Cassidy Turley Retro-commissioning Hyattsville, MD Facility Engineering Associates, P.C. (FEA) services included an ASHRAE Level I Audit, a refrigerant compliance analysis, retro-commissioning services, and the review and revision of the sequence of operations pertaining to all major base building HVAC equipment and lighting. During the execution of these phases, FEA worked closely with building staff and management to provide a detailed analysis of the building’s HVAC systems and lighting and identified energy conservation measures and tested the volumetric flow rate of the air distribution and ventilating systems. FEA partnered with C&W Tesco Inc. and performed retro-commissioning on major base building HVAC equipment including the chiller plant equipment, air-handling units, variable-air-volume boxes, and ventilation fans. FEA also studied trending data collected by data loggers placed strategically throughout the building to identify energy efficiency opportunities and equipment malfunctions. Drawing on FEA’s unmatched knowledge of building operation and engineering and C&W Tesco’s unparalleled dedication to thorough equipment testing, we were able to provide the client with a comprehensive report detailing an assortment of energy conservation measures. PRIMARY CLIENT REFERENCE Michael Alexander, LEED AP, GA-C Sustainability Project Manager 2101 L Street, NW, Suite 700 Washington, DC 20037 (202) 266-1339 Michael.Alexander@cassidyturle y.com START DATE: November 3, 2011 COMPLETION DATE: On- going PROJECT SIZE: 303,394 SQFT VALUE OF CONTRACT: $43,900 CLIENT BENEFITS Provided knowledgeable team in management and maintenance of existing buildings Verified that systems are operating in accordance with owner’s requirements
Transcript
Page 1: Vision Word Macro for Deltek Vision 5.1 · Web viewFEA partnered with C&W Tesco Inc. and performed retro-commissioning on major base building HVAC equipment including the ... Vision

Cassidy Turley Retro-commissioningHyattsville, MD

Facility Engineering Associates, P.C. (FEA) services included an ASHRAE Level I Audit, a refrigerant compliance analysis, retro-commissioning services, and the review and revision of the sequence of operations pertaining to all major base building HVAC equipment and lighting. During the execution of these phases, FEA worked closely with building staff and management to provide a detailed analysis of the building’s HVAC systems and lighting and identified energy conservation measures and tested the volumetric flow rate of the air distribution and ventilating systems.

FEA partnered with C&W Tesco Inc. and performed retro-commissioning on major base building HVAC equipment including the chiller plant equipment, air-handling units, variable-air-volume boxes, and ventilation fans. FEA also studied trending data collected by data loggers placed strategically throughout the building to identify energy efficiency opportunities and equipment malfunctions. Drawing on FEA’s unmatched knowledge of building operation and engineering and C&W Tesco’s unparalleled dedication to thorough equipment testing, we were able to provide the client with a comprehensive report detailing an assortment of energy conservation measures. As a PEPCO Trade Ally, FEA acted as Cassidy Turley’s official representative for the application of incentives relating to the retro-commissioning services provided. FEA’s knowledge of PEPCO incentive programs in the Washington DC region allowed for a seamless application process.

Year*Energy

Consumption (kWh)

Energy Demand (kW) Cost ($)

Year 1 9,064,621 18,030 $1,142,436Year 2 8,258,105 18,747 $1,046,660Year 3 5,946,365 15,402 $758,477

* Year 3 numbers are projected based on estimated ECM energy savings

Estimated annual savings of $288,183!!

PRIMARY CLIENT REFERENCEMichael Alexander, LEED AP, GA-CSustainability Project Manager2101 L Street, NW, Suite 700Washington, DC 20037(202) [email protected]

START DATE: November 3, 2011COMPLETION DATE: On-going

PROJECT SIZE: 303,394 SQFTVALUE OF CONTRACT: $43,900

CLIENT BENEFITS Provided knowledgeable team in

management and maintenance of existing buildings

Verified that systems are operating in accordance with owner’s requirements

Provided PEPCO rebate application assistance (FEA is a PEPCO Trade Ally)

SCOPE ITEMS ASHRAE Level I Energy Audit Refrigerant Compliance

Assessment and Calculations Retro-commissioning Services Sequence of Operations

Documentation


Recommended