22 April 2016 BLACK & VEATCH DOE – CSP SUNSHOT FLEXIBLC AND INTEGRATED FACILITY CONCEPTUAL DESIGN, COSTS AND SCHEDULE
Transcript
Page 1: DOE CSP SUNSHOT - Energy.gov Veatch_DOE SunShot...Black & Veatch | FALLING PARTICLE 10 MW INTEGRATED FACILITY KEY DESIGN PARAMETERS Assumptions Selected Suggested Value Falling Particles

22

Ap

ril 2

01

6

BLACK & VEATCH

DOE – CSP SUNSHOT FLEXIBLC AND INTEGRATED FACILITY CONCEPTUAL DESIGN, COSTS AND SCHEDULE

Page 2: DOE CSP SUNSHOT - Energy.gov Veatch_DOE SunShot...Black & Veatch | FALLING PARTICLE 10 MW INTEGRATED FACILITY KEY DESIGN PARAMETERS Assumptions Selected Suggested Value Falling Particles

AGENDA (1 0F 3)

• Objectives and Deliverables

• Project Funding

• Project Integrated Test Facilities

• Project Flexible Use Test Facilities

2

Page 3: DOE CSP SUNSHOT - Energy.gov Veatch_DOE SunShot...Black & Veatch | FALLING PARTICLE 10 MW INTEGRATED FACILITY KEY DESIGN PARAMETERS Assumptions Selected Suggested Value Falling Particles

AGENDA (2 0F 3)

• Design Basis for Conceptual Design

• General Arrangement for SCO2 Cycle

• SCO2 Power Cycle Key Design Parameters (Preliminary)

• Molten Salt Integrated Facility

• Molten Salt 10 MW Integrated Facility Key Design Assumptions

• Simplified MS Process Flow Diagram

• Falling Particle Facility

• Falling Particles Key Design Parameters (Preliminary)

• Flexible Test Facility

• Identify Critical Equipment to Test

3

Page 4: DOE CSP SUNSHOT - Energy.gov Veatch_DOE SunShot...Black & Veatch | FALLING PARTICLE 10 MW INTEGRATED FACILITY KEY DESIGN PARAMETERS Assumptions Selected Suggested Value Falling Particles

AGENDA (3 0F 3)

• Cost Estimates and Schedules

• Capital Cost Estimates New Facilities

• O&M Facilities

• Schedule Lead Times from B&V Database and Suppliers

• Contact Information

4

Page 5: DOE CSP SUNSHOT - Energy.gov Veatch_DOE SunShot...Black & Veatch | FALLING PARTICLE 10 MW INTEGRATED FACILITY KEY DESIGN PARAMETERS Assumptions Selected Suggested Value Falling Particles

OBJECTIVES AND DELIVERABLES

5

Page 6: DOE CSP SUNSHOT - Energy.gov Veatch_DOE SunShot...Black & Veatch | FALLING PARTICLE 10 MW INTEGRATED FACILITY KEY DESIGN PARAMETERS Assumptions Selected Suggested Value Falling Particles

• This project is funded by the Solar Energy Technologies Office, Concentrating Solar Power Program, under Contract DE-EE0006650

• Prime Contractor: Allegheny Science and Technology

• Subcontractor: Black & Veatch Special Projects Corporation

• Period of Performance: March 24, 2016 through June 30, 2016

PROJECT FUNDING

6

Page 8: DOE CSP SUNSHOT - Energy.gov Veatch_DOE SunShot...Black & Veatch | FALLING PARTICLE 10 MW INTEGRATED FACILITY KEY DESIGN PARAMETERS Assumptions Selected Suggested Value Falling Particles

• System definition, cost estimate, and schedule for a green field “flexible use” facility for component tests

• Assessment of the National Solar Thermal Test Facility (NSTTF) at Sandia Laboratories, Albuquerque, including cost for any necessary updates to support advanced SunShot technology component testing

PROJECT OBJECTIVES: FLEXIBLE USE TEST FACILITIES

8

Page 9: DOE CSP SUNSHOT - Energy.gov Veatch_DOE SunShot...Black & Veatch | FALLING PARTICLE 10 MW INTEGRATED FACILITY KEY DESIGN PARAMETERS Assumptions Selected Suggested Value Falling Particles

DESIGN BASIS FOR CONCEPTUAL DESIGN

9

Page 10: DOE CSP SUNSHOT - Energy.gov Veatch_DOE SunShot...Black & Veatch | FALLING PARTICLE 10 MW INTEGRATED FACILITY KEY DESIGN PARAMETERS Assumptions Selected Suggested Value Falling Particles

10

GENERAL ARRANGEMENT FOR SCO2 CYCLE

Precooler Primary

Heat Exchanger

HT Recuperator

Recycle Compressor

Main Compressor

Turbine

LT Recuperator

Page 11: DOE CSP SUNSHOT - Energy.gov Veatch_DOE SunShot...Black & Veatch | FALLING PARTICLE 10 MW INTEGRATED FACILITY KEY DESIGN PARAMETERS Assumptions Selected Suggested Value Falling Particles

11

SCO2 POWER CYCLE KEY DESIGN PARAMETERS (PRELIMINARY)

Plant Rating Basis Target Design Basis Base Electrical Output (Net Plant) ~10,000 kW (Target) Base Efficiency (Net Plant) ≥50% (Target) Ambient Dry Bulb Temperature, C Average Operating Day, Daggett CA Ambient Relative Humidity, % Average Operating Day, Daggett CA Barometric Pressure, bara 0.9422 bara (610 m. elevation) Generator Power Factor 0.85 Frequency 60 Hz Plant Configuration Configuration Recompression Closed Brayton Cycle Condensing/Partial Condensing No Reheat No Recuperators LT and HT Gas Cooler (Wet or Dry Cooling) Dry Turbine Turbine Inlet Temperature, C 715 Turbine Inlet Pressure, bara 250 Main Compressor Pressure Ratio ~3.1 Recycle Compressor Pressure Ratio ~3.1 Recycle Flow Split, % 33% HT Recuperator Pinch, C 5 LT Recuperator Pinch, C 5 Generator Efficiency, % 97.4 Windage and Mechanical Losses 0.75% Gas Cooler/Pre-Cooler

Corresponding CO2 Outlet Temperature, C 35 Piping Pressure Drop Allowances, % of Inlet Pressure Piping Heat Loss Allowances, kJ/kg Electrical Losses and Major Loads/Systems in Service

Page 12: DOE CSP SUNSHOT - Energy.gov Veatch_DOE SunShot...Black & Veatch | FALLING PARTICLE 10 MW INTEGRATED FACILITY KEY DESIGN PARAMETERS Assumptions Selected Suggested Value Falling Particles

12

MOLTEN SALT INTEGRATED FACILITY

12

FROM sCO2

POWER CYCLE

SOLAR FIELD WITH

HELIOSTATS

HEAT

EXCHANGER

COLD

SALT

TANK

HOT

SALT

TANK

SOLAR

TOWER

RECEIVER

COLD

SALT

PUMP

TO sCO2

POWER CYCLE

HOT SALT

PUMP

Page 13: DOE CSP SUNSHOT - Energy.gov Veatch_DOE SunShot...Black & Veatch | FALLING PARTICLE 10 MW INTEGRATED FACILITY KEY DESIGN PARAMETERS Assumptions Selected Suggested Value Falling Particles

MOLTEN SALT 10 MW INTEGRATED FACILITY KEY DESIGN ASSUMPTIONS

13

Assumptions Selected Suggested Value

Molten Salt Type MgCl2/KCl MgCl/KCl

sCO2 Cycle

MWe, Net adjust later 10

MWe, Gross 12 12

sCO2, TiT, C 715

MS Hot Temp, C 750

sCO2 MC HX Temp, C 500

MWth, HX 24

Solar Field

Solar Multiple 1.3

Tower Height, m 50

Field Configuration Surround

Heliostat, m2 Per SAM/NREL

MS System

Hours of storage, h 4

Page 14: DOE CSP SUNSHOT - Energy.gov Veatch_DOE SunShot...Black & Veatch | FALLING PARTICLE 10 MW INTEGRATED FACILITY KEY DESIGN PARAMETERS Assumptions Selected Suggested Value Falling Particles

SIMPLIFIED MS PROCESS FLOW DIAGRAM

SCO2

Hot

Vent line

Hot Tank Cold Tank

Nitrogen

SCO2

Cold

Receiver

1 Tank 12.9m D/7mH

240 m3/h Hd = 100m Haynes 230

1 Tank 13.4m D/7mH

32 mm t at base 200 m3/h Hd ≈ 40m

Haynes 230

Page 15: DOE CSP SUNSHOT - Energy.gov Veatch_DOE SunShot...Black & Veatch | FALLING PARTICLE 10 MW INTEGRATED FACILITY KEY DESIGN PARAMETERS Assumptions Selected Suggested Value Falling Particles

15

FALLING PARTICLE INTEGRATED FACILITY

15

SOLAR FIELD WITH

HELIOSTATS

HEAT

EXCHANGER

SOLAR

TOWER

RECEIVER

BUCKET

ELEVATOR

OR LIFT

DEVICE

COLD

PARTICLE

TANK

HOT

PARTICLE

TANK

FROM sCO2

POWER CYCLE

TO sCO2

POWER

CYCLE

Page 16: DOE CSP SUNSHOT - Energy.gov Veatch_DOE SunShot...Black & Veatch | FALLING PARTICLE 10 MW INTEGRATED FACILITY KEY DESIGN PARAMETERS Assumptions Selected Suggested Value Falling Particles

18 April 2016

16

Black & Veatch |

FALLING PARTICLE 10 MW INTEGRATED FACILITY KEY DESIGN PARAMETERS

Assumptions Selected Suggested Value

Falling Particles Type CARBO Accucast ID50K

sCO2 Cycle

MWe, Net 10

MWe, Gross 12

sCO2, TiT, C 715

MWth, HX 24

Solar Field

Solar Multiple 1.3

Tower height, m 50

Field Configuration North facing

Receiver Configuration Cavity

Heliostat reqts, m2 Per SAM/NREL

Receiver

Hot Bin FP temperature, C 750 750

Cold Bin FP temperature, C 500 500

TES Bin (Hot) Design

Hours of storage, h 4

MWh stored 96

Number of Bins, hot & cold 1 each

TES Bin (Cold) Design

FP flow rate, tonne/h 382

FP/sCO2 HX

Arrangement In tower, maybe fluidized bed

FP/sCO2 HX Lift Device

FP flow rate, tonne/h xxx 382

Location Outside tower

Potential devices Bucket elevators, skip hoist, etc.

Page 17: DOE CSP SUNSHOT - Energy.gov Veatch_DOE SunShot...Black & Veatch | FALLING PARTICLE 10 MW INTEGRATED FACILITY KEY DESIGN PARAMETERS Assumptions Selected Suggested Value Falling Particles

• OBJECTIVE REMINDER

• ENSURE EQUIPMENT IS TESTED TO SATISFY FUTURE LENDERS

• TEST CRITICAL EQUIPMENT BEFORE BUILDING INTEGRATED FACILITY

• CONTINUED MATERIAL/OTHER TESTS OUTSIDE OF FLEXIBLE FACILITY TO SUPPORT WORK

FLEXIBLE TEST FACILITY

17

Page 18: DOE CSP SUNSHOT - Energy.gov Veatch_DOE SunShot...Black & Veatch | FALLING PARTICLE 10 MW INTEGRATED FACILITY KEY DESIGN PARAMETERS Assumptions Selected Suggested Value Falling Particles

• SIZE OF FACILITY (MWT)

• sCO2 COMPONENTS

• MOLTEN SALT SYSTEM

• PUMPS, PIPING & VALVES (HOT AND COLD)

• HEAT EXCHANGERS (RECEIVER, MS TO CO2)

• MS (IMPURITIES, ETC.)

• MS TANK FOUNDATION DESIGN

• FALLING PARTICLE SYSTEM

• HOT ELEVATORS, CHUTES, BINS, GATES

• HEAT EXCHANGERS (CAVITY, FP/sCO2)

• DUST COLLECTION

IDENTIFY CRITICAL EQUIPMENT TO TEST

18

Page 19: DOE CSP SUNSHOT - Energy.gov Veatch_DOE SunShot...Black & Veatch | FALLING PARTICLE 10 MW INTEGRATED FACILITY KEY DESIGN PARAMETERS Assumptions Selected Suggested Value Falling Particles

COST ESTIMATES AND SCHEDULES

19

Page 20: DOE CSP SUNSHOT - Energy.gov Veatch_DOE SunShot...Black & Veatch | FALLING PARTICLE 10 MW INTEGRATED FACILITY KEY DESIGN PARAMETERS Assumptions Selected Suggested Value Falling Particles

• BOQ Based Estimate with Assumptions

• Conventional Equipment – B&V Database/Limited Quotes

• sCO2 Equipment

• TG and Recuperators: Obtain supplier ROM costs

• New/Unproven Equipment: Molten Salt

• Receiver: Obtain supplier ROM costs

• MS/CO2 HX: As above or factor with assumptions

• MS Pumps/Piping/Valves/etc: Factor with assumptions

• Melting System: Factor with assumptions

• New/Unproven Equipment: Falling Particle

• Base costs on available research or factor with assumptions

• Basis: Not EPC, Include Indirects

CAPITAL COST ESTIMATES NEW FACILITIES

20

Page 21: DOE CSP SUNSHOT - Energy.gov Veatch_DOE SunShot...Black & Veatch | FALLING PARTICLE 10 MW INTEGRATED FACILITY KEY DESIGN PARAMETERS Assumptions Selected Suggested Value Falling Particles

O&M ESTIMATES

21

Personnel Known Consumables

General Maintenance

Insurance and Taxes

Annual O&M Cost

- % of CAPEX

Org Chart and $/MY

Page 22: DOE CSP SUNSHOT - Energy.gov Veatch_DOE SunShot...Black & Veatch | FALLING PARTICLE 10 MW INTEGRATED FACILITY KEY DESIGN PARAMETERS Assumptions Selected Suggested Value Falling Particles

SCHEDULE LEAD TIMES FROM B&V DATABASE AND SUPPLIERS

22

Permitting Financing Plant Engineering and Procurement Solar Field Earthworks, Fdns, Tower, Heliostats, Receiver Molten HX, Pumps, Tanks, MS, Melting Time, CX Salt Power Turbine, Cooler, Recuperators, Electrical, DCS, XRs CX COD Block MV/HV Substation / T-Line Connections Energize

Page 23: DOE CSP SUNSHOT - Energy.gov Veatch_DOE SunShot...Black & Veatch | FALLING PARTICLE 10 MW INTEGRATED FACILITY KEY DESIGN PARAMETERS Assumptions Selected Suggested Value Falling Particles

CONTACT INFORMATION

Geoff Galluzzo

[email protected]

913-458-8671

Mike Eddington

[email protected]

913-458-2056

Larry Stoddard

[email protected]

913-458-6551

Page 24: DOE CSP SUNSHOT - Energy.gov Veatch_DOE SunShot...Black & Veatch | FALLING PARTICLE 10 MW INTEGRATED FACILITY KEY DESIGN PARAMETERS Assumptions Selected Suggested Value Falling Particles