Concept:Iowa’s First Destination Resort Park• Lodge
108 rooms, conference center, restaurant, indoor water park
• 18-hole golf course•28 family & group cabins•RV campground•Boat Ramp, Boat Docks•Beach•Day use area, paved/unpaved trails•Ped Bridge to exisiting park
HCRP is intended to exemplify a sustainable approach to development, by protecting the natural environment of both the site itself and the neighboring Rathbun Lake. To meet this goal both water quality monitoring and stormwater management must be part of the development plans.
Water Quality Monitoring
Stormwater Management & Design
Water Quality MonitoringGoal : To protect Rathbun Lake from
contaminants due to construction activities at HCRP
Work Plan:• Baseline monitoring • Construction monitoring • Post-construction / Operational
monitoring??Components:
Lake (near shore and offshore)Surface and integrated depth samples
Stormwater inputsStatic/first flush and automated samplers
Monitoring ProtocolStorm Events
First flush samples with static samplers at many locations
Automatic sampling at prime location for 12 -24 hours
Parameters- Solids (total, suspended
and volatile) Turbidity, pH and
Conductivity
In –lake SamplingNear shore
locationsDepth integrated
samples for solids and nutrients
Depth profiles (YSI) for temp, DO, conductivity
Other parameters - BTEX, pesticides,
nutrients, metals