Transcript
  • 8/9/2019 Documents 78 89

    1/12

    BILL

    OF

    QUANTITIES

  • 8/9/2019 Documents 78 89

    2/12

    Section

    -

    Biddingorms

    Upgradation, idening& lmprovement f

    Qila

    Saiful lah Loralai

    Waigum

    Rud

    Section

    f

    NationalHighway

    N-70

    ICB-N-70)

    Lot # 1:

    Qila

    Saifullah o

    Loralai

    Km

    0+000

    o

    67+900)

    BILL

    OF

    QUANTITIES

    SUMMARY F

    BILLS

    Bi t l

    No.

    DESCRIPTION

    AMOUNT

    (RS.}

    1

    EARTHWORK

    2 SUB-BASENDBASECOURSE

    3

    SURFACE OURSESNDPAVEMENT

    4A SUBSTRUCTURE

    48 SUPERSTRUCTURE

    4C REHABILITAION

    F

    EXISTING

    RIDGES

  • 8/9/2019 Documents 78 89

    3/12

    Seclion

    - Bidding

    oms

    Upgradation,Widening&

    lmprovement f

    Qila

    Saifullah

    Loralai

    Waigum

    Rud

    secuon

    of

    Nafonal HighwayN-70

    lcB-N-7o)

    Lot# l:

    Qila

    Saifullah o Lo.alai

    Km

    0+000 o 67+900)

    BILL OF QUANTITIES

    +40

    BILL

    NO. 1 : EARTH

    WORK

    Item

    No .

    Description Uni t

    Quantity

    Rate

    Rs.

    n

    Fiqures)

    RATE

    (Rs.

    n Words)

    Amount

    (Rs-)

    1 0 1

    Clearing

    Grubbing

    SM 683,529

    102a

    Removal

    f trees

    150

    300mm

    qirth

    Each 367

    102b

    Removal

    f trees300 600mm

    qirth

    Each 220

    102c Removal

    f rees 01

    or

    over Each

    147

    10 4

    Compaction

    f natural

    round

    SM 683,529

    1

    06b i Excavate

    unsuitable ard

    rock material

    CM 112,319

    108a

    Formation

    of

    embankment

    from roadway

    excavation ir

    common

    material.

    CM

    281,150

    108bi

    Formatlon

    f embankment

    rom roadway

    xcavation

    n harc

    rock

    material-

    CM 289,122

    108bi i

    Formation

    of embankment from

    roadway

    excavation

    ir

    medium

    ockmaterial

    CM

    168,831

    108c

    Formation

    of embankment rom borrow excavation

    n

    commonmaterial

    CM 1,317,127

    108d

    Formation f embankment rom Structuralexcavationr

    common

    material

    CM 1 ,104

    TOTAL OF BILL NO. 1 : EARTH

    WORK

    ':":3.'*

    6,

    Ll .s\

    "Ytr

    Single-Stage

    Two-Envelope

    Procurement

    f Works

    ADB/JCB_N-70

    sdfsdfsdf sdsdasdasdasdasd 213123

    123123

    123123

    xvxcvcxvxc

    xcvxcvxc

  • 8/9/2019 Documents 78 89

    4/12

    Section

    -

    Bidding orms

    Upgradation,

    Widening &

    lmprovement

    of

    Qila

    Saifullah

    Loralai Waigum

    Rud Section of National

    Highway

    N-70

    |CB-N-7O)

    Lot # 1:

    Qila

    Saifullah o

    Loralai

    Km

    0+000 o 67+900)

    BILL OF

    QUANTITIES

    BILL NO.2 : SUBBASE

    BASE

    COURSE

    44'l

    Item

    No .

    Description

    Unit

    Quantity

    Rate

    (Rs.

    in

    Fiqures)

    RATE

    (Rs.

    n Words)

    Amount

    (Rs.)

    201

    Granular ubbase CM

    160,473

    202

    Aggregate

    Base CM

    296,000

    203b

    Asphaltic aseCourse-Plant ix ClassB) CM 44,695

    209b

    Scarificationf

    existing

    oad

    pavement

    SM 337,563

    TOTALOF BILLNO.2

    SUBBASE BASECOURSE

    Single-Stage

    Two-Envelope

    Procurementf Works

    ADB/ICB-N-70

  • 8/9/2019 Documents 78 89

    5/12

    Section

    4

    -

    BiddingForms

    Upgradation,Widening

    & lmprovement f

    Qila

    Saifullah

    Loralai WaigumRud Section

    of NationalHighwayN-70

    |CB-N-7o)

    Lot # 1:

    Qila

    Saifullah

    o Loralai

    Km

    0+000 o

    67+9001

    BILLOFQUANTITIES

    BILLNo.3: SURFACEOURSE PAVEITIENT

    442

    Item

    No .

    Description

    Unit

    Quantity

    Rate

    (Rs.

    n

    Fiqures)

    RATE

    Rs.

    n Words)

    Amount

    (Rs.)

    3O2a Bituminous rime oat

    SM 545,239

    303a Bituminous

    ack coat

    SM 545,239

    305b

    Asphalticwearingcourse ClassB) CM 27,449

    304b Double

    urface reatment n shoulders SM 319,660

    TOTAL

    OFBILL

    NO.3 :

    SURFACE

    COURSE

    & PAVEMENT

    Single-Stage Two-Envelope

    Procurement

    f

    Works ADB/ICB_N-70

  • 8/9/2019 Documents 78 89

    6/12

    Seclion - Bidding orms

    Upgradation,Widening

    & lmprovement f

    Qila

    Saifullah

    Loralai WaigumRud

    Section

    of

    NationalHighwayN-70

    |CB-N-7o)

    Lot# 1:

    Qila

    saifullah o Loralai

    Km

    0+000 o 67+9001

    BILL OF

    QUANTITIES

    BILL NO.

    4A :

    SUBSTRUCTURE

    443

    Item

    No .

    Description Unit

    Quantity

    Rate

    Rs.

    n

    Fiquresl

    RATE

    (Rs.

    in

    Words)

    Amount

    (Rs-)

    4079

    Test

    piles

    of 1000 mm. dia.

    lncludingBoringand

    concrete

    class43 includingeinforcement.

    M

    60

    4O7m confirmatory

    oring

    ncluding

    est

    eports M

    60

    407d

    Cast-in-place

    oncrete

    piles

    including

    concrete class

    A3

    bu:

    excluding

    einforcement.

    407d2.

    Boring nly

    760mm

    ia )

    M 7BB

    407d4.

    Boring nly

    1000mm

    ia) M 3 1 5

    401a.

    Concrete lass43 in oiles

    CM

    60 5

    4071 Pi le

    LoadTest

    Design

    oad240 Ton)

    Each

    2

    107a

    Structural

    xcavation n common material.

    CM

    1,305

    107e

    Commonback ill n structures CM 676

    401t

    Lean

    concrete

    CM 40

    401a

    Concrete

    lass

    A2

    n

    a) Pile

    aps

    underground)

    CM 373

    b)

    Abutment

    on

    ground)

    CM 381

    c) Transoms elevated)

    CM 125

    Concrete

    lass 3 in

    d) Piers

    (elevated)

    CM

    91

    Concrete

    lass

    A1 n

    e) Approach

    lab

    on ground)

    CM

    B6

    404

    Reinforcementn substructurencludingiles s perAASHTC

    M31 .

    404b.Grade 0

    Ton 239

    406e

    Elastomeric

    earing

    pads

    as shown n the drawings.

    Cu.Cm 564,732

    SP-6 Permanent

    teel iner

    Bmm

    hick)

    ,,,':,r.,-iilr'.;1.

    Ton

    ?

    , . {

    E

    i

    ' . i - ' , ,

    \

    :1, \\

    TOTAL

    OF BILLNO.4A:

    SUBSTRUCTURE

    i , t ; ' l \

    -

    ' 1 1 - r

    : \

    rt-:'

    \

    '

    ,l

    'Il1r

    .l'"

    ,-*.

    -i,

    r\*-,i..::-:Llj

    ingle-Stage

    Two-Envelope

    Procurementf Works

    ADB/ICB-N-70

  • 8/9/2019 Documents 78 89

    7/12

    Section

    -

    Bidding orms

    Upgradation,

    Widening& lmprovement

    of

    Qila

    Saifullah Loralai

    Waigum

    Rud

    Section of

    NationalHighway

    N-70

    |CB-N-7O)

    Lot # 1:

    Qila

    Saifullah o

    Loralai

    Km

    0+000 o

    67+900)

    BILL OF

    QUANTITIES

    BILL NO.48

    :

    SUPERSTRUCTURE

    Item

    No .

    Description Unit

    Quantity

    Rate

    (Rs.

    in

    Fioures)

    RATE

    (Rs.

    n

    Words)

    Amount

    (Rs.)

    40'1gv

    Concrete lassD2 nprecast restressedoncrete irders.

    CM

    3BB

    4 05 b L au nc hi ng

    f

    P.C.

    Girders

    TON 968

    40 1a C on cr et e

    Class43 in deck

    slabsand diaphragms

    CM 499

    401a Concrete

    lass

    Al

    in barrier

    CM

    107

    SP-2

    Manufactured

    rade mark expansion

    oints

    WoSD

    50 by

    Freyssinet r VerduET-50 Spanish) r Equivalent M 113

    404

    Reinforcementn

    superstructure

    s

    per

    AASHTOM31.

    404b.

    Grade 0

    Ton 1 90

    SP-3

    PVC

    service

    ipes.

    '150

    mm

    diameter,2mm

    hick). M 427

    SP-4

    G.l.

    drain

    pipes

    or

    drainagencluding

    ll ixtures, ends

    nc

    grates

    100

    mm

    diameter)

    M

    52

    4O5a

    Prestressing

    trand 112"

    ia

    ncluding ll sheaths

    Pipes

    5C

    mm Dia Wall thickness mm), rumpets, lock, tressing

    anchorage,

    tc.and

    grouting,

    ll

    complete

    Ton 13

    TOTAL OF BILL NO.48 :

    SUPERSTRUCTURE

    ilffi+

    'ttft#

    Single-Stage Two-Envelope

    Procurement

    f

    Works

    ABD/ICB-N.70

  • 8/9/2019 Documents 78 89

    8/12

    Sciion - Bidding

    orms

    lJpgradation,

    Widening& lmprovement

    f

    Qila

    Saifullah

    Loralai

    Waigum

    RudSectionof National

    HighwayN-70

    |CB-N'701

    Lot # l: Sila

    Saifullah o

    Loralai

    Km

    0+000 o

    67+900)

    BILL OF QUANTITIES

    BILL NO.4C

    : REHABILITATION

    F

    EXISTING

    RIDGES

    445

    Item

    No .

    Description

    Unit

    Quantity

    Rate

    (Rs.

    in

    Fiqures)

    RATE

    Rs.

    n Words)

    Amount

    (Rs.)

    107a

    Structuralxcavationncommonmaterial.

    CM

    1,187

    1 7e

    Common

    ack

    ill n

    structures

    CM

    712

    401f Lean concrete

    CM

    40

    411d Stone masonary ressed

    uncoursedwith

    mortar.

    CM 348

    4O1a

    Concrete

    ClassA2 in

    Pad

    beams

    & abutments.

    CM

    290

    401a

    Concrete

    ClassA3 in deckslabsand

    R.C.Cbeams

    CM

    77 6

    4O1a ConcreteClass41

    in

    barrier

    CM 132

    401a

    Concrete lass

    2 i n approach lab

    CM

    157

    406e Elastomeric earing

    pads

    as shown

    n

    the drawings.

    Cu.Cm

    174,993

    SP_2

    Manufacturedrade mark expansion

    oints

    WoSD 50 by

    Freyssinet

    r

    VerduET-50

    Spanish)

    r

    Equivalent

    M 126

    404

    Reinforcementnas

    per

    AASHTO

    M31.

    404b.

    Grade

    0

    Ton 310

    SP-3 PVCservice

    ipes.

    150

    mm

    diameter, mm hick).

    M 527

    SP-4

    G.l. drain

    pipes

    or

    drainage

    ncluding

    ll

    fixtures,

    ends

    anc

    grates 100mm diameter)

    M 101

    5 1 0 D ism an tl ing

    f

    Structure nd obstructions

    CM 1,873

    Er:.THlf|."

    TOTALOFBILLNO.4C REHABILITATIONF

    EXISTING

    RIDGES

    Procurementf

    Works

    ABD/ICB-N-70

  • 8/9/2019 Documents 78 89

    9/12

    Section

    -

    Bidding orms

    Upgradation,

    Widening& lmprovement

    f

    Qila

    Saifullah

    Loralai

    Waigum

    Rud Sectionof National

    HighwayN-70

    |CB-N-7o)

    Lot # 1:

    Qila

    Saifullah

    o Loralai

    Km

    0+000 o 67+9001

    BILL OF QUANTITIES

    BILL

    NO.4D:

    CULVERTS

    Item

    No .

    Description

    Unit

    Quantity

    Rate

    (Rs.

    n

    Fiqures)

    RATE

    (Rs.

    n

    Words)

    Amount

    (Rs.)

    107a Structural xcavationn commonmaterial CM 12,396

    1O7ci

    Structuralexcavation

    n hard rock material

    CM

    13,945

    107ci i

    Structuralexcavationn medium

    ock material

    CM

    4,649

    401t

    Leanconcrete

    CM

    1 , 4 1 3

    401aii

    Concrete

    lass

    Al

    (culverts

    /cwingwall,approns

    etc) CM

    7,749

    401

    Concrete

    lass

    B

    (for

    bedding)

    CM

    145

    411d

    Stonemasonary ressed ncoursed

    ith

    mortar.

    CM

    7,274

    404b

    Reinforcement

    teel as

    per

    AASHTO M31

    grade

    60

    TON 908

    107d Granu la r

    ack il l ing

    CM

    9,344

    501 R.C.CPipeculvert ASHTOM170

    Class

    V

    dia

    1070mm

    M 526

    4OGa

    Premoulded

    oint

    il lerwith bitumastic

    oint

    il ler SM

    494

    406d

    Water

    tops "

    M

    100

    509b Rip ap

    classB CM

    534

    SP-5

    Plaster

    ork SM 3,850

    510

    Dismantling

    f structure ndobstructions

    CM 7,967

    ,,sffihN

    TOTAL

    OF

    BILLNO.4D: CULVERTS

    i i

    '',\E,

    {,\

    I

    \b\

    \ 4

    ;\

    -/.

    rg

    Si

    Single-Stage

    Two-Envelope

    'rr ffi -'.'rz

    Procurementf Works

    ABD/ICB-N-70

  • 8/9/2019 Documents 78 89

    10/12

    SecUon- Biddingoms

    upgr.dation,

    Widening & lmprovement

    of

    Qila

    Saifullah

    -

    Loralai

    -

    Waigum Rud Section

    of Na tional Highway N-70

    |CB-N-?o)

    Lot# 1: Oila Saifullah

    to Loralai

    (Km

    0+000

    o 67+9001

    BILL OF

    QUANTITIES

    BILL

    NO.5:

    DRAINAGE, ROSION

    PROTECTION

    ORKS

    447

    Item

    No .

    Description

    Unit

    Quantity

    Rate

    (Rs.

    in

    Fiqures)

    RATE

    Rs.

    n Words)

    Amount

    (Rs.)

    107a Structural xcavation

    n

    common

    material

    CM 13,604

    1O7cii Structuralexcavation

    n

    medium

    ockmaterial

    CM 9,069

    411b

    Stone

    masonary andomwith mortar or debries

    wall CM

    16,800

    509b

    Rip apclassB

    (

    for

    slope

    protection

    appron)

    CM 22,489

    509e Grouted ip ap

    class

    B

    (

    for

    bridges

    culverts)

    CM

    18,171

    509h F il te r aye rof

    granular

    material CM

    1 , 7 1 4

    TOTAL OF BILL NO.5:

    DRAINAGE,

    ROSION& PROTECTION

    WORKS

    r',i

    w

    ingle-Stage Two-Envelope Procurementf Works

    ABD/ICB_N-70

  • 8/9/2019 Documents 78 89

    11/12

    Seclion

    -

    Biddingorms

    UpgEdation,

    Widening

    &

    lmprovement of

    Qila

    Saifullah

    -

    Loralai

    -

    Waigum Rud

    Section

    of National Highway N-70

    |CB-N-?o)

    Lot # 1:

    Qila

    Saifullah to Lo lai

    (Km

    0+000 o 67+900)

    BILLOFOUANTITIES

    BILL NO.6 : ANCILLARYWORKS

    448

    Item

    No .

    Description Unit

    Quantity

    Rate

    Rs.

    n

    Fiorrresl

    RATE

    Rs.

    n

    Words)

    Amount

    (Rs.)

    401t

    LeanConcrete

    CM 3.672

    411d

    Stone

    masonaryressed

    ncoursed

    ith

    mortar.(Guard) CM

    22,274

    607a Traffic oad signs category1. Each 227

    607b Traff ic road

    signs category2. Each 94

    607c

    Traffic oad signs category

    3a Each

    o

    607e Traffic oad

    igns ategory

    c SM

    1,796

    608h,1

    PavementMarking n Reflective

    R

    paint

    or lines

    of

    15

    cm

    width.

    M 168,053

    60Bjl Pavement arkingn Reflective

    R

    paint

    or4 meters rrows. Each 20

    609c Ref lector ized

    avement

    tud

    (Raised

    profile

    ype single)

    Each 9,336

    609d

    Reflectorized

    avement

    tud

    (Raised

    profile

    ype double)

    Each

    4,668

    401f

    Lean

    Concrete

    CM 464

    401ai i

    Concrete

    lass41

    median

    CM 365

    404b

    Reinforcing

    teelGrade

    0.

    Ton 1B

    601di i

    Precast oncrete erbs

    M

    80 3

    a01s i (1 )

    recast oncrete oncrete

    lass 1

    CM 194

    610c

    kilometer

    ost

    0.610x0.114

    x 1.5

    ",;..rj l=o**.

    Each 69

    610d

    ren

    kilometer

    ost

    'ipT*;N

    Each 7

    ;h

    \}a }r

    TOTAL

    OF

    BILL

    NO. 6 : ANGILLARYWORKS

    *

    :Two-E

    UNJ

    :3

    \*-d4-

    Single-Stage Two-Envelope

    ']-.

    \ -,/ rit",.1

    :.i1,-rfi1

    -,r-

    Procurementf Works

    t _ . / . , t . , t i1 : . .

    ''

    1: : : : . : . -'-

    '

    ABD/ICB_N-70

  • 8/9/2019 Documents 78 89

    12/12

    Sedion -

    Bidding orms

    Upgradation, Widening &

    lmprovement

    of

    Qila

    Saifullah

    -

    Loralai

    -Waigurn

    Rud Section of

    National Highway N-70

    (lcB-N-7o)

    Lot # l:

    Qila

    Saifullah to

    Loralai

    (Km

    0+000 to 67+9001

    BILL OF

    OUANTITIES

    Bill No.7 : General

    lems

    449

    Item

    No .

    Description

    Unit

    Quantity

    Rate

    Rs.

    n

    Fiorrresl

    RATE

    Rs.

    n Words)

    Amount

    (Rs.)

    7Ah Provide urveying Allied quipment P .S

    2.000.000

    701b Maintain

    urveying quipment nd

    provide

    eams

    or survey Month 24

    7O2ai

    Provide equipment

    & furnish

    Employer's/Engineer's

    ffice

    floorarea

    372

    SM).minimum

    P. S

    5.000.000

    7O2ati

    Provide, urnish

    and

    Equip Residential

    Accommodationor

    Emplover's/Enoineer's

    350

    SM)

    P.S

    4,000,000

    702bi Maintain ngineer's

    Employer's epresentative

    ffice Month

    27

    702bi i

    Maintain

    Residential Accommodation for

    Emplover's/Enoineer's.

    Month 27

    7O3a

    Provideequipment

    & furnish

    project

    aboratory

    n base camp

    (160

    SM )

    P.S 1.500.000

    703c

    Maintain

    roject

    aboratory

    Month 27

    Sp-709aProvideransportor Engineer's

    I

    4WD Double

    Cabin

    Pickup) axa)

    with

    A.C Each 1

    t l

    4WD

    Single

    Cabin

    ickup

    ithA. C

    Each

    4

    Sp-709b

    ProvideRun

    and

    Maintain

    ransport or

    Employer's/Engineer's

    representative

    Veh./

    Month

    13 5

    Sp-709cProvide

    ransport

    or Employer's ep

    I

    4 WD Double

    abin

    Pick

    up

    with

    A.C

    Each

    'l

    I

    t l 4 x 2 SingleCabin

    withA.C

    Each

    1

    i ii

    Car 1300CC

    withA/C

    Each 1

    Sp-709dRunning and Maintenance of transport fo

    Employer's/Enqineer's

    epresentative

    Veh./

    Month

    81

    Sp-712

    Employee

    Trainee

    Engineer's ncluding

    Boarding,

    Lodgingan c

    food.

    Man/

    Month

    24x 3

    SP

    13

    SportsFacilities

    s

    per

    NHAPolicey

    P. S

    1,000,000

    i"iifrl--dF'

    TOTAL

    OFB|llNo.7:

    General tems

    \:

    1il

    Jb

    >t

    c i

    SJ

    :" '

    Single-Stage

    Two-Envelope

    ABD/ICB_N-70


Recommended