WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT
HIBSER YAMAUCHI Architects
DOVER ELEMENTARYExisting MPB
(2/14/12)
WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT
HIBSER YAMAUCHI Architects
OVERVIEW
WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT
HIBSER YAMAUCHI Architects
FINISHED SITE PLAN
JOINT-USE FIELD
PRIMARY PUBLIC ACCESS
POTENTIAL SCHOOL ACCESS
PO
TEN
TIA
L JO
INT-
USE
PAR
KIN
G
FIR
E A
CC
ESS
DOVER ELEMENTARY SCHOOL
WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT
HIBSER YAMAUCHI Architects
EXISTING FLOOR PLAN
Statistics and Assessment
Area = 6,300sf (approx) Basic Upgrade Needs
Seismic Upgrade Fire Alarm Accessibility HVAC Finishes
WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT
HIBSER YAMAUCHI Architects
STUDY FOR CCS
Preliminary Study for CCS and Dover School joint-use CCS = 4,600sf (approx)
Note: CCS program currently reduced to 2,900sf
Dover school use = 1,400 sf (approx)
Allows for separate entries CCS and School
Provides School with additional community space or multi-use classroom + storage
CCS Test-fit Only. Not an Approved Plan
WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT
HIBSER YAMAUCHI Architects
EXISTING CONDITIONS:
EXTERIOR
WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT
HIBSER YAMAUCHI Architects
EXISTING CONDITIONS:
INTERIOR
WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT
HIBSER YAMAUCHI Architects
COST / USES
Estimated cost for renovation (generic modernization with CCS or other tenant) $1.5M -$2M (project cost)
Potential Uses Community Health Clinic CCS Other District, City or Community Programs
WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT
HIBSER YAMAUCHI Architects
QUESTIONS