Fleet Readiness Center Southeast Captain Tim Matthews – Commanding Officer Restructuring Maintenance for the 21 st Century: Fleet Readiness Centers DoD Symposium – November 2007 Restructuring Maintenance for the 21 st Century: Fleet Readiness Centers DoD Symposium – November 2007
Transcript

Fleet Readiness Center Southeast Captain Tim Matthews – Commanding Officer

Restructuring Maintenance for the 21st Century:Fleet Readiness Centers

DoD Symposium – November 2007

Restructuring Maintenance for the 21st Century:Fleet Readiness Centers

DoD Symposium – November 2007

Fleet Readiness Center Southeast

AGENDA

The Challenge

Fleet Readiness Center Concept

Partnerships

High Velocity Repair Loops

Fleet Readiness Center Southeast

TODAY’S CHALLENGE

Aging Weapons Systems– Consumption – Up

– Reliability – Down

– Complex Configuration Issues

Declining Parts Inventories– Obsolescence – Up

– Funding – Down

Vendor Base– Shrinking and Volatile

– Mergers and Relocations

Attain Recapitalization Objectives

– Reduce Workload

– Focus on Savings

Transformation– Realign Infrastructure

– Implement Cost-wise Readiness

Movement to TLS– High Velocity Repair Loops

– Increase Performance Based Logistics Support

– Expand to Other ILS Elements

“A Delicate Balance”Current Readiness Future Readiness

Yesterday’s inventory-intense and sub-optimized solutions are no longer an option. We need a new strategy.

Fleet Readiness Center Southeast

FLEET READINESS CENTERS

Fleet Readiness Center Southeast

I Level Maintenance~ 9,300 Sailors and Marines~ 20 Aircraft Intermediate Maintenance

Departments (AIMDs)~ 580,000 Component Repairs~ 262,000 BCMs to Depot-level ~ $2.9 Billion AFM + AVDLR dollars

NAVAL AVIATION ENTERPRISE – BEFORE D Level Maintenance

~ 10,800 Civilians~ 3 Organic Depots~ 70,000 Depot Component Repairs~ 700 Depot Aircraft Repairs~ 1,500 Depot Engine/Module Repairs~ $2.1 Billion Total Operational Budget

NAE AIMD AND MALS FY 05 INFONAE AIMD AND MALS FY 05 INFO

AIMD New Orleans

MALS 13 YumaNADEP NORTH IS.AIMD North Island

AIMD Corpus Christi(Truax Field)

NADEP JAXAIMD JacksonvilleAIMD Mayport

NADEP CHERRY PTMALS-14MALS-31MALS-26 & 29

AIMD Atlanta

AIMD WHIDBEY ISLAND

AIMD Fort Worth

AIMD Patuxent River

AIMD Pt. MuguMALS-39

AIMD Fallon

AIMD BRUNSWICK

AIMD Willow Grove

AIMD NORFOLK

AIMD KEY West

AIMD OCEANA

AIMDNAF Wash

AIMD CHINA LAKE

MALS 24 KANEOHE BAY

MALS-11 MALS-16

AIMD LEMOORE

NAE AIMD AND MALS FY 05 INFONAE AIMD AND MALS FY 05 INFO

AIMD New Orleans

MALS 13 YumaNADEP NORTH IS.AIMD North Island

AIMD Corpus Christi(Truax Field)

NADEP JAXAIMD JacksonvilleAIMD Mayport

NADEP CHERRY PTMALS-14MALS-31MALS-26 & 29

AIMD Atlanta

AIMD WHIDBEY ISLAND

AIMD Fort Worth

AIMD Patuxent River

AIMD Pt. MuguMALS-39

AIMD Fallon

AIMD BRUNSWICK

AIMD Willow Grove

AIMD NORFOLK

AIMD KEY West

AIMD OCEANA

AIMDNAF Wash

AIMD CHINA LAKE

MALS 24 KANEOHE BAY

MALS-11 MALS-16

AIMD LEMOORE

Fleet Readiness Center Southeast

NAVAL AVIATION ENTERPRISE – AFTER Six Geographically Aligned FRCs

Fleet Readiness Center Southeast

FRCS ‐ CREATING VALUE ‐ Expected Enterprise Benefits ‐

Movement of Depot Capability Forward Will:– Lower Enterprise Cost Through:

• Reduced Duplicate / Repeated Maintenance Activity• Reduced Manpower Requirements at Depot and IMA • Reduced Materiel Cost

Integrated Depot And IMA Command And Control Will Enable:– Single Maintenance Entry Point for Depot and IMA– Improve Readiness Through:

• Reduced Turn-around Times• Less Work In Process (WIP)• Improved Reliability / Increased Time On Wing

– Site Consolidation– Enterprise Policy, Standards, and Metrics– Streamlined Feedback of Flight Line Materiel / Readiness Issues into

Modified Maintenance Practices and Improved Materiel Design

Fleet Readiness Center Southeast

FRCsDepot and Intermediate Maintenance Integration

Repairing Components Closer to the Flight Line through Forward Deployed Artisans– Requires Coordination of Efforts between FRCs– Includes Forward Deployment of Artisans From FRC-to-FRC

Repairing Components through FRCSE Customer Service FRCSE Component Interdiction Savings, FY07: – 265 Components Interdicted– $3.7 Million in Cost Avoidance to Flying Hour Program

Total FRC Component Interdiction Savings, FY07:– 2,761 Components Interdicted– $51 Million in Cost Avoidance

Total FRC Projected Savings over FYDP : $1.2B

Reduced BCMs - Reduced Cost and TAT

Fleet Readiness Center Southeast

PARTNERSHIPS

Fleet Readiness Center Southeast

LEVERAGING PARTNERSHIPS FOR BETTER SUPPORTABILITY SOLUTIONS

Skilled Depot LaborReady FacilitiesOCONUS TransContainer RepairProcess Control (ISO 9000)CPI Culture

All spares & material Material Storage & DistributionTrainingTech DataCONUS TransportationSupport EquipmentReliability GrowthDesign Engineering

USN & OEM Strengths UtilizedUSN & OEM Strengths Utilized

• Fleet Support Team• Life Cycle Mgmt• System Safety• R & M• IT• Configuration Mgmt• Maintenance planning• Training

USN OEM

Fleet Readiness Center Southeast

PARTNERSHIPS: BENEFITS FOR FRCSE 

Industry infusion to FRC SE:

– Latest industry processes

•GE-Lean 6 Sigma / New product introduction

•Raytheon R6 Sigma

– Introduction of new technology to support industry processes

– OEM investment in support equipment

– OEM investment in facilities

Fleet Readiness Center Southeast

BAEAN/ALQ-126B Electronic

Countermeasures85% Guaranteed Availability

Lockheed MartinALQ-142 Electronic Countermeasures

85% Guaranteed Availability

Rockwell CollinsF/A-18 Cockpit Displays, HUD, DDI

85% Guaranteed Availability

GEAEGEAEF404 Engine Components

85% Guaranteed Availability

RaytheonAAS-44 Forward Looking

Infra-Red (FLIR) 90% Guaranteed

Availability

BoeingF/A-18 E/F Unique Components

Guaranteed Fill Rate

AVAILABILITY & RELIABILITY

AAIEA-6B Hydraulic

Components 100% Guaranteed

Availability

HoneywellF404 Engine Main Fuel Control

90% Guaranteed Availability

Performance Driven – Delivering Measurable Results

GEAEGEAEF414 Engine Components

85% Guaranteed Availability

• SECDEF PBL AWARD WINNERS

Fleet Readiness Center Southeast

HIGH VELOCITY REPAIR LOOPS

Fleet Readiness Center Southeast

Increasing the Velocity of the Repair Loop

Fleet Readiness Center Southeast

The Future:  High Velocity Repair Loops

Depot Repair Capability closer to flight line

Agile Workforce

Premium Transportation

Integrated Supply Chains

Enterprise Alignment with Fewer Stovepipes

Robust CPI

Highly Synchronized Pull Systems

PPP’s to optimize reliability and availability

Fleet Readiness Center Southeast

The Future:  High Velocity Repair Loops

Shorter Cycle Times

Smaller Inventories

Less WIP

Lower Costs

Higher Readiness

Fleet Readiness Center Southeast

QUESTIONS?