November 2004 Paul Odlyzko, Motorola Slide 1 doc.: IEEE 802.22-04-0004- 00-0000 Submiss ion Project: IEEE P802.22 Working Group for Wireless Project: IEEE P802.22 Working Group for Wireless Regional Area Networks (WRANs) Regional Area Networks (WRANs) Submission Title: [Canopy Installation Overview] Date Submitted: [17 November 2004 Source: [Paul Odlyzko] Company [Motorola] Address [1301 E. Algonquin Rd., Schaumburg, IL, 60196.1065, USA] Voice:[(847) 538-5234], FAX: [???], E-Mail: [[email protected]] Re: [General installation requirements for fixed wireless access systems.] Abstract: [Presentation on general installation requirements for fixed wireless access systems.] Purpose: [For information only] Notice: This document has been prepared to assist the IEEE P802.22 WG. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that
Transcript
Page 1: Doc.: IEEE 802.22-04-0004-00-0000 Submission November 2004 Paul Odlyzko, MotorolaSlide 1 Project: IEEE P802.22 Working Group for Wireless Regional Area.

November 2004

Paul Odlyzko, MotorolaSlide 1

doc.: IEEE 802.22-04-0004-00-0000

Submission

Project: IEEE P802.22 Working Group for Wireless Regional Area Networks Project: IEEE P802.22 Working Group for Wireless Regional Area Networks (WRANs)(WRANs)

Submission Title: [Canopy Installation Overview]Date Submitted: [17 November 2004Source: [Paul Odlyzko] Company [Motorola]Address [1301 E. Algonquin Rd., Schaumburg, IL, 60196.1065, USA]Voice:[(847) 538-5234], FAX: [???], E-Mail:[[email protected]]

Re: [General installation requirements for fixed wireless access systems.]

Abstract: [Presentation on general installation requirements for fixed wireless access systems.]

Purpose: [For information only]

Notice: This document has been prepared to assist the IEEE P802.22 WG. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein.Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P802.22.

Page 2: Doc.: IEEE 802.22-04-0004-00-0000 Submission November 2004 Paul Odlyzko, MotorolaSlide 1 Project: IEEE P802.22 Working Group for Wireless Regional Area.

November 2004

Paul Odlyzko, MotorolaSlide 2

doc.: IEEE 802.22-04-0004-00-0000

Submission

Canopy Installation Overview

Page 3: Doc.: IEEE 802.22-04-0004-00-0000 Submission November 2004 Paul Odlyzko, MotorolaSlide 1 Project: IEEE P802.22 Working Group for Wireless Regional Area.

November 2004

Paul Odlyzko, MotorolaSlide 3

doc.: IEEE 802.22-04-0004-00-0000

Submission

Topics to be Discussed

• Site Identification

• RF analysis

• Installation

• Cost

• Installer Certifications

Page 4: Doc.: IEEE 802.22-04-0004-00-0000 Submission November 2004 Paul Odlyzko, MotorolaSlide 1 Project: IEEE P802.22 Working Group for Wireless Regional Area.

November 2004

Paul Odlyzko, MotorolaSlide 4

doc.: IEEE 802.22-04-0004-00-0000

Submission

Site Identification – General Requirements

• Tall structure such as radio towers, buildings, and water towers are ideal radio sites

• Source of power is needed– AC, DC, Solar

• Data source must be available– IPOP (Internet Point of Presence)– T1/E1, Satellite, fiber, backhaul, etc.

• Is the frequency you plan to use available?

Page 5: Doc.: IEEE 802.22-04-0004-00-0000 Submission November 2004 Paul Odlyzko, MotorolaSlide 1 Project: IEEE P802.22 Working Group for Wireless Regional Area.

November 2004

Paul Odlyzko, MotorolaSlide 5

doc.: IEEE 802.22-04-0004-00-0000

Submission

Site Identification – Visual Validation

• How high does the radio need to be mounted?

• Are any major obstructions between the tower radios and potential “remote” installations?

• What is the roof material made out of? – Many owners of membrane roofs will not

allow you to access the roof when the temperature is below 320.

Page 6: Doc.: IEEE 802.22-04-0004-00-0000 Submission November 2004 Paul Odlyzko, MotorolaSlide 1 Project: IEEE P802.22 Working Group for Wireless Regional Area.

November 2004

Paul Odlyzko, MotorolaSlide 6

doc.: IEEE 802.22-04-0004-00-0000

Submission

Site Identification – Physical Protection

• Is the site properly grounded?• Is there lightning protection?• Is there a radio shed for equipment that

cannot survive outdoor conditions?• Can you access the site after hours to

perform maintenance?• Can the tower physically support the

equipment AND a climber?

Page 7: Doc.: IEEE 802.22-04-0004-00-0000 Submission November 2004 Paul Odlyzko, MotorolaSlide 1 Project: IEEE P802.22 Working Group for Wireless Regional Area.

November 2004

Paul Odlyzko, MotorolaSlide 7

doc.: IEEE 802.22-04-0004-00-0000

Submission

RF Analysis - Conduct Potential Site Assessments

• Begin identifying locations for the radios– Study local and topographical maps– Drive the proposed coverage area– Take photographs

• If necessary, use a Spectrum Analyzer to sweep the proposed coverage area to determine what type of RF activity is present. – Canopy Subscriber Modules and Backhaul

Slave modules (10 or 20 Mbps) can be used as spectrum analyzers.

– The Canopy 45 Mbps backhaul has a Link Calculator tool that should be used when assessing potential paths.

Page 8: Doc.: IEEE 802.22-04-0004-00-0000 Submission November 2004 Paul Odlyzko, MotorolaSlide 1 Project: IEEE P802.22 Working Group for Wireless Regional Area.

November 2004

Paul Odlyzko, MotorolaSlide 8

doc.: IEEE 802.22-04-0004-00-0000

Submission

RF Analysis - Graphical Spectrum Analyzer Display

• Enable the Spectrum Analyzer from the SM or BHS Expanded Stats web page.

• All frequencies in the band are scanned and reported.

- Green bars show the latest reading.

- Yellow tick marks show the maximum reading over time.

- Red tick marks indicate strong readings (-40 dBm or greater).

• Select Enable to refresh the readings, or set the page to auto-refresh.

• Select Disable to re-establish SM or BHS connectivity to APs or BHMs.

• Enabling Spectrum Analyzer will drop the RF link. If not disabled, the Spectrum Analyzer will time out after 15 minutes.

Page 9: Doc.: IEEE 802.22-04-0004-00-0000 Submission November 2004 Paul Odlyzko, MotorolaSlide 1 Project: IEEE P802.22 Working Group for Wireless Regional Area.

November 2004

Paul Odlyzko, MotorolaSlide 9

doc.: IEEE 802.22-04-0004-00-0000

Submission

Installation – LPS/Grounding

• Outdoor Considerations– Masts, Towers– Transmission lines– Outdoor enclosures– All cable entering or leaving a structure– Radios

• Indoor Consideration– Equipment racks– Equipment

Page 10: Doc.: IEEE 802.22-04-0004-00-0000 Submission November 2004 Paul Odlyzko, MotorolaSlide 1 Project: IEEE P802.22 Working Group for Wireless Regional Area.

November 2004

Paul Odlyzko, MotorolaSlide 10

doc.: IEEE 802.22-04-0004-00-0000

Submission

Installation – Placement considerations

• Canopy radios must NOT be mounted directly to lightning rods

• Radios should be 2’ or more below the top of mounting structure.

• Properly designed Lightning Protection Systems (LPS) should provide a path for current to travel to ground.

Page 11: Doc.: IEEE 802.22-04-0004-00-0000 Submission November 2004 Paul Odlyzko, MotorolaSlide 1 Project: IEEE P802.22 Working Group for Wireless Regional Area.

November 2004

Paul Odlyzko, MotorolaSlide 11

doc.: IEEE 802.22-04-0004-00-0000

Submission

Installation - LPS Components

• Air Terminals – Slender rods installed on roof or tower as defined by industry standard.

• Conductor – Copper cabling that interconnect the air terminals and grounding plates.

• Ground Terminators – Metal rods driven into the earth to guide lightning current harmlessly to ground.

• Surge Arrestors and Suppressors – Devices installed in conjunction with a LPS to protect electrical wiring and electronic systems. Should be installed at point of entrance of cable into a building.

Page 12: Doc.: IEEE 802.22-04-0004-00-0000 Submission November 2004 Paul Odlyzko, MotorolaSlide 1 Project: IEEE P802.22 Working Group for Wireless Regional Area.

November 2004

Paul Odlyzko, MotorolaSlide 12

doc.: IEEE 802.22-04-0004-00-0000

Submission

Installation – LPS Conductor

Page 13: Doc.: IEEE 802.22-04-0004-00-0000 Submission November 2004 Paul Odlyzko, MotorolaSlide 1 Project: IEEE P802.22 Working Group for Wireless Regional Area.

November 2004

Paul Odlyzko, MotorolaSlide 13

doc.: IEEE 802.22-04-0004-00-0000

Submission

Installation - Tools

• Safety Harness must be worn at all times when climbing.

• A multipoint safety harness can be purchased for approximately $270.

• Tower Climbing Safety & Rescue (book by Comtrain) $29.95. Contains ANSI, OSHA, and CSA climbing and tower requirements.

Page 14: Doc.: IEEE 802.22-04-0004-00-0000 Submission November 2004 Paul Odlyzko, MotorolaSlide 1 Project: IEEE P802.22 Working Group for Wireless Regional Area.

November 2004

Paul Odlyzko, MotorolaSlide 14

doc.: IEEE 802.22-04-0004-00-0000

Submission

Installation – Basic Tools

• Punch down tool - $69.00

• Cat5 Cable tester - $79.00

• Cat5 Cable crimper - $45.00

• Fluke 110 Volt Meter -$99.00

• Wire cutters, screw drivers, small socket set, tie wraps

Page 15: Doc.: IEEE 802.22-04-0004-00-0000 Submission November 2004 Paul Odlyzko, MotorolaSlide 1 Project: IEEE P802.22 Working Group for Wireless Regional Area.

November 2004

Paul Odlyzko, MotorolaSlide 15

doc.: IEEE 802.22-04-0004-00-0000

Submission

Installation – Alignment and Configuration tools

• Laptop or iPAQ – Needed for accessing Canopy web page via the Ethernet (RJ45) interface.

• Audio Tone headset for alignment – RJ11 port on SM and BHS’s produces volume, pitch, and cadence.– Volume – higher volume

means less Jitter– Pitch – higher pitch means

better RSSI– Cadence – tone interruption

of .155 seconds every 2 seconds means the SM/BHS has registered.

Page 16: Doc.: IEEE 802.22-04-0004-00-0000 Submission November 2004 Paul Odlyzko, MotorolaSlide 1 Project: IEEE P802.22 Working Group for Wireless Regional Area.

November 2004

Paul Odlyzko, MotorolaSlide 16

doc.: IEEE 802.22-04-0004-00-0000

Submission

Installation – Mounting considerations

• Distance limitations– CAT5 – 328’ – GPS LMR-200 cable

100’– CMM power 400’

• Tower wind load must be taken into consideration when mounting reflector dishes

Page 17: Doc.: IEEE 802.22-04-0004-00-0000 Submission November 2004 Paul Odlyzko, MotorolaSlide 1 Project: IEEE P802.22 Working Group for Wireless Regional Area.

November 2004

Paul Odlyzko, MotorolaSlide 17

doc.: IEEE 802.22-04-0004-00-0000

Submission

Installation – Platform Mount

• Platform made from angle iron.

• Pole is 2” conduit.• Design for flat roof

installs.• Sandbags or cinder

blocks used to weigh down structure base.

Page 18: Doc.: IEEE 802.22-04-0004-00-0000 Submission November 2004 Paul Odlyzko, MotorolaSlide 1 Project: IEEE P802.22 Working Group for Wireless Regional Area.

November 2004

Paul Odlyzko, MotorolaSlide 18

doc.: IEEE 802.22-04-0004-00-0000

Submission

Installation – Pole Mount

• Canopy Backhaul with Reflector. – RJ45 out of radio and

into Surge Suppressor– RJ45 out of Surge

Suppressor and into Power adapter indoors.

– RJ45 our power adapter into network

– Surge Suppressor grounded with 10AWG copper to LPS.

Page 19: Doc.: IEEE 802.22-04-0004-00-0000 Submission November 2004 Paul Odlyzko, MotorolaSlide 1 Project: IEEE P802.22 Working Group for Wireless Regional Area.

November 2004

Paul Odlyzko, MotorolaSlide 19

doc.: IEEE 802.22-04-0004-00-0000

Submission

Installation - Canopy Cabling

Page 20: Doc.: IEEE 802.22-04-0004-00-0000 Submission November 2004 Paul Odlyzko, MotorolaSlide 1 Project: IEEE P802.22 Working Group for Wireless Regional Area.

November 2004

Paul Odlyzko, MotorolaSlide 20

doc.: IEEE 802.22-04-0004-00-0000

Submission

Installation – Surge Suppressor

• Operating temperature is -40F to 131F

• Capacity 1500 Watts peak pulse dissipation with 10µs /1000µs waveform, repetition rate (duty cycle): 0.01%

• Clamp voltage – 35V• Internal Connectors – RJ45• Weighs .4lbs• H 5.2” x W 5.0” x D1.7”

Page 21: Doc.: IEEE 802.22-04-0004-00-0000 Submission November 2004 Paul Odlyzko, MotorolaSlide 1 Project: IEEE P802.22 Working Group for Wireless Regional Area.

November 2004

Paul Odlyzko, MotorolaSlide 21

doc.: IEEE 802.22-04-0004-00-0000

Submission

Page 22: Doc.: IEEE 802.22-04-0004-00-0000 Submission November 2004 Paul Odlyzko, MotorolaSlide 1 Project: IEEE P802.22 Working Group for Wireless Regional Area.

November 2004

Paul Odlyzko, MotorolaSlide 22

doc.: IEEE 802.22-04-0004-00-0000

Submission

High level CMM2 wiring overview

Page 23: Doc.: IEEE 802.22-04-0004-00-0000 Submission November 2004 Paul Odlyzko, MotorolaSlide 1 Project: IEEE P802.22 Working Group for Wireless Regional Area.

November 2004

Paul Odlyzko, MotorolaSlide 23

doc.: IEEE 802.22-04-0004-00-0000

Submission

Page 24: Doc.: IEEE 802.22-04-0004-00-0000 Submission November 2004 Paul Odlyzko, MotorolaSlide 1 Project: IEEE P802.22 Working Group for Wireless Regional Area.

November 2004

Paul Odlyzko, MotorolaSlide 24

doc.: IEEE 802.22-04-0004-00-0000

Submission

Installation – Cost (not including radios)

• 4 Pair 24 AWG Shielded Category 5e Plenum cable – approximately $0.60/foot

• LMR-200 GPS cabling – approximately $0.80/foot

• Truck roll - $75-100 per instance• 3rd Party site acquisition - $0-15,000• 3rd Party site survey - $0-10,000• Base installation - $500-$10,000

Page 25: Doc.: IEEE 802.22-04-0004-00-0000 Submission November 2004 Paul Odlyzko, MotorolaSlide 1 Project: IEEE P802.22 Working Group for Wireless Regional Area.

November 2004

Paul Odlyzko, MotorolaSlide 25

doc.: IEEE 802.22-04-0004-00-0000

Submission

Installer Certifications/Insurance

• The Satellite Broadcasting and Communications Association (SBCA)– No standard has been developed for

wireless broadband. The SBCA certification is suggested for truck roll installation.

• Persons climbing must have proof of insurance for climbing and roof access.