+ All Categories
Home > Documents > Doc.: IEEE 802.15-13-0404-01-wng0 Submission July 2013 Shoichi Kitazawa (ATR)Slide 1 Project: IEEE...

Doc.: IEEE 802.15-13-0404-01-wng0 Submission July 2013 Shoichi Kitazawa (ATR)Slide 1 Project: IEEE...

Date post: 20-Jan-2018
Category:
Upload: damon-ward
View: 214 times
Download: 0 times
Share this document with a friend
Description:
doc.: IEEE wng0 Submission Contributors July 2013 Shoichi Kitazawa (ATR)Slide 3
17
doc.: IEEE 802.15-13-0404-01- wng0 Submiss ion July 2013 Shoichi Kitazawa (ATR) Slide 1 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Establishing a Study Group for a Spectrum Resource Utilization (SRU) through Radio Resource Measurement and Management for WPANs] Date Submitted: [July 12, 2013] Source: [Shoichi Kitazawa] Company [ATR] Address [2-2-2, Hikaridai, Seika, Kyoto, Japan] Voice:[+81-774-95-1511], FAX: [ ], E-Mail:[[email protected]] Re: [] Abstract: [This document proposes establishment of the Study group for Spectrum Resource Utilization.] Purpose: [Information to SC WNG] Notice: This document has been prepared to assist the IEEE P802.15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P802.15.
Transcript
Page 1: Doc.: IEEE 802.15-13-0404-01-wng0 Submission July 2013 Shoichi Kitazawa (ATR)Slide 1 Project: IEEE P802.15…

doc.: IEEE 802.15-13-0404-01-wng0

Submission

Shoichi Kitazawa (ATR)

July 2013

Slide 1

Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs)

Submission Title: [Establishing a Study Group for a Spectrum Resource Utilization (SRU) through Radio Resource Measurement and Management for WPANs]Date Submitted: [July 12, 2013]Source: [Shoichi Kitazawa] Company [ATR]Address [2-2-2, Hikaridai, Seika, Kyoto, Japan]Voice:[+81-774-95-1511], FAX: [ ], E-Mail:[[email protected]]Re: []

Abstract: [This document proposes establishment of the Study group for Spectrum Resource Utilization.]

Purpose: [Information to SC WNG]Notice: This document has been prepared to assist the IEEE P802.15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein.Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P802.15.

Page 2: Doc.: IEEE 802.15-13-0404-01-wng0 Submission July 2013 Shoichi Kitazawa (ATR)Slide 1 Project: IEEE P802.15…

doc.: IEEE 802.15-13-0404-01-wng0

Submission

Establishing a Study Group for a Spectrum Resource Utilization (SRU) through Radio Resource Measurement

and Management for WPANs

Shoichi KitazawaATR

Chair IEEE 802.15 IG SRU

July 2013

Shoichi Kitazawa (ATR)Slide 2

Page 3: Doc.: IEEE 802.15-13-0404-01-wng0 Submission July 2013 Shoichi Kitazawa (ATR)Slide 1 Project: IEEE P802.15…

doc.: IEEE 802.15-13-0404-01-wng0

Submission

Shoichi Kitazawa (ATR)

Contributors

July 2013

Slide 3

Name Affiliations Address email Shoichi Kitazawa

ATR 2-2-2 Hikaridai, Seika,

Kyoto 619-0288, JAPAN

[email protected]

Masayuki Ariyoshi [email protected]

Kazuto Yano [email protected]

Kiyoshi Kobayashi [email protected]

Shusaku Shimada Schubiquist Technologies Guild

[email protected]

Mitsuru Iwaoka Yokogawa Electric Corporation

[email protected]

Takashi Yamamoto Sumitomo Electric Industries, Ltd.

1-1-3 Shimaya, Konohana-ku, Osaka,

554-0024 JAPAN

[email protected]

Yoshizo Tanaka tanaka-yoshizo@ sei.co.jp Yoji Okada okada-yoji@ sei.co.jp

Page 4: Doc.: IEEE 802.15-13-0404-01-wng0 Submission July 2013 Shoichi Kitazawa (ATR)Slide 1 Project: IEEE P802.15…

doc.: IEEE 802.15-13-0404-01-wng0

Submission

Shoichi Kitazawa (ATR)

Outline

• Goal• Background• Review of IG SRU activity• Scope and Objectives• Use case• Timeline

July 2013

Slide 4

Page 5: Doc.: IEEE 802.15-13-0404-01-wng0 Submission July 2013 Shoichi Kitazawa (ATR)Slide 1 Project: IEEE P802.15…

doc.: IEEE 802.15-13-0404-01-wng0

Submission

Shoichi Kitazawa (ATR)

Goal for SG SRU

• The focus of the Study Group is to draft a PAR and 5C for achieving more efficient utilization of spectrum resources through mechanisms of Radio Resource Measurement and Management for WPANs, primarily targeting applications using 802.15.4.

• Of particular interest are applications typical of those found in Hospital/Medical/Healthcare, Industrial Automation, and Infrastructure Monitoring.

July 2013

Slide 5

Page 6: Doc.: IEEE 802.15-13-0404-01-wng0 Submission July 2013 Shoichi Kitazawa (ATR)Slide 1 Project: IEEE P802.15…

doc.: IEEE 802.15-13-0404-01-wng0

Submission

Shoichi Kitazawa (ATR)

Background

• Heavy interference has been occurred due to various wireless systems are operating in the unlicensed band.

• In order for these wireless systems to operate in better quality, more efficient Spectrum Resource Utilization needs to be considered.

July 2013

Slide 6

2400 2410 2420 2430 2440 2450 2460 2470 2480 2490Frequency [MHz]

10m

s

-50

-55

-60

-65

-70

-75

-80

-85

-90

Pow

er S

pect

rum

Den

sity

[dB

m]

Page 7: Doc.: IEEE 802.15-13-0404-01-wng0 Submission July 2013 Shoichi Kitazawa (ATR)Slide 1 Project: IEEE P802.15…

doc.: IEEE 802.15-13-0404-01-wng0

Submission

Shoichi Kitazawa (ATR)

Overview of IG-SRU• The IG SRU (Spectrum Resources Usage in WPANs) started in

November 2010.– The IG was established based on “A Proposal Toward Better Use of Spectrum

Resources in future WPAN (15-10-0739-01)” in September 2010.• Objectives

– To explorer advanced technologies for improving the efficiency of spectrum usage in ISM and unlicensed band

– To summarize informative ideas to judge to establish SG• Discussion topics

– Measurements and simulations of congestion situation in 2.4GHz– System and mechanism proposals

• Achievements (deliverables) of IG SRU so far– IG SRU Technical Document (15-12-184r1) has been released

July 2013

Slide 7

Page 8: Doc.: IEEE 802.15-13-0404-01-wng0 Submission July 2013 Shoichi Kitazawa (ATR)Slide 1 Project: IEEE P802.15…

doc.: IEEE 802.15-13-0404-01-wng0

Submission

Overview of IG-SRU

July 2013

Shoichi Kitazawa (ATR)Slide 8

Year Month Venue Agenda Closing Report Minutes Number of participant

2010 November Dallas 15-10-0839-01 15-10-0924-01 15-10-0934-00 10

2011

March Singapore 15-11-0159-01 15-11-0298-00 15-11-0440-00 8

July San Francisco 15-11-0456-00 15-11-0552-00 15-11-755-00 11

November Atlanta 15-11-0757-01 15-11-0830-00 15-12-0106-00 13

2012

March Waikoloa 15-12-0107-00 15-12-0191-00 15-12-0197-00 4

July San Diego 15-12-0326-01 15-12-0425-00 15-12-0440-00 11

November San Antonio 15-12-0595-01 15-12-0628-01 15-12-0659-01 9

2013

January Vancouver 15-12-0681-02 15-13-0078-00 15-13-0093-00 10

March Orlando 15-13-105-01 15-13-0225-00 15-13-0305-00 12

May Waikoloa 15-13-260-01 15-13-0318-00 15-13-0344-00 9

• History– Ten F2F and three teleconference meetings were held.– Average number of attendee is 10.

Page 9: Doc.: IEEE 802.15-13-0404-01-wng0 Submission July 2013 Shoichi Kitazawa (ATR)Slide 1 Project: IEEE P802.15…

doc.: IEEE 802.15-13-0404-01-wng0

Submission

Shoichi Kitazawa (ATR)

Scope and Objectives

• Scope– SG-SRU focuses on mechanisms of Radio Resource

Measurement and Management (RRMM) for WPANs.• Primary target may be on 802.15.4

• Objectives– A common RRMM mechanisms for WPANs will be

established for achieving efficient spectrum resource utilization.

July 2013

Slide 9

Page 10: Doc.: IEEE 802.15-13-0404-01-wng0 Submission July 2013 Shoichi Kitazawa (ATR)Slide 1 Project: IEEE P802.15…

doc.: IEEE 802.15-13-0404-01-wng0

Submission

Shoichi Kitazawa (ATR)

Conceptual Model for RRMM

July 2013

Slide 10

Application - AApplication’s QoS

requirement

Wireless communication system X

Resource Usage

Interference Immunity

Application - BApplication’s QoS

requirement

Wireless communication system Y

Resource Usage

Interference Immunity

Resource UtilizationTraffic

Interference

Interference

Measurement Assignment

Resource Allocation / Arbitration / Coordination

Resource UtilizationTraffic

Interference

Resource UtilizationInterference

QoS/Power constraints

Resource Management

Wireless Resources (Frequency / Time / Space ..)

Radio Resource Measurement& Management (RRMM)

Rules / HeuristicsAnalytical Models / Simulations

Page 11: Doc.: IEEE 802.15-13-0404-01-wng0 Submission July 2013 Shoichi Kitazawa (ATR)Slide 1 Project: IEEE P802.15…

doc.: IEEE 802.15-13-0404-01-wng0

Submission

Shoichi Kitazawa (ATR)

Use Case Examples

• Three major use cases have been in consideration– Hospital/Medical/Healthcare– Industrial Automation– Infrastructure Monitoring

July 2013

Slide 11

Page 12: Doc.: IEEE 802.15-13-0404-01-wng0 Submission July 2013 Shoichi Kitazawa (ATR)Slide 1 Project: IEEE P802.15…

doc.: IEEE 802.15-13-0404-01-wng0

Submission

Shoichi Kitazawa (ATR)

Use case: HospitalVarious wireless systems are deployed in medical environments.

• Requirement– Self-organizing wireless system– Spectrum sensing of whole band for searching vacant radio resources– Radio resource assignment and network topology management

July 2013

Slide 12

BT-ID(for location)

BT-AP (for data exchange)

DB

Electronic medical record

Bluetooth AP network connected with WiFi

Laptop PC for nurses

WiFi (IEEE 802.11b/g)

Nurse

Bluetooth Barcode Reader

Patient

Medicine

WiFi AP

A Use Case of Self-Organizing Wireless Network for Medical System(15-13-0306r0)

Sensing

RRAssign.

TopologyControl

TargetQoE

+

-

DataSrc.

DataSink

Wireless Network System

Observer

η= f(𝐱)

Page 13: Doc.: IEEE 802.15-13-0404-01-wng0 Submission July 2013 Shoichi Kitazawa (ATR)Slide 1 Project: IEEE P802.15…

doc.: IEEE 802.15-13-0404-01-wng0

Submission

Shoichi Kitazawa (ATR)

Use case: Industrial Automation

July 2013

Slide 13

Page 14: Doc.: IEEE 802.15-13-0404-01-wng0 Submission July 2013 Shoichi Kitazawa (ATR)Slide 1 Project: IEEE P802.15…

doc.: IEEE 802.15-13-0404-01-wng0

Submission

Shoichi Kitazawa (ATR)

Use case: Infrastructure monitoring

July 2013

Slide 14

Proposal of radio resource management architecture(15-13-0285r1)

Application Server

Status Management

Wireless Node

Radio Resource Management Entity

Optimization Function

Radio ResourceMeasurement

desired QoS(data rate, delay, ...)

ConfigurationModification

network condition(maximum data rate, …)

measurement result(interference, battery, …)

communication parameters(interval, topology, ...)

Page 15: Doc.: IEEE 802.15-13-0404-01-wng0 Submission July 2013 Shoichi Kitazawa (ATR)Slide 1 Project: IEEE P802.15…

doc.: IEEE 802.15-13-0404-01-wng0

Submission

Shoichi Kitazawa (ATR)

Related Issues on 802.11 Standards

• 802.11k Radio Resource Management

July 2013

Slide 15

• 802.11v Wireless Network Management

Channel load Noise histogram Beacon Frame STA statics LCI(Location Configuration Information) Transmit stream/category measurement

BSS Max idle period management

BSS transition management

Channel usage Collocated interference

reporting Diagnostic reporting Directed multicast

service (DMS) Event reporting Flexible multicast

service (FMS) Location services Multicast diagnostic

reporting

Multiple BSSID capability

Proxy ARP QoS traffic capability SSID list Triggered STA statistics TIM broadcast Timing measurement Traffic filtering service U-APSD Coexistence WNM-Notification WNM-Sleep mode

Page 16: Doc.: IEEE 802.15-13-0404-01-wng0 Submission July 2013 Shoichi Kitazawa (ATR)Slide 1 Project: IEEE P802.15…

doc.: IEEE 802.15-13-0404-01-wng0

Submission

Shoichi Kitazawa (ATR)

Proposed Timeline

July 2013

Slide 16

Year 2013 2014

Month 1 3 5 7 9 11 1 3 5 7 9 11

Preparatory phase (IG)

Technical presentation & Use cases

SG Work Items

PAR development

Use Cases

Title

Scope & Purpose

5C analyses

Interaction with other TG/WG(to identify relationship )Submission to WG

Standard development phase (TG) Ad Hoc

Target dates: PAR submission to NesCom in March 2014 SASB approval in June 2014

Page 17: Doc.: IEEE 802.15-13-0404-01-wng0 Submission July 2013 Shoichi Kitazawa (ATR)Slide 1 Project: IEEE P802.15…

doc.: IEEE 802.15-13-0404-01-wng0

Submission

Shoichi Kitazawa (ATR)

References

1. Proposal of radio resource management architecture(15-13-0285r1)2. A Use Case of Self-Organizing Wireless Network for Medical System(15-13-

306-0)3. IG SRU Working Draft RRMM-usecases and 5C(15-13-0294r1)4. IG SRU Usecase requirements table(15-13-0293r1)

July 2013

Slide 17


Recommended