+ All Categories
Home > Documents > DOORDARSHAN MAINTENANCE CENTRE, KARNAL … · Scopus IRD 2900 09.05.11 DMC Karnal Yes ok 1.6...

DOORDARSHAN MAINTENANCE CENTRE, KARNAL … · Scopus IRD 2900 09.05.11 DMC Karnal Yes ok 1.6...

Date post: 19-May-2018
Category:
Upload: vuongkhue
View: 215 times
Download: 0 times
Share this document with a friend
24
PRASAR BHARATI (Broadcasting corporation of India) DOORDARSHAN MAINTENANCE CENTRE, KARNAL-132 001 E-mail: [email protected] DMC/KNL/M.R./2011-12/ Dated :06.07.2011 To The Chief Engineer (N/Z) DDM Akashvani & Doordarshan Jamnagar House, Shahjahan Road, New Delhi – 110 011. Sub: Technical monthly Report June 2011 Sir, Kindly find enclosed here with Technical Monthly Report for the month of June 2011 of LPT’s under DMC Karnal. Yours Faithfully (A.K.Wadhwa) Assistant Station Engineer DMC Karnal Encls: - Monthly Report in new proforma sent through e-mail.
Transcript

PRASAR BHARATI (Broadcasting corporation of India)

DOORDARSHAN MAINTENANCE CENTRE, KARNAL-132 001 E-mail: [email protected]

DMC/KNL/M.R./2011-12/ Dated :06.07.2011

To

The Chief Engineer (N/Z) DDM Akashvani & Doordarshan Jamnagar House, Shahjahan Road, New Delhi – 110 011.

Sub: Technical monthly Report June 2011

Sir,

Kindly find enclosed here with Technical Monthly Report for the month of

June 2011 of LPT’s under DMC Karnal.

Yours Faithfully

(A.K.Wadhwa) Assistant Station Engineer

DMC Karnal

Encls: -

Monthly Report in new proforma sent through e-mail.

MONTHLY REPORT OF DMC, KARNAL

For the month of June 2011

1. GENERAL 1.1 DETAILS OF IMPORTANT TECHNICAL WORK DONE AT

LPTs / VLPTs DURING THE MONTH

Name of Station Details of the important technical work done REMARKS

DMC Karnal

LPT Karnal

1. General maintenance of transmitter undertaken, all modules i.e. SMPS, Switcher & all input/monitor rack equipments cleaned and loose connections tightened. 2. All necessary precautions for smooth working of transmitter were undertaken.

LPT Kuru-

kshetra

1. The Earth Resistance of 5 pits has been measured using Waco Digital Earth Resistance meter.

2. PA s Combiner unit attended to remove loose connection of combiner on heat sink which was causing reflections in Lower PA.

3. Preventive Maintenance of 15 KVA DG has been carried out. 4. All the electrical connections checked and tightened. 5. Monthly Preventive maintenance of the transmitter has been carried out.

6. All necessary precautions to run the transmitter smoothly have been undertaken.

LPT Ambala

1. General maintenance of transmitter undertaken. 2 Preventive Maintenance of AC has been carried out. 3. Preventive Maintenance of 15 KVA DG has been carried out 4. Control card of AVR repaired and one No.40 Amp of 10KVA AVR replaced as 40 Amp DP of AVR got heated up during course of operation. 5. Faulty single phase meter of DG panel replaced with new Volt meter.

LPT Yamuna--

agar

1. General cleaning & maintenance of Transmitter carried out. 2. Three Nos MCB 32 Amp, 20 Amp & 6 Amp found damaged replaced with new MCB s. One no DP 20 Amp also replaced in supply panel. 3. VIVA make AC repaired after replacing its compressor thimble. Now AC is working O.K.

LPT Jind

1. General Maintenance of Transmitter. 2. One 45mfd 440 volt capacitor was leaky in AC. Anew capacitor of same capacity taken from store and replaced. AC is now working o.k. 3. General maintenance of D.G set has been carried out.

LPT Kaithal

1 The routine maintenance carried out on transmitter rack, input rack and Monitoring rack. All the units dust blown off with the help of vacuum cleaner and Clean with soft cloth.

1. DETAILS OF OFFICERS / STAFF RELIEVED / JOINED FROM / AT DURING THE MONTH

DETAILS OF OFFICERS / STAFF JOINED DURING THE MONTH Name Desig-

nation Emp. No. Relieved from

Station Relieving

Date Joined

at Joining

date Transfer order No. and Date

DETAILS OF OFFICERS / STAFF RELIEVED DURING

THE MONTH Name Designation Emp. No. Relieved

from StationRelieving

Date To join at Transfer order

No. and Date

-----Nil---- 2. TOUR / LEAVE DETAILS OF ENGG. HEAD OF OFFICE /

CONTROLLING OFFICERS DURING THE MONTH

NAME OF OFFICER TOUR DETAILS PERIOD OF E.L. / M.

L. ALONGWITH ITS NATURE PERIOD PLACE

Sh. A.K.Wadhwa SE DMC Karnal

Sh. Rameshwar Prasad AE LPT Yamuna nagar

LPT Ambala

V.K. Jain, S.E.A. ----- ------- 16.6.2011 to 19.06.2011

EL (04 days) Sh. Anil Kumar, AE LPT Kurukshetra -

Sh. V P Sharma, AE LPT Kaithal 28.06.2011 DMC KNL Tour 20.6.11 to 24.6.11 EL

1.4 TRAINING DETAILS OF ENGG. HEAD OF OFFICE / STAFF

DURING THE MONTH NAME OF OFFICER /

STAFF DESIGNATION

PERIOD PLACE NAME OF

COURSE From To

1.5 DETAILS OF NEW EQUIPMENTS RECEIVED AT DMC / LPTs / VLPTs DURING LAST SIX MONTHS

Name of Station

Name of equipment

Date of receipt of equipment

Received from

Whether put in to circuit

Performance of equipment

Remarks

LPT Yamuna Nagar

Scopus IRD 2900 25.05.11 DMC

Karnal Yes ok

LPT Kaithal New DG Bty set Feb.11 DMC

Karnal no ok

Mono Bloc Pump June 11 DMC

Karnal Not yet --

LPT Kurukshetra

300W PA with 30 V /50

A Power supply

31.03.2011 CP&S New Delhi

Working O.K. O.K.

. 1.5 TR

Window AC Make

SAMSUNG

May 11 DMC Karnal Yes ok

LPT Karnal

300W PA with 30 V /50

A Power supply

31.03.2011 CP&S New Delhi

Working O.K. O.K.

Scopus IRD 2900 09.05.11 DMC

Karnal Yes ok

1.6 DETAILS OF SCROLLER

Name of Station

Working Status of Scroller-1

Working Status of Scroller-2

Revenue generated in

current month

year

LPT Jind OK Def. (Soft + ICs) Nil Nil

1.7 ELECTRIC CONNECTION DETAILS

Name of Station

Availability of Electricity

Whether Single Phase / Three Phase

Sanctioned Load

Power Factor

Karnal Available Co-sited with HPT Karnal (3 Phase) 150 KVA 0.97

Kurukshetra Available Co-sited with AIR Kurukshetra (3 Phase) - -

Ambala Available (3 Phase) 25.8 KW 0.89

Yamunanagar Available (3 Phase) 18.3 KW Better than 0.85

Jind Available (3 Phase) 7.8K W -

Kaithal Available (3 Phase) 24.7 KW -

1.8 LAND / BUILDING DETAILS

Station Name of Owner of Land

Category of Owner

(Deptt. / Govt. / Private)

Type of Building

(Porta Cabin / Permanent)

Is Building / Porta Cabin constructed

departmentally

Rent of Setup

(Rs. p.m.)

Availability of Lease

Deed

Due Date of Renewal of Lease Deed

Due Date of Revision of

Rent Remarks

Karnal Prasar Bharati Deptt Permanent Yes - LPT in HPT Building -

Kurukshetra Govt. Of India Deptt Porta Cabin Yes - LPT in AIR Campus ( own Porta-Cabin) -

Ambala State Govt. State Govt. Permanent No No Rent - - - -

Yamunanagar Improvement Trust. State Govt. Permanent No 5625/- - 30.04.2013 1.05.2013

Jind Govt. of India Deptt. Permanent Yes - - - - -

Kaithal HS MITC State Govt. Permanent No 8840/- 04.08.2013 08.2013 Rent as per DC Kaithal-

2. TECHNICAL

2.1 DETAILS OF WORKING OF TRANSMITTER FOR THE MONTH June 2011

LPT

Karnal LPT

Kuruksh.LPT

Ambala LPT

Y. Nagar LPT Jind

LPT Kaithal

1 Test Hours 7.50Hrs 10.00 Hrs 15.00 Hrs 10.00Hrs 4.00 Hrs. 7.50 Hrs

2 Scheduled Prog. Hours 570.00 570.00 570.00 570.00 573.91 227.38

3 Gear Breakdown Hrs. Nil 0.00 0.00 0.00 Nil 0.00

4 Power Supply Breakdown Hrs. 0.53 0.00 1.17 0.00 0.78 0.30

5 Other Causes Breakdown Hrs. Nil 0.00 0.06 0.00 Nil 0.00

6 Total Breakdown Hrs. (3+4+5) 0.53 0.00 1.23 0.00 0.78 0.30

7 Prog. Hours Radiated (2-6) 569.47 570.00 568.77 570.00 573.13 227.08

8 Total Hours of Working (1+7) 576.97 580.00 583.77 580.00 577.13 234.58

9 % B/D ={(Total B/D x 100)/ Scheduled Prog. Hrs.)} 0.09 % 0.00 0.21% 0.00 0.135% 0.13%

2.2 PROGRESSIVE TOTAL FROM APRIL OF CURRENT FINANCIAL YEAR

LPT

Karnal LPT

Kuruksh. LPT

Ambala LPT

Y. Nagar LPT Jind

LPT Kaithal

1 Test Hours 22.75 30.33 45.50 30.33 12.26 22.75

2 Scheduled Prog. Hours 1729.00 1729.00 1729.00 1729.00 1718.74 666.02

3 Gear Breakdown Hrs. Nil 0.00 0.00 0.00 Nil 0.00

4 Power Supply Breakdown Hrs. 1.54 0.00 2.57 0.00 2.8 1.15

5 Other Causes Breakdown Hrs. Nil 0.00 0.06 0.00 Nil 0.00

6 Total Breakdown Hrs. (3+4+5) 1.54 0.00 2.63 0.00 2.8 1.15

7 Prog. Hours Radiated (2-6) 1727.46 1729.00 1726.37 1729.00 1715.94 664.87

8 Total Hours of Working (1+7) 1750.21 1759.33 1771.87 1759.33 1728.2 687.62

9 % B/D ={(Total B/D x 100)/ Scheduled Prog. Hrs.)} 0.09 % 0.00 0.15 0.00 0.16 % 0.17%

2.3 DETAILS OF POWER OF TRANSMITTER FOR THE MONTH June 2011 LPT

Karnal LPT

Ku-kshetraLPT

Ambala LPT

Y. Nagar LPT Jind

LPT Kaithal

1 Rated Power of Transmitter (in KW / Watts) 300 500 500 300 100 500

2

Forward Peak Power of Transmitter

Video 300 500 498 170 Aver. 100

Audio 30 30 - 30 10

3

Reflected Power

Video 3.0 <1.00 2.0 2.0 10.00 2.00

Audio - - - - -

4 Since when Transmitter is on less than rated power (if applicable)

- - - - -

5 Reasons for less than rated power - - - - -

6 Reasons for high reflection, if any - - - - - -

2.4 DETAILS OF LOW POWER RADIATION FROM TRANSMITTER June 2011 (Sync Peak Video Power less than rated power)

LPT

Karnal LPT

Kuruksh. LPT

Ambala LPT

Y. Nagar LPT Jind

LPT Kaithal

1 Dates - - - - - -

2 Duration - - - - - -

3 Power (Radiation) - - - - - -

4 Reasons - - - - - -

5 Total duration of Low Power in hours during the month

6 No. of occurrences - - - - - -

7 Progressive total of occurrences of Low Power Radiation - - - - - -

8 Progressive total of duration of Low Power Radiation - - - - - -

9 Complaints of reception, if any & Reason of complaints - - - - - -

DETAILS OF MAJOR BREAKDOWN DURING THE MONTH June 2011

(More than 15 minutes)

LPT Karnal (separate for each LPT)

Date Duration Period Reasons

for B/D Action taken to solve the B/D

Preventive action taken to avoid such

breakdown in future From To

- - - - - - -

LPT Kurukshetra (separate for each LPT)

Date Duration Period Reasons

for B/D Action taken to solve the B/D

Preventive action taken to avoid such

breakdown in future From To

- - - - - - -

LPT Ambala (separate for each LPT)

Date Duration Period Reasons

for B/D Action taken to solve the B/D

Preventive action taken to avoid such

breakdown in future From To

- - - - - - -

LPT Yamunanagar (separate for each LPT)

Date Duration Period Reasons

for B/D Action taken to solve the B/D

Preventive action taken to avoid such

breakdown in future From To

- - - - - - -

LPT Jind (separate for each LPT)

Date Duration Period Reasons

for B/D Action taken to solve the B/D

Preventive action taken to avoid such

breakdown in future From To

- - - - - - -

LPT Kaithal (separate for each LPT)

Date Duration Period Reasons

for B/D Action taken to solve the B/D

Preventive action taken to avoid such

breakdown in future From To

- - - - - - -

CATEGORY WISE BREAKDOWN DURING THE MONTH June 2011 2.5

LPT Karnal (separate for each LPT) GEAR POWER SUPPLY OTHER CAUSES

Major Minor Major Minor Major Minor No. Dur. No. Dur. No. Dur. No. Dur. No. Dur. No. Dur.

- - - - - - 32 0.53 - - - - Remarks: MI (PS) : 32nos LPT Kurukshetra (separate for each LPT)

GEAR POWER SUPPLY OTHER CAUSES Major Minor Major Minor Major Minor

No. Dur. No. Dur. No. Dur. No. Dur. No. Dur. No. Dur. - - - - - - - - - - - -

Remarks: MI (PS) : 27 nos.

LPT Ambala (separate for each LPT) GEAR POWER SUPPLY OTHER CAUSES

Major Minor Major Minor Major Minor No. Dur. No. Dur. No. Dur. No. Dur. No. Dur. No. Dur.

- - - - - - 35 1.17 - - 1 0.06 LPT Yamunanagar (separate for each LPT)

GEAR POWER SUPPLY OTHER CAUSES Major Minor Major Minor Major Minor

No. Dur. No. Dur. No. Dur. No. Dur. No. Dur. No. Dur. - - - - - - - - -

Remarks: MI (PS) : 21nos

LPT Jind (separate for each LPT) GEAR POWER SUPPLY OTHER CAUSES

Major Minor Major Minor Major Minor No. Dur. No. Dur. No. Dur. No. Dur. No. Dur. No. Dur.

- - - - - - 47 0.78. - - -

LPT Kaithal (separate for each LPT) GEAR POWER SUPPLY OTHER CAUSES

Major Minor Major Minor Major Minor No. Dur. No. Dur. No. Dur. No. Dur. No. Dur. No. Dur.

- - - - - - 18 0.30 - - - -

2.6 CATEGORY-WISE PROGRESSIVE BREAKDOWN FROM APRIL OF CURRENT FINANCIAL YEAR

LPT Karnal (separate for each LPT) GEAR POWER SUPPLY OTHER CAUSES

Major Minor Major Minor Major Minor No. Dur. No. Dur. No. Dur. No. Dur. No. Dur. No. Dur.

- - - - - - 93 1.54 - - - - Remarks: MI (PS) : 93nos LPT Kurukshetra (separate for each LPT)

GEAR POWER SUPPLY OTHER CAUSES Major Minor Major Minor Major Minor

No. Dur. No. Dur. No. Dur. No. Dur. No. Dur. No. Dur. - - - - - - - - - - - -

Remarks: MI (PS) : 106

LPT Ambala (separate for each LPT) GEAR POWER SUPPLY OTHER CAUSES

Major Minor Major Minor Major Minor No. Dur. No. Dur. No. Dur. No. Dur. No. Dur. No. Dur.

- - - - - - 77 2.57 1 0.06 LPT Yamunanagar (separate for each LPT)

GEAR POWER SUPPLY OTHER CAUSES Major Minor Major Minor Major Minor

No. Dur. No. Dur. No. Dur. No. Dur. No. Dur. No. Dur. - - - - 6KVA UPS in CKT. - - - -

Remarks: MI (PS) : 30 nos

LPT Jind (separate for each LPT) GEAR POWER SUPPLY OTHER CAUSES

Major Minor Major Minor Major Minor No. Dur. No. Dur. No. Dur. No. Dur. No. Dur. No. Dur.

- - - - - - 168 Nos.

2.8 Hrs. - - - -

LPT Kaithal (separate for each LPT) GEAR POWER SUPPLY OTHER CAUSES

Major Minor Major Minor Major Minor No. Dur. No. Dur. No. Dur. No. Dur. No. Dur. No. Dur.

- - - - - - 69 1.15 - - - -

2.7 PERFORMANCE FIGURES OF TRANSMITTER LPT

Karnal LPT

Kuruksh.LPT

Ambala LPT

Y. NagarLPT Jind

LPT Kaithal

Frequency of Vision Carrier 559. 260416 543.260416 575.260416 519. 260416 217.25 543.25

Frequency of Aural Carrier 564. 760416 548.760416 580.760416 524.260416 222.75 548.75

K Factor Meas. Equp. Not Availble

Meas. Equp. Not

Available

Meas. Equp. Not

Available

Meas. Equp. Not

Available

(1) K-Bar

(2) K Pulse to Bar

(3) K2T

Differential Gain

Differential Phase

Signal to Noise Ratio

Vision Peak Power

2.8 VIDEO FREQUENCY RESPONSE

Station Freq (MHz) -1.25 -0.75 0.0 1.0 1.5 2.0 3.0 4.43 5.0 5.30 5.50

Karnal

Kurukshetra

Ambala

Yamunanagar

Jind

Kaithal Note: Gain in dB

2.9 AUDIO PERFORMANCE FIGURES

LPT

Karnal LPT

Kuruksh.LPT

Ambala LPT

Y. NagarLPT Jind

LPT Kaithal

Aural Carrier 564. 760416 548.760416 580.760416 524.260416 222.75 548.75

Frequency response

50 Hz to 15 KHz

Distortion Factor

F.M. Noise level

Frequency Deviation at

100% Modulation

2.10 WORKING STATUS OF 500W AUTO MODE TRANSMITTERS

(Wherever applicable) S.No. Name of LPT Xtr. Make, Model,

Channel Whether

Operating on Auto / Manual Mode

Details of Fault

occurred

Current Working Status

(in detail)

Remarks

------ NA -----

2.11 WORKING STATUS OF VLPTs (Wherever applicable) Sr. No.

Name of VLPT

Ch. No.

Type of Transmitter

Rated Power

O/P Power

Reflected Power

Ex-1

Ex-2

PA1 PA2 ASU

------ NA -----

Sr. No.

Name of VLPT

Batteries (In circuit)

Solar Panel Battery Charger

Charge Controller

Installed Damaged Remark Installed Damaged Remark

------ NA -----

2.12 EARTH RESISTANCE (in Ohms)

Station TX EARTH

PS EARTH DG Set PDA-1 PDA-2 TOWER

Date of measure-

ment

Make, Model and type of Instrument used for

measurement

Karnal 1.60 0.80 0.9 1.2 1.0 0.9 17.04.2011 Motwane

Kurukshetra 0.56 0.75 0.76 0.78 0.60 0.41 24-06-2011 Waco Digital Earth Resistance Meter

Ambala 0.42 0.40 0.62 0.51 0.50 0.58 20.06.2011 Waco Digital ERM

Yamunanagar 1.0 0.2 1.6 1.8 1.7 1.6 06.06.2011 Motwane DET-20

Jind 1.3 1.4 1.8 1.1 1.0 1.8 19.04.2011 Digital Make WACO

Kaithal 0.35 0.36 0.42 0.71 0.78 0.35 26.06.11 Waco Digital ERM

3. REQUIPMENTS & SPARES

3.1 REQUIREMENT OF SPARE COMPONENTS Station Name of

Component Part No.

Name of Unit of

transmitter for which required

Quantity Required

Qty available

at Station

Qty issued to Station during last six months

Justification for

requirement

Karnal (separate for each LPT)

Ku.Kshetra (separate for each LPT)

Ambala (separate for each LPT)

Ch. Filter - XTR 01 Nil Nil

Pine apple board - 300W PA 01 Nil Nil

RF Card(FEC) - Scopus IRD 02 Nil Nil

Y. Nagar (separate for each LPT)

Jind (separate for each LPT)

SCR 3890 28V/25A PS - 02 01 As spare 10000 Mfd. /63V DC Capacitor -do- 06 - - -

Capacitor 45 mfd 440 volt For A.C. 02 Nos. Nil

Kaithal (separate for each LPT)

- - - - - -

LPT (separate for each LPT) -

- - - - - -

- - - - - - -

3.2 REQUIREMENT OF SPARE EQUIPMENTS / CARDS / MODULES

Station Name of

Equipment / Card / Module

Part No.

Name of Unit of

transmitter for which required

Quantity Required

Qty available

at Station

Qty issued

to Station during last six months

Justification for

requirement

Karnal (separate for each LPT)

- - - - - - -

Ku.Kshetra (separate for each LPT)

High low cut Tirpping device contact capacity 25 A

Mains 01 - - Supply

Variable DC Regu 0-30 V,10A

- - - - Repair work

Up converter ch 30+ GA110600621812 Exciter unit 01 Stand by

Ambala (separate for each LPT)

Y. Nagar (separate for each LPT)

TV reciever 02 Monitoring 28V 50A SMPS 04

3 db combiner Combiner Unit 01 Spare combiner from LPT Karnal in Circuit

Jind (separate for each LPT)

CRO - 01 - - For measurement

WFM - 01 - For measurement

A/V Switcher 8X2 - 01 02 - 02 def.-

Kaithal (separate for each LPT)

3.3 AVAILABILITY OF SPARE -- COMPONENTS / MODULES /

TRANSMITTER UNITS

Spare Components Station Name of Spare

Component Qty. in Stock Working Status

LPT Karnal (separate for each LPT)

UTV 200 01 O.K.

LPT Ku. Kshetra UTV 200 01 O.K. LPT Ambala - - - LPT Y. Nagar UTV 200 05 O.K.

BLW-98 05 O.K. BLW-32,33 06 each O.K.

LPT Jind

UTV 150 02 O.K. UTV 300 01 O.K.

UMIL 100 04 O.K. LPT Kaithal

15V Reg., AGC, APL, Control board, Hybrid Amp. 1No. Each O.K.

PCB of TPV 8100 B 01 O.K. TPV 595A 02 0.k PCB of TPV 595 with bias 02 Nos. O.K.

Spare Transmitter Modules

Station Name of Spare

Transmitter Modules (pallets)

Qty. in stock Working Status

Karnal (separate for each LPT)

Ku. Kshetra - - -

Ambala

Y. Nagar -

Jind Modulator of Ch#11 (Commercial Type) 01 OK

Kaithal PA Ch#29 Ch#34 01- -ok

33/26 V SMPS Digitronics 01 ok

spare Transmitter Units

Station Name of Spare Transmitter Unit

Qty. in Stock

Working Status

LPT Karnal (separate for each LPT)

50 W PA 02 One No. is low power due to weak biasing Transistors & UTV200

28V/50A SMPS 01 O.K

LPT Ku. Kshetra

300 Watt PA Make : GCEL 02 (Stand By) One Faulty, one O.K.

SMPS 28V/40A : GCEL

02 (Stand By)

Both working O.K.

LPT Ambala

28V/40A SMPS 01 O.K

LPT Y. Nagar

50 W PA 02 Low Power - - -

LPT Jind

28V/25A PS 01 OK Power Amp. 02 OK 12-25 W Driver Amp. 01 OK

LPT Kaithal 33V/26V (SMPS) 01 OK

PA Ch 29/Ch 34 01 OK

3.4 DETAILS OF DEFECTIVE TRANSMITTER EQUIPMENT

Make & Model of Transmitter

Name of defective Tx equipment

Since when it

is defective

Action taken by Station for

the repair

Shortcoming if any, being

faced by station for the repair

Remarks

300 W GCEL LPT Karnal

- - - - - - - - - -

500 W GCEL-12U-500

LPT Kurukshetra

300 W Power Amplifier Dec. 2009

UHF 200-AB AMPLIFIER One Pallet is Defective

Parts not available in DMC

500 W GCEL-12U-500

LPT Ambala

DP corrector 25.03.08 Deffective

PA Pine apple board 1.08.06 Deffective

GCEL 121 III 100 w Jind

Exciter & Audio vedio switcher 3/2007

300 W GCEL LPT Yamuna

Nagar SMPS 28V/50A, 03 nos Sep 09,

0ne under repair In one PCB burnt 01 beyond repair

Power Amplifier 50 w Feb 10 0ne under repair

3.5 WORKING STATUS OF AVR FOR TRANSMITTER

Station Capacity of

AVR Make and

Type Working Condition ( Auto/Manual/def)

Action Taken for repair, if defective

Karnal 10KVA True Line Auto - Kurukshetra 10 KVA Sylvan, 3VS OK (Auto) (Line Noise

Suppressor Faulty)It is sealed unit. Matter has been taken up with company to supply a new one.

Ambala 10 KVA GCEL 3VS OK (Auto) Y. Nagar 10 KVA Sylvan, 3VS OK (Auto) Jind 10 KVA CYBEX, 3VS OK (Auto) Kaithal 10 KVA Aplab make OK

3.6 WORKING STATUS OF DIESEL / PETROL / KEROSENE GENERATOR SETS AT LPTs / VLPTs

Station Capacity of

Generator Make, Model

and Type Working Condition

Action Taken for

repair, if defective LPT Y. Nagar 15KVA HA 294

Kirloskar Overhauling

required- -

Kurukshetra 15KVA HA 294 Kirloskar ok

Ambala 15KVA Kirloskar ok

Karnal 125 KVA Greaves ok

Kaithal 15KVA HA 294 Kirloskar ok

Jind 15KVA HA 294 Kirloskar ok

3.7 TVRO ELECTRONICS

Station Make & Type of

IRDs Total No.

available

Total No. Defective

Action taken by Station for

repair

Remarks

LPT Karnal

Scopus DVB IRD-2800 1 No. -Def Under progress - Scopus DVB IRD-2900 1 no Sky 21 DVB (Mini Sat) 1 No. - - -

Thomson DSR 200T 1 No. - - - MXI ADI IRD 1 No. -Def - Under progress -

LPT Kurukshetra

Scopus DVB IRD-2800 Two nos. 01 Capacitor 150 micro farad/400 V in P.S. Card is faulty

Sky 21 DVB (Mini Sat) 1 No. 1 No Def Under progress - Changhong 1 No. Delton 1 No.

LPT Ambala

Scopus DVB IRD-2800 2 Nos. Only one FEC in each working.

Thomson DSR 200T 1 No. Def. RF section def. Echo Star 2150 R 1 No. Def. PS Board Changhong 1 No. Delton 1 No.

LPT Yamuna-nagar

Scopus DVB IRD-2800 1 Nos. - - - Scopus DVB IRD-2900 1 no DTH Receiver Power 1 No.

Changhong 1 No. Def. - -

l Delton plus PS005 1No. -. -

LPT Jind

Thomson DSR 200T *2 No. 01 No. Def. - One on loan from HPT KNL

Sky 21 DVB (Mini Sat) 1 No. - - Changhong 1 No. - - - Delton 1 No. Scopus DVB IRD-2800 2 Nos. -02 ok - -

LPT Kaithal

Euro Star IRD 1 No. Def. Software problem - MXI ADI IRD 1 No. - - -

Changhong 1 No. - - - Scopus DVB IRD-2800 1 Nos. - - -

3.8 UPS

Station Make, Model & Rating of UPS

Total No.available

Total No. Defective

Action taken by Station for

repair Remarks

LPT Yamunanagar

Aplab 6 KVA 01

Defective Batteries 20

Nos Require

replacement

LPT Kurukshtra

Elnova X500 W 02 ONE Not repairable in local Mkt. For Telemetry

APC 650 VA 01 01 Battery has been worn out For PC

LPT Jind 0.5 KVA Line Iteractive Made APA 01 Nil For scroll bar

3.9 AIRCONDITIONERS & AVRs

Station Total No. at Station

Defective Nos.

Make and Model of defective

Date from

which def.

Reason for Being

defective

Action taken by Station for the repair

Karnal

Air- conditioner 03 Nos. - - - -

AVRs for ACs 03 Nos. - - - -

Kurukshetra

Air- conditioner 04 Nos. 01 No.

Videocon Sr. No. 51254

One of the terminal on compressor has been melt down.

Can not repair locally

AVRs for ACs 07 Nos. - - - -

Ambala

Air- conditioner 05Nos. - -

Sl. No. 7575 7579&7580 Cooling efficiency very low.

AVRs for ACs 05 Nos. - - -

Y. Nagar Air- conditioner 05 Nos. 01

01 Samsung as declared

unserviceable by Samsung

service dealer

19.05.11 Gas leekage

03 Blue star low cooling VIVA make OK

AVRs for ACs 03 Nos. - - -

Jind

Air- conditioner 06 Nos. 4 Nos. 1.5 T

carrier 4 years Aging effect.

AVRs for ACs 05 Nos. 1 No. Sent to DMC

Hissar

Kaithal

Air- conditioner 03 Nos. - - -

AVRs for ACs 03 Nos. - - -

3.10 DETAILS OF DEFECTIVE INPUT / MONITORING AND MEASURING EQUIPMENTS

Station Name of defective equipment

Make and model of defective

equipment

Date from which

defective

Action taken by Station for the repairing

Karnal Earth Resistance Meter (Analog)

Waco Spindle detached from pivot, Unit is sealed.

Kurukshetra

1 Colour Monitor 2 Telemetry System

BEL old model-2Nos. Prototype model of R&D (AIR/DD)

-Received defective from I.O. in Nov, 2001 - March, 2008

-Not repairable -Since no literature is available at the Station. Matter has been taken up with CE (R&D) for repair.

Ambala

Echo Star IRD Thomson TV Set 20” Phillips

DSB 1100 DSB 200T Phillips 27000220

- -

21.09.09

-PS Board def. -RF Section def. -STR PLVC 802 P was changed but did not work.

Yamuna-nagar

Colour TV Set 21” Colour TV Set 14’’ Sony monitors 02 nos

ECTV (2 Nos.) one def & in other reception poor Uptron Sony, Trintron

Very old (obsolete)

PCB faulty 01Def & one with color problem in picture quality

-.

Jind CRO WFM Digital M. Meter

Tekhind, 2235 Tektronix, 1731 Phillips

Aging effect. (poor response)

Kaithal

-Euro Star (DVB) O Euro Plus Software problem

3.11 WORKING FIGURES OF DIESEL GENERATORS June 2011

For LPTs only

Karnal Ku. kshetra Ambala Y.

Nagar Jind Kaithal

Make

LPT

inst

alle

d in

HP

T H

all

HA-294 Kirloskar

HA-294 Kirloskar

HA-294 Kirloskar

Kirloskar HA – 294

HA-294 Kirloskar

Capacity 15 KVA 15 KVA 15 KVA 15 KVA 15 KVA Utilization for transmission during the month 20.07 Hrs 22.37 16.80 54.12 16.83

Test Hrs. for the month ------ Hrs 11.83 3.0 2.08 4.50

Total Working Hrs. for the month 20.07 Hrs 34.20 19.80 56.20 21.33

Progressive utilization 80.22 Hrs 83.80 76.30 175.84 72.15 Occasion of utilization during the month 27 35 51 59 18

Progressive Utilization 106 77 175 193 98 Breakdown in service due to failure of D/G during the month

Nil Nil Nil Nil

Nil

Average consumption of Diesel (Lit/Hr.) 1.89 lt/hr. 2.04 2.47 2.02 2.25

Date of commissioning of DG set

17th Nov 2001 16.11.01 22.05.00

Received from LPT KNL on

23.01.2008

05.09.05

Total Hours of working since date of commissioning 5396.43 6878.41 7350.80 6080.18 2053.05

Reading of Hour Meter installed at DG Set at the end of month

Not in circuit Def. Def

Defective -

Reading of Hour Meter installed at LT Panel at the end of month

5343.5 hrs667.0

(start from zero on

16.02.10

def 41720.0

Def

4. CABLE OPERATORS MONITORING REPORT June 2011

MONITORING REPORT FOR THE IMPLEMENTATION OF CABLE TV

NETWORK REQULATION

. No.

Stat

e &

nam

e of

M

onito

ring

st

atio

n

Nam

e A

nd

Add

ress

of

MSO

s

DD CHANNELS TO BE CARRIED ON CABLE NETWORK

Prime Band Channels Non Prime Band Channels

DD

-N

atio

nal

DD

-N

ews

DD

-R

egio

nal

/ B

hara

ti

DD

-Sp

orts

DD

-LS

DD

-RS

DD

-U

rdu

Gya

n D

arsh

an DD

Bha

rati

(If

1 LPT Karnal Seven Star Cable Network, Karnal 10 06 38 266

Mhz- - - - -

2 LPT Kuru Kurukshetra Darpan Pvt. Ltd. SCO 77 Ist Floor Sector-13 Kurukshetra 09 01 02 29 46 47 - 48

3 LPT Ambala

M/s Ambala Cable Network, H.No – 810, Sector-7, Ambala City. 09 02 - - - - - -

M/S Ganpati Cable Network Ambala City. 06 03 - - - - - -

M/s Radhe Cable Network, Ambala Cantt. 06 03 - - - - - -

4 LPT Y.Nagar Den SAYA Cable Network Yamunanagar 03 06 12 34 - 35 - -

5

1. 2.

Jind Cable Network Saphidho Gate, Jind 2 4 12 S20 - C22 C28 C12

Star Cable Network, Jind 04 02 06 10 - S2 16 06

6 LPT Kaithal

M/s Kaithal Cable Network, Ambala Road, Kaithal Yes Yes Yes Yes - No No No M/s Friends Cable Network, Devigarh Rd., Kaithal Yes Yes Yes Yes - No No No

1. State wise report is to be compiled. All monitoring stations under the same state should come together. Cities and major locations need to be reported. 2. Statement “YES” or “NO” is to be mentioned against each channel both in prime and non prime band. 3. Action taken like reporting to DM/SP/any other law enforcing authority is to be mentioned’ in Remarks column 4. Copy of complaint as lodged should be forwarded to the Satellite Maintenance Dte. of DG DD


Recommended