3 500 MENWORKER CAMP3 500 MENWORKER CAMP3.500 MEN WORKER CAMP 3.500 MEN WORKER CAMP RAS LAFFAN / RAS LAFFAN / QATARQATAR
3.500 MEN WORKER CAMP 3.500 MEN WORKER CAMP RAS LAFFAN / QATARRAS LAFFAN / QATAR
Type of Contract: Construction
Scope of Work: Building construction works, Electrical works, Mechanical works, Water heater units, A/Cunits
Total Building Area : 34 379 72 m²Total Building Area : 34.379,72 m
Duration of the Work: September 2006 ‐ January 2007
2 400 PERSON CAMP PROJECT FOR2 400 PERSON CAMP PROJECT FOR2.400 PERSON CAMP PROJECT FOR 2.400 PERSON CAMP PROJECT FOR SOUTH YOLOTEN PIPELINE INST. PROJECT SOUTH YOLOTEN PIPELINE INST. PROJECT
TURMENISTANTURMENISTAN
2.400 PERSON CAMP PROJECT FOR SOUTH 2.400 PERSON CAMP PROJECT FOR SOUTH YOLOTEN PIPELINE INST. PROJECT YOLOTEN PIPELINE INST. PROJECT TURMENISTAN TURMENISTAN
Type of Contract: Engineering & Supply
Scope of Work: Design works, Electrical works, Mechanical works, Water heater units, HVAC systems,Fire Fighting systems, Assembly supervision, Furnishing
Total Building Area: 30 188 86 m²Total Building Area: 30.188,86 m
Duration of the Work:May 2011‐ October 2011
KPO B.V. HEAD OFFICE BUILDING KPO B.V. HEAD OFFICE BUILDING AKSAIAKSAI KAZAKHSTAKAZAKHSTANNAKSAI, AKSAI, KAZAKHSTAKAZAKHSTANN
KPO B.V. HEAD OFFICE BUILDING KPO B.V. HEAD OFFICE BUILDING AKSAI, KAZAKHSTANAKSAI, KAZAKHSTAN
Type of Contract: Design & Build
T f W k KPO Offi d h b ildiType of Work : KPO Office and warehouse buildings.
Scope of Work: Building construction works, civil works , Electrical works, Mechanical works
Total Building Area: 9,512 m2
Duration of the Work: October 2007 ‐ February 2008
KPO B.V. KPO B.V. OFFICE BUILDING OFFICE BUILDING AKSAI / KAZAKHSTANAKSAI / KAZAKHSTAN
Type of Work : KPO Office and warehouse buildings.yp g
Scope of Work : As the main contractor, supply of prefabricated modular and pre‐engineered steel construction buildings; electrical, sanitary and heating installation, transportation and assembly.
Total Building Area: 11.622,10 m2
Duration of the Work: September 2009‐March 2010
PALOUGE OPERATION BASE CAMP PALOUGE OPERATION BASE CAMP EXTENSIONEXTENSION PROJECTPROJECTEXTENSION EXTENSION PROJECTPROJECT
SUDANSUDAN
OPERATING OPERATING BASE CAMP BASE CAMP ADAR / SUDANADAR / SUDAN
Type of ontract : Design & Build
Type of Work: Pre‐Engineered Steel Construction Buildings yp g g
Scope of Work : Building construction works, Electrical works, Mechanical works
Total Building Area: 5.835 m2g
Duration of the Work: January 2011‐April 2011
FERTILIZER PLANT MOBILIZATIONFERTILIZER PLANT MOBILIZATIONFERTILIZER PLANT MOBILIZATION FERTILIZER PLANT MOBILIZATION PROJECTSPROJECTS
MARY / TURKMENISTANMARY / TURKMENISTAN
FERTILIZER PLANT MOBILIZATION PROJECTSFERTILIZER PLANT MOBILIZATION PROJECTSMARY / TURKMENISTANMARY / TURKMENISTAN
Type of Contract: Engineering & Supply
Scope of Work: Electrical works, Mechanical works, Assembly supervision
Total Building Area: 6,022 m²
Duration of the Work:May 2011‐ October 2011
TENGIZ CHEVROIL MANAGEMENTTENGIZ CHEVROIL MANAGEMENTTENGIZ CHEVROIL MANAGEMENT TENGIZ CHEVROIL MANAGEMENT BUILDING BUILDING
TENGIZ / TENGIZ / KAZAKHSTANKAZAKHSTAN
TENGIZ CHEVROIL MANAGEMENT BUILDING TENGIZ CHEVROIL MANAGEMENT BUILDING TENGIZ / KAZAKHSTANTENGIZ / KAZAKHSTAN
Type of Contract: Engineering & Supply
Scope of Work: Electrical works, Mechanical works, Assembly supervision
Total Building Area: 6.700 m²
Duration of the Work: February 2004 ‐ April 2004
ENRICHMENT PLANT GUELB II PROJECTENRICHMENT PLANT GUELB II PROJECTENRICHMENT PLANT GUELB II PROJECT ENRICHMENT PLANT GUELB II PROJECT
WORKSHOPS WORKSHOPS AND ADMINISTRATION AND ADMINISTRATION BUILDINGS BUILDINGS ZOUERATE, MAURITANIAZOUERATE, MAURITANIAZOUERATE, MAURITANIAZOUERATE, MAURITANIA
Type of Contract: Design & Build
Type of Work : Pre‐engineered Workshops and Concrete Administration Buildings
Scope of Work: Infrastructure works Building construction works Civil Works Electrical works MechanicalScope of Work: Infrastructure works, Building construction works, Civil Works, Electrical works, Mechanical works, Furnishing, Finishing works
Total Building Area: 8.555 m2Total Building Area: 8.555 m2
Duration of the Work: November 2010‐May 2012
URANIUM PLANT WORKER CAMP PROJECTURANIUM PLANT WORKER CAMP PROJECTURANIUM PLANT WORKER CAMP PROJECTURANIUM PLANT WORKER CAMP PROJECTNIGERNIGER
URANIUM PLANT WORKER CAMP PROJECTURANIUM PLANT WORKER CAMP PROJECTNIGERNIGER
Type of Contract: Design & Build
S f W k B ildi i k El i l k M h i l k F i hiScope of Work: Building construction works, Electrical works, Mechanical works, Furnishing
Total Building Area: 1.848 m²
D i f h W k J l 2012 N b 2012Duration of the Work: July 2012‐November 2012
500 MENWORKER CAMP PROJECT FOR AL500 MENWORKER CAMP PROJECT FOR AL500 MEN WORKER CAMP PROJECT FOR AL 500 MEN WORKER CAMP PROJECT FOR AL KHAIRAT GAS TURBINE POWER PLANT KHAIRAT GAS TURBINE POWER PLANT
KARBALA / IRAQ KARBALA / IRAQ
500 MEN WORKER CAMP PROJECT FOR AL KHAIRAT 500 MEN WORKER CAMP PROJECT FOR AL KHAIRAT GAS TURBINE POWER PLANT KARBALA / IRAQ GAS TURBINE POWER PLANT KARBALA / IRAQ
Type of Contract: Design & Build
S f W k D i i Di i h ll Ki h WC Sh U i L d i B ildi i kScope of Work: Dormitories , Dining halls, Kitchens, WC‐Shower Units , Laundries, Building construction works
Total Building Area: 8.775 m²
D i f h W k A il 2011 S b 2011Duration of the Work: April 2011 – September 2011
700 MENWORKER CAMP PROJECT FOR700 MENWORKER CAMP PROJECT FOR700 MEN WORKER CAMP PROJECT FOR 700 MEN WORKER CAMP PROJECT FOR NAINAWA GAS TURBINE POWER PLANT NAINAWA GAS TURBINE POWER PLANT
MOSUL / MOSUL / IRAQIRAQ
700 MEN WORKER CAMP PROJECT FOR NAINAWA 700 MEN WORKER CAMP PROJECT FOR NAINAWA GAS TURBINE POWER PLANT MOSUL / IRAQ GAS TURBINE POWER PLANT MOSUL / IRAQ
Type of Contract: Design & Build
Scope of Work: Dormitories , Dining halls, Kitchens, WC‐Shower Units, Laundries, Building constructionworks
Total Building Area: 10 356 m²Total Building Area: 10.356 m
Duration of the Work: June 2011 – September 2011
MODULAR BUILDINGS PROJECTMODULAR BUILDINGS PROJECTMODULAR BUILDINGS PROJECT MODULAR BUILDINGS PROJECT BAKOUDOU / BAKOUDOU / GABONGABON
MODULAR BUILDINGS PROJECT MODULAR BUILDINGS PROJECT BAKOUDOU / BAKOUDOU / GABONGABON
What is the role of DORCE in Gold Bakoudou Project?
Type of ContractConstruction
j
Scope of WorkBuilding construction works, septic tanks, Water tanks, Electrical works, Mechanical works, A/C units,Water heatersWater heaters
Total Building Area: 5.263,70 m2
Duration of the WorkNovember 2006 ‐May 2007
OFFSHORE PROJECTOFFSHORE PROJECTOFFSHORE PROJECT OFFSHORE PROJECT BALKANABAT / BALKANABAT / TURKMENISTATURKMENISTANN
OFFSHORE PROJECT OFFSHORE PROJECT BALKANABAT / TURKMENISTANBALKANABAT / TURKMENISTAN
What is the role of DORCE in Offshore Project?
Type of Contract: Construction
j
Scope of Work: Building construction works, Septic tanks, Water tanks, Electrical works , Mechanicalworks , A/C units , Water heaters
Total Container Area: 677 82 m2Total Container Area: 677,82 m2
Duration of the Work: November 2006 ‐May 2007
QIT IOC OFFICE BUILDING PROJECTQIT IOC OFFICE BUILDING PROJECTQIT IOC OFFICE BUILDING PROJECTQIT IOC OFFICE BUILDING PROJECTQUAIBOE / QUAIBOE / NIGERIANIGERIA
QIT IOC OFFICE BUILDING PROJECTQIT IOC OFFICE BUILDING PROJECTQUAIBOE / QUAIBOE / NNIGERIAIGERIA
Type of Work : 6 Units of single‐storey Modular Sandwich Panel System Prefabricated Office & Canteen Buildings
Scope of Work : Supply of Modular Prefabricated Building including, floor covering, electrical and sanitary installation materials, A/C units & Water Heaters & Exhaust Fan Units, Addressable Fire Alarm System, transportation and supervision of erection
Total Building Area: 5.000 m2
Duration of the Work: April 2010 ‐ June 2010
PREFABRICATED MODULAR OFFICEPREFABRICATED MODULAR OFFICEPREFABRICATED MODULAR OFFICE PREFABRICATED MODULAR OFFICE BUILDINGBUILDING
LUBUMBASHI / LUBUMBASHI / CONGOCONGO
PREFABRICATED MODULAR OFFICE BUILDINGPREFABRICATED MODULAR OFFICE BUILDINGLUBUMBASHI LUBUMBASHI / / CONGOCONGO
Type of Work : Prefabricated Modular Office Buildings
Scope of Work : Production, Transportation from Ankara to Tanzania Port, Erection and Electrical & mechanical works on site
Total Building Area: 9 024 m2Total Building Area: 9.024 m2
Duration of the Work: February 2011‐May 2011 (120 Days)
HEAD OFFICE:Aşağı öveçler Mahallesi 1325. Sokak No:6, 06460, Ankara / TÜRKİYEPhone: +90 312 472 82 10 (pbx) Fax : +90 312 472 82 18‐19Web : www dorce com tr E‐mail: dorce@dorce com tr
FACTORY:
Ankara‐İstanbul Kara yolu, 29.km 06105 Sarayköy, Ankara / Türkiye
Phone: +90 312 815 51 65 ‐ 72 Fax : +90 312 815 51 71 Web : www.dorce.com.tr E mail: [email protected]