Downtown Parking Discussion

Date post: 15-Jan-2016
Category:
Upload: aviv
View: 30 times
Download: 0 times
Share this document with a friend
Description:
Downtown Parking Discussion. Faculty Senate Meeting December 4, 2012. Parking Wisdom. “When Solomon said there was a time and a place for everything he had not encountered the problem of parking his automobile.” Bob Edwards - PowerPoint PPT Presentation
Popular Tags:
7
Downtown Parking Discussion Faculty Senate Meeting December 4, 2012
Transcript
Page 1: Downtown Parking Discussion

Downtown ParkingDiscussion

Faculty Senate MeetingDecember 4, 2012

Page 2: Downtown Parking Discussion

2

Parking Wisdom

“When Solomon said there was a time and a place for everything he had not encountered the problem of parking his automobile.”

Bob Edwards

“Politics ain’t worrying this country one-tenth as much as where to find a parking space.”

Will Rogers

“Anyplace worth its salt has a ‘parking problem.’”

James Castle

Page 3: Downtown Parking Discussion

3

• Central Location to:

- Women's & Children's Hospital (WCOB) (planned)

- Medical Office Building (MOB) (planned)

- NFTA Metro Rail Station

- Existing UB SMBS Facilities

- Buffalo General Hospital

- Roswell Park (RPCI)

• Link and create a coatless connection between MOB, SMBS, NFTA, Buffalo General, RPCI, CTRC, RIA etc.

• Fast and efficient connection of SMBS to other Health Science Schools on South Campus through Metro Rail.

• Begin implementation of a regional Academic Health Center

Medical School Site and Benefits

Page 4: Downtown Parking Discussion

4

Community Connections

Allentown

BNMC

6

Fruit Belt

UBNORTH

NFTA

MAIN

STREET

UBSMBS

NFTA

UBSOUTH

NFTA

Page 5: Downtown Parking Discussion

5

BNMC Workforce Trends

2002 2011 2012 2017 -

2,000

4,000

6,000

8,000

10,000

12,000

14,000

16,000

18,000

20,000

7,000 8,500

12,000

17,500

Page 6: Downtown Parking Discussion

6

CONSULTANT SELECTION

STARTJanuary 2012

LAND ACQUISITION March 2012

DESIGN START May 2012

DESIGN COMPLETE November 2013

CONSTRUCTION START September 2013

CONSTRUCTION COMPLETE August 2016

OCCUPANCY August 2016

Project Schedule

Page 7: Downtown Parking Discussion

7

Discussion….


Recommended