, 2014. Results 69/13/4 84.15%
• Received 223 comments; 39 left to be resolved.• Set up BRC to finish addressing comments and send updated draft out
for recirculation
Clint Chaplin, Samsung ElectronicsSlide 16
doc.: IEEE 802.11-14/1546r0
Submission
November 2014
Clint Chaplin, Samsung ElectronicsSlide 17Slide 17
References
• This document
• All Documents– https://mentor.ieee.org/802.15/documents
• Current draft is in the members-only area
– http://www.ieee802.org/15 Members_Only_Area
– 802.11 members log in using 802.11 username and password