    Department of Permitting Services

    FY2013

    How Much? How Many?

    Building Construction

    26 MSF new

    construction, additions,

    renovations and TIs almost 1600 fire alarm

    and fire protection

    system inspections

    Land Development

    48+ MSF of land

    development activities --

  • 8/12/2019 DPS FY2013 Presentation

    2/12

    Then and Now

    FY2009

    809 new residentialunits

    876 non-residential Value $479,002,391

    4933 permits

    Walk-in customers

    55,291 Information requests

    2240

    FY2013

    2975 new residentialunits

    1243 non-residential Value $966,287,881

    6688 permits

    Walk-in customers

    66,600 Information requests

    4376

  • 8/12/2019 DPS FY2013 Presentation

    3/12

  • 8/12/2019 DPS FY2013 Presentation

    4/12

    Improving DPS Service Delivery

    ePermits/Apply online

    Electricalmore than 50%

    Residential new construction

    Deck

    Right-of-way

    Commercial addition

    ePlans

    Residential new construction

    Right of way

    commercial

  • 8/12/2019 DPS FY2013 Presentation

    5/12

    How are we doing?

    Walk-in/walk-out permitsresidential

    additions/ tenant improvements

    Approx. 17 days to issue residential additions

    permits

    Approx. 51 days commercial permit additions

    Approx. 88 days commercial reviews Approx. 82 days new residential construction

  • 8/12/2019 DPS FY2013 Presentation

    6/12

    New Accountability Improvements

    New Division of Zoning and Site Plan Enforcement

    Automation Fee Rollback 10% to 5%

    Midrise woodframe constructionfee calculation

    fee decrease

    several hundredthousand/project

    Implement deferred collection of impact taxes

    Implemented school facilities payments

    collections Developed new headline performance measures

    New fee payment office/handling accountability

  • 8/12/2019 DPS FY2013 Presentation

    7/12

    Accountability improvements

    Elimination of backlogs Electrical permits and licenses

    Record plats

    Scanning for document retention and field coordination

    Streamlining Revised DRC process

    Signature delegation Plats notes

    Greentape coordination with MNCPPC

    move forest conservation precon to after building permit issues

    Form agreements to resolve overlapping easement conflicts

    Checklist developments

    Metrics

    Performance reports Fire safety systems

    ePermits/ePlans

    More is coming

    Data Montgomery

  • 8/12/2019 DPS FY2013 Presentation

    8/12

    Legislation

    New stormwater law implementation

    Design for Life Tax Credit program

    New fire system regulations Tree Canopy and Roadside trees

    implementation

    International green Construction Codes Zoning Ordinance rewrite

  • 8/12/2019 DPS FY2013 Presentation

    9/12

    eServices

    Faster and greener

    Concurrent reviews

    better for customers; more time for business

    development

    Better for the environment

  • 8/12/2019 DPS FY2013 Presentation

    10/12

    eServices

    how much better for the environment?

    ProjectDox green calculator - assumes 4 submissions during permit review -for each permit, the following savings can be expected:

    Miles driven 104 miles

    Gas 6.93 gallons

    Cost of fuel $23.92

    Driving time saved 4.163 hours

    Carbon monoxide 5 pounds

    Hydrocarbons 1 pound

    Trees .08

    Annually, assuming 3000 permits:

    Miles driven 312,000 miles

    Gas 20,800 gallons Cost of fuel $71,760

    Driving time saved 12,480 hours

    Carbon monoxide 15,119 pounds

    Hydrocarbons 1,993 pounds

    Trees 239

  • 8/12/2019 DPS FY2013 Presentation

    11/12

    Where to next?

    Comprehensive Fee review

    ePlans/ePermits/ePayments

    WSSC colocation for improved one stop shop

    Tree canopy/roadside tree manual

    Additional streamlining efforts

    Process time improvements/quality control

    International green Construction Code

    Improved outreach to sectors

    Online training modules

  • 8/12/2019 DPS FY2013 Presentation

    12/12

    Contact DPS

    http://permittingservices.montgomerycounty

    md.gov/DPS/general/Home.aspx

    311

    http://permittingservices.montgomerycounty

    md.gov/DPS/general/PhoneDirectory.aspx

    http://permittingservices.montgomerycountymd.gov/DPS/general/Home.aspxhttp://permittingservices.montgomerycountymd.gov/DPS/general/Home.aspxhttp://permittingservices.montgomerycountymd.gov/DPS/general/Home.aspxhttp://permittingservices.montgomerycountymd.gov/DPS/general/Home.aspx

Recommended