Central Avenue Downtown Construction - Green Bay Road to 11th Street (Anticipated between August 1, 2020 and December 15, 2020)
Downtown Streetscape Improvements: Central Ave + Wilmette Ave Detour RouteWilmette, IL
1. Central Avenue one-way traffic allowed in westbound direction.2. Central Avenue eastbound traffic will not be allowed and will be detoured to Lake Avenue.3. Wilmette Avenue open to two-way traffic.
Wilmette Avenue Downtown Construction - Green Bay Road to Lake Avenue (Anticipated between March 1, 2021 and May 30, 2021)
1. Wilmette Avenue one-way traffic allowed in northbound direction.2. Wilmette Avenue southbound traffic will not be allowed and will be detoured to Green Bay Road.3. Central Avenue open to two-way traffic.
Central Avenue Residential and School Construction - 11th Street to Sheridan Road(Anticipated between August 2020 and September 2021 with a break between December 2020 and March 2021 for winter. During winter, road will be reopened to two-way traffic.)
1. Central Avenue one-way traffic allowed in westbound direction.2. Central Avenue eastbound traffic will not be allowed and will be detoured to Lake Avenue.
DETOUR NOTES FOR DOWNTOWNLEGEND
Existing Traffic Signal
Staged Construction Zones
One-Way traffic on Central Ave + Wilmette Ave
Eastbound Central Ave Detour Route
Southbound Wilmette Ave Detour Route
Road Closure Barrier
Green Bay Rd
Sheridan Rd
Lake Ave
Washington Ct
Washington Ave
Greenleaf Ave
Park Ave
Linden Ave
12th
St
11th
St
10th
St
9th S
t
8th S
t
7th S
t
6th S
t
5th S
t
4th S
t
3rd S
tWilmett
e Ave
Wilmette
Ave
Central Ave
Central Ave
Union Pacific Railroad
te AAvv
ee
1122tad
So
RRo
P
P
P
P
P
P
Green Bay Rd Union Pacific Railroad
Lake Ave
Washington Ct
Greenleaf Ave
12th
St
11th
St
Wilm
ette A
ve
Construction ZoneLEGEND
Pedestrian Access
Two-Way Traffic Flow
On Street ParkingTemporary Angled Parking as Shown
One-Way Traffic Direction
Public Parking Lots
Central Ave
Downtown Streetscape Improvements: Stage 1Wilmette, IL
STAGE 1· CENTRAL AVENUE FROM GREEN BAY ROAD TO 11TH STREET (ANTICIPATED BETWEEN AUGUST 1, 2020 AND DECEMBER 15, 2020) 1. ONE-WAY TRAFFIC IN THE WESTBOUND DIRECTION ONLY.2. EASTBOUND TRAFFIC NOT ALLOWED AND DETOURED TO LAKE AVENUE.3. WILMETTE AVENUE OPEN TO TWO-WAY TRAFFIC.4 . CONSTRUCT NORTH HALF OF ROADWAY.5. PRIOR TO ANY ROADWAY CONSTRUCTION, EXISTING SIDEWALK SHALL BE REMOVED TO ALLOW CONSTRUCTION OF A NEW 5 FOOT WIDE SIDEWALK ADJACENT TO BUILDING FACES.6 . ACTIVITIES INCLUDE WATER MAIN, MINOR STORM SEWER WORK, ROAD RECONSTRUCTION, CURB & GUTTER, SIDEWALK REPLACEMENT, AND TRAFFIC SIGNAL INSTALLATION.7. PARKING WILL BE AVAILABLE ON THE OPPOSITE SIDE OF CONSTRUCTION ACTIVITY. 8. PROJECT TEAM WILL WORK WITH BUSINESS OWNERS TO KEEP PEDESTRIAN ACCESS TO BUILDINGS OPEN AND COORDINATE OPTIMAL TIME/STRATEGY TO POUR THE SIDEWALK IN FRONT OF BUSINESSES.
Lefty’s pizzaSchultz & Odhner's Dry Cleaners
The Bottle shopCraig Scott opticians
William Harris Lee + CO
vALLEY LODGE TAVERN
lAMBRECHT’S jEWELERS
morning glory ltd
gOLD METAL CLEANERS
kelly’s appliances
DEGIULIOKITCHEN DESIGN
vETERANS pARKbIG tOMATO pIZZERIA
ywca shop for gooddOWIZE BISTRO
ST. ROGER ABBEY BAKERYPediatric dentistry
Hubba hubba
NapolitA
WILMETTE THEATERCHUCK WAGON
KOYA SUSHI The Wild Child
Healing tree physical therapyFonseca Martial Arts
Ambiance Window FashionsWilmette Wine CellarForever Young nails
@ Properties
Village Hall + Green
P
P
P
P
P
STAGE 2• CENTRAL AVENUE FROM GREEN BAY ROAD TO 11TH STREET (ANTICIPATED BETWEEN AUGUST 1, 2020 AND DECEMBER 15, 2020) 1. ONE-WAY TRAFFIC IN THE WESTBOUND DIRECTION ONLY.2. EASTBOUND TRAFFIC NOT ALLOWED AND DETOURED TO LAKE AVENUE.3. WILMETTE AVENUE OPEN TO TWO-WAY TRAFFIC.4 . CONSTRUCT SOUTH HALF OF ROADWAY.5. PRIOR TO ANY ROADWAY CONSTRUCTION, EXISTING SIDEWALK SHALL BE REMOVED TO ALLOW CONSTRUCTION OF A NEW 5 FOOT WIDE SIDEWALK ADJACENT TO BUILDING FACES.6. ACTIVITIES INCLUDE WATER MAIN, MINOR STORM SEWER WORK, ROAD RECONSTRUCTION, CURB & GUTTER, SIDEWALK REPLACEMENT, AND TRAFFIC SIGNAL INSTALLATION.7. PARKING WILL BE AVAILABLE ON THE OPPOSITE SIDE OF CONSTRUCTION ACTIVITY. 8. PROJECT TEAM WILL WORK WITH BUSINESS OWNERS TO KEEP PEDESTRIAN ACCESS TO BUILDINGS OPEN AND COORDINATE OPTIMAL TIME/STRATEGY TO POUR THE SIDEWALK IN FRONT OF BUSINESSES. P
Construction Zone
Construction in Previous Stage
LEGEND
Pedestrian AccessTwo-Way Traffic Flow
On Street ParkingTemporary Angled Parking as Shown
One-Way Traffic Direction
Public Parking Lots
Green Bay Rd Union Pacific Railroad
Lake Ave
Washington Ct
Greenleaf Ave
12th
St
11th
St
Central Ave
Downtown Streetscape Improvements: Stage 2Wilmette, IL
Wilm
ette A
ve
Lefty’s pizzaSchultz & Odhner's Dry Cleaners
The Bottle shopCraig Scott opticians
William Harris Lee + CO
vALLEY LODGE TAVERN
lAMBRECHT’S jEWELERS
morning glory ltd
gOLD METAL CLEANERS
kelly’s appliances
DEGIULIOKITCHEN DESIGN
vETERANS pARKbIG tOMATO pIZZERIA
ywca shop for gooddOWIZE BISTRO
ST. ROGER ABBEY BAKERYPediatric dentistry
Hubba hubba
NapolitA
WILMETTE THEATERCHUCK WAGON
KOYA SUSHI The Wild Child
Healing tree physical therapyFonseca Martial Arts
Ambiance Window FashionsWilmette Wine CellarForever Young nails
@ Properties
Village Hall + Green
P
P
P
P
P
STAGE 3 • WILMETTE AVENUE FROM GREEN BAY ROAD TO LAKE AVENUE (ANTICIPATED BETWEEN MARCH 1, 2021 AND MAY 30, 2021) 1. ONE-WAY TRAFFIC IN THE EASTBOUND OR NORTHBOUND DIRECTION ONLY.2. WESTBOUND OR SOUTHBOUND TRAFFIC NOT ALLOWED AND DETOURED TO LAKE AVENUE.3. CENTRAL AVENUE OPEN TO TWO-WAY TRAFFIC.4. CONSTRUCT EAST HALF OF ROADWAY.5. PRIOR TO ANY ROADWAY CONSTRUCTION, EXISTING SIDEWALK SHALL BE REMOVED TO ALLOW CONSTRUCTION OF A NEW 5 FOOT WIDE SIDEWALK ADJACENT TO BUILDING FACES.6. ACTIVITIES INCLUDE RESURFACING WORK.7. PARKING WILL BE AVAILABLE ON THE OPPOSITE SIDE OF CONSTRUCTION ACTIVITY.8. PROJECT TEAM WILL WORK WITH BUSINESS OWNERS TO KEEP PEDESTRIAN ACCESS TO BUILDINGS OPEN AND COORDINATE OPTIMAL TIME/STRATEGY TO POUR THE SIDEWALK IN FRONT OF BUSINESSES.
The first congregationalchurch of Wilmette
P
Construction ZoneLEGEND
Pedestrian Access
Two-Way Traffic Flow
On Street ParkingReversed Temporary Angled Parking as Shown
One-Way Traffic Direction
Public Parking Lots
Green Bay Rd Union Pacific Railroad
Lake Ave
Washington Ct
Greenleaf Ave
12th
St
11th
St
Wilmett
e Ave
Central Ave
Downtown Streetscape Improvements: Stage 3Wilmette, IL
rOLFsALONHIGH TOUCH BOUTIQUE & SPA
THE UPS STOREBELLA TILE & STONE, WILMETTE INC.
THE TRENDY TACO
pANERA bREADJOSEPH A. BANKS
PINKLICIOUS NAILS & SPANick’s Neighborhood Bar + Grill
torion ramenALL WASHED UP
Sofia steakExhibit
Allstate insurance
St. Augustine’s episcopal church
Pediatric Associates of the North Shore
COCOMEROAl’s Meat market
pESCADERO
THE ACTORS TRAINING CENTERJOHN'S SHOES
Village Hall + Green
The first congregationalchurch of Wilmette
depot nuevo restaurant
north side community bank +trust
bella cosa jewelersOUTATIME GAMES ESCAPE ROOM
ELENIS UNISEX HAIR DESIGN
P
P
P
P
P
P
STAGE 4 • WILMETTE AVENUE FROM GREEN BAY ROAD TO LAKE AVENUE (ANTICIPATED BETWEEN MARCH 1, 2021 AND MAY 30, 2021) 1. ONE-WAY TRAFFIC IN THE EASTBOUND OR NORTHBOUND DIRECTION ONLY.2. WESTBOUND OR SOUTHBOUND TRAFFIC NOT ALLOWED AND DETOURED TO LAKE AVENUE.3. CENTRAL AVENUE OPEN TO TWO-WAY TRAFFIC.4. CONSTRUCT EAST HALF OF ROADWAY.5. PRIOR TO ANY ROADWAY CONSTRUCTION, EXISTING SIDEWALK SHALL BE REMOVED TO ALLOW CONSTRUCTION OF A NEW 5 FOOT WIDE SIDEWALK ADJACENT TO BUILDING FACES.6. ACTIVITIES INCLUDE RESURFACING WORK.7. PARKING WILL BE AVAILABLE ON THE OPPOSITE SIDE OF CONSTRUCTION ACTIVITY.8. PROJECT TEAM WILL WORK WITH BUSINESS OWNERS TO KEEP PEDESTRIAN ACCESS TO BUILDINGS OPEN AND COORDINATE OPTIMAL TIME/STRATEGY TO POUR THE SIDEWALK IN FRONT OF BUSINESSES.
P
Construction Zone
Construction in Previous Stage
LEGEND
Pedestrian AccessTwo-Way Traffic Flow
On Street ParkingReversed Temporary Angled Parking as Shown
One-Way Traffic Direction
Public Parking Lots
Green Bay Rd Union Pacific Railroad
Lake Ave
Washington Ct
Greenleaf Ave
12th
St
11th
St
Wilmett
e Ave
Central Ave
Downtown Streetscape Improvements: Stage 4Wilmette, IL
HOTCAKESSHARE LLC
rOLFsALONHIGH TOUCH BOUTIQUE & SPA
THE UPS STOREBELLA TILE & STONE, WILMETTE INC.
THE TRENDY TACO
pANERA bREADJOSEPH A. BANKS
PINKLICIOUS NAILS & SPANick’s Neighborhood Bar + Grill
torion ramenALL WASHED UP
Sofia steakExhibit
Allstate insurance
St. Augustine’s episcopal church
Pediatric Associates of the North Shore
The first congregationalchurch of Wilmette
depot nuevo restaurant
north side community bank +trust
bella cosa jewelers
COCOMEROAl’s Meat market
pESCADERO
OUTATIME GAMES ESCAPE ROOMELENIS UNISEX HAIR DESIGN
THE ACTORS TRAINING CENTERJOHN'S SHOES
Village Hall + Green
Green Bay Rd
Wilmett
e Ave
Wilmett
e Ave
Central Ave
Greenleaf Ave
Linden Ave
Washington Ct
Lake Ave
11th
St
12th
St
Park Ave
Union Pacific Railroad
Downtown Streetscape Improvements: Village Center ParkingWilmette, IL
Commuter Parking LotsFree after 3 PM weekdays and all weekend.
30 Minute Parking
30 Minute - 3 Hour Variable Parking
1 Hour ParkingPublic Parking LotsFree 90 mins to 4 hrs, check signs.
2 Hour Parking
3 Hour Parking
Central Ave
Village Hall + Green
veteranspark
wilmette Library
wilmette metra
station
30
30
2
2
2
2
2
3
3
3
3
3
3
3
2
2
2
22
222
2
1
1
2
2
2
22
30
30
30
30-330-3
30-3
Burmeister Lot
11th + Central Lot
North Poplar Commuter Lot
metra commuter lot
metra commuter lot
1199 Wilmette Lot
village hall Lot
veterans park lot