DOVER ELEMENTARY Existing MPB (2/14/12). OVERVIEW. FINISHED SITE PLAN. DOVER ELEMENTARY SCHOOL. POTENTIAL SCHOOL ACCESS. POTENTIAL JOINT-USE PARKING. JOINT-USE FIELD. FIRE ACCESS. PRIMARY PUBLIC ACCESS. EXISTING FLOOR PLAN. Statistics and Assessment Area = 6,300sf (approx) - PowerPoint PPT Presentation
Popular Tags:
9
WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT HIBSER YAMAUCHI Architects DOVER ELEMENTARY Existing MPB (2/14/12)
Transcript
Page 1: DOVER ELEMENTARY Existing MPB  (2/14/12)

WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT

HIBSER YAMAUCHI Architects

DOVER ELEMENTARYExisting MPB

(2/14/12)

Page 2: DOVER ELEMENTARY Existing MPB  (2/14/12)

WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT

HIBSER YAMAUCHI Architects

OVERVIEW

Page 3: DOVER ELEMENTARY Existing MPB  (2/14/12)

WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT

HIBSER YAMAUCHI Architects

FINISHED SITE PLAN

JOINT-USE FIELD

PRIMARY PUBLIC ACCESS

POTENTIAL SCHOOL ACCESS

PO

TEN

TIA

L JO

INT-

USE

PAR

KIN

G

FIR

E A

CC

ESS

DOVER ELEMENTARY SCHOOL

Page 4: DOVER ELEMENTARY Existing MPB  (2/14/12)

WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT

HIBSER YAMAUCHI Architects

EXISTING FLOOR PLAN

Statistics and Assessment

Area = 6,300sf (approx) Basic Upgrade Needs

Seismic Upgrade Fire Alarm Accessibility HVAC Finishes

Page 5: DOVER ELEMENTARY Existing MPB  (2/14/12)

WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT

HIBSER YAMAUCHI Architects

STUDY FOR CCS

Preliminary Study for CCS and Dover School joint-use CCS = 4,600sf (approx)

Note: CCS program currently reduced to 2,900sf

Dover school use = 1,400 sf (approx)

Allows for separate entries CCS and School

Provides School with additional community space or multi-use classroom + storage

CCS Test-fit Only. Not an Approved Plan

Page 6: DOVER ELEMENTARY Existing MPB  (2/14/12)

WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT

HIBSER YAMAUCHI Architects

EXISTING CONDITIONS:

EXTERIOR

Page 7: DOVER ELEMENTARY Existing MPB  (2/14/12)

WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT

HIBSER YAMAUCHI Architects

EXISTING CONDITIONS:

INTERIOR

Page 8: DOVER ELEMENTARY Existing MPB  (2/14/12)

WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT

HIBSER YAMAUCHI Architects

COST / USES

Estimated cost for renovation (generic modernization with CCS or other tenant) $1.5M -$2M (project cost)

Potential Uses Community Health Clinic CCS Other District, City or Community Programs

Page 9: DOVER ELEMENTARY Existing MPB  (2/14/12)

WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT

HIBSER YAMAUCHI Architects

QUESTIONS